Final Executive Summary

Final Executive Summary

National Highways Authori ty of India (GOVERNMENT OF INDIA MINISTRY OF R OAD TRANSPORT & HIGHWAYS) Construction of 4-lane Road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design Chainage from 9.860 to 58.740) (Darah- Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on Hybrid Annuity Mode (Length 48.880 km.) – Package -II FINAL EXECUTIVE SUMMARY Prepared by Thoughts Consultants Jaipur Pvt. Ltd. 1 DA 15, Jawahar Nagar,Jaipur- 302004 Phone: 0141- 4049864, 9829055330 E mail: [email protected] VOLUME I EXECUTIVE SUMMARY Construction of 4-lane Road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design Chainage from 9.860 to 58.740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on Hybrid EXECUTIVE SUMMARY Annuity Mode (Length 48.880 km.) – Package -II TABLE OF CONTENTS CHAPTER 0.0 EXECUTIVE SUMMARY .......................................................................... 1 0.1 ABOUT NATIONAL HIGHWAY-12 (NEW NH 52) ........................................ 1 0.2 NEED OF THE PROJECT ................................................................................. 4 0.3 PROJECT ROAD ............................................................................................... 4 0.4 CHARACTERISTICS OF EXISTING PROJECT ................................................ 7 0.5 Traffic SURVEYS ANALYSIS ......................................................................... 10 0.5.1 PRESENT TRAFFIC ................................................................................. 10 0.5.2 Seasonal Variation of Traffic Volume ...................................................... 11 0.5.3 Annual Average Daily Traffic (AADT) ................................................... 12 0.5.4 Analysis of Turning Movement Survey .................................................. 13 0.5.5 Analysis of Axle Load Survey ................................................................. 13 0.5.6 Speed and Delay Survey Analysis ........................................................... 14 0.6 TRAFFIC PROJECTIONS ................................................................................ 15 0.6.1 Adopted Mode-Wise Growth Rates ........................................................ 15 0.6.2 Projected Total Traffic Volume on Homogeneous Sections .................... 15 0.6.3 Tollable Traffic ......................................................................................... 16 0.7 SELECTION OF PROJECT ALIGNMENT ...................................................... 16 0.7.1 Package-I: Darah ROB to Amjhar river bridge (From Chainage 289/500 Km. To 299/000 Km) ............................................................................... 17 0.7.2 Package-II: From Amjhar bridge to Teendhar (From Chainage 299/000 Km. To 346/540 Km) ............................................................................... 18 0.8 COMPARISION OF EXISTING AND PROPOSED ALIGNMENT OF PACKAGE-II ................................................................................................... 21 0.9 ENGINEERING SURVEYS &INVESTIGATIONS FOR PACKAGE-II ........... 24 0.9.1 Topographic Surveys ............................................................................... 24 0.9.2 Sub Grade Investigations ......................................................................... 24 0.10 DESIGN PARAMETERS ................................................................................. 24 0.11 IMPROVEMENT PROPOSALS for package-II ............................................... 25 0.11.1 Proposed Cross Sections .......................................................................... 25 0.11.2 Flyovers /Vehicular Underpasses/ Overpasses ..................................... 34 0.11.3 Service Road/ Slip Road .......................................................................... 35 0.11.4 Cross Drainage Structures ....................................................................... 36 0.11.5 ROAD over Bridge (ROB)/ Rail under BRIDGE (RUB) .......................... 39 0.11.6 Elevated and FLYOVER ROAD ............................................................... 39 0.11.7 PavEment Design ..................................................................................... 40 0.11.8 Intersections and Grade Separators......................................................... 42 0.11.9 Drainage ................................................................................................... 44 0.11.10 PROTECTION WORKS ............................................................................ 45 Thoughts Consultants Jaipur Pvt. Ltd. Page i Construction of 4-lane Road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design Chainage from 9.860 to 58.740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on Hybrid EXECUTIVE SUMMARY Annuity Mode (Length 48.880 km.) – Package -II 0.11.11 Retaining Wall/ Breast Wall .................................................................... 45 0.11.12 Project Facilities ....................................................................................... 45 0.12 CONSTRUCTION MATERIAL ....................................................................... 46 0.13 ENVIRONMENTAL FOREST & WILDLIFE ISSUES ..................................... 47 0.14 LAND ACQUISITION & RESETTLEMENT ACTION PLAN ........................ 47 0.15 PROJECT COST ESTIMATES ......................................................................... 51 0.15.1 Rate analaysis ........................................................................................... 51 0.15.2 Quantities ................................................................................................. 51 0.15.3 Cost Estimates .......................................................................................... 51 0.16 IMPLEMENTATION OPTIONS AND FINANCIAL ANALYSIS .................. 52 0.16.1 FINANCIAL ANALYSIS WITH VGF ...................................................... 52 0.16.2 FINANCIAL ANALYSIS WITH Hybrid Annuity ................................... 53 Thoughts Consultants Jaipur Pvt. Ltd. Page ii Construction of 4-lane Road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design Chainage from 9.860 to 58.740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on Hybrid EXECUTIVE SUMMARY Annuity Mode (Length 48.880 km.) – Package -II LIST OF TABLES TABLE 0-1: DETAILS OF NH 12 IN STATE OF RAJASTHAN 1 TABLE 0-2: LOCATION OF BUILT-UP SECTIONS ALONG EXISTING NH-12 7 TABLE 0-3: SALIENT FEATURES OF EXISTING ROAD 7 TABLE 0-4: AVERAGE DAILY TRAFFIC 10 TABLE 0-5: TRAFFIC COMPOSITIONS (BY NUMBER) 10 TABLE 0-6: SEASONAL CORRECTION FACTORS (SCF) BASED ON MONTHLY TRAFFIC 11 TABLE 0-7: ANNUAL AVERAGE DAILY TRAFFIC 12 TABLE 0-8: ANNUAL AVERAGE DAILY TRAFFIC-COMPOSITION 12 TABLE 0-9: SUMMARY OF PEAK HOUR FLOW AT VARIOUS INTERSECTIONS 13 TABLE 0-10: VDF VALUES OBTAINED FOR DARAH-TEENDHAR ROAD SECTION 14 TABLE 0-11: LOAD SPECTRUM VALUE FOR DARAH-TEENDHAR ROAD SECTION 14 TABLE 0-12: ANALYSIS OF SPEED-DELAY SURVEY 15 TABLE 0-13: SUMMARY OF PROJECTED TOTAL TRAFFIC VOLUME 15 TABLE 0-14: SUMMARY OF TOLLABLETRAFFIC VOLUME (AADT)(2015-16) 16 TABLE 0-15: COMPARISON OF EXISTING AND PROPOSED ALIGNMENT OF PACKAGE-II 21 TABLE 0-16: DESIGN PARAMETERS 24 TABLE 0-17: SUMMARY OF PROPOSED CROSS SECTIONS 25 TABLE 0-18: THE PROPOSED LOCATION OF THE VUP/LVUP FLYOVER UNDERPACKAGE-II 34 TABLE 0-19: DETAILS OF LOCATIONS OF THE PROPOSED SLIP ROAD 35 TABLE 0-20: DETAILS OF CONNECTING ROAD 35 TABLE 0-21: DETAILS OF PROPOSED MAJOR BRIDGES 36 TABLE 0-22: DETAILS OF PROPOSED MINOR BRIDGES 37 TABLE 0-23: DETAILS OF NEW BOX CULVERTS 37 TABLE 0-24: DETAILS OF NEW PIPE CULVERTS 38 TABLE 0-25: DETAILS OF PROPOSED ROB 39 TABLE 0-26: DETAILS OF PROPOSED RUB 39 TABLE 0-27: PROPOSED PAVEMENT COMPOSITION FOR MAIN CARRIAGEWAY 41 TABLE 0-28: PROPOSED PAVEMENT COMPOSITION FOR SLIP ROADS & CROSS ROADS 41 TABLE 0-29: SUMMARY OF COST ESTIMATES 51 TABLE 0-30: SUMMARY OF FINANCIAL ANALYSIS FOR PPP-VGF 53 TABLE 0-31: SUMMARY OF FINANCIAL ANALYSIS FOR PPP-HYBRID ANNUITY MODE 53 Thoughts Consultants Jaipur Pvt. Ltd. Page iii Construction of 4-lane Road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design Chainage from 9.860 to 58.740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on Hybrid EXECUTIVE SUMMARY Annuity Mode (Length 48.880 km.) – Package -II LIST OF FIGURES FIGURE 0-1: INDEX MAP OF NATIONAL HIGHWAY 52 ALONG WITH PROJCT HIGHWAYError! Bookmark not defined. FIGURE 0-2: INDEX MAP OF NATIONAL HIGHWAY 12 IN RAJASTHANALONG WITH PROJCT HIGHWAY 3 FIGURE 0-3: PROJECT HIGHWAY ON DISTRICT MAP 5 FIGURE 0-4: THEDETAILS OF MAJOR TOWNS ON EXISTING NH-12 DARAH-JHALAWAR-TEENDHAR SECTION 6 FIGURE 0-5: THE PHOTOGRAPHS OF EXISTING ROAD 8 FIGURE 0-6: POOR GEOMETRIC CONDITIONS 9 FIGURE 0-7: PAVEMENT CONDITION OF PROJECT ROAD 9 FIGURE 0-8:EXISTING RUBS 9 FIGURE 0-9: PHOTOS OF BRIDGES & CROSS-DRAINAGE WORKS 9 FIGURE 0-10: APPROVED PROJECT ALIGNMENT OF BOTH PACKAGES ON GT SHEET 20 FIGURE 0-11: COMPARISON OF EXISTING AND PROPOSED ALIGNMENT OF PACKAGE-II 23 FIGURE 0-12: PROPOSED CROSS SECTION DETAILS 30 FIGURE 0-13: APPROVED ALIGNMENT OF PACKAGE-II IN FOREST AREA 49 FIGURE 0-14: APPROVED ALIGNMENT OF PACKAGE-II IN ECO SENSITIVE ZONE 50 Thoughts Consultants Jaipur Pvt. Ltd. Page iv Construction of 4-lane Road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design Chainage from 9.860 to 58.740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    60 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us