Independent Technical Report Site 11 Fujian Yuanxin (Far South) Fujian Province, China

Independent Technical Report Site 11 Fujian Yuanxin (Far South) Fujian Province, China

APPENDIX III COMPETENT PERSON’S REPORT — AAI REPORT SITE 11 INDEPENDENT TECHNICAL REPORT SITE 11 FUJIAN YUANXIN (FAR SOUTH) FUJIAN PROVINCE, CHINA Timothy A. Ross, P.E., RM-SME Dr. Douglas F. Hambley Ph.D, P.E., P.Eng, PG, RM-SME and Vanessa A. Santos, P.G., RM-SME Agapito Associates, Inc. Grand Junction and Lakewood, Colorado, USA Thomas R. Kelly, RM-SME Lima, Peru Qinghua “Jason” Jin, P.E., RM-SME SGS North America, Inc. Tucson, Arizona, USA Carl E. Brechtel, P.E., RM-SME Carl Brechtel Consulting LLC Arvada, Colorado, USA Report Date: 14 September 2018 Effective Date: 31 March 2018 Prepared for: — III11-1 — APPENDIX III COMPETENT PERSON’S REPORT — AAI REPORT SITE 11 INDEPENDENT TECHNICAL REPORT SITE 11 FUJIAN YUANXIN (FAR SOUTH) FUJIAN PROVINCE, CHINA TABLE OF CONTENTS Page 1 Summary..........................................................III11-13 1.1 Property Description and Ownership..................................III11-14 1.2 Geology and Mineralization ........................................III11-14 1.3 Development and Operations .......................................III11-15 1.4 Mineral Resource Estimate .........................................III11-15 1.5 Mineral Reserve Estimate..........................................III11-16 1.6 Economics .....................................................III11-19 1.7 Environmental and Permitting ......................................III11-19 1.8 Processing Plant.................................................III11-19 1.9 Risk Assessment.................................................III11-20 1.10 Conclusions and Recommendations...................................III11-20 2 Introduction .......................................................III11-21 2.1 Information Sources ..............................................III11-21 2.2 Qualified Persons ................................................III11-22 3 Reliance on Other Experts ............................................III11-23 4 Property Description and Location .....................................III11-24 4.1 Location.......................................................III11-24 4.2 Mineral Rights ..................................................III11-24 4.3 Environmental Liabilities, Permits, and Risks for the Property ..............III11-24 5 Accessibility, Climate, Local Resources, Infrastructure and Physiography ......III11-27 5.1 Topography, Elevation, and Vegetation ................................III11-27 5.2 Accessibility ...................................................III11-27 5.3 Local Resources and Infrastructure...................................III11-27 5.4 Climate .......................................................III11-28 6 History ...........................................................III11-28 6.1 Ownership ........................................................III11-28 6.2 Exploration and Development Work .....................................III11-28 6.3 Historical Mineral Resource and Mineral Reserve Estimates ..................III11-28 6.4 Production ........................................................III11-28 — III11-2 — APPENDIX III COMPETENT PERSON’S REPORT — AAI REPORT SITE 11 7 Geological Setting and Mineralization ...................................III11-29 7.1 Regional Stratigraphy.............................................III11-29 7.2 Regional Structure ...............................................III11-29 7.3 Property Geology ................................................III11-30 7.3.1 Stratigraphy ..............................................III11-30 7.3.2 Structure ................................................III11-31 8 Deposit Types ......................................................III11-31 9 Exploration ........................................................III11-34 9.1 Dongji Mining Area ..............................................III11-34 9.2 Dongji Deep General Exploration Area................................III11-34 10 Drilling ...........................................................III11-35 10.1 Dongji Mining Area ..............................................III11-35 10.2 Dongji Deep General Exploration Area................................III11-35 10.3 Core Drilling—General Procedures, Recovery, and Sampling ...............III11-36 10.4 Core Recovery ..................................................III11-38 10.5 Drill-Hole Deviation..............................................III11-38 10.6 Comments on Section 10 ..........................................III11-38 11 Sample Preparation, Analyses, and Security ..............................III11-38 11.1 Sample Preparation...............................................III11-38 11.2 Internal Quality Control ...........................................III11-41 11.3 Sample Security .................................................III11-41 11.4 Density and Moisture Samples ......................................III11-41 11.5 Comments on Section 11 ..........................................III11-41 12 Data Verification....................................................III11-42 12.1 Site Visits .....................................................III11-42 12.2 Witness Samples ................................................III11-44 12.3 Data Review....................................................III11-44 13 Mineral Processing and Metallurgical Testing.............................III11-45 13.1 Sample Selection ................................................III11-46 13.2 Mineralogical Analysis ............................................III11-46 13.3 Physical Testwork ...............................................III11-46 13.4 Gravity-Flotation Testwork.........................................III11-46 13.5 Ancillary Testwork ...............................................III11-47 — III11-3 — APPENDIX III COMPETENT PERSON’S REPORT — AAI REPORT SITE 11 14 Mineral Resource Estimates ...........................................III11-47 14.1 Mineral Resource Classification System ...............................III11-47 14.2 Mineral Resource Estimation Methodology under PRC MRL ...............III11-49 14.2.1 Economic Parameters .......................................III11-49 14.2.2 Grade Capping ............................................III11-50 14.2.3 Polygonal Method .........................................III11-50 14.2.4 Tonnage Factor............................................III11-52 14.2.5 Estimate Verification .......................................III11-52 14.3 Reconciliation to 2014 CIM Definition Standards........................III11-52 14.3.1 Resource Classification .....................................III11-53 14.3.2 Geostatistical Mineral Zone Analysis and Variography .............III11-57 14.3.3 Considerations of Reasonable Prospects for Eventual Economic Extraction ..............................................III11-60 14.3.4 Mining Reconciliation Considerations ..........................III11-60 14.4 Mineral Resource Statement ........................................III11-60 15 Mineral Reserve Estimates ............................................III11-64 15.1 Estimation Parameters ............................................III11-65 15.1.1 Dongji Mining Area Reserve Estimation Parameters ................III11-65 15.1.2 Breakeven Gold Equivalent Cut-Off Grade .......................III11-67 15.1.3 Reconciliation of Mineral Reserves to Production .................III11-67 15.2 Reserve Classification ............................................III11-68 15.2.1 Potential for Additional Reserves ..............................III11-70 16 Mining Methods ....................................................III11-70 16.1 Mining Method..................................................III11-70 16.1.1 Mining at Dongji Mining Area ................................III11-70 16.2 Backfill .......................................................III11-75 16.3 Mining Fleet ...................................................III11-76 16.4 Mine Infrastructure...............................................III11-76 16.4.1 Mine Ventilation...........................................III11-76 16.4.2 Compressed Air ...........................................III11-76 16.4.3 Underground Haulage.......................................III11-76 16.4.4 Shafts...................................................III11-76 16.4.5 Winders .................................................III11-77 16.4.6 Mine Water Discharge ......................................III11-79 16.5 Labor .........................................................III11-79 16.6 Mining Schedule ................................................III11-79 — III11-4 — APPENDIX III COMPETENT PERSON’S REPORT — AAI REPORT SITE 11 17 Recovery Methods ..................................................III11-82 17.1 Crushing Circuit.................................................III11-82 17.2 Grinding Circuit.................................................III11-87 17.3 Flotation Circuit.................................................III11-87 17.4 Concentrate Dewatering ...........................................III11-87 18 Project Infrastructures ...............................................III11-89 18.1 Roads.........................................................III11-89 18.2 Mine Waste Dumps ..............................................III11-89 18.3 Mine Ore Stockpiles..............................................III11-89 18.4 Electrical Energy ................................................III11-89 18.5 Tailings Impoundments............................................III11-89

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    129 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us