The Virginia-Class America’S New Fast Attack Submarines

The Virginia-Class America’S New Fast Attack Submarines

THE VIRGINIA-CLASS AMERICA’S NEW FAST ATTACK SUBMARINES Using expertise from more than half a century of STATISTICS building submarines, NEWPORT NEWS Replaces: SHIPBUILDING and GENERAL Los Angeles-class DYNAMICS ELECTRIC BOAT are Displacement: approx. 7,800 tons constructing the newest fast attack submarines – the Virginia-class, the most advanced submarine Length: 377 feet in the world, ready for 21st century missions. Beam: 34 feet TOMAHAWK MISSILES, The submarines Vertical Launch tubes or large diameter payload have a pair of extendable tubes, starting on North Dakota (SSN 784), MK-48 torpedoes and “PHOTONICS MASTS” unmanned undersea vehicles are outside the pressure hull. among many of the Each contains high-resolution ADVANCED WEAPONS CAMERAS with light- of the Virginia-class. intensification and infrared sensors, an infrared laser rangefinder, and more. MILLIONS OF PARTS come from 5,000 Suppliers across 48 STATES. One NUCLEAR REACTOR SILENT designed to last the life of POWER the ship quietly powers the submarine for speeds of 25+ knots (28+ mph). A versatile torpedo room can accomodate a large crew of SPECIAL OPERATIONS THOUSANDS of shipbuilders at FORCES NEWPORT NEWS for prolonged deployments. SHIPBUILDING The class includes large and ELECTRIC BOAT build lock-in/lock out each frame and compartment chambers for divers. with attention to every detail. MULTI-MISSION READY • Launches TOMAHAWK Virginia-class missiles at targets ashore submarines and their • Conducts surveillance crews can stay on both land and sea submerged for up to • Detects and destroys THREE MONTHS threats to a carrier or expeditionary strike group and dive in excess of • Deploys Special Forces 800 FEET TEAMING ARRANGEMENT NEWPORT NEWS SHIPBUILDING is teamed with GENERAL DYNAMIC ELECTRIC BOAT to build Virginia-class submarines. Newport News Shipbuilding builds the stern, habitability & machinery spaces, torpedo room, sail and bow. Electric Boat builds the pressure hull, engine room and control room. Newport News Shipbuilding and Electric Boat each perform work on the reactor plant as well as alternate on the final assembly, test, outfit and delivery. Electric Boat Newport News Both USS Virginia (SSN 774) * USS North Dakota (SSN 784) * Montana (SSN 794) USS Texas (SSN 775) * USS John Warner (SSN 785) * Hyman G. Rickover (SSN 795) USS Hawaii (SSN 776) * USS Illinois (SSN 786) * New Jersey (SSN 796) USS North Carolina (SSN 777) * USS Washington (SSN 787) * Iowa (SSN 797) USS New Hampshire (SSN 778) * USS Colorado (SSN 788) * Massachusetts (SSN 798) USS New Mexico (SSN 779) * Indiana (SSN 789) * Idaho (SSN 799) USS Missouri (SSN 780) * South Dakota (SSN 790) Arkansas (SSN 800) USS California (SSN 781) * Delaware (SSN 791) Utah (SSN 801) USS Mississippi (SSN 782)* Vermont (SSN 792) USS Minnesota (SSN 783) * Oregon (SSN 793) * Construction completed and delivered to the Navy.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us