PA 192 of 2010, Sec. 902 MICHIGAN DEPARTMENT of TRANSPORTATION Office of Aeronautics Airport Improvement Program

PA 192 of 2010, Sec. 902 MICHIGAN DEPARTMENT of TRANSPORTATION Office of Aeronautics Airport Improvement Program

PA 192 OF 2010, Sec. 902 MICHIGAN DEPARTMENT OF TRANSPORTATION Office of Aeronautics Airport Improvement Program Associated City/County Project Airport Name Description Federal State Local Total ADRIAN Lenawee County Airport Land acquisition (for runway 23 protection zone) $150,000 $3,947 $3,948 $157,895 Lenawee County Airport Airfield crack sealing $19,000 $500 $500 $20,000 ALLEGAN Padgham Field Airport Approach clearing for runway 11/29 - final phase $147,250 $3,875 $3,875 $155,000 Padgham Field Airport Approach clearing - final phase (design), supplementa $48,450 $1,275 $1,275 $51,000 for beacon rehabilitation ALMA Gratiot Community Airport AWOS replacement (components) $47,500 $1,250 $1,250 $50,000 BAD AXE Huron County Memorial Airport Extend parallel taxiway to runway 17/35, includes $753,350 $19,825 $19,825 $793,000 spot repair to runway 17/35 and rehab parking lot and airfield marking BARAGA Baraga Airport Environmental Assessment for proposed runway $0 $23,750 $1,250 $25,000 alignment (phase 3) BAY CITY James Clements Airport Rehabilitate taxiway C & install terminal area access $38,950 $1,025 $1,025 $41,000 gates - design James Clements Airport Rehabilitate taxiway C and hangar taxilanes (west of $333,450 $8,775 $8,775 $351,000 taxiway C) airfield crack sealing and paint marking Associated City/County Project Airport Name Description Federal State Local Total BELLAIRE Antrim County Airport Rehabilitate taxiway C (portion) including hangar $216,254 $5,691 $5,691 $227,636 taxilanes and terminal parking lot BENTON HARBOR Southwest Michigan Reg'l Airport Extend & shift runway 9/27 - final phase, including $2,755,000 $72,500 $72,500 $2,900,000 airport layout plan, & exhibit A updates BIG RAPIDS Roben-Hood Airport Rehabilitate runway 9/27 - design $19,000 $500 $500 $20,000 Roben-Hood Airport Rehabilitate runway 9/27 (joint repairs & porous friction $235,477 $6,197 $6,197 $247,871 course), emergency airfield lighting generator CADILLAC Wexford County Airport Rehabilitate runway & taxiway lighting $579,500 $15,250 $15,250 $610,000 CARO Tuscola Area Airport Acquire snow removal equipment (SRE) $190,000 $5,000 $5,000 $200,000 CHARLEVOIX Charlevoix Muncipal Airport Acquire snow removal equipment (SRE) $1,045,000 $27,500 $27,500 $1,100,000 CHARLOTTE Fitch H Beach Municipal Airport Design of ten-unit T-hangar, terminal bldg improvement $39,900 $1,050 $1,050 $42,000 CLARE Clare Municipal Airport Parallel taxiway to runway 4/22, wetland delineation $51,300 $1,350 $1,350 $54,000 short-form ENV assessment & preliminary engineering COLDWATER Branch County Memorial Airport Terminal building construction (phase 2); design of $150,000 $3,947 $3,948 $157,895 terminal apron rehabilitation; AWOS replacement Associated City/County Project Airport Name Description Federal State Local Total DETROIT Coleman A Young Municipal Airport Rehabilitate taxiway A $2,000,000 $52,632 $52,632 $2,105,264 Coleman A Young Municipal Airport Supplemental transfer for rehabilitation of taxiway A $356,000 $9,368 $9,368 $374,736 Coleman A Young Municipal Airport Land acquisition reimbursement including exhibit A $3,242,350 $85,325 $85,325 $3,413,000 update - phased acquisition Detroit Metropolitan Wayne Co Airport Reconstruct portion of runway 9L/27R east of runway $932,480 $0 $310,827 $1,243,307 3L/21R Detroit Metropolitan Wayne Co Airport Reconstruct balance of runway 9L/27R, construct $5,700,000 $0 $1,900,000 $7,600,000 extension to taxiway G, reconstruct taxiways F, H & V Detroit Metropolitan Wayne Co Airport Reconstruction and relocation of taxiway Z and $14,022,816 $0 $4,674,272 $18,697,088 staging site preparation Detroit Metropolitan Wayne Co Airport Purchase Voluntary Airport Low Emissions equipment $1,849,866 $0 $616,623 $2,466,489 DOWAGIAC Dowagiac Municipal Airport Exhibit A update including boundary survey and $92,150 $2,425 $2,425 $97,000 conservation easement coordiantion, ALP update EVART Evart Municipal Airport Supplemental for runway 24 clearing and threshold $163,400 $4,300 $4,300 $172,000 relocation FLINT Bishop International Airport Airside terminal expansion, phase 1b $3,324,818 $87,495 $87,495 $3,499,808 FREMONT Fremont Municipal Airport Acquire snow removal equipment $115,900 $3,050 $3,050 $122,000 GAYLORD Gaylord Regional Airport Rehabilitate terminal apron including remaining section $688,750 $18,125 $18,125 $725,000 of taxiway A & SRE building site prep GLADWIN Gladwin Zettel Memorial Airport Acquire snow removal equipment $33,250 $875 $875 $35,000 Associated City/County Project Airport Name Description Federal State Local Total GRAND HAVEN Grand Haven Memorial Airport Airfield crack sealing $11,400 $300 $300 $12,000 Grand Haven Memorial Airport Supplemental for runway 27 approach clearing; box $184,300 $4,850 $4,850 $194,000 hangar & taxilane - design; install taxiway reflectors; electrical vault door replacement GRAND LEDGE Abrams Municipal Airport Land acquisition for runway 9 runway protection zone $594,568 $15,647 $15,647 $625,862 parcel 9 (final phase) & hangar/property acquisition parcel 10 GRAND RAPIDS Gerald R. Ford International Airport Purchase snow removal equipment, airfield $1,100,491 $28,960 $28,961 $1,158,412 lighting design, and storm water/deicing study GRAYLING Grayling Army Airfield Install fuel farm (for GA civilian use) - phase II $231,891 $6,102 $6,103 $244,096 GREENVILLE Greenville Municipal Airport Supplemental transfer to rehabilitate runway 10/28 joint $73,150 $1,925 $1,925 $77,000 including porous friction course overlay GROSSE ILE Grosse Ile Municipal Airport Rehabilitate taxiway A lighting including drainage $150,000 $3,947 $3,948 $157,895 improvements - design, rehab taixway A HANCOCK Houghton County Memorial Airport Construct relocated airport entrance road (phase 3) $415,238 $10,927 $188,838 $615,003 Terminal building improvements and sewage lagoon $608,950 $16,025 $16,025 $641,000 closure HARBOR SPRINGS Harbor Springs Municipal Airport Rehabilitation and expansion of terminal apron - design $0 $76,000 $4,000 $80,000 Associated City/County Project Airport Name Description Federal State Local Total HART Oceana County Airport Construct taxiway extension for runway 27 end $332,384 $8,747 $8,747 $349,878 HASTINGS Hastings City/Barry County Airport Rehabilitate & expand terminal apron $332,500 $8,750 $8,750 $350,000 HILLSDALE Hillsdale Municipal Airport Land acquisition (final phase for parcels 14 & 33) $150,000 $3,947 $3,948 $157,895 includes exhibit A update HOLLAND Tulip City Airport Rehabilitate taxiway (south hangar area) including $643,150 $16,925 $16,925 $677,000 wetland mitigation Tulip City Airport Airport layout plan (reimbursement) $0 $18,450 $2,050 $20,500 Tulip City Airport Refurbish runway 26 ILS $0 $228,750 $335,250 $564,000 Tulip City Airport Rehabilitate taxiway (south hangar area) - design $52,250 $1,375 $1,375 $55,000 HOWELL Livingston County - Spencer J. Hardy Construct terminal apron & section of taxiway, $1,900,000 $50,000 $50,000 $2,000,000 Airport airfield paint marking IONIA Ionia County Airport Rehabilitate hangar taxilanes - design $12,350 $325 $325 $13,000 Ionia County Airport Rehabilitate hangar taxilanes $114,000 $3,000 $3,000 $120,000 IRON MOUNTAIN Ford Airport Acquire snow removal equipment $69,250 $1,822 $1,823 $72,895 JACKSON Jackson County - Reynolds Field Preliminary design for runway 7/25 including parallel $285,000 $7,500 $7,500 $300,000 taxiway, remark existing runway 6/24 Jackson County - Reynolds Field Airport layout plan update $61,750 $1,625 $1,625 $65,000 Jackson County - Reynolds Field Design of SRE building including site work and access $0 $252,000 $28,000 $280,000 road Associated City/County Project Airport Name Description Federal State Local Total KALAMAZOO Kalamazoo/Battle Creek International Pavement marking and crack sealing, terminal $887,656 $23,359 $23,360 $934,375 Airport reimbursement, interactive training system, design of Approach Light Control System & new beacon & cost benefit ratio for SRE/ARFF building LAKEVIEW Lakeview - Griffith Field Airport Rehabilitate airfield lighting & guidance signs $117,610 $3,095 $3,095 $123,800 LAPEER Dupont - Lapeer Airport Rehabilitate hangar taxilanes, entrance road, and $161,500 $4,250 $4,250 $170,000 terminal parking lot - design, also install AWOS LANSING Capital Region International Airport Reimbursement (phase 4a) for federal inspection station $693,897 $18,260 $18,261 $730,418 Capital Region International Airport Federal inspection station reimbursement (phase 4) $856,934 $22,551 $22,551 $902,036 design for runway 10R/28L electrical system LINDEN Price's Airport Supplemental for terminal building $0 $30,000 $0 $30,000 Price's Airport Supplemental for terminal bulding construction $0 $145,000 $0 $145,000 MACKINAC ISLAND Mackinac Island Airport Rehabilitate runway 8/26 inluding safety area $4,085,000 $215,000 $0 $4,300,000 improvement MANISTEE Manistee County - Blacker Airport Airfield crack sealing, construct four-unit T-hangar $304,550 $8,014 $8,015 $320,579 including rehabilitation of hangar area taxiways MANISTIQUE Schoolcraft County Airport Rehabilitate apron and connecting taxiway $330,365 $8,694 $8,694 $347,753 MARLETTE Marlette Township Airport Rehabilitate terminal apron - design $57,000 $1,500 $1,500 $60,000 Associated City/County Project Airport Name Description Federal State Local Total MARQUETTE Sawyer International Airport SRE-snow blower & runway 1/19 joint rehab/crack $1,214,456 $31,959 $31,960 $1,278,375 sealing & airfield pavement marking MARSHALL Brooks Field Design of parallel taxiway

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us