Daily Illini, 3 February 1966 — Fund Crisis Only Temporary [ARTICLE] This article has been automatically clipped from the Daily Illini, organised into a single column, then optimised for display Daily Illini, 10 March 1966 — Trustees Approve Request for Funds [ARTICLE] Back Daily Illini, 21 July 1966 Issue PDF (12.76 MB) laboratory space for soils , structures and mechanics , the Civil Engineering Building is located on the northeast corner of Romine and Stoughton Streets , Urbana . The four story reinforced concrete and masonry structure will cost $ 4 , 330 , 000 and is scheduled for completion in October . Still in the planning stage is the $ 3 , 130 , 000 Civil Engineering Phase IIA Building . It will be an addition to Phase I and is a comparable structure . It is designed to provide additional space for structures and hydraulics . The Childrens Research Center on South First Street , Champaign , is part of a mental health complex being developed in conjunction with the state department of mental health . Providing offices and laboratory space for the Institute on Research for Exceptional Children , the two story building will cost $ 1 , 500 , 000 . It will be completed in September . The Herman A . Adler Clinic wilJ be the state owned portion of the complex . Construction on the Krannert Center for the Performing Arts has just begun following awarding of the contracts at the July 8 meeting of the Board of Trustees . At approximately $ 21 , 000 , 000 , the complex will consist of the great hall , drama theater , music theater and drama studio . The two block area is bounded by Goodwin , Illinois , Gregory Place and Oregon Streets , Urbana . Construction will continue over a two year period . The Coordinated Science Laboratory Phases III and IV \ are located at the southeast corner of Springfield and Goodwin Streets , Urbana . Designed to be an addition to the existing facilities , Phase III will consist of a three story unit and Phase IV will consist of a four story unit . Completion is projected for May 1967 . Immediately north of Smith Music Hall on Mathews Avenue , Urbana , the addition to the Observatory will provide additional office facilities at a cost of $ 220 , 000 . The two story building will be finished in February 1967 . The two story Undergraduate Library scheduled for completion in September 1968 will be located underground east of the main Library and south of the Auditorium on the Quadrangle . Bids will be put in late in the summer for the $ 3 , 700 ,- 000 building . Located on the southeast corner of Sixth and Daniel Streets , Champaign , will be the eight story Psychology Laboratory . It will cost $ 5 , 700 , 000 . Completion is scheduled for January 1969 . According to Dixon This years volume of construction has been fairly constant as compared to previous years . Daily Illini, 24 April 1968 — Money for what ? [ARTICLE] Back .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages7 Page
-
File Size-