Daily Illini, 3 February 1966 — Fund Crisis Only Temporary [ARTICLE]

Daily Illini, 3 February 1966 — Fund Crisis Only Temporary [ARTICLE]

Daily Illini, 3 February 1966 — Fund Crisis Only Temporary [ARTICLE] This article has been automatically clipped from the Daily Illini, organised into a single column, then optimised for display Daily Illini, 10 March 1966 — Trustees Approve Request for Funds [ARTICLE] Back Daily Illini, 21 July 1966 Issue PDF (12.76 MB) laboratory space for soils , structures and mechanics , the Civil Engineering Building is located on the northeast corner of Romine and Stoughton Streets , Urbana . The four story reinforced concrete and masonry structure will cost $ 4 , 330 , 000 and is scheduled for completion in October . Still in the planning stage is the $ 3 , 130 , 000 Civil Engineering Phase IIA Building . It will be an addition to Phase I and is a comparable structure . It is designed to provide additional space for structures and hydraulics . The Childrens Research Center on South First Street , Champaign , is part of a mental health complex being developed in conjunction with the state department of mental health . Providing offices and laboratory space for the Institute on Research for Exceptional Children , the two story building will cost $ 1 , 500 , 000 . It will be completed in September . The Herman A . Adler Clinic wilJ be the state owned portion of the complex . Construction on the Krannert Center for the Performing Arts has just begun following awarding of the contracts at the July 8 meeting of the Board of Trustees . At approximately $ 21 , 000 , 000 , the complex will consist of the great hall , drama theater , music theater and drama studio . The two block area is bounded by Goodwin , Illinois , Gregory Place and Oregon Streets , Urbana . Construction will continue over a two year period . The Coordinated Science Laboratory Phases III and IV \ are located at the southeast corner of Springfield and Goodwin Streets , Urbana . Designed to be an addition to the existing facilities , Phase III will consist of a three story unit and Phase IV will consist of a four story unit . Completion is projected for May 1967 . Immediately north of Smith Music Hall on Mathews Avenue , Urbana , the addition to the Observatory will provide additional office facilities at a cost of $ 220 , 000 . The two story building will be finished in February 1967 . The two story Undergraduate Library scheduled for completion in September 1968 will be located underground east of the main Library and south of the Auditorium on the Quadrangle . Bids will be put in late in the summer for the $ 3 , 700 ,- 000 building . Located on the southeast corner of Sixth and Daniel Streets , Champaign , will be the eight story Psychology Laboratory . It will cost $ 5 , 700 , 000 . Completion is scheduled for January 1969 . According to Dixon This years volume of construction has been fairly constant as compared to previous years . Daily Illini, 24 April 1968 — Money for what ? [ARTICLE] Back .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us