
PRE FEASIBILITY REPORT OF KAJRA STONE MINE, LESSEE – M/s VINOD KUMAR JAIN VILLAGE – KAJRA, P.O. – HAPHU, P.S. – KAMDARA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kajra Stone Mine is situated in Village - Kajra, P.O. – Haphu, P.S. - Kamdara, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. – 2199(P)]. Kajra Stone Mine over an area of 2.02 Ha./5.00 Acres situated in Village - Kajra, P.O. – Haphu, Thana No. – 98, P.S. – Kamdara, Dist. – Gumla, Jharkhand, applied for Mining lease in favour of M/s Vinod Kumar Jain for a period of ten (10) years was submitted to DMO, Gumla dated 18.07.2018. The entire lease area is free from forest, so therefore no forest clearance is required. But at present it is mandatory to take Environmental clearance. The proposed quarry will be developed as opencast for the production of stone of 102300 Cum/annum or 341 Cum per day OR 3612690.741 Cft./annum or 12042.30 Cft./day OR 276210 MT/annum or 920.7 MT/day. The estimated project cost is Rs. 40.80 Lakhs and the project is economically viable. The expected life of mine is 5.116 years. This mining project falls under Category “B2” project as per EIA Notification 2006. The lease for minor mineral is situated in the Village - Kajra, P.O. – Haphu, Thana No. - 98, P.S. – Kamdara, Dist. – Gumla, (Jharkhand). The area is located in Survey of India Toposheet No. - 73 B/13 (Ref: Key Plan - Plate No. - III) and bounded by Latitude: 22° 56' 49.03'' N to 22° 56' 54.72'' N & Longitude: 84° 52' 55.97'' E to 84° 53' 01.50'' E. The lease area can be approachable from SH – 3 at Kamdara by travelling a distance of about 2.5 km on pucca road towards north and then move onto village motorable morrum road running for a distance of about 5 km in north-west direction via Turbul village to reach the mining lease site of Kajra Stone Mine. The nearest Railway Station is Pokla Railway Station which is located at a distance of about 14 km south-east from the lease area. Birsa Munda airport, Ranchi is situated at a distance of 91 km (approx.) in North- east of the lease area. Electricity connection is not taken as it is an isolated area. However a DG set (250KVA) is installed to meet the power requirement Stone is used for a wide variety of purposes. Almost all the construction and infrastructural activity, Stone required as one of the measure ingredient. In order to obtain environmental clearance as per the EIA Notification 2006 the prefeasibility report is being submitted along with the application Form – I (M) for the project under consideration. The drinking water requirement shall be met from bore wells and for other purposes water requirement shall be met from nearby water bodies. Potable – 04 KLD, Dust Suppression – 04 KLD and Green belt - 06 KLD. Total - 14 KLD. Sized stone chips will be transported by dumpers to consumers. Production will be stared after getting EC. Project Proponent – M/s VINOD KUMAR JAIN Consultant –M/s GEMS PROJECTS PVT. LTD. REG. NO. –RQP/RNC/166/2014/B Page 1 PRE FEASIBILITY REPORT OF KAJRA STONE MINE, LESSEE – M/s VINOD KUMAR JAIN VILLAGE – KAJRA, P.O. – HAPHU, P.S. – KAMDARA, DIST. - GUMLA, JHARKHAND 1.1 Salient features of the project Project Name Kajra Stone Mine Location of mine Village - Kajra, P.O.- Haphu, P.S. - Kamdara, District : Gumla, Jharkhand Latitude Latitude: 22° 56' 49.03'' N to 22° 56' 54.72'' N Longitude Longitude: 84° 52' 55.97'' E to 84° 53' 01.50'' E Topo sheet number 73 B/13 Land Use Govt. Land = 2.02 Ha./5.00 Acres Minerals of mine Stone Total Geological Reserves 921225 Cum Total Mineable Reserves 523410 Cum Life of mine 5.116 Years Proposed production of mine 102300 Cum/annum Method of mining Opencast Semi-Mechanized mining No of working days 300 days Water demand Total water requirement is about 14 KLD (Drinking &+Dust Suppression+ Greenbelt) Source of water Near village (Well & Hand pump) Man power 34 Nearest Railway Station Pokla Railway Station nearly 14 km Nearest Airport Ranchi Airport is at about 91 km in NE Seismic zone Zone II 1.2 Present Land Use Plan: Category Area in Hectares Quarry Nil Road Nil Infrastructure Nil Balance area unused Nil Total Leasehold Area Nil 1.3 Proposed Planning Mining method - Opencast Semi-Mechanized Mining Method Project cost - Rs. 40.80 Lakhs Production - Stone – 102300 Cum 1.4 Conclusion India possesses a wide range of dimensional stones that include granite, dolerite, basalt etc., spread out all over the country. Stones are still the mainstays of civil instruction in India, with stones being used extensively in public buildings, roads, and temples. Project Proponent – M/s VINOD KUMAR JAIN Consultant –M/s GEMS PROJECTS PVT. LTD. REG. NO. –RQP/RNC/166/2014/B Page 2 PRE FEASIBILITY REPORT OF KAJRA STONE MINE, LESSEE – M/s VINOD KUMAR JAIN VILLAGE – KAJRA, P.O. – HAPHU, P.S. – KAMDARA, DIST. - GUMLA, JHARKHAND 2. INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION. i) Identification of Project and Project Proponent Mukesh Kumar Jain, Partner is authorized Signatory for M/s Vinod Kumar Jain and has already applied Mining Lease Application for a period of 10 years in favour of M/s Vinod Kumar Jain for a period of ten (10) years was submitted to DMO, Gumla dated 18.07.2018. Communication details of the project proponent are as under; Mukesh Kumar Jain Partner, M/s Vinod Kumar Jain For, Kajra Stone Mine Vill. – At College Road, Jashpurnagar, P.O. + P.S. + District – Jashpur, Chhattisgarh ii) Brief description of nature of the project:- The present Pre-Feasibility Report has been prepared for the Kajra Stone Mine of M/s Vinod Kumar Jain over an area of 2.02 Hectares or 5.00 Acres [Plot no. – 2199(P)] in Village - Kajra, P.O. – Haphu, P.S. - Kamdara, District - Gumla, Jharkhand. In order to obtain environmental clearance as per the EIA Notification 2006 the prefeasibility report is being submitted along with the application Form I-M for the project under consideration. The project is categorized as Category B2. iii) Need for the project and it’s important to the country and or region. Construction material is one of the minor mineral deposits occurring in the majority portion of Jharkhand. It has played a great role in development of civilization and industrialization. The production has important role in the local infrastructural development. iv) Demand Supply Gap. It is an essential constituent infrastructural development projects like road, dams, bridges and building. v) Imports vs. Indigenous production. Stone shall be used for the purpose of road construction project. vi) Export Possibility. Not explored vii) Domestic / export Markets. Domestic market for stone as infrastructural development material is well established. viii) Employment Generation (Direct and Indirect) due to the project. It is proposed to employ the local population wherever possible in the proposed project activities. Direct employment will be about 29 Persons and same no will be the indirectly benefited. Project Proponent – M/s VINOD KUMAR JAIN Consultant –M/s GEMS PROJECTS PVT. LTD. REG. NO. –RQP/RNC/166/2014/B Page 3 PRE FEASIBILITY REPORT OF KAJRA STONE MINE, LESSEE – M/s VINOD KUMAR JAIN VILLAGE – KAJRA, P.O. – HAPHU, P.S. – KAMDARA, DIST. - GUMLA, JHARKHAND 3. PROJECT DESCRIPTIONS i) Type of project including interlinked and Interdependent project, if any. The proposed project is quarry by opencast semi-mechanized method of mining, there is no interlinked and Interdependent project. ii) Location (map showing general location, specific location, and project boundary & project site layout) with coordinates. Plate-1: Location Plan of Kajra Stone Mine in Gumla District of Jharkhand. Project Proponent – M/s VINOD KUMAR JAIN Consultant –M/s GEMS PROJECTS PVT. LTD. REG. NO. –RQP/RNC/166/2014/B Page 4 PRE FEASIBILITY REPORT OF KAJRA STONE MINE, LESSEE – M/s VINOD KUMAR JAIN VILLAGE – KAJRA, P.O. – HAPHU, P.S. – KAMDARA, DIST. - GUMLA, JHARKHAND The lease for minor mineral is situated in the Village - Kajra, P.O. – Haphu, Thana No. - 98, P.S. – Kamdara, Dist. – Gumla, (Jharkhand). The area is located in Survey of India Toposheet No. - 73 B/13 (Ref: Key Plan - Plate No. - III) and bounded by Latitude: 22° 56' 49.03'' N to 22° 56' 54.72'' N & Longitude: 84° 52' 55.97'' E to 84° 53' 01.50'' E. The Lease area of Kajra Stone Mine exhibits hill type of topography in nature and mainly it represents gentle slope towards South direction. The highest elevation point of the lease area is at 650 m in east and the lowest elevation point in the South side is about 643 m above M.S.L. iii) Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental consideration gone into should be highlighted. The project is a site specific and has to be undertaken at the place of the occurrence of the Stone and hence no alternative sites explored. iv) Size or magnitude of operation. The proposed quarry will be developed as opencast for the production of 102300 Cum/annum or 341 Cum per day. v) Project description with process details (a schematic diagram/ flow chart showing the project layout, components of the project etc. should be given). This Stone is building material as it possesses most of the required characteristic. The applicant has already applied Mining lease application for a period of 10 years in favour of M/s Vinod Kumar Jain for a period of ten (10) years was submitted to DMO, Gumla dated 18.07.2018.The proposed quarry will be developed as opencast semi-mechanized method of mining for the production of Stone of 102300 Cum/annum or 341 Cum per day.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages15 Page
-
File Size-