Relevant Project Experience

Relevant Project Experience

RELEVANT PROJECT EXPERIENCE Aquatic Feasibility and Facility Projects Hydrotherapy Feasibility - City of Bayside Guidelines for Outdoor Seasonal Pools - Maintenance, Retrofitting, Refurbishment & Re-Building Input - Aquatics Gosford Olympic Pool Feasibility and Design Concept - Central Recreation Victoria Coast Council Corryong Swimming Pool Master Plan - Shire of Towong Aquatic Facility Design Concept - Shire of Moorabool Corroyong Swimming Pool Coomunity Engagement - Shire of Aquatics Feasibility Study - Shire of Moorabool Towong Mildura Waves Competitive Neutrality Review - Mildura Rural City Newman Recreation Facilities Master Plan (including aquatic Whittlesea Swimming Pool Upgrade Feasibility - City of Whittle- facilities) - Shire of East Pilbara sea Business Case and Concept for a Kununurra Aquatic and Hydrotherapy Facility Feasibility - Shire of Campaspe Leisure Facility - City of Wyndham Management of the Operation of the Swimming Pools 2017-2018 Business Case and Feasibility - Tweed Regional Sports - West Coast Council Centre (including aquatic centre) - Tweed Shire West Coast Aquatic Facilities Strategy - West Coast Council Business and Marketing Plan for a new Aquatic Centre - City of Orange Portland Leisure and Aquatic Centre Feasibility Study - including Business Plan and Concept Design - Shire of Glenelg Regional Aquatic and Netball Precinct Feasibility and Master plan - Yarra Ranges Shire Short Term Aquatic Demand Strategy - City of Wyndham Aquatic Facility Development Strategy and Strategic Technical Review of Seymour War Memorial Outdoor Pool (in conjunction Assessment - Southern Grampians Shire with Jeavons Landscape Architects) - Shire of Mitchell Yea Swimming Pool Redevelopment Feasibility - Shire of Pembroke Park Indoor Sports and Aquatics Centre BusinessCase Murrindindi and Master Plan Review - Sorell Council Aquatic Facilities Contract Specifications - Shire of Glenelg Memorial Pool Business Case and Cost Benefit Analysis - Circular Head Council Indoor Sports and Aquatic Centre Feasibility - Narrabri Shire Sport, Recreation and Aquatics Facility Review - Charles Sturt Marketing Strategy - Life Saving Victoria University Aquatic Centre and Gym Expansion Feasibility Study - Gunyama Park and Green Square Aquatic Centre Planning and Hurstville City Design (in conjunction with Andrew Burges Architects/ Grimshaw/Taylor Cullity Lethlean) - City of Sydney Swimming Pool & Leisure Facility Recurrent Cost Analysis - City of Orange Hobart Aquatic Centre Fees and Charges Review - City of Hobart Indoor Sport and Recreation Facility and Feasibility Study - Yarra Leisure Service Review (Aquatics and indoor gym/fitness) – Gungahlin Development Authority Industry Benchmarking - City of Yarra Yarra Leisure Service Review (Aquatics and indoor gym/fitness) – Market Analysis - City of Yarra.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us