Draft Strategic Highways Assessment

Draft Strategic Highways Assessment

S SPELTHORNE BOROUGH COUNCIL LOCAL PLAN Strategic Highway Assessment Part 2: Results and Analysis Spelthorne Borough Council Local Plan Strategic Highway Assessment Part 2: Results and Analysis Project Title: Spelthorne Borough Council Local Plan Document Title: Strategic Highway Assessment Part 2: Results and Analysis Date: 11/10/19 Prepared By: Samuel Pink Authorised By: William Bryans All maps contained in this document are licensed © Crown copyright and database rights 2018 Ordnance Survey 100019613 and are orientated to grid north Amendment List Iss. / Amendment List Rev. 0201SF10 07/08/02 Filename: S:\Project-current\3000 PROJECT NOS STARTING WTIH 3000\3613\53613T52_Spelthorne_2019\02_Reports Issue No. 03 Page 2 Document No. 53613T52/02 Spelthorne Borough Council Local Plan Strategic Highway Assessment Part 2: Results and Analysis CONTENTS 1 INTRODUCTION ................................................................................................................................... 6 1.1 REGULATION 18 APPRAISAL ..................................................................................................................... 6 1.2 ORGANISATION OF THIS REPORT ................................................................................................................ 6 2 RESULTS AND ANALYSIS ...................................................................................................................... 7 2.1 OVERVIEW ............................................................................................................................................ 7 2.2 SCENARIO OVERVIEW .............................................................................................................................. 7 2.3 SELECT LINK ANALYSIS ........................................................................................................................... 11 2.4 LEVEL OF SERVICE (LOS) METRIC ............................................................................................................. 19 2.5 LINK ANALYSIS ..................................................................................................................................... 19 2.6 INCREASE IN JUNCTION DELAY ................................................................................................................. 30 2.7 THE STRATEGIC HIGHWAY NETWORK ....................................................................................................... 43 2.8 CROSS BOUNDARY IMPACTS ................................................................................................................... 58 2.9 NETWORK HOTSPOTS AND MITIGATION .................................................................................................... 69 3 OVERVIEW OF FINDINGS ................................................................................................................... 72 3.2 KEY POINTS ......................................................................................................................................... 72 Issue No. 03 Page 3 Document No. 53613T52/02 Spelthorne Borough Council Local Plan Strategic Highway Assessment Part 2: Results and Analysis TABLE OF FIGURES FIGURE 2-1 AM PEAK HOUR TOTAL VEHICLE-KILOMETRES PER SCENARIO FOR SPELTHORNE BOROUGH ................................. 8 FIGURE 2-2 PM PEAK HOUR TOTAL VEHICLE-KILOMETRES PER SCENARIO FOR SPELTHORNE BOROUGH .................................. 8 FIGURE 2-3 AM PEAK HOUR TOTAL VEHICLE-HOURS PER SCENARIO FOR SPELTHORNE BOROUGH ........................................ 9 FIGURE 2-4 PM PEAK HOUR TOTAL VEHICLE-HOURS PER SCENARIO FOR SPELTHORNE BOROUGH ......................................... 9 FIGURE 2-5 AM PEAK HOUR AVERAGE LINK SPEED FOR SPELTHORNE BOROUGH ............................................................. 10 FIGURE 2-6 PM PEAK HOUR AVERAGE LINK SPEED FOR SPELTHORNE BOROUGH ............................................................. 10 FIGURE 2-7 SCENARIO C SELECT LINK ANALYSIS OF LAND OFF WORPLE ROAD, WORPLE ROAD (256 DWELLINGS). ................. 14 FIGURE 2-8 SCENARIO C SELECT LINK ANALYSIS OF LAND TO SOUTH AND WEST OF STRATTON ROAD, STRATTON ROAD (245 DWELLINGS). ............................................................................................................................................... 15 FIGURE 2-9 SCENARIO C SELECT LINK ANALYSIS OF LAND TO SOUTH OF ASHFORD COMMON WATER TREATMENT WORKS, CHARLTON ROAD (200 DWELLINGS). ............................................................................................................... 16 FIGURE 2-10 SCENARIO D SELECT LINK ANALYSIS OF KEMPTON PARK (3,000 DWELLINGS). ............................................... 17 FIGURE 2-11 LINK FLOW DIFFERENCE PLOTS, SCENARIO B COMPARED WITH SCENARIO A ................................................. 21 FIGURE 2-12 LINK FLOW DIFFERENCE PLOTS, SCENARIO C COMPARED WITH SCENARIO A ................................................. 22 FIGURE 2-13 LINK FLOW DIFFERENCE PLOTS, SCENARIO D COMPARED WITH SCENARIO A ................................................. 23 FIGURE 2-14: LINK FLOW DIFFERENCE PLOTS BETWEEN SCENARIOS A AND D AT KEMPTON PARK. ........................................ 25 FIGURE 2-15 LINK LEVEL OF SERVICE FOR SCENARIO A AM AND PM PEAK HOUR ............................................................. 27 FIGURE 2-16: AM PEAK HOUR LOS SCENARIO A VS SCENARIO D .................................................................................. 28 FIGURE 2-17: PM PEAK HOUR LOS SCENARIO A VS SCENARIO D .................................................................................. 29 FIGURE 2-18: DELAY IN SECONDS PER VEHICLE AT JUNCTIONS WITHIN THE BOROUGH WITH A LOS VALUE OF C – D DURING THE DO MINIMUM SCENARIO A. ................................................................................................................................ 30 FIGURE 2-19 M25 JUNCTION 13 FLOW DIFFERENCE PLOT BETWEEN SCENARIO B AND SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS. ............................................................................................................................................... 45 FIGURE 2-20 M25 JUNCTION 13 FLOW DIFFERENCE PLOT BETWEEN SCENARIO C AND SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS. ............................................................................................................................................... 46 FIGURE 2-21 M25 JUNCTION 13 FLOW DIFFERENCE PLOT BETWEEN SCENARIO D AND SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS. ............................................................................................................................................... 47 FIGURE 2-22 A30 FLOW DIFFERENCE PLOT OF SCENARIO B VS SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS.WITH AN INSERT SHOWING THE CROOKED BILLET ROUDABOUT. ......................................................................................... 48 FIGURE 2-23 A30 FLOW DIFFERENCE PLOT OF SCENARIO C VS SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS WITH AN INSERT SHOWING THE CROOKED BILLET ROUNDABOUT. ....................................................................................... 49 FIGURE 2-24 A30 FLOW DIFFERENCE PLOT OF SCENARIO D VS SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS WITH AN INSERT SHOWING THE CROOKED BILLET ROUNDABOUT. ....................................................................................... 50 FIGURE 2-25 M3 FLOW DIFFERENCE PLOT OF SCENARIO B VS SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS WITH AN INSERT SHOWING THE SUNBURY CROSS ROUNDABOUT. ....................................................................................... 51 FIGURE 2-26 M3 FLOW DIFFERENCE PLOT OF SCENARIO C VS SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS WITH AN INSERT SHOWING THE SUNBURY CROSS ROUNDABOUT. ....................................................................................... 52 FIGURE 2-27: M3 FLOW DIFFERENCE PLOT OF SCENARIO D VS SCENARIO A FOR BOTH THE AM AND PM PEAK HOURS WITH AN INSERT SHOWING THE SUNBURY CROSS ROUNDABOUT. ....................................................................................... 53 TABLE OF TABLES TABLE 2-1 VEHICLE TRIP MATRIX TOTALS BY SCENARIO WITH DIFFERENCES FROM SCENARIO A............................................. 7 TABLE 2-2 INTERPRETATION OF LEVEL OF SERVICE CATEGORIES ..................................................................................... 19 TABLE 2-3: DO MINIMUM SCENARIO A AM PEAK HOUR JUNCTIONS CLASSIFIED AS LOS C – D ............................................ 32 TABLE 2-4: DO MINIMUM SCENARIO A PM PEAK HOUR JUNCTIONS CLASSIFIED AS LOS C – D ............................................ 35 TABLE 2-5: SCENARIO B VS SCENARIO A JUNCTION PERFORMANCE DURING THE AM ASSESSED HOUR. JUNCTIONS WITH A DETERIORATION TO LOS C/D AND/OR INCREASED JUNCTION DELAY OF >1 SECOND. .................................................. 37 TABLE 2-6: SCENARIO B VS SCENARIO A JUNCTION PERFORMANCE DURING THE PM ASSESSED HOUR. JUNCTIONS WITH A DETERIORATION TO LOS C/D AND/OR INCREASED JUNCTION DELAY OF >1 SECOND. .................................................. 37 TABLE 2-7: SCENARIO C VS SCENARIO A JUNCTION PERFORMANCE DURING THE AM ASSESSED HOUR. JUNCTIONS WITH A DETERIORATION TO LOS C/D AND/OR INCREASED JUNCTION DELAY OF >1 SECOND. .................................................. 38 Issue No. 03 Page 4 Document No. 53613T52/02 Spelthorne Borough Council Local Plan Strategic Highway Assessment Part 2: Results and Analysis TABLE 2-8: SCENARIO C VS SCENARIO

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    74 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us