<Council/Committee Meeting Date>

<Council/Committee Meeting Date>

Attachment 4 City of Edmonton Transportation Operations Tweet / Response January – June 2013 Date Tweet / Response 2013-01-04 @mattd_classic thanks for letting us know - we've passed this 20:40:43 along to Transportation Operations. 2013-01-04 @ninoroy thanks for letting us know - we've passed this along to 20:40:56 Transportation Operations. 2013-01-08 News: Snow Removal on Collector/Bus Routes Begins January 17:04:02 14 http://t.co/bHGNCopX #yeg 2013-01-08 @commonsensesoc Locations will be posted @ 17:18:17 http://t.co/dtZvwumY later this week. Watch for signage too! Windrow removal on #yeg bus routes starts Jan 14. Parking 2013-01-08 restrictions will apply, so please watch for signs. 17:44:32 http://t.co/euvRghIY Windrow removal locations on #yeg bus routes posted. Watch 2013-01-11 for no parking signs in the area to avoid fines/towing. 20:11:22 http://t.co/09wIYYz7 2013-01-12 Locations for upcoming snow removal on bus routes: 17:10:46 http://t.co/qKPjbJGp #yegtraffic #yegsnow Edmonton This Week radio show: Snow Removal on 2013-01-14 Collector/Bus Routes, Donate-a-Ride, Outdoor Skating Rinks. 18:20:10 Listen: http://t.co/pgLPB97m #yeg 2013-01-16 Due to emergency road work, southbound 109 Street from 82 00:17:12 Ave to 81 Ave is reduced to one lane until repairs. #yegtraffic Due to emergency sewer repair, Grierson Hill from Low Level 2013-01-16 Bridge to 95A St will be totally closed from 9am to 3pm on 00:23:47 Wednesday, January 16 Windrow removal continues on #yeg bus routes. Watch for signs 2013-01-16 or check http://t.co/09wIYYz7 for list of this week's areas. Thank 15:54:49 you! Traffic Notice: @EdmontonPolice remind QE2 motorists of 2013-01-16 National Day of Aboriginal Action rally this afternoon 19:17:10 http://t.co/xDkFLzgk #yeg 2013-01-18 Prepare for eventual drop in temps by getting free sand for your 20:24:34 sidewalk from community boxes: http://t.co/lrBgQmM2 2013-01-18 Bus Route Snow Removal schedule: http://t.co/oOAAP7p7 20:42:32 #yegtraffic City crews are plowing & sanding on priority routes 2 keep 2013-01-21 traffic flowing smoothly; ensure roads are in good winter driving 17:13:54 condition #yeg 2013-01-21 Motorists are urged to drive for conditions, leave extra distance 17:14:50 between vehicles, keep windows clear of ice/snow, and to brake Page 1 of 15 Report: <Report#> Attachment <Attachment #> City of Edmonton Transportation Operations Tweet / Response carefully. Crews will continue to remove windrowed snow. See current 2013-01-21 & upcoming no parking restrictions http://t.co/dtZvwumY 17:18:20 #yeg 2013-01-24 News: 112 Avenue Reconstruction: Get Informed 17:06:20 http://t.co/QawCgky9 #yeg 2013-01-24 @adampatterson The old bridge is scheduled to be removed in 21:51:31 2015-16. Info at http://t.co/ugnovW6V 2013-01-28 News: Crews to Begin Blading in Neighbourhoods 17:01:46 http://t.co/a73G6UWP #yeg 2013-01-28 @flyingjai Windrows are not removed from neighbourhoods. 18:43:39 More info: http://t.co/YQS1ga8E 2013-01-29 See a pothole? Please report the pothole via 311 or online at 17:50:11 http://t.co/JNxVRh2B #yeg @bigdaddysaid sorry we missed your question - just waiting to 2013-01-30 hear back from our Transportation Operations team for an 16:52:50 answer. 106 St between 114 Ave - Princess Elizabeth Ave periodically 2013-01-31 reduced by 1 lane for NLRT Construction Thurs-Fri (9am-3:30pm) 17:48:49 #yegtraffic 2013-01-31 WB Kingsway between 104 St -105 St periodically reduced by 1 17:49:05 lane for NLRT Construction Thurs-Fri (9am-3:30pm) #yegtraffic EB Princess Elizabeth Ave. between 106 St - 109 St periodically 2013-01-31 reduced by 1 lane for NLRT Construction Thurs-Fri (9am-3:30pm) 17:49:11 #yegtraffic @BigDaddySaid We have approx. 5000 km of roads, but in terms 2013-01-31 of 'lane kilometres', our crews put on a great deal more mileage .. 20:43:51 (1of2) 2013-01-31 @BigDaddySaid .. multiple lanes increase the amount of road 20:44:12 cleared significantly. (2of2) 2013-02-06 @patrickbpenguin great to hear! Thank you for submitting your 17:18:07 pothole reports. 2013-02-06 @depp35 If your vehicle is damaged from hitting a pothole, you 19:40:27 can submit a damage claim. http://t.co/tmcrVtro Today until Feb 15 (9am-3:30pm) WB traffic on 111Ave btwn 2013-02-07 Kingsway & 105St will be periodically reduced by 1 lane for 16:14:06 NLRT #yegtraffic @thekrisjohnson traffic be able to use the existing bridge while 2013-02-07 the new bridge is being constructed. See FAQ 4 details 17:08:53 http://t.co/bcUzluWQ @_jacs Our transportation department fills potholes year round. 2013-02-07 To report a pothole please call 311 or online: 17:15:42 http://t.co/BXnKydmV Page 2 of 15 Report: <Report Number> City of Edmonton Transportation Operations Tweet / Response 2013-02-07 @_jacs recent photos from @edmontonjournal of city workers 17:22:14 filling potholes: http://t.co/v6OfHCH7 2013-02-07 @thekrisjohnson Short-term traffic disruptions & detours are 21:54:59 anticipated during the final stages of construction. @thekrisjohnson Either Walterdale Hill Rd or Queen E Park Rd 2013-02-07 will remain open to traffic during construction to allow for 21:55:25 realignment. 2013-02-07 @thekrisjohnson both roads will be open to traffic in the winter. 21:55:44 (3of3) 2013-02-11 @timmychachakasn Which planned roadways and buildings are 04:32:11 you referring to? Thx 2013-02-13 @ProgressJonny thanks for message. What cross street to 100 16:09:45 Ave. are the big problems? 2013-02-13 @mariovarga5 Try calling 511 or go to http://t.co/bhfpxgdy. 511 is 22:19:59 a provincial service that will have info on the highway conditions. 2013-02-13 @progressjonny Our roadways foreman will assess and rectify 22:48:17 the situation. Thank you for taking the time to let us know. @amylauren3 Thank you for the alert. We are following up on the 2013-02-15 condition of this intersection & sending an officer out to take 21:13:47 a look. 2013-02-19 Reduced ETS service due to Reading Week. Is your route 15:45:22 affected? Visit http://t.co/xu6sbw0U #yegtransit @garytmcd The City of Edmonton does year-round pothole 2013-02-19 repairs. In January 2013 alone, we filled 5,624 potholes around 15:58:16 the city! 2013-02-20 @mcfadyenmatt Information regarding the City of Edmonton's 22:08:18 roads infrastructure can be found at http://t.co/DhchLhIQdx 2013-02-20 @edmontonlight Thank you for the alert. The information will be 23:54:44 passed on to roadway maintenance. @sarahnkraus Thanks! With over 44 million square metres of 2013-02-25 roadway to maintain, we are filling the potholes as fast as 16:39:19 possible. 2013-02-25 @drdagly Thanks for the information. We will pass it on to our 19:42:03 crews. @cokebear17 Current projects on Winterburn Rd are developer 2013-02-25 projects(deferred to '13 construction season)More info@ 23:33:24 http://t.co/si1f21B8oF 2013-02-26 How are we doing on snow and ice control? Survey: 16:00:37 http://t.co/UFwhJMgLIC #yegsnow 2013-02-26 @drdagly We will alert transportation crews again. Thanks 16:19:05 2013-02-26 @m_burden Here is the 2013 Snow and Ice Control Survey link 16:19:38 you are looking for: http://t.co/UFwhJMgLIC Page 3 of 15 Report: <Report Number> City of Edmonton Transportation Operations Tweet / Response Info meeting re: Sask Drive Retaining Wall project being held 2013-02-26 Wed Mar 6 @ Old Timers Cabin. Please plan to attend! 20:48:21 http://t.co/aAcBd0ccNa 2013-02-27 @caleyhearn We will pass it on to our crews. Thanks for the 15:45:44 information! @shaunguthrie Thanks for sharing. We will pass on the 2013-02-28 feedback. Can you tell me the day/neighbourhood? Might help us 15:59:49 thank the crew. 2013-02-28 @imthelisa Is this the 178 st between 86 ave and 87 Ave location 16:02:25 you reported yesterday? 2013-02-28 @shaunguthrie Perfect! Thanks again for the feedback. 16:58:53 2013-02-28 @imthelisa We will pass it on to our crews. Thanks for the 22:10:20 information! Due to emergency gas line repairs, 103 Avenue between 107 2013-02-28 Street and 108 Street will be totally closed until further notice. 23:11:26 #yegtraffic 2013-03-01 @djtruffle Here is the link for pothole damage claims. 16:09:33 http://t.co/RqoiEmr6Ks @joshstock Hi, this information is also posted on our 2013-03-01 transportation page under latest news http://t.co/QD3YaJBKCU 20:21:29 Thank you 2013-03-05 News: City to Stabilize Slope Along Saskatchewan Drive 22:41:32 http://t.co/rfJDPWXKGS #yeg Reminder! Sask Dr Retaining Wall Info Session tonight,4-8 2013-03-06 pm,Old Timers Cabin. http://t.co/aAcBd0ccNa Please plan to 16:09:19 attend for more details Recap - CRL boundary revised for downtown revitalization, 2013-03-07 Council agrees to fund Sask Drive retaining wall: 01:16:24 http://t.co/T2WJkIyoyZ 2013-03-07 Escalators in University/Grandin LRT Stations are out of service 14:31:05 for step replacements.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us