CURRICULUM VITAE

Proposed role in the project: Senior Electrical Engineer

Family name: POPOVIC

First names: Milos

Date of birth: August 9, 1947, Uzice,

Nationality: Serbian

Civil status: Married

Education: Institution Degree(s) or Diploma(s) obtained: [ Date from - Date to ] University of ; Electric Power Department; Bachelor Degree; 1968 Faculty of Electrical Engineering; 1966 – 1968 University of Belgrade; Electric Power Department; Graduated Engineer; Diploma Faculty of Electrical No.257, Dated February 15, 1971 Engineering; 1968 – 1971 University of Belgrade; Automation Systems Department; Master of Science Degree; Faculty of Electrical Diploma No.2536, Dated September 28, 1979 Engineering; 1971 – 1979

Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic) Language Reading Speaking Writing Serbian Native English 1 2 2 Russian 2 3 3 French 3 4 4

Membership of professional bodies: Member of Chamber of Engineers of Serbia (Licensed for low and high voltage works, control system and instrumentation)

Other skills: (e.g. Computer literacy, etc.) Windows; Word; Excel; AutoCAD; Other Specialized Engineer’s Softwares; Drive License Present position: Technical Advicer

Years within the Company: ten

Key qualifications:

FIDIC, Consulting and Engineering duty

CV_EuForm-MP_2002021231 Page 1 Curriculum vitae

Control Systems, Instrumentation and Power Supply; Design, Consulting and Erection − Water Treatment and Distribution Systems − Petrol Industry − Power Generation and Distribution − Process Industry

Specific experience in the region:

Country Date from - Date to Iraq 1984-1986 Croatia 1981-1982; 1986-1987 Russia 1998 Macedonia 1997-1999; 2014-2015 Montenegro 1972-1975; 2004-2005; 2015 Bosnia & Herzegovina 2015-2017 Cyprus 1988

Professional Training:

Information and Production, Course at the Institute of Automation, Arles, , 1976, four weeks; Subject: Instrumentation and Process Control

Computers and Information Systems, Course at Telemecanique, Grenoble, France, 1976; two weeks; Subject: System Configuration and Applications

New Information Technology, University of Sarajevo, Jahorina, Bosnia, 1988; one week; Subject: System Configuration and Applications. Computer courses

Other relevant information (eg, Publications)

1. M.R.Stojic, M.Popovic: Once – Through Boiler Modeling, 320 MW, TPP “Nikola Tesla A”, JUNAKO CIGRE, Struga, Macedonia, 1985

2. M.R.Stojic, M.Popovic, R.M.Stojic, I.Zivanovic: Control Parameters Analysis concerning Quality of Dynamic Behavior of Once – Through Boiler, 320 MW, TPP “Nikola Tesla A”, JUNAKO CIGRE, Struga, Macedonia, 1985

3. M.R.Stojic, M.Popovic, S.Turajlic, B.Kovacevic: Calculation and Simulation of Once – Through Boiler, 320 MW, TPP “Nikola Tesla A”, JUNAKO CIGRE, Struga, Macedonia, 1985

4. M.Popovic, M.Marinkovic: Computer Control System in M.Zabran WTP, Sabac, Start-up and First Exploitation Experience; XVII Yugoslav Waterworks Association Conference, Sabac, 1996

5. T.Lukic, M.Popovic: Algorithms of Functional Tasks of M.Zabran WTP Computer System; XVII Yugoslav Waterworks Association Conference, Sabac, 1996

CV_EuForm-MP_200202 Page 2 Curriculum vitae

Professional experience

Date from Location Company Position Description - Date to 2018 - 2019 Raška EPTISA Services de Electrical Engineer Supervision of construction and commissioning of the Waste Water Treatment Serbia Ingenieria, Spain (FIDIC) Plant of Raska; Power Supply, Control & Installation works 2012 - 2019 Belgrade SET New Technical Adviser Thermal PP; Petrol Industry; Water Systems; Power & Control; Supervisory, Serbia Technology Design, Installation & Consulting Services 2016 - 2017 Obrenovac Aets Consulting, Engineer (FIDIC); Payments &TOC; Supervision of Perphormance Tests, Defect notification period Serbia France Electrical Expert & of the Waste Water Treatment Plant at TPP Nikola Tesla A (Yellow FIDIC). Team Leader Power Supply, Control and SCADA System 2015 - 2017 Brcko, Bosnia & SAFEGE Consulting Electrical Engineer Supervision of construction of the Brchko road bypass. (Red FIDIC). Collisions of Herzegovina Engineers, France (FIDIC) Overhead Lines up to 110 kV, LV installations and Communication Networks 2014 - 2015 Vrbas EPTISA Servicios Assistant of Supervision of construction and commissioning of the Waste Water Treatment Serbia de Ingenieria, Spain Resident Engineer Plant of Vrbas (PRAG). Power Supply, Control & Installation works 2012 - 2016 Obrenovac EPTISA Services Electrical Engineer Supervision of construction and commissioning of the Waste Water Treatment Serbia de Ingenieria, Spain (FIDIC) Plant at TPP Nikola Tesla B (Yellow FIDIC). Pow. Supply, Contr. and SCADA Syst. 2009 - 2011 Belgrade SET New Head of Engineers Thermal & Hydro Power Plants; Industry & Irrigation Installations; MCC & Control Serbia Technology Systems; Design, Supervisory & Consulting Services 2008 - 2009 Belgrade SET New Company Manager Industry Installations and Water Treatment, MCC & Control System; Design & Serbia Technology Consulting Services 2007 - 2012 Serbia IRD Engineering, Electrical Engineer Power Supply, Instrumentation & Control System for Waste Water (FIDIC) Treatment Plant & Temerin Clarifier; Consulting Services 2006 - 2010 Serbia SAFEGE Consulting Consulting Different EU founded Projects, Consulting Services Engineers, France Engineer 2006 - 2008 Belgrade System Engineering Company Branch Managing of Civil, Power Supply; Consulting Services for Power Plants; Design Serbia Team NT Manager of Petrol Industry Installations 2004 - 2005 Belgrade IK Consulting Head of Electrical Waste Water TP; Design Serbia Engineers Department Hydro PP, PS and Water TP in Iraq; Design, Procurement & Consulting Services

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 3 Curriculum vitae

2004 - 2005 Budva ITSC Montenegro Project Manager Revitalization of Budva Waterworks: Motor Drives replacement, VSD starters and Montenegro Flow Measurements; Design, Construction, Commissioning & Taking Over 2004 Serbia Colenco, Swiss Consulting India Hydro PP Projects, Consulting Services for Bidding Phase of Project Engineer 2004 Serbia CHF International Consulting Engin. 110 kV Power Distribution & Transformer Station, UN founded Projects on South Team Manager of Serbia; Consulting Services 2003 - 2004 Belgrade Kosovoprojekt Senior Engineer Municipal Infrastructure for Belgrade and Environments; Design Serbia Design Section HV Distribution & TS, Design & Approval 2000 – 2003 Belgrade Ekohem Head of Petrol Industry Plants; Design Serbia International Department Industry & Industry WW Treatment; Design and Procurement Engineering Reverse Osmosis Water Purification; Design, Installation & Commissioning 1998 - 2000 Belgrade Energoproject Consulting Kozjak Hydro PP; Consulting Services, Manufacturer Documentation Approval, Serbia Hydroengineering Engineer Release Notes for Manufacturing 1992 - 1998 Belgrade Energoproject Head of Electrical Different Project of Potable and Waste Municipal Water, and HP Plants; Design & Serbia Hydroengineering Department Consulting Services 1986 - 1992 Belgrade Energoproject Project Manger Design of Regional Water Supply Systems, Pump Stations, Transport Systems Serbia Hydroengineering and Water Treatment Plants. Revitalization of Pump Stations, Construction of Water Clarification Plant, Water Monitoring Systems. Consulting Services in Water Supply Domain and Hydro Power Plant Domain. 1984 - 1986 Mosul MODACOM J.V. Senior Engineer Mosul Dam Hydro Power Plants; Supervision, Commissioning, Taking Over & Iraq Swiss Consultants - Performance Tests; Manufacturer Technical Documents Approval & As-Built Energoproject Design 1979 - 1984 Belgrade Energoproject Senior Engineer Regional Water Supply Systems, Pump Stations, Transport Systems and Water Serbia Hydroengineering Treatment Plants; Design & Consulting Services 1978 - 1979 Belgrade Energoproject Entel Engineer Thermal PP; Design Serbia Once-Through Boiler Modeling and Control System Application 1971 - 1979 Belgrade Energoproject Engineer Water Supply and Pump Stations; Design & Construction; Construction Schedule Serbia Industry & Management (CPM Algorithm). Thermotechnique Industrial & Thermal Plans and Installations; Design

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 4 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Oil and Gas installation and processing

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2017 Oil Refinery; NIS, Oil Refinery, Improving of Design Engineer Detail Design High pressure pumping facilities for Constructed Serbia Thermal Plant, Pancevo LO pressure Home Office; boilers, instrumentation and control Pancevo regulation for loops; boilers of TP 2014 Smeltery and RTB Bor Group, TIR Distribution Design Engineer Detail Design Cascade PS and oil reservoir up to Constructed Serbia Refinery, Bor Bor d.o.o. syst. of light oil Home Office; injection to boiler 2013 Oil Refinery; NIS, Oil Refinery, Auto-unloading Design Engineer Detail Design Pumping facilities; metering system and Constructed Serbia Pancevo Pancevo Crude oil PS Home Office; on-line analizers, site installations 2012 Petrol Chemic; HIP Petrol Chemic, RP 6kV PEVG Design Engineer Detail Design Implementation of new INRU unit (410 Constructed Serbia Pancevo PEVG; Pancevo & MCC IA(B) Home Office; kW); Supply and preparation for DCS control; Protection programming 2012 Oil Refinery; NIS Refinery, Block 20 & 8; Supervision Supervision of Instrumentation and Control of pumps, Constructed Serbia Pancevo Pancevo Invensys DCS Engineer; electric works valves and levels; Additional SCADA extension presentation 2010 Oil Refinery; NIS Refinery, Solid particles Consulting Engineer Consulting services Refurbishment of Fluid Catalytic Designed by Srbija Pancevo Pancevo emission Home Office; Detail Design Cracking; Power & Lighting Installation Projmetal, reducing Approval and instrumentation, Belgrade 2008 Petrol Chemic; HIP Petrol Chemic, Motor Drive Design Engineer Detail Design and Bid Frequency controlled motor drive of Constructed Serbia Pancevo Etilen; Pancevo 250 kW Home Office; Document steam boiler primary air blower 2008 Petrol Chemic; HIP Petrol Chemic, MCC IV E Design Engineer Detail Design and Bid Reconstruction of MCC PEVG, Motor Constructed Serbia Pancevo PEVG; Pancevo Home Office; Document drives up to 160 kW for emergency consumers; Supply TS 1000 kVA 2008 Oil Refinery; NIS Refinery, Motor Test Design Engineer Detail Design Test Station for asynchronous drives up Serbia Pancevo Pancevo Station Home Office; to 132 kW maintenance 2007 Jagodina & Lukoil Oil Terminals Oil terminals Design Engineer Final & Detail Design Control and Instrumentation, System Serbia Bogutovac Home Office; upgrading 2003 Petrol Chemic; HIP Petrol Chemic, Design Engineer, Detail Design Cable Supply TS 6/0.4 kV to Thermal Constructed Serbia Pancevo Pancevo Home Office; Plant , Switchgear 6 kV and compressors 302A, B, C 2000-2001 Carbon Black ITSC, London 12.000 t/year Head of Engineers; Detail Design Pow. Supp, Contr. System, Instrument.,

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 5 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description Jordan Production Plant Home Office; Intercom, Tapping; Hazardous envir.

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 6 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Industry

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2018 Pljevlja, Jagnjila Tim Company, Lime powder Design Engineer Conceptual & Final - Power supply, MCC for motor drives SS Montenegro Contractor Hamon preparation Plant Home Office; Design starters up to 400 kW; TS 1600 kVA Capacity 40 t/h - Control System & Instrumentation 2014-2015 Smeltery and RTB Bor Group, TIR Smelting slag Design Engineer Detail Design, - Power supply and centralized control of Constructed Serbia Refinery, Bor Bor d.o.o. cooling, process Home Office; slag cooling, process, pumps and part 8200 sprinkler system - Video and light access control of lorries 2013-2014 Smeltery and RTB Bor Group, TIR Auxiliary Syst.; Design Engineer Detail Design, Distribution systems of (i) technical & Constructed Serbia Refinery, Bor Bor d.o.o. compressor1MW Home Office; instrumental air 7bar, (ii) oxygen and 5kV, & 315kW nitrogen & (iii) accidental water; Drives & 04kV connection to Factory DCS 2011 Zrenjanin Dijamant a.d., Oil seed Sunflower Seed Design Engineer Detail Design Rehabilitation of MCC for silo transport Constructed Serbia refinery Zrenjanin Storage Silo Home Office; system; Adaptation to Central Control System 2010 Sombor Battery Factory, Oxide Mill & Design Engineer Final & Detail Design New oxide Mill 24t. and six Currying Constructed Serbia Farmakom MB Currying Home Office; Chambers installation, Power Supply & Chambers Local Control System; 2010 Steel Plant; US Steel Company Consulting Engineer Consulting services HVAC System of Switch board Rooms ; Serbia Smederevo Home Office; Detail Design Approv. Designed by Delta Engineering 2010 Steel Plant; US Steel Company Consulting Engineer Consulting services Motor drives of moving hood, Designed Serbia Smederevo Home Office; Det. Design Approval by Delta Eng. 2010 Jelen Do Lime Company “Jelen Lime storage Consulting Engineer Consulting services Motor drives and control for system of Serbia Do” a.d. and transport Home Office; Detail Design Approv. 350 t per day; Designed by Delta Eng. 2010 Popovac Holcim - Serbia Cement Mill Design Engineer Detail Design Refurbishment of MCC-s, Motor drives; Constructed Serbia No.1 Home Office; Local Control and SCADA System; 2009 Indjija Maksim AD, Belgrade Deep Design Engineer Final and Detail MCC-s, Motor drives; Local Control and Constructed Serbia galvanizing, Home Office; Design SCADA System; Power Supply and 60.000 t/year service installations; 2008 - 2010 Zrenjanin Dijamant a.d., Oil seed Sunflower Seed Design, Erection and Det. & AsBuilt Design, MCC-s; Motor drives and Local and Constructed Serbia refinery Zrenjanin Storage 50.000 t Start up Engineer; Contractor’s Supervis. Radio remote control of store transport & System start up system

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 7 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description 2008 -2009 Lucani ValveProfil, Ratina, Cellulose Design Engineer Detail Design Reconstruction of MCC-s, motor drives, under Serbia Kraljevo refinery Home Office; Power Supply and service installations; construction Hazardous environment 2008 Terra Production Terra Production Drink Bottled Consulting Engineer Consulting services Production of process dry steam; two Serbia Indjija Factory; Boiler Home Office; Detail Design Approval boiler 2x0.9 t/h capacity at 6 bar; Room Designed by Delta Eng. 2008 RTB Mines; Bor RTB Bor Mines, MCC Design Engineer Detail Design Reconstruction of MCC for copper Serbia Flotation Home Office; flotation; motor drives 2.5 to 200 kW 2007 Steel Plant; US Steel Company Lime conveyer Design Engineer Final Design and Bid Power Supply, Control System and Serbia Smederevo and Storage Home Office; Document Instrumentation 2007 Rauch Sokovi, Energoprojekt Industry Design Engineer Detail Design Power Supply and Distribution for Plant Constructed Serbia Koceljeva Home Office; and HVAC System and Boiler Room 2007 “Imlek”, Milk Production Boiler Room Design Engineer Detail Design Production of steam for milk sterilization Constructed Serbia Padinska Skela “Imlek”, P.Skela Home Office; and processing 2006 Refrigerating & Gorenje – Velenje Factory Design Engineer Detail Design Storage and recharging of cyclopentan Constructed Serbia Freezing Equip. Slovenia Storage Home Office; and oil for factory production purpose; Factory; Valjevo Hazardous environment 2006 Refrigerating & Gorenje – Velenje 25.000 sqm Design Engineer Final and Detail Lighting and Power Supply Installation; Constructed Serbia Freezing Equip. Slovenia Home Office; Design Outdoor Infrastructure and Hazardous Factory; Valjevo Area Installations 2001 -2002 CCP-4000, ITSC, London Procurement Manager Procurement of goods Power Supply, Control System, Fully Jordan Thermal & Home Office; Automated PLC Networked System; Refinery Plant Instrumentation, Intercom, Tapping; Hazardous Environment 1999 Steel Converter; US Steel Company Design Engineer; Detail Design Steel Converter, Unit 3; Converter Constructed Serbia Steel Plant; Home Office; Refurbishment; Computerized, fully Smederevo automated System 1996 Slab Cooling; US Steel Company Slabs 35 t Project Engineer, Detail Design and Modernization of Slab Cooling Computer Constructed Serbia Steel Plant Start-up Assistant; Start-up Services based Control System Smederevo Home office / Site 1973 Electric Ceramic Arandjelovac Company Design Engineer Detail Design, Instrumentation and Control System of Constructed Serbia Ind.;Arandjelovac Home office Chamber Furnace

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 8 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Waste & Waste Water Treatment and Pumping

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2018-2019 Raska CFCU, (EU Finacing) WWTP Raska Consulting Engineer; Yellow FIDIC Services Approval of design & goods, Supervision Active Project Serbia Serbia EPTISA Servicios de of construction & commissioning of Municipality of Raska Ing, Sp sewage system and WWTP; Power supply, SCADA & Instrumentation 2018 right Iron Gate HP System Danube Area Design Engineer As Built Design PS; Supply & Control Completed Serbia side bank Serbia Small Towns Home Office; 2016 - 2017 TPP Nikola EU Delegation to Oil, Coal and Engineer's Team Yellow FIDIC Services Interim payements, issuing TO and €6 mil. Serbia Tesla A, Serbia; Sulphate Leader; Aets France Project finalizing period Performance Certificate; Supervising of Completed Obrenovac EPS & TENT A waste waters the defect notification period treatment 2012 - 2016 TPP Nikola EU Delegation to WWTP for TP Consulting Yellow FIDIC Services Approval of design & goods, Supervision €7.5 mil; Serbia Tesla B, Serbia; waste water; Engineer; EPTISA of construction & commissioning of the Project Obrenovac EPS & TENT B Oil, Coal & Servicios de industrial water WWTP at TPP TENT B terminated Sulphate Ingenieria, Spain 2015 - 2016 Kruščica, EU Delegation to WWTP for Consulting Materials approval; Construction & commissioning of the Implemented Serbia Serbia Serbia Kruščica Engineer; Red Supervision of works WWTP of vilage region by Safege; Municipality of B.Crkva FIDIC Services and measurements Constructed 2014 - 2015 Vrbas EU Delegation to WWTP for Assist. of Resident FIDIC Services Supervision of construction & Serbia Serbia Vrbas & Kula Engineer; EPTISA commissioning of the WWTP; Power Municipality of Vrbas Servicios de Ing, Sp supply, SCADA & Instrumentation Sys. 2013 Bujanovac EU Delegation to Waste Consulting Engineer Consulting services Transfer station is foreseen as regional Designed by Serbia Serbia, Municipality of Transfer Home Office; Detail Design recycling centre for south of Serbia Drago Project Bujanovac Station Approval. Belgrade 2013 Nova Varos. EU Delegation to Regional Consulting Engineer Consulting services Regional Waste Landfill in Nova Varos Designed by Serbia Chelice Serbia Landfill in Home Office; Detail Design is foreseen as waste disposal for Techn Faculty Municipality of Nova Nova Varos Approval. Municipalities Nova Varos, Prijepolje & of N.Sad Varos Sjenica University 2012 Kosjeric Waterworks Kosjeric 8.000 PE Design Engineer Final Design Water and Sludge Supply, SCADA and Done Serbia (Safege) Home Office; Instrumentation 2011 - 2012 Raska Waterworks Raska 16.000 PE Engineer; FIDIC Services Water and Sludge Line; TS 400 kVA; Done

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 9 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description Serbia (Safege) Bid Documents SCADA and Instrumentation 2011 Bar World Bank Budget Engineer; FIDIC Services Supervision Services for Sanitary In progress Montenegro Safege, Belgrad 5.000.000 € Landfill, Mozura in Bar 2011 Sabac Energoprojekt 130.000 PE Consulting Engineer; Bid Design & Sabac WWTP; Process Drives Supply, Serbia Equipment Home Office; Budgeting; SCADA System and Instrumentation 2011 Danube right Iron Gate HP System Danube Area Design Engineer Detail Design Milutinovac PS, Velesnica PS & Completed Serbia side bank Serbia Small Towns Home Office; PS; Supply & Control (local & remote) 2007 - 2011 Subotica WWTP Subotica 150.000 PE Engineer; FIDIC Services Subotica WWTP; Water and Sludge Constructed Serbia IRD Engineering, Italy Budget Line; TS 2x1000 kVA; Gas Generators 15.000.000 € 2x250 kW; SCADA and Instrumentation 2010 , Dan. Iron Gate HP System Municipal Consulting Engineer Consulting services Sewage System of Korbovo, 7 individual Serbia right side bank Serbia Sewage Syst. Home Office; Detail Design Approval PS, locally auto controlled. Designed by Geosonda Project 2009 Belgrade Belgrad 20 PS of Consulting Engineer Tender Documents, Power Supply, average 1000 kVA per Serbia Waterworks and BWWS Home Office; GTS and List of Items each PS; Speed Controlled Pumps; Sewage Company Company SCADA based on Distributed PLCs 2008 - 2010 Temerin 2.500 PE Supervision Supervision of electric Temporary waste water treatment Constructed Safege Serbia Engineer; works installations 2006 Grit Chamber Kikinda Design & Erection Detail Design & Refurbishment of Grit Chamber Bridge Constructed Serbia Kikinda Municipal Authority Engineer; Erection PLC Control and Power Supply 2006 Ostruznica Belgrad 35,000 P.E. Design Engineer Final Design for Koks, Power Supply 1000 kW, 10/0.4 kV; Serbia WWTP Waterworks and 0.11 m3/s Home Office; Speed Controlled Pump Drives; Belgrade Sewage Company SCADA based on Distributed PLCs 2005 - 2006 Krnjaca WWTP Belgrade 118,000 P.E. Design Engineer Final Design for Koks, Power Supply 2x1000 kVA; 10/0.4 kV; Serbia Belgrade Waterworks and 0.55 m3/s Home Office; Germany Gas Gen.; VS Pump Drives; SCADA Sewage Company based on Distributed PLCs 2003 Sewage PS Hydro Power System 2x15 kW Consulting Engineer Consulting; Motor Drives and PLC Based Automation Constructed Serbia No.3 “Iron Gate I”, Kladovo Home Office Design Approval of Pump Station 2003 Kisacka PS N.Sad; Waterworks 4x22 kW Design Engineer Detail Design Motor Drives and PLC Based Automation Serbia Novi Sad and Sewage Company Home Office; of Pump Station 2000 - 2001 CCT 4000 ITSC UK Projekt value Design Engineer Final & Detail Design; Motor Drives & PLC based Automation of Jordan Copper Refinery London > $ 4.5 mil. Home Office and Procurement of Refinery Water Neutralization Plant; Plant Equiment Electrolysis Waste Water

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 10 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description 1998 Grit Chamber Kikinda Design & Erection Detail Design & Automation of Grit Chamber Bridge; PLC Constructed Serbia Kikinda Municipal Authority Engineer; Site Erection Based Control 1996 -1997 Velika Plana Velika Plana, Consulting Engineer Consulting Services Plant Performances Confirmation; Over Constructed Serbia WWTP Managem. of Constr. Home Office /Site; Taking Inspection 1996 Krusevac PS Krusevac (2+1)x132 kW Design Engineer Detail Design; Motor Drives and PLC Based Automation Constructed Serbia (WWTP) Waterworks and Home Office / Site; Consulting Services of Pump Station and Fine Screens Krusevac Sewage Company 1990 - 1991 G.Milanovac G.Milanovac 100,000 P.E. Design Engineer Final, Detail and Power Supply 1x1000kVA; 10/0.4 kV Constructed Serbia WWTP Municipal Authority Home Office / Site; As-Built Design; Centralized Control; Local Relay Based G.Milanovac Erection Supervision Automation System 1989 - 1990 Kragujevac Kragujevac 250,000 P.E. Design Engineer Final, Detail and Power Supply 3x1000kVA; 10/0.4 kV; Constructed Serbia WWTP Waterworks and 1.5 m3/s Home Office / Site; As-Built Design; Gas Generating Units; Centralized Cvetojevac Sewage Company Erection Supervision Control; Local Relay Automation System 1989 Kragujevac; WW Waterwork & Sewage Design Engineer Final Design Industrial Waste Water Pretreatments Partially Serbia Pretreatments Company Kragujevac Home Office; Constructed

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 11 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Potable Water Treatment and Pumping

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2012 VZ II, Subotica Waterworks and 4x75 kW VSD Design Engineer Detail Design Motor Drives and PLC Based Serbia Sewage Company Pumps & Home Office; Automation of Pump Station Water Storag. 2008 Mareza PS, TEI Practa, Belgrade 2x200kW + Design Engineer Tender Technical Power Supply 2x1600 kVA, 11/0.4 kV; Montenegro Podgorica 3x110kW; Home Office; Details; Consulting Frequency Converter Motor Starters; SCADA –PLCs 2008 Rimac River, Tahal, Tel Avivi WTP 10 m3/s Design Engineer Bid Design; Bidder Power Supply & SCADA – Centralized Peru Huachipa WTP, and Conveyor Home Office; Consulting Services, System based on Distributed PLCs; Lima 27 km under FIDIC YB 1650 Analog & Digital Input/Outputs 2008 Belgrade Tahal, Belgrade, Makis 2 WTP Technical Adviser Support to implem. of Power Supply & SCADA – Centralized Serbia Makis WTP Serbia 2 m3/sec Project System based on Distributed PLCs 2005 - 2006 Al Refai WTP Ministry of Interior 0.5 m3/s Design Engineer Final and Detail Power Supply 2x1000 kW, 11/0.4 kV; Iraq General Establishm. Home Office; Design; Frequency Converter Motor Starters; for Water & Sewage Consulting Services SCADA – Centralized System based on Projects, Iraq Distributed PLCs 2005 - 2006 Shark Dijlah PS Parsons, USA 4(8)x300 kW Design Engineer Final Design Motor Drives and PLC Based Constructed Iraq Baghdad WTP (Baghdad Municipal Home Office; Consulting Services Automation of Pump Station Governorate) Procurem. of Equip. 2004 - 2005 Rezevici PS Budva 3x75 kW + Project Manager & Detail Design, Power Supply 2x1000 kW, 11/0.4 kV; Montenegro Montenegro Rezevici Waterworks and 2x7.5 kW Construction Eng; Procurement of Equip. Motor Drives and PLC Based Coast Devel. Sewage Company Site; & Constr. Automation of Pump Station; Frequency Program Converters 2004 - 2005 Montenegro Budva Flow Meters Design, Detail Design, Flow Meters with Remote Indication, on Montenegro Montenegro Coast Waterworks and Ø 250 – 400; Construction & Procurem., Construct. PS high pressure side and Water Coast Devel. Sewage Company 5 pcs Start-up Engineer & Commissioning Distribution System Program 2004 Podgor & Utrg Budva 2x(5x250) kW Project Manager, Detail Design, Pump/Motor Replacement (5 pcs); Montenegro Montenegro PS; Pog. Vrela Waterworks and Construction & Procurem., Construct. Installation of Soft Starters & Frequency Coast Devel. Sewage Company Start-up Engineer & Commissioning Converters (Total 2.5 MW) Program 2004 Crmnica & Budva (22 - 45) kW; Proj. Man, Construct. Detail Design, Installation of Soft Starters & Frequency Montenegro Montenegro Montenegro Waterworks and 7 pcs & Start-up Engineer; Procurm., Construct. & Converters (Total 250 kW) Coast Devel.

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 12 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description Coast Area Sewage Company Commissioning Program 2003 Pancevo Old Pancevo Waterworks 340 l/sec Project Engineer; Detail Design; Refurbishment of drives, power supply Serbia WTP Home Office, and control system 2002 Reverse Osm. Enel.Hydro, Italy 29 l/sec Project & Site Constr. Detail Design; Project coordination with User, As-Built Constructed Serbia Plant Meminac; Manager; Installation, Start-up & and T.O. Documentation, Site Erection, Pozarevac Home Office / Site Consulting Servises Support to Supplier (Ctida, Italy) 2001 Vozdvizenije IBC Swiss 1.2 m3/s Expert Engineer Feasibility Report WT Plant and Overall Municipal SCADA Russia WTP, Jaroslavlj Home Office; System 1996 Uhta, Komi Severgasprom Start-up Engineer; Construction & Water Purification, Bulb type pressurized Constructed Russia Site; 3 Months Commissioning filters; 1996 M. Zabran WTP Sabac 0.25 m3/s Start-up Engineer; Procurement, SCADA – Centralized System based on Constructed Serbia Sabac Waterworks and Site Construction & Distributed PLCs; 450 Analog & Digital Sewage Company Commissioning Input/Outputs 1996 -1997 Tabanovic WTP Sabac 2x0.40 m3/s Consultant Manager; Consulting Services; Power Supply 2x1000 kW, 20/0.4 kV; Constructed Serbia & PS Waterworks and 2x135+2x75 Home Office / Site Supervision of Constr. SCADA – Centralized System based on Sabac Sewage Company kW & Commi. Distributed PLCs 1994 -1995 Jezero WTP & Belgrade 1.0 m3/s Design & Consultant Detail Design, Power Supply 10/0.4 kV Constructed Serbia PS Waterworks and Engineer; Consulting Services; SCADA – Centralized System based on Belgrade Sewage Company Home Office / Site Supervision of Distributed PLCs; 1600 Analog & Digital Construction Input/Outputs 1993 South Adriatic Regional Water Supply WTP1300 l/s Electrical Design ManaFinal & Detail Design; System of one WTP, four main PS and Constructed Montenegro Water Supply Authority Conveyor Home Office Bid Documents 19 Distribution Reservoirs; Power System; 100km Supply, SCADA and Telemetry System, and Branch Metering Chambers 1992 Water Quality Belgrade Project Manager & Construction and As- River Water Sampling, Remote on-line Serbia Monitoring; Waterworks and Construction Built Design Water Quality Measuring to Makis WTP Obrenovac Sewage Company Engineer; SCADA System 1988 - 1990 Tabanovic & Sabac 2x0.40 m3/s Design & Consultant Final & Detail Design; Power Supply; Constructed Serbia M. Zabran WTP; Waterworks and CWPS 2x135 Manager; Home Off. Bid Documents; SCADA – Centralized System based on Sabac Sewage Company + 2x90 kW Consulting Services; Distributed PLCs 1989 Petrovaradinska Waterworks N. Sad (600 + 300) l/s Electrical Design ManaFinal Design Power Supply, Auxiliaries and SCADA Serbia Ada WTP; N. Sad Home Office System 1987 Fonte Gaj PS; Labin 4x250 kW Project Manager, DDes., Procurement, Fonte Gaj PS; Revitalization; Power Constructed

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 13 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description Croatia Labin Waterworks Company Construction & Constr. & Commissi. Supply; Control based on Relay Start-up Engineer Automation System 1987 Fonte Gaj WTP; Labin 4x250 i/s Project Engineer Final Design, Fonte Gaj WTP; Final Design; Instrumenta Croatia Labin Waterworks Company Home Office and SCADA System 1986 - 1988 Limassol WTP; Ministry of Agriculture 0.50 m3/s Design & Consultant Final Design; Southern Conveyor System; Power Constructed Cyprus Thersephanou Department of Water 0.50 m3/s Manager; Bid Documents; Supply; Ground Water Treatment WTP; Limassol Development; Cyprus Home Office / Site FIDIC Services SCADA – Centralized System based on Thersephanou Distributed PLCs 1986 - 1988 Thersephanou Ministry of Agriculture Design Engineer; Final Design Southern Conveyor System; Constructed Cyprus PS; Department of Water Home Office Power Supply; SCADA – Centralized Thersephanou Development; Cyprus System based on Distributed PLCs 1986 Gradole WCP Regional Waterworks 250 l/s Design,Site & Start-up Detail Design, Control, Instrumentation and Full Constructed Croatia Istria of Istria, Buzet Engineer Erection, Start –up and Automated Preparation and Dozing Home Office / Site Taking Over 1881-1884 Makis WTP & Belgrade Waterworks 1(3)x2.0 m3/s Design & Consultant Final & Detail Design; Power Supply 2x16 MW; 110/10/0.4 kV; Constructed Serbia RWPS & CWPS and Sewage Company RWP: 250 kW; Engineer; Bid Documents; River Water Treatment; Ozonization; Belgrade CWP: 2 MW Home Office / Site Consulting Services; SCADA – Centralized System based on (per unit) Distributed PLCs 1981-1982 Butoniga WTP; Regional Woterworks (2)x1000 l/s Project Engineer Final Design, Bid River Water Treatment and Regional Constructed Croatia Conveyor of Istria, Buzet Home Office / Site Documents and Conveyor System; Power Supply; System; Istria Consultant Services Ozonization; SCADA – Centralized System based on Distributed PLCs 1977 - 1978 Vracar II PS Belgrade Waterworks 4x750 kW Design Engineer Final Design Supply, Motor Drives; DOL Starters on Constructed Serbia Belgrade and Sewage Company 10 kV Home Office; Consulting Services 10 kV; Diesel Engine 2.5 MVA Fixed Wired Logic Based Automation

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 14 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Dams and Irrigation

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2018 Sava river, Austrian Development Pumps from Design Engineer From Feasibility Study Mislodjin PS, Z.Livade PS, V.Bara PS, Irrigation Serbia Progar and Agency 18 to 75 kW Home Office; to Detail Design Kupinav PS and Progar I PS; Obrenovac Rehabilitation of Power Supply and Control Equipment 2018 Danube right Iron Gate HP System Danube Area Design Engineer Detail Design Drainage wells V,Gradiste; Greenfield Constructed Serbia side bank, Veliko Serbia Irrigation Home Office; Project ; Revitalization & preparation for Gradiste GPRS control 2014 Danube right Iron Gate HP System Danube Area Design Engineer Detail Design Drainage wells Golubac; Greenfield Constructed Serbia side bank, Serbia Irrigation Home Office; Project ; Revitalization & preparation for Golubac GPRS control 2013 Sava right side Iron Gate HP System 2x200+132 Design Engineer Detail Design Skela PS; Rehabilitation of Power Irrigation Serbia bank Serbia kW Home Office; Supply and Control Equipment 2012 Danube right Iron Gate HP System 2x250 kW Design Engineer Detail Design Ibrifor PS; New motor starters of SS Irrigation Serbia side bank Serbia Home Office; types Automation and Preparation for Remote GPRS control 2012 Danube left side Iron Gate HP System Danube Area Consulting Engineer Consulting services Marijino polje PS; Rehabilitation of Geosonda Serbia bank Serbia Irrigation Home Office; Det. Design Approval Power Supply and Control Equipment Project 2011 Danube left side Iron Gate HP System Danube Area Consulting Engineer Consulting services Kajtasovo & Topola PS; Rehabilitation of Geosonda Serbia bank Serbia Irrigation Home Office; Detail Design Approv. Power Supply and Control Equip. Project 2011 Danube right Iron Gate HP System Danube Area Design Engineer Detail & AsB Design Automation and Remote GPRS control Serbia side bank Serbia Irrigation Home Office; preparation for PS Ribnjak; drainage Kladovo pumps 3x90 kW 2010 Danube right Iron Gate HP System Danube Area Consulting Engineer Consulting services Karas I & II PS; Rehabilitation of Power Geosonda Serbia side bank Serbia Irrigation Home Office; Detail Design Approv. Supply and Control Equipment Project 2010 Danube right Iron Gate HP System Irrigation Design Engineer As Built Design Usce Peka PS; Serbia side bank Serbia Home Office; 2010 DTD Channel Vojvodina Water 3x315 kW & Design Engineer Detail Design Irrigation Bogojevo PS; Rehabilitation of Irrigation Serbia Sys., Bogojevo Authority, Serbia TS 20/3 kV Home Office; Power Supply and Control Equipment 2010 DTD Channel Vojvodina Water Channel Syst. Consulting Engineer Consulting services Kajtasovo Navigation Lock; Rehabilitation Designed by Serbia Sys., Kajtasovo Authority, Serbia Navigation Home Office; Detail Design Approval of Power Supply and Control Equipment Energoprojekt

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 15 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description Lock 2010 DTD Channel Vojvodina Water One Radial Consulting Engineer Consulting services Novi Becej Dam; Rehabilitation of gate; Designed by Serbia System, N.Becej Authority, Serbia Gate Dam Home Office; Det. Design Approval Power Supply and Control Equipment Energoprojekt 2010 Danube right Iron Gate HP System Danube Area Consulting Engineer Consulting services Beljarica PS; Rehabilitation of Power Designed by Serbia side bank Serbia Irrigation Home Office; Detail Design Approv. Supply and Control Equipment Geos. Project 2010 Danube right Iron Gate HP System Danube Area Consulting Engineer Consulting services Ivanovo selo PS; Rehabilitation of Power Designed by Serbia side bank Serbia Irrigation Home Office; Detail Design Approval Supply and Control Equipment Geosonda Project 2009 River Tamis, Iron Gate HP System One Radial Consulting Engineer Consulting services Opovo Dam; Rehabilitation of gate Serbia Opovo Serbia Gate Dam Home Office; Detail Design Approval Mechanical, Power Supply and Control Equipment; Designed by Energoprojekt 2008 Danube right Iron Gate HP System Danube Area Consulting Engineer Consulting services Drainage wells Ljubicevac; Greenfield Serbia side bank Serbia Irrigation Home Office; Detail Design Approv. Project ; Designed by Geosonda Project 2007- 2008 Danube left side Iron Gate HP System Danube Area Design Engineer Final Design and Bid Remote GPRS control preparation for Serbia bank Serbia Irrigation Home Office; Documents seven PS; pumps from 22 to 200 kW 2007 Danube right Iron Gate HP System 2x300 kW Design Engineer Detail Design Zavojska PS; Controlled starting and duty Irrigation Serbia side bank Serbia Pumps Home Office; by inverter of one 300 kW pump 2006 Navigation Lock European Agency for Danube Nav. Consulting Engineer Consultant Services Revitalization of Navigation Lock Serbia Iron Gate I & II, Reconstruction Locks, Serbian Home Office; ToR for Consultant Services Kladovo Side 2005 Navigation Lock Iron Gate HP System Danube Nav. Design and Consult. Final Design; Bid Revitalization of Power Supply and new Serbia Iron Gate I, Serbia Lock, Serbian Engineer; Home Document Technical SCADA System Kladovo Side Office; Specification 2005 Barje Dam Serbian Water Design Engineer Final Design New Control / SCADA system with Serbia Leskovac Resources Authority Home Office; wireless communication 1998 Pancevo Dam & Iron Gate HP System Consulting Engineer Feasibility Study Revitalization of Hydro mechanical Serbia Navigation Lock Serbia Home Office / Site Equipment; Proposal of Scope of Works for Control and Power Supply 1993 Bajina Basta Electricity Authority of 4x100 MVA; Project Engineer Detail Design Dam Seismic Monitoring System Serbia HPP, Perucac Serbia Home Office / Site 1986– 1987 Los Ejidos Dam Consorcio E.P.-CU.V, Consultant Team Consulting FIDIC Approval of Contractor’s Technical Peru Chirra-Piura Sys Peru Engineer; Home Services Documentation 2rd Stage Office;

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 16 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description 1984 Bajina Basta Electricity Authority of 3x800KW; Project Engineer Detail Design Dam leakage water pumping, Power Serbia Pumped HPP, Serbia PS Djurici Home Office / Site Supply, TS 35/6 kV, Local and Remote Lazici Dam Control System

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 17 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Power Distribution

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2013-2014 Smeltery and RTB Bor Group, TIR Supply cables Design Engineer Detail Design, Distribution multi cables supplying Conctructed Serbia Refinery, Bor Bor d.o.o. 1250A, 5.25kV Home Office; TS3000 & TS7000 2013 TS 110/35 kV NIS EnergoWind, TS 110/35 kV, Supervision Supervision of Transformer station is part of future Serbia Plandiste 1; Belgrade 2x63 MVA Engineer; electric works wind Power Plant; total capacity 102 MVA 2012 Smederevo, Iron Gate HP System TS 10/0.4 kV, Design Engineer Detail Design MBTS (prefabricated concrete structure) Conctructed Serbia Serbia Serbia 400 kVA Home Office; for Smederevo PS Supply 2010 - Corridor 11 Serbia Roads MV & HV Design Engineer Detail Design & Collision of overhead lines and 2011 Obrenovac - overhead lines Home Office; Elaborate (HV) Highway, Corridor 11 at section Serbia Ub, Serbia (35 to 400 kV) Obrenovac – Ub HV Lines Collision Elaborate 2010 , Serbia Iron Gate HP System TS 10/0.4 kV, Design Engineer Detail Design MBTS (prefabricated concrete structure) Conctructed Serbia Serbia 630 kVA Home Office; 1 Mon. for Local Power Distribution 2010 Corridor 10 Serbia Roads MV overhead Design Engineer Detail Design Collision of overhead lines and Serbia Grdelica, lines (35 kV) Home Office; Highway, Corridor 10 at Grdelica Tax Serbia Point; Reversing to underground cables 2004 TS 110/10 kV CHF International & Consultant Team Consulting Services; Completely New Transformer Station; Constructed Serbia Presevo; Electrical Power Leader; Home Office Detail Design Detail Designe by Energoproject - Entel Presevo Authority of Serbia Approval 2004 TS 110/10 kV CHF International & Consultant Team Consulting Services; New Switchyard and Connection to Constructed Serbia Bujanovac; Electrical Power Leader; Home Office Detail Design Overhead line 110 kV; Detail Designe Bujanovac Authority of Serbia Approval by “Energoproject – Entel” 2003 Doubled 110 Ministry of Capital Consultant Engineer; Consulting Services; Final Design of Cable line from TS Bgd Designed by Serbia kV Cable Line Investment Home Office; Final Design 1 to TS Bgd 28; Belgrade “Elektroistok” Approval

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 18 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Thermal Plants and Thermal Power Plants

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2019 TPP TENT A, Balkan Energy Reconstruction of Design Engineer Detail Design Reconstruction of air cooling system for Serbia Units 3 & 5; Team Belgrade bunker's charging steam lance blowers; Power supply and Obrenovac transporters control of new blowers drives; Instrumentation and control system rewiring to the unit's DCS 2019 TPP TENT A, Balkan Energy Reconstruction of Design Engineer Detail Design Reconstruction of horizontal transporter for Serbia Obrenovac Team Belgrade bunker's charging charging of coal bunkers for units 4, 5 & 6 transporters 2019 Thermal PP STEAG & Balkan Ecology Design Engineer Final Design Auxiliary fuel system and new auxiliary Montenegro Pljevlja, 220 MW Energy Team reconstruction of boiler plant (steam generator) for Pljevlja Belgrade Pljevlja TPP and TPP upgrading; Power supply and local power upgrading control system as part of unit's DCS 2019 Thermal PP STEAG & Balkan Ecology Design Engineer Final Design Heat source for heating town of Pljevlja, Montenegro Pljevlja, 220 MW Energy Team reconstruction of subtraction of heat from the turbine system; Belgrade Pljevlja TPP and Heat exchangers and condensate drainage power upgrading pumps; Power Supply and control system 2019 TPP TENT A, Electrical Power TENT A, Design Engineer Detail Design Control Loop: Temperature to cold sprinkler Serbia Obrenovac Authority of Serbia Turbine A2 water; Leakage vapor condensation 2018 TPP TENT A, Electrical Power TENT A, blocks Design Engineer Detail Design and Reconstruction of horizontal transporter for In construction Serbia Obrenovac Authority of Serbia 4, 5 abd 6 Procurement charging of coal bunkers for units 4,5 and 6

2016 - 2017 TPP B, Electrical Power TEKO 2x348.5 Design & Constr. Detail Design, Procur., Reconstruction of slag crusher line for Constructed Serbia Authority of Serbia Megawatts Engineer Installation and Block No.1; MCC and Control System Comissioning adaptation 2015 Thermo Power Electrical Power 220MW Thermo Design, Construction Design, Installation & New cooling water circulating pump of Constructed Montenegro Plant Pljevlja, Authority of unit & Start up Engineer Comissioninng 450kW, VSD controlled. Power Supply, 220 MW Montenegro Control and connection to Plant DCS 2014 - 2015 Thermo Power ELEM Macedonia 4x50MW Heat Design Engineer Detail Design Heat exchengers 4x50MW with hot water Macedonia Plant Bitola (Energosystem, exch. with Home Office; recircullation PS for remote heating; 3x200 MW Skopje) 6x800kW VSD controlled motor drives 6x800kW MV circul.pumps and 11x 45kW LV; MCC 6kV & 0.4 kV 2012 - 2013 Kostolac, Drmno Electrical Power TEKO 2x348.5 Consultant Engineer; Consulting Services; TPP Kostolac B modernization, Block 2; Contracted by Serbia Authority of Serbia Megawatts Home Office; Detail Design DCS, Protection & Turbine Control Institute M.Pupin Approval Systems;

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 19 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description 2011 - 2012 Kostolac, Drmno Electrical Power TEKO 2x348.5 Consultant Engineer; Consulting Services; TPP Kostolac B modernization; Block 2, Constructed Serbia Authority of Serbia MW Home Office; Detail Design Designed by Energoprojekt Entel Approval 2011 Obrenovac, Electrical Power TENT B 1240 Design Engineer Detail Design Reconstruction of slag transport line; Slag Constructed Serbia Ushche Authority of Serbia Megawatts crusher MCC adaptation 2011 Vreoci, Siemens, Belgrade, TEKA5 110, Design Engineer; Detail Design Centralized Emission Monitoring System for €1.7 mil. Serbia Obrenovac General Contractor; TENT A 1650 Home Office; Coal fired boilers of Kolubara A5 (one unit), Protent Obrenovac, TENT B 1240 Nikola Tesla TPP (eight units); Control & Subcontractor MW Instrum. 2008 Coal excavation Projmetal a.d. Coal Storage for Design Engineer; Detail Design Temperature control for unfreezing of coal Serbia area Tamnava TP Home Office; storage outlet cones 1997 - 1998 Tripoli West Technopromexport, 2x325 MW Electric Design Bid Design; Power Supply and Control System of Libya TPP, Moscow PS 4x4MW Manager; Home Consulting Services Circulating Water System, 4x4 MW Pumps; Extension Office / Moscow; Design for GEC, Tripoli, Libya Tripoli 1983 Obrenovac Electricity Authority TENT A Project Team O/T Boiler Modeling Analyses of a Thermal Process, Over Serbia of Serbia; Boiler 300 MW Assistant & overheating Heaters’ Sections, as to Control Contractor ETF, process simulation Parameters Adjustment Belgrade 1980 Danube TP Belgrade (300 + 400) GCal Project Engineer Preliminary Design Power Supply; Belgrade Municipal Serbia Belgrade Municipality Home Office Remote Heating System 1978 Kolubara B Electricity Authority 4x600 MW Project Engineer Feasibility Study; Feasibility Study of Auxiliary Services Serbia TPP of Serbia Home Office Control System Tamnava 1976-1979 Kolubara A ETF Belgrade Boiler 100 MW Master of Science Investigation and Development and Analyses of High Power Serbia TPP Candidate Master of Science, Once-Through Boiler, as for Application of Veliki Crljeni Report Conventional Controllers

1979 Vozdovac TP Belgrade (200 + 100) GCal Project Engineer Final Design Power Supply; Belgrade Municipal Serbia Belgrade Municipality Home Office Remote Heating System 1978 N.Sad TPP / N.Sad Municipality (135/100 +129) Project Engineer Feasibility Study Monitoring System Serbia TP N.Sad MW Home Office

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 20 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Hydro Power Plants

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2011 Iron Gate 2 Iron Gate HP System; HPP Drainage Consultant Consultant Services; HPP and Dam Gallery main drainage Designed by Serbia HPP, Negotin El. Authority of Serbia Pump Station Engineer; Detail Design system PS. Geosonda Home Office; Approv. 2008-2009 Ram, Danube Iron Gate HP Telelimnigraph Project Engineer Detail Design Referent Danube level measuring for Constructed Serbia System; measuring Home Office hydro potential distribution between Station Serbians and Rumanians Parties 2006 Iron Gate 1 Iron Gate HP System; 2x200 MW Consultant Consultant Services; Approval of Unit Start /Stop Procedure Constructed Serbia HPP Electricity Authority of Engineer; Procedure and Detail & Protection System; Unit Cooling Kladovo Serbia Home Office; Design Approval System; Tasks for Control System Supplier 2006 Vojvodinci, Jon & Marin Roksa, Kaplan turbine Consultant Engineer; Consultant Services; Adaptation of river mill drive to the Designed by Serbia River Karash Vojvodinci 136kW; 130kW Home Office; Detail Design MHPP Rus Danzor Electrical Power Approval System 2006 Kragujevac, Waterworks Banki turbine Design and Pre Bid Design MHPP on municipal water supply Serbia Water Supply Company, 95,8kW, 84kW Procurement of system System Kragujevac Electrical Power goods 2005 Bekhme HPP Ministry of Water 6x250MW Design & Consultant Reconsideration of Updating of Techniques applied; New Iraq Iraq Recourses; Engineer; Technical Solutions; Control, Power Generation and 400 kV Directorate General of Home Office; Innovation of Bid Transmission System Engineering Doc. FIDIC Yellow B. 2004 Niksic, Water Waterworks El. power Design & Procurem. Pre Bid Design MHPP on municipal water supply Montenegro Supply System Company, Niksic 2x100 kW of goods system 2003 Pirot HPP Iron Gate HP System; 2x40 MW Project Engineer; Detail Design Unit 1 and 2 high voltage 110 kV Constructed Serbia 2x 40 MW; Electricity Authority of Home Office Circuit Breakers failure protection; Pirot Serbia 1999 Djerdap II HPP Iron Gate HP System; Bulb Turbines Project Manager; Detail Design Unit Shut-Off Gate Control System; Serbia Negotin Electricity Authority of 8x28 MW; Home Office PLC networked automated System; Serbia Interconnected to Plant Control System 1997-2000 Kozjak HP Electricity Authority of Francis Consultant Engineer Consultant FIDIC Bid Documents, Yellow Book; Approval Constructed Macedonia Macedonia Macedonia Turbine 2x50 (Manager 1999); Services of Detail Design Releasing for Manufact. MW, el. Office/Site/China for Electrical Equipment (C&I, Gener.,

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 21 Curriculum vitae

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description Protection etc.) and 110 kV Switchyard; 1998 Vlasina HP Iron Gate HP System; (4x15+2x15 Project Engineer; Final Design Modernization of HP System and Serbia System Electricity Authority of +2x15+2x14 Home Office Requirements Plants; SCADA for unit HPP to Hydro Surdulica Serbia +2x15 pumps) Power System level; Connection to MVA; Regional Dispatch Centre 1998 Perucica HPP Electricity Authority of Pelton Turbines Project Engineer Consultant FIDIC Modernization of Unit Control, and Montenegro Glava Zete Montenegro (5x40 + 2x65) Home Office Services Monitoring System; Computer based MVA, Electrical plant control and system networking; Bid Documents, Yellow Book 1997 Bajina Basta Electricity Authority of Francis Turbine Project Engineer Consultant FIDIC Modernization of Turbine Governor and Serbia HPP, Serbia 4x80 MW; Home Office Services Plant Joint Controller; Final Design and Perucac Bid Documents, Yellow Book 1995-1996 Bajina Basta Electricity Authority of 1x80 MW; Consulting Engineer Consultant Services; Additional Generating Unit; Feasibility Serbia HPP, Perucac Serbia Study 1996-1997 Rzav river, Electricity Authority of Barrage H60m, Consulting Engineer Consultant Services, Final & Detail Design, Generating and Serbia Arilje Serbia and Rzav L196m; 7.1 MW Home Office Energoprojekt Design Transformer Units; Control System; Waterworks System Electrical Power Team Overhead line 35kV 1995 Perucica HPP Electricity Authority of (5x40 + 2x65) Consulting Engineer Consultant Services; Unit No.7 Control System and Auxiliary Montenegro Glava Zete Montenegro MVA Home Office / Site Detail Design Power Supply 1995– 1996 Sullana Dam Direccion Ejecutiva del 320 kVA; 5.5m; Consultant Team Final Design, Bid Dam Spillway and Mini HP Design; Peru Chirra-Piura Proyecto Especial 5m3/s Manger; Home Docum. & Consultant Manufacturing Inspection and Work Sys 3rd Stage Chira Piura, Peru Office FIDIC Services Shop Design Approval 1993-1994 Curumy HPP, E.E. Curumuy S.A. 2x7.5 MVA Consulting Engineer Consultant FIDIC Final Design, Bid Documents; Consult. Peru Piura Piura Home Office Services Services for Procurement and Construction Period 1984-1986 Mosul II HPP SOD, Iraq Bulb turbine, Senior Engineer Engineer’s Supervision, Commissioning, Taking Iraq Mosul 4x20MVA el. Site; Representative; Over, Trial Run of the Plant 132 kV Switchy. FIDIC Services

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 22 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Buildings

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2013 Belgrade Belgrade City City Admin. Design Engineer; Detail design Reconstruction of floors subdistribution Serbia Sebia Administration building, Queen Home Office; boards; Electric Power consumption Maria Street metering 2010 - 2011 Belgrade JUP Investment and 15,000 m2; Design Engineer; Detail design and HVAC Building Management System Serbia Sebia Development 1200 address. Home Office; Tender Specification for NTP Zvezdara; Beneficiary Institute dig.& analogue M.Pupin, Belgrade 2010 Mokra Gora, Imtel RTV a.d. Individ. house Design Engineer; Detail design House installations and site power Serbia Mecavnik apartments Home Office; supply; road and decorative lighting Sebia 2,200 m2 Total 2008 -2010 Viminacium New Technology Romanian Supervision Supervision of Power supply, lighting, lightning, small Serbia Stari Kostolac Center Viminacium Archeological Engineer; electric works consumers, security and locality communication installations 2007 -2008 Belgrade Gorenje Invest, 8,000 m2; Design Engineer; Final and Detail TS 10/0.4; Power Supply and Serbia Serbia Belgrade Home Office; Design, As-Built infrastructure installations, HVAC Design system, motor drive installations 2007 Bogojevo Ministry of Finance Road border Design Engineer; Techn. & Bid Specif., Detail List of items and Technical

Serbia Serbia crossings Home Office; Feasibility Design Specification as part of Bid Documents 2006 -2007 Belgrade European 65,000 m2; Design Engineer; Detail design, phase I Multifunctional Centre “Ušće”; HVAC,

Serbia Serbia Construction Home Office; system motor drives and MCC 2006 Belgrade Ministry of Finance, Custom Head Design Engineer; Detail design and Bid Refurbishment of building interior and

Serbia Serbia Custom Head Office Office Building Home Office; Documents ventilation system 2006 NIS Ministry of Finance, Custom Head Design Engineer; Detail design and Bid Refurbishment of building interior and

Serbia Serbia Custom Head Office Office Building Home Office; Documents ventilation system 2006 Serbia Border Ministry of Finance, Small Border Design Engineer; Detail design and Bid Refurbishment of building electrical

Serbia crossings Custom Head Office crossings Home Office; Documents installations 2005 Pancevo Construction authority Theater annex Design Engineer; Detail design and Bid Power Supply and infrastructure

Serbia of Pančevo building Home Office; Documents electrical installations; HVAC Control

CV_EuForm-MP_200202CV_EuForm-MP_200202 Page 23 Curriculum vitae

PROFESSIONAL EXPERIENCE RECORD – Infrastructure

Year Project Function Service Client Project Data Project Description Note Country Location Service Duration Description

2015 -2017 Brčko District Brčko District 20 km of new Consulting Engineer; Method statements & Collisions with LV, MV and HV lines; Implemented by Bosnia & Authorities bypass road Red FIDIC Services materials approval; Collisions with Communication's Spea -Safege; Herzegovina with two car Supervision of works installation; New road facilities, bridges, under construction tracks and measurements signalization & lighting 2011 Obrenovac - JP Putevi Srbije. Highway E-763, Design Engineer; Elaborate of crossing Colisions of 110, 220 and 400kV OHL Implemented by Serbia Ub Belgrade-South Home Office; OHL 110, 220 and with motorway, sec. Obrenovac-Ub: CPV; Adriatic 400 kV Desigh No.1490, Book 12, Sec. 2.2 Constracted. 2010 Grabovica - JP Putevi Srbije. Coridor 10 Design Engineer; Detail design Displacement 35 kV line at chainage Implemented by Serbia Grdelica Highway E-75 Home Office; km 868+166.10 to 873+700 Geoput; Constracted. 2010 Obrenovac - JP Putevi Srbije. Highway E-763, Design Engineer; Detail design Colisions of 35 kV OHL with motorway, Implemented by Serbia Ub Belgrade-South Home Office; sec. Obrenovac-Ub at 14+550, 14+600, CPV; Adriatic 17+375 and 40+575 km Constracted. 2009 Border European Delegation Border Consulting Engineer Detail design and Small road border crossings to Bosnia, Implemented by Serbia crossings of crossings Equipment approval Montenegro and Macedonia; Power & Safege; Serbia facilities Communication facilities, Border area Constructed lighting 2006 Dimitrovgrad European Delegation Railway station Consulting Engineer Detail design Refurbishment of railway station; Implemented by Serbia & Serbian Railway buiding Approval buildings and border crossing custom Safege; offices; Station area lighting Designer CIP Bgd 2004 Belgrade, Belgrade Agency for Reconstruction Design Engineer; Detail design Reconstruction of streets; Displacement Implemented by Serbia Topcider Construction of streets at Home Office; of Power lines 0,4 & 10 kV; Lighting & Kosovoprojekt Topcider area Communication facilities 2004 Belgrade, Belgrade Agency for Reconstruction Design Engineer; Detail design Reconstruction of streets; Displacement Implemented by Serbia Banjicki venac Construction of streets at Home Office; of Power lines 0,4 & 10 kV; Lighting & Kosovoprojekt Banjicki venac Communication facilities