Resettlement Plan

49215-001 Loan: 3260

August 2017

NEP: Earthquake Emergency Assistance Project Luitel-Aappipal-Harmibhanjyang--Bhachek Road Project

Prepared by the Government of Nepal for Asian Development Bank (ADB).

This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ilqrfi T{6,rt

Qlt v@II: 06&\6( ar., (6 6 ffrfr: QoeY/oQ/!q

fr k@T 3ildq1r {fl-€, TfrTqI

fuqq; Resetdemen. tt"r, fuS.tT (ItrffrFTT I

gqtl-tr vml-rcrril 3{fqfuwq-F{fuqcqrf,-qqqtr-rrqfr {g-q ( to.{\e{ f6fu) TIFF,, T-{-qhT d=q-ql {Ifuq g{t{qiq flP"E-{q-ard k+-d tr-€ qffi-fr 6rq vq-kfl {s.F { sfr-(e-fi'A ?frqao} ilifqh-o, {TrtT ftFfff stfqr+1 wrrn qf}+ e11-{qTfi qi W qrrfl ,,r{4-rqq[e qr1t{d qqq{r+i ffi ilfrI qnn qqa.ft.FliifuPcr, wk RoeR'+1 6-1 { +} gqffilrvl q*fuq trft-r ifq (Ff q +l qnTidqlz q{+Tft, Rlffi+' r +qm qrqT { Tq eTfu i nw Wr wrm qrFo e1q' trfi. q-rrrilF+1 qqPdrlf 9_qfun flTq fr-rrqR EH-fr qqt qft T4rqr hatTur rri r wnn qtk (q-'"ft ?'mTfu FRqlfi 4idrsl ffi louY/l/l{ d qfu-{ Rfu ffiq qqdrfr k-+-a Resettlement plan Fq-q mfi %T{\r+1 I gfr- efi-rk d dlrqlft] +Tii Tdrg;T fttqTr.q-qR n+tu rrftEi r

\( cTIdTsI: h@r qq=ffi qfuftrdr orrr|qq, rillgt lmplementation Central Support Consultant (CISC) \t{

o\u r.k.

Government of Nepal Ministry of Federal Affairs and Local Development Central Level Project Implementation Unit Earthquake Emergency Assistance Project Lalitpur, Nepal

Earthquake Emergency Assistance Project (ADB Loan 3260-NEP)

Detailed Project Report

Luitel-Aappipal-Harmibhanjyang-Thalajung- Bhachek Road Subproject, Gorkha,

Section III: Social Safeguard

Volume 2: Revised Resettlement Plan

August, 2017

Prepared by:

Central Implementation Support Consultant (CISC) AF-Iteco Ltd. Switzerland Ekantakuna, Lalitpur

Table of Contents

ABBREVIATION ...... I GLOSSARY OF TERMS ...... II EXECUTIVE SUMMARY ...... 1 1 PROJECT DESCRIPTION ...... 4 1.1 Scope of Land Acquisition ...... 5 1.3 Losses of Trees, Standing Crops ...... 8 2 SOCIO-ECONOMIC PROFILE OF THE AFFECTED HOUSEHOLDS ...... 9 3 INFORMATION DISSEMINATION, CONSULTATION, PARTICIPATION, DISCLOSURE 13 4 GRIEVANCE REDRESS MECHANISMS ...... 14 5. RESETTLEMENT POLICY AND LEGAL FRAMEWORK ...... 17 5.1 Nepal Government Applicable Legal and Policy Framework ...... 17 5.2 ADB‘s Involuntary Resettlement Policy Requirement ...... 21 6. ENTITLEMENTS, ASSISTANCE AND BENEFITS ...... 24 7 RELOCATION OF HOUSING AND SETTLEMENTS ...... 25 7.1 Valuation and Compensation Determination ...... 25 8 INCOME RESTORATION AND REHABILITATION PROGRAM ...... 26 9 RESETTLEMENT BUDGET...... 27 9.1 Compensation for land ...... 28 9.2 Compensation for structures ...... 28 9.3 Compensation for standing crops ...... 28 9.4 Compensation for trees ...... 28 9.5 Other Supporting Cost ...... 30 9.6 Total RP Cost Estimate of Luitel-Aappipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject ...... 30 10. INSTITUTIONAL ARRANGEMENTS ...... 32 11. IMPLEMENTATION SCHEDULE ...... 33 12. MONITORING AND EVALUATION ...... 39

APPENDICES ...... 40 Appendix I: List of Affected Households ...... 40 Appendix II: Poverty Analysis of Interviewed Households ...... 40 Appendix III: Details on Land Compensation Estimation ...... 40 Appendix IV:Details on Structure Compensation Estimation ...... 40 Appendix V: Details on Crop Compensation Estimation ...... 40 Appendix VI: Details on Private Trees Compensation Estimation ...... 40 Appendix VII: Details on CFUG Trees Compensation Estimation ...... 40 Appendix VIII: Details on Fruits Trees Compensation Estimation ...... 40 Appendix IX: Details on Bamboo Clumps Compensation Estimation ...... 40 Appendix X: Nepali Summary ...... 40 Appendix XI: Entitlement Matrix for Resettlement Plan under EEAP ...... 40 Appendix XII: Meeting Minutes ...... 40 Appendix XIII: Photographs of Road Alignment ...... 40 Appendix XIII: ADB Comments……………………………………………………………………35

ii | P a g e

List of Tables

Table 1: Land required by the Subproject ...... 5 Table 2: Summary of Affected Plots along the Alignment ...... 2 Table 3: Summary of Land Loss ...... 6 Table 4: Structure Losses along the Alignment ...... 7 Table 5: Affected Trees by the Road Alignment ...... 8 Table 6: Summary of Affected Households by the Subproject ...... 9 Table 7: Food Sufficiency and Income level of the Affected Households ...... 11 Table 8: Poverty Level of the Affected Households ...... 8 Table 9: Key Difference between ADB Policy and GoN ...... 23 Table 10: Details of Land Rate of the affected Plots ...... 28 Table 11: Labor Requirement for Cutting and Transportation of Trees ...... 29 Table 12: Summary of Harvesting and Transportation Cost of the Affected Trees ...... 29 Table 13: Budget for Resettlement Plan Implementation ...... 31 Table 14: RP Implementation Schedule for Luitel-Aappipal-Harmibhanjyang-Thalajung- Bhachek Road Subproject...... 34

iii | P a g e

ABBREVIATION

ADB The Asian Development Bank AP(s) Affected Person(s)/People CDC Compensation Determination Committee CDO Chief District Officer CFUG Community Forest Users Group CLPIU Central Level Project Implementation Unit CoI Corroder of Impact DCC District Coordination Committee DLPIU District Level Project Implementation Unit DLRO District Land Revenue Office DMS Detailed Measurement Survey DISC District Implementation Support Consultant DSO District Survey Office DTO District Technical Officer EA Executing Agency EEAP Earthquake Emergency Assistance Project FGD Focus Group Discussion GESI Gender Equality and Social Inclusion GoN Government of Nepal GRM Grievance Redress Mechanism Ha Hectare HHs Households IA Implementing Agency IR Involuntary Resettlement LRO Land Revenue Office LEST Livelihood Enhancement Skills and Training MoFALD Ministry of Federal Affairs and Local Development NRA National Reconstruction Authority NRs Nepalese Rupees PMU Project Management Unit RF Resettlement Framework RP Resettlement Plan SPS Safeguard Policy Statement SPAF Severely Project Affected Family sqm Square meter VDC Village Development Committee

I | P a g e

GLOSSARY OF TERMS Affected Persons All persons who as of the cut-off-date stand to lose for the project all or part of (APs) their land or other assets, irrespective of legal or ownership title. Cut-off Date The date of census survey to count the APs and their affected land and assets. Legalizable Those who do not have formal legal rights to land when APs are recorded, but could claim rights to such land under the law of Nepal. Non-titled Those who have no recognizable rights or claims to the land that they are occupying. SPS defines them as illegal inhabitants; termed as squatters or encroachers. However illegal inhabitants as per law of Nepal will be excluded from non-titled. Poverty Line The level of income below which an individual or a household is considered poor. Nepal‘s national poverty line which is based on a food consumption basket of 2,124 calories and an allowance for non food items of about two thirds of the cost of the basket will be adopted by the sub project to count APs under the poverty line. Whereas this poverty level may vary in accordance to district. Reference poverty line for poverty measurement 2015/16 for is NRs 27948.27, calculated on the basis of NRs. 18,428.00 for Rural hills- West Region. By Nepal Living Survey Standard 2010/11 The determination of poor households or persons will be based on the census and socio-economic survey and further confirmed by community meetings.

Project Affected A family consisting of APs, his/her spouse, sons, unmarried daughters, Family daughters-in law, brothers or unmarried sisters, father, mother and other legally adopted members residing with him/her and dependent on him/her for their livelihood. Severely Project A Project Affected Family that is affected by the project such as: Affected a. There is a loss of land or income such that the affected family fall below the Family/People poverty line; and/or (SPAF) b. There is a loss of residential house such that the family members are physically displaced from housing. Titled APs who have formal legal rights to land, including any customary of traditional rights recognized under the laws of Nepal. Third Party An agency or organization to witness and/or verify ―no coercion‖ clause in an agreement with APs in case of voluntary land donation. One independent agency (i.e. not involved in project implementation), preferably working on rights aspect, will be recruited in each development region to serve this function. Vulnerable Group Distinct group of people or persons who are considered to be more vulnerable to impoverishment risks than others. The poor, women-headed, Dalits and IPs households who may or may not fall below poverty line including all other APs who fall below poverty line will be counted as vulnerable APs. Women-headed Household headed by women, the woman may be divorced, widowed or household abandoned or her husband can be working away from the District for long periods of time, where the woman takes decision about the use of and access to household resources.

II | P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

EXECUTIVE SUMMARY 1. This Resettlement Plan has been prepared for the Luitel-Aappipal-Harmibhanjyang- Thaljung-Bhachek road subproject of Gorkha district under the Earthquake Emergency Assistance Project(EEAP). The major objective of the EEAP is to restore and reestablish the use of earthquake damaged infrastructures within existing facilities and Corridor-of- Impact (CoI) with minimal or no land acquisition. This RP is prepared following Resettlement Framework (RF) of EEAP and in accordance with Government of Nepal Land Acquisition Act 2034, The Reconstruction Related Act 2072 and its Working Procedures 2072, and ADB Safeguard Policy Statement 2009. 2. The objectives of the RP are to ensure adequate safeguard measures and appropriate entitlements are provided to affected persons wherever involuntary resettlement is observed. The RP explains processes adopted for preparation of the resettlement plan impact due to construction of road, mitigation measures and implementation.

3. The RF will guide the preparation of resettlement plans during the project implementation, according to which EEAP subprojects will avoid or minimize land acquisition and involuntary resettlement wherever possible. In unavoidable situation, the project will ensure the APs‘ rights and they will receive assistance. 4. APs have been informed and consulted about the involuntary resettlement during the survey of subproject. Special attention has been paid to ensure that the vulnerable groups and the women-headed households receive appropriate assistance. The national laws, regulation, resettlement framework of EEAP and ADB‘s resettlement safeguard policy have been followed during the planning and preparation of Resettlement Plan. During the survey consultations, none of household has shown interest to donate their land. Thus, they are not compelled to donate their land and hence all private lands affected under new cutting are subjected for compensation.

5. The total length of the Luitel-Aappipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha is 30.575 km. The road alignment starts from Luitel Gaun of Municipality and ends at Ajirkot Rural Municipality, Bhachek. It passes through Palungar Municipality, Siranchowk, Ajirkot Rural Municipality, Bhachek..The existing alignment is mostly earthen with stone soling in some sections which is proposed to upgrade to all weather Bituminous road (Premix Carpeting) by DCC Gorkha

6. There are total 703 land plots. Out of them, 127 non-registered plots1 are government plots and 614 private plots are to be acquired and deed needs to be transferred in the name of this road. Among the total land plots, 18 are under the authority of the Guthi, namely Kot Kalika Guthi. As observed during the field survey, Guthi plots are uncultivated land having no tenancy. On the other hand, 127 plots belong to non-registered plots. All these plots don‘t have official land ownership in the District Land Survey Office. A public notice will be published and informed among the local people for the review and claim of these land plots in consultation with the LRO and DLPIU.

7. Altogether, 106 structures are being affected. Out of them, 30 are public structures and remaining 76 are private. Among these private structures, 24 are fully affected residential buildings including 15 residential buildings affected by earthquake 2015. There are 9 secondary structures that categorically include 5 cattle sheds, 3 toilets, and 1 pali. 43 temporary shelters with CGI roofing have been established in the aftermath of earthquake.

1 Non registered plots: - Land plots having no official land ownership in the District Land Survey Office, Gorkha 1| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

The public structures include chautaras, tapstand, drinking water reservoir, and community schools.

8. Similarly, the road alignment involves cutting trees within the formation width. Total of 292 private trees, 142 private fruit trees, 475 bamboos, 59 cash crops (amriso/cardamom), 583 trees belonging to 3 CFUGs, 142 GoN trees, 85 different institutional trees need to be cleared for the road construction. In addition to the trees, standing crops from the affected private plots are also affected during construction. Although, various crops are found in the affected plots, paddy cultivation is in most of the plots.

9. The affected households verified from cadastral report showed that total of 342 HHs of different socio-economic background is affected by the road subproject. A census socio- economic and loss assessment survey of the project affected people was conducted in order to study the project impact upon them. Out of 342 HHs, 204 HHs were present for the interview and rest 138 HHs were found absent in the project area, meaning they are living outside the project area. Out of total 342 HHs, 204 HHs of 1234 population were available for socio-economic survey. Of the total HHs, 67 HHs belong to Brahamin/Chhetri, 24 Newar 35 Dalits, 78 Janajatis and 9 HHs are headed by female.

10. In an average, the interviewed families have 2.96 ha of land which will reduce to 2.94 ha after subproject intervention. The interviewed HHs having agricultural source of income will be affected for temporary period. On the other hand, APs having income through non- agricultural sector are less affected by the sub-project The average agricultural income of the 204 affected HHs is NRs 82166.27 annually in the current situation which will decrease to NRs 80844.13 in a year after the project intervention. This shows they will loss NRs 1322 in average in a year after the loss of their land to the sub-project. Similarly, the average food sufficiency of the APs from their own agriculture production is 7.08 months, which will slightly decrease to 6.96 months following the implementation of subproject. The APs are involved in small business activities, like grocery shop, tea shop, hardware shop, clothing store. The other non-agricultural incomes of the interviewed HHs are remittance, private and government services and wage labor. The APs will be incorporated in Income Restoration and Rehabilitation Training program under RP.

11. The data analysis of the APs shows that there are 204 interviewed households. 2 HHs lose more than 5 percent of their total land holding and 3 HHs are found below district poverty level. All the subproject affected persons within Right of Way (10 m) have requested to be compensated in cash. The APs losing residential buildings have another house for temporary shifting making them less vulnerable in terms of resettlement. All the residential structure owners have either enough space in the same plot or other plot beyond CoI of the road in order to rebuild their house. Those affected HHs will be provided compensation with relocation cost/business allowances before having their structures dismantled. Also, the earthquake affected families, living in the temporary sheds, will be resettled in the land beyond the CoI enabling them to continue with their business (tea-shops, grocery shops). Hence, there is no need to find resettlement land area for the APs.

12. The project affected families shared that they were severely affected by the earthquake of 2014. And 78 janajati families shared that they have their own language and traditions. Apart from the mainstream festivities, ethnic communities celebrate festivals. These indigenous APs lose land plots along the road alignments, but according to them, there are

2| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

no cultural heritage that they are losing for the subproject. Hence, the subproject intervention does not affect the culture or harm the identity of the indigenous people along the alignment. So no adverse impact has been assessed among indigenous households due to project intervention.

13. The interviewed indigenous APs have same level of access to the education, health and government facilities and market networks compared to the other caste groups. Thus it is expected that they have equal social status to enjoy the same level of benefits from this subproject implementation in future. This road will provide better access to market, education institutions, and Health center and government service offices.

14. A well-defined grievance redress and resolution mechanism has been established to resolve grievances and complaints in a timely and satisfactory manner. District Level Project Implementation Unit (DLPIU) is playing key role to address all kinds of grievances of project affected people. All affected HHs are oriented and made fully aware of their rights, and the detailed grievance redress procedures have been publicized through an effective public information campaign. First Level of GRM has initiated its work at field effectively.

15. During the socioeconomic survey, 204 interviewed HHs have expressed their interest to be the part of the training and benefit from entrepreneurial skills. Among 90 HHs proposed for the training, priority will be accorded to Dalits, Janajatis, women HH-heads, BPLs HHs. Income restoration program (IRP) will be designed for one person per family in the age group 16-45. Different categories of trainings are under finalization in the district and the tentative cost of the training program is NRs 2518976.22.

16. The total cost estimated for implementation of this RP is NRs 69.10 million in which NRs 53.81 million is direct compensation amount. The other RP expense title includes deed transfer assistance amount, training amount for APs and 20 percent contingency of the total cost for any unseen expenses during implementation period.

17. The National Reconstruction Authority (NRA) is the executing agency of the project. The Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and Local Development (MOFALD) supported by Central Implementation Support Consultant (CISC) provides overall guide and monitoring of the project activities at central level. District Level Project Implementation Unit (DLPIU) supported by District Level Implementation Support Consultant (DISC) will be responsible to implement overall activities at district.

3| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

1 PROJECT DESCRIPTION

18. This Resettlement Plan has been prepared for the Luitel-Aappipal-Harmibhanjyang- Thaljung-Bhachek road subproject of Gorkha district under the Earthquake Emergency Assistance Project(EEAP). The major objective of the EEAP is to restore and reestablish the use of earthquake damaged infrastructures within existing facilities and Corridor-of- Impact (CoI) with minimal or no land acquisition. This RP is prepared following Resettlement Framework (RF) of EEAP and in accordance with Government of Nepal Land Acquisition Act 2034, The Reconstruction Related Act 2072 and its Working Procedures 2072, and ADB Safeguard Policy Statement 2009. 19. The objectives of the RP are to ensure adequate safeguard measures and appropriate entitlements are provided to affected persons wherever involuntary resettlement is observed. The RP explains processes adopted for preparation of the resettlement plan impact due to construction of road, mitigation measures and implementation.

20. The RF will guide the preparation of resettlement plans during the project implementation, according to which EEAP subprojects will avoid or minimize land acquisition and involuntary resettlement wherever possible. In unavoidable situation, the project will ensure the APs‘ rights and they will receive assistance. 21. The total length of the Luitel-Aappipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha is 30.575 km. The road alignment starts from Luitel Gaun of Palungtar Municipality and ends at Ajirkot Rural Municipality, Bhachek. It passes through Palungar Municipality, Siranchowk, Ajirkot Rural Municipality, Bhachek. The existing alignment is mostly earthen with stone soling in some sections which is proposed to upgrade to all weather bituminous road (Premix Carpeting) by DDC Gorkha.

22. The road alignment passes through settlement area, national forest, community forest and agricultural land. The project area is located in Gorkha District is located in the in the Western Development Region of Nepal. Its elevation ranges from 488 to 8156 m. Ecologically, it lies in the hilly region bordering Tibet (China) in the north, Dhading & Tibet (China) in the east, Lamjung, Chitwan, Tanahun & Dhading in the south and Tanahun, Lamjung, Manang, Chitwan & Tibet (China) in the west.

23. The National Reconstruction Authority (NRA) is the executing agency of the project. The Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and Local Development (MOFALD) supported by Central Implementation Support Consultant (CISC) provides overall guide and monitoring of the project activities at central level. District Level Project Implementation Unit (DLPIU) supported by District Level Implementation Support Consultant (DISC) will be responsible to implement overall activities at district.

4| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

1.1 Scope of Land Acquisition

1. The road subproject requires 30.575 ha of land for its implementation. Out of total required land, 14.499 ha of land are under private ownership in which 6.262 ha is already occupied by the existing road. Thus, 8.237 ha of new private land need to be acquired as new cutting area. Table 1 presents the detail of affected land to be acquired for the subproject.

Table 1: Land required by the Subproject SN Land Requirement within the CoI (10 m) Area in hectare 1. Private land 14.499 1.1 Private land under existing area 6.262 1.2 Private land under new cut area 8.237 2 Public land 16.076 Total land area 30.575 Source: Cadastral Survey, February, 2017

2. Cadastral survey team was mobilized after the detailed design of the subproject. According to the cadastral survey report, there are total 703 land plots to be acquired by the subproject. Among the total land plots, 18 land plots come under the guthi, 127 plots belong to non-registered plots. (Refer Table 2).

Table 2: Summary of Affected Plots by the Subproject SN Affected Plot Count 1 Total Interviewed Plots 303 2 Non-Interviewed Plots 166 3 Total Plots of Guthi 18 4 Non-Registered Plots 127 5 Public Land Plots (Government of Nepal) 89 Total plots 703 Source: Cadastral Survey, February, 2017

3. There are 127 plots lacking official land ownership. These are labeled as ‗non-registered‘ plots in this report. The Surveyor made field verifications checked the field books and documents at LRO but these plots lack other information except their plot numbers. A public notice will be published and informed to local people for the review and claim of these land plots. These land plots, during household survey, were found uncultivated. However, there will be no time limit for claiming ownership to those plots.

4. It is noted from the field survey that 78 families belonging to janajati category lose land in the subproject. However, it is learnt that they have no significant cultural resources over the land that they are losing for the subproject. Neither the subproject intervention has any disturbances nor any impact on the customary rights of these indigenous populations (economic impact is discussed in next chapter). Hence, the subproject intervention does not affect the culture or harm the identity of the janajati people along the alignment.

5| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

5. The average land holding of affected households is 2.96 ha which will reduce to 2.94 ha after land acquisition of the subproject. Out of 204 interviewed affected households, 2 households lose more than 5 percent of total land holding. In average, these households lose 0.02 ha. Table 3 summarizes extent of land loss in the road sub-project.

Table 3: Summary of Land Loss Land Loss Measure Pre Project Post Project Count Percent Count Percent 1. Land Holding <0.5 ha 30 14.71 30 14.71 0.5-1.0 ha 64 31.37 69 33.82 >1.0 ha 110 53.92 105 51.47 Average Holding (ha) 2.96 2.94 2. Land Loss Losing <5% 202 99.02 Losing >5% 2 0.98 Average Holding (ha) 0.02 Source: Household Survey, February, 2017

6| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

1.2 Losses of Structures

6. Apart from land, crops, tree loss, there will be loss of structures within the CoI. Altogether 106 structures out of this 30 structures are public and 76 structures belonging to 68 owners will be affected by the road subproject. The 76 private affected structures are 9 residential houses, 3 toilets, 1pali, 5 cattle sheds, 15 residential buildings are affected by recent earthquake, 43 CGI huts (taharas) and 30 public structures including 14 electric poles and 11 community chautaras, 2 tapstands, 1 drinking water reservoir, and 2 community schools. The 43 huts are CGI roofed-walled temporary structures were built as temporary residences after the devastating earthquake of April 25, 2015. Table 4 presents a brief account of affected structures (details have been tabulated in Appendix IV).

Table 4: Structure Losses along the Alignment SN Structure Owners Count Remarks Physically Displaced (Yes/No) hip 1 Total Private Private 76 structures 1.1 Residence Private 9 Residence Yes. Though they have other houses, allowances have been allocated in accordance with entitlement matrix 1.2 Pali Private 1 Pali No. Partially affected. Allowances have been allocated in accordance with entitlement matrix. 1.3 Toilets Private 3 Toilets No. Allowances have been allocated in accordance with entitlement matrix. 1.4 Sheds Private 5 Sheds No. Allowances have been allocated in accordance with entitlement matrix. CGI Huts Private 43 CGI Huts Allowances have been allocated in accordance with entitlement matrix 1.4 Residence Private 15 Residence EQ affected. Allowances have been allocated in accordance with entitlement matrix 2 Total Public Public 30 Allowances have been allocated in structures accordance with entitlement matrix 1.5 Community Public 11 Communit Chautara, y Chautara, 1.6 Drinking Public 1 Drinking water water reservoir reservoir 1.7 Tap stand Public 2 Tap stand 1.8 School Public 2 School 1.9 Electric pole Public 14 Electric pole 1.1 Total affected 106 0 structures Total affected structures 106 Source: Household Survey, February, 2017

7| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

7. Total 76 private structures are affected by the subproject alignment and 25 belong to janajati, 11 dalits whereas 40 structures belong to Newar and Brahmin/Chettri family. Although the janajati and dalit families are being physically displaced by the subproject, it is learnt that they have another house for temporary shifting making them less vulnerable in terms of resettlement. Similarly, all the residential structure owners have either enough space in the same plot or other plot nearby beyond CoI of the road in order to rebuild their houses.

1.3 Losses of Trees, Standing Crops

8. The road alignment passes through three community forest area, Aamdadar Community Forest Users Group (CFUG), Andheri Pakha Community Forest Users Group (CFUG), Tarke Dada Community Forest Users Group and GoN Trees. Hence, the alignment requires cutting down of trees and seedlings from the forest area and also from private land area. There are 583 trees from CFUGs, 142 GoN trees, 85 Institution trees and 968 trees from private land (including fruit trees, bamboo clumps and cash crops) which need to cut down for the road improvement. The affected trees are Sal, Sallo, Katus, Chilaune, Lakuri and Uttis timber by the community people. There are also bamboo clumps, some cash crops like amriso and cardamom, and fruit trees like mango, banana, guava, jackfruit from private land that needs to be cleared for the construction of the road. Table 5 presents a brief account of affected trees (details have been tabulated in Appendix VI).

Table 5: Affected Trees by the Road Alignment SN Ownership Count Remarks 1 Private trees 292 2 AamdadaCFUG 18 3 AndheriPakhaCFUG 19 4 Tarke Dada CFUG 546 5 GoN Trees 142 6 Institutional Trees 85 7 Private Bamboo clumps 475 Private 8 Fruit Trees 142 Private 9 Alaichi 15 Private 10 Amriso 44 Private Source: Household Survey, February, 2017

9. Private structures affected by the subproject alignment mainly belong to janajati and dalit family. Out of 76, 46 structures are owned by janajati and 11 dalit families are being temporarily displaced by the subproject. It is learnt that they have houses elsewhere for temporary shifting making them less vulnerable in terms of resettlement. Similarly, all the residential structure owners have either enough space in the same plot or other plot beyond CoI of the road in order to rebuild their houses. Also, the earthquake affected families, living in the temporary sheds, will be resettled in the land beyond the CoI enabling them to continue with their business (tea-shops, hotels, grocery shops).

8| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

2 SOCIO-ECONOMIC PROFILE OF THE AFFECTED HOUSEHOLDS

10. A detailed socio-economic survey was conducted to investigate affected households‘ income, food sufficiency, livelihood options, loss of land, structures, trees and other assets. The affected families are included, within the families from Ch 0+000 until Ch 30+575. The total affected households are 342; socio-economic survey was carried for 204(61.82%) households‘ having 1234 populations. Out of total APs, 67 HHs are from Brahmin/Chettri, 24 HHs from Newar, 35 HH from Dalit and 78 HHs are from Janjati. There are 9 women- headed HHs in the subproject area. The Table 6 provides summary of the affected households.

Table 6: Summary of Affected Households by the Subproject SN Variable Count 1 Total Affected HHs 342 2 Interviewed HHs 204 2.1 Dalit HHs 35 2.2 Janjati HHs 78 2.3 Newar HHs 24 2.4 Brahmin/Chettri HHs 67 3 Interviewed Population 1234 3.1 Male 630 3.2 Female 604 3.3 Average HHs Size 6.04 4 Non-Interviewed HHs 138 5 Women headed HH 9 Source: Household Survey, February, 2017

9| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

11. As per the survey, the maximum families are engaged in agricultural activity and few families are not engaged in agriculture. The families in agriculture occupation in this area are involved in the cultivation of paddy, wheat, maize etc. The major sources of non-agriculture income are small business activities like running tea shop, grocery shop, remittances, job in different institutions, pension and government allowances. The members of the affected families are mostly in Gulf countries (India, Malaysia and some European countries) whose income plays a crucial role in the sustenance of their family.

12. The food sufficiency of the affected families from their own land is 7.08 month per year in an average which will reduce to 6.96 months after their land loss to the subproject. There are 60 families who reported that they have food sufficiency for 10-12 months. The food supply during the deficit period is covered through income from non-agricultural sectors. Table 7 gives the details of the food sufficiency and other income level.

Table 7: Food Sufficiency and Income level of the Affected Households Pre-Project Post-Project Variables Frequency Percent Frequency Percent 1. Food Sufficiency

1-3 Months 37 18.14 38 18.63 4-6 Months 84 41.18 84 41.18 7-9 Months 23 11.27 23 11.27 10-12 Months 60 29.41 59 28.92 Average (months) 7.08 6.96 2. Agriculture Income (HH) <=12000 19 9.31 19 9.31 12000-25000 16 7.84 16 7.84 >=25000 169 82.84 169 82.84 Average (NRS) 82166.27 80844.13 3. Non-Agriculture Income

(HH) <=12000 8 3.92 12000-25000 7 3.43 >=25000 189 92.65 Average (NRS) 300003.43 4.Total Income (HH) <=25000 0 0 0 0 25000-50000 4 1.96 4 1.96 >=50000 200 98.04 200 98.04 Average (NRS) 382169.71 380847.57 Source: Household Survey, February, 2017

10| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

13. Table 7 reveals that the non-agricultural income occupies the maximum (21.50 %) share of the family income which remains unaffected by the road implementation. The agricultural income is expected to reduce by NRs. 1322 due to the land loss.

14. Table 8 reveals that the poverty analysis shows that 3 households fall below the district poverty level before and after the sub-project and 2 households will lose more than 5 percent of their total land.

Table 8: Poverty Level of the Affected Households Variables Pre-Project Post Project Frequency Percent Frequency Percent <5% Land Loss 202 99.02 202 99.02 Above Poverty Level 199 97.55 199 97.55 Below Poverty Level 3 1.47 3 1.47 >5% Land Loss 2 0.98 2 0.98 Above Poverty Level 2 0.98 2 0.98 Below Poverty Level 0 0.00 0 0.00 Source: Household Survey, February, 2017

15. The janajati APs have same level of access to the education, health and government facilities and market networks compared to the other caste groups. Thus it is expected that they have equal social status to enjoy the same level of benefits from this subproject implementation in future. This road will provide better access to market, education institutions, and health center and government service outlets. In addition, Aappipal municipality is also famous for Mission Hospital which is situated in the zone of influence of this road subproject.

.

11| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

16. The interviewed families visit local and district headquarters as per their need. Each family is active in community participation and they are affiliated to at least one community institutions. In average, the members are educated until secondary level, every house has toilet and all the children are immunized which shows that the affected families along the road alignment are well informed, have access to social networks and benefits and are mobile in their everyday life.

17. It is noted from the survey that 78 families belonging to janajati category lose land in the subproject. These janajati families have their own language, customs and traditions. They celebrate Lhosar (Tamu Lhosar by Gurung community and Sonam Lhosar by Tamang community) as an important festival in addition to other popular Hindu festivals once a year as per their belief. However, they have no cultural heritage due to the intervention of the sub project

18. Almost every affected family was affected by the earthquake of April 2015. Among the interviewed families, 100 percent families responded that their residential structures were affected by the earthquake.

19. It is expected that the road improvement will provide better access to market, education institutions, and health centres and government offices. It will reduce the prices of everyday necessities and also accelerate the earthquake emergency works. Similarly, the janajati families have same level of access to the education, health and government facilities and market networks compared to the other caste groups. Thus, it is expected that they have equal social status to enjoy the same level of benefits from this subproject implementation in future. The female headed families, families below poverty level, families losing more than 5 percent of total land are the target population and will be prioritized for benefit schemes like income restoration program in the subproject. Since allowances have been provided to APs as per the entitlement matrix, there is no additional vulnerability due to project intervention.

12| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

3 INFORMATION DISSEMINATION, CONSULTATION, PARTICIPATION, DISCLOSURE 20. The public community meeting and interviews were carried out with the owners of land and structures regarding the road upgrading program along the alignment.They were provided information on ADB Policy on Involuntary resettlement, compensation and entitlement, RF of the EEAP. The communities were explained about:

1. Relevancy of the road subproject scope and schedules, 2. Key features of RP and its impact on project, 3. About land acquisition, compensation and other entitlements schemes, 4. About Grievance redress mechanism , and 5. Special consideration and assistance of all vulnerable groups 6. Overall projects norms, guidelines, websites and contact person for more details

21. There were several public meetings with APs, and with the other stakeholders along the alignment. The details of consultation meeting have been presented in the Appendix XII. The local leaders and the villagers also facilitated for consultations with the affected people during cadastral and household listing and socio-economic and loss assessment survey of the families. During the community consultations, people expressed that they would fully support the project implementation. Till the period of RP preparation, no complaints were received from affected people.

22. DLPIU will play lead role to publish notice of affected land as per the land acquisition act 2072 NRA with the support of CISC and other public consultation program for RP implementation is conducted by DISC with close consultation of DLPIU. In addition, project affected people has already been informed about overall EEAP project norms, rules and regulations during HHs survey. RP has been approved by NRA, and disclosure is under process.

13| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

4 GRIEVANCE REDRESS MECHANISMS 23. The objective of the Grievance Redress Mechanism (GRM) is to resolve complaints as quickly as possible and at the local level through a process of conciliation; and, if that is not possible, well defined grievance redress and resolution mechanism will be followed. A well- defined grievance redress and resolution mechanism is guided by the RF which will be fully disseminated to APs and they are made aware of the rights. The grievance redress process includes four levels which is shown in the figure.

Figure 1: Grievance Redress Mechanism

Grievance

1-2 days Field Level: Grievance 1st Level Grievance Contractor, Redressed DISC,DLPIU

7 days nd Grievance 2 Level Grievance CLPIU Redressed

15 days Grievance 3rd Level Grievance Grievance Redress Redressed Committee

4th Level Higher Authority Grievance Court of Law

Note: CLPIU-Central Level Project Implementation Unit, DLPIU-District Level Project Implementation Unit, DISC-District Level Implementation Consultant

14| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

23.1 First level of GRM: The first level and most accessible and immediate contact for the fastest resolve of grievances are the contractors, and design and supervision consultants on site. Prior to construction of any works, the CLPIU and DLPIU will ensure local community meetings are held to notify local residents and businesses of any temporary disturbances, and to inform them of the Project. If a local area committee (LAC) exists in the area, they should also be informed. If any complaints arise, the contractors, consultants, and DLPIU can immediately resolve the complaint on site. The CLPIU can also be involved in grievance redress at this stage. The CLPIU and DLPIU office phone number will be posted in public areas within the subproject areas and construction sites. Any person with a grievance related to the project works can contact the project to file a complaint. The DLPIU offices will have a safeguards focal person to field and resolve complaints. The safeguards (environment and resettlement) focal person will document the complaint, and immediately address and resolve the issue with the contractor within 1-2 days, if the complaint remains unresolved at the field level. The DLPIU may seek the assistance of the consultant safeguards specialists (the environmental specialist or social safeguards specialist) to resolve the issue. The DIU safeguards focal person will notify the CLPIU safeguards focal person that a complaint was received, and whether it was resolved. The DLPIU safeguards focal person will fully document the following information: (i) name of the person; (ii) date complaint was received; (iii) nature of complaint; (iv) location, and (v) how the complaint was resolved.

23.2 Second level of GRM:If the grievances remain unresolved; the DLPIU will forward the complaint to the CLPIU safeguards focal person. The person filing the grievance will be notified by DLPIU safeguards focal person that the grievance was forwarded to the PIU safeguards focal person. The CLPIU will address the grievance. Grievances will be resolved through continuous interactions with affected persons, and the CLPIU will answer queries and resolve grievances regarding various issues including environmental or social impacts. Corrective measures will be undertaken at the field level by the CLPIU safeguards focal person within 7 days. He/she will fully document the following information: (i) name of the person; (ii) date complaint was received; (iii) nature of complaint; (iv) location and (v) how the complaint was resolved.

23.3 Third level of GRM:If the grievance remain unresolved, the CLPIU‘s project director will activate the third level of the GRM by referring the issue (with written documentation) to a Grievance Redress Committee (GRC) constituted by the EA, which will, based on review of the grievances, address them in consultation with the PMU, CLPIU, DLPIU, and affected persons. The GRC will consist of PMU leadership, affected persons, and local area committee, among others—determined to provide impartial, balanced views on any issues. The GRC should consist of at least five persons. A hearing will be called with the GRC, if necessary, where the affected person can present his/her concern and issues. The process will promote conflict resolution through mediation. The GRC will meet as necessary when there are grievances to be addressed. The GRC will suggest corrective measures at the field level and assign clear responsibilities for implementing its decision within 15 days. The functions of the GRC are as follows: (i) to provide support to affected persons on problems arising from environmental or social disruption, asset acquisition (where required), and eligibility for entitlements, compensation, and assistance; (ii) to record grievances of affected persons, categorize and prioritize them, and provide solutions within 15 days; and (iii) to report to the aggrieved parties developments regarding their grievances and

15| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

decisions of the GRC. The PMU safeguards focal person will be responsible for processing and placing all papers before the GRC, recording decisions, issuing minutes of the meetings, and taking follow-up action to see that formal orders are issued and the decisions carried out.

23.4 Fourth level of GRM: In the event that a grievance is not addressed by the contractor, DISC, DLPIU, CLPIU or GRC, the affected person can seek legal redress of the grievance in the appropriate courts, the fourth level of the GRM, which is the formal legal court system. The GRM however does not prevent affected persons from seeking legal redress at any time.

24. Further 1st level GRM is under function which looks after field level grievances to quickly resolve the issues. Till date, only one grievance was recorded and it was also resolved.

16| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

5. RESETTLEMENT POLICY AND LEGAL FRAMEWORK

5.1 Nepal Government Applicable Legal and Policy Framework

25. This section provides the review of national laws, policies of the donor agency and the Resettlement Framework of the EEAP that applies to the project.

26. The Land Acquisition Act, 2034 (1977) is the main legal document on land acquisition and resettlement activities in Nepal. There is provision in Clause 3 of the Act to acquire land for any public purpose, subject to award of compensation. According to Clause 4, institutions seeking land acquisition may also request the Government of Nepal to acquire land under regular provisions, subject to compensation by such institutions. Clause 27 of the Act provides for land acquisition through negotiation with the plot owners, were all processes specified in the Act is not required.

27. The Reconstruction Related Act 2072 (2015)2 is the most recent Act promulgated after the earthquake of April 2015 for the reconstruction of earthquake affected structures. The Notice 2, Part 3 and Part 5 of this Act‘s Regulation explains the land acquisition and compensation determination process and procedures, named under, ‗the working procedures on land acquisition required for reconstruction of earthquake affected structures, 2072‘. The major clauses of these working procedures related to land acquisition are highlighted under:  Clause 3-4: the land required for reconstruction project can acquire land from anywhere for the project and reserves right to enter such land.  Clause 5 (1): the project head should include the details of the land to be acquired and send for approval to NRA secretary.  Clause 5 (3): after NRA approval, the project head should publish the details of the land plots to be acquired in national or local level newspaper requesting the land owners to register complain within 15 days if they do not agree.  Clause 5 (4-10): processes of keeping such land plots on hold and resolve disagreements of the land owners if any.  Clause 6 (1): the project head will write to land registration office for transferring the ownership of the land plots acquired according to Clause 5 (3) and Clause 5 (7) in the name of Government of Nepal.  Clause 8 (2): formation of Compensation Determination Committee (CDC).  Clause 10 (1-2): CDC should determine the compensation rate on the basis of market rate, vulnerability of the loss-owner and so on which should be stated in the decision minute.  Clause 10 (3): CDC should make the compensation decisions public as soon as possible to notify the landowners, publish in national or local newspapers, notice in VDC or municipality board about details of compensation amount recipients, date and place to receive compensation and about place and duration to complain if not agree with the compensation amount.  Clause 11 (1): Unsatisfied individuals can complain about the compensation amount within 15 days of the notice publication.

2 This is unofficial translation extracted from Nepal Gazet, Regulations on Reconstruction of Earthquake Affected Structures, 2072 (Nepali language), Part 3 and Part 5.

17| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

 Clause 11 (2-4): process of resolving complains received as per Clause 11 (1).  Clause 12 (1): compensation should be given to any standing crops or trees or plants of the land plots while entering in lands as per Clause 4.  Clause 13 (1-4): duration to receive compensation is 3 months from the date of notice publication as Clause 10(3). If not, the project head shall register the amount in the office and public the notice to receive the amount within 6 months. If the recipients still do not claim the amount, such amount will be no longer payable and register in reserve fund.  Clause 16: if any public land needs to acquire but occupied by any individual, government can compensate with other public land to those individual, if land is available.  Clause 17: If the remaining land area becomes unusable after land acquisition, the remaining land shall be acquired by the project if complained by the landowner within 35 days of notice publication as per Clause 10(3).

28. The National Policy on Land Acquisition, Resettlement and Rehabilitation in Infrastructure Development Projects 2015 provide clear guidelines to screen, assess and plan land acquisition and resettlement aspects in development projects. The Policy highlights the need to handle resettlement issues with utmost care and forethought particularly in case of vulnerable groups. There are provisions of voluntary land donation by non-poor. Voluntary donation will be accepted if a) donation of land is < 10% of his agriculture land b) The donation is unforced, not the result of community pressure and MOU should be signed and is witnessed by third party c) Land donating HHs should not be from vulnerable group and poor families d) APs is fully consulted informed about their rights. Non- titled (encroachers/squatters) are eligible for compensation for their property except land compensation for structure; crops and tree should be calculated scientifically not less than market price.

29. The Constitution of Nepal 2015 guarantees the fundamental rights and duties of a citizen. Article 30(1) establishes the right to property for every citizen of Nepal, whereby every citizen is entitled to earn, use, sell and exercise their right to property under existing laws. Article 30 (2) states can impose taxes on the property of person as necessary on the basis of principles of progressive taxation. Article 30(3) states shall not except in the public interest, requisition or acquire, or otherwise create any encumbrance on, the property of the people. But not apply to any property acquired in an illicit manner. Article 30 (4) in requisition of private land for public interest according to sub-article (3), it shall be done on the basis of compensation and procedural law. Article 30 (5), Nothing in sub –articles (3) and (4) shall be deemed to prevent the state in enforcing land reform, management and regulation for the purpose of increasing production and productivity of land, modernization and commercialization of agriculture, environment preservation, organized housing and planned urbanization.

30. The Guthi Corporation Act 1976, in case of Guthi Land acquisition must also comply with the provisions set out in. The second amendment in 1993, section 43 of the Act states that if Government of Nepal thinks that any Guthi land is required for social welfare or community interest, such a lad can be acquired at a concessional rate. In addition, the Act states that

18| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

the compensation of Guthi land will be divided into Guthi and the tenants. The Guthi will receive 33 percent and the tenant will receive 67 percent of the total compensatory amount. 31. The Public Roads Act 1974 empowers the government to acquire any land on a temporary basis for storage facilities, construction camps and so on during construction and upgrading of roads. Any buildings and other structures such as houses, sheds, schools, and temples are to be avoided wherever possible. The government is required to pay compensation for any damages caused to buildings, standing crops and trees. Compensation rates are negotiated between the government and the landowners. 32. The Land Reform Act 1964 is also relevant. As per the Act, a landowner may not be compensated for more land than s/he is entitled to under the law. This Act also establishes the tiller‘s right on the land which s/he is tilling. The land reform act additionally specifies the compensation entitlements of registered tenants on land sold by the owner or acquired for the development purposes. The Act amendment most recently in 2001 has established a rule that when state acquires land under tenancy, the tenant and the landlord will each be entitled to 50 percent of the total compensation amount.

33. The Malpot Ain or Land Revenue (land administration and revenue) Act, 2034 is the main Act to carry out land administration including maintenance and updating records, collection of land revenue and settlement of the disputes after completion of survey and handing over the records to LRO by the Survey Parties. It authorizes the LRO for registration, ownership transfer and deed transfer of land. This Act also authorizes the LRO to transfer ownership and deeds of individual land, if any person applied for the ownership and deeds of individual land, if any person applied for the ownership transfer of his/her land with mutual understanding for public use with recommendation of relevant committee. 34. Local Self Governance Act 1999: The Clause 258 in the Part – 5, General Provisions relating to Local Body Chapter – 3, Miscellaneous of the Local Self-Governance Act, 1999 has provision of land acquisition. The Clause states that in case the Local body has to acquire land to carry out any development and construction works within its area, it may acquire the land required for that work by following the requirements of the prevailing law and providing compensation to the concerned land-owner for the land. The Clause 149 of the LSGA has provision of prohibition on construction of building without obtaining approval. The clause states that no person shall, without obtaining construction approval from the Mayor, do 'construction of a building'3 in the municipal area. According to the Clause 161(1) the Mayor may depute any engineer, overseer or employee to inquire into the following matters in respect to any building constructed or being constructed by anyone in the municipal area: Whether or not approval has been obtained pursuant to this Act to construct such a building, Whether or not such a building has been constructed or is being constructed in accordance with the design approved pursuant to this Act, and Whether or not any public land, road, temple, courtyard, sewerage, canal, pond etc. is encroached upon from such a building. (2) The person deputed to inquire into the matters pursuant to Subsection (1) shall have to inquire into the matter according to the prevailing law and submit a report, along with his/her suggestions, to the Mayor within fifteen days of his/her deputation. (4) In case it is held, as per the report submitted

3 The act of "construction of building" means the act to construct a new building, to reconstruct by demolishing the old building, to add a storey or to alter the facade, or to construct a window, door, veranda, attic, porch, shed, stable or garage or erecting a compound wall in alternation of the existing design

19| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

pursuant to Subsection (2) above, that anyone has constructed or is constructing a building without obtaining approval pursuant to this Act or by encroaching upon any public land, road, temple, courtyard sewerage, canal, pond, etc., the Mayor shall have to order to demolish the building or any portion thereof. (5) In case it is held, as per the report submitted pursuant to Subsection (2), that any person has constructed or is constructing a building by altering the design approved pursuant to this Act without obtaining approval of the Mayor, the Mayor may order to punish such a person with a fine of up to one hundred thousand rupees or to demolish the building or any portion thereof.

35. The Clause 163 (1) mentioned that in cases where an order has been issued pursuant to Sub-section (4) or (5) of Clause 161 to demolish any building or any portion thereof, the concerned person shall have to demolish such a building or any portion thereof according to the order of the Mayor or the decision of the Appellate Court within thirty-five days of the decision made by the Appellate Court requiring the demolition of such a building or any portion thereof. (2) If the concerned person does not demolish such a building or any portion thereof within the time-limit referred to in Sub-section (1), the Municipality itself may demolish such a building or any portion thereof, and the expenditures incurred for so demolishing shall be realized from the concerned person.

20| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

5.2 ADB’s Involuntary Resettlement Policy Requirement

36. The objectives of ADB‘s Safeguards Policy Statement, 2009 (SPS) with regard to involuntary resettlement are: (i) to avoid involuntary resettlement wherever possible; (ii) to minimize involuntary resettlement by exploring project and design alternatives; (iii) to enhance, or at least restore, the livelihoods of all displaced persons in real terms relative to pre-project levels; and (iv) to improve the standards of living of the displaced poor and other vulnerable groups.

37. ADB‘s SPS covers permanent and temporary physical displacement (relocation, loss of residential land, or loss of shelter) and economic displacement (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. The SPS covers them whether such losses and involuntary restrictions are full or partial, permanent or temporary.

38. For any ADB operation requiring involuntary resettlement, resettlement planning is an integral part of project design, to be dealt with from the earliest stages of the project cycle, taking into account the following basic principles:

I. Screen the project early on to identify past, present, and future involuntary resettlement impacts and risks. Determine the scope of resettlement planning through a survey and/or census of displaced persons, including a gender analysis, specifically related to resettlement impacts and risks. II. Carry out meaningful consultations with affected persons, host communities, and concerned nongovernment organizations (NGOs). Inform all displaced persons of their entitlements and resettlement options. Ensure their participation in planning, implementation, and monitoring and evaluation of resettlement programs. Pay particular attention to the needs of vulnerable groups, especially those below the poverty line, the landless, the elderly, women and children, and indigenous people, and those without legal title to land, and ensure their participation in consultations. Establish a grievance redress mechanism to receive and facilitate resolution of the affected persons‘ concerns. Support the social and cultural institutions of displaced persons and their host population. Where involuntary resettlement impacts and risks are highly complex and sensitive, compensation and resettlement decisions should be preceded by social preparation. III. Improve, or at least restore, the livelihoods of all displaced persons through (a) land- based resettlement strategies when affected livelihoods are land-based, or cash compensation at replacement value for land when the loss of land does not undermine livelihoods; (b) prompt replacement of assets with access to assets of equal or higher value; (c) prompt compensation at full replacement cost for assets that cannot be restored; and (d) additional revenues and services through benefit sharing schemes where possible. IV. Provide physically and economically displaced persons with needed assistant including the following: (a) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, economic and social integration of resettled persons into

21| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

their host communities, and extension of project benefits to host communities; (b) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (c) civic infrastructure and community services, as required. V. Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards. In rural areas, provide them with legal and affordable access to land and resources, and in urban areas, provide them with appropriate income sources and legal and affordable access to adequate housing. VI. Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through negotiated settlement, to ensure that people who enter into negotiated settlements will maintain the same or better income and livelihood status. VII. Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of non-land assets. VIII. Prepare a resettlement plan elaborating on displaced persons‘ entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule. IX. Disclose a draft resettlement plan, including documentation of the consultation process in a timely manner, before project appraisal, in an accessible place and in a form and language(s) understandable to affected persons and other stakeholders. Disclose the final resettlement plan and its updates to affected persons and other stakeholders. X. Conceive and execute involuntary resettlement as part of a development project or program. Include the full costs of resettlement in the presentation of the project‘s costs and benefits. For a project with significant involuntary resettlement impacts, consider implementing the involuntary resettlement component of the project as a stand-alone operation. XI. Pay compensation and provide other resettlement entitlements before physical or economic displacement. Implement the resettlement plan under close supervision throughout project implementation. XII. Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by taking into account the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports.

5.3 Gap Filling Between ADB and Government of Nepal Policies

39. The Government of Nepal‘s legal frameworks and ADB‘s SPS share the following: I. Both permanent and temporary involuntary resettlement shall be avoided to the extent possible or minimized where feasible, exploring all viable alternative project designs. II. Where displacement is unavoidable, people losing assets, livelihood, or other resources shall be assisted in improving status at no cost to them.

40. There are certain differences as shown in Table 9, and where different, ADB‘s SPS will be applied for subprojects.

5.4. Key Difference between ADB Policy and Government of Nepal Legal Framework

22| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

Table 9: Key Difference between ADB Policy and GoN S.N. ADB Policy Government of Nepal Legal Framework 1 Compensation for assets Legal ownership is required for compensation regardless of legal ownership. eligibility; however, tenants registered with the Land Revenue Office are also recognized. 2 Compensation to all affected Encroachers are not entitled to compensation. persons regardless of tenure for all affected structures. 3 Compensation for affected Compensation is to be determined by the assets at replacement cost. compensation Fixation Committee to be formed under the Chief District Office which may be replacement cost.

41. In cases where subprojects involve voluntary donation and no other land acquisition and involuntary resettlement impacts, the subproject will be classified as Category C, but the PIU will prepare a report to ADB (to be attached to the classification form) which will document that: (i) the subproject site is selected in full consultation with landowners and any non-titled affected persons; (ii) voluntary donations do not severely affect the living standards of affected persons and the amount of agricultural or other productive land to be acquired from each affected household does not exceed 5% of the total productive landholdings of the household; (iii) voluntary donations are linked directly to benefits for the affected persons; (iv) any voluntary donation will be confirmed through written record and verified by an independent third party; (v) there is an adequate grievance process (vi) no affected household will be displaced from housing and severely affected; (viii) no affected household is vulnerable; and (ix) a process is in place to provide official documentation to those who donated land of their landholding post- donation. In cases where the subproject is classified as B and involves voluntary donation, the voluntary donation report will be attached to the resettlement plan.

42. All involuntary land acquisition will be compensated at replacement cost and APs assisted so that their economic and social future would generally be as favorable as it would have been in the absence of the project. The absence to formal title to land will not be a bar to compensation assistance for loss of assets and special attention will be paid to ensuring that households headed by women and other vulnerable groups receive appropriate assistance to help them and improve their status. The APs whose land will be affected by the road was informed through publishing general notice during census survey, which will remain the ―cut- off-date (17-02-2017) for the entitlement and owners (including non-titled) of affected assets till such a date will be eligible to be categorized as APs. The entitlement policy/matrix is attached in Appendix in XI.

23| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

6. ENTITLEMENTS, ASSISTANCE AND BENEFITS

43. The APs whose land is being affected by the road subproject was informed to the local people by publishing a general notice during the socioeconomic survey. The date of socio- economic survey, 17 February, 2017, will remain the cut-off-date for the entitlement that was informed to the interviewed families during the field survey and community meetings. The owners, including non-titled, of the affected assets till the cut-off-date are eligible to be categorized as APs.

44. The compensation to be paid for affected assets will be based on the principle of replacement cost, which is the amount needed to replace an affected asset without deduction for taxes and/or costs of transaction before displacement and which is operationally defined as follows:

i. Productive land (agricultural, ponds, and forest) based on replacement cost that reflect recent land sales, and in the absence of such recent sales, based on productive value; ii. Residential land based on replacement cost that reflect resent land sales, and in the absence of such resent land sales, based on similar location attributes; iii. Houses and other related structures based on replacement cost reflecting current market prices of materials and labor without depreciation nor deductions for salvaged building materials; iv. Annual crops equivalent to current market value of crops at the time of compensation. v. For perennial corps and trees, cash compensation at replacement cost is equivalent to current market value given the type, age, and productive value (future production) at the time of compensation. Timber trees based on diameter at four feet height at current market value; vi. For temporary impacts, no compensation for land if returned to the legal owners, promissory and non-legal right users, and the land restored to pre-project condition within 3 months after use. If the land is not returned and restored to pre-project condition within 3 months, the affected person will receive compensation at replacement cost for the land. A penalty clause will be included in the contractor‘s contract to ensure that the cost of such compensation is recovered from the contractor.

45. The residential and commercial loss will be provided with allowances in order to support their living condition. For the houses to be relocated, material transport allowances is provided. Similarly, if there is loss of income due to disruption of business or employment, material transport and one time assistance allowance is provided. Loss of standing crops and trees will also be compensated on the current market provision. Further the policies on compensation and other entitlements are attached in Appendix XI.

46. A Gender Equality and Social Inclusion Action Plan (GESI/AP) has been prepared for the Project and subprojects will be prepared and implemented in accordance with the GESI/AP. Consistent with the GESI/AP, resettlement planning and implementation will ensure that women, as members of the affected households, are adequately considered when they are physically or economically displaced by subprojects. To ensure gender- sensitive and culturally responsive measures, the executing agency and the implementing agencies will adopt suitable strategies to ensure the active involvement of women consistent with the GESI/AP.

24| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

7 RELOCATION OF HOUSING AND SETTLEMENTS

47. Total structures affected by the road subproject is 106 in which 30 structures are public and 76 private. Out of 76 private structures, 5 structures will be relocated beyond the CoI whereas remaining others are dismantled as they have their other houses. Eligible structure owners will be entitled to get transportation and other reestablishment cost based on entitlement matrix under RF. Hence, the relocation cost for 5 structures along the sub- project is NRs. 75000.00 (refer Appendix IV for details).

48. Although these families are being temporarily physically displaced by the subproject, it is learnt that the families will manage another place for temporary shifting making them less vulnerable in terms of resettlement. The structure owner has enough space in the same plot beyond CoI in the same village of the road in order to rebuild the house.

49. RP has allocated full compensation amount for the physical structures and also allocated material transport allowances and one time allowance for disruption of the economic activity. The relocation of the affected residences will be completed before civil works starts at the particular chainage.

50. APs will be compensated at replacement cost for any loss assets in addition to other assistance. Compensation will be provided as per replacement and relocation cost on the basis of entitlement matrix. Further both replacement and government rate are included in RP to facilitate CDC committee to take replacement value of affected assets. As per the Reconstruction Related Act 2072, The Notice 2, Part 3 and Part 5 of this Act‘s Regulation explain about the detail of CDC working procedures Clause 8 (2) states the composition of CDC as follows:  Chief District Officer – Chairperson  Land Revenue Officer – Member  Officer appointed by NRA – Member  President/Secretary/Executive Officer from VDC/Municipality – Member  Survey Officer –Member  Project Officer – Member Secretary

7.1 Valuation and Compensation Determination

51. The survey and valuation of affected HHs‘ properties were undertaken by Consultants on the basis of respective district rate. The compensation rates have been proposed both at market rate and government rate (as per Gorkha district). Land cost will be updated once CDC meeting will finalize the land rate. Cadastral mapping has verified the land plots of road alignment for the deed transfer

25| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

8 INCOME RESTORATION AND REHABILITATION PROGRAM

52. During the socioeconomic survey, 204 interviewed HHs have expressed their interest to be the part of the training and benefit from entrepreneurial skills. 90 HHs are proposed for the training and priority will be accorded to Dalits, Janajatis, women headed HHs, BPLs HHs. Income Restoration Program (IRP) will be designed for the one person per family in 16-45 age-group. List of trainings are being finalized in the district and the tentative cost of the training program is NRs 2518976.22.

53. 138 non-interviewed HHs, whenever they approach the project, will be given further consultation on entitlement, compensation. The amount of compensation has been separated in the non-interviewed assistance cost NRs 1386000 for non-interviewed owner as a precautionary measure.

.

26| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

9 RESETTLEMENT BUDGET

54. The total resettlement cost includes compensation and allowances, deed transfer fees, operation and administration costs. A contingency of 20% will be included in these cost estimates to be used as required during implementation of the resettlement plan.

55. The compensation package includes compensation for affected land plots and any standing crop, structures or trees in these plots. The compensation rates have been proposed both at market rate and government rate (as per Gorkha district). Land cost will be updated once CDC meeting will finalize the land rate. Compensation for structures is calculated on replacement cost on the basis of entitlement matrix provisioned in RF. Additionally, allowances for material transport and business allowances for affected structures will also be estimated as per entitlement matrix. Similarly, trees are compensated on the reference provided by Department of Forest (DoF). However, all these valuations will be endorsed by CDC before finalization of the compensation package. The detail cost estimation and basis of compensation is described under following paragraphs.

27| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

9.1 Compensation for land 56. The additional requirement of private land (Interviewed HHs including 138 non-interviewed HHs, 18 guthi plots and 127 non-registered plots) for upgrading is 8.237 ha which costs NRs 45278992.434 as per the current government rate. The rate for land compensation is presented in the Table 10. Both are proposed cost and rate will be finalized after CDC meeting and updated in RP accordingly.

Table 10: Details of Land Rate of the affected Plots

DLRO Land Rate per Replacement cost rate per S.N. Name of the VDC sqm. sqm.(5% increment) 1 Aappipal 687.97 722.37 2 Palungtar 982.82 1031.96 3 Thalajung 393.13 412.79 4 Harmi 393.13 412.79 5 Jaubari 491.41 515.98 6 Kerabari 393.13 412.79 7 Gaikhura 393.13 412.79

Source: District Land Revenue office, Gorkha District

9.2 Compensation for structures 57. There are 76 private and 30 public structures affected along the alignment. Compensation amount for these structures is calculated by the technical team based on district norms taking account of entitlement matrix under RF. The total compensation amount of the private affected structures is NRs 4804175.44 and total compensation of public structures is NRs.2121764.73.

9.3 Compensation for standing crops 58. The affected land plots had different crops during the household survey. The survey reported there were paddy, maize and some plots having vegetables. However, compensation for affected crops is calculated for all affected land plots on the basis of average paddy productivity of the available data. One crop varieties is compensated from the crop cycle of the local agriculture calendar. In this road area, paddy is considered for compensation and the amount stands to NRs.807192.97 of 8.237 ha. (refer Appendix V for details).

9.4 Compensation for trees 59. The affected trees are compensated not for their timber value but only for harvesting and transportation cost based on the girth and height of the tree. The man-days required for the calculation is provided by the Ministry of Forest and Soil Conservation Norms 2060 explained in Table 11 and the unskilled wage rate NRS 580.(2072/73).

28| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

Table 11: Labor Requirement for Cutting and Transportation of Trees Girth of Tree Labor Requirement (Man days) Above 12 cm to 30 cm 0.13 Above 31 cm to 60 cm 0.39 Above 61 cm to 90 cm 0.52 Above 91 cm to 120 cm 1.56 Above 121 cm to 180 cm 2.50 Above 181 cm to 240 cm 4.00 Above 242 cm to 300 cm 12.99 Above 300 cm 41.67 Distance between felling spot and stacking yard Labor Requirement (mandays) First 10 m 0.5 For each additional 10 m 0.08 For first 1000 m 8.42 For each additional 1000 m 8.00 For first 5000 m 40.42 For small seedling less than 12 cm girth is NRs. 10 per seedling 4Source: Ministry of Forest and Soil Conservation, 2060

60. There are total 1102 trees affected along the road alignment in private and CFUG forest land area. The harvesting and transportation cost of these trees are summarized in the Table 12.

Table 12: Summary of Harvesting and Transportation Cost of the Affected Trees

Trees Harvesting Transportation S.N. Ownership count cost cost Total cost

1 Private Trees 292 114178.8 20830.9 160622.5

2 Institution Trees 85 24476 12596.39 58573

3 Aamdada CFUG 18 3619.2 1957.6 6934.03

4 AndheriPakha CFUG 19 2262 1309.1 5606.9

5 Tarke Dada CFUG 546 1885 171007.2 234871 6 GoN Trees 142 86396.8 13311.6 123778.4 Total 1102 232817.8 221012.79 590385.83

4MFSC. 2060. Norms, 2060. Ministry of Forests and Soil Conservation, Kathmandu.

29| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

61. Addition to crops and trees, there are bamboo clumps, high value cash crops, amriso, cardamom and fruit trees affected along the road alignment. The private fruit trees is estimated NRs 67334.00 NRs 118750.00 for bamboo clumps and NRs 31320.00 for the cash crops of private ownership.

9.5 Other Supporting Cost

62. Other supporting costs in Resettlement Plan implementation includes, compensating the time given by the affected households during deed transfer and other purposes. This cost includes the total amount required for management cost for APs‘ households and deed transfer fees in the district. The estimated amount for supporting cost is NRs 2000000.

9.6 Total RP Cost Estimate of Luitel-Aappipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject

63. Resettlement budget includes compensatory amounts, implementation and management costs for APs‘. The total cost estimated for implementation of this proposed resettlement plan for Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road subproject is NRs. 69102874.56. Table 13 provides the details for the resettlement implementation budgeting. The total direct compensatory cost in the road subproject is NRs 53819915.28. The estimated training cost is NRs 2518976.22.

30| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

Table 13: Budget for Resettlement Plan Implementation Total Amount S.N. Budget Unit loss (NRs.) Remarks 1. DIRECT COST Land Compensation of 342 Interviewed HHs (including 1.1 Interviewed HHs Ha. 6.488 35109101.11 non-interviewed HHs) Compensation for Non- 1.3 Registered Land Ha. 1.592 9089661.47 127 Non-Registered Plots 1.4 Guthi Land Ha. 0.157 1080229.85 18 plots 2 Private Trees No. 232 160622.5 2.1 Private Fruit Trees No. 25 67334 2.2 Private Cash Crops No. 21 31320 2.3 Private Bamboo No. 475 118750 247411.90 2.4 CFUGs Trees No. 583 3 CFUGs 2.5 GoN Trees No. 142 123778.4 2.6 Institution Trees No. 85 58573 342 HHs(including non- interviewed HHs, 18 guthi plots 3 Private Crops (Paddy) Ha. 8.237 807192.97 and 127non-registered plots)

9 residences, 5sheds, 3 toilets 4 Private structures No. 18 3687421.6 and 1 pali Affected by earthquake, cost calculates only materials 4.1 Private Residence EQ No. 15 355000 transportation. 4.2 Temporary huts/taharas No. 43 686753.84 43 Temporary huts/taharas Relocation 4.3 /Transportation cost No. 5 75000 Relocate beyond the RoW

14 electric pole and 11 chautara, 1 water tank, 2 public tapstand 4.4 Public Structure No. 30 2121764.73 including 2 public schools Sub Total 53819915.28 2. INDIRECT COST 2.1 Deed Transfer Fees plots 614 614000 @400 Deed Transfer Fees for 2.2 non-interviewed HHs 138 1386000 @1000 Sub Total 2000000 Income Generation and 90 APs who are taken from Livelihood Improvement dalit,janajatis,APs more than 10%

3 Program[2] LS 90 2518976.22 land loss, women HHs 4 Contingency (20%) 10763983.06 Subtotal (1+2+3+4) GRAND TOTAL 69102874.56

31| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

10. INSTITUTIONAL ARRANGEMENTS

64. The National Reconstruction Authority (NRA) is the executing agency of the project. The Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and Local Development (MOFALD) supported by Central Implementation Support Consultant(CISC) provides overall guide and monitoring of the project activities at central level. District Level Implementation Unit (DLPIU) supported by District Level Implementation Support Consultant (DISC) will be responsible to implement overall activities at district.

65. The DISCs together with the CLPIU and DLPIU, will assist in developing and updating resettlement plans through the conduct of the DMS in a participatory and transparent way and consistent with the project resettlement principles and the resettlement framework. Once approved by the NRA and reviewed and concurred by ADB, the CISC will provide technical advice in the implementation of the approved resettlement plan. The CISC will likewise provide capacity-building orientation, as needed, to concerned personnel of the CLPIU and DLPIU.

66. Together with the CLPIU and DLPIU, CISC and DISC will supervise civil works activities to be carried out by contractor/s for quality assurance. Furthermore, the contractors will be responsible to pay appropriate compensation if the land is taken temporarily such as for labor camp, material storage etc. as stated in Resettlement Framework. In addition, CISC will assist the CLPIU in regular monitoring of Resettlement Plan implementation

32| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

11. IMPLEMENTATION SCHEDULE

67. An implementation schedule has been agreed upon for timely completion of implementation of RP. Table 14 below presents time-bound action plan to complete identified activities of the RP including compensation payment and transfer of deed of ownership. Draft Resettlement Plan has been disclosed to the APs and Local Government at subproject site. A translated copy of summary of resettlement plan (in Nepali) has also been shared with APs. The objective of disclosure was to inform APs regarding their entitlement and working approach and modality.

68. Though the contract has already been signed after approval of resettlement plan from NRA, contractor‘s mobilization schedule has been synchronized with the RP implementation schedule. The contractor has been well instructed to initiate the works in the sections where compensation payment is not required or the activity falls in public land. The RP implementation schedule presented in the Tables below presents the section wise implementation plan matching with contractor‘s mobilization schedule. DISC will monitor the implementation status and report to DLPIU and CISC in a periodic basis. In case of any deviation from the agreed schedule, updated schedule will be agreed and implemented in accordance with the new milestone. The DISC and DLPIU ensures that no physical possession will be taken prior to compensation payment.

33| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

Road Alignment Status for construction works of Luitel-Aapipal-Harmibhanjyang- Thalajung-Bhachek Road Subproject, Gorkha

Compensation Chainage Land Trees Distribution Proposed Prposed completion Planned S.N From To Pubic Prvt. Community Private Start Date date Contract Remarks 20 Dec, 1 0+000 0+140 Yes yes 2017 31-Jan-17 Will start after compensation 20 Dec, 2 0+140 0+800(Rhs) Yes Yes 2017 31-Jan-17 Construction ongoing 3 0+140 0+800(Lhs) Yes Yes Public Land Construction ongoing 4 0+800 1+330 Yes yes Public Land Construction ongoing 20 Dec, 5 1+330 1+800 Yes yes 2017 31-Jan-17 Will start after compensation 6 1+800 2+000(Rhs) Yes yes Public Land Construction ongoing 20 Dec, 7 1+800 2+000(Lhs) Yes yes 2017 31-Jan-17 Will start after compensation 20 Dec, 9 2+000 7+380 Yes 2017 31-Jan-17 Will start after compensation 10 7+380 7+850 Yes yes Public Land Construction ongoing 20 Dec, 11 7+850 8+200 Yes 2017 31-Jan-17 Will start after compensation 13 8+200 8+500 Yes Yes Public Land 20 Dec, 14 8+500 9+120 Yes 2017 31-Jan-17 Will start after compensation 15 9+120 9+240(Lhs) Yes Yes Public Land Construction ongoing 20 Dec, 16 9+240 9+400 Yes 2017 31-Jan-17 Will start after compensation 17 9+400 9+800(Lhs) Yes Yes Public Land Construction ongoing 18 9+400 10+060(Rhs) Yes Yes Public Land Construction ongoing

34| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

20 Dec, 19 9+800 10+060(Lhs) Yes 2017 31-Jan-17 Will start after compensation 20 Dec, 20 10+060 10+100 Yes 2017 31-Jan-17 Will start after compensation 21 10+100 10+250(Rhs) Yes Yes Public Land Construction ongoing 20 Dec, 22 10+100 10+250(Lhs) Yes 2017 31-Jan-17 Will start after compensation 20 Dec, 23 10+250 12+540 Yes 2017 31-Jan-17 Will start after compensation 24 12+540 13+150(Rhs) Yes Yes Public Land Construction ongoing 25 12+540 12+930(Lhs) Yes Yes Public Land Construction ongoing 20 Dec, 26 12+930 13+150(Lhs) Yes 2017 31-Jan-17 Will start after compensation 20 Dec, 27 13+150 16+350 Yes 2017 31-Jan-17 Will start after compensation 28 16+350 17+600 Yes Yes Public Land 29 17+600 17+720 Yes Yes Public Land 20 Dec, 30 17+720 17+770 Yes 2017 31-Jan-17 Will start after compensation 31 17+770 17+880 Yes Yes Public Land Construction ongoing 32 17+880 18+000(Rhs) Yes Yes Public Land Construction ongoing 20 Dec, 33 17+880 18+000(Lhs) Yes 2017 31-Jan-17 Will start after compensation 20 Dec, 34 18+000 18+580 Yes 2017 31-Jan-17 Will start after compensation 35 18+580 19+150 Yes Yes Public Land Construction ongoing 20 Dec, 36 19+150 19+970 Yes 2017 31-Jan-17 Will start after compensation 37 19+970 20+300 Yes Yes Public Land Construction ongoing 20 Dec, 38 20+300 21+490 Yes 2017 31-Jan-17 Will start after compensation

35| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

39 21+490 21+590 Yes Yes Public Land Construction ongoing 20 Dec, 40 21+590 21+720 Yes 2017 31-Jan-17 Will start after compensation 41 21+720 22+570 Yes Yes Public Land Construction ongoing 20 Dec, 42 22+570 22+620 Yes 2017 31-Jan-17 Will start after compensation 43 22+620 22+800 Yes Yes Public Land Construction ongoing 20 Dec, 44 22+800 23+800 Yes 2017 31-Jan-17 Will start after compensation 45 23+800 24+170 Yes Yes Public Land Construction ongoing 20 Dec, 46 24+170 25+650 Yes 2017 31-Jan-17 Will start after compensation 47 25+650 25+800 Yes Yes Public Land Construction ongoing 20 Dec, 48 25+800 28+730 Yes 2017 31-Jan-17 Will start after compensation 49 28+730 29+750 Yes Yes Public Land Construction ongoing 20 Dec, 50 29+750 30+575 Yes 2017 31-Jan-17 Will start after compensation Source: DLPIU/DISC, Gorkha

36| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

Table 14: RP Implementation Schedule for Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

2017/18 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June Jul Aug Responsibility SN Activities 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 Contractor’s Excavation and civil works in DLPIU/DISC/Contractor mobilization reset of the sections schedule 3,4,6,10,13,15,17,18,21,24,2 Agreement Joint construction survey, equipment 5,28,29,31,32,35,37,39,41,4 1 mobilization and HR mobilization 3,45,47,49 (Public Land) Excavation and civil works in reset of the sections (Private Land) Cadastral survey, DLPIU/DISC Final list of affected people, consultation 2 with APs Consultation and Throughout project duration CLPIU/DLPIU/DISC/GRC grievances 3 resolution HH survey and CLPIU/DLPIU/DISC field works, data analysis, draft report 4 preparation Submit final CLPIU/DLPIU/DISC draft RP to CLPIU/NRA/ADB for review and 5 approval Draft RP DLPIU/DISC 6 disclosure in site ADB comments CLPIU/DLPIU 7 incorporated Notice CLPIU/DLPIU/DISC publication and grievance 8 collection CDC meeting for CDO/NRA/CLPIU/DISC compensation 9 determination Call APs DLPIU/DISC application for compensation 10 claim Verify NRA/DLPIU/DISC 11 application

37| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

documents Pay CLPIU/DLPIU/DISC compensation to 12 APs 13 Deed Transfer DLPIU/DISC Implementation CLPIU/DLPIU/DISC 14 of AP’s Trainings Regular Throughout project duration NRA/CLPIU/DLPIU/DISC monitoring Evaluation of RP Implementation progress & 15 achievement

38| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

12. MONITORING AND EVALUATION

69. The Project has a mechanism to monitor and evaluate the resettlement and compensation process. The CLPIU through the DLPIU, CISC and DISC will conduct regular monitoring and evaluation of the updating and implementation of the resettlement plan. Monitoring and evaluation is intended to help ensure that the resettlement plan is prepared and implemented according to the resettlement framework

70. The following key indicators will be monitored periodically by CLPIUs

(i) Compensation and entitlements are computed at rates and procedures as provided in the approved resettlement plan;

(ii) Affected households are paid as per agreement with project authorities;

(iii) Public information, public consultation and grievance redress procedures are followed as described in the approved resettlement plan;

(iv) Public facilities and infrastructure affected by the Project are restored promptly; and,

(v) The transition between resettlement and civil works is smooth.

71. The NRA as the project executing agency can monitor and supervise overall RP implementation and progress. CISC submits the monthly, quarterly semi-annual reports to CLPIU/NRA and ADB. DLPIU is primarily responsible to submit the report to CLPIU. DISC team will support to prepare the monthly report on behalf of DIPIU to be finally submitted to CLPIU through CISC. .

39| P a g e

Resettlement Plan of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

APPENDICES

Appendix I: List of Affected Households Appendix II: Poverty Analysis of Interviewed Households Appendix III: Details on Land Compensation Estimation Appendix IV:Details on Structure Compensation Estimation Appendix V: Details on Crop Compensation Estimation Appendix VI: Details on Private Trees Compensation Estimation Appendix VII: Details on CFUG Trees Compensation Estimation Appendix VIII: Details on Fruits Trees Compensation Estimation Appendix IX: Details on Bamboo Clumps Compensation Estimation Appendix X: Nepali Summary Appendix XI: Entitlement Matrix for Resettlement Plan under EEAP Appendix XII: Recommendation Letters from the CFUGs and Meeting Minutes Appendix XIII: Photographs of Road Alignment Appendix XIII: ADB Comments

40| P a g e

Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

1 Lal bdr.Damai Lal bdr. Damai Kerabari 1 7 635 095-1208 4047.95 0.00 34.94 34.94 6 0 600000 600000 85714.29 3.07 4013.01 6 0.86 0 600000 85714.29 3.07

2 Lok bdr. Tamang Lok bdr. Tamang Kerabari 5 4 146 095-1208 4075.73 0.00 88.83 88.83 6 20000 480000 500000 125000.00 4.47 3986.90 6 2.18 19564 499564 124891.03 4.47

3 Devmaya Tamang Devmaya Tamang Kerabari 1 2 637 095-1208 836.56 0.00 31.89 31.89 0 5000 600000 605000 302500.00 10.82 804.67 0 3.81 4809 604809 302404.70 10.82

4 Jeet bdr. Tamang Chandra bdr. Tamang Kerabari 1 5 133 095-1208 15637.11 0.00 102.09 102.09 9 67000 100000 167000 33400.00 1.20 15535.02 9 0.65 66563 166563 33312.52 1.19

5 Lal bdr. Thapa Lal bdr. Thapa Jaubari 5 9 1336 095-1288 240719.51 0.00 42.40 42.40 12 130000 200000 330000 36666.67 1.31 240677.11 12 0.02 129977 329977 36664.12 1.31

Bhibi Tamang + 6 Tirtha bdr. Tamang Tirtha bdr. Tamang Jaubari 5 7 ,244, 877 095-1208 12477.26 94.57 182.94 277.51 6 130000 100000 230000 32857.14 1.18 12294.32 6 1.47 128094 228094 32584.85 1.17

7 Rankumari Tamang Rankumari Tamang Jaubari 5 6 277, 180 095-1208 38198.57 109.08 112.80 221.88 12 40000 150000 190000 31666.67 1.13 38085.77 12 0.30 39882 189882 31646.98 1.13

8 Dhan bdr. Gurung Dhan bdr. Gurung Jaubari 5 6 886 095-1248 18117.81 207.40 560.44 767.84 6 54000 254000 308000 51333.33 1.84 17557.37 6 3.09 52330 306330 51054.94 1.83

9 Karmasingh Tamang Karmasingh tamang Jaubari 5 8 309 095-1208 19681.28 59.82 292.82 352.64 12 73000 172000 245000 30625.00 1.10 19388.46 12 1.49 71914 243914 30489.24 1.09

10 Phoolmaya Tamang Phoolmaya Tamang Jaubari 5 7 236 095-1208 13488.97 28.93 281.57 310.50 8 75000 150000 225000 32142.86 1.15 13207.40 8 2.09 73434 223434 31919.21 1.14

11 Bodh bdr. Gurung Bodh bdr. Gurung Jaubari 5 2 615 095-1288 106769.53 551.00 820.00 1371.00 3 53400 12000 65400 32700.00 1.17 105949.53 3 0.77 52990 64990 32494.94 1.16

12 Mangali Tamang Mangali Tamang Jaubari 5 6 224 095-1208 15259.32 0.00 28.55 28.55 4 40000 500000 540000 90000.00 3.22 15230.77 4 0.19 39925 539925 89987.53 3.22

13 Dal bdr. Tamang Kul bdr. Tamang Jaubari 5 6 220 095-1208 22997.66 41.90 95.83 137.73 12 55500 400000 455500 75916.67 2.72 22901.83 12 0.42 55269 455269 75878.12 2.71

14 Ram bdr. Gurung Ram bdr. Gurung Thalajung 1 6 125 095-1337 5466.60 165.50 219.00 384.50 8 180000 0 180000 30000.00 1.07 5247.60 8 4.01 172789 172789 28798.16 1.03

15 Tara bdr. Gurung Tara bdr. Gurung Thalajung 1 11 192, 197.111 095-1367 17892.98 276.39 417.54 693.93 6 111000 200000 311000 28272.73 1.01 17475.44 6 2.33 108410 308410 28037.25 1.00

16 Shreekauri Gurung Bir bdr. Gurung Thalajung 9 6 270 095-1286 13587.95 55.57 80.65 136.22 9 160000 30000 190000 31666.67 1.13 13507.30 9 0.59 159050 189050 31508.39 1.13

17 Nar bdr. Gurung Gan bdr. Gurung Thalajung 9 3 595, 611 095-1287 37073.86 827.00 1216.00 2043.00 12 210000 0 210000 70000.00 2.50 35857.86 12 3.28 203112 203112 67704.04 2.42 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

18 Yuktaman Gurung Yuktaman Gurung Thalajung 9 4 496 095-1288 7811.33 98.00 126.00 224.00 6 72000 97000 169000 42250.00 1.51 7685.33 6 1.61 70839 167839 41959.65 1.50 579, 520, 526, 19 Tek bdr. Gurung Tek bdr. Gurung Thalajung 9 10 518 095-1288 29112.46 206.20 463.80 670.00 8 600000 142000 742000 74200.00 2.65 28648.66 8 1.59 590441 732441 73244.12 2.62

Yegya subha, Chalimaya, Dil bdr., 221, 246, 268, 20 Moti bdr Gurung Yegya subha gurung Thalajung 9 5 259, 298 254172.69 211.86 859.75 1071.61 10 101000 52000 153000 30600.00 1.09 253312.94 10 0.34 100658 152658 30531.67 1.09

21 Dhansingh Gurung Dhansingh Gurung Thalajung 2 12 122, 124, 160 095-1326 21589.03 567.96 793.64 1361.60 5 81000 500000 581000 48416.67 1.73 20795.39 5 3.68 78022 578022 48168.53 1.72

22 Suk bdr. Gurung Suk bdr. Gurung Thalajung 7 5 232 095-1286 65106.15 232.03 348.74 580.77 5 26600 144000 170600 34120.00 1.22 64757.41 5 0.54 26458 170458 34091.50 1.22 366, 365, 373, 23 Atimaya Gurung Atimaya Gurung Thalajung 7 6 391, 384 095-1288 25765.74 265.45 804.12 1069.57 8 103500 660000 763500 127250.00 4.55 24961.62 8 3.12 100270 760270 126711.65 4.53

24 Tek bdr. Gurung Tek bdr. Gurung Thalajung 9 7 47 095-1287 7652.67 69.60 70.10 139.70 9 47000 276000 323000 46142.86 1.65 7582.57 9 0.92 46569 322569 46081.35 1.65

25 Bal bdr.Gurung Bal bdr.Gurung Thalajung 9 3 793 2511.45 0.00 22.90 22.90 3 99000 100000 199000 66333.33 2.37 2488.55 3 0.91 98097 198097 66032.43 2.36

26 Bhesh bdr. Gurung Amardhoj Gurung Thalajung 9 7 296 095-1286 7948.70 163.30 221.36 384.66 6 70300 202000 272300 38900.00 1.39 7727.34 6 2.78 68342 270342 38620.32 1.38

27 Rana bdr. Gurung Rana bdr. Gurung Thalajung 7 10 197, 213 095-1286 8089.99 121.34 193.09 314.43 12 106000 240000 346000 34600.00 1.24 7896.90 12 2.39 103470 343470 34347.00 1.23

28 Chitra bdr.Gurung Laxmi maya Gurung Thalajung 1 6 585, 126 095-1327 17445.02 195.12 326.10 521.22 6 63000 324000 387000 64500.00 2.31 17118.92 6 1.87 61822 385822 64303.72 2.30

29 Hastabina Gurung Hastabina Gurung Thalajung 1 3 114, 195 095-1327 16465.97 469.75 664.99 1134.74 5 42500 54000 96500 32166.67 1.15 15800.98 5 4.04 40784 94784 31594.54 1.13

30 Min kumari Gurung Min kumari Gurung Thalajung 9 4 220 095-1286 7865.18 6.00 62.20 68.20 3 0 120000 120000 30000.00 1.07 7802.98 3 0.79 0 120000 30000.00 1.07

31 Rabilal Gurung Lalimaya Gurung Thalajung 9 8 48 095-1288 6658.78 111.00 148.00 259.00 3 80000 174000 254000 31750.00 1.14 6510.78 3 2.22 78222 252222 31527.74 1.13

32 Prem bdr.Gurung Janga pd. Gurung Thalajung 9 4 274 095-1288 5357.40 36.25 65.27 101.52 6 55000 312000 367000 91750.00 3.28 5292.13 6 1.22 54330 366330 91582.48 3.28

33 Suk bdr. Gurung Suk bdr. Gurung Thalajung 9 2 46 095-1288 21346.91 79.00 59.00 138.00 6 10000 288000 298000 149000.00 5.33 21287.91 6 0.28 9972 297972 148986.18 5.33 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

34 Ganesh bdr. Gurung Ganesh bdr. Gurung Thalajung 9 7 96 095-1288 26407.90 2.00 21.00 23.00 12 522000 372000 894000 127714.29 4.57 26386.90 12 0.08 521585 893585 127654.99 4.57

35 Dil bdr.Gurung Dil bdr.Gurung Thalajung 9 8 593, 521, 530 095-1287 46302.32 405.90 479.80 885.70 6 49500 250000 299500 37437.50 1.34 45822.52 6 1.04 48987 298987 37373.38 1.34

36 Chitra bdr.Gurung aamumaya Gurung Thalajung 9 6 519, 594 095-1287 53896.97 289.00 425.00 714.00 6 33500 240000 273500 45583.33 1.63 53471.97 6 0.79 33236 273236 45539.31 1.63

37 Hiramaya Gurung Hiramaya Gurung Thalajung 9 5 114, 115 095-1288 18693.82 606.60 903.00 1509.60 6 32000 500000 532000 106400.00 3.81 17790.82 6 4.83 30454 530454 106090.85 3.80

38 Purnaa Gurung Purna bdr.Gurung Thalajung 9 4 514 095-1287 16621.28 0.00 210.00 210.00 6 62500 160000 222500 55625.00 1.99 16411.28 6 1.26 61710 221710 55427.59 1.98

39 Kheman Gurung Kheman Gurung Thalajung 9 5 515, 566, 569 095-1287 15662.12 370.00 565.00 935.00 6 35000 370000 405000 81000.00 2.90 15097.12 6 3.61 33737 403737 80747.48 2.89

40 Santa maya Gurung Santa maya Gurung Thalajung 7 5 385, 390 095-1326 18047.96 17.07 160.47 177.54 12 65350 200000 265350 53070.00 1.90 17887.49 12 0.89 64769 264769 52953.79 1.89

41 Som bdr. Gurung Som bdr. Gurung Thalajung 7 4 446, 444, 095-1286 4566.18 36.65 34.84 71.49 6 55000 200000 255000 63750.00 2.28 4531.34 6 0.76 54580 254580 63645.09 2.28

42 Indra bdr. Gurung Indra bdr. Gurung Thalajung 2 4 166 095-1326 19138.85 9.93 67.51 77.44 12 289700 0 289700 72425.00 2.59 19071.34 12 0.35 288678 288678 72169.53 2.58

43 Suguna Gurung Bel bdr. Gurung Thalajung 7 4 367 095-1286 15204.01 61.37 98.30 159.67 7 99000 15000 114000 28500.00 1.02 15105.71 7 0.65 98360 113360 28339.98 1.01

44 Nar jung Gurung Nar bdr. Gurung Thalajung 7 5 392, 121 095-1326 32858.53 277.05 479.10 756.15 0 127500 41900 169400 33880.00 1.21 32379.43 0 1.46 125641 167541 33508.19 1.20

45 Bir singh Gurung Bir singh Gurung Thalajung 2 4 194, 199, 200 095-1326 8868.81 6.50 214.19 220.69 9 159100 60000 219100 54775.00 1.96 8654.62 9 2.42 155258 215258 53814.40 1.93

46 Ek bdr. Gurung Ek bdr. Gurung Thalajung 7 8 231, 374 095-1286 29736.51 227.94 324.19 552.13 12 208000 40800 248800 31100.00 1.11 29412.32 12 1.09 205732 246532 30816.55 1.10

47 Kamal bdr. Shah Ganesh jung Shah Palungtar 4 6 274 095-1521 10963.41 129.00 194.00 323.00 12 80000 200000 280000 46666.67 1.67 10769.41 12 1.77 78584 278584 46430.73 1.66

48 Lekh bdr. Thakuri Lekh bdr. Thakuri Palungtar 4 4 354 095-1521 13115.43 176.00 243.00 419.00 12 145000 216000 361000 90250.00 3.23 12872.43 12 1.85 142313 358313 89578.37 3.21

49 Hari maya Malla Krishna jung thakuri Palungtar 4 5 273 095-1521 5538.02 108.00 164.00 272.00 6 76200 600000 676200 135240.00 4.84 5374.02 6 2.96 73943 673943 134788.69 4.82

50 Gopal Paudel Gopal Paudel Palungtar 5 10 265 095-1481 23721.07 79.00 149.00 228.00 3 100000 500000 600000 60000.00 2.15 23572.07 3 0.63 99372 599372 59937.19 2.14

51 Babulal Shrestha Babulal Shrestha Palungtar 4 7 31 095-1521 8888.31 0.00 31.00 31.00 12 126500 85000 211500 30214.29 1.08 8857.31 12 0.35 126059 211059 30151.26 1.08

52 Kamal bdr. Thapa Kamal bdr. Thapa Aappipal 8 5 829 095-1481 2543.70 2.50 88.50 91.00 3 6500 400000 406500 81300.00 2.91 2455.20 3 3.48 6274 406274 81254.77 2.91

53 Devendra Paudel Devendra Paudel Palungtar 5 5 649 095-1404 4955.98 66.80 147.20 214.00 3 192000 0 192000 38400.00 1.37 4808.78 3 2.97 186297 186297 37259.46 1.33 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

54 Buddhilal Shrestha Buddhilal Shrestha Palungtar 4 14 236, 297 095-1521 9041.72 206.00 293.00 499.00 2 455000 0 455000 32500.00 1.16 8748.72 2 3.24 440256 440256 31446.83 1.13

Dharma narayan Dharma narayan 55 Shrestha Shrestha Palungtar 4 11 234 095-1521 10975.10 42.50 158.50 201.00 12 150000 800000 950000 86363.64 3.09 10816.60 12 1.44 147834 947834 86166.70 3.08

56 Ramji Paudel Ramji Paudel Palungtar 5 3 909, 650 095-1482 6368.59 109.00 154.00 263.00 6 140000 282000 422000 140666.67 5.03 6214.59 6 2.42 136615 418615 139538.21 4.99

57 Tek bdr. Rana Tek bdr. Rana Aappipal 4 2 133, 134, 136 095-1442 11147.81 0.00 221.00 221.00 12 80000 120000 200000 100000.00 3.58 10926.81 12 1.98 78414 198414 99207.02 3.55

58 Anil Pariyar Krishna Pariyar Palungtar 4 5 276 095-1521 3348.47 12.00 39.00 51.00 6 15000 270000 285000 57000.00 2.04 3309.47 6 1.16 14825 284825 56965.06 2.04

59 Prem Shrestha Babulal Shrestha Aappipal 8 5 201 095-1403 8636.38 45.00 180.00 225.00 6 15000 460000 475000 95000.00 3.40 8456.38 6 2.08 14687 474687 94937.47 3.40

Rajendra kr. 60 Shrestha Rajendra kr. Shrestha Aappipal 8 6 876 095-1403 5740.86 2.00 29.00 31.00 4 440000 224000 664000 110666.67 3.96 5711.86 4 0.51 437777 661777 110296.22 3.95

61 Rajkumar Shrestha Rajkumar Shrestha Aappipal 8 6 122 095-1403 5556.13 19.37 148.06 167.43 6 15000 370000 385000 64166.67 2.30 5408.07 6 2.66 14600 384600 64100.05 2.29

62 Narmada Shrestha Narmada Shrestha Palungtar 4 4 27 095-1521 3151.64 0.00 6.60 6.60 12 15000 180000 195000 48750.00 1.74 3145.04 12 0.21 14969 194969 48742.15 1.74

63 Dayaram Paudel Dayaram Paudel Palungtar 5 6 834 095-1481 10271.84 117.00 158.00 275.00 12 125000 685000 810000 135000.00 4.83 10113.84 12 1.54 123077 808077 134679.54 4.82

64 Purna bdr. Sarki Purna bdr. Sarki Palungtar 4 6 94, 98 095-1521 33940.08 101.00 305.00 406.00 4 35000 150000 185000 30833.33 1.10 33635.08 4 0.90 34685 184685 30780.91 1.10

Santa kumari/Sankhar 65 Shrestha Buddhiman Shrestha Palungtar 4 6 28 095-1521 4586.07 0.00 25.70 25.70 6 45500 200000 245500 40916.67 1.46 4560.37 6 0.56 45245 245245 40874.17 1.46

66 Tek nath Devkota Bishnu kumari Devkota Aappipal 2 6 938 095-1442 4210.61 2.00 130.00 132.00 12 35000 300000 335000 55833.33 2.00 4080.61 12 3.09 33919 333919 55653.23 1.99

Bishnu maya 67 Devkota Bishnu maya Devkota Aappipal 3 1 305 095-1482 2139.97 0.00 21.00 21.00 3 5000 24000 29000 29000.00 1.04 2118.97 3 0.98 4951 28951 28950.93 1.04

68 Kumar BK Kumar BK Palungtar 4 6 293, 1240 0985-1521 12495.82 113.40 227.90 341.30 4 79000 310000 389000 64833.33 2.32 12267.92 4 1.82 77559 387559 64593.20 2.31

Badri kumar 1402, 1404, 69 Shrestha Badri kumar Shrestha Palungtar 7 5 1406, 1408 095-1521 3745.53 12.70 113.50 126.20 11 103000 400000 503000 100600.00 3.60 3632.03 11 3.03 99879 499879 99975.76 3.58 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

1403, 1405, 70 Hit kaji Shrestha Hit kaji Shrestha Palungtar 7 6 1407 095-1521 3747.51 10.00 42.30 52.30 10 94000 300000 394000 65666.67 2.35 3705.21 10 1.13 92939 392939 65489.83 2.34

71 Bhatte Damai Bhatte Damai Palungtar 4 1 108 095-1521 2201.85 20.00 47.00 67.00 3 11000 34000 45000 45000.00 1.61 2154.85 3 2.13 10765 44765 44765.20 1.60

72 Bhim bdr. BK Bhim bdr. BK Palungtar 4 5 107 095-1521 17735.10 164.00 182.00 346.00 6 53000 99000 152000 30400.00 1.09 17553.10 6 1.03 52456 151456 30291.22 1.08

73 Baburam Shrestha Baburam Shrestha Palungtar 4 1 15 095-1521 3604.72 290.00 430.00 720.00 12 40000 54000 94000 94000.00 3.36 3174.72 11 11.93 35228 89228 89228.48 3.19

74 Daanmaya Devkota Bishwonath Devkota Aappipal 2 5 753, 785 095-1442 8616.01 0.00 37.00 37.00 12 102000 783000 885000 177000.00 6.33 8579.01 12 0.43 101562 884562 176912.40 6.33

75 Krishna pd. Devkota Krishna pd. Devkota Aappipal 2 3 946 095-1442 13129.28 197.00 297.00 494.00 12 63000 100000 163000 54333.33 1.94 12832.28 12 2.26 61575 161575 53858.29 1.93

76 Hem bdr. Shrestha Hem bdr. Shrestha Aappipal 3 9 ,165,314 095-1482 14136.16 212.40 277.00 489.40 12 99000 540000 639000 71000.00 2.54 13859.16 12 1.96 97060 637060 70784.45 2.53

77 Dil maya Ale Magar Resham bdr. Ale Aappipal 8 7 244 095-1403 52366.11 202.20 353.58 555.78 3 83000 120000 203000 29000.00 1.04 52012.53 3 0.68 82440 202440 28919.94 1.03

78 Bude(Ramtara BK) Krisharam B.K Palungtar 4 6 298 095-1521 30371.60 267.00 396.00 663.00 6 63400 112000 175400 29233.33 1.05 29975.60 6 1.30 62573 174573 29095.56 1.04

Josana Pradhan 79 Shrestha Durga naran Shrestha Gaikhura 8 3 556 095-1561 28635.49 48.60 158.40 207.00 12 83400 70000 153400 51133.33 1.83 28477.09 12 0.55 82939 152939 50979.55 1.82

80 Dil kumari Ale Dil kumari Ale Aappipal 8 7 239 095-1403 8888.27 74.56 69.29 143.85 12 35000 2020000 2055000 293571.43 10.50 8818.98 12 0.78 34727 2054727 293532.45 10.50

Sarad chandra Sarad chandra 81 Devkota Devkota Aappipal 3 10 278 095-1482 14108.41 6.50 119.20 125.70 7 65000 716000 781000 78100.00 2.79 13989.21 7 0.84 64451 780451 78045.08 2.79

82 Toyanath Devkota khadananda Devkota Palungtar 5 6 626 095-1481 14222.21 79.00 149.00 228.00 12 59200 276000 335200 55866.67 2.00 14073.21 12 1.05 58580 334580 55763.30 2.00

83 Shankar bdr. Sarki Ram bdr. Sarki Aappipal 9 5 232, 239 095-1363 17180.32 349.66 436.66 786.32 2 9600 252000 261600 52320.00 1.87 16743.66 2 2.54 9356 261356 52271.20 1.87

84 Rohini pd. Paudel Rohini pd. Paudel Palungtar 5 6 644, 655, 844 095-1481 6572.85 173.00 262.00 435.00 12 102500 69000 171500 28583.33 1.02 6310.85 12 3.99 98414 167414 27902.38 1.00

85 Mangal kr. Shrestha Mangal kr. Shrestha Palungtar 4 10 270 095-1521 8141.39 0.00 49.50 49.50 10 83000 711000 794000 79400.00 2.84 8091.89 10 0.61 82495 793495 79349.54 2.84 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

Harimaya, Chij kr. 86 Shrestha Chij kr. Shrestha Palungtar 4 5 230, 271, 272 095-1521 8815.17 325.60 438.00 763.60 8 102500 85000 187500 37500.00 1.34 8377.17 8 4.97 97407 182407 36481.41 1.31

87 Nanda bdr. Ale Nanda bdr. Ale Aappipal 4 5 388 095-1442 18230.11 11.00 52.00 63.00 12 42000 445000 487000 97400.00 3.49 18178.11 12 0.29 41880 486880 97376.04 3.48

Pitamber Paudel (son Arjun pd. 88 Paudel) Taranath pd. Paudel Palungtar 5 5 643(968) 095-1481 5418.73 35.00 54.00 89.00 9 33000 300000 333000 66600.00 2.38 5364.73 9 1.00 32671 332671 66534.23 2.38

Gyan kumari 89 Devkota Gyan kumari Devkota Palungtar 5 11 678 095-1481 19652.90 220.00 245.00 465.00 6 73000 1324000 1397000 127000.00 4.54 19407.90 6 1.25 72090 1396090 126917.27 4.54

90 Bharat Paudel Nanda kumari Paudel Palungtar 5 4 910 095-1521 5677.00 170.00 129.00 299.00 9 0 224000 224000 56000.00 2.00 5548.00 9 2.27 0 224000 56000.00 2.00

91 Hari bdr. Bhandari Hari bdr. Bhandari Aappipal 9 5 1304 095-1363 27866.07 53.96 82.91 136.87 0 0 850000 850000 170000.00 6.08 27783.16 0 0.30 0 850000 170000.00 6.08

92 Tek bdr. Sunar Tek bdr. Sunar Aappipal 2 10 712, 744 095-1442 10643.35 309.00 407.00 716.00 12 143000 144000 287000 28700.00 1.03 10236.35 12 3.82 137532 281532 28153.17 1.01

93 Rajendra Bhandari Rajendra Bhandari Aappipal 9 4 1303, 291 095-1363 7807.59 51.18 129.66 180.84 0 0 250000 250000 62500.00 2.24 7677.93 0 1.66 0 250000 62500.00 2.24

94 Tul bdr. Bhandari Ganesh Bhandari Aappipal 9 7 202, 319 095-1363 52883.60 327.10 479.47 806.57 6 75000 458000 533000 76142.86 2.72 52404.13 6 0.91 74320 532320 76045.72 2.72

Nanu maya 95 Bhandari Nanu maya Bhandari Aappipal 9 9 203 095-1363 9303.65 94.13 160.12 254.25 0 1500 472000 473500 52611.11 1.88 9143.53 0 1.72 1474 473474 52608.24 1.88

96 Ram kr. Shrestha Ram kr. Shrestha Aappipal 8 5 130 095-1403 13397.25 0.00 11.74 11.74 12 163000 60000 223000 44600.00 1.60 13385.51 12 0.09 162857 222857 44571.43 1.59

Krishna bdr. Khatri(Krishna pd. Devkota)/Mina devi 97 Khatri Krishna bdr. Khatri Aappipal 2 4 628, 627, 629 095-1442 7721.78 103.00 146.00 249.00 6 35000 288000 323000 80750.00 2.89 7575.78 6 1.89 34338 322338 80584.56 2.88

98 Rishi ram Devkota Khem maya Devkota Aappipal 2 12 901 095-1442 14327.08 0.00 55.00 55.00 6 9200 616000 625200 52100.00 1.86 14272.08 6 0.38 9165 625165 52097.06 1.86

241(1286- 99 Khadga bdr. Sarki Chinimaya Acchami Aappipal 9 2 present plot) 095-1363 148162.51 2.23 64.64 66.87 2 22000 50000 72000 36000.00 1.29 148097.87 2 0.04 21990 71990 35995.20 1.29

100 Santa bdr. Rana Santa bdr. Rana Aappipal 4 5 349, 393, 135 095-1442 13838.56 18.00 193.00 211.00 12 100000 660000 760000 152000.00 5.44 13645.56 12 1.39 98605 758605 151721.07 5.43 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

101 Chandra bdr. Rana Chandra bdr. Rana Aappipal 4 8 394 095-1442 12646.45 0.00 47.00 47.00 6 123000 150000 273000 34125.00 1.22 12599.45 6 0.37 122543 272543 34067.86 1.22

102 Mankaji Ale Mankaji Ale Aappipal 4 7 353, 396 095-1442 10548.11 5.00 165.00 170.00 6 125000 700000 825000 117857.14 4.22 10383.11 6 1.56 123045 823045 117577.81 4.21

103 Manu maya Thapa Manu maya Thapa Aappipal 2 6 637 095-1442 13645.89 82.00 117.00 199.00 12 91700 54000 145700 24283.33 0.87 13528.89 12 0.86 90914 144914 24152.29 0.86

104 Gunakant Devkota Gunakant Devkota Aappipal 2 9 942 095-1442 7491.54 8.00 95.00 103.00 10 156000 1200000 1356000 150666.67 5.39 7396.54 10 1.27 154022 1354022 150446.86 5.38

105 Raju Sunar Raju Sunar Aappipal 2 4 738 095-1442 955.78 0.00 14.00 14.00 12 3000 360000 363000 90750.00 3.25 941.78 12 1.46 2956 362956 90739.01 3.25

106 Gopinath Devkota Gopinath Devkota Aappipal 2 8 784 095-1442 7078.39 0.00 42.00 42.00 6 145000 400000 545000 68125.00 2.44 7036.39 6 0.59 144140 544140 68017.45 2.43

Devnarayan 107 Shrestha Devnarayan Shrestha Aappipal 3 5 164 095-1482 2946.48 73.30 105.40 178.70 3 35000 150000 185000 37000.00 1.32 2841.08 3 3.58 33748 183748 36749.60 1.31

108 Kulman Shrestha Dipnarayan Shrestha Aappipal 8 5 131 095-1363 8952.20 0.00 17.93 17.93 12 103000 537000 640000 128000.00 4.58 8934.27 12 0.20 102794 639794 127958.74 4.58

109 Deumaya Sarki Durkha bdr. Basel Aappipal 2 2 1013 095-1442 496721.94 0.00 57.00 57.00 6 40000 60000 100000 50000.00 1.79 496664.94 6 0.01 39995 99995 49997.70 1.79

110 Nanumaya Shrestha Yeri kr. Shrestha Aappipal 3 6 ,320,225,230 095-1442 17097.53 17097.53 306.40 17403.93 3 200000 100000 300000 50000.00 1.79 16791.13 3 1.79 196416 296416 49402.64 1.77

111 Ram bdr. Shrestha Ram bdr. Shrestha Aappipal 3 7 178 , 187,245 095-1482 13233.89 124.70 224.90 349.60 5 45000 206000 251000 35857.14 1.28 13008.99 5 1.70 44235 250235 35747.89 1.28

112 Dil kumari Thapa Kamal Thapa Aappipal 4 3 107 095-1442 13777.34 0.00 78.00 78.00 12 620000 0 620000 206666.67 7.39 13699.34 12 0.57 616490 616490 205496.63 7.35

113 Harka bahadur ale Dhan bdr. Ale Aappipal 8 1 242 095-1403 54867.97 281.15 318.15 599.30 12 70000 0 70000 70000.00 2.50 54549.82 12 0.58 69594 69594 69594.11 2.49

Surya Kumari 114 Shrestha Mohan kmr.Shrestha Aappipal 8 4 180, 181, 202 095-1403 16654.79 291.73 403.73 695.46 12 93000 168000 261000 65250.00 2.33 16251.06 12 2.42 90746 258746 64686.40 2.31

115 Gane Sarki Durga bdr. Basel Aappipal 3 7 182, 184 095-1482 10427.96 132.80 163.20 296.00 6 93000 200000 293000 41857.14 1.50 10264.76 6 1.57 91545 291545 41649.22 1.49

116 Sitadevi Pariyar Shyam bdr. Damai Aappipal 8 6 133 095-1403 32891.73 0.00 12.90 12.90 1 40000 200000 240000 40000.00 1.43 32878.83 1 0.04 39984 239984 39997.39 1.43

117 Sita Majakoti Sita Majakoti Aappipal 9 1 233 095-1363 1786.45 0.00 17.31 17.31 2 38000 160000 198000 198000.00 7.08 1769.14 2 0.97 37632 197632 197631.79 7.07

Shambhulal 118 Shrestha Shambhulal Shrestha Aappipal 9 6 27 095-1403 5226.31 172.00 182.00 354.00 6 99000 130000 229000 38166.67 1.37 5044.31 6 3.48 95552 225552 37592.07 1.35 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

119 Nar bdr. Thapa Nar bdr. Thapa Aappipal 8 12 830 095-1403 10899.96 67.50 437.00 504.50 10 60000 300000 360000 30000.00 1.07 10462.96 10 4.01 57594 357594 29799.54 1.07

120 Krishna A.C Krishna A.C Aappipal 9 4 224, 225 095-1363 25404.04 69.76 96.70 166.46 4 73000 42000 115000 28750.00 1.03 25307.34 4 0.38 72722 114722 28680.53 1.03

Amrit bahadur 121 Thapa Devimaya Thapa Aappipal 9 4 227 095-1363 5846.12 49.40 64.99 114.39 6 89600 22000 111600 27900.00 1.00 5781.13 6 1.11 88604 110604 27650.98 0.99

122 Lure sunar Arati Sunar Aappipal 2 4 646 095-1442 4096.96 100.00 129.00 229.00 3 70000 63000 133000 33250.00 1.19 3967.96 3 3.15 67796 130796 32698.98 1.17

123 Nar bdr. Sarki Nanda Kumari Basel Aappipal 2 4 1012 095-1442 10078.97 0.00 6.00 6.00 6 59000 65500 124500 31125.00 1.11 10072.97 6 0.06 58965 124465 31116.22 1.11

Kul 124 bdr.Bishwokarma Kul bdr.Bishwokarma Aappipal 2 12 640, 713, 746 095-1442 15901.71 286.00 648.00 934.00 6 78000 634000 712000 59333.33 2.12 15253.71 6 4.08 74821 708821 59068.46 2.11

Pahal bdr. Ale 125 magar Pahal bdr. Ale magar Aappipal 2 9 579 095-1442 17373.37 41.00 151.00 192.00 12 55000 200000 255000 28333.33 1.01 17222.37 12 0.87 54522 254522 28280.22 1.01

126 Bishnu ale magar Bishnu ale magar Aappipal 8 7 238, 241 095-1403 8043.49 180.92 379.20 560.12 6 106800 228000 334800 47828.57 1.71 7664.29 6 4.71 101765 329765 47109.29 1.69

127 Santaman Shrestha Ratna kumari Shrestha Aappipal 8 2 125 095-1403 20414.60 3.28 68.30 71.58 3 40000 70000 110000 55000.00 1.97 20346.30 3 0.33 39866 109866 54933.09 1.97

Nanu maya thapa Nanu maya thapa 128 (shrestha) (shrestha) Aappipal 8 2 134 095-1403 506.61 0.00 10.49 10.49 6 174000 0 174000 87000.00 3.11 496.12 6 2.07 170397 170397 85198.56 3.05

krishna bdr. 129 Acchami krishna bdr. Acchami Aappipal 9 4 1161 095-1363 10917.55 72.98 109.45 182.43 12 96000 280000 376000 94000.00 3.36 10808.10 12 1.00 95038 375038 93759.40 3.35

Bishnu prasad adhikari (purna bdr. 130 Gharti) Purna bdr. Gharti Aappipal 9 11 231 095-1363 5184.60 68.29 95.23 163.52 6 15370 300000 315370 28670.00 1.03 5089.37 6 1.84 15088 315088 28644.34 1.02

131 Ramji bhandari Ramji bhandari Aappipal 9 6 1302 095-1363 2873.27 52.79 77.98 130.77 12 90000 108000 198000 33000.00 1.18 2795.29 12 2.71 87557 195557 32592.90 1.17

132 Bhesanta devkota Bhesanta devkota Aappipal 2 9 ,777,779,780 095-1442 11416.06 172.00 319.00 491.00 12 72000 500000 572000 63555.56 2.27 11097.06 12 2.79 69988 569988 63332.01 2.27

Dil narayan 133 shrestha Dil narayan shrestha Aappipal 2 10 163 095-1482 7105.87 41.40 56.20 97.60 6 48000 680000 728000 72800.00 2.60 7049.67 6 0.79 47620 727620 72762.04 2.60 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

134 Yagya bdr. Bhandari Yagya bdr. Bhandari Aappipal 9 4 1300 095-1363 3672.18 8.26 25.59 33.85 0 0 1500000 1500000 375000.00 13.42 3646.59 0 0.70 0 1500000 375000.00 13.42 Dil bahadur 135 bhandari Maina bhandari Aappipal 9 13 312, 1015 095-1403 11726.44 0.00 156.49 156.49 5 60000 480000 540000 41538.46 1.49 11569.95 5 1.33 59199 539199 41476.87 1.48

Dalle sunar, 136 gurusini sunar Gurusini sunar Aappipal 2 14 643 095-1442 6128.04 0.00 26.00 26.00 2 39000 870000 909000 64928.57 2.32 6102.04 2 0.42 38835 908835 64916.75 2.32

Bishnu prasad 137 devkota Bishnu prasad devkota Aappipal 2 7 ,943,945 095-1442 10595.83 170.00 255.00 425.00 12 65000 150000 215000 30714.29 1.10 10340.83 12 2.41 63436 213436 30490.82 1.09

Kul bdr./Chameli 138 Sarki Kul bdr. Sarki Aappipal 9 5 238, 1162 095-1363 12225.74 296.80 442.06 738.86 12 95000 1224000 1319000 263800.00 9.44 11783.68 12 3.62 91565 1315565 263113.00 9.41

139 Debu maya dargi Debu maya dargi Aappipal 9 1 243 095-1363 4786.96 157.49 235.28 392.77 4 15000 24000 39000 39000.00 1.40 4551.68 4 4.92 14263 38263 38262.75 1.37

140 Durga A.C Durga A.C Aappipal 9 4 240 095-1363 7680.37 24.70 40.96 65.66 6 35000 212000 247000 61750.00 2.21 7639.41 6 0.53 34813 246813 61703.34 2.21

141 Kamli kanta sapkota Kamli kanta sapkota Harmi 3 7 1790 095-1364 4067.47 14.25 130.87 145.12 6 122750 180000 302750 43250.00 1.55 3936.60 6 3.22 118801 298801 42685.79 1.53

Kamal, Ram bdr., 142 Ishwor, hari Dankoti Kamal Dankoti Harmi 4 3 327 095-1365 73663.10 351.50 484.18 835.68 6 56000 190000 246000 82000.00 2.93 73178.92 6 0.66 55632 245632 81877.31 2.93

143 Gangamaya Gurung Gangamaya Gurung Harmi 4 5 43 095-1365 11118.58 0.00 54.45 54.45 6 55000 186000 241000 48200.00 1.72 11064.13 6 0.49 54731 240731 48146.13 1.72

144 Suman Gurung Suman Gurung Harmi 8 7 1133 095-1367 281862.51 25.80 28.69 54.49 20000 396000 416000 59428.57 2.13 281833.82 0 0.01 19998 415998 59428.28 2.13

Man bdr. Tamang,Krishna 145 bdr.Tamang Krishna bdr. Tamang Harmi 4 5 198, 201, 202 095-1365 7280.98 127.41 221.98 349.39 2 45000 125000 170000 34000.00 1.22 7059.00 2 3.05 43628 168628 33725.61 1.21

Thakur prasad 146 Gurung Thakur prasad Gurung Harmi 8 8 279, 300 095-1367 3695.94 49.31 122.20 171.51 6 83500 192000 275500 34437.50 1.23 3573.74 6 3.31 80739 272739 34092.40 1.22

Chitra kumari 147 Dhakal Chitra kumari Dhakal Harmi 4 5 195, 385 095-1365 7786.19 171.71 197.52 369.23 6 50000 720000 770000 154000.00 5.51 7588.67 6 2.54 48732 768732 153746.32 5.50

148 Jal maya Sodari Kalika prasad Sodari Gaikhura 8 10 486 095-1561 3809.41 0.00 12.00 12.00 12 105000 472000 577000 57700.00 2.06 3797.41 12 0.32 104669 576669 57666.92 2.06 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

149 Gopal bdr. Sarki Gopal bdr. Sarki Harmi 4 6 374 095-1365 5540.27 130.45 189.58 320.03 2 13000 216000 229000 38166.67 1.37 5350.69 2 3.42 12555 228555 38092.53 1.36

150 Mane/Sete Sarki Bate bdr. Sarki Harmi 4 8 353 095-1365 12087.53 10.00 61.00 71.00 6 143000 128000 271000 33875.00 1.21 12026.53 6 0.50 142278 270278 33784.79 1.21

Buddhi bilas 151 Sapkota Buddhi bilas Sapkota Harmi 3 10 1791 095-1364 15019.28 0.00 32.34 32.34 3 52500 250000 302500 30250.00 1.08 14986.94 3 0.22 52387 302387 30238.70 1.08

152 Ran bdr. Gurung Ran bdr. Gurung Harmi 8 15 361 095-1367 48613.30 364.33 448.59 812.92 6 42500 500000 542500 36166.67 1.29 48164.71 6 0.92 42108 542108 36140.52 1.29

153 Ram mani Dhakal Ram mani Dhakal Harmi 4 5 196 095-1365 15699.50 191.19 268.77 459.96 12 123000 30000 153000 30600.00 1.09 15430.73 12 1.71 120894 150894 30178.86 1.08

154 Mainchauri Gurung Mainchauri Gurung Harmi 8 5 274 095-1367 9433.03 244.04 295.78 539.82 6 40800 220000 260800 52160.00 1.87 9137.25 6 3.14 39521 259521 51904.14 1.86

Ambika devi 155 sapkota Ambika devi sapkota Harmi 3 5 1862 095-1365 15152.20 3.04 27.80 30.84 4 47750 112000 159750 31950.00 1.14 15124.40 4 0.18 47662 159662 31932.48 1.14

156 Bir bdr. Gurung Bir bdr. Gurung Harmi 8 8 353, 360 095-1367 4355.72 3.92 162.70 166.62 9 48000 370000 418000 52250.00 1.87 4193.02 9 3.74 46207 416207 52025.88 1.86

157 Suk bdr. Gurung Suk bdr. Gurung Harmi 8 9 577 095-1367 9589.34 17.16 14.74 31.90 2 36600 229000 265600 29511.11 1.06 9574.60 2 0.15 36544 265544 29504.86 1.06

Maheshwor 158 Pokharel Maheshwor Pokharel Harmi 7 6 742 095-1366 12312.10 0.00 31.29 31.29 8 70000 156000 226000 37666.67 1.35 12280.81 8 0.25 69822 225822 37637.02 1.35

Mannmaya devi Mannmaya devi 159 Gurung Gurung Harmi 8 4 587 095-1407 8087.76 140.00 214.00 354.00 7 20000 550000 570000 142500.00 5.10 7873.76 7 2.65 19471 569471 142367.70 5.09

160 Jit bdr. Gurung Jit bdr. Gurung Harmi 8 2 575, 861 095-1367 15235.35 116.50 208.56 325.06 6 40000 120000 160000 80000.00 2.86 15026.79 6 1.37 39452 159452 79726.22 2.85

Dambar kumari Dambar kumari 161 Gurung Gurung Harmi 8 1 489 095-1407 14975.03 7.16 5.00 12.16 5 47000 200000 247000 247000.00 8.84 14970.03 5 0.03 46984 246984 246984.31 8.84

162 Men bdr. Gurung Ganga devi gurung Harmi 8 2 858 095-1407 5517.98 2.67 20.00 22.67 9 20000 200000 220000 110000.00 3.94 5497.98 9 0.36 19928 219928 109963.75 3.93

Dhan bdr. Dhan bdr. 163 Bishwokarma Bishwokarma Harmi 8 8 753, 752, 840 095-1407 51163.15 135.63 280.46 416.09 3 60000 184000 244000 30500.00 1.09 50882.69 3 0.55 59671 243671 30458.89 1.09

164 Takman Gurung Takman Gurung Harmi 8 5 573 095-1367 4708.62 51.65 71.50 123.15 3 211000 68000 279000 55800.00 2.00 4637.12 3 1.52 207796 275796 55159.20 1.97

165 Hari bdr.Dhakal Hari bdr.Dhakal Harmi 4 11 419 095-1365 1738.65 2.98 23.30 26.28 3 44000 337000 381000 34636.36 1.24 1715.35 3 1.34 43410 380410 34582.76 1.24 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

166 Bimala Dhakal Janardhan Dhakal Harmi 4 6 137, 420 095-1365 949.79 37.82 65.20 103.02 4 55000 253000 308000 51333.33 1.84 884.59 4 6.86 51224 304224 50704.07 1.81

167 Bharat Dhakal Bharat Dhakal Harmi 5 3 1248 095-1364 270.20 0.00 8.02 8.02 3 250400 300000 550400 183466.67 6.56 262.18 3 2.97 242968 542968 180989.23 6.48 141, 142, 151, 168 Thagmaya Dhakal Thagmaya Dhakal Harmi 4 5 152 095-1365 23238.05 124.11 186.65 310.76 3 50000 500000 550000 110000.00 3.94 23051.40 3 0.80 49598 549598 109919.68 3.93

169 Hari datta Dhakal Shankar Dhakal Harmi 4 10 194 095--1365 19279.58 50.61 83.87 134.48 6 121000 300000 421000 42100.00 1.51 19195.71 6 0.44 120474 420474 42047.36 1.50

170 Maan bdr. Gurung Maan bdr. Gurung Harmi 8 7 846 095-1407 10466.56 3.30 198.00 201.30 4 106000 324000 430000 61428.57 2.20 10268.56 4 1.89 103995 427995 61142.11 2.19

171 Bhim Bd Gurung Bhim Bd Gurung Harmi 8 6 1070 095-1407 15700.72 8.40 54.00 62.40 6 80000 370000 450000 75000.00 2.68 15646.72 6 0.34 79725 449725 74954.14 2.68

172 Kajiram Nepali Kajiram Nepali Harmi 4 9 878 095-1365 3912.82 101.29 126.66 227.95 6 49000 210000 259000 28777.78 1.03 3786.16 6 3.24 47414 257414 28601.54 1.02

173 Narandutta Dhakal Indra nanda Dhakal Harmi 5 8 119 095-1364 10480.09 0.00 7.80 7.80 8 20000 410000 430000 53750.00 1.92 10472.29 8 0.07 19985 429985 53748.14 1.92

174 Kale sarki Kale sarki Harmi 9 7 203 095-1365 14908.29 36.56 104.93 141.49 4 130000 280000 410000 58571.43 2.10 14803.36 4 0.70 129085 409085 58440.72 2.09

221, 225, 357, 175 Sir bdr. Tamang Man bdr.Tamang Harmi 4 5 359 095-1365 22626.07 397.77 578.64 976.41 6 100000 165000 265000 53000.00 1.90 22047.43 6 2.56 97443 262443 52488.52 1.88

176 Sobha Dhakal Jaumaya Dhakal Harmi 4 6 847 095-1364 280.12 0.00 8.00 8.00 12 0 605000 605000 100833.33 3.61 272.12 12 2.86 0 605000 100833.33 3.61

177 Dandapani Sapkota Prem Pd.Sapkota Harmi 5 5 1315 095-1364 9276.04 0.00 150.16 150.16 12 152000 62000 214000 42800.00 1.53 9125.88 12 1.62 149539 211539 42307.89 1.51

178 Raghunath Dhakal Raghunath Dhakal Harmi 4 5 224 095-1365 5593.98 8.89 56.31 65.20 7 0 329000 329000 65800.00 2.35 5537.67 7 1.01 0 329000 65800.00 2.35

179 Kali Ghartini Kali Ghartini Harmi 3 1 1559 095-1363 8443.69 1.11 18.13 19.24 6 5000 24000 29000 29000.00 1.04 8425.56 6 0.21 4989 28989 28989.26 1.04

180 Yugnath Sapkota Mayadevi sapkota Harmi 3,4 4 147, 1871 095-1364 32514.40 420.80 592.62 1013.42 6 33000 90000 123000 30750.00 1.10 31921.78 6 1.82 32399 122399 30599.63 1.09

181 Dhale sarki Thakur bdr. Nepali Harmi 4 6 326 095-1365 10476.49 15.48 37.38 52.86 6 11000 500000 511000 85166.67 3.05 10439.11 6 0.36 10961 510961 85160.13 3.05

Chandra bdr. 218, 197, 356, 182 Tamang Chandra bdr. Tamang Harmi 4 2 358 095-1365 21025.60 181.70 252.68 434.38 5 94000 24000 118000 59000.00 2.11 20772.92 5 1.20 92870 116870 58435.17 2.09 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

183 Kul bdr Pandit Dev raj Pandit Harmi 4 14 347 095-1365 14450.88 187.83 311.82 499.65 12 121300 1524000 1645300 117521.43 4.20 14139.06 12 2.16 118683 1642683 117334.47 4.20

184 Kirkamali sarki Kirkamali sarki Harmi 4 6 220 095-1365 9532.06 229.37 330.29 559.66 6 61000 258000 319000 53166.67 1.90 9201.77 6 3.47 58886 316886 52814.39 1.89

185 Masini Gurung Masini Gurung Harmi 8 1 859 095-1407 10317.37 3.00 27.80 30.80 4 16000 90000 106000 106000.00 3.79 10289.57 4 0.27 15957 105957 105956.89 3.79

186 Padam bdr. Gurung Padam bdr. Gurung Harmi 8 5 574 095-1367 10646.97 184.01 307.56 491.57 12 52500 187000 239500 47900.00 1.71 10339.41 12 2.89 50983 237983 47596.69 1.70

187 Santa bdr. Gurung Kumari Gurung Harmi 8 3 526, 860 095-1407 727073.00 24.93 67.97 92.90 2 14500 78000 92500 30833.33 1.10 727005.03 2 0.01 14499 92499 30832.88 1.10

188 Khade Sarki Putali Sarki Harmi 4 7 348 095-1365 29667.76 330.92 488.35 819.27 6 58000 151500 209500 29928.57 1.07 29179.41 6 1.65 57045 208545 29792.18 1.07

189 Durgamaya Dhakal Durgamaya Dhakal Harmi 5 5 112, 113 095-1364 2632.73 0.00 68.72 68.72 9 65000 48000 113000 22600.00 0.81 2564.01 9 2.61 63303 111303 22260.67 0.80

190 Khilanath Dhakal Gangamaya Dhakal Harmi 4 9 140, 157 095-1365 928773.00 316.94 4444.05 4760.99 9 75000 214000 289000 32111.11 1.15 924328.95 9 0.48 74641 288641 32071.24 1.15

Dharma datta 191 Dhakal Rudra pd. Dhakal Harmi 4 6 384 095-1365 17232.65 8.83 171.55 180.38 9 66000 440000 506000 84333.33 3.02 17061.10 9 1.00 65343 505343 84223.83 3.01

192 Ramakanta Dhakal Chij kumari Dhakal Harmi 4 6 133, 183, 199 095-1365 7485.47 133.18 234.35 367.53 6 75000 252000 327000 54500.00 1.95 7251.12 6 3.13 72652 324652 54108.66 1.94

193 Kamala Dhakal Krishna pd. Dhakal Harmi 5 8 145 095-1364 15917.19 34.93 158.68 193.61 12 59000 439000 498000 62250.00 2.23 15758.51 12 1.00 58412 497412 62176.48 2.22

194 Indra bdr. Dhakal Indra bdr. Dhakal Harmi 5 7 144 095-1364 5126.95 40.79 149.09 189.88 6 43000 360000 403000 57571.43 2.06 4977.86 6 2.91 41750 401750 57392.80 2.05

195 Ramji pd. Dhakal Yamuna devi Dhakal Harmi 5 1 138 095-1364 4796.70 22.82 71.57 94.39 12 30000 130000 160000 160000.00 5.72 4725.13 12 1.49 29552 159552 159552.38 5.71

196 Sanmaya BK Sanmaya BK Harmi 8 5 217 095-1367 7372.38 98.13 113.20 211.33 7 86000 192000 278000 55600.00 1.99 7259.18 7 1.54 84680 276680 55335.90 1.98

197 Jaalmaya Gurung Jaalmaya Gurung Harmi 8 9 354 095-1367 11691.97 66.23 70.91 137.14 12 66000 454000 520000 57777.78 2.07 11621.06 12 0.61 65600 519600 57733.30 2.07

198 Kauman Gurung Naina bdr. Gurung Harmi 8 8 355 095-1367 13820.55 49.82 76.94 126.76 6 130000 100000 230000 28750.00 1.03 13743.61 6 0.56 129276 229276 28659.54 1.03

199 Santamaya Gurung Santamaya Gurung Harmi 8 16 222, 223 095-1367 11714.09 254.30 346.48 600.78 6 35000 754000 789000 49312.50 1.76 11367.61 6 2.96 33965 787965 49247.80 1.76 Socio-Economic Analysis of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Pre Project Scenerio Post Project Scenerio S.N. Owner Name Land head Household VDC Ward No. MembersFamily no. Affected Plot Sheet no sqm holding, Land Total Area, sqm Exisitng Area, sqm New Cut (sqm) Affected area Total mth sufficiency, food Total Income Agricultural Income Agricultural Non Income Total Per Income Capita Poverty Level Holding Land Post Sufficiency Food Post Month % loss Land Income Agricultural Post Income Total Post Per Income Post Capita Poverty Level Post

200 Lal bdr. Gurung Lal bdr. Gurung Harmi 8 6 272, 276 095-1367 18909.84 31.09 84.28 115.37 12 71500 240000 311500 51916.67 1.86 18825.56 12 0.45 71181 311181 51863.55 1.86

201 Jagnath Bhatta Jagnath Bhatta Harmi 3 6 1773 095-1364 10011.44 7.10 84.81 91.91 6 44000 420000 464000 77333.33 2.77 9926.63 6 0.85 43627 463627 77271.21 2.76

202 Dandapani Adhikari Khemraj Adhikari Harmi 4 15 41 095-1365 15774.22 0.00 64.74 64.74 6 86800 1376000 1462800 97520.00 3.49 15709.48 6 0.41 86444 1462444 97496.25 3.49

203 Dil bdr. Dhakal Dil bdr. Dhakal Harmi 5 4 111 095-1364 20868.68 36.50 65.38 101.88 3 19100 168000 187100 46775.00 1.67 20803.30 3 0.31 19040 187040 46760.04 1.67

204 Tul bdr. Shah Narendra jung Shah Palungtar 4 6 350 095-1521 148649.00 608.00 884.00 1492.00 12 56000 180000 236000 39333.33 1.41 147765.00 12 0.59 55667 235667 39277.83 1.41 1234 304 6043968.42 39065.46 43955.91 83021.37 1444 16761920 61200700 77962620 6000012.51 1420 16491443 77692143.40 Details of Private Structures of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha Distance from Structure centerline: Chainage : 2+3No: 9 3.5 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House Tahara Shed toilet 1.2 35,044.03 wall Pali others Transport allowance

Land owner Name: Harke Damai (Dil Bahadur Damai ) Plot - 102 Sheet no 095-1521 Total 35044.03328

Distance from Structure centerline: Chainage : 2+4No: 11 3.5 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House Tahara Shed 7.05 7.05 774.00 5,456.67 toilet wall Pali others Transport allowance NA

Land owner Name: Purna Bahadur Sarki Plot - 94 Sheet no 095-1521 Total 5456.670541 Distance from Structure centerline: Chainage : 2+6No: 14 2.9 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House Tahara Shed 14.4 7.2 774.00 5,572.77 toilet wall Pali others Transport allowance

Land owner Name: Ananda Shrestha Plot - Public Land Total 5572.769914

Distance from Structure centerline: Chainage : 2+8No: 23 3.6 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House Tahara Shed 774.00 - toilet wall Pali Chautara 57,954.24 Transport allowance

Land owner Name: Shanta Kumari Shrestha Plot - 28 Sheet no. 095-1521 Total 57954.24 Distance from Structure centerline: Chainage : 10No: 45 4.5 Address : Palungtar Municipality-13, Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 49.3 8.7 Tahara Shed toilet wall Pali 8.7 774.00 6,733.76 others Transport allowance

Land owner Name: Rajkumar Shrestha Plot - 122 Sheet no 095-1403 Total 6733.763646

Distance from Structure centerline: Chainage : 10No: 47 3 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 48.6 48.6 2 14,400.10 699844.74 Tahara Shed toilet wall Pali others Transport allowance

Land owner Name: Rajendra Kumar Shrestha Plot - 876 Sheet no 095-1403 Total 699844.7423 Distance from Structure centerline: Chainage : 10No: 53 2.8 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 48.99 31.74 2 14,400.10 457059.10 Tahara Shed toilet wall Pali others Transport allowance for Bhagwan Prasad Gupta 10000 Buisiness Allowance

Land owner Name: Rudra Bahadur Basnet Plot - 129 Sheet no 095-1403 Total 467059.0971

Distance from Structure centerline: Chainage : 10No: 54 3.0 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 18.525 18.525 2 14,400.10 266761.81 Tahara Shed toilet wall Pali others Transport allowance

Land owner Name: Sita Devi Pariyar Plot - 133 Sheet no. 095-1403 Total 266761.8076 Distance from Structure centerline: Chainage : 10No: 56 2.6 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 33.55 33.55 2 14,400.10 483123.27 Tahara Shed toilet wall Pali others Transport allowance

Land owner Name: Tribhunath Shrestha Plot - 136 Sheet no 095-1403 Total 483123.2737

Distance from Structure centerline: Chainage : 10No: 58 2.8 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 60.48 60.48 1 9,810.87 593361.65 Tahara Shed toilet wall Pali others Transport allowance to Gopal BK, Gopal Sunar & Bharat 30000 Business allowance

Land owner Name: Kulman Shrestha (Thakur Kumar Shrestha ) Plot - 131 Sheet no 095-1403 Total 623361.649 Distance from Structure centerline: Chainage : 14No: 66 3.9 Address : Harmi-5, Gorkha Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 16.53 16.53 1 9,810.87 162173.74 Tahara Shed toilet wall Pali others Transport allowance

Land owner Name: Hari Dhakal Plot - 1269 Sheet no 095-1364 Total 162173.7443

Distance from Structure centerline: Chainage : 15No: 83 3.5 Address : Harmi-4, Gorkha Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 31.68 31.68 2 14,400.10 456195.09 Tahara Shed toilet wall Pali others Transport allowance

Land owner Name: Kale Sharki Plot - 203 Sheet no 095-1365 Total 456195.0913 Distance from Structure centerline: Chainage : 19No: 89 4 Address : -1, Gorkha Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 25.6 25.6 1 9,810.87 251158.37 Tahara Shed toilet wall Pali others Transport allowance

Land owner Name: Subdari Gurung Plot - Public Land Total 251158.3699

Distance from Structure centerline: Chainage : 19No: 91 2.2 Address : Chhoprak-1, Gorkha Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House Tahara Shed toilet 35,044.03 wall Pali others Transport allowance

Land owner Name: Gyan Kumari Gurung (owned by Tej Bahadur Nepali) Plot - Public Land Total 35044.03328 Distance from Structure centerline: Chainage : 19No: 96 3.5 Address : Chhoprak-1, Gorkha Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House Tahara Shed toilet 35,044.03 wall Pali others Transport allowance

Land owner Name: Jit Bdr Gurung (Bam Bahadur Gurung ) Plot - 305 Sheet no 095-1367 Total 35044.03328

Distance from Structure centerline: Chainage : 28No: 107 4 Address : Jaubari-5, Chipleti Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House 11.2 11.2 9,810.87 109881.79 Tahara Shed toilet wall Pali others Transport allowance 5000 Business allowance

Land owner Name: Lal Bahadur Thapa (currently owned by Bich Kumar Uparkoti) Plot - 1336 Sheet no 095-1288 Total 114881.7868 Distance from Structure centerline: Chainage : 0+0No: 118 4 Address : Palungtar Municipality-8, Luintel Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House Tahara Shed 28.38 28.38 774.00 21,966.00 toilet wall Pali others Transport allowance

Land owner Name: Rit Kumar Shrestha Plot - Public Land Total 21966.00141

Distance from Structure centerline: Chainage : 0+0No: 119 4 Address : Palungtar Municipality-8, Luintel Affected Total Area Area Storey ( Sqm) (Sqm) Storey Rate /Sqm Total Amount

House Tahara Shed 25.9 25.9 774.00 20,046.49 toilet wall Pali others Transport allowance Business allowance 15000

Land owner Name: Rit Kumar Shrestha Plot - Public Land Total 35046.49178 Details of Temporary Shelters of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Sub Project, Gorkha

Distance from Structure centerlin Ch: 2+390 No:10 e: 2.5m Address : Palungtar Municipality-8, Baddanda Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 15.9 15.9 774.00 12,306.53 Shed toilet wall Pali others Transport allowance NA

Land owner Name: Krishna Bahadur Sarki Plot - Public Land Total 12306.5336

Distance from Structure centerlin Ch : 2+500 No: 12 e: 3 Address : Palungtar Municipality-8, Baddanda Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 2.24 2.24 774.00 1,733.75 Shed toilet wall Pali others Transport allowance

Land owner Name: Purna Bahadur Sarki Plot - 94 Sheet no 095-1521 Total 1733.75064 Distance from Structure centerlin Ch : 2+600 No: 13 e: 3.8 Address : Palungtar Municipality-8, Baddanda Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 10.25 4.1 774.00 3,173.38 Shed toilet wall Pali others Transport allowance 5000

Land owner Name: Tulasi Shrestha Plot - Public Land Total 8173.38287

Distance from Structure centerlin Ch: 10+265 No: 40 e: 3.1 Address : Palungtar Municipality-13 Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 11.34 11.34 774.00 8,777.11 Shed toilet wall Pali others Transport allowance

Land owner Name: Chini Maya Bhandari Plot - Public Land Total 8777.11262 Distance from Structure centerlin Ch : 10+650 No: 44 e: 4 Address : Palungtar Municipality-13, Aanppipal Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 18.36 18.36 774.00 14,210.56 Shed toilet wall Pali others Transport allowance

Land owner Name: Babulal Shrestha Plot - Public Land Total 14210.5633

Distance from Structure centerlin Ch : 10+740 No: 48 e: 32 Address : Palungtar Municipality-13, Aanppipal Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 20.46 20.46 774.00 15,835.95 Shed toilet wall Pali others Transport allowance

Land owner Name: Narayan Prasad Shrestha Plot - Public Land Total 15835.9545 Distance from Structure centerlin Ch : 10+745 No: 49 e: 1.8 Address : Palungtar Municipality-13, Aanppipal Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 45.88 45.88 774.00 35,510.93 Shed toilet wall Pali others Transport allowance

Land owner Name: Padam Raj Shrestha Plot - Public Land Total 35510.9283

Distance from Structure centerlin Ch : 10+760 No: 50 e: 4.5 Address : Palungtar Municipality-13, Aanppipal Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 44 8.4 774.00 6,501.56 Shed toilet wall Pali others Transport allowance

Land owner Name: Ratna Kumari Shrestha Plot - Public Land Total 6501.5649 Distance from Structure centerlin Ch : 11+280 No: 60 e: 3.5 Address : Palungtar Municipality-13, Aanppipal Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 5.1 5.1 774.00 3,947.38 Shed toilet wall Pali others Transport allowance

Land owner Name: Tul Bdr Bhandari (Radhika Bhandari ) Plot - 202 Sheet no 095-1363 Total 3947.37869

Distance from Structure centerlin Ch : 13+690 No: 61 e: 3.8 Address : Harmi-3, gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 11.1 11.1 774.00 8,591.35 Shed toilet wall Pali others Transport allowance

Land owner Name: Yubanath Sapkota Plot -1871 Sheet no 095-1364 Total 8591.35362 Distance from Structure centerlin Ch : 13+710 No: 62 e: 2.9 Address : Harmi-3, gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 13.64 13.64 774.00 10,557.30 Shed toilet wall Pali others Transport allowance Business allowance 30000

Land owner Name: Prem Prasad Sapkota Plot - Public Land Total 40557.303

Distance from Structure centerlin Ch : 13+715 No: 63 e: 3.3 Address : Harmi-3, gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 4.75 4.75 774.00 3,676.48 Shed toilet wall Pali others Transport allowance

Land owner Name: Prem Prasad Sapkota Plot - Public Land Total 3676.48015 Distance from Structure centerlin Ch : 13+718 No: 64 e: 3.8 Address : Harmi-3, gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 26.6 26.6 774.00 20,588.29 Shed toilet wall Pali others Transport allowance

Land owner Name: Laxmi Sapkota Plot - Public Land Total 20588.2889

Distance from Structure centerlin Ch : 14+360 No: 72 e: 4.2 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 21.45 21.45 774.00 16,602.21 Shed toilet wall Pali others Transport allowance

Land owner Name: Santa Bahadur Gurung Plot - Public Land Total 16602.2104 Distance from Structure centerlin Ch: 14+280 No: 73 e: 4 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 12.18 12.18 774.00 9,427.27 Shed toilet wall Pali others Transport allowance

Land owner Name: Chandra Bahadur Tamang Plot - 197 Sheet no 095-1365 Total 9427.26911

Distance from Structure centerlin Ch : 14+280 No: 74 e: 2.8 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 3 3 774.00 2,321.99 Shed toilet wall Pali others Transport allowance

Land owner Name: Chandra Bahadur Tamang Plot - 197 Sheet no 095-1365 Total 2321.98746 Distance from Structure centerlin Ch: 15+300 No: 75 e: 3.5 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 16.24 16.24 774.00 12,569.69 Shed toilet wall Pali others Transport allowance

Land owner Name: Chitra Kumari Dhakal (Sanu Maya Gurung owns the tahara who have no land at all. Plot - 195 Sheet no 095-1365 Total 12569.6921

Distance from Structure centerlin Ch : 15+260 No: 76 e: 3.0 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 17.2 17.2 774.00 13,312.73 Shed toilet wall Pali others Transport allowance 7500

Land owner Name: Chandra Bdr Tamang (Sita Gurung ) Plot - 356 Sheet no. 095-1365 Total 20812.7281 Distance from Structure centerlin Ch :15+260 No: 77 e: 4.5 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 12.54 12.54 774.00 9,705.91 Shed toilet wall Pali others Transport allowance

Land owner Name: Chhatra Bahadur Pariyar Plot - Public Land Total 9705.9076

Distance from Structure centerlin Ch : 15+265 No: 78 e: 4 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 20.24 20.24 774.00 15,665.68 Shed toilet wall Pali others Transport allowance

Land owner Name: Chandra Bdr Tamang (Sita Gurung ) Plot - 356 Sheet no 095-1365 Total 15665.6754 Distance from Structure centerlin Ch : 15+320 No: 79 e: 3.1 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 30.24 30.24 774.00 23,405.63 Shed toilet wall Pali others Transport allowance

Land owner Name: Krishna Bahadur Tamang Plot - 198 Sheet no 095-1365 Total 23405.6336

Distance from Structure centerlin Ch: 15+510 No: 80 e: 3.2 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 9.12 9.12 774.00 7,058.84 Shed toilet wall Pali others Transport allowance

Land owner Name: Man Bahadur Tamang Plot - 202 Sheet no 095-1365 Total 7058.84189 Distance from Structure centerlin Ch : 15+590 No: 82 e: 3.4 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 23.2 23.2 774.00 17,956.70 Shed toilet wall Pali others Transport allowance

Land owner Name: Kale sarki (Laxmi Nepali ) Plot - 203 Sheet no 095-1365 Total 17956.7031

Distance from Structure centerlin Ch : 15+598 No: 84 e: 4.4 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 19.72 19.72 774.00 15,263.20 Shed toilet wall Pali others Transport allowance

Land owner Name: Gopal Bahadur Sarki Plot - 374 Sheet no 095-1365 Total 15263.1976 Distance from Structure centerlin Ch : 15+770 No: 85 e: 3.6 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 12.21 12.21 774.00 9,450.49 Shed toilet wall Pali others Transport allowance

Land owner Name: Sete Sarki (Tej bahadur Achhami ) Plot - 353 Sheet no 095-1365 Total 9450.48898

Distance from Structure centerlin Ch : 15+780 No: 86 e: 4 Address : Harmi-9, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 20.72 20.72 774.00 16,037.19 Shed toilet wall Pali others Transport allowance

Land owner Name: Hari Bdr Nepali ( Prem Bahadur Nepali ) Plot - Public Land Total 16037.1934 Distance from Structure centerlin Ch : 19+320 No: 88 e: 3 Address : Chhoprak-1, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 6 6 774.00 4,643.97 Shed toilet wall Pali others Transport allowance

Land owner Name: Suk Bahadur Gurung Plot - 577 Sheet no 095-1367 Total 4643.97493

Distance from Structure centerlin Ch : 19+360 No: 90 e: 3.5 Address : Chhoprak-1, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 3.68 3.68 774.00 2,848.30 Shed toilet wall Pali others Transport allowance

Land owner Name: Lila Maya Gurung (Constructed and owned by Bel Maya Gurung) Plot - Public Land Total 2848.30462 Distance from Structure centerlin Ch : 19+580 No: 92 e: 3.3 Address : Chhoprak-1, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 20.65 20.65 774.00 15,983.01 Shed toilet wall Pali others Transport allowance Business allowance

Land owner Name: Gyan Kumari Gurung Plot - 1174 Sheet no 095-1367 Total 15983.0137

Distance from Structure centerlin Ch : 19+625 No: 95 e: 3.5 Address : Chhoprak-1, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 17.49 17.49 774.00 13,537.19 Shed toilet wall Pali others Transport allowance Business allowance

Land owner Name: Jit Bdr Gurung (Bam Bahadur Gurung ) Plot - 305 Sheet no 095-1367 Total 13537.1869 Distance from Structure centerlin Ch : 19+640 No: 97 e: 3.5 Address : Chhoprak-1, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 23.2 23.2 774.00 17,956.70 Shed toilet wall Pali others Transport allowance

Land owner Name: Jit Bahadur Gurung Plot - 306 Sheet no 095-1367 Total 17956.7031

Distance from Structure centerlin Ch : 20+505 No: 101 e: 3.3 Address : Chhoprak-1, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 16.2 7.02 774.00 5,433.45 Shed toilet wall Pali others Transport allowance Business allowance

Land owner Name: Bhim Bahadur Gurung (currently owned by Bikram Gurung) Plot - 1070 Sheet no 095-1407 Total 5433.45067 Distance from Structure centerlin Ch : 28+340 No: 102 e: 4 Address : Jaubari-5, Chipleti Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 27.69 27.69 774.00 21,431.94 Shed toilet wall Pali others Transport allowance Business allowance 5000

Land owner Name: Janajyoti Higher School (currently owned by Ek Bahadur Gurung) Plot - 374 Sheet no 095-1286 Total 26431.9443

Distance from Structure centerlin Ch : 28+560 No: 104 e: 3.0 Address : Jaubari-5, Chipleti Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 19.8 19.8 774.00 15,325.12 Shed toilet wall Pali others Transport allowance

Land owner Name: Jas Bdr Gurung (Kalpana Pathak ) Plot - Public Land Total 15325.1173 Distance from Structure centerlin Ch : 28+570 No: 105 e: 3.3 Address : Jaubari-5, Chipleti Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 16.5 16.5 774.00 12,770.93 Shed toilet wall Pali others Transport allowance 5000 Business allowance

Land owner Name: Jas Bahadur Gurung (currently owned by Budha Bahadur Gurung) Plot - Public Land Total 17770.9311

Distance from Structure centerlin Ch : 28+580 No: 106 e: 3.1 Address : Jaubari-5, Chipleti Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 9.45 9.45 774.00 7,314.26 Shed toilet wall Pali others Transport allowance

Land owner Name: Numaya Gurung Plot - Public Land Total 7314.26051 Distance from Structure centerlin Ch : 28+620 No: 109 e: 2.9 Address : Jaubari-5, Chipleti Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 51.51 51.51 774.00 39,868.52 Shed toilet wall Pali others Transport allowance Business allowance 25000

Land owner Name: Kala Thapaliya Plot - Public Land Total 64868.5248

Distance from Structure centerlin Ch : 28+630 No: 110 e: 2.6 Address : Jaubari-5, Chipleti Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 29.93 29.93 774.00 23,165.69 Shed toilet wall Pali others Transport allowance Business allowance 10000

Land owner Name: Prakash Gurung ( Santa Maya Gurung ) Plot - Public Land Total 33165.6949 Distance from Structure centerlin Ch : 28+645 No: 111 e: 3.4 Address : Jaubari-5, Chipleti Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 39.6 39.6 774.00 30,650.23 Shed toilet wall Pali others Transport allowance Business allowance 5000

Land owner Name: Kali Maya Gurung (built and owned by Lal Bahadur shrestha) Plot - Public Land Total 35650.2345

Distance from Structure centerlin Ch : 30+385 No: 113 e: 4 Address : Jaubari-5, Nayagaun Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 21.3 21.3 774.00 16,486.11 Shed toilet wall Pali others Transport allowance Business allowance 10000

Land owner Name: Man Bd./Dhan Bdr Gurung (Sirmaya Gurung) Plot - 846 Sheet no 095-1208 Total 26486.111 Distance from Structure centerlin Ch : 30+400 No: 115 e: 4.1 Address : Jaubari-5, Nayagaun Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 50.16 13.2 774.00 10,216.74 Shed toilet wall Pali others Transport allowance

Land owner Name: Karma Sing Tamang (Built by Sagar Tamang) Plot - 309 Sheet no 095-1208 Total 10216.7448

Distance from Structure centerlin Ch : 30+420 No: 116 e: 2.9 Address : Jaubari-5, Nayagaun Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 36.8 36.8 774.00 28,483.05 Shed toilet wall Pali others Transport allowance

Land owner Name: Karma Shing Tamang (Anil Tamang) Plot - 309 Sheet no 095-1208 Total 28483.0462 Distance from Structure centerlin Ch : 19+680 No: 94 e: 2.7 Address : Chhoprak-1, Gorkha Total Affected Area ( Area Total Storey Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara 2.52 2.52 774.00 1,950.47 Shed toilet wall Pali others Transport allowance 2000

Land owner Name: Gyan Kumari Gurung (currently owned by Banu Gurung) Plot - Public Land Total 3950.46947 Grand Total 43 Taharas 686753.84 EQ Affected Private Structure Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Sub Project, Gorkha

Structure Distance from Ch : 2+630 No: 15 centerline: 3m Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 34.68 9.15 Tahara Shed toilet wall Pali others Transport allowance 20000

Land owner Name: Tikaram Shrestha Plot - Public Land Total 20000

Structure Distance from Ch : 2+760 No: 16 centerline: 3 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 42.21 23.45 Tahara Shed toilet wall Pali others Transport allowance 10000

Land owner Name: Mahendra Kumar Shrestha Plot - Public Land Total 10000 Structure Distance from Ch : 2+768 No: 17 centerline: 4 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 24.75 24.75 Tahara Shed toilet wall Pali others Transport allowance 10000

Land owner Name: Maha Prasad Shrestha Plot - Public Land Total 10000

Structure Distance from Ch : 2+774 No: 18 centerline: 2.9 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 48.8 48.8 Tahara Shed toilet wall Pali others Transport allowance 25000

Land owner Name: Maha Prasad Shrestha Plot - Public Land Total 25000 Structure Distance from Ch : 2+785 No: 20 centerline: 3.2 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 43.2 20 3 Tahara Shed toilet wall Pali others Transport allowance 50000

Land owner Name: Baburam Shrestha Plot - 15 Sheet no 095-1521 Total 50000

Structure Distance from Ch : 2+830 No: 22 centerline: 3.6 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 30 30 1 Tahara Shed toilet wall Pali others Transport allowance 30000

Land owner Name: Tulasi Shrestha Plot - Public Land Total 30000 Structure Distance from Ch : 2+870 No: 24 centerline: 4 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 28.52 4.6 1 Tahara Shed toilet wall Pali others Transport allowance 10000

Land owner Name: Maniraj Shrestha Plot - Public Land Total 10000

Structure Distance from Ch : 2+890 No: 26 centerline: 3.4 Address : Palungtar Municipality-4, Baddanda Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 45.54 7.92 Tahara Shed toilet wall Pali others Transport allowance 5000

Land owner Name: Babulal Shrestha Plot - 31 Sheet no 095-1521 Total 5000 Structure Distance from Ch :10+790 No: 51 centerline: 2.7 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 45.1 23.65 Tahara Shed toilet wall Pali others Transport allowance 0 Buisiness Allowance 40000

Land owner Name:Ganesh Kumar Shrestha ( Abdul rahman Khan ) Plot - Public Land Total 40000

Structure Distance from Ch : 10+810 No: 52 centerline: 3.8 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 22.1 22.1 Tahara Shed toilet wall Pali others Transport allowance Buisiness Allowance 40000

Land owner Name: Ganga Maya Shrestha Plot - Public Land Total 40000 Structure Distance from Ch : 10+821 No: 55 centerline: 3.0 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 18.6875 18.6875 Tahara Shed toilet wall Pali others Transport allowance Business allowance 25000

Land owner Name: Nanumaya Thapa Shrestha Plot - 134 Sheet no 095-1403 Total 25000

Structure Distance from Ch : 10+825 No: 57 centerline: 2.8 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 26.55 26.55 Tahara Shed toilet wall Pali others Transport allowance to Salina Miya 10000 Business allowance to Salina Miya

Land owner Name: Ramkumar Shrestha Plot - 130 Sheet no 095-1403 Total 10000 Structure Distance from Ch :10+920 No: 59 centerline: 1.8 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 58.95 58.95 Tahara Shed toilet wall Pali others Transport allowance 40000

Land owner Name: Dilu Shrestha Plot - 902 Sheet no 095-1403 Total 40000

Structure Distance from Ch : 14+190 No: 67 centerline: 3.4 Address : Harmi-8, Gorkha Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 23 23 1 - 0.00 Tahara Shed toilet wall Pali others Transport allowance to Rupak Neupane 10000

Land owner Name: Mohan Dhakal Plot - Public Land Total 10000 Structure Distance from Ch : 14+190 No: 68 centerline: 2.5 Address : Harmi-9, Gorkha Affected Total Area Area Rate Total Storey ( Sqm) (Sqm) Storey /Sqm Amount

House 81.88 81.88 Tahara Shed toilet wall Pali others Transport allowance to Krishna Pariyar, Juna 30000

Land owner Name: Yam Kumari Dhakal ( Hemraj Dhakal ) Plot - 120 Sheet no 095-1364 Total 30000 Grand Total 15 EQ Cost (NRs) 355000 Details of Public Structure Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Sub Project, Gorkha Distance from Structure centerline Ch : 0+040 No: 1 : 2.7m Address : Palungtar Municipality-8, Luintel Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount House Tahara Shed toilet wall Pali EP 2,722.00 Business allowance Material transport allowance

Land woner Name : Plot Public Total 2722.00

Distance from Structure centerline Ch : 0+090 No: 2 : 2.6m Address : Palungtar Municipality-8, Luintel Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Business allowance Material transport allowance

Land owner Name: Plot - Public Total 2722.00 Distance from Structure centerline Ch : 0+120 No: 3 : 3m Address : Palungtar Municipality-8, Luintel Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Business allowance Material transport allowance

Land owner Name: Plot - Public Total 2722.00

Distance from Structure centerline: Ch: 0+650 No: 4 2.8 Address : Palungtar Municipality-8, Luintel Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Material transport allowance

Land owner Name: Plot - Public Total 2722.00 Distance from Structure centerline Ch : 0+700 No: 5 : 2.9m Address : Palungtar Municipality-8, Luintel Affected Total Area Area Total Type ( Sqm) (Sqm) Storey Rate /Sqm Amount

Building EP 2,722.00 Transport allowance

Land owner Name Public Total 2722.00

Distance from Structure centerline Ch: 0+750 No: 6 : 3m Address : Palungtar Municipality-8, Luintel Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount House Tahara Shed toilet wall Pali EP 2,722.00 Transport allowance

Land owner Name: Plot- Public Total 2722 Distance from Ch :(2+740- Structure centerline: 2+950) 6Nos No: 19 3.0 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 6 nos 16,332.00 Transport allowance

Land owner Name: Plot - Public Total 16332

Distance from Structure centerline: Ch : 5+130 No: 34 3.3 Address : Palungtar Municipality-8 Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Transport allowance

Land owner Name: Plot - Public Total 2722 Distance from Structure centerline: Ch : 8+610 No: 38 3 Address : Palungtar Municipality-13 Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Transport allowance

Land owner Name: Plot - Public Total 2722

Distance from Structure centerline: Ch : 10+096 No: 39 3.2 Address : Palungtar Municipality-13 Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Transport allowance

Land owner Name: Plot - Public Total 2722 Distance from Structure centerline: Ch : 10+680 No: 46 4.5 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Transport allowance

Land owner Name: Plot - Public Total 2722

Distance from Structure centerline: Ch : 19+680 No: 93 2.7 Address : Chhoprak-1, Gorkha Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Transport allowance

Land owner Name: Plot - Public Total 2722 Distance from Structure centerline: Ch : 19+660 No: 98 3.3 Address : Chhoprak-1, Gorkha Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Transport allowance

Land owner Name: Plot - Public Total 2722

Distance from Structure centerline: Ch : 20+500 No: 100 3.2 Address : Chhoprak-1, Gorkha Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali EP 2,722.00 Transport allowance

Land owner Name: Plot - Public Total 2722 Grand Total 14 electric Pole (NRs) 51718.00 Details of Public Structure Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Sub Project, Gorkha Distance from Structure centerline Ch : 1+350 No: 7 : 2.6m Address : Palungtar Municipality-8, Luintel Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali Chautara 57,954.24 Transport allowance

Land owner Name: Plot - Public Total 57954.24

Distance from Structure centerline Ch : 1+390 No: 8 : 1m Address : Palungtar Municipality-8, Luintel Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali Chautara 57,954.24 Transport allowance

Land owner Name: Plot - Public Total 57954.24 Distance from Structure centerline: Ch : 2+830 No: 21 2.1 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali Chautara 57,954.24 Transport allowance

Land owner Name: Plot - 16 Public Total 57954.24

Distance from Structure centerline: Ch : 2+950 No: 33 2.9 Address : Palungtar Municipality-8, Baddanda Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali Chautara 57,954.24 Transport allowance

Land owner Name: Plot - Public Total 57954.24 Distance from Structure centerline: Ch: 3+180 No: 35 3.2 Address : Palungtar Municipality-8 Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali others Transport allowance 5000

Land owner Name: Plot - Public Total 5000

Distance from Structure centerline: Ch : 3+908 No: 36 3.3 Address : Palungtar Municipality-8 Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali others Transport allowance 5000

Land owner Name: Plot - Public Total 5000 Distance from Structure centerline: Ch : 4+340 No: 37 3.1 Address : Palungtar Municipality-8 Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali others Transport allowance 5000

Land owner Name: Plot - Public Total 5000 Distance from Structure centerline: Ch : 10+600 No: 42 2.6 Address : Palungtar Municipality-13, Aanppipal Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House 100.98 100.98 1 9,810.87 990702.04 Tahara Shed toilet wall Pali others Transport allowance

Land owner Name: Community Building Plot - Public Total 990702.039 Distance from Structure centerline: Ch : 19+280 No: 87 4.5 Address : Chhoprak-1, Gorkha Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House 42.94 42.94 1 9,810.87 421278.92 Tahara School Toilet Shed Building toilet wall Pali others Transport allowance

Land owner Name: Chitre Pokhari Secondary School Plot - Public Total 421278.922

Distance from Structure centerline: Ch: 18+540 No: 120 3.7 Address : Chhoprak,1 Citrepokhari. Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara - Shed toilet wall Pali Water tank 162927.879 Transport allowance

Land owner Name: Plot - Public Total 162927.879 Distance from Structure centerline: Ch : 18+900 No: 121 3.0 Address : Chhoprak,1 Citrepokhari. Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara - Shed toilet wall Pali Chautara 57,954.24 Transport allowance

Land owner Name: Plot - Public Total 57954.24

Distance from Structure centerline: Ch : 19+320 No: 122 3.0 Address : Chhoprak,1 Citrepokhari. Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed toilet wall Pali Tap Stand 35000 Transport allowance

Land owner Name: Plot - Public Total 35000 Distance from Structure centerline: Ch: 20+400 No: 123 3.1 Address : Chhoprak,1 Citrepokhari. Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed - toilet wall Pali Chautara 57,954.24 Transport allowance

Land owner Name: Public Plot - Total 57954.24

Distance from Structure centerline: Ch : 20+740 No: 124 2.7 Address : Chhoprak,1 Tallo pam. Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed - toilet wall Pali Chautara 57,954.24 Transport allowance Business allowance

Land owner Name: Plot - Public Total 57954.24 Distance from Structure centerline: Ch : 20+490 No: 99 2.7 Address : Chhoprak,1 Tallo pam. Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed - toilet wall Pali Chautara 4,458.22 Transport allowance Business allowance

Land owner Name:(Panchashil Mahila Samuha) Plot - Public Total 4458.215

Distance from Structure centerline: Ch : 30+415 No: 117 2.7 Address : Nayagoan, Jaubari 5 Affected Total Area Area Total Storey ( Sqm) (Sqm) Storey Rate /Sqm Amount

House Tahara Shed - toilet wall Pali Tap 35,000.00 Transport allowance Business allowance

Land owner Name: Plot - Public Total 35000.00 Public Structures Grand Total (NRs) 2070046.73 Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 1 Lal bdr.Damai Lal bdr. Damai Kerabari 1 635 0.00 34.94 34.94 393.13 13735.96 Interviewed

2 Lok bdr. Tamang Lok bdr. Tamang Kerabari 5 146 0.00 88.83 88.83 393.13 34921.74 Interviewed

3 Devmaya Tamang Devmaya Tamang Kerabari 1 637 0.00 31.89 31.89 393.13 12536.92 Interviewed

4 Jeet bdr. Tamang Chandra bdr. Tamang Kerabari 1 133 0.00 102.09 102.09 393.13 40134.64 Interviewed

5 Lal bdr. Thapa Lal bdr. Thapa Jaubari 5 1336 0.00 42.40 42.40 491.41 20835.78 Interviewed Bhibi Tamang + Tirtha bdr. 6 Tamang Tirtha bdr. Tamang Jaubari 5 244 94.57 182.94 277.51 491.41 89898.55 Interviewed

7 Rankumari Tamang Rankumari Tamang Jaubari 5 277, 180 109.08 112.80 221.88 491.41 55431.05 Interviewed

8 Dhan bdr. Gurung Dhan bdr. Gurung Jaubari 5 886 207.40 560.44 767.84 491.41 275405.82 Interviewed

9 Karmasingh Tamang Karmasingh tamang Jaubari 5 309 59.82 292.82 352.64 491.41 143894.68 Interviewed

10 Phoolmaya Tamang Phoolmaya Tamang Jaubari 5 236 28.93 281.57 310.50 491.41 138366.31 Interviewed

11 Bodh bdr. Gurung Bodh bdr. Gurung Jaubari 5 615 551.00 820.00 1371.00 491.41 402956.20 Interviewed

12 Mangali Tamang Mangali Tamang Jaubari 5 224 0.00 28.55 28.55 491.41 14029.76 Interviewed

13 Dal bdr. Tamang Kul bdr. Tamang Jaubari 5 220 41.90 95.83 137.73 491.41 47091.82 Interviewed

14 Ram bdr. Gurung Ram bdr. Gurung Thalajung 1 125 165.50 219.00 384.50 393.13 86095.47 Interviewed

15 Tara bdr. Gurung Tara bdr. Gurung Thalajung 1 192, 197.111 276.39 417.54 693.93 393.13 164147.50 Interviewed

16 Shreekauri Gurung Bir bdr. Gurung Thalajung 9 270 55.57 80.65 136.22 393.13 31705.93 Interviewed

17 Nar bdr. Gurung Gan bdr. Gurung Thalajung 9 595, 611 827.00 1216.00 2043.00 393.13 478046.08 Interviewed

18 Yuktaman Gurung Yuktaman Gurung Thalajung 9 496 98.00 126.00 224.00 393.13 49534.38 Interviewed

19 Tek bdr. Gurung Tek bdr. Gurung Thalajung 9 579, 520, 526, 518 206.20 463.80 670.00 393.13 182333.69 Interviewed Yegya subha, Chalimaya, Dil bdr., 221, 246, 268, 259, 20 Moti bdr Gurung Yegya subha gurung Thalajung 9 298 211.86 859.75 1071.61 393.13 337993.52 Interviewed

21 Dhansingh Gurung Dhansingh Gurung Thalajung 2 122, 124, 160 567.96 793.64 1361.60 393.13 312003.69 Interviewed

22 Suk bdr. Gurung Suk bdr. Gurung Thalajung 7 232 232.03 348.74 580.77 393.13 137100.16 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

S.N. Owner Name Land head Household VDC No. Ward 366, Plot no. Affected 365, 373, 391, Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 23 Atimaya Gurung Atimaya Gurung Thalajung 7 384 265.45 804.12 1069.57 393.13 316123.70 Interviewed

24 Tek bdr. Gurung Tek bdr. Gurung Thalajung 9 47 69.60 70.10 139.70 393.13 27558.41 Interviewed

25 Bal bdr.Gurung Bal bdr.Gurung Thalajung 9 793 0.00 22.90 22.90 393.13 9002.68 Interviewed

26 Bhesh bdr. Gurung Amardhoj Gurung Thalajung 9 296 163.30 221.36 384.66 393.13 87023.26 Interviewed

27 Rana bdr. Gurung Rana bdr. Gurung Thalajung 7 197, 213 121.34 193.09 314.43 393.13 75909.47 Interviewed

28 Chitra bdr.Gurung Laxmi maya Gurung Thalajung 1 585, 126 195.12 326.10 521.22 393.13 128199.69 Interviewed

29 Hastabina Gurung Hastabina Gurung Thalajung 1 114, 195 469.75 664.99 1134.74 393.13 261427.52 Interviewed

30 Min kumari Gurung Min kumari Gurung Thalajung 9 220 6.00 62.20 68.20 393.13 24452.69 Interviewed

31 Rabilal Gurung Lalimaya Gurung Thalajung 9 48 111.00 148.00 259.00 393.13 58183.24 Interviewed

32 Prem bdr.Gurung Janga pd. Gurung Thalajung 9 274 36.25 65.27 101.52 393.13 25659.60 Interviewed

33 Suk bdr. Gurung Suk bdr. Gurung Thalajung 9 46 79.00 59.00 138.00 393.13 23194.67 Interviewed

34 Ganesh bdr. Gurung Ganesh bdr. Gurung Thalajung 9 96 2.00 21.00 23.00 393.13 8255.73 Interviewed

35 Dil bdr.Gurung Dil bdr.Gurung Thalajung 9 593, 521, 530 405.90 479.80 885.70 393.13 188623.77 Interviewed

36 Chitra bdr.Gurung aamumaya Gurung Thalajung 9 519, 594 289.00 425.00 714.00 393.13 167080.25 Interviewed

37 Hiramaya Gurung Hiramaya Gurung Thalajung 9 114, 115 606.60 903.00 1509.60 393.13 354996.39 Interviewed

38 Purnaa Gurung Purna bdr.Gurung Thalajung 9 514 0.00 210.00 210.00 393.13 82557.30 Interviewed

39 Kheman Gurung Kheman Gurung Thalajung 9 515, 566, 569 370.00 565.00 935.00 393.13 222118.45 Interviewed

40 Santa maya Gurung Santa maya Gurung Thalajung 7 385, 390 17.07 160.47 177.54 393.13 63085.57 Interviewed

41 Som bdr. Gurung Som bdr. Gurung Thalajung 7 446, 444, 36.65 34.84 71.49 393.13 13696.65 Interviewed

42 Indra bdr. Gurung Indra bdr. Gurung Thalajung 2 166 9.93 67.51 77.44 393.13 26540.21 Interviewed

43 Suguna Gurung Bel bdr. Gurung Thalajung 7 367 61.37 98.30 159.67 393.13 38644.68 Interviewed

44 Nar jung Gurung Nar bdr. Gurung Thalajung 7 392, 121 277.05 479.10 756.15 393.13 188348.58 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 45 Bir singh Gurung Bir singh Gurung Thalajung 2 194, 199, 200 6.50 214.19 220.69 393.13 84204.51 Interviewed

46 Ek bdr. Gurung Ek bdr. Gurung Thalajung 7 231, 374 227.94 324.19 552.13 393.13 127448.81 Interviewed

47 Kamal bdr. Shah Ganesh jung Shah Palungtar 4 274 129.00 194.00 323.00 982.82 190667.08 Interviewed

48 Lekh bdr. Thakuri Lekh bdr. Thakuri Palungtar 4 354 176.00 243.00 419.00 982.82 238825.26 Interviewed

49 Hari maya Malla Krishna jung thakuri Palungtar 4 273 108.00 164.00 272.00 982.82 161182.48 Interviewed

50 Gopal Paudel Gopal Paudel Palungtar 5 265 79.00 149.00 228.00 982.82 146440.18 Interviewed

51 Babulal Shrestha Babulal Shrestha Palungtar 4 31 0.00 31.00 31.00 982.82 30467.42 Interviewed

52 Kamal bdr. Thapa Kamal bdr. Thapa Aappipal 8 829 2.50 88.50 91.00 687.97 60885.35 Interviewed

53 Devendra Paudel Devendra Paudel Palungtar 5 649 66.80 147.20 214.00 982.82 144671.10 Interviewed

54 Buddhilal Shrestha Buddhilal Shrestha Palungtar 4 236, 297 206.00 293.00 499.00 982.82 287966.26 Interviewed

55 Dharma narayan Shrestha Dharma narayan Shrestha Palungtar 4 234 42.50 158.50 201.00 982.82 155776.97 Interviewed

56 Ramji Paudel Ramji Paudel Palungtar 5 909, 650 109.00 154.00 263.00 982.82 151354.28 Interviewed

57 Tek bdr. Rana Tek bdr. Rana Aappipal 4 133, 134, 136 0.00 221.00 221.00 687.97 152041.37 Interviewed

58 Anil Pariyar Krishna Pariyar Palungtar 4 276 12.00 39.00 51.00 982.82 38329.98 Interviewed

59 Prem Shrestha Babulal Shrestha Aappipal 8 201 45.00 180.00 225.00 687.97 123834.60 Interviewed

60 Rajendra kr. Shrestha Rajendra kr. Shrestha Aappipal 8 876 2.00 29.00 31.00 687.97 19951.13 Interviewed

61 Rajkumar Shrestha Rajkumar Shrestha Aappipal 8 122 19.37 148.06 167.43 687.97 101860.84 Interviewed

62 Narmada Shrestha Narmada Shrestha Palungtar 4 27 0.00 6.60 6.60 982.82 6486.61 Interviewed

63 Dayaram Paudel Dayaram Paudel Palungtar 5 834 117.00 158.00 275.00 982.82 155285.56 Interviewed

64 Purna bdr. Sarki Purna bdr. Sarki Palungtar 4 94, 98 101.00 305.00 406.00 982.82 299760.10 Interviewed

65 Santa kumari/Sankhar Shrestha Buddhiman Shrestha Palungtar 4 28 0.00 25.70 25.70 982.82 25258.47 Interviewed

66 Tek nath Devkota Bishnu kumari Devkota Aappipal 2 938 2.00 130.00 132.00 687.97 89436.10 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 67 Bishnu maya Devkota Bishnu maya Devkota Aappipal 3 305 0.00 21.00 21.00 687.97 14447.37 Interviewed

68 Kumar BK Kumar BK Palungtar 4 293, 1240 113.40 227.90 341.30 982.82 223984.68 Interviewed 1402, 1404, 1406, 69 Badri kumar Shrestha Badri kumar Shrestha Palungtar 7 1408 12.70 113.50 126.20 982.82 111550.07 Interviewed

70 Hit kaji Shrestha Hit kaji Shrestha Palungtar 7 1403, 1405, 1407 10.00 42.30 52.30 982.82 41573.29 Interviewed

71 Bhatte Damai Bhatte Damai Palungtar 4 108 20.00 47.00 67.00 982.82 46192.54 Interviewed

72 Bhim bdr. BK Bhim bdr. BK Palungtar 4 107 164.00 182.00 346.00 982.82 178873.24 Interviewed

73 Baburam Shrestha Baburam Shrestha Palungtar 4 15 290.00 430.00 720.00 982.82 422612.60 Interviewed

74 Daanmaya Devkota Bishwonath Devkota Aappipal 2 753, 785 0.00 37.00 37.00 687.97 25454.89 Interviewed

75 Krishna pd. Devkota Krishna pd. Devkota Aappipal 2 946 197.00 297.00 494.00 687.97 204327.09 Interviewed

76 Hem bdr. Shrestha Hem bdr. Shrestha Aappipal 3 ,165,314 212.40 277.00 489.40 687.97 190567.69 Interviewed

77 Dil maya Ale Magar Resham bdr. Ale Aappipal 8 244 202.20 353.58 555.78 687.97 243252.43 Interviewed

78 Bude(Ramtara BK) Krisharam B.K Palungtar 4 298 267.00 396.00 663.00 982.82 389196.72 Interviewed

79 Josana Pradhan Shrestha Durga naran Shrestha Gaikhura 8 556 48.60 158.40 207.00 393.13 62271.79 Interviewed

80 Dil kumari Ale Dil kumari Ale Aappipal 8 239 74.56 69.29 143.85 687.97 47669.44 Interviewed

81 Sarad chandra Devkota Sarad chandra Devkota Aappipal 3 278 6.50 119.20 125.70 687.97 82006.02 Interviewed

82 Toyanath Devkota khadananda Devkota Palungtar 5 626 79.00 149.00 228.00 982.82 146440.18 Interviewed

83 Shankar bdr. Sarki Ram bdr. Sarki Aappipal 9 232, 239 349.66 436.66 786.32 687.97 300408.98 Interviewed

84 Rohini pd. Paudel Rohini pd. Paudel Palungtar 5 644, 655, 844 173.00 262.00 435.00 982.82 257498.84 Interviewed

85 Mangal kr. Shrestha Mangal kr. Shrestha Palungtar 4 270 0.00 49.50 49.50 982.82 48649.59 Interviewed

86 Harimaya, Chij kr. Shrestha Chij kr. Shrestha Palungtar 4 230, 271, 272 325.60 438.00 763.60 982.82 430475.16 Interviewed

87 Nanda bdr. Ale Nanda bdr. Ale Aappipal 4 388 11.00 52.00 63.00 687.97 35774.44 Interviewed Pitamber Paudel (son Arjun pd. 88 Paudel) Taranath pd. Paudel Palungtar 5 643(968) 35.00 54.00 89.00 982.82 53072.28 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 89 Gyan kumari Devkota Gyan kumari Devkota Palungtar 5 678 220.00 245.00 465.00 982.82 240790.90 Interviewed

90 Bharat Paudel Nanda kumari Paudel Palungtar 5 910 170.00 129.00 299.00 982.82 126783.78 Interviewed

91 Hari bdr. Bhandari Hari bdr. Bhandari Aappipal 9 1304 53.96 82.91 136.87 687.97 57039.59 Interviewed

92 Tek bdr. Sunar Tek bdr. Sunar Aappipal 2 712, 744 309.00 407.00 716.00 687.97 280003.79 Interviewed

93 Rajendra Bhandari Rajendra Bhandari Aappipal 9 1303, 291 51.18 129.66 180.84 687.97 89202.19 Interviewed

94 Tul bdr. Bhandari Ganesh Bhandari Aappipal 9 202, 319 327.10 479.47 806.57 687.97 329860.98 Interviewed

95 Nanu maya Bhandari Nanu maya Bhandari Aappipal 9 203 94.13 160.12 254.25 687.97 110157.76 Interviewed

96 Ram kr. Shrestha Ram kr. Shrestha Aappipal 8 130 0.00 11.74 11.74 687.97 8076.77 Interviewed

Krishna bdr. Khatri(Krishna pd. 97 Devkota)/Mina devi Khatri Krishna bdr. Khatri Aappipal 2 628, 627, 629 103.00 146.00 249.00 687.97 100443.62 Interviewed

98 Rishi ram Devkota Khem maya Devkota Aappipal 2 901 0.00 55.00 55.00 687.97 37838.35 Interviewed

241(1286-present 99 Khadga bdr. Sarki Chinimaya Acchami Aappipal 9 plot) 2.23 64.64 66.87 687.97 44470.38 Interviewed

100 Santa bdr. Rana Santa bdr. Rana Aappipal 4 349, 393, 135 18.00 193.00 211.00 687.97 132778.21 Interviewed

101 Chandra bdr. Rana Chandra bdr. Rana Aappipal 4 394 0.00 47.00 47.00 687.97 32334.59 Interviewed

102 Mankaji Ale Mankaji Ale Aappipal 4 353, 396 5.00 165.00 170.00 687.97 113515.05 Interviewed

103 Manu maya Thapa Manu maya Thapa Aappipal 2 637 82.00 117.00 199.00 687.97 80492.49 Interviewed

104 Gunakant Devkota Gunakant Devkota Aappipal 2 942 8.00 95.00 103.00 687.97 65357.15 Interviewed

105 Raju Sunar Raju Sunar Aappipal 2 738 0.00 14.00 14.00 687.97 9631.58 Interviewed

106 Gopinath Devkota Gopinath Devkota Aappipal 2 784 0.00 42.00 42.00 687.97 28894.74 Interviewed

107 Devnarayan Shrestha Devnarayan Shrestha Aappipal 3 164 73.30 105.40 178.70 687.97 72512.04 Interviewed

108 Kulman Shrestha Dipnarayan Shrestha Aappipal 8 131 0.00 17.93 17.93 687.97 12335.30 Interviewed

109 Deumaya Sarki Durkha bdr. Basel Aappipal 2 1013 0.00 57.00 57.00 687.97 39214.29 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 110 Nanumaya Shrestha Yeri kr. Shrestha Aappipal 3 ,320,225,230 17097.53 306.40 17403.93 687.97 210794.01 Interviewed

111 Ram bdr. Shrestha Ram bdr. Shrestha Aappipal 3 178 , 187,245 124.70 224.90 349.60 687.97 154724.45 Interviewed

112 Dil kumari Thapa Kamal Thapa Aappipal 4 107 0.00 78.00 78.00 687.97 53661.66 Interviewed

113 Harka bahadur ale Dhan bdr. Ale Aappipal 8 242 281.15 318.15 599.30 687.97 218877.66 Interviewed

114 Surya Kumari Shrestha Mohan kmr.Shrestha Aappipal 8 180, 181, 202 291.73 403.73 695.46 687.97 277754.13 Interviewed

115 Gane Sarki Durga bdr. Basel Aappipal 3 182, 184 132.80 163.20 296.00 687.97 112276.70 Interviewed

116 Sitadevi Pariyar Shyam bdr. Damai Aappipal 8 133 0.00 12.90 12.90 687.97 8874.81 Interviewed

117 Sita Majakoti Sita Majakoti Aappipal 9 233 0.00 17.31 17.31 687.97 11908.76 Interviewed

118 Shambhulal Shrestha Shambhulal Shrestha Aappipal 9 27 172.00 182.00 354.00 687.97 125210.54 Interviewed

119 Nar bdr. Thapa Nar bdr. Thapa Aappipal 8 830 67.50 437.00 504.50 687.97 300642.89 Interviewed

120 Krishna A.C Krishna A.C Aappipal 9 224, 225 69.76 96.70 166.46 687.97 66526.70 Interviewed

121 Amrit bahadur Thapa Devimaya Thapa Aappipal 9 227 49.40 64.99 114.39 687.97 44711.17 Interviewed

122 Lure sunar Arati Sunar Aappipal 2 646 100.00 129.00 229.00 687.97 88748.13 Interviewed

123 Nar bdr. Sarki Nanda Kumari Basel Aappipal 2 1012 0.00 6.00 6.00 687.97 4127.82 Interviewed

124 Kul bdr.Bishwokarma Kul bdr.Bishwokarma Aappipal 2 640, 713, 746 286.00 648.00 934.00 687.97 445804.56 Interviewed

125 Pahal bdr. Ale magar Pahal bdr. Ale magar Aappipal 2 579 41.00 151.00 192.00 687.97 103883.47 Interviewed

126 Bishnu ale magar Bishnu ale magar Aappipal 8 238, 241 180.92 379.20 560.12 687.97 260878.22 Interviewed

127 Santaman Shrestha Ratna kumari Shrestha Aappipal 8 125 3.28 68.30 71.58 687.97 46988.35 Interviewed Nanu maya thapa 128 Nanu maya thapa (shrestha) (shrestha) Aappipal 8 134 0.00 10.49 10.49 687.97 7216.81 Interviewed

129 krishna bdr. Acchami krishna bdr. Acchami Aappipal 9 1161 72.98 109.45 182.43 687.97 75298.32 Interviewed Bishnu prasad adhikari (purna bdr. 130 Gharti) Purna bdr. Gharti Aappipal 9 231 68.29 95.23 163.52 687.97 65515.38 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 131 Ramji bhandari Ramji bhandari Aappipal 9 1302 52.79 77.98 130.77 687.97 53647.90 Interviewed

132 Bhesanta devkota Bhesanta devkota Aappipal 2 ,777,779,780 172.00 319.00 491.00 687.97 219462.43 Interviewed

133 Dil narayan shrestha Dil narayan shrestha Aappipal 2 163 41.40 56.20 97.60 687.97 38663.91 Interviewed

134 Yagya bdr. Bhandari Yagya bdr. Bhandari Aappipal 9 1300 8.26 25.59 33.85 687.97 17605.15 Interviewed

135 Dil bahadur bhandari Maina bhandari Aappipal 9 312, 1015 0.00 156.49 156.49 687.97 107660.43 Interviewed

136 Dalle sunar, gurusini sunar Gurusini sunar Aappipal 2 643 0.00 26.00 26.00 687.97 17887.22 Interviewed

137 Bishnu prasad devkota Bishnu prasad devkota Aappipal 2 ,943,945 170.00 255.00 425.00 687.97 175432.35 Interviewed

138 Kul bdr./Chameli Sarki Kul bdr. Sarki Aappipal 9 238, 1162 296.80 442.06 738.86 687.97 304124.02 Interviewed

139 Debu maya dargi Debu maya dargi Aappipal 9 243 157.49 235.28 392.77 687.97 161865.58 Interviewed

140 Durga A.C Durga A.C Aappipal 9 240 24.70 40.96 65.66 687.97 28179.25 Interviewed

141 Kamli kanta sapkota Kamli kanta sapkota Harmi 3 1790 14.25 130.87 145.12 393.13 51448.92 Interviewed Kamal, Ram bdr., Ishwor, hari 142 Dankoti Kamal Dankoti Harmi 4 327 351.50 484.18 835.68 393.13 190345.68 Interviewed

143 Gangamaya Gurung Gangamaya Gurung Harmi 4 43 0.00 54.45 54.45 393.13 21405.93 Interviewed

144 Suman Gurung Suman Gurung Harmi 8 1133 25.80 28.69 54.49 393.13 11278.90 Interviewed Man bdr. Tamang,Krishna 145 bdr.Tamang Krishna bdr. Tamang Harmi 4 198, 201, 202 127.41 221.98 349.39 393.13 87267.00 Interviewed

146 Thakur prasad Gurung Thakur prasad Gurung Harmi 8 279, 300 49.31 122.20 171.51 393.13 48040.49 Interviewed

147 Chitra kumari Dhakal Chitra kumari Dhakal Harmi 4 195, 385 171.71 197.52 369.23 393.13 77651.04 Interviewed

148 Jal maya Sodari Kalika prasad Sodari Gaikhura 8 486 0.00 12.00 12.00 393.13 4717.56 Interviewed

149 Gopal bdr. Sarki Gopal bdr. Sarki Harmi 4 374 130.45 189.58 320.03 393.13 74529.59 Interviewed

150 Mane/Sete Sarki Bate bdr. Sarki Harmi 4 353 10.00 61.00 71.00 393.13 23980.93 Interviewed

151 Buddhi bilas Sapkota Buddhi bilas Sapkota Harmi 3 1791 0.00 32.34 32.34 393.13 12713.82 Interviewed

152 Ran bdr. Gurung Ran bdr. Gurung Harmi 8 361 364.33 448.59 812.92 393.13 176354.19 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 153 Ram mani Dhakal Ram mani Dhakal Harmi 4 196 191.19 268.77 459.96 393.13 105661.55 Interviewed

154 Mainchauri Gurung Mainchauri Gurung Harmi 8 274 244.04 295.78 539.82 393.13 116279.99 Interviewed

155 Ambika devi sapkota Ambika devi sapkota Harmi 3 1862 3.04 27.80 30.84 393.13 10929.01 Interviewed

156 Bir bdr. Gurung Bir bdr. Gurung Harmi 8 353, 360 3.92 162.70 166.62 393.13 63962.25 Interviewed

157 Suk bdr. Gurung Suk bdr. Gurung Harmi 8 577 17.16 14.74 31.90 393.13 5794.74 Interviewed

158 Maheshwor Pokharel Maheshwor Pokharel Harmi 7 742 0.00 31.29 31.29 393.13 12301.04 Interviewed

159 Mannmaya devi Gurung Mannmaya devi Gurung Harmi 8 587 140.00 214.00 354.00 393.13 84129.82 Interviewed

160 Jit bdr. Gurung Jit bdr. Gurung Harmi 8 575, 861 116.50 208.56 325.06 393.13 81991.19 Interviewed

161 Dambar kumari Gurung Dambar kumari Gurung Harmi 8 489 7.16 5.00 12.16 393.13 1965.65 Interviewed

162 Men bdr. Gurung Ganga devi gurung Harmi 8 858 2.67 20.00 22.67 393.13 7862.60 Interviewed

163 Dhan bdr. Bishwokarma Dhan bdr. Bishwokarma Harmi 8 753, 752, 840 135.63 280.46 416.09 393.13 110257.24 Interviewed

164 Takman Gurung Takman Gurung Harmi 8 573 51.65 71.50 123.15 393.13 28108.80 Interviewed

165 Hari bdr.Dhakal Hari bdr.Dhakal Harmi 4 419 2.98 23.30 26.28 393.13 9159.93 Interviewed

166 Bimala Dhakal Janardhan Dhakal Harmi 4 137, 420 37.82 65.20 103.02 393.13 25632.08 Interviewed

167 Bharat Dhakal Bharat Dhakal Harmi 5 1248 0.00 8.02 8.02 393.13 3152.90 Interviewed

168 Thagmaya Dhakal Thagmaya Dhakal Harmi 4 141, 142, 151, 152 124.11 186.65 310.76 393.13 73377.71 Interviewed

169 Hari datta Dhakal Shankar Dhakal Harmi 4 194 50.61 83.87 134.48 393.13 32971.81 Interviewed

170 Maan bdr. Gurung Maan bdr. Gurung Harmi 8 846 3.30 198.00 201.30 393.13 77839.74 Interviewed

171 Bhim Bd Gurung Bhim Bd Gurung Harmi 8 1070 8.40 54.00 62.40 393.13 21229.02 Interviewed

172 Kajiram Nepali Kajiram Nepali Harmi 4 878 101.29 126.66 227.95 393.13 49793.85 Interviewed

173 Narandutta Dhakal Indra nanda Dhakal Harmi 5 119 0.00 7.80 7.80 393.13 3066.41 Interviewed

174 Kale sarki Kale sarki Harmi 9 203 36.56 104.93 141.49 393.13 41251.13 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks

175 Sir bdr. Tamang Man bdr.Tamang Harmi 4 221, 225, 357, 359 397.77 578.64 976.41 393.13 227480.74 Interviewed

176 Sobha Dhakal Jaumaya Dhakal Harmi 4 847 0.00 8.00 8.00 393.13 3145.04 Interviewed

177 Dandapani Sapkota Prem Pd.Sapkota Harmi 5 1315 0.00 150.16 150.16 393.13 59032.40 Interviewed

178 Raghunath Dhakal Raghunath Dhakal Harmi 4 224 8.89 56.31 65.20 393.13 22137.15 Interviewed

179 Kali Ghartini Kali Ghartini Harmi 3 1559 1.11 18.13 19.24 393.13 7127.45 Interviewed

180 Yugnath Sapkota Mayadevi sapkota Harmi 3,4 147, 1871 420.80 592.62 1013.42 393.13 232976.70 Interviewed

181 Dhale sarki Thakur bdr. Nepali Harmi 4 326 15.48 37.38 52.86 393.13 14695.20 Interviewed

182 Chandra bdr. Tamang Chandra bdr. Tamang Harmi 4 218, 197, 356, 358 181.70 252.68 434.38 393.13 99336.09 Interviewed

183 Kul bdr Pandit Dev raj Pandit Harmi 4 347 187.83 311.82 499.65 393.13 122585.80 Interviewed

184 Kirkamali sarki Kirkamali sarki Harmi 4 220 229.37 330.29 559.66 393.13 129846.91 Interviewed

185 Masini Gurung Masini Gurung Harmi 8 859 3.00 27.80 30.80 393.13 10929.01 Interviewed

186 Padam bdr. Gurung Padam bdr. Gurung Harmi 8 574 184.01 307.56 491.57 393.13 120911.06 Interviewed

187 Santa bdr. Gurung Kumari Gurung Harmi 8 526, 860 24.93 67.97 92.90 393.13 26721.05 Interviewed

188 Khade Sarki Putali Sarki Harmi 4 348 330.92 488.35 819.27 393.13 191985.04 Interviewed

189 Durgamaya Dhakal Durgamaya Dhakal Harmi 5 112, 113 0.00 68.72 68.72 393.13 27015.89 Interviewed

190 Khilanath Dhakal Gangamaya Dhakal Harmi 4 140, 157 316.94 4444.05 4760.99 393.13 1747089.38 Interviewed

191 Dharma datta Dhakal Rudra pd. Dhakal Harmi 4 384 8.83 171.55 180.38 393.13 67441.45 Interviewed

192 Ramakanta Dhakal Chij kumari Dhakal Harmi 4 133, 183, 199 133.18 234.35 367.53 393.13 92130.02 Interviewed

193 Kamala Dhakal Krishna pd. Dhakal Harmi 5 145 34.93 158.68 193.61 393.13 62381.87 Interviewed

194 Indra bdr. Dhakal Indra bdr. Dhakal Harmi 5 144 40.79 149.09 189.88 393.13 58611.75 Interviewed

195 Ramji pd. Dhakal Yamuna devi Dhakal Harmi 5 138 22.82 71.57 94.39 393.13 28136.31 Interviewed

196 Sanmaya BK Sanmaya BK Harmi 8 217 98.13 113.20 211.33 393.13 44502.32 Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 197 Jaalmaya Gurung Jaalmaya Gurung Harmi 8 354 66.23 70.91 137.14 393.13 27876.85 Interviewed

198 Kauman Gurung Naina bdr. Gurung Harmi 8 355 49.82 76.94 126.76 393.13 30247.42 Interviewed

199 Santamaya Gurung Santamaya Gurung Harmi 8 222, 223 254.30 346.48 600.78 393.13 136211.68 Interviewed

200 Lal bdr. Gurung Lal bdr. Gurung Harmi 8 272, 276 31.09 84.28 115.37 393.13 33133.00 Interviewed

201 Jagnath Bhatta Jagnath Bhatta Harmi 3 1773 7.10 84.81 91.91 393.13 33341.36 Interviewed

202 Dandapani Adhikari Khemraj Adhikari Harmi 4 41 0.00 64.74 64.74 393.13 25451.24 Interviewed

203 Dil bdr. Dhakal Dil bdr. Dhakal Harmi 5 111 36.50 65.38 101.88 393.13 25702.84 Interviewed

204 Tul bdr. Shah Narendra jung Shah Palungtar 4 350 608.00 884.00 1492.00 982.82 868812.88 Interviewed 303 39065.46 43955.91 83021.37 23951450.67 8.302 1 Yam bdr. Gurung Nara bahadur Jaubari 5 223 2685.94 2502.50 5188.44 491.41 1229753.53 Non-Interviewed

2 Tek bdr. Damai Dil bdr Jaubari 5 634 0.00 35.32 35.32 491.41 17356.60 Non-Interviewed

3 Ram kmr. Gurung Rana bdr. Jaubari 5 636 0.00 25.54 25.54 491.41 12550.61 Non-Interviewed

4 Suk bdr. Gurung Lal bdr. Jaubari 5 60 945.95 580.18 1526.13 491.41 285106.25 Non-Interviewed

5 Ser bdr. Damai Bal bdr . Jaubari 5 973 60.01 67.97 127.98 491.41 33401.14 Non-Interviewed

6 Hasta bdr Thapa Magar Kaharsingh Jaubari 4 635 42.00 33.00 75.00 491.41 16216.53 Non-Interviewed

7 Bil bdr. Pariyar Tilak Jaubari 4 1207 85.00 217.00 302.00 491.41 106635.97 Non-Interviewed

8 Yem nath Sapkota Loknath Jaubari 4 1208 19.00 17.00 36.00 491.41 8353.97 Non-Interviewed

9 Batuli Thapa Mujbal Harmi 3 1555 42.55 63.82 106.37 393.13 25089.56 Non-Interviewed

10 Yem kumari Dhakal Hemraj Harmi 5 120 20.74 13.63 34.37 393.13 5358.36 Non-Interviewed

11 Hari pd. Dhakal Homnath Harmi 5 1269 21.31 70.51 91.82 393.13 27719.60 Non-Interviewed

12 Ramudevi Dawadi Tilakram Harmi 5 1087 24.98 125.88 150.86 393.13 49487.20 Non-Interviewed

13 Loknath Sapkota Rabilal Harmi 3 1636 83.93 99.86 183.79 393.13 39257.96 Non-Interviewed

14 Krishna Bilash Mili prasad. Harmi 3 1046 0.00 107.81 107.81 393.13 42383.35 Non-Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 15 Dale Sarki Kale Harmi 4 326 15.48 37.38 52.86 393.13 14695.20 Non-Interviewed

16 Manohar Dhakal Laxmikanta Harmi 4 ,185,136 39.26 75.23 114.49 393.13 29575.17 Non-Interviewed

17 Jit bdr Gurung Dhane Harmi 8 305, 306 325.95 485.85 811.80 393.13 191002.21 Non-Interviewed

18 Hasta Kauri Gurung Manbahadur Harmi 8 301, 302 40.27 65.55 105.82 393.13 25769.67 Non-Interviewed

19 Girman Gurung Pahalman Harmi 8 221 149.31 237.80 387.11 393.13 93486.31 Non-Interviewed

20 Gagansingh Gurung Nara bahadur Harmi 8 226 5.50 20.52 26.02 393.13 8067.03 Non-Interviewed

21 Saraswoti Gurung Dambarsingh Harmi 8 275 62.41 87.81 150.22 393.13 34520.75 Non-Interviewed

22 Buddhibal Gurung Laxuman Harmi 8 ,1201, 273 0.00 59.64 59.64 393.13 23446.27 Non-Interviewed

23 Dil bdr. Gurung Tilbdr. Harmi 8 1202 0.00 25.50 25.50 393.13 10024.82 Non-Interviewed

24 Narayan Gurung Nara bahadur Harmi 8 530, 539 495.10 746.62 1241.72 393.13 293518.72 Non-Interviewed

25 Lal bdr. Gurung Dhan bdr Harmi 8 531 10.74 13.20 23.94 393.13 5189.32 Non-Interviewed

26 Lekhman Gurung Ram bdr. Harmi 8 532 44.08 64.33 108.41 393.13 25290.05 Non-Interviewed

27 Bir bdr. Gurung Maan Harmi 8 534 29.07 36.11 65.18 393.13 14195.92 Non-Interviewed

28 Ram pd. Gurung Nara bahadur Harmi 8 572 92.58 98.50 191.08 393.13 38723.31 Non-Interviewed

29 Lal kumari Gurung Dil bdr Harmi 8 842 104.45 220.72 325.17 393.13 86771.65 Non-Interviewed

30 Manmaya devi Gurung Suk bdr. Harmi 8 587 140.00 214.00 354.00 393.13 84129.82 Non-Interviewed

31 Bishnu Pokhrel Devi Pd. Harmi 7 740 0.00 5.91 5.91 393.13 2323.40 Non-Interviewed

32 Lekhnath Pokharel Buddhikanta Harmi 7 151 11.34 49.32 60.66 393.13 19389.17 Non-Interviewed

33 Tanka Pd. Bhatta Hari bhakta Harmi 7 693, 695 4.56 60.28 64.84 393.13 23697.88 Non-Interviewed

34 Aashpur Sunar Dhanaraj Harmi 8 1011 12.07 40.56 52.63 393.13 15945.35 Non-Interviewed

35 Purushwotam Devkota Jagannath Aappipal 3 306 61.20 87.20 148.40 687.97 59990.98 Non-Interviewed

36 Rameshraj Devkota Rewati Aappipal 3 289 0.00 6.80 6.80 687.97 4678.20 Non-Interviewed

37 Bishnu Pd. Devkota Tirtharaj Aappipal 3 82 0.00 21.90 21.90 687.97 15066.54 Non-Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 38 Homnath Devkota Premsagar Aappipal 3 271 1.00 13.00 14.00 687.97 8943.61 Non-Interviewed

39 Chetnath Devkota Ekasure Aappipal 3 272 12.50 120.40 132.90 687.97 82831.59 Non-Interviewed

40 Krishna Pd. Devkota Modnath Aappipal 3 231, 234 9.60 55.50 65.10 687.97 38182.34 Non-Interviewed

41 Chhabilal Shrestha Dhanajman Aappipal 3 224 27.20 46.10 73.30 687.97 31715.42 Non-Interviewed 181, 188, 177, 167, 42 Lal bdr Newar Bishnu Aappipal 3 168, 149 312.20 416.60 728.80 687.97 286608.30 Non-Interviewed

43 Krishna kumar Shrestha Dilman Aappipal 3 172, 176 44.40 31.50 75.90 687.97 21671.06 Non-Interviewed

44 Tika bdr Rana Shankar bdr Aappipal 4 120 3.00 150.00 153.00 687.97 103195.50 Non-Interviewed

45 Jiwan Rana Tika bdr. Aappipal 4 138 3.00 186.00 189.00 687.97 127962.42 Non-Interviewed

46 Krishna Rana Samyukta Ramji Aappipal 4 724 13.00 162.00 175.00 687.97 111451.14 Non-Interviewed

47 Naresh Thakuri Dip bdr. Aappipal 4 719 3.00 39.00 42.00 687.97 26830.83 Non-Interviewed

48 Kanchha kaji rana Krishna bdr. Aappipal 4 350 272.00 346.00 618.00 687.97 238037.62 Non-Interviewed

49 Krishna bdr. Hamal Nara bahadur Aappipal 4 242 47.00 73.00 120.00 687.97 50221.81 Non-Interviewed

50 Padamraj Devkota Umakanta Aappipal 2 108 70.00 177.00 247.00 687.97 121770.69 Non-Interviewed

51 Prakash Chandra Shrestha Kulchandra Aappipal 2 1011 0.00 21.00 21.00 687.97 14447.37 Non-Interviewed

52 Rabindra Devkota Kasiram Aappipal 2 772, 786 13.00 155.00 168.00 687.97 106635.35 Non-Interviewed

53 Padamwati Devkota Toyanath Aappipal 2 767 3.00 102.00 105.00 687.97 70172.94 Non-Interviewed

54 Tilak bdr. Rana Magar Rishiram Aappipal 2 751, 752 42.00 99.00 141.00 687.97 68109.03 Non-Interviewed

55 Ishwor Pd. Devkota Lekhnath Aappipal 2 749 13.00 39.00 52.00 687.97 26830.83 Non-Interviewed

56 Tankanath Devkota Shiva pd. Aappipal 2 747, 748 0.00 27.00 27.00 687.97 18575.19 Non-Interviewed

57 Tek bdr. Ale magar Hiraman Aappipal 2 739 119.00 159.00 278.00 687.97 109387.23 Non-Interviewed

58 Mohan singh Thapa Padam bdr. Aappipal 2 620 3.00 63.00 66.00 687.97 43342.11 Non-Interviewed

59 Ikal bdr. Thapa Magar Padam bdr. Aappipal 2 639 6.00 36.00 42.00 687.97 24766.92 Non-Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks

60 Dhan bdr. Thapa Magar Hiraman Aappipal 2 625, 630, 631, 634 485.00 713.00 1198.00 687.97 490522.61 Non-Interviewed

61 Bil bdr. Sunar Lyage Aappipal 2 714 55.00 102.00 157.00 687.97 70172.94 Non-Interviewed

62 gyanu Devi Shrestha Shambhulal Aappipal 2 111 18.51 488.68 507.19 687.97 336197.18 Non-Interviewed

63 Tribhunath Shrestha Loknath Aappipal 8 136 0.00 12.67 12.67 687.97 8716.58 Non-Interviewed

64 Rudra bdr. Basnet Sher bdr. Aappipal 2 129 0.00 6.68 6.68 687.97 4595.64 Non-Interviewed

65 Gunjaman Shrestha Buddhi Pd. Aappipal 8 146, 147 185.89 212.45 398.34 687.97 146159.23 Non-Interviewed

66 Rudra bdr. Ale Jaharsingh Aappipal 8 309 128.19 190.43 318.62 687.97 131010.13 Non-Interviewed

67 Yem pd. Devkota Sombilas 8 476 2.00 20.00 22.00 393.13 7862.60 Non-Interviewed

68 Suryaman Shrestha Khirman Palungtar 4 235 27.60 29.80 57.40 982.82 29288.04 Non-Interviewed

69 Man bdr.Tamang samsher bdr. Palungtar 4 355 104.00 156.00 260.00 982.82 153319.92 Non-Interviewed

70 Kumar Gotame Juthe Palungtar 4 294 0.00 13.00 13.00 982.82 12776.66 Non-Interviewed

71 Ratna kmr. Shrestha Hiraman Palungtar 7 1013 0.00 6.70 6.70 982.82 6584.89 Non-Interviewed

72 Ganesh kmr. Shrestha Maan bdr. Palungtar 7 1010 0.00 1.60 1.60 982.82 1572.51 Non-Interviewed

73 Madhav Poudel Nara hari Palungtar 5 647 119.00 200.00 319.00 982.82 196564.00 Non-Interviewed

74 Pitambar Pd.Poudel Taranath Palungtar 5 643 35.00 54.00 89.00 982.82 53072.28 Non-Interviewed

75 Ishwori Pd. Sapkota Bishnu pd. Palungtar 5 190 0.00 24.60 24.60 982.82 24177.37 Non-Interviewed

76 Lokchandra Devkota Kulchandra Palungtar 5 4, 38 25.80 524.00 549.80 982.82 514997.68 Non-Interviewed

77 Bishnu Pd. Devkota Tirtharaj Palungtar 5 1 71.80 167.30 239.10 982.82 164425.79 Non-Interviewed

78 Tanka Devi Devkota Bhojraj Palungtar 5 36 15.40 106.60 122.00 982.82 104768.61 Non-Interviewed

79 Prakash Chandra Devkota Kulchandra Palungtar 5 37 10.40 125.00 135.40 982.82 122852.50 Non-Interviewed

80 Rajeshwor Devkota Hari bhakta Palungtar 5 99 0.00 87.00 87.00 982.82 85505.34 Non-Interviewed

81 Rama Devkota Laxmi pd. Palungtar 5 100 2.20 45.60 47.80 982.82 44816.59 Non-Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 82 Men bdr Gurung Bhim bdr. Thalajung 9 794 66.90 100.40 167.30 393.13 39470.25 Non-Interviewed

83 Tilmaya Gurung Dil bdr. Thalajung 9 72 155.00 231.00 386.00 393.13 90813.03 Non-Interviewed

84 Bir bdr. Gurung Dil bdr. Thalajung 9 73 230.00 346.00 576.00 393.13 136022.98 Non-Interviewed

85 Bhoj bdr Gurung sundar Thalajung 9 131 397.00 580.00 977.00 393.13 228015.40 Non-Interviewed

86 Thagmaya Gurung Deu bdr. Thalajung 9 107 108.00 163.00 271.00 393.13 64080.19 Non-Interviewed

87 Yem bdr. Gurung Narabdr. Thalajung 9 570 10.00 31.70 41.70 393.13 12462.22 Non-Interviewed

88 Kumar Gurung Tilak bdr. Thalajung 9 568 90.00 158.00 248.00 393.13 62114.54 Non-Interviewed

89 Chayomaya Gurung Purnasingh Thalajung 9 486, 513 117.60 175.90 293.50 393.13 69151.57 Non-Interviewed

90 Amar bdr.Gurung Indra singh Thalajung 9 489 91.40 18.40 109.80 393.13 7233.59 Non-Interviewed

91 Dhana bdr. Gurung Bam bdr Thalajung 9 487 69.00 162.00 231.00 393.13 63687.06 Non-Interviewed

92 Kul bdr. Gurung Maniraj Thalajung 9 493 27.90 64.80 92.70 393.13 25474.82 Non-Interviewed

93 Kaman bdr. Gurung Maniraj Thalajung 9 494 23.20 50.50 73.70 393.13 19853.07 Non-Interviewed

94 Kasiram Gurung Sattalsing Thalajung 9 488 35.70 31.10 66.80 393.13 12226.34 Non-Interviewed

95 Santamaya Gurung Tek bdr. Thalajung 9 271, 272 19.51 27.28 46.79 393.13 10724.59 Non-Interviewed

96 Sansari Gurung Chakra bdr. Thalajung 9 265 17.54 31.36 48.90 393.13 12328.56 Non-Interviewed

97 Tej bdr.Gurung Aaitasingh Thalajung 9 260, 262 7.80 47.89 55.69 393.13 18827.00 Non-Interviewed

98 Keshari Gurung Tej bdr. Thalajung 9 293 28.59 38.55 67.14 393.13 15155.16 Non-Interviewed

99 Nar bdr Gurung Chanmarsingh Thalajung 7 ,266 620.02 13.92 633.94 393.13 5472.37 Non-Interviewed

100 Kul bdr. Gurung Man bdr. Thalajung 7 182 159.58 143.39 302.97 393.13 56370.91 Non-Interviewed

101 Sano nar bdr Gurung Rana bdr. Thalajung 7 195 238.67 338.33 577.00 393.13 133007.67 Non-Interviewed

102 Harka bdr.Gurung Puransingh Thalajung 7 196 7.25 51.08 58.33 393.13 20081.08 Non-Interviewed

103 Hom bdr. Gurung Puransingh Thalajung 7 198 155.96 185.34 341.30 393.13 72862.71 Non-Interviewed

104 Jit bdr Gurung Ambardhoj Thalajung 7 212 108.18 117.24 225.42 393.13 46090.56 Non-Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 105 Durmaya Gurung Chakmaan Thalajung 7 452 0.00 5.19 5.19 393.13 2040.34 Non-Interviewed

106 Chandra singh Gurung Maandhoj Thalajung 7 267 353.86 346.19 700.05 393.13 136097.67 Non-Interviewed

107 Rana bdr. Gurung Dal bdr. Thalajung 7 265 18.85 97.64 116.49 393.13 38385.21 Non-Interviewed

108 Lal bdr.Gurung Jaman singh Thalajung 7 359 19.71 82.43 102.14 393.13 32405.71 Non-Interviewed

109 Hom bdr. Gurung Puransingh Thalajung 7,2 ,240,120 144.90 292.08 436.98 393.13 114825.41 Non-Interviewed

110 Bhakta bdr. Gurung Manu Thalajung 7 ,360, 375,376 622.32 913.01 1535.33 393.13 358931.62 Non-Interviewed

111 Sano maya Gurung Bir bdr. Thalajung 7 368 29.59 76.50 106.09 393.13 30074.45 Non-Interviewed

112 Dip Gurung Mankaji Thalajung 7 123 0.00 18.33 18.33 393.13 7206.07 Non-Interviewed

113 Prasas Gurung Lalras Thalajung 7 130 0.00 10.49 10.49 393.13 4123.93 Non-Interviewed

114 Parbati Ale Sanjit Thalajung 7 131 42.61 51.50 94.11 393.13 20246.20 Non-Interviewed

115 Mankaji Gurung Man bdr Thalajung 7 767 260.06 385.05 645.11 393.13 151374.71 Non-Interviewed

116 Bir bdr. Gurung Ran bdr. Thalajung 2 161, 162 250.85 348.49 599.34 393.13 137001.87 Non-Interviewed

117 Harka bdr.Gurung Ranadhoj Thalajung 2 165 174.75 325.09 499.84 393.13 127802.63 Non-Interviewed

118 Dil bdr. Gurung Ranadhoj Thalajung 2 168 18.50 209.66 228.16 393.13 82423.64 Non-Interviewed

119 Bibimaya Gurung Man bdr. Thalajung 2 202 4.30 241.27 245.57 393.13 94850.48 Non-Interviewed

120 Nanda bdr.Gurung Tej bdr. Thalajung 2 198 1.49 31.31 32.80 393.13 12308.90 Non-Interviewed

121 Than bdr Gurung Gol bdr. Thalajung 2 196 0.00 22.60 22.60 393.13 8884.74 Non-Interviewed

122 Manisha Gurung Top bdr. Thalajung 2 630 20.90 148.50 169.40 393.13 58379.81 Non-Interviewed

123 Bahadur Gurung Ujirsingh Thalajung 2 120 2.92 58.79 61.71 393.13 23112.11 Non-Interviewed

124 Mina Kumari samet Durga naran Gaikhura 8 555 76.50 113.50 190.00 393.13 44620.26 Non-Interviewed

125 Bhagirathi Gurung Bahadur Thalajung 1 196 46.24 59.63 105.87 393.13 23442.34 Non-Interviewed

126 Puna Bd Gharti Jasbir Harmi 4 1635 107.81 107.81 393.13 42383.35 Non-Interviewed

127 Bishnu Kr Shrestha Lal Krishna Harmi 5 230 59.64 165.61 225.25 393.13 65106.26 Non-Interviewed Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 128 Khem Bd. Bhandarai Rudra Bd Aapipal 9 1301 73.65 96.25 169.90 687.97 66217.11 Non-Interviewed

129 Purna kumari Shrestha Ram Bd Aapipal 8 179 2.35 83.55 85.90 687.97 57479.89 Non-Interviewed

875 14.27 40.83 55.10 393.13 16051.50 Non-Interviewed

130 Nur Pd. Shrestha Anta Narayan Aapipal 8 182 3.85 26.65 30.50 687.97 18334.40 Non-Interviewed

131 Harka Bd. Rana Mohan Sing Aapipal 8 242 281.15 318.25 599.40 687.97 218946.45 Non-Interviewed

132 Chakra Bd. Devkota Tilak Aapipal 2 632 41 63 104 687.97 43342.11 Non-Interviewed

133 Bir Bd. Sunar Dalle Aapipal 2 644 40 70 110 687.97 48157.90 Non-Interviewed

134 Bhoj Raj Devkota Ishwori Pd Aapipal 2 750 109 171 280 687.97 117642.87 Non-Interviewed

135 Krishna Pd Devkota Tika Dutta Aapipal 2 939 8 95 103 687.97 65357.15 Non-Interviewed

136 Chandra Bir Ale Tek Bd Aapipal 4 392 3 6 9 687.97 4127.82 Non-Interviewed

137 Madhav Poudel Narhari Palungtar 5 835 74 96 170 982.82 94350.72 Non-Interviewed

138 Khil Maya Poudel Farindra Pd Palungtar 5 631 47.60 112.20 159.80 982.82 110272.40 Non-Interviewed 166 13608.13 20921.54 34529.67 11157650.44 3.453 1 Kot Kalika Guthi Aapipal 4 685 41.31 41.31 687.97 28420.04 Guthi Land

2 Kot Kalika Guthi Aapipal 4 109 222.78 108.86 331.64 687.97 74892.41 Guthi Land

3 Kot Kalika Guthi Aapipal 4 302 22.00 205.00 227.00 687.97 141033.85 Guthi Land

4 Kot Kalika Guthi Aapipal 4 303 23.00 109.00 132.00 687.97 74988.73 Guthi Land

5 Kot Kalika Guthi Aapipal 4 316 10.00 10.00 687.97 6879.70 Guthi Land

6 Kot Kalika Guthi Aapipal 4 318 9.00 49.00 58.00 687.97 33710.53 Guthi Land

7 Kot Kalika Guthi Aapipal 4 317 11.00 86.00 97.00 687.97 59165.42 Guthi Land

8 Kot Kalika Guthi Aapipal 4 319 44.00 44.00 687.97 30270.68 Guthi Land

9 Kot Kalika Guthi Aapipal 4 237 4.00 4.00 687.97 2751.88 Guthi Land

10 Kot Kalika Guthi Aapipal 4 238 36.00 48.00 84.00 687.97 33022.56 Guthi Land Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 11 Kot Kalika Guthi Aapipal 4 241 38.00 55.00 93.00 687.97 37838.35 Guthi Land

12 Kot Kalika Guthi Aapipal 4 243 34.00 34.00 687.97 23390.98 Guthi Land

13 Kot Kalika Guthi Aapipal 4 146 55.00 55.00 687.97 37838.35 Guthi Land

14 Kot Kalika Guthi Aapipal 4 117 346.00 466.00 812.00 687.97 320594.02 Guthi Land

15 Kot Kalika Guthi Aapipal 4 118 43.00 43.00 687.97 29582.71 Guthi Land

16 Kot Kalika Guthi Aapipal 4 105 34.00 34.00 687.97 23390.98 Guthi Land

17 Kot Kalika Guthi Aapipal 4 106 53.00 53.00 687.97 36462.41 Guthi Land

18 Kot Kalika Guthi Aapipal 4 103 3.00 125.00 128.00 687.97 85996.25 Guthi Land Total 18 710.78 1570.17 2280.95 1080229.85 0.228 1 Non-Registered Kerabari 1 147 167.30 167.30 393.13 65770.65 Non-Registered

2 Non-Registered Jaubari 5 132 20.80 209.38 230.18 491.41 102891.43 Non-Registered

3 Non-Registered Jaubari 5 211 57.12 284.86 341.98 491.41 139983.05 Non-Registered

4 Non-Registered Jaubari 5 971 8.59 218.09 226.68 491.41 107171.61 Non-Registered

5 Non-Registered Jaubari 5 972 6.32 34.79 41.11 491.41 17096.15 Non-Registered

6 Non-Registered Jaubari 5 1362 56.00 64.00 120.00 491.41 31450.24 Non-Registered

7 Non-Registered Jaubari 5 526 63.00 160.00 223.00 491.41 78625.60 Non-Registered

8 Non-Registered Jaubari 5 624 641.00 911.00 1552.00 491.41 447674.51 Non-Registered

9 Non-Registered Jaubari 5 805 25.00 25.00 491.41 12285.25 Non-Registered

10 Non-Registered Thalajung 9 100 22.50 30.00 52.50 393.13 11793.90 Non-Registered

11 Non-Registered Thalajung 9 516 33.00 53.00 86.00 393.13 20835.89 Non-Registered

12 Non-Registered Thalajung 9 511 79.40 137.50 216.90 393.13 54055.38 Non-Registered

13 Non-Registered Thalajung 9 495 158.00 218.00 376.00 393.13 85702.34 Non-Registered

14 Non-Registered Thalajung 9 490 70.40 102.50 172.90 393.13 40295.83 Non-Registered Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 15 Non-Registered Thalajung 9 219 53.55 171.38 224.93 393.13 67374.62 Non-Registered

16 Non-Registered Thalajung 9 28 80.52 117.00 197.52 393.13 45996.21 Non-Registered

17 Non-Registered Thalajung 7 193 94.84 118.31 213.15 393.13 46511.21 Non-Registered

18 Non-Registered Thalajung 7 194 69.65 102.00 171.65 393.13 40099.26 Non-Registered

19 Non-Registered Thalajung 7 445 82.80 184.60 267.40 393.13 72571.80 Non-Registered

20 Non-Registered Thalajung 7 451 136.08 265.09 401.17 393.13 104214.83 Non-Registered

21 Non-Registered Thalajung 7 208 220.89 220.89 393.13 86838.49 Non-Registered

22 Non-Registered Thalajung 7 433 314.11 413.73 727.84 393.13 162649.67 Non-Registered

23 Non-Registered Thalajung 7 230 64.65 108.21 172.86 393.13 42540.60 Non-Registered

24 Non-Registered Thalajung 7 357 49.01 55.57 104.58 393.13 21846.23 Non-Registered

25 Non-Registered Thalajung 7 386 97.68 97.19 194.87 393.13 38208.30 Non-Registered

26 Non-Registered Thalajung 1 580 97.56 100.00 197.56 393.13 39313.00 Non-Registered

27 Non-Registered Thalajung 1 122 33.70 49.34 83.04 393.13 19397.03 Non-Registered

28 Non-Registered Thalajung 1 111 85.03 76.68 161.71 393.13 30145.21 Non-Registered

29 Non-Registered Thalajung 2 765 3.76 3.76 393.13 1478.17 Non-Registered

30 Non-Registered Harmi 8 223 140.90 206.31 347.21 393.13 81106.65 Non-Registered

31 Non-Registered Harmi 8 1134 247.00 388.00 635.00 393.13 152534.44 Non-Registered

32 Non-Registered Harmi 8 1174 406.00 576.00 982.00 393.13 226442.88 Non-Registered

33 Non-Registered Harmi 8 585 7.00 62.00 69.00 393.13 24374.06 Non-Registered

34 Non-Registered Harmi 8 1159 40.00 41.00 81.00 393.13 16118.33 Non-Registered

35 Non-Registered Harmi 8 866 22.00 22.00 393.13 8648.86 Non-Registered

36 Non-Registered Harmi 8 739 30.20 65.89 96.09 393.13 25903.34 Non-Registered

37 Non-Registered Harmi 8 1012 57.36 75.17 132.53 393.13 29551.58 Non-Registered Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 38 Non-Registered Harmi 7 1250 46.61 46.61 393.13 18323.79 Non-Registered

39 Non-Registered Harmi 4 486 1.97 48.69 50.66 393.13 19141.50 Non-Registered

40 Non-Registered Harmi 4 485 293.74 316.00 609.74 393.13 124229.08 Non-Registered

41 Non-Registered Harmi 4 484 18.35 18.35 393.13 7213.94 Non-Registered

42 Non-Registered Harmi 4 134 138.77 180.42 319.19 393.13 70928.51 Non-Registered

43 Non-Registered Harmi 4 155 559.91 805.38 1365.29 393.13 316619.04 Non-Registered

44 Non-Registered Harmi 4 219 166.31 254.73 421.04 393.13 100142.00 Non-Registered

45 Non-Registered Harmi 4 184 43.20 52.80 96.00 393.13 20757.26 Non-Registered

46 Non-Registered Harmi 4 330 126.88 188.98 315.86 393.13 74293.71 Non-Registered

47 Non-Registered Harmi 3 2354 147.00 221.00 368.00 393.13 86881.73 Non-Registered

48 Non-Registered Harmi 3 1858 44.74 67.00 111.74 393.13 26339.71 Non-Registered

49 Non-Registered Harmi 3 1864 15.36 137.92 153.28 393.13 54220.49 Non-Registered

50 Non-Registered Harmi 3 1865 15.36 137.92 153.28 393.13 54220.49 Non-Registered

51 Non-Registered Harmi 3 1870 66.10 94.96 161.06 393.13 37331.62 Non-Registered

52 Non-Registered Harmi 3 2352 106.73 156.49 263.22 393.13 61520.91 Non-Registered

53 Non-Registered Harmi 5 1268 15.04 15.04 393.13 5912.68 Non-Registered

54 Non-Registered Harmi 5 116 3.57 3.57 393.13 1403.47 Non-Registered

55 Non-Registered Harmi 3 1556 0.43 15.80 16.23 393.13 6211.45 Non-Registered

56 Non-Registered Harmi 3 1558 111.23 148.30 259.53 393.13 58301.18 Non-Registered

57 Non-Registered Harmi 8 267 15.05 15.05 393.13 5916.61 Non-Registered

58 Non-Registered Harmi 4 394 4.00 30.00 34.00 393.13 11793.90 Non-Registered

59 Non-Registered Harmi 4 419 3.00 23.00 26.00 393.13 9041.99 Non-Registered

60 Non-Registered Aappipal 9 1249 10.52 24.96 35.48 687.97 17171.73 Non-Registered Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 61 Non-Registered Aappipal 9 222 13.00 23.00 36.00 687.97 15823.31 Non-Registered

62 Non-Registered Aappipal 9 242 135.48 125.68 261.16 687.97 86464.07 Non-Registered

63 Non-Registered Aappipal 9 292 9.18 9.18 687.97 6315.56 Non-Registered

64 Non-Registered Aappipal 9 318 2.78 2.78 687.97 1912.56 Non-Registered

65 Non-Registered Aappipal 9 246 7.20 20.72 27.92 687.97 14254.74 Non-Registered

66 Non-Registered Aappipal 9 308 396.35 564.64 960.99 687.97 388455.38 Non-Registered

67 Non-Registered Aappipal 9 310 84.56 123.00 207.56 687.97 84620.31 Non-Registered

68 Non-Registered Aappipal 9 301 30.00 67.00 97.00 687.97 46093.99 Non-Registered

69 Non-Registered Aappipal 9 1014 41.60 120.44 162.04 687.97 82859.11 Non-Registered

70 Non-Registered Aappipal 8 901 89.00 173.00 262.00 687.97 119018.81 Non-Registered

71 Non-Registered Aappipal 8 903 72.00 119.00 191.00 687.97 81868.43 Non-Registered

72 Non-Registered Aappipal 8 902 12.00 46.00 58.00 687.97 31646.62 Non-Registered

73 Non-Registered Aappipal 8 143 6.36 6.36 687.97 4375.49 Non-Registered

74 Non-Registered Aappipal 8 900 3.00 45.00 48.00 687.97 30958.65 Non-Registered

75 Non-Registered Aappipal 8 108 7.00 71.00 78.00 687.97 48845.87 Non-Registered

76 Non-Registered Aappipal 8 874 5.00 19.00 24.00 687.97 13071.43 Non-Registered

77 Non-Registered Aappipal 8 245 52.00 63.00 115.00 687.97 43342.11 Non-Registered

78 Non-Registered Aappipal 8 922 10.00 85.10 95.10 687.97 58546.25 Non-Registered

79 Non-Registered Aappipal 8 476 20.00 20.00 687.97 13759.40 Non-Registered

80 Non-Registered Aappipal 8 144 7.00 7.00 687.97 4815.79 Non-Registered

81 Non-Registered Aappipal 2 715 4.00 80.00 84.00 687.97 55037.60 Non-Registered

82 Non-Registered Aappipal 2 668 152.00 217.00 369.00 687.97 149289.49 Non-Registered

83 Non-Registered Aappipal 2 947 208.00 315.00 523.00 687.97 216710.55 Non-Registered Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 84 Non-Registered Aappipal 2 951 4.00 206.00 210.00 687.97 141721.82 Non-Registered

85 Non-Registered Aappipal 2 1017 2.00 119.00 121.00 687.97 81868.43 Non-Registered

86 Non-Registered Aappipal 3 325 32.00 112.00 144.00 687.97 77052.64 Non-Registered

87 Non-Registered Aappipal 3 311 77.00 129.00 206.00 687.97 88748.13 Non-Registered

88 Non-Registered Aappipal 4 395 34.00 34.00 687.97 23390.98 Non-Registered

89 Non-Registered Aappipal 4 387 11.00 44.00 55.00 687.97 30270.68 Non-Registered

90 Non-Registered Aappipal 4 405 29.00 29.00 687.97 19951.13 Non-Registered

91 Non-Registered Aappipal 4 400 15.00 15.00 687.97 10319.55 Non-Registered

92 Non-Registered Aappipal 4 209 28.00 150.00 178.00 687.97 103195.50 Non-Registered

93 Non-Registered Aappipal 2 166 28.80 50.90 79.70 687.97 35017.67 Non-Registered

94 Non-Registered Aappipal 195 319.00 430.00 749.00 687.97 295827.10 Non-Registered

95 Non-Registered Aappipal 3 161 44.00 43.00 87.00 687.97 29582.71 Non-Registered

96 Non-Registered Aappipal 3 162 40.00 69.00 109.00 687.97 47469.93 Non-Registered

97 Non-Registered Aappipal 3 228 19.00 40.00 59.00 687.97 27518.80 Non-Registered

98 Non-Registered Aappipal 3 237 13.40 57.70 71.10 687.97 39695.87 Non-Registered

99 Non-Registered Aappipal 3 226 220.00 281.00 501.00 687.97 193319.57 Non-Registered

100 Non-Registered Aappipal 3 273 16.40 81.60 98.00 687.97 56138.35 Non-Registered

101 Non-Registered Aappipal 3 169 7.90 17.60 25.50 687.97 12108.27 Non-Registered

102 Non-Registered Aappipal 3 170 28.80 28.80 687.97 19813.54 Non-Registered

103 Non-Registered Palungtar 5 45 8.00 8.00 982.82 7862.56 Non-Registered

104 Non-Registered Palungtar 5 843 11.00 64.00 75.00 982.82 62900.48 Non-Registered

105 Non-Registered Palungtar 5 845 98.90 109.10 208.00 982.82 107225.66 Non-Registered

106 Non-Registered Palungtar 5 295 107.00 182.00 289.00 982.82 178873.24 Non-Registered Cost Calculation of Land; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 107 Non-Registered Palungtar 5 632 128.00 136.00 264.00 982.82 133663.52 Non-Registered

108 Non-Registered Palungtar 5 662 23.00 117.00 140.00 982.82 114989.94 Non-Registered

109 Non-Registered Palungtar 5 665 17.90 17.90 982.82 17592.48 Non-Registered

110 Non-Registered Palungtar 5 679 2.30 2.30 982.82 2260.49 Non-Registered

111 Non-Registered Palungtar 5 766 195.00 269.00 464.00 982.82 264378.58 Non-Registered

112 Non-Registered Palungtar 7 1011 11.80 11.80 982.82 11597.28 Non-Registered

113 Non-Registered Palungtar 7 1112 6.80 6.80 982.82 6683.18 Non-Registered

114 Non-Registered Palungtar 7 1095 16.80 36.90 53.70 982.82 36266.06 Non-Registered

115 Non-Registered Palungtar 4 97 112.00 80.00 192.00 982.82 78625.60 Non-Registered

116 Non-Registered Palungtar 4 30 4.20 39.30 43.50 982.82 38624.83 Non-Registered

117 Non-Registered Palungtar 4 35 22.90 22.90 982.82 22506.58 Non-Registered

118 Non-Registered Palungtar 4 85 194.00 298.00 492.00 982.82 292880.36 Non-Registered

119 Non-Registered Palungtar 4 102 159.00 240.00 399.00 982.82 235876.80 Non-Registered

120 Non-Registered Palungtar 4 351 2.00 17.00 19.00 982.82 16707.94 Non-Registered

121 Non-Registered Palungtar 4 1899 16.00 31.00 47.00 982.82 30467.42 Non-Registered

122 Non-Registered Palungtar 4 1898 0.00 9.00 9.00 982.82 8845.38 Non-Registered

123 Non-Registered Palungtar 4 1897 11.00 11.00 982.82 10811.02 Non-Registered

124 Non-Registered Palungtar 4 1896 52.00 41.00 93.00 982.82 40295.62 Non-Registered

125 Non-Registered Palungtar 4 874 399.00 591.00 990.00 982.82 580846.62 Non-Registered

126 Non-Registered Gaikhur 8 869 239.00 124.00 363.00 393.13 48748.12 Non-Registered

127 Non-Registered Gaikhur 8 28 37.00 55.00 92.00 393.13 21622.15 Non-Registered 127.00 9237.61 15919.01 25156.62 9089661.47 614 62621.98 82366.63 144988.61 45278992.43 Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 1 Lal bdr.Damai Lal bdr. Damai Kerabari 1 635 0.00 34.94 34.94 9.80 342.41 Interviewed

2 Lok bdr. Tamang Lok bdr. Tamang Kerabari 5 146 0.00 88.83 88.83 9.80 870.53 Interviewed

3 Devmaya Tamang Devmaya Tamang Kerabari 1 637 0.00 31.89 31.89 9.80 312.52 Interviewed

4 Jeet bdr. Tamang Chandra bdr. Tamang Kerabari 1 133 0.00 102.09 102.09 9.80 1000.48 Interviewed

5 Lal bdr. Thapa Lal bdr. Thapa Jaubari 5 1336 0.00 42.40 42.40 9.80 415.52 Interviewed

6 Bhibi Tamang + Tirtha bdr. Tamang Tirtha bdr. Tamang Jaubari 5 244 94.57 182.94 277.51 9.80 1792.81 Interviewed

7 Rankumari Tamang Rankumari Tamang Jaubari 5 277, 180 109.08 112.80 221.88 9.80 1105.44 Interviewed

8 Dhan bdr. Gurung Dhan bdr. Gurung Jaubari 5 886 207.40 560.44 767.84 9.80 5492.31 Interviewed

9 Karmasingh Tamang Karmasingh tamang Jaubari 5 309 59.82 292.82 352.64 9.80 2869.64 Interviewed

10 Phoolmaya Tamang Phoolmaya Tamang Jaubari 5 236 28.93 281.57 310.50 9.80 2759.39 Interviewed

11 Bodh bdr. Gurung Bodh bdr. Gurung Jaubari 5 615 551.00 820.00 1371.00 9.80 8036.00 Interviewed

12 Mangali Tamang Mangali Tamang Jaubari 5 224 0.00 28.55 28.55 9.80 279.79 Interviewed

13 Dal bdr. Tamang Kul bdr. Tamang Jaubari 5 220 41.90 95.83 137.73 9.80 939.13 Interviewed

14 Ram bdr. Gurung Ram bdr. Gurung Thalajung 1 125 165.50 219.00 384.50 9.80 2146.20 Interviewed 15 Tara bdr. Gurung Tara bdr. Gurung Thalajung 1 192, 197.111 276.39 417.54 693.93 9.80 4091.89 Interviewed 16 Shreekauri Gurung Bir bdr. Gurung Thalajung 9 270 55.57 80.65 136.22 9.80 790.37 Interviewed

17 Nar bdr. Gurung Gan bdr. Gurung Thalajung 9 595, 611 827.00 1216.00 2043.00 9.80 11916.80 Interviewed

18 Yuktaman Gurung Yuktaman Gurung Thalajung 9 496 98.00 126.00 224.00 9.80 1234.80 Interviewed

19 Tek bdr. Gurung Tek bdr. Gurung Thalajung 9 579, 520, 526, 518 206.20 463.80 670.00 9.80 4545.24 Interviewed Yegya subha, Chalimaya, Dil bdr., 221, 246, 268, 259, 20 Moti bdr Gurung Yegya subha gurung Thalajung 9 298 211.86 859.75 1071.61 9.80 8425.55 Interviewed

21 Dhansingh Gurung Dhansingh Gurung Thalajung 2 122, 124, 160 567.96 793.64 1361.60 9.80 7777.67 Interviewed

22 Suk bdr. Gurung Suk bdr. Gurung Thalajung 7 232 232.03 348.74 580.77 9.80 3417.65 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 366, 365, 373, 391, 23 Atimaya Gurung Atimaya Gurung Thalajung 7 384 265.45 804.12 1069.57 9.80 7880.38 Interviewed

24 Tek bdr. Gurung Tek bdr. Gurung Thalajung 9 47 69.60 70.10 139.70 9.80 686.98 Interviewed

25 Bal bdr.Gurung Bal bdr.Gurung Thalajung 9 793 0.00 22.90 22.90 9.80 224.42 Interviewed

26 Bhesh bdr. Gurung Amardhoj Gurung Thalajung 9 296 163.30 221.36 384.66 9.80 2169.33 Interviewed

27 Rana bdr. Gurung Rana bdr. Gurung Thalajung 7 197, 213 121.34 193.09 314.43 9.80 1892.28 Interviewed

28 Chitra bdr.Gurung Laxmi maya Gurung Thalajung 1 585, 126 195.12 326.10 521.22 9.80 3195.78 Interviewed

29 Hastabina Gurung Hastabina Gurung Thalajung 1 114, 195 469.75 664.99 1134.74 9.80 6516.90 Interviewed

30 Min kumari Gurung Min kumari Gurung Thalajung 9 220 6.00 62.20 68.20 9.80 609.56 Interviewed

31 Rabilal Gurung Lalimaya Gurung Thalajung 9 48 111.00 148.00 259.00 9.80 1450.40 Interviewed

32 Prem bdr.Gurung Janga pd. Gurung Thalajung 9 274 36.25 65.27 101.52 9.80 639.65 Interviewed

33 Suk bdr. Gurung Suk bdr. Gurung Thalajung 9 46 79.00 59.00 138.00 9.80 578.20 Interviewed

34 Ganesh bdr. Gurung Ganesh bdr. Gurung Thalajung 9 96 2.00 21.00 23.00 9.80 205.80 Interviewed

35 Dil bdr.Gurung Dil bdr.Gurung Thalajung 9 593, 521, 530 405.90 479.80 885.70 9.80 4702.04 Interviewed

36 Chitra bdr.Gurung aamumaya Gurung Thalajung 9 519, 594 289.00 425.00 714.00 9.80 4165.00 Interviewed

37 Hiramaya Gurung Hiramaya Gurung Thalajung 9 114, 115 606.60 903.00 1509.60 9.80 8849.40 Interviewed

38 Purnaa Gurung Purna bdr.Gurung Thalajung 9 514 0.00 210.00 210.00 9.80 2058.00 Interviewed

39 Kheman Gurung Kheman Gurung Thalajung 9 515, 566, 569 370.00 565.00 935.00 9.80 5537.00 Interviewed

40 Santa maya Gurung Santa maya Gurung Thalajung 7 385, 390 17.07 160.47 177.54 9.80 1572.61 Interviewed

41 Som bdr. Gurung Som bdr. Gurung Thalajung 7 446, 444, 36.65 34.84 71.49 9.80 341.43 Interviewed

42 Indra bdr. Gurung Indra bdr. Gurung Thalajung 2 166 9.93 67.51 77.44 9.80 661.60 Interviewed

43 Suguna Gurung Bel bdr. Gurung Thalajung 7 367 61.37 98.30 159.67 9.80 963.34 Interviewed

44 Nar jung Gurung Nar bdr. Gurung Thalajung 7 392, 121 277.05 479.10 756.15 9.80 4695.18 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 45 Bir singh Gurung Bir singh Gurung Thalajung 2 194, 199, 200 6.50 214.19 220.69 9.80 2099.06 Interviewed

46 Ek bdr. Gurung Ek bdr. Gurung Thalajung 7 231, 374 227.94 324.19 552.13 9.80 3177.06 Interviewed

47 Kamal bdr. Shah Ganesh jung Shah Palungtar 4 274 129.00 194.00 323.00 9.80 1901.20 Interviewed

48 Lekh bdr. Thakuri Lekh bdr. Thakuri Palungtar 4 354 176.00 243.00 419.00 9.80 2381.40 Interviewed

49 Hari maya Malla Krishna jung thakuri Palungtar 4 273 108.00 164.00 272.00 9.80 1607.20 Interviewed

50 Gopal Paudel Gopal Paudel Palungtar 5 265 79.00 149.00 228.00 9.80 1460.20 Interviewed

51 Babulal Shrestha Babulal Shrestha Palungtar 4 31 0.00 31.00 31.00 9.80 303.80 Interviewed

52 Kamal bdr. Thapa Kamal bdr. Thapa Aappipal 8 829 2.50 88.50 91.00 9.80 867.30 Interviewed

53 Devendra Paudel Devendra Paudel Palungtar 5 649 66.80 147.20 214.00 9.80 1442.56 Interviewed

54 Buddhilal Shrestha Buddhilal Shrestha Palungtar 4 236, 297 206.00 293.00 499.00 9.80 2871.40 Interviewed

55 Dharma narayan Shrestha Dharma narayan Shrestha Palungtar 4 234 42.50 158.50 201.00 9.80 1553.30 Interviewed

56 Ramji Paudel Ramji Paudel Palungtar 5 909, 650 109.00 154.00 263.00 9.80 1509.20 Interviewed

57 Tek bdr. Rana Tek bdr. Rana Aappipal 4 133, 134, 136 0.00 221.00 221.00 9.80 2165.80 Interviewed

58 Anil Pariyar Krishna Pariyar Palungtar 4 276 12.00 39.00 51.00 9.80 382.20 Interviewed

59 Prem Shrestha Babulal Shrestha Aappipal 8 201 45.00 180.00 225.00 9.80 1764.00 Interviewed

60 Rajendra kr. Shrestha Rajendra kr. Shrestha Aappipal 8 876 2.00 29.00 31.00 9.80 284.20 Interviewed

61 Rajkumar Shrestha Rajkumar Shrestha Aappipal 8 122 19.37 148.06 167.43 9.80 1450.99 Interviewed

62 Narmada Shrestha Narmada Shrestha Palungtar 4 27 0.00 6.60 6.60 9.80 64.68 Interviewed

63 Dayaram Paudel Dayaram Paudel Palungtar 5 834 117.00 158.00 275.00 9.80 1548.40 Interviewed

64 Purna bdr. Sarki Purna bdr. Sarki Palungtar 4 94, 98 101.00 305.00 406.00 9.80 2989.00 Interviewed

65 Santa kumari/Sankhar Shrestha Buddhiman Shrestha Palungtar 4 28 0.00 25.70 25.70 9.80 251.86 Interviewed

66 Tek nath Devkota Bishnu kumari Devkota Aappipal 2 938 2.00 130.00 132.00 9.80 1274.00 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 67 Bishnu maya Devkota Bishnu maya Devkota Aappipal 3 305 0.00 21.00 21.00 9.80 205.80 Interviewed

68 Kumar BK Kumar BK Palungtar 4 293, 1240 113.40 227.90 341.30 9.80 2233.42 Interviewed 1402, 1404, 1406, 69 Badri kumar Shrestha Badri kumar Shrestha Palungtar 7 1408 12.70 113.50 126.20 9.80 1112.30 Interviewed

70 Hit kaji Shrestha Hit kaji Shrestha Palungtar 7 1403, 1405, 1407 10.00 42.30 52.30 9.80 414.54 Interviewed

71 Bhatte Damai Bhatte Damai Palungtar 4 108 20.00 47.00 67.00 9.80 460.60 Interviewed

72 Bhim bdr. BK Bhim bdr. BK Palungtar 4 107 164.00 182.00 346.00 9.80 1783.60 Interviewed

73 Baburam Shrestha Baburam Shrestha Palungtar 4 15 290.00 430.00 720.00 9.80 4214.00 Interviewed

74 Daanmaya Devkota Bishwonath Devkota Aappipal 2 753, 785 0.00 37.00 37.00 9.80 362.60 Interviewed

75 Krishna pd. Devkota Krishna pd. Devkota Aappipal 2 946 197.00 297.00 494.00 9.80 2910.60 Interviewed

76 Hem bdr. Shrestha Hem bdr. Shrestha Aappipal 3 ,165,314 212.40 277.00 489.40 9.80 2714.60 Interviewed

77 Dil maya Ale Magar Resham bdr. Ale Aappipal 8 244 202.20 353.58 555.78 9.80 3465.08 Interviewed

78 Bude(Ramtara BK) Krisharam B.K Palungtar 4 298 267.00 396.00 663.00 9.80 3880.80 Interviewed

79 Josana Pradhan Shrestha Durga naran Shrestha Gaikhura 8 556 48.60 158.40 207.00 9.80 1552.32 Interviewed

80 Dil kumari Ale Dil kumari Ale Aappipal 8 239 74.56 69.29 143.85 9.80 679.04 Interviewed

81 Sarad chandra Devkota Sarad chandra Devkota Aappipal 3 278 6.50 119.20 125.70 9.80 1168.16 Interviewed

82 Toyanath Devkota khadananda Devkota Palungtar 5 626 79.00 149.00 228.00 9.80 1460.20 Interviewed

83 Shankar bdr. Sarki Ram bdr. Sarki Aappipal 9 232, 239 349.66 436.66 786.32 9.80 4279.27 Interviewed

84 Rohini pd. Paudel Rohini pd. Paudel Palungtar 5 644, 655, 844 173.00 262.00 435.00 9.80 2567.60 Interviewed

85 Mangal kr. Shrestha Mangal kr. Shrestha Palungtar 4 270 0.00 49.50 49.50 9.80 485.10 Interviewed

86 Harimaya, Chij kr. Shrestha Chij kr. Shrestha Palungtar 4 230, 271, 272 325.60 438.00 763.60 9.80 4292.40 Interviewed

87 Nanda bdr. Ale Nanda bdr. Ale Aappipal 4 388 11.00 52.00 63.00 9.80 509.60 Interviewed Pitamber Paudel (son Arjun pd. 88 Paudel) Taranath pd. Paudel Palungtar 5 643(968) 35.00 54.00 89.00 9.80 529.20 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 89 Gyan kumari Devkota Gyan kumari Devkota Palungtar 5 678 220.00 245.00 465.00 9.80 2401.00 Interviewed

90 Bharat Paudel Nanda kumari Paudel Palungtar 5 910 170.00 129.00 299.00 9.80 1264.20 Interviewed

91 Hari bdr. Bhandari Hari bdr. Bhandari Aappipal 9 1304 53.96 82.91 136.87 9.80 812.52 Interviewed

92 Tek bdr. Sunar Tek bdr. Sunar Aappipal 2 712, 744 309.00 407.00 716.00 9.80 3988.60 Interviewed

93 Rajendra Bhandari Rajendra Bhandari Aappipal 9 1303, 291 51.18 129.66 180.84 9.80 1270.67 Interviewed

94 Tul bdr. Bhandari Ganesh Bhandari Aappipal 9 202, 319 327.10 479.47 806.57 9.80 4698.81 Interviewed

95 Nanu maya Bhandari Nanu maya Bhandari Aappipal 9 203 94.13 160.12 254.25 9.80 1569.18 Interviewed

96 Ram kr. Shrestha Ram kr. Shrestha Aappipal 8 130 0.00 11.74 11.74 9.80 115.05 Interviewed Krishna bdr. Khatri(Krishna pd. 97 Devkota)/Mina devi Khatri Krishna bdr. Khatri Aappipal 2 628, 627, 629 103.00 146.00 249.00 9.80 1430.80 Interviewed

98 Rishi ram Devkota Khem maya Devkota Aappipal 2 901 0.00 55.00 55.00 9.80 539.00 Interviewed 241(1286-present 99 Khadga bdr. Sarki Chinimaya Acchami Aappipal 9 plot) 2.23 64.64 66.87 9.80 633.47 Interviewed

100 Santa bdr. Rana Santa bdr. Rana Aappipal 4 349, 393, 135 18.00 193.00 211.00 9.80 1891.40 Interviewed

101 Chandra bdr. Rana Chandra bdr. Rana Aappipal 4 394 0.00 47.00 47.00 9.80 460.60 Interviewed

102 Mankaji Ale Mankaji Ale Aappipal 4 353, 396 5.00 165.00 170.00 9.80 1617.00 Interviewed

103 Manu maya Thapa Manu maya Thapa Aappipal 2 637 82.00 117.00 199.00 9.80 1146.60 Interviewed

104 Gunakant Devkota Gunakant Devkota Aappipal 2 942 8.00 95.00 103.00 9.80 931.00 Interviewed

105 Raju Sunar Raju Sunar Aappipal 2 738 0.00 14.00 14.00 9.80 137.20 Interviewed

106 Gopinath Devkota Gopinath Devkota Aappipal 2 784 0.00 42.00 42.00 9.80 411.60 Interviewed

107 Devnarayan Shrestha Devnarayan Shrestha Aappipal 3 164 73.30 105.40 178.70 9.80 1032.92 Interviewed

108 Kulman Shrestha Dipnarayan Shrestha Aappipal 8 131 0.00 17.93 17.93 9.80 175.71 Interviewed

109 Deumaya Sarki Durkha bdr. Basel Aappipal 2 1013 0.00 57.00 57.00 9.80 558.60 Interviewed

110 Nanumaya Shrestha Yeri kr. Shrestha Aappipal 3 ,320,225,230 17097.53 306.40 17403.93 9.80 3002.72 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks

111 Ram bdr. Shrestha Ram bdr. Shrestha Aappipal 3 178 , 187,245 124.70 224.90 349.60 9.80 2204.02 Interviewed

112 Dil kumari Thapa Kamal Thapa Aappipal 4 107 0.00 78.00 78.00 9.80 764.40 Interviewed

113 Harka bahadur ale Dhan bdr. Ale Aappipal 8 242 281.15 318.15 599.30 9.80 3117.87 Interviewed

114 Surya Kumari Shrestha Mohan kmr.Shrestha Aappipal 8 180, 181, 202 291.73 403.73 695.46 9.80 3956.55 Interviewed

115 Gane Sarki Durga bdr. Basel Aappipal 3 182, 184 132.80 163.20 296.00 9.80 1599.36 Interviewed

116 Sitadevi Pariyar Shyam bdr. Damai Aappipal 8 133 0.00 12.90 12.90 9.80 126.42 Interviewed

117 Sita Majakoti Sita Majakoti Aappipal 9 233 0.00 17.31 17.31 9.80 169.64 Interviewed

118 Shambhulal Shrestha Shambhulal Shrestha Aappipal 9 27 172.00 182.00 354.00 9.80 1783.60 Interviewed

119 Nar bdr. Thapa Nar bdr. Thapa Aappipal 8 830 67.50 437.00 504.50 9.80 4282.60 Interviewed

120 Krishna A.C Krishna A.C Aappipal 9 224, 225 69.76 96.70 166.46 9.80 947.66 Interviewed

121 Amrit bahadur Thapa Devimaya Thapa Aappipal 9 227 49.40 64.99 114.39 9.80 636.90 Interviewed

122 Lure sunar Arati Sunar Aappipal 2 646 100.00 129.00 229.00 9.80 1264.20 Interviewed

123 Nar bdr. Sarki Nanda Kumari Basel Aappipal 2 1012 0.00 6.00 6.00 9.80 58.80 Interviewed

124 Kul bdr.Bishwokarma Kul bdr.Bishwokarma Aappipal 2 640, 713, 746 286.00 648.00 934.00 9.80 6350.40 Interviewed

125 Pahal bdr. Ale magar Pahal bdr. Ale magar Aappipal 2 579 41.00 151.00 192.00 9.80 1479.80 Interviewed

126 Bishnu ale magar Bishnu ale magar Aappipal 8 238, 241 180.92 379.20 560.12 9.80 3716.16 Interviewed

127 Santaman Shrestha Ratna kumari Shrestha Aappipal 8 125 3.28 68.30 71.58 9.80 669.34 Interviewed Nanu maya thapa 128 Nanu maya thapa (shrestha) (shrestha) Aappipal 8 134 0.00 10.49 10.49 9.80 102.80 Interviewed

129 krishna bdr. Acchami krishna bdr. Acchami Aappipal 9 1161 72.98 109.45 182.43 9.80 1072.61 Interviewed Bishnu prasad adhikari (purna bdr. 130 Gharti) Purna bdr. Gharti Aappipal 9 231 68.29 95.23 163.52 9.80 933.25 Interviewed

131 Ramji bhandari Ramji bhandari Aappipal 9 1302 52.79 77.98 130.77 9.80 764.20 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 132 Bhesanta devkota Bhesanta devkota Aappipal 2 ,777,779,780 172.00 319.00 491.00 9.80 3126.20 Interviewed

133 Dil narayan shrestha Dil narayan shrestha Aappipal 2 163 41.40 56.20 97.60 9.80 550.76 Interviewed

134 Yagya bdr. Bhandari Yagya bdr. Bhandari Aappipal 9 1300 8.26 25.59 33.85 9.80 250.78 Interviewed

135 Dil bahadur bhandari Maina bhandari Aappipal 9 312, 1015 0.00 156.49 156.49 9.80 1533.60 Interviewed

136 Dalle sunar, gurusini sunar Gurusini sunar Aappipal 2 643 0.00 26.00 26.00 9.80 254.80 Interviewed

137 Bishnu prasad devkota Bishnu prasad devkota Aappipal 2 ,943,945 170.00 255.00 425.00 9.80 2499.00 Interviewed

138 Kul bdr./Chameli Sarki Kul bdr. Sarki Aappipal 9 238, 1162 296.80 442.06 738.86 9.80 4332.19 Interviewed

139 Debu maya dargi Debu maya dargi Aappipal 9 243 157.49 235.28 392.77 9.80 2305.74 Interviewed

140 Durga A.C Durga A.C Aappipal 9 240 24.70 40.96 65.66 9.80 401.41 Interviewed

141 Kamli kanta sapkota Kamli kanta sapkota Harmi 3 1790 14.25 130.87 145.12 9.80 1282.53 Interviewed

142 Kamal, Ram bdr., Ishwor, hari Dankoti Kamal Dankoti Harmi 4 327 351.50 484.18 835.68 9.80 4744.96 Interviewed

143 Gangamaya Gurung Gangamaya Gurung Harmi 4 43 0.00 54.45 54.45 9.80 533.61 Interviewed

144 Suman Gurung Suman Gurung Harmi 8 1133 25.80 28.69 54.49 9.80 281.16 Interviewed Man bdr. Tamang,Krishna 145 bdr.Tamang Krishna bdr. Tamang Harmi 4 198, 201, 202 127.41 221.98 349.39 9.80 2175.40 Interviewed

146 Thakur prasad Gurung Thakur prasad Gurung Harmi 8 279, 300 49.31 122.20 171.51 9.80 1197.56 Interviewed

147 Chitra kumari Dhakal Chitra kumari Dhakal Harmi 4 195, 385 171.71 197.52 369.23 9.80 1935.70 Interviewed

148 Jal maya Sodari Kalika prasad Sodari Gaikhura 8 486 0.00 12.00 12.00 9.80 117.60 Interviewed

149 Gopal bdr. Sarki Gopal bdr. Sarki Harmi 4 374 130.45 189.58 320.03 9.80 1857.88 Interviewed

150 Mane/Sete Sarki Bate bdr. Sarki Harmi 4 353 10.00 61.00 71.00 9.80 597.80 Interviewed

151 Buddhi bilas Sapkota Buddhi bilas Sapkota Harmi 3 1791 0.00 32.34 32.34 9.80 316.93 Interviewed

152 Ran bdr. Gurung Ran bdr. Gurung Harmi 8 361 364.33 448.59 812.92 9.80 4396.18 Interviewed

153 Ram mani Dhakal Ram mani Dhakal Harmi 4 196 191.19 268.77 459.96 9.80 2633.95 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 154 Mainchauri Gurung Mainchauri Gurung Harmi 8 274 244.04 295.78 539.82 9.80 2898.64 Interviewed

155 Ambika devi sapkota Ambika devi sapkota Harmi 3 1862 3.04 27.80 30.84 9.80 272.44 Interviewed

156 Bir bdr. Gurung Bir bdr. Gurung Harmi 8 353, 360 3.92 162.70 166.62 9.80 1594.46 Interviewed

157 Suk bdr. Gurung Suk bdr. Gurung Harmi 8 577 17.16 14.74 31.90 9.80 144.45 Interviewed

158 Maheshwor Pokharel Maheshwor Pokharel Harmi 7 742 0.00 31.29 31.29 9.80 306.64 Interviewed

159 Mannmaya devi Gurung Mannmaya devi Gurung Harmi 8 587 140.00 214.00 354.00 9.80 2097.20 Interviewed

160 Jit bdr. Gurung Jit bdr. Gurung Harmi 8 575, 861 116.50 208.56 325.06 9.80 2043.89 Interviewed

161 Dambar kumari Gurung Dambar kumari Gurung Harmi 8 489 7.16 5.00 12.16 9.80 49.00 Interviewed

162 Men bdr. Gurung Ganga devi gurung Harmi 8 858 2.67 20.00 22.67 9.80 196.00 Interviewed

163 Dhan bdr. Bishwokarma Dhan bdr. Bishwokarma Harmi 8 753, 752, 840 135.63 280.46 416.09 9.80 2748.51 Interviewed

164 Takman Gurung Takman Gurung Harmi 8 573 51.65 71.50 123.15 9.80 700.70 Interviewed

165 Hari bdr.Dhakal Hari bdr.Dhakal Harmi 4 419 2.98 23.30 26.28 9.80 228.34 Interviewed

166 Bimala Dhakal Janardhan Dhakal Harmi 4 137, 420 37.82 65.20 103.02 9.80 638.96 Interviewed

167 Bharat Dhakal Bharat Dhakal Harmi 5 1248 0.00 8.02 8.02 9.80 78.60 Interviewed

168 Thagmaya Dhakal Thagmaya Dhakal Harmi 4 141, 142, 151, 152 124.11 186.65 310.76 9.80 1829.17 Interviewed

169 Hari datta Dhakal Shankar Dhakal Harmi 4 194 50.61 83.87 134.48 9.80 821.93 Interviewed

170 Maan bdr. Gurung Maan bdr. Gurung Harmi 8 846 3.30 198.00 201.30 9.80 1940.40 Interviewed

171 Bhim Bd Gurung Bhim Bd Gurung Harmi 8 1070 8.40 54.00 62.40 9.80 529.20 Interviewed

172 Kajiram Nepali Kajiram Nepali Harmi 4 878 101.29 126.66 227.95 9.80 1241.27 Interviewed

173 Narandutta Dhakal Indra nanda Dhakal Harmi 5 119 0.00 7.80 7.80 9.80 76.44 Interviewed

174 Kale sarki Kale sarki Harmi 9 203 36.56 104.93 141.49 9.80 1028.31 Interviewed

175 Sir bdr. Tamang Man bdr.Tamang Harmi 4 221, 225, 357, 359 397.77 578.64 976.41 9.80 5670.67 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 176 Sobha Dhakal Jaumaya Dhakal Harmi 4 847 0.00 8.00 8.00 9.80 78.40 Interviewed

177 Dandapani Sapkota Prem Pd.Sapkota Harmi 5 1315 0.00 150.16 150.16 9.80 1471.57 Interviewed

178 Raghunath Dhakal Raghunath Dhakal Harmi 4 224 8.89 56.31 65.20 9.80 551.84 Interviewed

179 Kali Ghartini Kali Ghartini Harmi 3 1559 1.11 18.13 19.24 9.80 177.67 Interviewed

180 Yugnath Sapkota Mayadevi sapkota Harmi 3,4 147, 1871 420.80 592.62 1013.42 9.80 5807.68 Interviewed

181 Dhale sarki Thakur bdr. Nepali Harmi 4 326 15.48 37.38 52.86 9.80 366.32 Interviewed

182 Chandra bdr. Tamang Chandra bdr. Tamang Harmi 4 218, 197, 356, 358 181.70 252.68 434.38 9.80 2476.26 Interviewed

183 Kul bdr Pandit Dev raj Pandit Harmi 4 347 187.83 311.82 499.65 9.80 3055.84 Interviewed

184 Kirkamali sarki Kirkamali sarki Harmi 4 220 229.37 330.29 559.66 9.80 3236.84 Interviewed

185 Masini Gurung Masini Gurung Harmi 8 859 3.00 27.80 30.80 9.80 272.44 Interviewed

186 Padam bdr. Gurung Padam bdr. Gurung Harmi 8 574 184.01 307.56 491.57 9.80 3014.09 Interviewed

187 Santa bdr. Gurung Kumari Gurung Harmi 8 526, 860 24.93 67.97 92.90 9.80 666.11 Interviewed

188 Khade Sarki Putali Sarki Harmi 4 348 330.92 488.35 819.27 9.80 4785.83 Interviewed

189 Durgamaya Dhakal Durgamaya Dhakal Harmi 5 112, 113 0.00 68.72 68.72 9.80 673.46 Interviewed

190 Khilanath Dhakal Gangamaya Dhakal Harmi 4 140, 157 316.94 4444.05 4760.99 9.80 43551.69 Interviewed

191 Dharma datta Dhakal Rudra pd. Dhakal Harmi 4 384 8.83 171.55 180.38 9.80 1681.19 Interviewed

192 Ramakanta Dhakal Chij kumari Dhakal Harmi 4 133, 183, 199 133.18 234.35 367.53 9.80 2296.63 Interviewed

193 Kamala Dhakal Krishna pd. Dhakal Harmi 5 145 34.93 158.68 193.61 9.80 1555.06 Interviewed

194 Indra bdr. Dhakal Indra bdr. Dhakal Harmi 5 144 40.79 149.09 189.88 9.80 1461.08 Interviewed

195 Ramji pd. Dhakal Yamuna devi Dhakal Harmi 5 138 22.82 71.57 94.39 9.80 701.39 Interviewed

196 Sanmaya BK Sanmaya BK Harmi 8 217 98.13 113.20 211.33 9.80 1109.36 Interviewed

197 Jaalmaya Gurung Jaalmaya Gurung Harmi 8 354 66.23 70.91 137.14 9.80 694.92 Interviewed

198 Kauman Gurung Naina bdr. Gurung Harmi 8 355 49.82 76.94 126.76 9.80 754.01 Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 199 Santamaya Gurung Santamaya Gurung Harmi 8 222, 223 254.30 346.48 600.78 9.80 3395.50 Interviewed

200 Lal bdr. Gurung Lal bdr. Gurung Harmi 8 272, 276 31.09 84.28 115.37 9.80 825.94 Interviewed

201 Jagnath Bhatta Jagnath Bhatta Harmi 3 1773 7.10 84.81 91.91 9.80 831.14 Interviewed

202 Dandapani Adhikari Khemraj Adhikari Harmi 4 41 0.00 64.74 64.74 9.80 634.45 Interviewed

203 Dil bdr. Dhakal Dil bdr. Dhakal Harmi 5 111 36.50 65.38 101.88 9.80 640.72 Interviewed

204 Tul bdr. Shah Narendra jung Shah Palungtar 4 350 608.00 884.00 1492.00 9.80 8663.20 Interviewed 303 39065.46 43955.91 83021.37 430767.92 8.302 1 Yam bdr. Gurung Nara bahadur Jaubari 5 223 2685.94 2502.50 5188.44 9.80 24524.50 Non-Interviewed

2 Tek bdr. Damai Dil bdr Jaubari 5 634 0.00 35.32 35.32 9.80 346.14 Non-Interviewed

3 Ram kmr. Gurung Rana bdr. Jaubari 5 636 0.00 25.54 25.54 9.80 250.29 Non-Interviewed

4 Suk bdr. Gurung Lal bdr. Jaubari 5 60 945.95 580.18 1526.13 9.80 5685.76 Non-Interviewed

5 Ser bdr. Damai Bal bdr . Jaubari 5 973 60.01 67.97 127.98 9.80 666.11 Non-Interviewed

6 Hasta bdr Thapa Magar Kaharsingh Jaubari 4 635 42.00 33.00 75.00 9.80 323.40 Non-Interviewed

7 Bil bdr. Pariyar Tilak Jaubari 4 1207 85.00 217.00 302.00 9.80 2126.60 Non-Interviewed

8 Yem nath Sapkota Loknath Jaubari 4 1208 19.00 17.00 36.00 9.80 166.60 Non-Interviewed

9 Batuli Thapa Mujbal Harmi 3 1555 42.55 63.82 106.37 9.80 625.44 Non-Interviewed

10 Yem kumari Dhakal Hemraj Harmi 5 120 20.74 13.63 34.37 9.80 133.57 Non-Interviewed

11 Hari pd. Dhakal Homnath Harmi 5 1269 21.31 70.51 91.82 9.80 691.00 Non-Interviewed

12 Ramudevi Dawadi Tilakram Harmi 5 1087 24.98 125.88 150.86 9.80 1233.62 Non-Interviewed

13 Loknath Sapkota Rabilal Harmi 3 1636 83.93 99.86 183.79 9.80 978.63 Non-Interviewed

14 Krishna Bilash Mili prasad. Harmi 3 1046 0.00 107.81 107.81 9.80 1056.54 Non-Interviewed

15 Dale Sarki Kale Harmi 4 326 15.48 37.38 52.86 9.80 366.32 Non-Interviewed

16 Manohar Dhakal Laxmikanta Harmi 4 ,185,136 39.26 75.23 114.49 9.80 737.25 Non-Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 17 Jit bdr Gurung Dhane Harmi 8 305, 306 325.95 485.85 811.80 9.80 4761.33 Non-Interviewed

18 Hasta Kauri Gurung Manbahadur Harmi 8 301, 302 40.27 65.55 105.82 9.80 642.39 Non-Interviewed

19 Girman Gurung Pahalman Harmi 8 221 149.31 237.80 387.11 9.80 2330.44 Non-Interviewed

20 Gagansingh Gurung Nara bahadur Harmi 8 226 5.50 20.52 26.02 9.80 201.10 Non-Interviewed

21 Saraswoti Gurung Dambarsingh Harmi 8 275 62.41 87.81 150.22 9.80 860.54 Non-Interviewed

22 Buddhibal Gurung Laxuman Harmi 8 ,1201, 273 0.00 59.64 59.64 9.80 584.47 Non-Interviewed

23 Dil bdr. Gurung Tilbdr. Harmi 8 1202 0.00 25.50 25.50 9.80 249.90 Non-Interviewed

24 Narayan Gurung Nara bahadur Harmi 8 530, 539 495.10 746.62 1241.72 9.80 7316.88 Non-Interviewed

25 Lal bdr. Gurung Dhan bdr Harmi 8 531 10.74 13.20 23.94 9.80 129.36 Non-Interviewed

26 Lekhman Gurung Ram bdr. Harmi 8 532 44.08 64.33 108.41 9.80 630.43 Non-Interviewed

27 Bir bdr. Gurung Maan Harmi 8 534 29.07 36.11 65.18 9.80 353.88 Non-Interviewed

28 Ram pd. Gurung Nara bahadur Harmi 8 572 92.58 98.50 191.08 9.80 965.30 Non-Interviewed

29 Lal kumari Gurung Dil bdr Harmi 8 842 104.45 220.72 325.17 9.80 2163.06 Non-Interviewed

30 Manmaya devi Gurung Suk bdr. Harmi 8 587 140.00 214.00 354.00 9.80 2097.20 Non-Interviewed

31 Bishnu Pokhrel Devi Pd. Harmi 7 740 0.00 5.91 5.91 9.80 57.92 Non-Interviewed

32 Lekhnath Pokharel Buddhikanta Harmi 7 151 11.34 49.32 60.66 9.80 483.34 Non-Interviewed

33 Tanka Pd. Bhatta Hari bhakta Harmi 7 693, 695 4.56 60.28 64.84 9.80 590.74 Non-Interviewed

34 Aashpur Sunar Dhanaraj Harmi 8 1011 12.07 40.56 52.63 9.80 397.49 Non-Interviewed

35 Purushwotam Devkota Jagannath Aappipal 3 306 61.20 87.20 148.40 9.80 854.56 Non-Interviewed

36 Rameshraj Devkota Rewati Aappipal 3 289 0.00 6.80 6.80 9.80 66.64 Non-Interviewed

37 Bishnu Pd. Devkota Tirtharaj Aappipal 3 82 0.00 21.90 21.90 9.80 214.62 Non-Interviewed

38 Homnath Devkota Premsagar Aappipal 3 271 1.00 13.00 14.00 9.80 127.40 Non-Interviewed

39 Chetnath Devkota Ekasure Aappipal 3 272 12.50 120.40 132.90 9.80 1179.92 Non-Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 40 Krishna Pd. Devkota Modnath Aappipal 3 231, 234 9.60 55.50 65.10 9.80 543.90 Non-Interviewed

41 Chhabilal Shrestha Dhanajman Aappipal 3 224 27.20 46.10 73.30 9.80 451.78 Non-Interviewed 181, 188, 177, 167, 42 Lal bdr Newar Bishnu Aappipal 3 168, 149 312.20 416.60 728.80 9.80 4082.68 Non-Interviewed

43 Krishna kumar Shrestha Dilman Aappipal 3 172, 176 44.40 31.50 75.90 9.80 308.70 Non-Interviewed

44 Tika bdr Rana Shankar bdr Aappipal 4 120 3.00 150.00 153.00 9.80 1470.00 Non-Interviewed

45 Jiwan Rana Tika bdr. Aappipal 4 138 3.00 186.00 189.00 9.80 1822.80 Non-Interviewed

46 Krishna Rana Samyukta Ramji Aappipal 4 724 13.00 162.00 175.00 9.80 1587.60 Non-Interviewed

47 Naresh Thakuri Dip bdr. Aappipal 4 719 3.00 39.00 42.00 9.80 382.20 Non-Interviewed

48 Kanchha kaji rana Krishna bdr. Aappipal 4 350 272.00 346.00 618.00 9.80 3390.80 Non-Interviewed

49 Krishna bdr. Hamal Nara bahadur Aappipal 4 242 47.00 73.00 120.00 9.80 715.40 Non-Interviewed

50 Padamraj Devkota Umakanta Aappipal 2 108 70.00 177.00 247.00 9.80 1734.60 Non-Interviewed

51 Prakash Chandra Shrestha Kulchandra Aappipal 2 1011 0.00 21.00 21.00 9.80 205.80 Non-Interviewed

52 Rabindra Devkota Kasiram Aappipal 2 772, 786 13.00 155.00 168.00 9.80 1519.00 Non-Interviewed

53 Padamwati Devkota Toyanath Aappipal 2 767 3.00 102.00 105.00 9.80 999.60 Non-Interviewed

54 Tilak bdr. Rana Magar Rishiram Aappipal 2 751, 752 42.00 99.00 141.00 9.80 970.20 Non-Interviewed

55 Ishwor Pd. Devkota Lekhnath Aappipal 2 749 13.00 39.00 52.00 9.80 382.20 Non-Interviewed

56 Tankanath Devkota Shiva pd. Aappipal 2 747, 748 0.00 27.00 27.00 9.80 264.60 Non-Interviewed

57 Tek bdr. Ale magar Hiraman Aappipal 2 739 119.00 159.00 278.00 9.80 1558.20 Non-Interviewed

58 Mohan singh Thapa Padam bdr. Aappipal 2 620 3.00 63.00 66.00 9.80 617.40 Non-Interviewed

59 Ikal bdr. Thapa Magar Padam bdr. Aappipal 2 639 6.00 36.00 42.00 9.80 352.80 Non-Interviewed

60 Dhan bdr. Thapa Magar Hiraman Aappipal 2 625, 630, 631, 634 485.00 713.00 1198.00 9.80 6987.40 Non-Interviewed

61 Bil bdr. Sunar Lyage Aappipal 2 714 55.00 102.00 157.00 9.80 999.60 Non-Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 62 gyanu Devi Shrestha Shambhulal Aappipal 2 111 18.51 488.68 507.19 9.80 4789.06 Non-Interviewed

63 Tribhunath Shrestha Loknath Aappipal 8 136 0.00 12.67 12.67 9.80 124.17 Non-Interviewed

64 Rudra bdr. Basnet Sher bdr. Aappipal 2 129 0.00 6.68 6.68 9.80 65.46 Non-Interviewed

65 Gunjaman Shrestha Buddhi Pd. Aappipal 8 146, 147 185.89 212.45 398.34 9.80 2082.01 Non-Interviewed

66 Rudra bdr. Ale Jaharsingh Aappipal 8 309 128.19 190.43 318.62 9.80 1866.21 Non-Interviewed

67 Yem pd. Devkota Sombilas Gaikhur 8 476 2.00 20.00 22.00 9.80 196.00 Non-Interviewed

68 Suryaman Shrestha Khirman Palungtar 4 235 27.60 29.80 57.40 9.80 292.04 Non-Interviewed

69 Man bdr.Tamang samsher bdr. Palungtar 4 355 104.00 156.00 260.00 9.80 1528.80 Non-Interviewed

70 Kumar Gotame Juthe Palungtar 4 294 0.00 13.00 13.00 9.80 127.40 Non-Interviewed

71 Ratna kmr. Shrestha Hiraman Palungtar 7 1013 0.00 6.70 6.70 9.80 65.66 Non-Interviewed

72 Ganesh kmr. Shrestha Maan bdr. Palungtar 7 1010 0.00 1.60 1.60 9.80 15.68 Non-Interviewed

73 Madhav Poudel Nara hari Palungtar 5 647 119.00 200.00 319.00 9.80 1960.00 Non-Interviewed

74 Pitambar Pd.Poudel Taranath Palungtar 5 643 35.00 54.00 89.00 9.80 529.20 Non-Interviewed

75 Ishwori Pd. Sapkota Bishnu pd. Palungtar 5 190 0.00 24.60 24.60 9.80 241.08 Non-Interviewed

76 Lokchandra Devkota Kulchandra Palungtar 5 4, 38 25.80 524.00 549.80 9.80 5135.20 Non-Interviewed

77 Bishnu Pd. Devkota Tirtharaj Palungtar 5 1 71.80 167.30 239.10 9.80 1639.54 Non-Interviewed

78 Tanka Devi Devkota Bhojraj Palungtar 5 36 15.40 106.60 122.00 9.80 1044.68 Non-Interviewed

79 Prakash Chandra Devkota Kulchandra Palungtar 5 37 10.40 125.00 135.40 9.80 1225.00 Non-Interviewed

80 Rajeshwor Devkota Hari bhakta Palungtar 5 99 0.00 87.00 87.00 9.80 852.60 Non-Interviewed

81 Rama Devkota Laxmi pd. Palungtar 5 100 2.20 45.60 47.80 9.80 446.88 Non-Interviewed

82 Men bdr Gurung Bhim bdr. Thalajung 9 794 66.90 100.40 167.30 9.80 983.92 Non-Interviewed

83 Tilmaya Gurung Dil bdr. Thalajung 9 72 155.00 231.00 386.00 9.80 2263.80 Non-Interviewed

84 Bir bdr. Gurung Dil bdr. Thalajung 9 73 230.00 346.00 576.00 9.80 3390.80 Non-Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 85 Bhoj bdr Gurung sundar Thalajung 9 131 397.00 580.00 977.00 9.80 5684.00 Non-Interviewed

86 Thagmaya Gurung Deu bdr. Thalajung 9 107 108.00 163.00 271.00 9.80 1597.40 Non-Interviewed

87 Yem bdr. Gurung Narabdr. Thalajung 9 570 10.00 31.70 41.70 9.80 310.66 Non-Interviewed

88 Kumar Gurung Tilak bdr. Thalajung 9 568 90.00 158.00 248.00 9.80 1548.40 Non-Interviewed

89 Chayomaya Gurung Purnasingh Thalajung 9 486, 513 117.60 175.90 293.50 9.80 1723.82 Non-Interviewed

90 Amar bdr.Gurung Indra singh Thalajung 9 489 91.40 18.40 109.80 9.80 180.32 Non-Interviewed

91 Dhana bdr. Gurung Bam bdr Thalajung 9 487 69.00 162.00 231.00 9.80 1587.60 Non-Interviewed

92 Kul bdr. Gurung Maniraj Thalajung 9 493 27.90 64.80 92.70 9.80 635.04 Non-Interviewed

93 Kaman bdr. Gurung Maniraj Thalajung 9 494 23.20 50.50 73.70 9.80 494.90 Non-Interviewed

94 Kasiram Gurung Sattalsing Thalajung 9 488 35.70 31.10 66.80 9.80 304.78 Non-Interviewed

95 Santamaya Gurung Tek bdr. Thalajung 9 271, 272 19.51 27.28 46.79 9.80 267.34 Non-Interviewed

96 Sansari Gurung Chakra bdr. Thalajung 9 265 17.54 31.36 48.90 9.80 307.33 Non-Interviewed

97 Tej bdr.Gurung Aaitasingh Thalajung 9 260, 262 7.80 47.89 55.69 9.80 469.32 Non-Interviewed

98 Keshari Gurung Tej bdr. Thalajung 9 293 28.59 38.55 67.14 9.80 377.79 Non-Interviewed

99 Nar bdr Gurung Chanmarsingh Thalajung 7 ,266 620.02 13.92 633.94 9.80 136.42 Non-Interviewed

100 Kul bdr. Gurung Man bdr. Thalajung 7 182 159.58 143.39 302.97 9.80 1405.22 Non-Interviewed

101 Sano nar bdr Gurung Rana bdr. Thalajung 7 195 238.67 338.33 577.00 9.80 3315.63 Non-Interviewed

102 Harka bdr.Gurung Puransingh Thalajung 7 196 7.25 51.08 58.33 9.80 500.58 Non-Interviewed

103 Hom bdr. Gurung Puransingh Thalajung 7 198 155.96 185.34 341.30 9.80 1816.33 Non-Interviewed

104 Jit bdr Gurung Ambardhoj Thalajung 7 212 108.18 117.24 225.42 9.80 1148.95 Non-Interviewed

105 Durmaya Gurung Chakmaan Thalajung 7 452 0.00 5.19 5.19 9.80 50.86 Non-Interviewed

106 Chandra singh Gurung Maandhoj Thalajung 7 267 353.86 346.19 700.05 9.80 3392.66 Non-Interviewed

107 Rana bdr. Gurung Dal bdr. Thalajung 7 265 18.85 97.64 116.49 9.80 956.87 Non-Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 108 Lal bdr.Gurung Jaman singh Thalajung 7 359 19.71 82.43 102.14 9.80 807.81 Non-Interviewed

109 Hom bdr. Gurung Puransingh Thalajung 7,2 ,240,120 144.90 292.08 436.98 9.80 2862.38 Non-Interviewed

110 Bhakta bdr. Gurung Manu Thalajung 7 ,360, 375,376 622.32 913.01 1535.33 9.80 8947.50 Non-Interviewed

111 Sano maya Gurung Bir bdr. Thalajung 7 368 29.59 76.50 106.09 9.80 749.70 Non-Interviewed

112 Dip Gurung Mankaji Thalajung 7 123 0.00 18.33 18.33 9.80 179.63 Non-Interviewed

113 Prasas Gurung Lalras Thalajung 7 130 0.00 10.49 10.49 9.80 102.80 Non-Interviewed

114 Parbati Ale Sanjit Thalajung 7 131 42.61 51.50 94.11 9.80 504.70 Non-Interviewed

115 Mankaji Gurung Man bdr Thalajung 7 767 260.06 385.05 645.11 9.80 3773.49 Non-Interviewed

116 Bir bdr. Gurung Ran bdr. Thalajung 2 161, 162 250.85 348.49 599.34 9.80 3415.20 Non-Interviewed

117 Harka bdr.Gurung Ranadhoj Thalajung 2 165 174.75 325.09 499.84 9.80 3185.88 Non-Interviewed

118 Dil bdr. Gurung Ranadhoj Thalajung 2 168 18.50 209.66 228.16 9.80 2054.67 Non-Interviewed

119 Bibimaya Gurung Man bdr. Thalajung 2 202 4.30 241.27 245.57 9.80 2364.45 Non-Interviewed

120 Nanda bdr.Gurung Tej bdr. Thalajung 2 198 1.49 31.31 32.80 9.80 306.84 Non-Interviewed

121 Than bdr Gurung Gol bdr. Thalajung 2 196 0.00 22.60 22.60 9.80 221.48 Non-Interviewed

122 Manisha Gurung Top bdr. Thalajung 2 630 20.90 148.50 169.40 9.80 1455.30 Non-Interviewed

123 Bahadur Gurung Ujirsingh Thalajung 2 120 2.92 58.79 61.71 9.80 576.14 Non-Interviewed

124 Mina Kumari samet Durga naran Gaikhura 8 555 76.50 113.50 190.00 9.80 1112.30 Non-Interviewed

125 Bhagirathi Gurung Bahadur Thalajung 1 196 46.24 59.63 105.87 9.80 584.37 Non-Interviewed

126 Puna Bd Gharti Jasbir Harmi 4 1635 107.81 107.81 9.80 1056.54 Non-Interviewed

127 Bishnu Kr Shrestha Lal Krishna Harmi 5 230 59.64 165.61 225.25 9.80 1622.98 Non-Interviewed

128 Khem Bd. Bhandarai Rudra Bd Aapipal 9 1301 73.65 96.25 169.90 9.80 943.25 Non-Interviewed

129 Purna kumari Shrestha Ram Bd Aapipal 8 179 2.35 83.55 85.90 9.80 818.79 Non-Interviewed

875 14.27 40.83 55.10 9.80 400.13 Non-Interviewed Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 130 Nur Pd. Shrestha Anta Narayan Aapipal 8 182 3.85 26.65 30.50 9.80 261.17 Non-Interviewed

131 Harka Bd. Rana Mohan Sing Aapipal 8 242 281.15 318.25 599.40 9.80 3118.85 Non-Interviewed

132 Chakra Bd. Devkota Tilak Aapipal 2 632 41 63 104.00 9.80 617.40 Non-Interviewed

133 Bir Bd. Sunar Dalle Aapipal 2 644 40 70 110.00 9.80 686.00 Non-Interviewed

134 Bhoj Raj Devkota Ishwori Pd Aapipal 2 750 109 171 280.00 9.80 1675.80 Non-Interviewed

135 Krishna Pd Devkota Tika Dutta Aapipal 2 939 8 95 103.00 9.80 931.00 Non-Interviewed

136 Chandra Bir Ale Tek Bd Aapipal 4 392 3 6 9.00 9.80 58.80 Non-Interviewed

137 Madhav Poudel Narhari Palungtar 5 835 74 96 170.00 9.80 940.80 Non-Interviewed

138 Khil Maya Poudel Farindra Pd Palungtar 5 631 47.60 112.20 159.80 9.80 1099.56 Non-Interviewed 166 13608.13 20921.54 34529.67 205031.09 3.453 1 Kot Kalika Guthi Aapipal 4 685 41.31 41.31 9.80 404.84 Guthi Land

2 Kot Kalika Guthi Aapipal 4 109 222.78 108.86 331.64 9.80 1066.83 Guthi Land

3 Kot Kalika Guthi Aapipal 4 302 22.00 205.00 227.00 9.80 2009.00 Guthi Land

4 Kot Kalika Guthi Aapipal 4 303 23.00 109.00 132.00 9.80 1068.20 Guthi Land

5 Kot Kalika Guthi Aapipal 4 316 10.00 10.00 9.80 98.00 Guthi Land

6 Kot Kalika Guthi Aapipal 4 318 9.00 49.00 58.00 9.80 480.20 Guthi Land

7 Kot Kalika Guthi Aapipal 4 317 11.00 86.00 97.00 9.80 842.80 Guthi Land

8 Kot Kalika Guthi Aapipal 4 319 44.00 44.00 9.80 431.20 Guthi Land

9 Kot Kalika Guthi Aapipal 4 237 4.00 4.00 9.80 39.20 Guthi Land

10 Kot Kalika Guthi Aapipal 4 238 36.00 48.00 84.00 9.80 470.40 Guthi Land

11 Kot Kalika Guthi Aapipal 4 241 38.00 55.00 93.00 9.80 539.00 Guthi Land

12 Kot Kalika Guthi Aapipal 4 243 34.00 34.00 9.80 333.20 Guthi Land

13 Kot Kalika Guthi Aapipal 4 146 55.00 55.00 9.80 539.00 Guthi Land Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 14 Kot Kalika Guthi Aapipal 4 117 346.00 466.00 812.00 9.80 4566.80 Guthi Land

15 Kot Kalika Guthi Aapipal 4 118 43.00 43.00 9.80 421.40 Guthi Land

16 Kot Kalika Guthi Aapipal 4 105 34.00 34.00 9.80 333.20 Guthi Land

17 Kot Kalika Guthi Aapipal 4 106 53.00 53.00 9.80 519.40 Guthi Land

18 Kot Kalika Guthi Aapipal 4 103 3.00 125.00 128.00 9.80 1225.00 Guthi Land Total 18 710.78 1570.17 2280.95 15387.67 0.228 1 Non-Registered Kerabari 1 147 167.30 167.30 9.80 1639.54 Non-Registered

2 Non-Registered Jaubari 5 132 20.80 209.38 230.18 9.80 2051.92 Non-Registered

3 Non-Registered Jaubari 5 211 57.12 284.86 341.98 9.80 2791.63 Non-Registered

4 Non-Registered Jaubari 5 971 8.59 218.09 226.68 9.80 2137.28 Non-Registered

5 Non-Registered Jaubari 5 972 6.32 34.79 41.11 9.80 340.94 Non-Registered

6 Non-Registered Jaubari 5 1362 56.00 64.00 120.00 9.80 627.20 Non-Registered

7 Non-Registered Jaubari 5 526 63.00 160.00 223.00 9.80 1568.00 Non-Registered

8 Non-Registered Jaubari 5 624 641.00 911.00 1552.00 9.80 8927.80 Non-Registered

9 Non-Registered Jaubari 5 805 25.00 25.00 9.80 245.00 Non-Registered

10 Non-Registered Thalajung 9 100 22.50 30.00 52.50 9.80 294.00 Non-Registered

11 Non-Registered Thalajung 9 516 33.00 53.00 86.00 9.80 519.40 Non-Registered

12 Non-Registered Thalajung 9 511 79.40 137.50 216.90 9.80 1347.50 Non-Registered

13 Non-Registered Thalajung 9 495 158.00 218.00 376.00 9.80 2136.40 Non-Registered

14 Non-Registered Thalajung 9 490 70.40 102.50 172.90 9.80 1004.50 Non-Registered

15 Non-Registered Thalajung 9 219 53.55 171.38 224.93 9.80 1679.52 Non-Registered

16 Non-Registered Thalajung 9 28 80.52 117.00 197.52 9.80 1146.60 Non-Registered

17 Non-Registered Thalajung 7 193 94.84 118.31 213.15 9.80 1159.44 Non-Registered Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 18 Non-Registered Thalajung 7 194 69.65 102.00 171.65 9.80 999.60 Non-Registered

19 Non-Registered Thalajung 7 445 82.80 184.60 267.40 9.80 1809.08 Non-Registered

20 Non-Registered Thalajung 7 451 136.08 265.09 401.17 9.80 2597.88 Non-Registered

21 Non-Registered Thalajung 7 208 220.89 220.89 9.80 2164.72 Non-Registered

22 Non-Registered Thalajung 7 433 314.11 413.73 727.84 9.80 4054.55 Non-Registered

23 Non-Registered Thalajung 7 230 64.65 108.21 172.86 9.80 1060.46 Non-Registered

24 Non-Registered Thalajung 7 357 49.01 55.57 104.58 9.80 544.59 Non-Registered

25 Non-Registered Thalajung 7 386 97.68 97.19 194.87 9.80 952.46 Non-Registered

26 Non-Registered Thalajung 1 580 97.56 100.00 197.56 9.80 980.00 Non-Registered

27 Non-Registered Thalajung 1 122 33.70 49.34 83.04 9.80 483.53 Non-Registered

28 Non-Registered Thalajung 1 111 85.03 76.68 161.71 9.80 751.46 Non-Registered

29 Non-Registered Thalajung 2 765 3.76 3.76 9.80 36.85 Non-Registered

30 Non-Registered Harmi 8 223 140.90 206.31 347.21 9.80 2021.84 Non-Registered

31 Non-Registered Harmi 8 1134 247.00 388.00 635.00 9.80 3802.40 Non-Registered

32 Non-Registered Harmi 8 1174 406.00 576.00 982.00 9.80 5644.80 Non-Registered

33 Non-Registered Harmi 8 585 7.00 62.00 69.00 9.80 607.60 Non-Registered

34 Non-Registered Harmi 8 1159 40.00 41.00 81.00 9.80 401.80 Non-Registered

35 Non-Registered Harmi 8 866 22.00 22.00 9.80 215.60 Non-Registered

36 Non-Registered Harmi 8 739 30.20 65.89 96.09 9.80 645.72 Non-Registered

37 Non-Registered Harmi 8 1012 57.36 75.17 132.53 9.80 736.67 Non-Registered

38 Non-Registered Harmi 7 1250 46.61 46.61 9.80 456.78 Non-Registered

39 Non-Registered Harmi 4 486 1.97 48.69 50.66 9.80 477.16 Non-Registered

40 Non-Registered Harmi 4 485 293.74 316.00 609.74 9.80 3096.80 Non-Registered Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 41 Non-Registered Harmi 4 484 18.35 18.35 9.80 179.83 Non-Registered

42 Non-Registered Harmi 4 134 138.77 180.42 319.19 9.80 1768.12 Non-Registered

43 Non-Registered Harmi 4 155 559.91 805.38 1365.29 9.80 7892.72 Non-Registered

44 Non-Registered Harmi 4 219 166.31 254.73 421.04 9.80 2496.35 Non-Registered

45 Non-Registered Harmi 4 184 43.20 52.80 96.00 9.80 517.44 Non-Registered

46 Non-Registered Harmi 4 330 126.88 188.98 315.86 9.80 1852.00 Non-Registered

47 Non-Registered Harmi 3 2354 147.00 221.00 368.00 9.80 2165.80 Non-Registered

48 Non-Registered Harmi 3 1858 44.74 67.00 111.74 9.80 656.60 Non-Registered

49 Non-Registered Harmi 3 1864 15.36 137.92 153.28 9.80 1351.62 Non-Registered

50 Non-Registered Harmi 3 1865 15.36 137.92 153.28 9.80 1351.62 Non-Registered

51 Non-Registered Harmi 3 1870 66.10 94.96 161.06 9.80 930.61 Non-Registered

52 Non-Registered Harmi 3 2352 106.73 156.49 263.22 9.80 1533.60 Non-Registered

53 Non-Registered Harmi 5 1268 15.04 15.04 9.80 147.39 Non-Registered

54 Non-Registered Harmi 5 116 3.57 3.57 9.80 34.99 Non-Registered

55 Non-Registered Harmi 3 1556 0.43 15.80 16.23 9.80 154.84 Non-Registered

56 Non-Registered Harmi 3 1558 111.23 148.30 259.53 9.80 1453.34 Non-Registered

57 Non-Registered Harmi 8 267 15.05 15.05 9.80 147.49 Non-Registered

58 Non-Registered Harmi 4 394 4.00 30.00 34.00 9.80 294.00 Non-Registered

59 Non-Registered Harmi 4 419 3.00 23.00 26.00 9.80 225.40 Non-Registered

60 Non-Registered Aappipal 9 1249 10.52 24.96 35.48 9.80 244.61 Non-Registered

61 Non-Registered Aappipal 9 222 13.00 23.00 36.00 9.80 225.40 Non-Registered

62 Non-Registered Aappipal 9 242 135.48 125.68 261.16 9.80 1231.66 Non-Registered

63 Non-Registered Aappipal 9 292 9.18 9.18 9.80 89.96 Non-Registered Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 64 Non-Registered Aappipal 9 318 2.78 2.78 9.80 27.24 Non-Registered

65 Non-Registered Aappipal 9 246 7.20 20.72 27.92 9.80 203.06 Non-Registered

66 Non-Registered Aappipal 9 308 396.35 564.64 960.99 9.80 5533.47 Non-Registered

67 Non-Registered Aappipal 9 310 84.56 123.00 207.56 9.80 1205.40 Non-Registered

68 Non-Registered Aappipal 9 301 30.00 67.00 97.00 9.80 656.60 Non-Registered

69 Non-Registered Aappipal 9 1014 41.60 120.44 162.04 9.80 1180.31 Non-Registered

70 Non-Registered Aappipal 8 901 89.00 173.00 262.00 9.80 1695.40 Non-Registered

71 Non-Registered Aappipal 8 903 72.00 119.00 191.00 9.80 1166.20 Non-Registered

72 Non-Registered Aappipal 8 902 12.00 46.00 58.00 9.80 450.80 Non-Registered

73 Non-Registered Aappipal 8 143 6.36 6.36 9.80 62.33 Non-Registered

74 Non-Registered Aappipal 8 900 3.00 45.00 48.00 9.80 441.00 Non-Registered

75 Non-Registered Aappipal 8 108 7.00 71.00 78.00 9.80 695.80 Non-Registered

76 Non-Registered Aappipal 8 874 5.00 19.00 24.00 9.80 186.20 Non-Registered

77 Non-Registered Aappipal 8 245 52.00 63.00 115.00 9.80 617.40 Non-Registered

78 Non-Registered Aappipal 8 922 10.00 85.10 95.10 9.80 833.98 Non-Registered

79 Non-Registered Aappipal 8 476 20.00 20.00 9.80 196.00 Non-Registered

80 Non-Registered Aappipal 8 144 7.00 7.00 9.80 68.60 Non-Registered

81 Non-Registered Aappipal 2 715 4.00 80.00 84.00 9.80 784.00 Non-Registered

82 Non-Registered Aappipal 2 668 152.00 217.00 369.00 9.80 2126.60 Non-Registered

83 Non-Registered Aappipal 2 947 208.00 315.00 523.00 9.80 3087.00 Non-Registered

84 Non-Registered Aappipal 2 951 4.00 206.00 210.00 9.80 2018.80 Non-Registered

85 Non-Registered Aappipal 2 1017 2.00 119.00 121.00 9.80 1166.20 Non-Registered

86 Non-Registered Aappipal 3 325 32.00 112.00 144.00 9.80 1097.60 Non-Registered Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 87 Non-Registered Aappipal 3 311 77.00 129.00 206.00 9.80 1264.20 Non-Registered

88 Non-Registered Aappipal 4 395 34.00 34.00 9.80 333.20 Non-Registered

89 Non-Registered Aappipal 4 387 11.00 44.00 55.00 9.80 431.20 Non-Registered

90 Non-Registered Aappipal 4 405 29.00 29.00 9.80 284.20 Non-Registered

91 Non-Registered Aappipal 4 400 15.00 15.00 9.80 147.00 Non-Registered

92 Non-Registered Aappipal 4 209 28.00 150.00 178.00 9.80 1470.00 Non-Registered

93 Non-Registered Aappipal 2 166 28.80 50.90 79.70 9.80 498.82 Non-Registered

94 Non-Registered Aappipal 195 319.00 430.00 749.00 9.80 4214.00 Non-Registered

95 Non-Registered Aappipal 3 161 44.00 43.00 87.00 9.80 421.40 Non-Registered

96 Non-Registered Aappipal 3 162 40.00 69.00 109.00 9.80 676.20 Non-Registered

97 Non-Registered Aappipal 3 228 19.00 40.00 59.00 9.80 392.00 Non-Registered

98 Non-Registered Aappipal 3 237 13.40 57.70 71.10 9.80 565.46 Non-Registered

99 Non-Registered Aappipal 3 226 220.00 281.00 501.00 9.80 2753.80 Non-Registered

100 Non-Registered Aappipal 3 273 16.40 81.60 98.00 9.80 799.68 Non-Registered

101 Non-Registered Aappipal 3 169 7.90 17.60 25.50 9.80 172.48 Non-Registered

102 Non-Registered Aappipal 3 170 28.80 28.80 9.80 282.24 Non-Registered

103 Non-Registered Palungtar 5 45 8.00 8.00 9.80 78.40 Non-Registered

104 Non-Registered Palungtar 5 843 11.00 64.00 75.00 9.80 627.20 Non-Registered

105 Non-Registered Palungtar 5 845 98.90 109.10 208.00 9.80 1069.18 Non-Registered

106 Non-Registered Palungtar 5 295 107.00 182.00 289.00 9.80 1783.60 Non-Registered

107 Non-Registered Palungtar 5 632 128.00 136.00 264.00 9.80 1332.80 Non-Registered

108 Non-Registered Palungtar 5 662 23.00 117.00 140.00 9.80 1146.60 Non-Registered

109 Non-Registered Palungtar 5 665 17.90 17.90 9.80 175.42 Non-Registered Cost Calculation of Crops; Affected HHs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha S.N. Owner Name Land head Household VDC No. Ward Plot no. Affected Exisitng Area, sqm New Cut Area, sqm (sqm) area Affected Total District sqm. per Rate CostTotal NRs Remarks 110 Non-Registered Palungtar 5 679 2.30 2.30 9.80 22.54 Non-Registered

111 Non-Registered Palungtar 5 766 195.00 269.00 464.00 9.80 2636.20 Non-Registered

112 Non-Registered Palungtar 7 1011 11.80 11.80 9.80 115.64 Non-Registered

113 Non-Registered Palungtar 7 1112 6.80 6.80 9.80 66.64 Non-Registered

114 Non-Registered Palungtar 7 1095 16.80 36.90 53.70 9.80 361.62 Non-Registered

115 Non-Registered Palungtar 4 97 112.00 80.00 192.00 9.80 784.00 Non-Registered

116 Non-Registered Palungtar 4 30 4.20 39.30 43.50 9.80 385.14 Non-Registered

117 Non-Registered Palungtar 4 35 22.90 22.90 9.80 224.42 Non-Registered

118 Non-Registered Palungtar 4 85 194.00 298.00 492.00 9.80 2920.40 Non-Registered

119 Non-Registered Palungtar 4 102 159.00 240.00 399.00 9.80 2352.00 Non-Registered

120 Non-Registered Palungtar 4 351 2.00 17.00 19.00 9.80 166.60 Non-Registered

121 Non-Registered Palungtar 4 1899 16.00 31.00 47.00 9.80 303.80 Non-Registered

122 Non-Registered Palungtar 4 1898 0.00 9.00 9.00 9.80 88.20 Non-Registered

123 Non-Registered Palungtar 4 1897 11.00 11.00 9.80 107.80 Non-Registered

124 Non-Registered Palungtar 4 1896 52.00 41.00 93.00 9.80 401.80 Non-Registered

125 Non-Registered Palungtar 4 874 399.00 591.00 990.00 9.80 5791.80 Non-Registered

126 Non-Registered Gaikhur 8 869 239.00 124.00 363.00 9.80 1215.20 Non-Registered

127 Non-Registered Gaikhur 8 28 37.00 55.00 92.00 9.80 539.00 Non-Registered 127 9237.61 15919.01 25156.62 156006.30 2.52 Cost Calculation of Cash Crops; Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha Chainage Market Total SN Name of Owner Address Plot nos. From To Species Unit Quantity rate, NRs Amount Remarks Palungtar Municipality-8, 1 Pahalman Dhoj Malla Luitel, Gorkha 00+065 00+095 Amriso Clumps 33 30 990 Chandraman Palungtar Municipality-8, 2 Shrestha Luitel, Gorkha 00+065 00+095 Amriso Clumps 5 30 150 Amar Jyoti Janta Higher Secondary School, Palungtar-8 Palungtar Municipality-8, 3 ,Gorkha Gorkha 871 00+095 00+210 Amriso Clumps 3 30 90 Mukti Narayan Palungtar Municipality-8, 5 Shrestha Baddada, Gorkha 02+720 02+740 Amriso Clumps 3 30 90 Per clumps avrege 12 Suk Bdr Gurung Thalajung-7, Gorkha 232 23+680 23+730 Cardamom Clumps 15 2000 30000 15 plant 59 31320 *Amriso: Per clumps 20 plants

Page 1 of 1 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total

Palungtar Rit Kumar Municipality-8, 1 00+000 00+065 Shrestha Luitel, Gorkha Gayo 1 90 11 0.5 301.6 301.6 0.3 5.0 0.5 0.1 580.0 74.3 74.3 375.9 Palungtar Rit Kumar Municipality-8, 2 00+000 00+065 Shrestha Luitel, Gorkha Gayo 1 110 10 1.6 904.8 904.8 0.4 5.0 0.5 0.2 580.0 100.9 100.9 1005.7

Palungtar Rit Kumar Municipality-8, 3 00+000 00+065 Shrestha Luitel, Gorkha Saj 1 60 8 0.4 226.2 226.2 0.1 15.0 0.5 0.0 580.0 28.2 28.2 254.4

Palungtar Rit Kumar Municipality-8, 4 00+000 00+065 Shrestha Luitel, Gorkha Bakaino 3 30 3 0.1 75.4 226.2 0.0 5.0 0.5 0.0 580.0 10.0 30.0 256.2

Palungtar Gajendra Pd Municipality-8, 5 00+095 00+130 Shrestha Luitel, Gorkha Sal 1 85 15 0.5 301.6 301.6 0.3 15.0 0.5 0.2 580.0 106.1 106.1 407.7

Palungtar Municipality-8, 6 00+130 00+135 Bimala Shrestha PalungtarLuitel, Gorkha Sal 1 90 15 0.5 301.6 301.6 0.4 15.0 0.5 0.2 580.0 118.9 118.9 420.5 Durganarayan Municipality-8, Buldhya 7 00+135 00+175 Shrestha Luitel, Gorkha ngro 1 210 6 4.0 2320.0 10.0 Palungtar 2320.0 0.8 0.5 0.4 580.0 239.8 239.8 2559.8 Durganarayan Municipality-8, 8 00+175 00+180 Shrestha Luitel, Gorkha Chilaune 1 75 12 0.5 301.6 301.6 0.2 5.0 0.5 0.1 580.0 56.3 56.3 357.9

Palungtar Dharmanarayan Municipality-8, 9 01+490 01+510 Shrestha Archale, Gorkha Gidari 2 80 7 0.5 301.6 603.2 0.1 5.0 0.5 0.1 580.0 37.4 74.7 677.9 Palungtar Municipality-8, 10 01+490 01+510 Buddhilal Shrestha Archale, Gorkha Gidari 1 250 10 13.0 7534.2 7534.2 2.0 10.0 0.5 1.0 580.0 566.4 566.4 8100.6 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total

Palungtar Mangal Kumar Municipality-8, 11 01+640 01+650 Shrestha Archale, Gorkha Gidari 1 210 7 4.0 2320.0 2320.0 1.0 10.0 0.5 0.5 580.0 279.8 279.8 2599.8

Palungtar Mangal Kumar Municipality-8, Khasret 12 01+640 01+650 Shrestha Archale, Gorkha o 1 130 5 2.5 1450.0 1450.0 0.3 5.0 0.5 0.1 580.0 70.5 70.5 1520.5

Palungtar Chijkumar Municipality-8, Shyalph 13 01+650 01+690 Shrestha Archale, Gorkha ushro 1 90 6 0.5 301.6 301.6 0.2 5.0 0.5 0.1 580.0 40.5 40.5 342.1

Palungtar Chijkumar Municipality-8, 14 01+650 01+690 Shrestha Archale, Gorkha Shaj 1 80 17 0.5 301.6 301.6 0.3 5.0 0.5 0.2 580.0 90.7 90.7 392.3

Palungtar Municipality-8, Thakurigaun, 15 01+730 01+740 Ganesh Junj Shaha Gorkha Sal 1 85 12 0.5 301.6 301.6 0.3 5.0 0.5 0.1 580.0 72.3 72.3 373.9

Palungtar Municipality-8, Thakurigaun, 16 01+930 01+930 Lekh Bdr Shaha Gorkha Chilaune 1 40 5 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 6.7 6.7 232.9

Palungtar Municipality-8, Thakurigaun, 17 01+970 02+785 Lekh Bdr Shaha Gorkha Katus 1 40 5 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 6.7 6.7 232.9

Palungtar Municipality-8, Thakurigaun, 18 01+970 02+785 Lekh Bdr Shaha Gorkha Chilaune 2 90 6 0.5 301.6 603.2 0.2 5.0 0.5 0.1 580.0 40.5 81.0 684.2 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total

Palungtar Municipality-8, Thakurigaun, 19 01+970 02+785 Lekh Bdr Shaha Gorkha Chilaune 2 130 8 2.5 1450.0 2900.0 0.4 5.0 0.5 0.2 580.0 105.7 211.4 3111.4

Palungtar Municipality-8, Thakurigaun, 20 01+970 02+785 Lekh Bdr Shaha Gorkha Bakaino 1 40 5 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 6.7 6.7 232.9

Palungtar Municipality-8, Thakurigaun, 21 02+080 02+180 Tul Bdr Shaha Gorkha Chilaune 2 70 10 0.5 301.6 603.2 0.2 5.0 0.5 0.1 580.0 40.9 81.7 684.9

Palungtar Municipality-8, Thakurigaun, 22 02+080 02+180 Tul Bdr Shaha Gorkha Katus 1 40 9 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 12.0 12.0 238.2

Palungtar Municipality-8, Thakurigaun, Bardhya 23 02+080 02+180 Tul Bdr Shaha Gorkha ngro 1 60 8 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 24.0 24.0 250.2

Palungtar Municipality-8, Thakurigaun, 24 02+080 02+180 Tul Bdr Shaha Gorkha Chilaune 1 120 7 1.6 904.8 904.8 0.3 5.0 0.5 0.1 580.0 84.0 84.0 988.8

Palungtar Municipality-8, Thakurigaun, 25 02+080 02+180 Tul Bdr Shaha Gorkha Chilaune 1 70 9 0.5 301.6 301.6 0.1 5.0 0.5 0.1 580.0 36.8 36.8 338.4 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total

Palungtar Municipality-8, Thakurigaun, 26 02+080 02+180 Tul Bdr Shaha Gorkha Chilaune 1 65 7 0.5 301.6 301.6 0.1 5.0 0.5 0.0 580.0 24.7 24.7 326.3

Palungtar Municipality-8, Thakurigaun, 27 02+080 02+180 Tul Bdr Shaha Gorkha Chilaune 1 41 10 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 14.0 14.0 240.2 Palungtar Municipality-8, Baddada, Bardhya 28 02+290 02+340 Budhe Bk Gorkha ngro 1 50 9 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 18.8 18.8 245.0 Palungtar Municipality-8, Baddada, 29 02+290 02+340 Budhe Bk Gorkha Chilaune 1 30 6 0.1 75.4 75.4 0.0 5.0 0.5 0.0 580.0 10.0 10.0 85.4 Palungtar Municipality-8, Baddada, 30 02+290 02+340 Budhe Bk Gorkha Chilaune 1 240 13 4.0 2320.0 2320.0 2.3 10.0 0.5 1.2 580.0 678.6 678.6 2998.6 Palungtar Municipality-8, Baddada, 31 02+380 02+390 Bhim Bdr BK Gorkha Tanki 1 110 14 1.6 904.8 904.8 0.5 5.0 0.5 0.2 580.0 141.2 141.2 1046.0 Palungtar Municipality-8, Baddada, 32 02+380 02+390 Bhim Bdr BK Gorkha Kapro 1 190 14 4.0 2320.0 2320.0 1.6 10.0 0.5 0.8 580.0 458.0 458.0 2778.0 Palungtar Municipality-8, Baddada, 33 02+470 02+540 Purna Bdr Sarki Gorkha Tanki 1 50 6 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 12.5 12.5 238.7 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Palungtar Municipality-8, Baddada, 34 02+470 02+540 Purna Bdr Sarki Gorkha Bakaino 1 40 7 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 9.3 9.3 235.5 Palungtar Municipality-8, Baddada, 35 02+470 02+540 Purna Bdr Sarki Gorkha Tanki 1 30 5 0.1 75.4 75.4 0.0 5.0 0.5 0.0 580.0 10.0 10.0 85.4 Palungtar Municipality-8, Baddada, Bardhya 36 02+470 02+540 Purna Bdr Sarki Gorkha ngro 1 35 7 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 7.1 7.1 233.3 Palungtar Municipality-8, Baddada, 37 02+470 02+540 Purna Bdr Sarki Gorkha Khirro 1 50 6 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 12.5 12.5 238.7 Palungtar Municipality-8, Baddada, Dabdab 38 02+600 02+600 Tulsi Shrestha Gorkha e 1 50 6 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 12.5 12.5 238.7 Palungtar Municipality-8, Baddada, Dabdab 39 02+600 02+720 Baburam Shrestha Gorkha e 1 35 5 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 10.0 10.0 236.2 Palungtar Municipality-8, Baddada, 40 02+600 02+720 Baburam Shrestha Gorkha Tuni 1 75 14 0.5 301.6 301.6 0.2 0.4 0.1 580.0 59.9 59.9 361.5 Palungtar Municipality-8, Baddada, 41 02+600 02+720 Baburam Shrestha Gorkha Harro 1 80 13 0.5 301.6 301.6 0.3 5.0 0.5 0.1 580.0 69.4 69.4 371.0 Palungtar Municipality-8, Baddada, 42 02+600 02+720 Baburam Shrestha Gorkha Tuni 1 80 15 0.5 301.6 301.6 0.3 5.0 0.5 0.1 580.0 80.0 80.0 381.6 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Palungtar Municipality-8, Baddada, 43 02+600 02+720 Baburam Shrestha Gorkha Barro 1 85 18 0.5 301.6 301.6 0.4 8.0 0.5 0.2 580.0 114.1 114.1 415.7 Palungtar Municipality-8, Baddada, 44 02+600 02+720 Baburam Shrestha Gorkha Tuni 1 90 15 0.5 301.6 301.6 0.4 5.0 0.5 0.2 580.0 101.3 101.3 402.9 Palungtar Municipality-8, Baddada, Dabdab 45 02+600 02+720 Baburam Shrestha Gorkha e 1 41 20 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 28.0 28.0 254.2 Palungtar Municipality-8, Baddada, Dabdab 46 02+600 02+720 Baburam Shrestha Gorkha e 1 250 20 13.0 7534.2 7534.2 3.9 10.0 0.5 2.0 580.0 1132.8 1132.8 8667.0 Palungtar Municipality-8, Mukti Narayan Baddada, Dabdab 47 02+720 02+740 Shrestha Gorkha e 2 60 7 0.4 226.2 452.4 0.1 5.0 0.5 0.0 580.0 21.0 42.0 494.4 Palungtar Municipality-8, Mukti Narayan Baddada, 48 02+720 02+740 Shrestha Gorkha Tuni 1 60 13 0.4 226.2 226.2 0.1 5.0 0.5 0.1 580.0 39.0 39.0 265.2 Palungtar Municipality-8, Baddada, Dabdab 49 02+800 02+805 Badri Shrestha Gorkha e 1 70 9 0.5 301.6 301.6 0.1 5.0 0.5 0.1 580.0 36.8 36.8 338.4 Palungtar Municipality-11, Bohora Gaun, 50 05+300 05+350 Lal Bdr Shrestha Gorkha Kapro 1 410 20 41.7 24168.6 24168.6 10.5 10.0 0.5 5.3 580.0 3046.8 3046.8 27215.4 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total

Palungtar Municipality-13, Darkhepani, 51 07+340 07+510 Teksing Thakuri Gorkha Chilaune 1 75 9 0.5 301.6 301.6 0.2 10.0 0.5 0.1 580.0 45.9 45.9 347.5

Palungtar Municipality-13, Darkhepani, 52 07+340 07+510 Teksing Thakuri Gorkha Katus 1 80 7 0.5 301.6 301.6 0.1 10.0 0.5 0.1 580.0 40.6 40.6 342.2

Palungtar Municipality-13, Darkhepani, 53 07+340 07+510 Teksing Thakuri Gorkha Chilaune 1 100 13 1.6 904.8 904.8 0.4 10.0 0.5 0.2 580.0 117.8 117.8 1022.6

Palungtar Municipality-13, Darkhepani, 54 07+340 07+510 Teksing Thakuri Gorkha Katus 1 55 7 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 17.7 17.7 243.9

Palungtar Municipality-13, Bijulidanda, 55 08+150 08+180 Naresh Thakuri Gorkha Chilaune 1 70 10 0.5 301.6 301.6 0.2 10.0 0.5 0.1 580.0 44.4 44.4 346.0

Palungtar Municipality-13, Bijulidanda, 56 08+150 08+180 Naresh Thakuri Gorkha Tanki 1 30 6 0.1 75.4 75.4 0.0 10.0 0.5 0.0 580.0 10.0 10.0 85.4

Palungtar Municipality-13, Ramchandra Bijulidanda, 57 09+330 09+335 Thakuri Gorkha Kutmero 1 40 5 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 6.7 6.7 232.9 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Palungtar Shambhulal Municipality-13, 58 10+320 10+400 Shrestha Gorkha Chilaune 1 70 6 0.5 301.6 301.6 0.1 10.0 0.5 0.0 580.0 26.6 26.6 328.2 Palungtar Shambhulal Municipality-13, 59 10+320 10+400 Shrestha Gorkha Chilaune 1 120 15 1.6 904.8 904.8 0.7 10.0 0.5 0.3 580.0 195.8 195.8 1100.6 Palungtar Shambhulal Municipality-13, 60 10+320 10+400 Shrestha Gorkha Chilaune 1 60 5 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 15.0 15.0 241.2 Palungtar Municipality-13, 61 10+465 10+510 Lila Shrestha Gorkha Chilaune 1 130 12 2.5 1450.0 1450.0 0.6 10.0 0.5 0.3 580.0 183.8 183.8 1633.8 Palungtar Municipality-13, 62 10+465 10+510 Lila Shrestha Gorkha Chilaune 1 85 8 0.5 301.6 301.6 0.2 5.0 0.5 0.1 580.0 48.2 48.2 349.8

63 12+280 12+300 Bakhat Bdr Pariyar Harmi-3, Gorkha Chilaune 2 40 6 0.4 226.2 452.4 0.0 5.0 0.5 0.0 580.0 8.0 16.0 468.4

64 12+340 12+380 Jip Bdr Thapa Harmi-3, Gorkha Chilaune 5 50 10 0.4 226.2 1131.0 0.1 10.0 0.5 0.0 580.0 22.7 113.3 1244.3

65 12+340 12+380 Jip Bdr Thapa Harmi-3, Gorkha Chilaune 1 80 12 0.5 301.6 301.6 0.2 10.0 0.5 0.1 580.0 69.6 69.6 371.2

66 12+440 12+580 Om Bdr Thapa Harmi-3, Gorkha Chilaune 3 40 11 0.4 226.2 678.6 0.1 5.0 0.5 0.0 580.0 14.7 44.0 722.6

67 12+440 12+580 Om Bdr Thapa Harmi-3, Gorkha Katus 1 70 16 0.5 301.6 301.6 0.2 5.0 0.5 0.1 580.0 65.4 65.4 367.0

68 12+440 12+580 Om Bdr Thapa Harmi-3, Gorkha Chilaune 2 40 11 0.4 226.2 452.4 0.1 5.0 0.5 0.0 580.0 14.7 29.3 481.7

69 12+440 12+580 Om Bdr Thapa Harmi-3, Gorkha Katus 1 50 12 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 25.0 25.0 251.2

Krishna Pd Dabdab 70 13+300 13+320 Sapkota (Bharat) Harmi-3, Gorkha e 2 90 17 0.5 301.6 603.2 0.4 10.0 0.5 0.2 580.0 124.8 249.6 852.8

Krishna Pd Panchpa 71 13+300 13+320 Sapkota (Bharat) Harmi-3, Gorkha te 1 90 18 0.5 301.6 301.6 0.5 10.0 0.5 0.2 580.0 132.1 132.1 433.7 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Bishnu maya 72 13+560 13+570 Sapkota Harmi-3, Gorkha Tidu 1 270 25 13.0 7534.2 7534.2 5.7 15.0 0.5 3.1 580.0 1783.8 1783.8 9318.0 Bishnu maya 73 13+560 13+570 Sapkota Harmi-3, Gorkha Kapro 1 60 7 0.4 226.2 226.2 0.1 10.0 0.5 0.0 580.0 22.8 22.8 249.0

74 13+690 13+710 Yubanath Shrestha Harmi-3, Gorkha Khanyu 1 35 5 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 10.0 10.0 236.2

75 13+690 13+710 Yubanath Shrestha Harmi-3, Gorkha Khanyu 1 60 11 0.4 226.2 226.2 0.1 5.0 0.5 0.1 580.0 33.0 33.0 259.2 Damber Kumari 76 14+070 14+080 Dhakal Harmi-3, Gorkha Kapro 1 60 7 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 21.0 21.0 247.2 Asare 77 14+140 14+160 Hemraj Dhakal Harmi-3, Gorkha Phul 1 35 10 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 10.2 10.2 236.4

78 14+140 14+160 Hemraj Dhakal Harmi-3, Gorkha Bohori 1 40 11 0.4 226.2 226.2 0.1 6.0 0.5 0.0 580.0 14.9 14.9 241.1

79 14+140 14+160 Hemraj Dhakal Harmi-3, Gorkha Bohori 1 230 20 4.0 2320.0 2320.0 3.3 15.0 0.5 1.8 580.0 1035.5 1035.5 3355.5 Dabdab 80 14+400 14+410 Dibash Dhakal Harmi-9, Gorkha e 1 60 10 0.4 226.2 226.2 0.1 10.0 0.5 0.1 580.0 32.6 32.6 258.8

81 14+400 14+410 Dibash Dhakal Harmi-9, Gorkha Kapro 1 100 15 1.6 904.8 904.8 0.5 10.0 0.5 0.2 580.0 135.9 135.9 1040.7

82 14+400 14+410 Dibash Dhakal Harmi-9, Gorkha Kapro 1 60 6 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 18.0 18.0 244.2

83 14+535 14+540 Hari Dhakal Harmi-9, Gorkha Uttis 1 80 20 0.5 301.6 301.6 0.4 5.0 0.5 0.2 580.0 106.7 106.7 408.3

84 14+535 14+540 Hari Dhakal Harmi-9, Gorkha Uttis 1 60 15 0.4 226.2 226.2 0.2 5.0 0.5 0.1 580.0 45.0 45.0 271.2 Chandrakanta 85 14+770 14+780 Dhakal Harmi-9, Gorkha Uttis 1 60 16 0.4 226.2 226.2 0.2 5.0 0.5 0.1 580.0 48.0 48.0 274.2 Chandrakanta 86 14+770 14+780 Dhakal Harmi-9, Gorkha Khanyu 2 70 11 0.5 301.6 603.2 0.2 5.0 0.5 0.1 580.0 44.9 89.9 693.1

87 15+170 15+180 Mira Nepali Harmi-9, Gorkha Chilaune 1 120 13 1.6 904.8 904.8 0.6 10.0 0.5 0.3 580.0 169.7 169.7 1074.5

88 15+770 15+780 Kajiram Dankuti Harmi-9, Gorkha Chuletro 1 75 7 0.5 301.6 301.6 0.1 5.0 0.5 0.1 580.0 32.8 32.8 334.4 Chhoprak-1, 89 18+500 18+560 Shanta Giri Gorkha Chilaune 3 80 12 0.5 301.6 904.8 0.2 5.0 0.5 0.1 580.0 64.0 192.1 1096.9 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Bhoj Bdr Chhoprak-1, 90 18+500 18+560 Ranamagar Gorkha Chilaune 3 130 16 2.5 1450.0 4350.0 0.8 10.0 0.5 0.4 580.0 245.1 735.2 5085.2 Chandra Bdr Chhoprak-1, 91 19+120 19+130 Gurung Gorkha Chilaune 1 90 13 0.5 301.6 301.6 0.3 10.0 0.5 0.2 580.0 95.4 95.4 397.0 Chhoprak-1, 92 19+190 19+200 Indra Bdr Gurung Gorkha Chilaune 1 40 12 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 16.0 16.0 242.2 Chhoprak-1, 93 19+260 19+270 Indra Bdr Gurung Gorkha Lankuri 2 90 15 0.5 301.6 603.2 0.4 10.0 0.5 0.2 580.0 110.1 220.2 823.4 Chhoprak-1, 94 19+300 19+320 Ishwori Gurung Gorkha Dudhilo 1 40 9 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 12.0 12.0 238.2 Nandamaya Chhoprak-1, 95 10+840 19+850 Gurung Gorkha Dudhilo 1 90 12 0.5 301.6 301.6 0.3 10.0 0.5 0.2 580.0 88.1 88.1 389.7 Chhoprak-1, 96 20+320 20+340 Maitakauri Gurung Gorkha Lankuri 1 70 20 0.5 301.6 301.6 0.3 10.0 0.5 0.2 580.0 88.8 88.8 390.4 Chhoprak-1, 97 20+360 20+370 Maitakauri Gurung Gorkha Malato 1 70 11 0.5 301.6 301.6 0.2 5.0 0.5 0.1 580.0 44.9 44.9 346.5 Chhoprak-1, 98 20+380 20+400 Naina Bdr Gurung Gorkha Tidu 1 60 15 0.4 226.2 226.2 0.2 10.0 0.5 0.1 580.0 48.9 48.9 275.1 Chhoprak-1, 99 20+480 20+500 Buddhibal Gurung Gorkha Uttis 1 35 10 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 10.2 10.2 236.4 Chhoprak-1, 100 20+480 20+500 Bel Bdr Gurung Gorkha Faleto 1 100 13 1.6 904.8 904.8 0.4 10.0 0.5 0.2 580.0 117.8 117.8 1022.6 Chhoprak-1, 101 20+560 20+580 Dilmaya Gurung Gorkha Nebaro 1 60 7 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 21.0 21.0 247.2 Chhoprak-1, 102 20+720 20+740 Thakur Pd Gurung Gorkha Chilaune 2 90 12 0.5 301.6 603.2 0.3 10.0 0.5 0.2 580.0 88.1 176.2 779.4 Chhoprak-1, 103 20+720 20+740 Thakur Pd Gurung Gorkha Uttis 1 30 10 0.1 75.4 75.4 0.0 5.0 0.5 0.0 580.0 7.5 7.5 82.9 Thalajung-1, 104 21+120 21+125 Laxmi Gurung Gorkha Uttis 1 60 10 0.4 226.2 226.2 0.1 5.0 0.5 0.1 580.0 30.0 30.0 256.2 Thalajung-1, 105 21+300 21+310 Rana Bdr Gurung Gorkha Khanyu 1 90 8 0.5 301.6 301.6 0.2 5.0 0.5 0.1 580.0 54.0 54.0 355.6 Thalajung-1, 106 21+340 21+350 Chitra Bdr Gurung Gorkha Dudhilo 1 50 7 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 14.6 14.6 240.8 Thalajung-1, 107 21+340 21+350 Chitra Bdr Gurung Gorkha Khanyu 1 35 11 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 11.2 11.2 237.4 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Thalajung-1, 108 21+350 21+400 Uddhav Gurung Gorkha Uttis 5 40 12 0.4 226.2 1131.0 0.1 5.0 0.5 0.0 580.0 16.0 80.0 1211.0 Thalajung-1, 109 21+350 21+400 Uddhav Gurung Gorkha Uttis 1 60 16 0.4 226.2 226.2 0.2 5.0 0.5 0.1 580.0 48.0 48.0 274.2 Thalajung-1, 110 21+420 21+540 Aash Bdr Gurung Gorkha Uttis 1 30 15 0.1 75.4 75.4 0.0 5.0 0.5 0.0 580.0 11.3 11.3 86.7 Thalajung-1, 111 21+420 21+540 Aash Bdr Gurung Gorkha Uttis 10 30 18 0.1 75.4 754.0 0.1 10.0 0.5 0.0 580.0 14.7 146.8 900.8 Thalajung-1, 112 21+420 21+540 Aash Bdr Gurung Gorkha Uttis 19 60 15 0.4 226.2 4297.8 0.2 10.0 0.5 0.1 580.0 48.9 929.8 5227.6 Thalajung-1, 113 21+420 21+540 Aash Bdr Gurung Gorkha Malato 1 70 16 0.5 301.6 301.6 0.2 8.0 0.5 0.1 580.0 68.8 68.8 370.4 Thalajung-1, 114 21+580 21+621 Yem Bdr Gurung Gorkha Uttis 5 50 14 0.4 226.2 1131.0 0.1 10.0 0.5 0.1 580.0 31.7 158.6 1289.6 Thalajung-1, 115 21+710 21+840 Ram Bdr Gurung Gorkha Chilaune 1 50 11 0.4 226.2 226.2 0.1 10.0 0.5 0.0 580.0 24.9 24.9 251.1 Thalajung-1, 116 21+710 21+840 Ram Bdr Gurung Gorkha Chilaune 1 110 13 1.6 904.8 904.8 0.5 10.0 0.5 0.2 580.0 142.6 142.6 1047.4 Thalajung-1, 117 21+710 21+840 Ram Bdr Gurung Gorkha Panyale 1 50 12 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 25.0 25.0 251.2 Thalajung-1, 118 21+710 21+840 Ram Bdr Gurung Gorkha Uttis 1 70 17 0.5 301.6 301.6 0.3 5.0 0.5 0.1 580.0 69.5 69.5 371.1 Thalajung-1, 119 21+710 21+840 Ram Bdr Gurung Gorkha Malato 1 65 15 0.5 301.6 301.6 0.2 5.0 0.5 0.1 580.0 52.8 52.8 354.4 Thalajung-2, Siplikan 120 22+800 22+820 Dip Bdr Gurung Gorkha e 1 120 16 1.6 904.8 904.8 0.7 10.0 0.5 0.4 580.0 208.8 208.8 1113.6 Thalajung-2, Siplikan 121 22+800 22+820 Dip Bdr Gurung Gorkha e 1 70 12 0.5 301.6 301.6 0.2 8.0 0.5 0.1 580.0 51.6 51.6 353.2 Thalajung-7, 122 23+150 23+200 Bel Bdr Gurung Gorkha Dudhilo 1 60 12 0.4 226.2 226.2 0.1 10.0 0.5 0.1 580.0 39.2 39.2 265.4 Thalajung-7, 123 23+150 23+200 Bel Bdr Gurung Gorkha Uttis 1 40 11 0.4 226.2 226.2 0.1 10.0 0.5 0.0 580.0 16.0 16.0 242.2 Thalajung-7, 124 23+150 23+200 Bel Bdr Gurung Gorkha Chilaune 2 60 14 0.4 226.2 452.4 0.2 10.0 0.5 0.1 580.0 45.7 91.4 543.8 Thalajung-7, 125 23+200 23+300 Nara Bdr Gurung Gorkha Kafal 1 70 15 0.5 301.6 301.6 0.2 10.0 0.5 0.1 580.0 66.6 66.6 368.2 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Thalajung-7, 126 23+200 23+300 Nara Bdr Gurung Gorkha Uttis 1 60 16 0.4 226.2 226.2 0.2 10.0 0.5 0.1 580.0 52.2 52.2 278.4 Thalajung-7, 127 23+200 23+300 Nara Bdr Gurung Gorkha Chilaune 1 45 12 0.4 226.2 226.2 0.1 10.0 0.5 0.0 580.0 22.0 22.0 248.2 Thalajung-7, 128 23+200 23+300 Nara Bdr Gurung Gorkha Chilaune 1 60 13 0.4 226.2 226.2 0.1 10.0 0.5 0.1 580.0 42.4 42.4 268.6 Thalajung-7, 129 23+200 23+300 Nara Bdr Gurung Gorkha Uttis 1 30 8 0.1 75.4 75.4 0.0 10.0 0.5 0.0 580.0 6.5 6.5 81.9 Thalajung-7, 130 23+420 23+440 Kamansing Gurung Gorkha Uttis 2 40 8 0.4 226.2 452.4 0.0 10.0 0.5 0.0 580.0 11.6 23.2 475.6 Thalajung-7, 131 23+480 23+490 Jog Bdr Gurung Gorkha Chilaune 1 60 9 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 27.0 27.0 253.2 Thalajung-7, 132 23+560 23+570 Chak Bdr Gurung Gorkha Chilaune 1 120 18 1.6 904.8 904.8 0.8 10.0 0.5 0.4 580.0 234.9 234.9 1139.7 Thalajung-7, 133 23+680 23+730 Suk Bdr Gurung Gorkha Khari 1 60 5 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 15.0 15.0 241.2 Thalajung-7, 134 23+680 23+730 Suk Bdr Gurung Gorkha Uttis 2 70 10 0.5 301.6 603.2 0.2 5.0 0.5 0.1 580.0 40.9 81.7 684.9 Thalajung-7, 135 23+730 23+740 Yukta Man Gurung Gorkha Uttis 1 60 9 0.4 226.2 226.2 0.1 10.0 0.5 0.1 580.0 29.4 29.4 255.6 Thalajung-7, 136 24+295 25+295 Sanu Gurung Gorkha Malato 1 50 15 0.4 226.2 226.2 0.1 10.0 0.5 0.1 580.0 34.0 34.0 260.2 Thalajung-9, 137 24+850 24+890 Padam Gurung Gorkha Chilaune 2 40 11 0.4 226.2 452.4 0.1 10.0 0.5 0.0 580.0 16.0 31.9 484.3 Thalajung-9, 138 24+850 24+890 Padam Gurung Gorkha Chilaune 2 60 12 0.4 226.2 452.4 0.1 10.0 0.5 0.1 580.0 39.2 78.3 530.7 Thalajung-9, 139 24+850 24+890 Padam Gurung Gorkha Malato 2 40 13 0.4 226.2 452.4 0.1 10.0 0.5 0.0 580.0 18.9 37.7 490.1 Thalajung-9, 140 25+800 25+840 Dil Bdr Gurung Gorkha Dudhilo 1 40 5 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 6.7 6.7 232.9 Thalajung-9, 141 25+800 25+840 Dil Bdr Gurung Gorkha Uttis 1 40 11 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 14.7 14.7 240.9 Thalajung-9, 142 25+800 25+840 Dil Bdr Gurung Gorkha Chilaune 1 60 15 0.4 226.2 226.2 0.2 10.0 0.5 0.1 580.0 48.9 48.9 275.1 Thalajung-9, 143 25+860 25+960 Chitra Bdr Gurung Gorkha Uttis 1 70 18 0.5 301.6 301.6 0.3 10.0 0.5 0.1 580.0 79.9 79.9 381.5 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Thalajung-9, 144 25+860 25+960 Chitra Bdr Gurung Gorkha Uttis 3 30 11 0.1 75.4 226.2 0.0 5.0 0.5 0.0 580.0 8.3 24.8 251.0 Thalajung-9, 145 25+860 25+960 Chitra Bdr Gurung Gorkha Uttis 5 45 12 0.4 226.2 1131.0 0.1 5.0 0.5 0.0 580.0 20.3 101.3 1232.3 Thalajung-9, 146 25+960 25+980 Dil Bdr Gurung Gorkha Uttis 2 40 12 0.4 226.2 452.4 0.1 5.0 0.5 0.0 580.0 16.0 32.0 484.4 Thalajung-9, 147 25+960 25+980 Dil Bdr Gurung Gorkha Uttis 2 60 18 0.4 226.2 452.4 0.2 5.0 0.5 0.1 580.0 54.0 108.1 560.5 Thalajung-9, 148 26+090 26+100 Kamal Bdr Gurung Gorkha Dudhilo 1 60 8 0.4 226.2 226.2 0.1 10.0 0.5 0.0 580.0 26.1 26.1 252.3 Thalajung-9, 149 26+140 26+150 Kamal Bdr Gurung Gorkha Uttis 1 40 8 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 10.7 10.7 236.9 Thalajung-9, 150 26+330 02+400 Gana Bdr Gurung Gorkha Chilaune 1 70 15 0.5 301.6 301.6 0.2 10.0 0.5 0.1 580.0 66.6 66.6 368.2 Thalajung-9, 151 26+330 02+400 Gana Bdr Gurung Gorkha Uttis 1 40 15 0.4 226.2 226.2 0.1 5.0 0.5 0.0 580.0 20.0 20.0 246.2 Thalajung-9, 152 26+330 02+400 Gana Bdr Gurung Gorkha Uttis 1 30 12 0.1 75.4 75.4 0.0 5.0 0.5 0.0 580.0 9.0 9.0 84.4 Thalajung-9, 153 26+330 02+400 Gana Bdr Gurung Gorkha Uttis 1 60 15 0.4 226.2 226.2 0.2 10.0 0.5 0.1 580.0 48.9 48.9 275.1 Thalajung-9, 154 26+520 26+530 Purna Bdr Gurung Gorkha Uttis 3 35 10 0.4 226.2 678.6 0.0 6.0 0.5 0.0 580.0 10.4 31.2 709.8 Thalajung-9, 155 26+580 26+600 Birman Gurung Gorkha Uttis 1 30 12 0.1 75.4 75.4 0.0 5.0 0.5 0.0 580.0 9.0 9.0 84.4 Thalajung-9, 156 27+030 27+100 Bal Bdr BK Gorkha Uttis 1 30 10 0.1 75.4 75.4 0.0 5.0 0.5 0.0 580.0 7.5 7.5 82.9 Thalajung-9, 157 27+030 27+100 Bal Bdr BK Gorkha Uttis 4 40 15 0.4 226.2 904.8 0.1 5.0 0.5 0.0 580.0 20.0 80.0 984.8 Thalajung-9, 158 27+190 27+210 Bhoj Bdr Gurung Gorkha Dudhilo 1 150 6 2.5 1450.0 1450.0 0.4 10.0 0.5 0.2 580.0 122.3 122.3 1572.3 Ganesh Bdr Thalajung-9, 159 27+190 27+210 Gurung Gorkha Futo 1 100 8 1.6 904.8 904.8 0.3 10.0 0.5 0.1 580.0 72.5 72.5 977.3 Ganesh Bdr Thalajung-9, 160 27+190 27+210 Gurung Gorkha Panyu 1 60 7 0.4 226.2 226.2 0.1 10.0 0.5 0.0 580.0 22.8 22.8 249.0 Thalajung-9, 161 27+190 27+210 Bhoj Bdr Gurung Gorkha Futo 1 50 5 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 10.4 10.4 236.6 Cost Calculation of Private Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N Chainage of Name Land Owner Address Species of No. trees Girth (cm) Height (m) days Man Harvestin Cost g Total Harvestin Cost g Volume (m3) Distance (m) MDs/cum MDs/ Tree District Rate Volume Cost Transport Cost ation Cost Total Ganesh Bdr Thalajung-9, 162 27+240 27+250 Gurung Gorkha Dudhilo 1 70 6 0.5 301.6 301.6 0.1 10.0 0.5 0.0 580.0 26.6 26.6 328.2 Thalajung-9, 163 27+600 27+640 Rudra Bdr Gurung Gorkha Uttis 1 35 6 0.4 226.2 226.2 0.0 5.0 0.5 0.0 580.0 6.1 6.1 232.3 Jaubari-5, Siplikan 164 27+800 27+940 Tek Man Gurung Gorkha e 1 110 12 1.6 904.8 904.8 0.5 10.0 0.5 0.2 580.0 131.6 131.6 1036.4 Jaubari-5, 165 27+800 27+940 Tek Man Gurung Gorkha Uttis 11 30 9 0.1 75.4 829.4 0.0 5.0 0.5 0.0 580.0 6.8 74.3 903.7 Jaubari-5, 166 27+800 27+940 Tek Man Gurung Gorkha Dudhilo 1 110 12 1.6 904.8 904.8 0.5 10.0 0.5 0.2 580.0 131.6 131.6 1036.4 Jaubari-5, 167 27+800 27+940 Tek Man Gurung Gorkha Uttis 5 30 13 0.1 75.4 377.0 0.0 5.0 0.5 0.0 580.0 9.8 48.8 425.8 Ganesh Bdr Jaubari-5, 168 27+970 28+100 Gurung Gorkha Chilaune 5 40 11 0.4 226.2 1131.0 0.1 10.0 0.5 0.0 580.0 16.0 79.8 1210.8 Ganesh Bdr Jaubari-5, 169 27+970 28+100 Gurung Gorkha Chilaune 1 40 12 0.4 226.2 226.2 0.1 6.0 0.5 0.0 580.0 16.3 16.3 242.5 Ganesh Bdr Jaubari-5, 170 27+970 28+100 Gurung Gorkha Katus 1 35 5 0.4 226.2 226.2 0.0 6.0 0.5 0.0 580.0 10.0 10.0 236.2 Ganesh Bdr Jaubari-5, 171 27+970 28+100 Gurung Gorkha Uttis 1 30 9 0.1 75.4 75.4 0.0 5.0 0.5 0.0 580.0 6.8 6.8 82.2 Ganesh Bdr Jaubari-5, 172 27+970 28+100 Gurung Gorkha Uttis 4 40 12 0.4 226.2 904.8 0.1 10.0 0.5 0.0 580.0 17.4 69.6 974.4 Jaubari-5, 173 28+100 28+280 Masino Gurung Gorkha Chilaune 5 40 12 0.4 226.2 1131.0 0.1 10.0 0.5 0.0 580.0 17.4 87.0 1218.0 Jaubari-5, 174 28+100 28+280 Masino Gurung Gorkha Chilaune 4 60 8 0.4 226.2 904.8 0.1 10.0 0.5 0.0 580.0 26.1 104.4 1009.2 Jaubari-5, 175 28+100 28+280 Masino Gurung Gorkha Chilaune 1 90 11 0.5 301.6 301.6 0.3 10.0 0.5 0.1 580.0 80.7 80.7 382.3 Jaubari-5, 176 28+100 28+280 Masino Gurung Gorkha Angeri 2 40 8 0.4 226.2 452.4 0.0 5.0 0.5 0.0 580.0 10.7 21.3 473.7 Jaubari-5, 177 28+100 28+280 Masino Gurung Gorkha Guransh 3 60 6 0.4 226.2 678.6 0.1 10.0 0.5 0.0 580.0 19.6 58.7 737.3 Jaubari-5, 178 28+100 28+280 Masino Gurung Gorkha Chilaune 1 60 8 0.4 226.2 226.2 0.1 10.0 0.5 0.0 580.0 26.1 26.1 252.3 Jaubari-5, 179 28+100 28+280 Masino Gurung Gorkha Guransh 3 90 7 0.5 301.6 904.8 0.2 10.0 0.5 0.1 580.0 51.4 154.2 1059.0 5 4 3 2 1 11 10 9 8 7 6 Cost Cost Calculation of Fruits Trees; Luitel-Aapipal-Harmibhanjyang-Thalajung SN Shrestha Baburam Sarki Bdr Purna Sarki Bdr Purna Sarki Bdr Purna BK Bdr Bhim Damai Bdr Dil ,Gorkha Palungtar-8 School, Secondary JantaHigher JyotiAmar ,Gorkha Palungtar-8 School, Secondary JantaHigher JyotiAmar DhojMalla Pahalman Shrestha RitKumar Shrestha RitKumar Name of Owner 8, Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Address 26002+700 02+650 02+540 02+500 02+540 02+500 02+540 02+500 02+380 02+370 02+360 02+350 00+350 00+350 00+150 00+095 00+095 00+065 00+065 00+000 00+065 00+000 From Chainage

To Banana Mango Guava Pineapple Banana Papaya Guava Banana Banana Mango Pineapple Species 942 943 15 95 95 94 107 871 871 Plot no 0 0 1 0 3 5 1 1 1 9 1 1 8 0 Fruit Bearing (Fal 14 45 12 1 faleko) Fal Fruit not Bearing ( -Bacheck Road sub project, Gorkha nafaleko ) 14 1 3 50 13 1 1 1 10 1 8 Total Tree 1/1.5 2 4 5 1.5 1 4 2 3 8 1 1 Age 010 3000 1000 10 550500 Dozan12 500 15 Dozen10 1400 2000 20 Production Kg (annual/Tree) 0 7000 500 7000 2000 0 500 500 0 5000 700 6500 500 1000 1000 5000 500 800 700 Rate/kg

Total Amount NRs. 22 21 20 16 18 17 15 14 13 12 19 Cost Cost Calculation of Fruits Trees; Luitel-Aapipal-Harmibhanjyang-Thalajung SN School Secondary Higher Janajyoti DipGurung DipGurung Sapkota Bdr Prem Sapkota Kumari Bhim WardOffice Basel Bdr Min Shresthan Muktinaraya Shresthan Muktinaraya Shrestha Baburam Shrestha Baburam Name of Owner Gorkha Chipleti, Jaubari-5, Gorkha Thalajung-2, Gorkha Thalajung-2, Gorkha Harmi-3, Gorkha Harmi-3, Gorkha13, Municipality- Palungtar Gorkha11, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Gorkha8, Municipality- Palungtar Total Address 83028+340 28+330 22+820 22+800 22+820 22+800 13+900 13+890 13+280 13+260 10+660 10+650 05+350 05+300 02+740 02+720 02+740 02+720 02+700 02+650 02+700 02+650 From Chainage

To (Mungre) Banana Jackfruit Mango Guava (Naspati) Apple (Naspati) Apple da) (Arubakha Plum re) (Halimung Banana Guava Bhogate Banana Species 123 123 15 15 Plot no 1 1 1 2 1 2 1 1 2 1 1 9 1 Fruit Bearing (Fal 2 13 faleko) Fal Fruit not Bearing ( -Bacheck Road sub project, Gorkha nafaleko ) 1 1 1 2 3 2 1 14 3 4 86 142 1 10 Total Tree 5 5 4 05 0 500 500 50 10 2 4 3 02050500 6 500 200 20 020503334 500 200 10 Age 050500 500 30 510 2000 1000 15 Dozen15 2501500 500 12 567.5 Dozen5 Production Kg (annual/Tree) 0 300 300 006000 2000 3000 1000 0 7000 500 70 67334 17700 5000 500 Rate/kg

Total Amount NRs. Cost Calculation of CFUGs Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha Chainag e S. N S. of Name CFUGs Species of No. trees Girth (cm) Height (m) Man days Harvesti Cost ng Total Harvesti Cost ng Volume (m3) Distance (m) MDs/cu m MDs/ Tree District Rate Volume Cost Transpor tation Cost Total Cost

00+230 00+235 Sal 1 15 10 0.1 75.4 75.4 0.0 15 0.5 0.0 580.0 10.0 10.0 85.4 00+250 00+260 Sal 1 70 15 0.5 301.6 301.6 0.2 10 0.5 0.1 580.0 66.6 66.6 368.2 00+060 00+270 Sal 1 80 15 0.5 301.6 301.6 0.3 15 0.5 0.2 580.0 94.0 94.0 395.6 Aamdanda 00+270 00+300 Sal 1 70 15 0.5 301.6 301.6 0.2 30 0.7 0.2 580.0 87.9 87.9 389.5 Community 00+300 00+330 Sal 2 90 20 0.5 301.6 603.2 0.5 20 0.6 0.3 580.0 170.3 340.6 943.8 Forestyr User 00+470 00+500 Sal 1 80 16 0.5 301.6 301.6 0.3 15 0.5 0.2 580.0 100.2 100.2 401.8 1 Group, 00+470 00+500 Sal 3 60 25 0.4 226.2 678.6 0.3 15 0.5 0.2 580.0 88.1 264.3 942.9 Palungtar 00+600 00+600 Sal 1 80 17 0.5 301.6 301.6 0.3 10 0.5 0.2 580.0 98.6 98.6 400.2 Municipality-8, 00+710 00+710 Sal 1 70 18 0.5 301.6 301.6 0.3 15 0.5 0.1 580.0 86.3 86.3 387.9 Gorkha 00+860 00+870 Sal 3 80 25 0.5 301.6 904.8 0.5 5 0.5 0.2 580.0 133.4 400.2 1305.0 00+920 00+925 Sal 1 80 25 0.5 301.6 301.6 0.5 5 0.5 0.2 580.0 133.4 133.4 435.0 00+980 00+980 Sal 1 90 20 0.5 301.6 301.6 0.5 8 0.5 0.2 580.0 142.1 142.1 443.7 01+000 01+000 Sal 1 80 25 0.5 301.6 301.6 0.5 5 0.5 0.2 580.0 133.4 133.4 435.0 Total 18 3619.2 1957.6 6934.03 12+550 12+580 Chilaune 1 60 35 0.4 226.2 226.2 0.4 10 0.5 0.2 580.0 114.2 114.2 340.4 12+600 12+610 Katus 1 60 20 0.4 226.2 226.2 0.2 10 0.5 0.1 580.0 65.3 65.3 291.5 Andheripakha 12+640 12+650 Chilaune 1 50 30 0.4 226.2 226.2 0.2 10 0.5 0.1 580.0 68.0 68.0 294.2 12+700 12+750 Chilaune 4 50 25 0.4 226.2 10 Community 904.8 0.2 0.5 0.1 580.0 56.6 226.6 1131.4 12+700 12+750 Chilaune 4 50 40 0.4 226.2 904.8 0.3 10 0.5 0.2 580.0 90.6 362.5 1267.3 16 Forestry User 12+700 12+750 Katus 4 40 30 0.4 226.2 904.8 0.2 10 0.5 0.1 580.0 43.5 174.0 1078.8 Group, Harmi- 13+050 13+100 Katus 1 60 40 0.4 226.2 226.2 0.5 10 0.5 0.2 580.0 130.5 130.5 356.7 3, Gorkha 13+050 13+100 Katus 1 40 30 0.4 226.2 226.2 0.2 10 0.5 0.1 580.0 43.5 43.5 269.7 13+050 13+100 Chilaune 1 50 30 0.4 226.2 226.2 0.2 10 0.5 0.1 580.0 68.0 68.0 294.2 13+160 13+180 Chilaune 1 50 25 0.4 226.2 226.2 0.2 10 0.5 0.1 580.0 56.6 56.6 282.8 Total 19 2262.0 1309.1 5606.9 Sallo 1 60 90 0.4 226.2 226.2 1.0 0.0 15 0.5 580.0 313.2 313.2 539.4 kaphal 78 70 60 0.5 301.6 23524.8 0.9 0.0 15 0.5 580.0 313.2 24429.6 47954.4 Chilaune 155 25 30 0.1 75.4 11687.0 0.1 0.0 15 0.5 580.0 313.2 48546.0 60233.0 Paiyu 10 30 40 0.1 75.4 754.0 0.1 0.0 15 0.5 580.0 313.2 3132.0 3886.0 Tarkedanda 3 16+500 17+660 Katus 275 30 50 0.1 75.4 20735.0 0.1 0.0 15 0.5 580.0 313.2 86130.0 106865.0 CFUG Mauwa 5 80 90 0.5 301.6 1508.0 1.8 0.0 15 0.5 580.0 313.2 1566.0 3074.0 Lakure 1 80 90 0.5 301.6 301.6 1.8 0.0 15 0.5 580.0 313.2 313.2 614.8 Tadi 5 80 90 0.5 301.6 1508.0 1.8 0.0 15 0.5 580.0 313.2 1566.0 3074.0 Katus 16 50 15 0.4 226.2 3619.2 0.1 0.0 15 0.5 580.0 313.2 5011.2 8630.4 Total 546 1885.0 171007.2 234871.00 Grand Total 583 7766.2 174273.9 247411.90 Cost Calculation of CFUGs Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha Chainag e MDs/ Tree District Rate Volume Cost Transpor tation Cost Total Cost S. N S. of Name CFUGs Species of No. trees Girth (cm) Height (m) Man days Harvesti Cost ng Total Harvesti Cost ng Volume (m3) Distance (m) MDs/cu m 233875.989 247411.81 -13535.821

Cost Calculation of GoN Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N S. of Name CFUGs Chainage Species trees of No. Girth (cm) (m) Height days Man Harvesting Cost Total Harvesting Cost (m3) Volume (m) Distance MDs/cum Tree MDs/ Rate District Cost Volume Transportatio Cost n Cost Total 1Govermental- 10+630 10+630 Pipal 1 350 20 41.7 24168.6 24168.6 7.7 10 0.5 3.8 580.0 2220.3 2220.3 26388.9 2Pa.Na.Pa-13 10+860 10+870 Chanp 1 530 7 41.7 24168.6 24168.6 6.1 15 0.5 3.3 580.0 1924.5 1924.5 26093.1 3 18+840 18+870 Kafal 1 80 9 0.5 301.6 301.6 0.2 5 0.5 0.1 580.0 48.0 48.0 349.6 4 18+840 18+870 Chilaune 1 90 14 0.5 301.6 301.6 0.4 10 0.5 0.2 580.0 102.8 102.8 404.4 5Govermental 18+840 18+870 Chilaune 1 60 12 0.4 226.2 226.2 0.1 10 0.5 0.1 580.0 39.2 39.2 265.4 6forest-Chhoprak- 18+840 18+870 Kafal 1 90 11 0.5 301.6 301.6 0.3 10 0.5 0.1 580.0 80.7 80.7 382.3 71 19+280 19+290 Pipal 1 350 25 41.7 24168.6 24168.6 9.6 20 0.6 5.6 580.0 3219.5 3219.5 27388.1 8Govermental 20+180 20+240 Chilaune 1 90 9 0.5 301.6 301.6 0.2 10 0.5 0.1 580.0 66.1 66.1 367.7 9forest protected 20+180 20+240 Chilaune 9 60 15 0.4 226.2 2035.8 0.2 10 0.5 0.1 580.0 48.9 440.4 2476.2 10 by local 20+180 20+240 Chilaune 5 40 11 0.4 226.2 1131.0 0.1 5 0.5 0.0 580.0 14.7 73.4 1204.4 11 community, 20+320 20+340 Chilaune 1 110 11 1.6 904.8 904.8 0.4 5 0.5 0.2 580.0 111.0 111.0 1015.8 12 Chhoprak-1, 20+320 20+340 Chilaune 1 60 12 0.4 226.2 226.2 0.1 10 0.5 0.1 580.0 39.2 39.2 265.4 13 20+840 20+860 Uttis 1 35 15 0.4 226.2 226.2 0.1 5 0.5 0.0 580.0 15.3 15.3 241.5 14 Govermental 20+840 20+860 Chilaune 1 70 7 0.5 301.6 301.6 0.1 5 0.5 0.0 580.0 28.6 28.6 330.2 15 forest protected 21+860 21+900 Chilaune 2 140 12 2.5 1450.0 2900.0 0.7 10 0.5 0.4 580.0 213.2 426.3 3326.3 16 by local 21+860 21+900 Katus 2 100 10 1.6 904.8 1809.6 0.3 10 0.5 0.2 580.0 90.6 181.3 1990.9 17 community, 21+860 21+900 Chilaune 2 90 16 0.5 301.6 603.2 0.4 5 0.5 0.2 580.0 108.1 216.1 819.3 18 Thalajung-1 21+910 21+920 Malato 1 80 15 0.5 301.6 301.6 0.3 5 0.5 0.1 580.0 80.0 80.0 381.6 19 22+300 22+310 Chilaune 1 60 15 0.4 226.2 226.2 0.2 10 0.5 0.1 580.0 48.9 48.9 275.1 20 Govermental 24+430 24+440 Chilaune 1 70 15 0.5 301.6 301.6 0.2 10 0.5 0.1 580.0 66.6 66.6 368.2 21 forest protected 24+430 24+440 Kafal 1 30 8 0.1 75.4 75.4 0.0 10 0.5 0.0 580.0 6.5 6.5 81.9 22 Govermental 25+100 25+120 Malato 1 40 11 0.4 226.2 226.2 0.1 10 0.5 0.0 580.0 16.0 16.0 242.2 23 25+120 25+130 Uttis 2 30 11 0.1 75.4 10 forest protected 150.8 0.0 0.5 0.0 580.0 9.0 17.9 168.7 24 25+340 25+340 Uttis 1 40 12 0.4 226.2 226.2 0.1 10 0.5 0.0 580.0 17.4 17.4 243.6 by local 25 25+360 25+370 Malato 2 30 10 0.1 75.4 150.8 0.0 5 0.5 0.0 580.0 7.5 15.0 165.8 community, 26 26+960 26+980 Malato 1 30 12 0.1 75.4 75.4 0.0 5 0.5 0.0 580.0 9.0 9.0 84.4 Thalajung-9 27 26+960 26+980 Uttis 2 35 15 0.4 226.2 452.4 0.1 5 0.5 0.0 580.0 15.3 30.6 483.0 28 28+700 29+280 Angeri 1 60 7 0.4 226.2 226.2 0.1 10 0.5 0.0 580.0 22.8 22.8 249.0 29 28+700 29+280 Gurans 2 40 6 0.4 226.2 452.4 0.0 5 0.5 0.0 580.0 8.0 16.0 468.4 30 28+700 29+280 Kafal 1 70 10 0.5 301.6 301.6 0.2 10 0.5 0.1 580.0 44.4 44.4 346.0 31 28+700 29+280 Chilaune 1 60 6 0.4 226.2 226.2 0.1 5 0.5 0.0 580.0 18.0 18.0 244.2 32 28+700 29+280 Chilaune 4 90 7 0.5 301.6 1206.4 0.2 10 0.5 0.1 580.0 51.4 205.5 1411.9 33 28+700 29+280 Kafal 1 40 8 0.4 226.2 226.2 0.0 5 0.5 0.0 580.0 10.7 10.7 236.9 34 28+700 29+280 Gurans 11 50 9 0.4 226.2 2488.2 0.1 5 0.5 0.0 580.0 18.8 206.4 2694.6 35 28+700 29+280 Chilaune 10 90 13 0.5 301.6 3016.0 0.3 10 0.5 0.2 580.0 95.4 954.3 3970.3 Cost Calculation of GoN Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha S. N S. of Name CFUGs Chainage Species trees of No. Girth (cm) (m) Height days Man Harvesting Cost Total Harvesting Cost (m3) Volume (m) Distance MDs/cum Tree MDs/ Rate District Cost Volume Transportatio Cost n Cost Total 36 28+700 29+280 Katus 2 90 12 0.5 301.6 603.2 0.3 10 0.5 0.2 580.0 88.1 176.2 779.4 37 Govermental 28+700 29+280 Chilaune 15 60 9 0.4 226.2 3393.0 0.1 10 0.5 0.1 580.0 29.4 440.4 3833.4 38 28+700 29+280 Gurans 6 40 7 0.4 226.2 10 forest protected 1357.2 0.0 0.5 0.0 580.0 10.2 60.9 1418.1 39 29+320 29+440 Mauwa 2 90 15 0.5 301.6 603.2 0.4 10 0.5 0.2 580.0 110.1 220.2 823.4 by local 40 29+320 29+440 Chilaune 7 70 11 0.5 301.6 2111.2 0.2 10 0.5 0.1 580.0 48.8 341.9 2453.1 community, 41 29+320 29+440 Gurans 2 60 7 0.4 226.2 452.4 0.1 10 0.5 0.0 580.0 22.8 45.7 498.1 Jaubari-5 42 29+320 29+440 Kafal 1 15 9 0.1 75.4 75.4 0.0 10 0.5 0.0 580.0 10.0 10.0 85.4 43 29+440 29+580 Chilaune 10 60 8 0.4 226.2 2262.0 0.1 10 0.5 0.0 580.0 26.1 261.0 2523.0 44 29+440 29+580 Katus 2 40 9 0.4 226.2 452.4 0.0 10 0.5 0.0 580.0 13.1 26.1 478.5 45 20+580 29+820 Katus 4 60 13 0.4 226.2 904.8 0.1 8 0.5 0.1 580.0 41.1 164.2 1069.0 46 20+580 29+820 Chilaune 5 65 14 0.5 301.6 1508.0 0.2 10 0.5 0.1 580.0 53.6 268.0 1776.0 47 20+580 29+820 Uttis 2 40 11 0.4 226.2 452.4 0.1 10 0.5 0.0 580.0 16.0 31.9 484.3 48 20+580 29+820 Katus 1 90 13 0.5 301.6 301.6 0.3 10 0.5 0.2 580.0 95.4 95.4 397.0 49 29+820 30+140 Jhigani 1 60 10 0.4 226.2 226.2 0.1 10 0.5 0.1 580.0 32.6 32.6 258.8 50 29+820 30+140 Chilaune 4 45 9 0.4 226.2 904.8 0.1 10 0.5 0.0 580.0 16.5 66.1 970.9 51 29+820 30+140 Kafal 2 55 10 0.4 226.2 452.4 0.1 7 0.5 0.0 580.0 26.1 52.2 504.6 Total 142 86396.8 13311.6 123778.40 Cost Calculation of Institution Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha Chainage S. N S. CFUGs of Name Species trees of No. no. Plot Girth (cm) (m) Height days Man Cost Harvesting Total Cost Harvesting (m3) Volume (m) Distance MDs/cum Tree MDs/ Rate District Cost Volume Transportation Cost Cost Total 1 00+095 00+210 Chilaune 1 60 7 0.4 226.2 226.2 0.1 5 0.5 0.0 580.0 21.0 21.0 247.2 2 00+095 00+210 Timure 1 60 7.5 0.4 226.2 226.2 0.1 15 0.5 0.0 580.0 26.4 26.4 252.6 3 00+095 00+210 Buldhyangro 1 35 9 0.4 226.2 226.2 0.0 15 0.5 0.0 580.0 10.8 10.8 237.0 4 00+095 00+210 Chilaune 1 180 12 2.5 1450.0 1450.0 1.2 20 0.6 0.7 580.0 408.7 408.7 1858.7 5 00+095 00+210 Buldhyangro 1 80 5 0.5 301.6 301.6 0.1 20 0.6 0.1 580.0 33.6 33.6 335.2 6 00+210 00+230 Sal 2 120 18 1.6 904.8 1809.6 0.8 25 0.6 0.5 580.0 291.3 582.6 2392.2 7 00+230 00+230 Sal 4 30 15 0.1 75.4 301.6 0.0 25 0.6 0.0 580.0 15.2 60.7 362.3 8 00+235 00+240 Sal 2 90 11 0.5 301.6 603.2 0.3 10 0.5 0.1 580.0 80.7 161.5 764.7 9 00+060 00+270 Sal 1 100 17 1.6 904.8 904.8 0.5 20 0.6 0.3 580.0 178.7 178.7 1083.5 10 00+270 00+300 Sal 5 50 16 0.4 226.2 1131.0 0.1 30 0.7 0.1 580.0 47.9 239.3 1370.3 11 00+270 00+300 Sal 3 180 22 2.5 1450.0 4350.0 2.2 30 0.7 1.5 580.0 852.7 2558.1 6908.1 12 00+270 00+300 Sal 2 90 19 0.5 301.6 603.2 0.5 30 0.7 0.3 580.0 184.1 368.2 971.4 13 00+300 00+330 Sal 3 120 16 1.6 904.8 2714.4 0.7 20 0.6 0.4 580.0 242.2 726.6 3441.0 14 00+300 00+330 Sal 2 180 22 2.5 1450.0 2900.0 2.2 20 0.6 1.3 580.0 749.3 1498.7 4398.7 Amar Jyoti 15 00+330 00+350 Sal 1 110 16 1.6 904.8 904.8 0.6 10 0.5 0.3 580.0 175.5 175.5 1080.3 Janta Higher 16 00+350 00+360 Sal 1 160 20 2.5 1450.0 1450.0 1.6 10 0.5 0.8 580.0 464.0 464.0 1914.0 Secondary 17 00+360 00+380 Sal 3 872 70 18 0.5 301.6 904.8 0.3 15 0.5 0.1 580.0 86.3 259.0 1163.8 School, 18 00+360 00+380 Sal 1 160 22 2.5 1450.0 1450.0 1.8 20 0.6 1.0 580.0 592.1 592.1 2042.1 19 Palungtar-8 00+380 00+400 Katus 1 40 12 0.4 226.2 226.2 0.1 25 0.6 0.0 580.0 21.6 21.6 247.8 20 ,Gorkha 00+470 00+500 Sal 1 80 15 0.5 301.6 301.6 0.3 20 0.6 0.2 580.0 100.9 100.9 402.5 21 00+550 00+570 Sal 2 40 10 0.4 226.2 452.4 0.1 10 0.5 0.0 580.0 14.5 29.0 481.4 22 00+550 00+570 Sal 1 70 15 0.5 301.6 301.6 0.2 10 0.5 0.1 580.0 66.6 66.6 368.2 23 00+550 00+570 Chilaune 2 70 6 0.5 301.6 603.2 0.1 10 0.5 0.0 580.0 26.6 53.3 656.5 24 00+800 00+830 Sal 1 100 14 1.6 904.8 904.8 0.4 5 0.5 0.2 580.0 116.7 116.7 1021.5 25 00+800 00+830 Sal 3 130 20 2.5 1450.0 4350.0 1.1 5 0.5 0.5 580.0 281.8 845.4 5195.4 26 00+870 00+880 Sal 2 100 18 1.6 904.8 1809.6 0.6 5 0.5 0.3 580.0 150.1 300.2 2109.8 27 00+890 00+920 Sal 4 70 16 0.5 301.6 1206.4 0.2 5 0.5 0.1 580.0 65.4 261.5 1467.9 28 00+935 00+940 Sal 1 130 22 2.5 1450.0 1450.0 1.2 5 0.5 0.5 580.0 310.0 310.0 1760.0 29 00+960 01+000 Sal 4 45 12 0.4 226.2 904.8 0.1 5 0.5 0.0 580.0 20.3 81.0 985.8 30 00+960 01+000 Sal 4 75 18 0.5 301.6 1206.4 0.3 5 0.5 0.1 580.0 84.4 337.7 1544.1 31 01+010 01+030 Sal 2 120 16 1.6 904.8 1809.6 0.7 5 0.5 0.3 580.0 192.1 384.2 2193.8 32 01+010 01+030 Sal 2 75 11 0.5 301.6 603.2 0.2 8 0.5 0.1 580.0 54.3 108.6 711.8 33 01+080 01+090 Sal 1 70 12 0.5 301.6 301.6 0.2 5 0.5 0.1 580.0 49.0 49.0 350.6 34 Janata 10+280 10+300 Painyun 3 100 20 1.6 904.8 2714.4 0.6 10 0.5 0.3 580.0 181.3 543.8 3258.2 Higher Cost Calculation of Institution Trees, Luitel-Aapipal-Harmibhanjyang-Thalajung-Bacheck Road sub project, Gorkha Chainage S. N S. CFUGs of Name Species trees of No. no. Plot Girth (cm) (m) Height days Man Cost Harvesting Total Cost Harvesting (m3) Volume (m) Distance MDs/cum Tree MDs/ Rate District Cost Volume Transportation Cost Cost Total Higher Secondary School, 208 Palungtar Municipality- 35 13, Gorkha 10+280 10+300 Painyun 1 60 16 0.4 226.2 226.2 0.2 10 0.5 0.1 580.0 52.2 52.2 278.4 36 Janajyoti 28+330 28+430 Uttis 7 40 14 0.4 226.2 1583.4 0.1 10 0.5 0.0 580.0 20.3 142.1 1725.5 37 Higher 28+330 28+430 Uttis 2 60 18 0.4 226.2 452.4 0.2 10 0.5 0.1 580.0 58.7 117.5 569.9 Secondary School, Jaubari-5, 38 Chipleti 28+330 28+430 Uttis 4 40 15 0.4 226.2 904.8 0.1 10 0.5 0.0 580.0 21.8 87.0 991.8

Khadgadevi Tample, 39 Chhoprak-1 20+400 20+420 Lakuri 1 80 15 0.5 301.6 301.6 0.3 10 0.5 0.2 580.0 87.0 87.0 388.6

Mukhya Chautara, 40 Chhoprak-1 20+600 20+610 Lakuri 1 100 15 1.6 904.8 904.8 0.5 10 0.5 0.2 580.0 135.9 135.9 1040.7 Total 85 24476.00 12596.39 58573.0 Photographs of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

Ch 000+000 Starting Point

Baddada, Palungtar Municipality 2+900

Tallo Pam, Chhoprak 25+000

Community consultation meeting of Luitel-Aapipal-Harmibhanjyang-Thalajung-Bhachek Road Subproject, Gorkha

n'OF6]n—cfFklkkn–xld{eGem\ofË–yfnfh'Ë–efrf]s ;8s v08 pkcfof]hgf -#)=%&% ls=dL _, uf]/vf k'g{af; of]hgfs]f sfo{sf/L ;f/+z

!= o; k'g{jf; of]hgf -Resettlement Plan_ n] cfktsflng e'sDk ;xfotf of]hgf -EEAP_ cGtu{t ;+rflnt n'OF6]n–cfFklkkn–xld{eGHofË–yfnfh'Ë–efrf]s ;8s v08 pk–cfof]hgfaf6 k|efljt 3/ w'/Lsf] ;fdflhs–cfly{s cj:yf, To; pk cfof]hgf jf6 x'g] Iflt tyf IfltnfO{ Go"lgs/0f ug}{ pkfox? ;fy} cfof]hgfaf6 k'Ug] kmfO{bf tyf d"ntM c:j]lR5s k'g{af; of]hgfsf] k|s[of tyf gLltnfO{ JofVof u/]sf]] 5 . of] k'gjf{; of]hgf g]kfn ;/sf/sf] d'nt hUuf k|flKt P]g @)#$ tyf k'glg{df{0f ;DaGwL P]g / To;sf] sfo{ljlw @)&@ nfO{ cfwf/ dfGb} Pl;ofnL lasfz a}+ssf] ;'/Iff gLlt @))( cg'?k agfO{Psf] 5 .

@= k"gjf{; of]hgfsf] k|d'v p2]Zo c:j]+lR5s k'gjf{;sf sf/0faf6 x'g] gsf/fTds c;/nfO{ Go"lgs/0f u/L k|efljt kl/jf/nfO{ Ifltk"lt{ tyf ljleGg tflndsf dfWodaf6 nfeflGjt u/fpg' xf] . EEAP cGt/ut cfof]hgfsf] k"g{jf; gLlt tyf lgb]{lzsf -RF) n] Joj:yf u/] cg';f/ c:j]+lR5s k"g{jf;sf] sf/0faf6 x'g] ;a} k|sf/sf] ;DktLsf] Ifltsf] nflu k|lt:yfkg d"No a/fj/sf] Ifltk"lt{ k|bfg ul/g]5 . c:j]+lR5s k"g{jf;nfO{ ;s];Dd lg?T;flxt u/L o; k"g{jf; of]hgfaf6 k|efljt JolQmutsf] hLjg:t/df ;'wf/ Nofpg] gLlt cg'?k o; k'g{jf; of]hgf tof/ ul/Psf] 5 .

#= k"g{jf; gLlt tyf lgb]{lzsf -RF_ sf l;4fGtnfO{ k"0f{tof kfng u/L cfjZos k/fdz{, e]nf, 5nkmn uf=lj=;= 6f]n a}7s / 3/w'/L ;a]{If0fsf] tYof+ssf] cfwf/df k'g{jf; of]hgf tof/ ul/Psf] xf] . o; k"gjf{; of]hgfsf] k|efjsf/L sfof{Gjogsf] nflu lgb]{lzt gLlt adf]lhd rflxg] cfjZos ljleGg ;ldltx? lhNnf :tl/o sfof{no u7g eP kZrft u7g ul/g]5 . o; k'g{jf; of]hgfdf hf]lvddf /x]sf kl/jf/, dlxnf 3/d'nL /x]sf] kl/jf/, blnt hghflt kl/jf/x?nfO{ ljz]if Wofg k'¥ofOPsf] 5 . lkmN8 ;e]{sf] bf}/fg s'g} klg kl/jf/n] hUuf bfgsf] OR5f gb]vfPsf] x'Fbf hUufwgLx?nfO{ hUuf bfgsf] lgDtL hf]8 ul/Psf] 5}g . To;y{, ;8sdf rflxg] ;Dk'0f{ gofF hldgnfO{ d'cfAhfsf] lglDt cufl8 a8fOPsf] 5 .

$= of] ;8s pk–cfof]hgf klZrdf~rn ljsf; If]q cGtu{t u08sL c~rnsf] uf]/vf lhNnfdf kb{5 . o; cfof]hgf uf]/vf lhNnfsf] kfnË6f/ gu/kflnsfsf] n'OF6]n ufpFaf6 z'? eO{ efr]ssf] chL/sf]6 ufpFkflnsfdf cGTo x'G5 . o; ;8s pkcfof]hgf kfn'Ë6f/ gu/kf;nsf, l;/fgrf]s, chL/sf]6 ufpFkflnsf x'Fb} hfG5 . ctM lhNnfsf] ;du| ljsf;df o; pkcfof]hgfsf] ljz]if dxTj /x]sf] 5 . n'OF6]n—cfFklkkn–xld{eGem\ofË–yfnfh'Ë–efr]s ;8s v08 pkcfof]hgfsf] s"n nDafO{ #)=%&% ls=dL= /x]sf] 5 clg !) ld6/ ef]uclwsf/ If]q (RoW) tf]lsPsf] 5 .

%= o; pkcfo]fhgf ;a} df};ddf rNg], !) ld rf}8fO ePsf], ;]G6/nfOgaf6 % ld bfofF / afofF, sfnf] kq] ul/g]5 . lsQfgfkL gS;f ;j]{If0f cg';f/ o; pkcfof]hgfn]] hDdf #)=%&% x]S6/ hldg lng]5, h; cGt/ut ^=@^@ x] klxNo} ;8sdf k/]sf] 5 / cGo *=@#& x] gofF hldg lng' kg]{5 . o; pk– cfof]hgfn] JolQmut hldg afx]s ;fd"bflos jg pkef]Qmf, ;d"x, /fli6«o jgsf] pkef]Qmf ;d"x / e"–efu ;d]tsf] hUuf clws/0f ug'{ kg]{ b]lvG5 .

Page- 1

^= s'n #$@ 3/w'/Ldf dWo] @)$ 3/w'/L ;j]{If0fsf] ;do e]6 eP]sf]]n] lt 3/w'/Lx?sf] lj:t[t ;j]{If0fdf ljz]ifu/L k|efljt kl/jf/sf] cfly{s cj:yf, cfo Joo, s[lif hGo pTkfbgaf6 vfgk'Ug] dlxgf, of]hgf k"j{ tyf kZrft k|efljt kl/jf/sf] cfly{s cj:yfdf kg]{ k|efj, hflto jlu{s/0f tyf kx'Frsf] af/]df ljZn]if0f ul/Psf] 5 . ;j]{If0fsf] tYof+s cg';f/ @)$ k|efljt 3/w'/L dWo] #% 3/w'/L blnt, &* hghftL 3/w'/L , @$ g]jf/ 3/w'/L tyf afFsL ^& 3/w'/L a|Xdf0f÷If]qL÷7s'/L÷/x]sf 5g\ . o; pk–cfof]hgfdf )=% x]S6/ eGbf sd hUuf /x]sf # 3/w'/L a;f]jf; ub{5g\ . @ 3/w'/Ln] s'n hldgsf] %Ü eGbf a9L hldg u'dfpg] tYof+saf6 b]lvG5 . o; pk–cfof]hgfsf kl/jf/sf] cf}ift s"n hUuf @=(^ x]S6/ tyf cf}ift Iflt )=)@ x]S6/ /x]sf] tYof+sn] b]vfp5 . slif k]zf b]zsf] cu| k]zf ePem} o; cfof]hgfsf cfwsf+z kl/jf/n] s[lif k]zf c+ufn]sf 5g\ tyfkL s[lif pTkfbgaf6 pgLx?nfO{ jif{ el/ vfgk'Ug] cj:yf g/x]sf] kfO{G5 . k|lt 3/w'/Lsf] cf}ift cfDbfgL ?= *@!^^=@& /x]sf] / To;sf] s]jn @!=%)Ü dfq s[lif If]qsf] of]ubfg /x]sf] 5 . of]hgfsf] sfof{Gjog kZrft k|efljt 3/w'/LnfO{ kg]{ k|efjnfO{ x]bf{ s[lifdf x'g] cfodf cf}ift ?= !#@@ sd x'g] tYof+saf6 b]lvG5 . ctM o; pk–cfof]hgfsf] afl;Gbfsf] d'Vo cfDbfgLsf] >f]t u}/ s[lif ePsf]n] ;Dk"0f{ k|efljt kl/jf/sf] u}/ s[lifIf]qsf] cfDbfgLdf s'g} c;/ gkg]{ b]lvG5 .

&= k|fljlws 6f]nLsf] lj:t[t k|fljlws cWoog -Detail Technical Design and Survey_ kZrft lsQf gfkL gS;f -Cadastral Survey_ sf] cfwf/df tof/ ul/Psf] ;Dkltsf] Ifltsf] ljj/0f adf]lhd #)=%&% ls=ld= ;8s v08af6 k|efljt 3/w'/Lsf] ;fdflhs tyf cfly{s cj:yfsf] hfgsf/Lsf] nflu 3/w'/L ;j]{If0f tyf k/fdz{ kZrft of] k'gjf{; of]hgf tof/ ul/Psf] xf] . lsQf gfkL gS;f ;j]{If0f cg';f/ o; pk–cfof]hgfn] #$@ 3/w'/Lsf] s"n ^!$ lsQfaf6 #)=%&% x]S6/ JolQmut tyf gLlh hUuf clws/0f ug'{ kg]{ b]vfp5 . ;fy} s'n #)=%&% x]S6/ dWo] !$=((% x]S6/ dfq JolQmut tyf gLlh hUuf clws/0f ug'{ kg]{ x'Fbf k|efljt hldgsf] clwsf+z e"–efu ;/sf/L hldg jf ;d"bflos jg If]qaf6 ;8s /]vfª\g uPsf] b]lvG5 . t;y{ s"n JolQmut hUufsf] Iflt Go"g ePsf] xf] . JolQmut tyf ;fd"bflos u/L s'n @(@ ?v lj?jf -gLlh_, %*# j6f ;fd"bflos ?v lj?jf, !$@ j6f ?v lj?jf -/fli6«o_, *$ j6f ?v lj?jf laleGg ;+3—;+:yfsf], $&% j6f afF;, @% kmnkm'nsf] af]6 x6fpg' kg]{ / &^ j6f JolQmut ;+/rgf tyf #) j6f ;fd"bflos ;+/rgf, s'n !)^ j6f ;+/rgf x6fpg' kg]{ b]lvG5 . o; x6fpg' kg]{ ;+/rgfx?df ( j6f 3/, ! j6f kfnL , # j6f zf}rfno , % j6f uf]7 , $# j6f l6gsf c:yfO a;f]af;sf] 6x/f, ;fy} #) j6f ;fd"bflos ;+/rgfdf , !$ j6f On]Sl6«s ˆf]n, !! j6f ;fd"bflos rf}tf/f, @ j6f wf/f, ! j6f ˆfgL 6+sL, / @ j6f ;fd"bflos :s"n k"g{:yfkgf ug'{kg]{ b]lvG5 .

*= o; pk–cfof]hgfsf kl/jf/sf] cf}ift s"n hUuf @=(^ x]S6/ tyf cf}iftdf @=($ x]S6/ hldg ;8ssf sf/0f u'dfpg] tYof+sn] b]vfp5 . oxfFsf] kfl/jfl/s cj:yf slif tyf u}/ s[lif k]zfdf ;+Nug/x]sf 5g\ . tfyflk ;8ssf sf/0f s[lifhGo cfodf Åf; cfpg]5 . k|lt 3/w'/Lsf] cf}ift s[lif cfDbfgL ?=*@!^^=@& /x]sf] 5 h'g ;8sdf hldg u'dfP jfkt ? *)*$$=!# df emg]{ b]lvG5 . o;/L ;8ssf sf/0f k|lt kl/jf/ cf}iftdf ?= !#@@ aflif{s ?kdf u'd]sf] b]lvPtf klg of] Iflt ;fdfGo ?kdf dfGg ;lsG5 . lsgls oxfFsf kl/jf/x?sf] s[lifaf6 s]xL cfDbfgL ePtf klg pgLx? u}/ s[lif If]qdf klg cfl>t 5g\ . To:t} cf}ift cfkm\gf] pTkfbgaf6 &=)* dlxgf a/fa/ ;Dk"0f{ 3/w'/LnfO{ vfg k'Ug] b]lvG5 h'g ;8ssf sf/0f sl/a #=^ lbg a/fa/sf] vfg k'Ug] cGg of]hgfaf6 Iflt x'g] b]lvG5 . t/ ;du|df o; pk–cfof]hgfsf] afl;Gbfsf] d'Vo cfDbfgLsf] >f]t u}/ s[lif ePsf]n] ;Dk"0f{ k|efljt kl/jf/sf] lhjg:t/df kg]{ c;/ Ifl0fs dfq x'g]5 . ;fgf k;n, Joj;fo,

Page- 2

a}b]lzs /f]huf/ tyf Hofnf dhb'/L h:tf u}/ s[lif If]qsf] cfDbfgLdf TofxfFsf kl/jf/x? cfl;|t 5g\ h'g k]zfdf ;8sn] s'g} g/fd|f] c;/ gkg]{ b]lvG5 . k|efljt kl/jf/sf] hLjg:t/ psf:gsf] lglDt o; pkcfof]hgfn] tflnd of]hgf klg o; k'g{af; of]hgfn] ;d]6\5 .

(= 3/w'/L ;j]{If0fn] @ kl/jf/n] s'n hldg :jfldTjsf] % k|ltzt eGbf w]/} hldg ;8sdf kg]{ b]vfp5 eg] dfq # kl/jf/ ul/aLsf] /]vf d'gL kg]{ b]lvG5 . ;Dk'0f{ kl/jf/sf] hldgsf] d'cfAhfsf] k|s[ofdf nluPsf] 5 . 3/af;df c;/ k'Ug] kl/jf/sf] cGo a:g] 7fpF /x]sf] x'bfF pSt kl/jf/nfO{ k'g{af;sf] w]/} hl6ntf cfpg] 5}g elg ;f]lrPsf] 5 . To;t} cGo ;+/rgfjfnfx?sf] ;f]lx hldgsf] aflsF cz+df 3/ ;fg]{ of]hgf /x]sf] 5 . t;y{ k'g{af;sf] lgDtL o; ;8s v08df s'g} klg gofF hldgsf] cfjZostf b]lvb}g .

!)= o; ;8s v08df hghftL kl/jf/x?nfO{ c;/ kg]{ ePtf klg o; ;8s /]vfdf pgLx?sf] s'g} ;f+:s[lts tyf wflds{ cf:yfsf] hldg kg]{ 5}g . To; cy{df of] ;8sn] Toxf a;f]af; ul//x]sf hghflt ;d'bfonfO{ pgLx?sf klxrfgsf] ljifodf 7f]; c;/ kg]{ b]lvb}g . ;j]{If0f ul/Psf] hghflt kl/jf/sf] cfly{s, z}lIfs / cGo ;fdflhs :t/ cGo ;d'bfosf] t'ngfdf p:t} b]lvPsf] 5 . To;}n] o; ;8sn] Nofpg] ;sf/fTds kl/jt{g tyf cGo ;'ljwfx?df klg hghftL ;d'bfon] cGo ;d'bfo ;/x nfe p7fpg ;Sg] 7flgPsf] 5 . o; ;8sn] o; If]qsf afl;Gbfx?nfO{ ahf/, lzIff, :jf:Yo / ;/sf/L lgsfosf ;]jfx? cem} /fd|f] lnª\s k'¥ofpg]5 .

!!= cg'kl:yt 3/w'/Lsf ;b:ox? of]hgf :yndf kms]{kl5 pgLx?sf] cfly{s cj:yf tyf hUufbfg lbg] tTk/tf x]/L Ifltk"lt{ ljt/0f ug]{ of]hgf agfO{Psf] 5 . To:t} u'gf;f] lgbfg ;ldtLx? klxnf], bf];|f], t];|f] / rf}yf] n]en ul/ rf/ r/0fsf] aGg]5 . xfnsf] cj:yfdf lhNnf :tl/o of]hgf sfJo{gog l6d aGg] s|ddf /x]sf]n], oL ;ldtLx? eljiodf u7g x'g]5 . t/ k|d'v lhNnf clwsf/Lsf] cWoIftfdf ! k6ssf] a}7saf6 hUuf, / ;+/rgfsf] Ifltk"lt /]6 / /sd lg0f{o ul/G5 .

!@= ;Dk'0f{ k|efljt hldg / ;+/rgfx?sf] d'cfAhfsf lgDtL uf]/vflhNnfsf] ;/sf/L b/ /]6nfO{ cfwf/ dflgPsf] 5 h'g uf=lj=;= 'df cfof]lht ;d'bfo 5nkmndf klg 5nkmn ul/Psf] 5 . ;Dk'0f{ hldgsf] s'n d'cfAhf /sd ? $%@&*((@=$# /x]sf] 5 . hDdf !)^ j6f k|efljt ;+/rgf dWo] JolQmut (^ JolQmut ;+/rgfsf]] d'cfAhf /sd ? $*)$!&%=$$ /x]sf]5 eg] ;a} #) j6f ;fd"bflos ;+/rgfsf] d'cfAhf/sd ? @!@!&^$=&# /x]sf]5 .

!#= 3/w'/L ;j]{If0fsf] s|ddf ;Dk'0f{ kl/jf/n] cfo:t/ a[l¢ tflnddf efu lng] OR5f b]vfPsf 5g\ . To;}n] of]hgf sfJo{gogsf a]nf cfj:ostf klxrfg ul/ hLljsf]kfh{g ;'wf/ lzk ljsf; tflnd cfjfl;o tflndsf] of]hgf agfOg] 5 . o;} cfwf/df !^–$% jif{ leqsf ;b:ox?, blnt, hghflt, % k|ltzt eGbf w]/} hldg ;8sdf kg]{x?, dlxnf 3/d'nL ePsf ;b:ox?nfO{ u|fxotfdf /flvg]5 . xfn o; tflnd of]hgfnfO{ rflxg] /sd ? @%!*(&^=@@ k|:tfj ul/Psf] 5 .

!$= o; k'g{af; of]hgfsf] sfof{Gjogsf nflu sl/a ^ s/f]8 (! nfv @ xhf/ * ;o &$ ¿k}of %^ k};f ?k}of vr{ nfUg]5 h'g cGt/ut % s/f]8 #* nfv !( xhf/ ( ;o !% ¿k}of @* k};f k|ToIf

Page- 3 vr{ d'cfAhfdf ljt/0f x'g]5 . cGo k'g{af; of]hgf vr{ cGt/ut hldgsf] nfut s§f u/fpg nfUg] vr{, tflnd vr{ / @) k|ltzt eljiodf e}kl/ cfpg] vr{sf] nflu 5'§fOPsf]5 .

Page- 4

Appendix X: Entitlement Matrix No. Type of Application Eligible Persons Entitlements Loss/Impacts 1. Productive land Marginal loss (i.e., land Owners with legal or A. For the portion to be used (agricultural, is still economically legalizable/ temporarily during construction: fishpond, viable for use or meets recognized right . No compensation for land if returned forest, etc.) the expected yield) to the legal owner and the land restored to pre-project condition within This will be confirmed by 3 months after use. If the land is not the implementing agency returned and restored to pre-project and concurred with by condition within 3 months, the affected the affected household person will receive compensation at during the detailed replacement cost for the land. A measurement survey penalty clause will be included in the (DMS). contractor's contract to ensure that the cost of such compensation is recovered from the contractor. . Cash compensation at replacement cost for the loss of standing crops and trees. . Compensation for loss of net income from subsequent crops that cannot be planted within the duration of the temporary use of the land. . Affected household will be notified 1 month in advance of the actual date that the land will be temporarily used or affected by the subproject. B. For the portion that will be acquired permanently: . Cash compensation at replacement cost for the acquired portion of the land. . Cash compensation at replacement cost for the loss of standing crops and trees. . Affected household will be notified 1 month in advance of the actual date that the land will be acquired by the subproject.

No. Type of Application Eligible Persons Entitlements Loss/Impacts Users with lease or A. For the portion to be used permissory right temporarily during construction: . No compensation for loss of land use if returned to the lessee and the land restored to pre-project condition within 3 months after use. If the land is not returned and restored to pre-project condition within 3 months, the affected person will receive compensation at replacement cost for the subject land. A penalty clause will be included in the contractor's contract to ensure that the cost of such compensation is recovered from the contractor. . Cash compensation at replacement cost for the loss of standing crops and trees. . Compensation for loss of net income from subsequent crops that cannot be planted within the duration of the temporary use of the land and within the remaining lease/assigned period. . Affected household will be notified 1 month in advance of the actual date that the land will be temporarily used or affected by the subproject. B. For the portion that will be acquired permanently: . Cash compensation for loss of net income for the remaining leased/assigned period. . Cash compensation at replacement cost for the loss of standing crops and trees. . Affected household will be notified 3 months in advance of the actual date that the land will be acquired by the subproject.

Non-legal users A. For the portion to be used temporarily during construction: . No cash assistance for loss of land use if returned to original user and the land restored to pre-project condition within 3 months after use. If the land is not returned and restored to pre-project condition within 3 months, the affected

No. Type of Application Eligible Persons Entitlements Loss/Impacts person will receive cash assistance for permanent loss of land use equivalent to the net income from the affected land during the immediate past year multiplied by 2 years. A penalty clause will be included in the contractor's contract to ensure that the cost of such compensation is recovered from the contractor. . Cash compensation at replacement cost for the loss of standing crops and trees. . Compensation for loss of net income from subsequent crops that cannot be planted within the duration of the temporary use of the land. . Affected household will be notified 1 month in advance of the actual date that the land will be temporarily used or affected by the subproject. B. For the portion that will be acquired permanently by the Project: . Cash assistance for permanent loss of land use equivalent to the net income from the affected land during the immediate past year multiplied by 2 years. . Cash compensation for the loss of standing crops and trees at replacement cost. . Affected household will be notified 3 months in advance of the actual date that the land will be temporarily used or affected by the subproject.

Severe loss (i.e., land no Owners with legal or . Cash compensation at replacement longer viable for legalizable/ cost for the entire land, or land-for-land continued use or does recognized right of equivalent productive value with not meet the expected secure tenure, and acceptable to the yield, therefore the entire affected household. property has to be . Cash compensation at replacement acquired). cost for the loss of standing crops and trees. This will be confirmed by . Entitled to take part in the income the implementing agency restoration program. and concurred with by . If the loss is equivalent to 10% or the affected household more of the total productive assets of during the detailed the affected household, see Item 7 measurement survey. below. . Affected household will be notified 3 months in advance of the actual date that the land will be acquired by the subproject. Users with lease or . Cash compensation for loss of net permissory right income from subsequent crops that cannot be planted within the remaining lease/assigned period. . Cash compensation at replacement cost for the loss of standing crops and trees. . Entitled to take part in the income

No. Type of Application Eligible Persons Entitlements Loss/Impacts restoration program. . If the loss is equivalent to 10% or more of the total productive assets of the affected household, see Item 7 below. . affected household will be notified 3 months in advance of the actual date that the land will be acquired by the subproject. Non-legal users . Cash assistance for permanent loss of land use equivalent to the net income from the affected land during the immediate past year multiplied by 4 years. Cash compensation at replacement cost for the loss of standing crops and trees. . Entitled to take part in the income restoration program. . If the loss is equivalent to 10% or more of the total productive assets of the affected household, see Item 7 below. . Affected household will be notified 3 months in advance of the actual date that the land will be acquired by the subproject. 2. Residential / Marginal loss (i.e., land Owners with legal or A. For the portion to be used commercial is still economically legalizable/ temporarily during construction: land viable for use or meets recognized right . Cash rental to be negotiated with the the expected personal affected household. yield) . Restoration of the land within 3 months after use. If the land is not This will be confirmed by returned and restored to pre-project the implementing agency condition within 3 months, the affected and concurred with by household will receive compensation at the affected household replacement cost for the subject land. during the detailed A penalty clause will be included in the measurement survey. contractor's contract to ensure that the cost of such compensation is recovered from the contractor. . For affected non-land assets, see Items 3-5 below. . Affected household will be notified 1 month in advance of the actual date that the land will be acquired by the subproject. B. For the portion that will be acquired permanently: . Cash compensation at replacement cost. . For affected non-land assets, see Items 3-5 below.

Non-legal users . No cash assistance or compensation for land, except affected properties on the land. . For affected non-land assets, see Items 3-5 below. Severe loss (i.e., land no Owners with legal or . Cash compensation at replacement longer viable for legalizable/ cost for the entire land, or land-for-land continued use; the entire recognized right of similar attributes with secure tenure

No. Type of Application Eligible Persons Entitlements Loss/Impacts property has to be and acceptable to the affected acquired). household. . For affected non-land assets, see This will be confirmed by Items 3-5 below the implementing agency . For allowances due to relocation of and concurred with by house, see Item 9 below. the affected household . Affected household to be notified at during DMS least 3 months in advance of the date the land will actually be acquired by the Project. Non-legal users . No cash assistance or compensation for land, except affected properties on the land. . Compensation at replacement cost for non-land assets. . For allowances due to relocation of house, see Item 9 below. . Affected household to be notified at least 3 months in advance of the date the land will actually be acquired by the Project. 3. House and Marginal impact (i.e., Owners of the . Cash compensation at replacement shops unaffected portion of the structures with or cost for the affected portion. house is still viable for without acceptable . Repair allowance equivalent to not use and no relocation proof of ownership less than 20% of replacement cost of required) over the land; with or the affected portion, or equivalent to without building the actual cost of repair. This will be confirmed by permit the implementing agency and concurred with by the affected household during the DMS Severe impact (i.e., Owners of the . Cash compensation at replacement house is no longer viable structures with or cost for the entire structure. for continued use and without acceptable . For allowances see Item 8 for shops the entire structure is to proof of ownership and Item 9 for houses below. be acquired over the land; with or without building This will be confirmed by permit the implementing agency and concurred with by the affected household during the DMS 4. Secondary Loss of, or damage to, Owners of the . Cash compensation at replacement structures assets structures with or cost (kitchen, latrine, without acceptable etc.) proof of ownership over the land; with or without building permit 5. Crops and Loss of, or damage to, Owners regardless of . Cash compensation at replacement trees assets tenure status cost 6. Public facilities, Loss of, or damage to, Owners . Cash compensation at replacement common assets cost to restore the affected facilities. property structures and facilities 7. Loss of income Loss of 10% or more of Affected household . One time assistance allowance of 3 / livelihood due total productive land losing productive months minimum wage per adult for to loss of land regardless of the household.

No. Type of Application Eligible Persons Entitlements Loss/Impacts

productive land tenure status . Entitled to take part in income restoration program.

8. Loss of income/ Marginal impact (i.e., Shop owners . One time assistance allowance of 1 livelihood due disruption of business (regardless of tenure month minimum wage per adult for the to disruption of due to reorganization of status) and household business or the shop on the residual employees/laborers employment land; disruption of of affected assets employment of less than 3 months)

Severe impacts (i.e., Shop owners . Materials transport allowance disruption of business (regardless of tenure equivalent to 1 month minimum wage due to relocation of status) and per adult for the household if relocating shop; and disruption of employees/laborers in the same village; 2 month minimum employment for more of affected assets wage per adult for the household if than 3 months) relocating elsewhere in the district. . One time assistance allowance of 1 month minimum wage per adult for the household . Entitled to take part in income restoration program.

9. Impacts on Severe impacts on Relocating affected . Materials transport allowance houses that houses households equivalent to 1 month minimum wage require regardless of tenure per adult for the household if relocating relocation status in the same village; 2 month minimum wage per adult for the household if relocating elsewhere in the district. . One time assistance allowance of 2 month minimum wage per adult for the household for those who will move to another plot of land and 1 month minimum wage per adult for the household for those who will move within their plot of land.

10. Higher risks of Loss of land and non- Affected vulnerable . One time assistance allowance of 3 impoverishment land assets groups regardless of month minimum wage per adult for the /hardship due severity of impacts household to cover for additional to loss of human resources needed to help them, resource base rebuild their houses, and re-establish their livelihood. . Entitled to take part in income restoration program.

24 August, 2017

ADB's Comments Incorporation for Involuntary Resettlement Plan of Luitel-Aappipal- Harmibhanjyang-Thalajung_Bhacheck Road Sub-Project, Gorkha

S.N ADB Comment on Resettlement Plan Response Section a) Project description, introduction of Incorporated and avoiding the repetitions. 1: RP, project information and subproject information are mixed with each other. Present related information in one paragraph for one aspect.

b) number of plots given in text and Tallied and consistency made. table are not matching. The statement given in the paragraphs does not clearly mentioned whether all plots will be affected or part of the plot is affected. The sentence in this regards may be interpreted as impact on all land parcel. Maintain consistency and revise the presentations.

c) mentioned that 127 plots are lacking In non-registered plots, no cultivable official land ownership. But the report lands/barren lands. does’t eplai how the are treated for impact and compensation. Whether the plots are cultivated by people or not, whether there is customary claim or land use claim by the affected persons exists or not. Further assessment on land use pattern and status, customary claim is needed. Further elaborate last two sentence written in the paragraph.

d) review all paragraphs in relation to Incorporated. impact assessment for loss of different types of structures. The definition of physical displacement has been interpreted differently. As per SPS 2009- physical displacement is reloatio, loss of residetial land, or loss of shelter as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks ad proteted areas.

e) states that most of the private IPs are categorized (Tamang and Gurung) structures owned by indigenous impact is well defined. people but the assessment of impact on them has been presented in generic way using standard language for all RPs. Further, assessment of impact on indigenous people is needed.

2 The paragraphs written in section-2: Socioeconomic analysis data regarding socio-economic analysis contains differing agricultural and non-agricultural incomes statements, figures and analysis. The are verified and corrected. Thus, analysis presented in para 10,11 and 13 contradictions are sorted out. have different sets of interpretation on income loss and livelihood strategy of the affected persons. The interpretation presented in paragraphs and figures presented in table are not complementing each other. Carefully review the section and revise interpretation and analysis of the information in line with figures and numbers.

a) Last sentence of para 19 talk about No impact on cultural heritages due to impact on their customary right. But project intervention. the impact assessment section explains that there is no customary Impact on customary rights is omitted. claim of land as all land are titled or recorded in the cadastral map and are individually owned. Further elaborate what type of customary rights exists in the area and how they are not affected.

b) Para 20 explains that most of affected None of the affected HHs found vulnerable families are earth quake affected due to land acquisition. families. Further assessment is needed to those families whether they will be further vulnerable due to land acquisition or not.

3 Para 16 states that the RP will be disclosed Para 16; Comments incorporated. to APs as soon as DLPIU is formed. As we know all required offices and committees have already formed. Revise the text accordingly. The disclosure of draft RP is required prior to approval. Ensure that RP is duly disclosed.

4 Para 26 revised the text in relation to Revised. formation of DLPIU. Follow the resettlement framework provision regarding timing of GRM formation.

5 Para 43: There is long gap between date Immediately after notice publication land of census and government notice transition was stopped. publication of for land acquisition. Assess whether the cutoff date is still valid or not. If there is transaction of the land in between then there could be problem in paying entitlement. Refer second last sentence of the para and revise accordingly, if needed.

6 Para 48 and other para: regarding Allowances and assistances have been allowances and other assistance, the revised as per entitlement matrix. recommendation has been proposed based on ad hoc basis. There are clear provisions in the entitlement policy matrix attached to the RP. Revise all recommendation adopting provisions specified in entitlement matrix.

7 Para 53-56: Explain rationale for Number of trainees has been identified as recommendation of life skill training. It per training criteria and lump sum budget seems that the skill trainings are proposed has been mentioned. by assumptions. If the impact assessment identified that there will be impact on income source or livelihood strategy, the skill development training could be one of mitigation measure and strategy to restore income and livelihood. In that case, the name of affected person, required skill, other stipends need to be finalized in advance and to be included in RP with details of implementation arrangement and budget. If it is only for enhancement measure in addition to mitigation measures explain it very clearly. The eligibility of APs for skill training is not clearly defined and not consistent with skill training provisions in entitlement matrix. Review the presentation on these paras and revise it following scope of income/livelihood restoration and entitlement matrix.

8 Para 58: The recommendation of land Proposed cost is mentioned in the report. compensation is based on LRO rate. It is After being finalized by CDC, cost will be not clear whether the recommended rate updated. represent the replacement cost. As per entitlement matrix and SPS requirement all compensation must be paid in replacement cost principle. So, assess the replacement cost for land and recommend in line with policy provisions.

9 Table 13: The total loss by category and Verified and revised. reoeded udget does’t represet the multiple of rate and loss of land. In the section 1 it is mentioned that the loss in new cutting (due to project cause) is less compare to area of land loss in the table. Verify the figures and revise accordingly. Revise recommendation for allowances following provisions in entitlement matrix. The cost and source for management cost for absentee is not clear. Revise it accordingly.

10 Revise the sentences in institutional Revised. arrangement with updated information on formation of different institutions for project implementation. Elaborate the section how the RP will be implemented and develop TOR if any new arrangement other than DISC and CISC is proposed.

11 The attached implementation schedule Complete table is revised and attached. given in table 14 is blank. Revise the table comparing activity of civil works and provisions of loan agreement and covenants.

12 Section 1.2 monitoring and evaluation: Revised. Revise name of different institution proposed for monitoring and supervision following updated institutional arrangement for project implementation.

13 Para 74: NRA cannot be external monitor Unnecessary lines are omitted and as it is executing agency. Revise the corrections are made where necessary. provision and propose new arrangement if external monitoring deemed necessary. The last sentence of the para has proposed for post-resettlement implementation evaluation study. Develop TOR for the activity with cost estimate and procurement process.

14 Appendix III: Review the loss area. In Revied. number of cases the area of land loss is significantly big. So, further impact assessment is required for those who lose large area of land despite the %loss is less than 10% of total productive assets.

15 There is special provision in entitlement Verified at field level and corrected in RP matrix for the households losing more too. than 10% of their productive assets. But, no entitlements have been recommended for this category despite there is record of >10% loss. Verify the information and revise the entitlements.

16 Appendix IV: Cross verify the Verified. recommendation of valuation of structures as there are omissions, and cross posting of value and allowances.

17 Revise executive summary following Done revisions in the main report.

18 Above are the major comments minor Comments are incorporated step by step. comments are written in hard copies. While revising the documents please go through all sections and paragraphs to avoid omission, repetitions, and unclear sentences.