FCA BVAP New Model Material Flow Launch Support Case Study 01.Ai
Total Page:16
File Type:pdf, Size:1020Kb
CUSTOMER Fiat Chrysler Automobiles Belvidere Assembly Plant PROJECT New Model Material Flow Launch Support BOTTOM-LINE RESULTS: OVERVIEW $2.1 MILLION Our Process OpƟmizaƟon Team was engaged at the FCA Bellvidere Assembly Plant supporƟng the launch of the Jeep Cherokee. The new COST SAVINGS model bought addiƟonal content that drove 30,000 sq. Ō. of floor DSI provided a solution to space requirements at the 3rd Party LogisƟcs (3PL) Provider. Working insource 45 Body Shop with the 3PL and the plant, the DSI team created a soluƟon that parts from the 3rd Party opened up the required space at the 3PL by insourcing forty-five body Logistics Provider . shop parts from the logisƟcs center and reduced plant logisƟcs costs by $2.1 million. The DSI Team developed a plan to redeploy the 30,000 SQ. FT. OF current material handling manpower in the Body Shop resulƟng in no increase in head count. SPACE MADE AVAILABLE AT THE 3PL Our team redesigned the THE DSI ADVANTAGE manufacturing areas improving how the space is • UƟlized current state understanding of material handling processes utilized for material to create a soluƟon that worked for the 3PL and the assembly plant. presentation and • Worked with external logisƟcs to opƟmize inbound shipping lanes workstation layouts. and level the plant’s receiving schedule. • Designed the material storage layout and the fork free delivery NO IMPACT TO processes. BODY SHOP • Rebalanced the material handling manpower and created documents detailing the delivery process for the plant operators MANPOWER and supervisors. We rebalanced the existing • The team supported the enƟre process from concept through Body Shop material implementaƟon on the Body Shop floor including managing the handling manpower to absorb the labor required installaƟon contractors. to handle the insource parts . www.dsidsc.com Excellence by Design since 1983.