A. GENERAL INFORMATION:

1. Name of Firm : APPLIED ENGINEERING

2. Address, Telephone & Fax Nos. : 38-A, Unit No. 3, Latifabad, Hyderabad-71800,

Phone # +92-22-2100311-12 Fax # +92-22-2100313

Email: [email protected] Email: [email protected]

3. National Tax Number : 0676537-8

4. Sales Tax Registration Number : 12-00-2800-140-82

5. Date of Establishment : 1st January 1987

We have been carrying out the business on the name of Applied Engineering Services (Pvt.) Limited and since 1st August 1996 as Applied Engineering. All manpower and equipment stand transferred to Applied Engineering.

6. Natural of Ownership : Partnership Firm

7. Chief Executive:

a) Name : Mr. Dabirul Mulk

b) Qualification : B.Sc. (Engg.) Mech.

c) Nationality : Pakistani

Page 3

APPLIED ENGINEERING

MANPOWER

Page 4

APPLIED ENGINEERING

ORGANIZATION CHART

CHIEF EXECUTIVE

Executive

Director

Manager Manager Manager Management (Administration) (Finance) (Inspection) Representative

Manager (Technical)

Inspectors Manager Manager Manager Inspector Radiography, UT, (Bill (Bill (Bill Third Party Distribution Distribution Distribution MPT and DPT

& Meter & Meter & Meter Reading) Reading) Reading) Mu ltan Hyderabad

Engineers Engineer Engineer

(Cathodic (Design and (Construction) Protection) Development)

Page 5

APPLIED ENGINEERING

B. MANPOWER: (Including Chief Executive)

Sr. Name of Person / Present Academic and Professional Relevant Courses Attended No. Assignment Qualification Membership of institute

1. Mr. Dabirul Mulk BSc. (Engg.) MECH 1. Advance Industrial Chief Executive a) Life member Institute of Radiography. Engineering Pakistan. 2. Special Course in b) Member engineering Council of Petroleum Engineering Pakistan. (Canada). c) Member American Society of 3. Course in Investment Mechanical Engineering Analysis and Decision (ASME). Making. d) Member Nation Association of Corrosion Engineers (NACE). e) Life Member of Pakistan Atomic Energy.

2. Mr. Syed Shoaib Shahid MB A ( IB) SAP (Basic) Executive Director MCS

3. Syed Sultan Alam BSc a) ASNT Level-II (IR) Sr. Manager (Technical) b) Magnetic Particle & Dye Penetrate Testing Conducted Level-I Pakistan Atomic Energy Commission Islamabad. c) PNRA Course (Transport Safety and Security of Radioactive Material / Sources)

4. Mr. M.Zubair Lodhi MBA (Management) Diploma in I.T Manager (Administration) / Internal Quality Auditor Management Representative

5. Ghazanfar Hussain M.Com Video Analyst Manager (Finance)

6. Abdul Khalique Rajput BE (Electrical) a) NACE Basic Corrosion Engineer (Cathodic Course at Karachi. Protection) b) NACE Corrosion Prevention Course at Karachi. c) 4 Week Corrosion Control Course at British Gas, UK.

7. Mohsin Ali BE(Telecommunications) a) PLC Course (PLC) Engineer (CP) ME(Communication Systems & Networks a) Member engineering Council of Pakistan

Page 6

APPLIED ENGINEERING

8. Arshad Azeem BE (Civil) Wireman Course. Engineer (Construction) Electrical Supervisor Course.

9. S.M.Saleem Associate Engineer Radiography Course from Incharge (Electrical) Intermediate PSNT, Nilore, Rawalpindi. Ex-Executive of SSGC. 10 Gul Hassan Qureshi MSC (Chemistry) Regional Manager Ex-Executive of SSGC (Karachi)

11 Aftab Hussain Shah BA Regional Manager (Lahore)

12 Muhammed Tahir B.Com ASNT Level-II (RT). Regional Manager Certified Industrial (Hyderabad) Radiographer from PNRA.

13 Malik Muhammed Afzal BA ASNT Level-II (RT) W IR Certified Industrial Radiographer from PNRA.

14 Muhammed Khalid Intermediate ASNT Level-II (RT) W IR Certified Industrial Radiographer from PNRA.

15 Muhammed Ajmal Intermediate ASNT Level-II (RT). W IR Certified Industrial Radiographer from PNRA.

16 Akhtar Abbas Intermediate ASNT Level-II (RT). Radiographer Certified Industrial Radiographer from PNRA

17 Ghulam Shabbir Intermediate ASNT Level-II (RT). WIR Certified Industrial Radiographer from PNRA

18 Syed Pervaiz Akhtar Intermediate ASNT Level-II (RT). W IR Certified Industrial Radiographer from PNRA

19 Khalil-ur-Rehman Zaheer Intermediate ASNT Level-II (RT). W IR Certified Industrial Radiographer from PNRA

20 Syed Mohsin Abbas Shah Intermediate ASNT Level-II (RT). Radiographer Certified Industrial Radiographer from PNRA

21 Fateh Muhammed Intermediate ASNT Level-II (RT). Radiographer

Page 7

APPLIED ENGINEERING

22 Asif Mehboob Intermediate ASNT Level-II (RT). Radiographer

23 Abdul Rauf Intermediate ASNT Level-II (RT). Radiographer

24 Faisal Irshad Intermediate ASNT Level-II (RT). Radiographer

25 Muhammed Yousuf Intermediate ASNT Level-II (RT). Radiographer

26 Muhammed Imran Intermediate ASNT Level-II (RT). Radiographer

27 Usman-ul-Haque Intermediate ASNT Level-II (RT). W IR

28 Usman Wajid Intermediate ASNT Level-II (UT) Radiographer

29 Ansar Ahmed DAE (Electrical) Ultrasonic Inspector BA

30 Mahmood Bhurgari BA Sr. Inspector DAE (Mechanical) PAEC Level-I (Eddy Current) PAEC Level-I ( UT) 31 Junaid Waqar B.Com Inspector

32 Naveed-ur-Rehman DAE (Civil) Inspector Matriculation

33 Nazeer Ahmed, BA Inspector

34 Bilal Ahmed Khan, B.Com Inspector DAE (Mechanical)

Note: Additional required staffs are recruited in accordance with the projects under execution.

Page 8

APPLIED ENGINEERING

COMPANY’S PROFILE

Page 9

APPLIED ENGINEERING

APPLIED ENGINEERING APPLIED ENGINEERING

AE has been established as high performance AE undertakes the delivery and construction of engineering Company acting all over Pakistan. AE project works and provides engineering and has proved its proficiency both as a general specialized services which includes as under: Consultant and as a consortium member in the field of design, construction supervision and construction BASIC ENGINEERING of pipelines and gas treating plant, civil works, piling works etc. Scope of work also includes survey work Civil, Mechanical, Electrical and Instrumentation, and selection of pipeline route and design of pipeline Plant Piping and Transmission and Distribution crossings, also include the services of Non Pipeline, Steel Structures and Survey. Destructive Testing NDT and Cathodic Protection of underground structures. DETAIL ENGINEERING

Detailed design of the projects, Preparation of material specification, BOQ’s, preparation of drawings, activity schedules, reports, Tender, Contract etc.

CONSTRUCTION WORK AND SUPERVISION

Non Destructive Testing (NDT) and Engineering Inspection Services

Authority Approvals

Project & Site Management

Commissioning Support

Cathodic Protection of Pipelines

Storage tanks and structures exposed to corrosive environment.

Our major activities centre on design pipelines and piping systems in industrial and gas plants, establishment of pipeline route.

We are specialized in Non Destructive Testing (NDT) and engineering Inspection Services as well.

Our staff’s know how extend beyond the technical and engineering requirement of the jobs and familiar with the local conditions, which are particularly important for expediting the pace of progress and removing the bottlenecks encountered during execution of the works.

Page 10

APPLIED ENGINEERING

BASIC AND DETAIL ENGINEERING RANGE OF SERVICES

Our experience staff prepares the Basic Engineering Document preparation in respect of detail documents on client requirement for detail engineering includes. engineering. • Project plants and schedules. Our motivated teams work closely with client. They have the support of specialist in all technical and • Plans and schedule of pipeline projects, engineering fields in order to find the most effective equipment, boilers and NDT. solution of problems encountered during the work execution. • Plans and schedule of Bridges and piling work.

• Plans and schedule of pipelines and piping system of plants.

• Land and pipeline route survey.

• Plan and schedule of structural steel.

• Detail and shop drawings on Auto CAD.

• Preparation of data and construction work details.

• Work schedules.

• Authority approvals.

• Cost estimates.

• Material specifications.

• Bill of Quantities.

• Tender and contract documents.

Page 11

APPLIED ENGINEERING

CONSTRUCTION WORK RANGE OF SERVICES

Our highly experienced engineers and staff are • Construction of all types of civil, mechanical and capable of execution of construction work of all types electrical works. related to civil, mechanical, pipelines, plant, piping, structural steel, electrical and instrumentation, land • Construction of gas water and oil pipelines. and pipeline route survey. • Structural steel works. In the time completion of work and meeting the quality requirement of the work are our major • Land and pipeline route survey. approach to satisfy the client. • Preparation of As-built documentation/drawings after work completion.

• Supervision and Inspection of construction activities.

• Quality control of work.

• Project site management.

• Utilities approval.

• Job safety.

Page 12

APPLIED ENGINEERING

NON DESTRUCTIVE TESTING (NDT) AND RANGE OF SERVICES ENGINEERING INSPECTION SERVICES The technique involved in NDT examination is The company’s philosophy is to provide technical based on established codes like API, ASME, ASTM services in quality inspection and NDT examination which include: based on established engineering codes and practices, as well as surveys in engineering works • Radiography during manufacturing and on stream operations. • Ultrasonic The company also provides third party inspection services, welding procedures and welders • Magnetic particles qualifications and on stream plant inspection. • Dye Penetrate

Third party inspection services in accordance with the specified code, specification like API, ASTM, BS etc. includes:

• Mill inspection of linepipe for oil and gas industry and civic institutions.

• Quality inspection in engineering works during manufacturing the materials like valves, regulators fittings etc. for use in gas and oil industry.

• Welding procedure and welders qualification testing.

• On stream plant inspection.

Page 13

APPLIED ENGINEERING

AUTHORITY APPROVALS RANGE OF SERVICES

APPLIED ENGINEERING (AE) has the experienced • Approvals from local Government and Union staff who have local know how to make approach to Council. the concerned authority for approvals wherever these are essential to expedite the work. However • Approvals from Highways Authority. such exercise require client’s supporting documents for effective action. • Approvals from Irrigation Authority.

• Approvals from Railways Authority.

• Approvals from Building Control Authority.

• Land Acquisition documents.

• Approvals from Concerned Ministry.

• Approvals from Chief Inspector of Explosives .

Page 14

APPLIED ENGINEERING

PROJECT AND SITE MANAGEMENT RANGE OF SERVICES

An efficient project team guarantees proper • Project Scheduling. execution of a Contract. • Cost Estimates and Control. Depending on the size of a project, a team of personnel’s having relevant experience of work is • Construction Site Management. organized to execute the work. • Procurement. Following personnel are available to execute the project management tasks: • Client and Sub-Contractor Coordination.

• Project Managers. • Scope of Responsibility.

• Construction Managers. • Safety.

• Site Engineers. • Coordination with Client and Consultant.

• Cost; budgeting and scheduling Engineers and other supporting staff.

Page 15

APPLIED ENGINEERING

COMMISSION SUPPORT RANGE OF SERVICES

On completion of a project work of any • Preparation of procedure for taking over disciplines/nature, we offer comprehensive technical works/units by the clients and occupants. support to our clients. The work/project is put into commission whether it is occupied or run the • Preparation of document in case there is any commodity. legal functional or operational matters are involved. For all purposes the experienced personnel are made available to undertake the tasks. • Startup testing procedure preparation in respect of plant or pipeline and machinery/equipment commissioning of system, plant, pipeline etc.

• Handing over/taking over notes/procedure for Contractor and client.

Page 16

APPLIED ENGINEERING

CATHODIC PROTECTION (CP) RANGE OF SERVICES

Corrosion is a natural phenomenon which follows the • Selection of appropriate material for any law of nature. It has devastating effects, on corrosive environment. pipelines, storage tanks, bridges, offshore plat forms and metallic structures and cost billions of • Selection of coating material. Dollars/Rupees. This tremendous loss could be saved by controlling corrosion through numerous • Resistivity Survey. methods including material selection protective coating and chemical inhabitation. However one of • Designing and installation of Cathodic Protection the most effective method for combating corrosion is System adopting any of the following system: Cathodic Protection (CP). • Imprest current system using Transformer APPLIED ENGINEERING provides corrosion control Rectifier, Thermal Generator, Solar Energy engineering services including survey, designing and Power etc. installation of Cathodic Protection Systems for pipelines, storage tanks, various submerged • Galvanic System i.e. Sacrificial Anodes structures etc. System.

• Maintenance and monitoring of Cathodic Protection System.

• Corrosion Audit.

Page 17

APPLIED ENGINEERING

QHSE POLICY

Page 18

APPLIED ENGINEERING

EXPERIENCE

Page 19

APPLIED ENGINEERING

CONSTRUCTION PROJECTS

Page 20

APPLIED ENGINEERING

A) CONSTRUCTION PROJECTS COMPLETED:

S. Description Job Carried Out Year No. 1. Installation of 3 Km of 16” diameter Oil Pipeline Civil Aviation Authority (Aviation Fuel) and Cathodic Protection through M/s. SOGEA of System and Welding Stainless Steel Piping. France. Jinnah Terminal, Karachi International Airport.

2. Designing & Construction of 3 Km of 10” WAPDA Lakhra near diameter steel pipelines with Water Pumping Hyderabad Station including eight sedimentation tanks of capacity 100,000 gallons each for 150 MW F.B.C. coal power station.

3. Designing & Laying of 4.5 Km of 8” dia steel WAPDA Khanote near pipeline from sedimentation tanks to residential Hyderabad colony WAPDA’s coal power station.

4. Construction of underground 1230 meters of WAPDA through Dong 1420 mm X 10 mm and 90 meter of 1020 mm Fong Electric X 10 mm pipelines with various fittings for Corporation of China. circulating water system at 150 MW (3 X 50 Lakhra Power Station. MW ).

5. Thrust Boring of twin 24” diameter pipeline WAPDA Nawabshah crossing under Railway Track for water flow.

6. Fabrication of Hot and Cold Air Ducts for boiler WAPDA through Dong at Lakhra Power Station. Fong Electric Corporation of China. Lakhra Coal Power Station.

7. Fabrication and erection of the following tanks: WAPDA through Dong Fong Electric 1. 300m3 demineration water tanking weight Corporation of China. 14.6 tons each – 2 set. Lakhra Coal Power 2. 150m3 soften water tanks, weight 4.786 Station. ton – 1 set. 3. 30m3 Drain Water Tank, weight 2.962 ton each – 2 sets. 4. 20m3 Oil Tank, weight 2.405 tons – 2 sets. 5. 2m3 Makeup Oil Tanks, weight 0.68 ton – 1 set

8. Painting of Equipment and piping 16522m2. WAPDA through Dong Fong Electric Corporation of China. Lakhra Coal Power Station.

Page 21

APPLIED ENGINEERING

9. Fabrication and Installations works for 50 MW WAPDA through HUBAI combined cycle power plant at Kotri were Electric Power carried out as mentioned below. Corporation (HEPEC) China. Kotri near Hyderabad.

a) Installation and Fabrication of inlet and out ducts and chimneys for boilers.

b) Installation of piping system (Carbon Steel and Stainless) for condensate water of sizes from 25 mm to 325 mm.

c) Installation and Fabrication of complete high pressure steam boiler carbon and alloy, steel piping having sizes from 79 mm to 610 mm with thickness varying from 6 mm to 20 mm. The system was welded with combination of GTAW and SAW with 100% X-Ray inspection.

d) Installation of complete firm fighting system with piping.

e) All piping system in other areas like, turbine house, pump houses etc.

f) Circulating water pipings system.

10. Construction (Civil Construction) of the WAPDA through Dong followings in 150 MW (3 X 50 MW) (FBC) coal Fong Electric fired thermal power station at Khanot near Corporation of China. Hyderabad. Larkhra 50 Km from Hyderabad. a) Chemical water treatment plant building. b) Acid and base storage. c) Neutralizing pool. d) Coal handling switch rooms building. e) Machine shop.

f) Garage and fire station. g) Soft water treatment building. h) Industrial water pump house.

i) Glass fibber cooling tower.

Page 22

APPLIED ENGINEERING

j) Demineralized water tank.

k) Refrigeration and air conditioning plants building.

11. Construction of 22.5 Km of natural gas SSGC distribution network of steel pipes of sizes 2”, Industrial Area North 4”, 6” and 8” at Karachi. Karachi.

12. Construction of 7.5 Km of steel pipelines for SSGC natural gas distribution having sizes of 8” and Karachi City 12” diameter.

13. Construction of 112 Km of steel pipeline of SSGC natural gas distribution network comprising 6”, District Larkana 2” and 1” dia in Shahdad Kot and Kumbe Ali Province Khan Towers near Larkana.

14. Cleaning, preparing and painting of weld seam STFA Construction and interior of 3000 / 3300 mm dia steel Company conduit / siphon at Pehur High Level Canal Project at Turbela constructed by STFA / Ciltug of Turkey. Total area painted: 88582 sq ft.

15. Welding / Construction / Installation of 6” dia Apr 2006 to July 2006 above ground feeder line for well-3 at Limited Kandhkot Gas Field.

16. Installation of MS Grating on ADAM X-1 (Hala Pakistan Petroleum Mar 2008 to Apr 2008 Project) Limited

17. Construction of 1 Diesel Storage Tank at Pakistan Petroleum 2010 Khewali Pump Station (KPS) and 1 Limited Condensate Settling Tank at Sui Gas Field (Sui)

18 Construction of 5 Kms long, 4” NPS, Schedule Pakistan Petroleum 10th February, 2011 to 40 Line Pipe at Sui Gas Field Limited 12th September, 2011

Page 23

APPLIED ENGINEERING

POLYETHYLENE PIPELINES

Page 24

APPLIED ENGINEERING

B) POLYETHYLENE PIPELINES

S. Name of Client Job Carried Out Year No.

1. Indus Gas Co. Designing and supervision of laying of Gas PE - (now SSGC) pipeline networks involving 125mm, 63 and 20mm dia pipes in Gas Company by CEO of Applied Engineering.

2. BHP Zamzama Laying of the following PE pipeline network at BHP 2000 Gas Field, Dadu Zamzama Gas Field.

a. Fire Water System

160mm PE 80 SDR-9 – 572 meters 110mm PE 80 SDR-9 – 223 meters 40mm PE 80 SDR-9 – 78 meters

b. Potable Water System

90mm PE 80 SDR-11 – 332 meters 40mm PE 80 SDR-11 – 152 meters

3. Agha Khan Laying PE pipelines for Gas. 2002 Hospital, Karachi 125mm PE 80 SDR – 460 meters 63mm PE 80 SDR-11 – 100 meters

4. S.S Engineers Butt Fusion Welding of 160mm PE Pipe. Feb 2007 to Mar 2007 (Pvt) Limited

5. BHP Petroleum Repair of 162 mm Dia Polyethylene Pipeline at February, 2009 Pakistan Limited Zamzama Gas Field, Dadu

6. Descon Laying of HDPE Portable & Fire Water Line at BHP March, 2010 Engineering Zamzama FEC Project, Dadu, Sindh Limited

7. Descon Welding & Hydrotesting of HDPE Pipe DN90 December, 2011 Engineering Limited

Page 25

APPLIED ENGINEERING

RADIOGRAPHIC INSPECTION

Page 26

APPLIED ENGINEERING

C) Radiographic Inspection

S. Name of Client Job Carried Out Year No.

1. Sui Northern Gas Sui Northern Gas Pipelines Limited in various areas Pipelines Limited of Punjab and Frontier Province were carried.

a). 116 Km of 24” diameter pipeline SNGPL/Near From 1987 to 1991 Sharifabad. b). 61 Km of 10” diameter pipeline Gujranwala. c). 60 Km of 10” diameter Ismail Kot-Tarnab Farm (Frontier). d). 22 Km of 8” diameter. e). 10 Km of 24” diameter Sadiqabad Ahmedpur. f). 86 Km of 16” diameter Dhulian near Rawalpindi. g). 26 Km of 18” diameter near Faisalabad. h). 58.7 Km of 16” diameter near Havalian. i). 32 Km of 16” diameter Rawat to Faisalabad (Islamabad). j). 47.7 Km of 18” diameter 25.76 Km of 30” diameter near Panjnab. k). 18” dia X 89 Miles Sahiwal, Lahore. 1995 Feb.97 to June 97 Feb.97 to August 99

l). 42 Km of 16” dia Sheikhupura to Gujranwala.

m). 19 Km of 24” dia Naughazi to Islamabad Site.

n). 45 Km of 8” Gujranwala to Sialkot Project.

o). 82 Km of 8” Jauharabad to Chashma.

p). 17 Km of 8” Dipalpur Project. March 2002 to q). Charsada and Khazana Sugar Mills. July 2002 r). 29 Km of 36” dia A4-AC4 Section.

s). 11.52 KM of 8” dia Pindori to Bhangali. Under execution since

September 2002

Page 27

APPLIED ENGINEERING

2. Sui Northern Gas Radiography & Welding Inspection for 16” dia from 1997 Pipelines Limited Sheikupura to Gujranwala.

3. // Radiography & Welding Inspection for 8” dia from 1997 Gujranwala to Sialkot.

4. // Radiography & Welding Inspection for 8” dia at 1999 Depalpur.

5. // Radiography & Welding Inspection for 8” dia from 1999 Jauharabad to Chashma Gas pipeline

6. // Radiography & Welding Inspection for 16” dia from Sheikhupura to Gujranwala.

7. // Radiography & Welding Inspection for 24” dia at 2001 Sadiqabad, Sui Field.

8. // Welding Inspection and Radiograph size 36” 18km 2002 (Loopline) A4-AC4 section.

9. // 18 Miles (Loopline) A4-AC4 section of 36” dia at 2002 Sardar Garh Camp.

10. // Modification of compressor station Sui-Peshawar 2003 section to Multan.

11. // Modification of compressor station Sui-Peshawar 2003 section to Faisalabad.

12. // Modification of compressor station at AC-0 (Sui Field) 2003 at Bhong District Sadiqabad.

13. // Modification of compressor station at Sui Field. 2003

14. // Welding Inspection 6”, 8” and 10” dia Assorted 2003 operational phases in Peshawar Distribution Region.

15. // Welding Inspection & Radiography of 36” dia x 3.5 2003 Kms AV-17-A20.

16. // Welding Inspection and Radiography of 20.09 Kms 2003 CC1-CC3 line of 30” dia and 0.80 kms of 30” dia Soan River Crossing at Fateh Jang Tala Gung Road, Dhunal(Main Road).

17. // Welding Inspection & Radiography 6” dia and 8” dia 2003 operational phases, Peshawar.

Page 28

APPLIED ENGINEERING

18. Sui Northern Gas Welding Inspection & Radiography of 36” dia x 28kms 2004 Pipelines Limited AV-22-AC6 Multan.

19. // Welding Inspection & Radiography of 10” dia x 78kms 2004 Guguri-Kohat.

20. // Welding Inspection & Radiography of 16” dia x 23kms 2004 Malikwal C V 12A-CV134 C1

21. // Welding Inspection & Radiography of 30” dia x 30kms 2004 CC1-04 Haranpur Chakwal.

22. // Welding Inspection & Radiography of 18” dia x 27kms 2006 Tobba-Gojra.

23. // Welding Inspection & Radiography of 10” dia x 43kms 2006 Sahiwal-Pakpattan.

24. // Welding Inspection & Radiography of 8” dia x 22.40 2006 kms Depalpur-Basirpur.

25. // Welding Inspection & Radiography of 12” dia x 28.23 2007 to 2008 kms CV12A-Khatlia Sheikhan.

26. // Compression construction work compressor stations. 2007

27. // Welding Inspection & Radiography of 12” dia x 90kms 2007 Mina Chanu-Hasilpur.

28. // Welding Inspection & Radiography of 8” dia x 37kms 2007 Manjuwal-Bannu.

29. // Welding Inspection & Radiography of 8” dia x 101kms 2007 to 2008 Kharapa Mor-D.I Khan.

30. // Welding Inspection & Radiography of 20” dia x 47kms 2007 Fatima Fertilizer.

31. // Welding Inspection & Radiography of 8” dia x 37.14 2007 kms AV-40 Sirhmir-Bhawana.

32. // Welding Inspection & Radiography 8” dia x 40kms 2007 AV40-Dijkot Tanlianwala.

33. // 8” dia x 14 Kms Chand Mela. 2007

34. // Welding Inspection & Radiography of 6” dia Above January, 2008 to assorted Phases Islamabad Region. April, 2009

Page 29

APPLIED ENGINEERING

35. Sui Northern Gas Welding Inspection & Radiography of 24” dia x 112 24th July, 2007 to Pipelines Limited kms Sahiwal-Bhari Pheru (Phool Nagar). 27th April, 2009

36. // 36” dia x 40 Kms SMS Mian Channu-Sahiwal. January, 2008 to April, 2009

37. // Welding Inspection & Radiography 8” dia x 32kms May, 2007 to Pezu Tank. October, 2008

38. // Welding Inspection Services Contract for 12th October, 2007 to Compression Construction Works at AC-0, AC-1X, October, 2009 AC-4, AC-6, AC-7, AC-8, CC-1 and CC-3 Compressor Stations.

39. // Welding Inspection Services Contract for 8” x 31st March, 2008 to 9.90Kms, 12” x 9.10Kms & 18” x 23.60Kms Gas 20th August, 2009 Gathering System of M/s Mol Pakistan.

40. // Welding Inspection & Radiography 8” dia x 37.64kms 13th September, 2008 to D.I Khan-Bhakkar Main Line. 10th May, 2009

41. // Welding Inspection Services Contract for 28” dia x 12 24th August, 2008 to Kms Raw Water Pipeline for Fatima Fertilizer. 13th August, 2009

42. // Welding Inspection Services Contract for 8” dia x 22nd November, 2008 to 28.50 Kms Pasroor-Offtake-Narowal Transmission 26th June, 2009 Line (Phase-I)

43. // Welding Inspection Services Contract for 6” dia and April, 2009 to 30th March, above Assorted Operation Phases in Peshawar 2010 Distribution Region

44. // Welding Inspection Services Contract for 24” Dia X 28th April, 2009 to 31st 53.68 Kms Head Balloki – Dadud Hercules (MP 59) January, 2010 Transmission Line

45 // Welding Inspection Services Contract for 8” Dia x 23rd November, 2009 to 22.45 Kms Kot Addu-Chowk Khokhar Textile 19th April, 2010 Transmission Line

46 // Welding Inspection Services Contract for Compressor 1st November, 2009 12th Construction Works at AC-0, AC-1X, AC-4, AC-6, October, 2010 AC-8, CC-1 and CC-3 Compressor Stations

47 // Welding Inspection Services Contract for 29th January, 2010 to 4th Construction of 8” dia x 20 kms SMS Okara-Satgarh June, 2010 & Chak No. 11 R NA-143 Lahore Transmission Line

Page 30

APPLIED ENGINEERING

48. Sui Northern Gas Welding Inspection Services Contract for 24” dia x 13th February, 2010 30th Pipelines Limited 32.71 Kms Dawood Hercules (MP59) – Repeat November, 2010 Station B3 (Shahdra) Loopline (Project – IX)

49 // Welding Inspection Services Contract for 6” Dia and 12th April, 2010 31st May, above assorted operational phases in Islamabad & 2011 Abbottabad Distribution Region

50. // Welding Inspection services Contract for Qadirpur 30th June, 2010 to 15th Interim Front End Compression Project October, 2010

51. // Welding Inspection Services Contract for 8” Dia x 4th September, 2010 to 26.70 Kms Shiwal – Sillanwali Line 30th December, 2010

52. // Welding Inspection Services Contract for 12” Dia x 17th December, 2010 to 47.17 Kms Mandi Bahauddin (V/A Mangat) to V/A 2nd March, 2011 Lala Musa Line

53. // WIS & Radiography Services Contract for 12” Dia x 19th June, 2011 to 31st 16.40 Kms Makori Line December, 2012

54. // WI / RS Contract for 2” Dia & Above Assorted 2nd April, 2012 to 5th April, Operational Phases in Multan & Bahawalpur 2013 Distribution Regions

55. // WI / RS Contract for 2” Dia & Above Assorted 2nd April, 2012 31st March, Operational Phases in Peshawar Distribution Region 2013

56. // W I / RS Contract for 2” Dia & Above Assorted 2nd April, 2012 to 3rd April, Operational Phases in Faisalabad & Sargodha 2013 Distribution Regions

57 // WI / RS Contract 12” Dia X 14.7 Kms Maramzai 15th January, 2013 to Extension MOL Line July, 2013

58 // WI /RS Contract for 16” Dia X 20 Kms, 16” Dia X 22.4 14th February, 2013 to Kms & 6” Dia X 2 Kms Flow Lines for Latif Gas Field August, 2013

59 // WI /RS Contract for 42” Dia x 21.45 Kms Sawan 4th April, 2013 to 28th Apr, Qadirpur Transmission Line 2015

60 // WIS Contract for 2” Dia & Above Assorted 1st April, 2013 to 31st Operational Phases in Peshawar Distribution Region March, 2014

Page 31

APPLIED ENGINEERING

61 Sui Northern Gas WI / RS Contract for ¾” to 2” Dia & Above Assorted 1st April, 2014 to 31st Mar, Pipelines Limited Operational Phases in Peshawar Distribution Region 2015

62 // WI / RS Contract for ¾” to 2” Dia & Above Assorted Operational Phases in Faisalabad Distribution Region 1st April, 2014 to 31st Mar, 2015

63 // WI / RS Contract for ¾” to 2” Dia & Above Assorted 1st April, 2014 to 31st Mar, Operational Phases in Sargodha Distribution Region 2015

64 // WIS Contract for 24” Dia X 145.8 Kms Kohat – 24th April, 2014 to 27th Dakhni – Dhullian – Gali Jagir Transmission Line Jan, 2016

65 // WI / RS Contract for ¾” to 2” Dia & Above Assorted 1st Apr, 2015 to 31st Mar, Operational Phases in Peshawar Distribution Region 2016

66 // WI / RS Contract for ¾” to 2” Dia & Above Assorted 1st Apr, 2015 to 31st Mar, Operational Phases in Faisalabad Distribution Region 2016

67 // WI / RS Contract for ¾” to 2” Dia & Above Assorted 1st Apr, 2015 to 31st Mar, Operational Phases in Sargodha Distribution Region 2016

68 // WIS for 42” Dia X 57.36 Kms LNG SV3 – SV4 and 12th May, 2015 to 16th SV5 – Qadirpur Transmission Line Sep, 2015

69 // 100% WI / RS Contract for Qadirpur – AC1X, 42” Dia 19th November, 2015 (In X 71 Kms Transmission Line Progress)

70 // 100% WI / RS Contract for 10” Dia X 10 Kms 8th Feb, 2016 (In Trunkline from Mardankhel V/A to Mardankhel VA-2 Progress) & 12” Dia X 12.22 Kms Trunkline from Mardankhel VA-2 to Makori GPF / Manzalai CPF

71 // WI & RS Contract for ¾” to 2” Dia and Above 1st Apr, 2016 (In Assorted Operational Phases in Peshawar Progress) Distribution Region

72 // WI & RS Contract for ¾” to 2” Dia and Above 1st Apr, 2016 (In Assorted Operational Phases in Sargodha Progress) Distribution Region

73 // WI & RS Contract for ¾” to 2” Dia and Above 1st Apr, 2016 (In Assorted Operational Phases in Faisalabad Progress) Distribution Region

Page 32

APPLIED ENGINEERING

74 // WI & RS Contract for ¾” to 2” Dia and Above 1st Apr, 2016 (In Assorted Operational Phases in Bahawalpur Progress) Distribution Region

75 // WI & RS Contract for ¾” to 2” Dia and Above 1st Apr, 2016 (In Assorted Operational Phases in Sahiwal Distribution Progress) Region

76 // Welding Inspection & Radiography Services Contract 19th Jun, 2016 (In for 36” Dia X 64 Kms AC1X-A3 Transmission Line Progress)

77 // Welding Inspection & Radiography Services Contract (In Hand) for 24” Dia X 85 Kms (D/H Offtake-Nandipur Power Plant) Transmission Line

01. Sui Southern Gas Welding and Radiographic Inspection for the 1994 to 1996 Company Ltd following pipeline projects constructed by Limited has been completed. a) 43 Km of 8” diameter pipeline Quetta.

b) 22 Km of 12”, 8”, 4” and 2” diameter gas 1991 to 1993 pipeline Hub Town Lasbella.

c) Sibi compression station piping system 6 month project Sibi-1995.

d) 135 Km of 24” diameter X-60 pipeline 1996 Kandanwari Gas Field to Nawabshah 230 Km of 20” diameter form Nawabshah to Karachi (25 months during) Welding x-ing involving radiography and dye penetrent for Indus River x-ing structure.

e) 20” dia X 5 Km Pakland – IC I Plant.

f) 12” dia X 1.5 Km PRL Realignment. Dec. 1996 to July 1997

g) 24” dia X 30 Km Bin Qasim Hydrocracker.

h) 12” dia Scheme 33 Gulshan-e-Iqbal. Aug. 1995 to Nov. 1997

i) Welding and Radiographic Inspection of 30 Km Dec. 1996 to of 8” pipeline (Quetta to Pishin). Aug. 1997

j) 30 Km of 24” dia of Hydrocracker high pressure Dec. 1996 to July 1997 line.

Page 33

APPLIED ENGINEERING

k) 13 Km of 30” dia KESC Bin Qasim Pipeline Aug. 1995 Project. to Nov. 1996

l) Welding and Radiographic Inspection of 30 Km Dec. 1996 to Aug. of 8” pipeline (Quetta to Pishin). 1997

m) 30 Km of Hydrocracker high pressure line.

n) 13 km of 30” dia KESC Bin Qasim Pipeline Project.

02 Sui Southern Gas WIS for 16” Dia required for Reinforcement Work of 24th Mar, 2015 to 30th Company Limited Quetta Mastung Pipeline Jun, 2015

03 // WIS for for Reinforcement Work on 16” Dia X 20 Kms 1st Jun, 2015 to 25th Quetta Mastung Pipeline (Phase II) August, 2015

04 // WIS for for 24” Dia X 33 Kms API 5L X70 (PSL-2) 1st Feb, 2015 to 31st Tando Adam to Massu Pipeline & related Valve December, 2015 Assemblies

05 // WIS for for 42” Dia X 20 Kms API 5L X70 Pipeline 1st Jun, 2015 to 30th (PSL-2) & related Valve Assemblies for MVA Nara - November, 2015 Sawan

06 // Welding Inspection Services for 24” Dia X 34 Kms (In Hand) Loop line from Shikarpur to Jacobabad & 12” Dia X 23 Kms, Re-Routing of QPL Segment

01. Indus Steel Pipes Radiographic Inspection of Weld seam of API Spiral 1986 to 2008 Limited Weld Pipes manufactured by ISPL.

01. Pakistan Refinery Radiographic Inspection of Weld at Plant. 1993 to 2009 Limited

01. Hyundai Compressor station piping at Pirkoh. July 1998 to June 1999 Engineering and Construction Company (IMS) (Oil and Gas Deve. Corp.) Project

01. S&N International 5.34 Km of 48” July 2000 5.8 Km of 36” 15.4 Km of 30” 1.9 Km of 18” of CDA water pipeline system.

Page 34

APPLIED ENGINEERING

01. Sadat 6 Km of 30” dia water pipeline of Rawalpindi Feb. 2001 to August Enterprises Development Authority. 2001

01. Techno Engg. White Oil Pipeline project NDT services, section-4 2003 from Fazil Pur to Mahmood Kot.

01. Pakistan Welding Inspection and Radiography for 4” dia well#5 2003 Petroleum Feeder Line and 1” dia domestic gad line at Adhi Limited Field.

02. Pakistan Welding Inspection and Radiography of 10” dia 2007 Petroleum coated line pipe, Kandhkot. Limited

03. // Welding Inspection and Radiography for 2007 Replacement of 20” dia line pipe MP-13 to MP-25.

04. // Storage Tanks Mazarani Gas Field. 2007

05. // Welding Inspection and Radiography of 20” dia x 2007 7kms Sui-KPS.

06. // Providing Visual and Radiographic Inspection 06th October, 2008 to Services during welding / construction / laying of 20” 30th June, 2009 dia linepipe to replace pipeline section of about 10km of existing and operation water pipeline between MP13 to MP25 and pipeline cleaning pigging from MP-0 to MP-20.

07. // Providing Visual & Radiographic Inspection Services 15th December, 2008 to during construction of above ground vertical steel 10th June, 2009 storage tanks for water (02 Nos at Sui Field and 02 Nos at Khewali Pump Station(Kps) near Kashmore) and 01 No Condensate Oil service (01 No at Sui Gas Field)

08. // Providing Visual & Radiographic Inspection Services 01st February, 2009 to during Construction of above ground Vertical Steel 30th November, 2009 Storage Tank for Raw Water Service of Capacity 350.000 IMP Gallons in Sui Purification Plant at Sui Gas Field

09 // Providing Visual and Radiographic Inspection 2nd July, 2009 to Services during construction of Adhi-18 Feederline 18th October, 2009

10 // Radiographic Inspection Services during welding / 1st November, 2009 to

Page 35

APPLIED ENGINEERING

construction / laying of 8” Dia Feederline and surface 25th December, 2009 fittings of Well Sui-88 (M)

11. // Providing Visual and Radiographic Inspection 16th October, 2010 to Services during replacement of 20 Kms Long 20” Dia 31st August, 2011 Sui-KPS Water Line

12. // Providing Visual and Radiographic Inspection 1st May, 2011 to 31st services during construction of above-ground vertical August, 2012 steel storage tanks for water 06 numbers at Sui Field and 01 number at KPS near Kashmore

13. Pakistan Providing Visual and Radiographic Inspection 9th June, 2011 30th Petroleum Services during welding / construction / laying of 8” August, 2011 Limited Dia Feeder Line and surface fittings of Well-89 (M) at Sui Gas Field

14. // Providing Visual and Radiographic Inspection 1st October, 2011 7th Services during replacement of 4.8 Kms long, 20” Dia June, 2012 Sui-KPS Water Line within plane premises and outside plant premises

15. // Providing Visual and Radiographic Inspection 26th July, 2011 to 30th Services during construction of Gas Gathering Main 7 November, 2011 Feeder Lines at Section VI, Kandhkot Gas Field

16. // Providing Visual and Radiographic Inspection 10th October, 2011 to Services during welding / construction / laying of 4” 20th December, 2011 Dia Feederline and surface fittings for Chachar-4 Well at Chachar Gas Field near Kandhkot

17 // Providing Visual & Radiographic Inspection Services 26th December, 2012 to during Construction of Feeder Lines for Well KDT- May, 2013 28(M) at Sui Gas Field

18 // Radiographic Testing Services during ATA at April, 2013 Chachar Gas Field

19 // Visual & Radiographic Inspection during Construction July, 2013 to of Feederlines for Well Adhi-19 (T/K) at Adhi Gas November, 2013 Field

20 // Visual & Radiographic Inspection for Construction of 16th March, 2014 to 5th 01 Number Vertical Cylindrical, Above Ground Steel September, 2014 Storage Tank for NGL Service (T-101B), Capacity 5000 BBLS at Adhi Gas Field to replace existing damaged tank

21 // Visual & radiographic Inspection during Construction / 12th March, 2014 to Welding / Installation of 4” Dia Buries / Above Ground 13th June, 2014 Pipeline from Chachar Plant to Kandhkot Well-03 including Above Ground Piping, Riser Assemblies for

Page 36

APPLIED ENGINEERING

Tie-in Connections

22 // Visual & radiographic Inspection for Construction of 15th May, 2014 9th Nov, 6” NPS, Underground Feederline for Well Adhi-20 2014 (T/K) & Well 21 (T/K)

23 // Visual & Radiographic Inspection for 16” Dia Sales 29th Sep, 2014 to 31st Gas Line & 8” Dia Kinza Feederline at gambit Sindh Mar, 2015

24 Pakistan Visual & Radiographic Inspection for Adam X-1 1st Apr, 2015 to 30th Petroleum Feederline to Hala Plant May, 2015 Limited

25 // Visual & Radiographic Inspection for Shahdad X-1 16th Jun, 2015 to 12th Feederline Oct, 2015

26 // Visual & Radiographic Inspection for Design, Supply 21st Oct, 2015 to 20th of all Material and Construction of 01 Number Jan, 2016 Vertical, Cylindrical, Above Ground Steel storage Tank for Fire Water Services, capacity 300 CU.M at SFGS, Sui Gas Field to replace existing Corroded Tank including Dismantling and Shifting of existing tank

27 // Visual & Radiographic Inspection for Design, Supply 15th Oct, 2015 to 17th of all Material and Construction of 01 Number Aug, 2016 Vertical, Cylindrical, Above Ground Steel storage Tank at Adhi Field, Punjab

28 // 3rd Party Inspection Services during Construction / 1st Feb, 2016 to 5th Apr, Welding / Installation of WHSF, 10” NPS Duplex 2016 Feederline and 8” NPS CS Sales Gas Line for Sharaf X-1 at GPF II

29 // 3rd Party Inspection Services during Construction of 15th Apr, 2016 ( In Fire Water Tank at Hala (5000 BBLS) Progress)

30 // Visual & Radiographic Inspection Services during (In Hand) Construction of 6” NPS, Underground Feederline for Well Adhi-27 at Adhi Gas Field

01. Welding Inspection at Central Manifold-I, II & Sub 15th March, 2008 to Company Limited Manifolds at MSCL-Field, Deharki 17th September, 2009

02 // NDT Inspection Services for Pipeline Welding and 18th November, 2009 to Fabrication for Koonj 1-A, Sukkur 16th January, 2010

Page 37

APPLIED ENGINEERING

03 // NDT Inspection of Pipeline & Surface Fittings at July, 2012 to Habib Rahi Infill Wells September, 2012

04 // NDT & QA / QC Inspection Services during 28th November, 2012 to fabrication work of Piping & Fittings at Sujawal X-1 23rd March, 2013

05 // NDT & QA / QC Inspection during fabrication works June, 2013 to July, of Piping & Fittings at Halini-I 2013

06 Mari Petroleum Hiring of NDT Services Contractor during Mechanical 27th February, 2014 to Company Limited Fabrications Works at Zarghun Gas Field 15th June, 2014

07 // NDT Services for inspection during fabrication works 10th November, 2015 to of Phase 1, Kalabagh EPF 15th December, 2015

01 PSS Asia Radiographic Services at POGC Project, District 8th April, 2013 to June, Pakistan (Pvt) Dadu 2013 Limited

01 Petroleum 3rd Party Inspection Services for Construction / Laying 8th May, 2014 to 21st Exploration of 4” Dia Feederline from Hassan-4 to Tie-in Point at June, 2014 Limited Hassan-I

02 // 3rd Party Inspection Services for Construction / 1st Dec, 2014 to 17th Fabrication of 6” Dia Pipeline from Badar – 2 to Tie-in Mar, 2015 Point at Badar - 1

01 Oil & Gas Radiography Inspection Services for Storage Tanks, January, 2011 to April, Development TOC, Dacharpur, Kunnar LPG Plant / Sinjhoro Gas 2014 Company Limited Plant, Sanghar related all locations of FGCP-II

02 // Radiography Inspection Services for Storage Tanks, May, 2014 (In TOC, Dacharpur, Kunnar LPG Plant / Sinjhoro Gas Progress) Plant, Sanghar related all locations of FGCP-II

01 Kerui Group, NDT Inspection Services at Kunnar LPG Plant 1st Jan, 2015 to 17th China Aug, 2015

02 // Radiography Inspection & NDT Services at Kunnar 22nd Feb, 2016 to 8th Field, OGDCL Gas Plant, Tando Jam, Jun, 2016

Page 38

APPLIED ENGINEERING

ULTRASONIC INSPECTION PROJECTS

Page 39

APPLIED ENGINEERING

D) ULTRASONIC INSPECTION PROJECTS COMPLETED:

S. Job Carried Out Job Carried Out Year No. 1 Ultrasonic testing of weld seam of 1000 meter ISPL Kotri 1989 of 24” diameter spirally welded API pipes.

2 Ultrasonic Thickness testing of boiler tubing of Finance & Trade Center, 1993 two boilers of 50 MW power station. Karachi

3 Ultrasonic Testing of welding seam of 4000 ISPL Kotri 1991 meter of 8” diameter spirally welded API pipe.

4 Ultrasonic Testing of four Steel Structure of Pipe Bridge over Pakistan Steel Intake Channel (Total length 2668 inches)

5 Overall supervision of on line Ultrasonic Since 1991 Testing of Spiral Welding of pipe manufacturing at Indus Steel Pipe manufacturing.

6 Ultrasonic Testing of Welding joints of pipes of STFA, Tarbela July 2000 to November 3150, 3250 and 3350 mm OD and 6.5 Km long 2002 pipeline 900 joints having scanning length of 9400 meter.

7 Ultrasonic Testing of 109 Weldolet joints on SNGPL September 2001 30” and 36” pipes on Sui Northern Gas Pipeline Limited (SNGPL) pipeline system at various stations from Sui to Peshawar.

8 Ultrasonic Work at Jamshoro Power Station Rayan Engineering 2011 Services

9 Ultrasonic Test of 18” Norma Sleeves on 18” SNGPL 2012 Dia Line at MP-252.71 (AV-30-AV-31 Segment) at Multan

10 Ultrasonic Work at Jamshoro Power Station Rayan Engineering 2012 Services

11 Ultrasonic Work at Jamshoro Power Station Rayan Engineering 2014 Services

12 Ultrasonic Thickness Work at & Joseph Lubo (Pvt) 2014 Ibrahim Hyderi 3 Submarine, Karachi Limited

Page 40

APPLIED ENGINEERING

THIRD PARTY INSPECTION

Page 41

APPLIED ENGINEERING

E) THIRD PARTY INSPECTION:

S. Name of Client Job Carried Out Year No.

1. Sui Northern Gas Pipelines Limited

1. 100% Mill Inspection / Loading Supervision of 17.50 Feb-2000 to April-2000 Km 12” X 0.219” Dia Pipeline API-5L Grade-B at ISPL Kotri.

2. 100% Mill Inspection / Loading Supervision of 30 Km June-2000 to 6” X 0.188” Dia Pipeline API-5L Grade-B at ISPL Aug-2000 Kotri.

3. 100% Mill Inspection / Loading Supervision of 140 July-2000 to July-2001 Km 4” X 0.188” Dia Pipeline API-5L Grade-B at BBJ Industries, Lahore.

4. 100% Mill Inspection / Loading Supervision of 101 July-2000 July-2001 Km 2” X 0.154” Dia Pipeline API-5L Grade-B at BBJ Industries, Lahore.

5. 100% Mill Inspection / Loading Supervision of 555 July-2000 to Jan-2001 Km 3/4” X 0.133” Dia Pipeline API-5L Grade-B at BBJ Industries, Lahore.

6. 100% Mill Inspection / Loading Supervision of 17 Km August-Sept-2001 of 36” X 0.500” (12.7) API X-70 manufactured at Crescent Steel and Allied Products, Nooriabad.

7. 100% Mill Inspection / Loading Supervision of 36 Km Nov-2001 to Dec-2001 of 36” X 0.500” (12.7 mm), API X-70 Linepipe manufactured at Crescent Steel and Allied Products, Nooriabad.

8. 100% Mill Inspection / Loading Supervision of 13 KM April 2002 to June of 36” Dia X 0.562” WT API X-70 Linepipe at 2002 Crescent Steel and Allied Product Limited, Nooriabad.

9. 100% Mill Inspection / Loading Supervision of 35 KM June 2002 to August of 36” Dia X 0.500” WT API X-70 Linepipe at 2002 Crescent Steel and Allied Product Limited, Nooriabad.

10. 100% Mill Inspection / Loading Supervision of 26.50 August 2002 to KM of 36” Dia X 0.500” WT API X-70 Linepipe at September 2002 Crescent Steel and Allied Product Limited, Nooriabad.

Page 42

APPLIED ENGINEERING

11. 100% Mill Inspection / Loading Supervision of 41.95 September 2002 to KM and 2.76 KM of 30” Dia X 0.438” WT and 30” X November 0.562” WT, API Grade X-60 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad.

12. 100% Mill Inspection / Loading Supervision of 47.600 December 2002 to KM of 24” Dia X 0.312” WT API 5L Grade X-70 February 2003 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad.

13. 100% Mill Inspection / Loading Supervision of 47.600 December 2002 to KM of 24” Dia X 0.312” WT API 5L Grade X-70 February 2003 Linepipe at Crescent Steel and Allied Product Limited, Nooriabad.

14. 100% Mill Inspection / Loading Supervision of 26.50 December 2002 to KM of 36” Dia X 0.500” WT API 5L Grade X-70 February 2003 Linepipe at Data Steel Pipe Industries (Pvt.) Ltd, at Sadiqabad.

15. 100% Mill Inspection / Loading Supervision of 36800 1st August 2002 to 26th Meter Steel Linepipe size 1” X 0.133” at International November 2002 Industries Limited, Karachi.

16. 100% Mill Inspection / Loading Supervision of the 26th December 2002 to following Steel Linepipe API 5L Grade-B at BBJ Pipe 8th February 2003 Industries (Pvt.) Limited, Lahore.

1. 3/4" X 0.133” – 115000 Meter (195.50 MT) 2. 6” X 0.188” – 16292 Meter (315.25 MT)

17. 100% Mill Inspection / Loading Supervision of the 15th December 2002 following sizes of API 5L Grade-B Steel Linepipe at Indus Steel Pipes Limited, Kotri.

1. 8” X 0.219” – 75000 Meter 2. 10” X 0.219” – 25000 Meter 3. 12” X 0.219” – 15000 Meter 4. 16” X 0.250” – 10000 Meter

18. 100% Mill Inspection / Loading Supervision of 250000 16th May 2002 to 18th Meter (630 MT) Size 1” X 0.133” at Pioneer Steel February 2003 Mills (Pvt.) Limited, Lahore.

19. 100% Mill Inspection / Loading Supervision of the 29th July 2003 following Steel Linepipe conforming to API 5L X-70 PSL-2 at Data Steel Pipe Industries Limited, Sadiqabad.

1. 36” X 0.500” WT – 24000 Meter (6774.480 MT) 2. 36” X 0.562” WT- 2000 Meter (634.54 MT).

Page 43

APPLIED ENGINEERING

20. 100% Mill Inspection / Loading Supervision of API 5L 1st August 2003 Grade-B Steel Linepipe of size 1” X 0.154” for 120000 meters (302.40 MT) at BBJ Pipe Industries (Pvt.) Limited, Lahore.

21. 100% Mill Inspection / Loading Supervision of API 5L 15th August 2003 Grade-B Steel Linepipe of size 3/4” X 0.113” for 120000 meters (204 MT) at BBJ Pipe Industries (Pvt.) Limited, Lahore.

22. 100% Mill Inspection / Loading Supervision in the 10th September 2003 following API 5L Grade-B, Steel Linepipe at International Industries Limited, Karachi.

1. 3/4" X 0.113” WT – 80000 Meter 2. 1” X 0.133” WT – 60000 Meter 3. 2” X 0.154” WT – 40000 Meter

23. 100% Mill Inspection / Loading Supervision at Indus 15 Dec 2002 Steel Pipeline Kotri. 1. 8” X 0.219” – 75,000m 2. 10” X 0.219” – 25,000m 3. 12” X 0.219” – 15,000m 4. 16” X 0.219” – 10,000m

24. 100% Mill Inspection / Loading Supervision at Jan 2007

1. 1” X 1.133” – 400,000m 2. 2” X 0.154” – 200,000m

25. 100% Mill Inspection / Loading Supervision of Steel Feb 2007 line pipe of dia 2” X 0.154” WT 31500m at International Industries Ltd.

26. 100% Mill Inspection / Loading Supervision of steel Feb 2007 line pipe of 4” X 0.188” WT 36000m

27. 100% Mill Inspection / Loading Supervision of steel Feb 2007 line pipe of 4” dia 25000m at Akbar & Zikria Pipes Pvt Ltd.

28. 100% Mill Inspection / Loading Supervision of steel March 2007 line pipe of 6” X 0.188” WT 25000m at International Industries Ltd.

29. 100% Inspection of Gas Service Tees ¾” Size at M/s Jan 2008 to July 2008 Osaka Steel & Rubber Works, Lahore.

30. 100% Inspection of Steel line pipe dia 6” at M/s IIL, June 2008 to July 2008 Karachi.

31. 100% Inspection of Tamper Proof Gas Service Aug 2007 to June 2008

Page 44

APPLIED ENGINEERING

Valves ¾” size (with tail piece) at M/s Universal Engineering Corporation, Lahore.

32. 100% Inspection of Steel line pipe dia 16”X0.219” WT 2008 at M/s Data Steel pipe Industries, Sadiqabad.

33. 100% Inspection of Steel line pipe dia 10”X0.219”W T 2008 at BBJ Pipe Industries, Lahore.

34. 100% Inspection of Gas Service Tees ¾” Size at M/s 2008 Osaka Steel & rubber Works, Lahore

35 100% Inspection of Meter Coupling (Aluminum) ¾” 2008 size at M/s Rashid Engineering, Lahore

36 100% Inspection of Socket Weld Elbows ¾” Size at 2008 M/s Usman & Sons, Lahore

37 100% Inspection of PE Pipe Size 4” & 6” Dia at M/s 2009 Dadex Eternit, Lahore

38 100% Inspection of PE Pipe Size 6” Dia (2,000 2009 Meters) at M/s International Industries (Pvt) Limited, Karachi 2009 39 100% Inspection of PE Pipe Size 4” Dia (1,687 Meters) at M/s International Industries (Pvt) Limited, Karachi

40. 100% Inspection of PE Pipe Size 2” Dia (428,000 2010 Meters) & 4” Dia (285,000 Meters) at M/s BBJ Polymer (Pvt) Limited, Lahore

41. 100% Inspection of Meter Couplings Aluminium Size 2010 ¾” (400,000 Nos) at M/s Rashid Engineering Works, Lahore

42. 100% Inspection of Meter Couplings Aluminium Size 2010 ¾” (335,000 Nos) at M/s Osaka Steel (Pvt) Limited, Lahore

43. 100% Inspection of PE Pipe Size 4” Dia (100,000 2010 Meters) at M/s Dadex Eternit Limited, Lahore

44. 100% Inspection of Steel Linepipe 6” Dia, Grade X- 2011 42, PSL-1 (170,000 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore

45. 100% Inspection of PE Pipe Size 1-1/4” Dia (211,000 2012 Meters), 2” Dia (27,300 Meters), 4” Dia (15,400 Meters) & 6” Dia (11,900 Meters) at M/s Dadex Eternit Limited, Lahore 46. 100% Inspection of Steel Linepipe 1” Dia (300,000 2012

Page 45

APPLIED ENGINEERING

Meters) 2” Dia (168,000 Meters) & 4” Dia (149,500.00 Meters), Grade B at M/s BBJ Pipe Industries (Pvt) Limited, Lahore

47. 100% Inspection of PE Pipe Size 1-1/4” Dia (700,000 2012 Meters) & 2” Dia (392,000 Meters) at M/s Akbar & Zikria (Pvt) Limited, Islamabad

48. 100% Inspection of PE Pipe Size 4” Dia (308,000 2012 Meters) at M/s Dadex Eternit Limited, Lahore

49. 100% Inspection of Steel Linepipe 16” Dia (1,335 2012 Meters), Grade X-70, PSL-2 at M/s Data Steel Pipe Industries (Pvt) Limited, Karachi

50. 100% Inspection of PE Pipe Size 1-1/4” Dia (104,914 2013 Meters) & 2” Dia (14,691.00 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore

51. 100% Inspection of PE Pipe Size 2” Dia (398,000 2013 Meters) at M/s Dadex Eternit Limited, Lahore

52. 100% Inspection of PE Pipe Size 3/4” Dia (125,000 2013 Meters) at M/s BBJ Pipe Industries (Pvt) Limited, Lahore 2. Sui Southern Gas Company Limited 1. 100% Mill Inspection / Loading Supervision of 36760 Aug. 2001 to meter of 24” OD X 0.375”; API X-60 and 5200 meter Nov. 2001 of 24” OD X 0.562”; API X-60 Grades; (Bare and 3 Layers Pre-coated) Linepipe manufactured at Data Steel Pipe Industries, Sadiqabad.

2. 100% Mill Inspection / Loading Supervision of 8700 Sep-2001 to Oct-2001 meter, 20” OD X 0.312”; API X-60 and 5500 meter of 24” OD X 0.562; API x-60 Linepipe (Bare and 3 Layers Pre-coated) manufactured at Crescent Steel and Allied Products, Nooriabad.

3. 100% Mill Inspection / Loading Supervision of 24” X July-2001 to Dec-2001 0.312”; X-42 and 7500 16” X 0.375”; X-60 Linepipe (Bare and Pre-coated) at Indus Steel Pipes Limited, Kotri.

4. 100% Mill Inspection / Loading Supervision of ERW Feb-2002 to May-2002 Linepipe of the following pipes at International Industries Limited. 1. 3/4” Dia X 0.113” 90000 Meters 2. 1” Dia X 0.133” 100000 Meters 3. 2” Dia X 0.154” 54000 Meters 4. 4” Dia X 0.188” 30000 Meters 5. 6” Dia X 0.188” 24000 Meters

Page 46

APPLIED ENGINEERING

5. 100% Mill Inspection / Loading Supervision Services Aug-2002 to Oct-2002 of 22 Kms, 18” diameter pipes for decoating, recoating and end beveling.

6. 100% Mill Inspection / Loading Supervision Services Dec 2002 of Linepipe ¾” , 1”, 2”, 4”, 6” diameter at International Industries Limited.

7. 100% Mill Inspection / Loading Supervision Services Jan 2006 of PE coating of 8” dia Linepipe 30000m at Crescent Steel & Allied Products.

8. 100% Mill Inspection / Loading Supervision Services Jan 2006 of steel Linepipe of 8” X 48000m at BBJ Pipe Industries.

9. 100% Mill Inspection / Loading Supervision Services April 2006 of ½” to 12” dia steel Linepipe coating at Bashir Pipe Industries. 109000m 73000m 20000m

10. 100% Mill Inspection / Loading Supervision Services June 2006 of API 5L grad X 70 (PSL-2) 4 steel Linepipe coating to ongoing at M/S Sashi Steel Pipe works.

11. 100% Mill Inspection / Loading Supervision Services Sept 2006 of steel Linepipe 1” X 0.133” WT 45000m at Bashir Pipe Industries.

12. 100% Mill Inspection / Loading Supervision Services Nov 2006 of 3 Layer PE coating of 4” dia MS Linepipe at Crescent Steel & Allied Products.

13. 100% Mill Inspection / Loading Supervision Services Dec 2006 of steel Linepipe of 2” dia 659000m.

14. 3rd Party Inspection Services of Manufacturing, 27th Sep, 2015 (In Supervision of Loading & Un-loading and Coating of Progress) 42” Dia X 338 Kms Pipeline at M/s North China Petroleum Company, China & M/s Data Steel pipes, Sadiqabad

3. 100% Mill Inspection / Loading Supervision of the pipes conforming to API 5L Grade B and Coating to DIN 30670 (3 Layers PE) for the following Linepipe.

1. 24” X 0.312 6500 Meters 2. 18” X 0.375 300 Meters

Page 47

APPLIED ENGINEERING

4. Reliance 100% Mill Inspection / Loading Supervision of 13200 We had a working Inspection (Pvt.) meters 30” X 11.10 pipe conforming API 5L X 42 and arrangement with M/s. Ltd. (for SSGC) coating to DIN 30670 at Crescent Steel and Allied Reliance Inspection for 1. Product, Nooriabad. Ex-Mill Pipe Inspection Dec-95 to Aug-96.

2. 100% Mill Inspection / Loading Supervision of 48700 Inspection carried out meters 20” X 8.74 pipe conforming API 5L X-60 and during 1996. coating to DIN 30670 at Crescent Steel and Allied Feb-97 to June-97 Product, Nooriabad.

3. 100% Mill Inspection / Loading Supervision of the following pipes conforming to API X-60 coating to DIN 30670 at Crescent Steel and Allied Product, Nooriabad.

1. 18” X 0.312 71000 Meters 2. 18” X 0.375 20000 Meters 3. 18” X 0.406 45000 Meters 4. 18” X 0.406 1000 Meters

5. S&N International 100% Mill Inspection / Loading Supervision Dec-2000 to Jan-2001 Conforming to API-5L Bare pipe 3 layers PE Coating to DIN-30670 and Cement lining to BS-534 for the following:

1. 48” X 0.438” Qty-1800 Meters 2. 30” X 0.312” Qty-1100 Meters

6. Limited 1. Inspection of laying of 8” dia pipeline from PARCO to April-99 to June-99 Shell Installations at Shikarpur.

2. Inspection of laying of 6” dia pipeline from Shell June-99 to Dec-99 Installation at Chaklala to Airport Islamabad.

3. Inspection of installation of meters (Smith) at Sept-99 to Dec-99 Daulatpur.

4. Welding inspection of 8” dia pipe for fire fighting at July-99 to Sept-99 Keamari Installation.

5. Inspection of erection of SP-14 (Fuel Tank) at Nov-2000 to Jan-2001 Keamari Installation.

7. Tullow Pakistan Inspection of laying of 8” dia pipeline at Tullow Pakistan (Development) Limited

Page 48

APPLIED ENGINEERING

8. Pakistan Petroleum Limited 1. Radiography and Inspection Services for 4” dia Well- May 2002 to July 2002 5 Feeder Line and 1” dia Adhi Field.

Radiography and Inspection Services for 4” Wellhead August 2002 to 2. Fittings and 6” dia Feeder Line for Adhi Well-13. September 2002

Third Party Inspection during construction and laying August 2002 to 3. of 8” dia high pressure buried sales gas transmission November 2002 pipeline from Mazarani Gas Field to Larkana.

Third Party Inspection Service during manufacture of April 2008 to July 2008 20” x 10,000 Meters Coated Linepipe for Sui 4. Kashmore water pipeline at M/s Data Steel Pipe Industries, Sadiqabad.

5. Third Party Inspection Services during Manufacturing March, 2010 to April, of 20” Dia, 20,000 Meter Water Line for Sui- 2010 Kashmore at CS&AP.

6. 3rd Party Inspection of 6” Dia API Seamless Line Pipe 2010 at M/s Huffaz Seamless Pipe, Nooriabad

7. 3rd Party Inspection of 20” Dia Sui-KPS Water Line between MP32 to MP35 (6.8 Kms) during 2011 manufacturing at M/s CS&AP, Nooriabad

8 Services of Welding Inspector during Construction 2011 activities of replacement of Bottom Plates at Adhi Gas Field

9 3rd Party Inspection of Seamless linepipes at 2011-2012 premises of M/s Huffaz Seamless Pipe Industries Limited, Nooriabad

10 Services of 3rd Party Welding Inspector for Tank T – Oct, 2013 to Mar, 2014 101B at Adhi Gas Field

11 Services of 3rd Party Welding Inspector for Tank T – Mar, 2014 to Apr, 2014 101B at Adhi Gas Field

9. Capital 100% Mill Inspection of Mild Steel Spirally Welded 2009 Development Pipe at CS&AP, Nooriabad Authority a) 18” x 6.4mm (2610 Meters) b) 24” x 7.9mm (2000 Meters) c) 30” x 7.9mm (5713 Meters)

Page 49

APPLIED ENGINEERING

CATHODIC PROTECTION PROJECTS

Page 50

APPLIED ENGINEERING

F) CATHODIC PROTECTION PROJECTS COMPLETED:

S. Description Agency / Location Year No. 1. Designed and Installed the Cathodic Protection WAPDA 1987 System for 50 Km of 16” diameter pipeline Guddu Khandkhot to Guddu thermal power station natural gas pipeline.

2. Designed and installed the Cathodic Protection Pakistan State Oil 1987 System for 24 Km of 8” diameter Attock (PSO) Refinery Limited, Sihala and Pipeline. Rawalpindi

3. Design and installation supervision of 32 Km of Pakistan State Oil 1990 10” diameter oil pipeline system was designed (PSO) with Solar Power System. Mahmood Kot to Kot Addn near Muzzafarabad Gurh in Punjab

4. Installation of Cathodic Protection System on CAA through M/s. Sogea 1991 16” diameter aviation fuel pipeline at Jinnah of France, Terminal No.4, Karachi. Cad Welding Brazing Karachi etc.

5. Designing of Cathodic Protection System for OGDC through 1993 22 Km of 6” and 12” diameter of gathering Engineering Co. of lines and main track respectively at Dhodak Oil Australia. Field. Dhodak near Dera Ghazi Khan

6. Construction of 3 Km of 10” dia Steel water WAPDA 1992 with pumping station and Cathodic Protection Lakhra System.

7. Design and Installation of Cathodic Protection M/s. King Crete Builders 1997 System for Two underground Oil Storage (For Ormara Naval Tanks Base).

8. Design supply and installation of Cathodic Shell Pakistan Limited 1999 Protection System for 3 Km of 6” dia pipeline from Chaklala Shell Terminal to Airport Islamabad.

9. Consultant to NESPAK for Cathodic Protection NESPAK Since 2000 on 135 Km long 56” dia and 8 Km of 16” dia Lahore desalinated water transmission pipeline system in Saudi Arabia (Alkhuber to Huffuf)

10. Design, supply and installation of Deepwell Shell Pakistan Limited 2001 Groundbed for 7 Km Shell 6” dia Pipeline from POL refinery to Chaklala Shell Terminal.

Page 51

APPLIED ENGINEERING

11. Soil Resistivity Survey on 15 KM section from White Oil Pipeline January 2002 PARCO CP-06A to value Assembly No.17 of Project White Oil Pipeline Project. (China Petroleum)

12. Installation of Deepwell Groundbed on 7 KM 6” Shell Pakistan Limited March 2002 dia Shell Oil Pipeline from ARL Refinery to Chaklala Shell Terminal Rawalpindi.

13. Removal and installation of CP Test Posts at National Refinery August 2002 to NRL K-K Pipeline with the provision of 58 Nos. Limited September 2002 of Cadwelds with the cables.

14. Installation of under ground piping CP system BHP - Billiton March 2003 at BHP Zamzama I Project.

15. Contract for monitoring of the following Shell Shell Pakistan Limited 2004 Oil Pipelines.

1. Shell installation to PARCO Station Shikarpur. 2. Shall installation to PARCO station at Mahmood Kot. 3. Attock Refinery to Shell installation Chaklala. 4. Shell Chaklala installation to Air Port.

16. Designing material, supply and installation of Diesel Power System March 2004 Two, 20000 litre and one, 30000 litre (Pvt.) Limited underground Diesel Tank for Pakistan International Containers Terminal Power Satiation at Karachi Port.

17. Designing material, supply and installation of Pakistan Petroleum December,2005 under ground piping system and slap vessel Limited. for Pakistan Petroleum Limited. Adhi Plant II Client : Ranhill Berhad

18. Designing, Supply of material, Installation, Ranhill for PPL April, 2006 Testing and Commissioning of CP System at PPL Adhi LPG/NGL Plant II Project

19. Installation of underground piping CP system BHP June,2006 at BHP Zamzama II Project.

20. Report on CP System Aviation Fueld on Shell 2007 hydrant pipeline at Jinnah International Airport

21 Installation of Tank bottom CP system at Parco BHP January,2007 .Bubak Terminal.

Page 52

APPLIED ENGINEERING

22 Inspection and Maintenance Contract of Shell 2007-2008 existing CP System at Shikarpur, Machike, Kemari and Chaklala

23 CP System for relocated CKL-ISB Pipeline Shell 2008

24 Design, Supply of Material, Installation and Petrocon February, 2008 Commissioning of CP System at 10” Dia underground Pipeline at Bulk Oil Depot at Machike of Total Parco Pakistan Limited

25 Supply, Construction, Installation, Testing and PPL / Hala Gas Field August, 2009 Commissioning of CP System at Adam X-1 Well Casing, Close Drain Vessel and Sales Gas Pipeline at Hala Gas Field

26 Inspection and Maintenance Contract of CP Shell 2010 (In Progress) System at Chaklala, Kemari, Machike and Shikarpur

27 Installation and Commissioning of CP System Petrocon for Bosicor 2010 of 28” Dia Pipeline at Bosicor Refinery

28 Design, Supply of Material, Installation, Joint Engineering 2013 Commissioning & Testing of CP System at Services for Mari Gas Mari Gas, Sujawal X-1, Sujawal Site

29 Design & Installation of Sacrificial CP System IIW – Industrial April, 2013 of 8” Dia 950 Meter Fuel Line at HPL Shikarpur Engineers & Contractors Depot as per specification of Limited & Zeeshan Engineering

30 Supply, Installation, Testing & Commissioning FFBL – Fauji Fertilizer May, 2013 to of CP System for Protection of 762 mm dia & Bin Qasim Limited December, 2013 7.75 Kms Long Underground PE Coated MS Water Pipeline for 7 MGD Waterline Project

31 Supply, Installation, Testing & Commissioning IIW – Industrial April, 2014 of CP System for Hascol, Machike Engineers & Contractors

Page 53

APPLIED ENGINEERING

CONSULTANCY SERVICES

Page 54

APPLIED ENGINEERING

G) CONSULTANCY SERVICES:

S. Name of Client Job Carried Out Year No.

1. Sui Northern Gas Consultancy Services for the Development of December 2011 Pipelines Limited Comprehensive Business Plan and preparation Feasibility Studies for the following

i) Bottling and Marketing of LPG Cylinders including establishment of the Bottle Filling Stations

ii) Supply of LPG in the form of Synthetic Natural Gas (LPG-Air Mix) through distribution pipeline network

2. Sui Southern Gas Consultancy Services for development of SSGC’s January, 2012 Company Limited SNG Projects and Evaluation of Bidders for Design, Continue Supply, Installation & Commissioning of two LPG-Air Mix Plants Capacity 50MMCFD.

3. Sui Northern Gas Consultancy Services for Evaluation of the bidder for July, 2012 Pipelines Limited supply of two LPG-Air Mix plants of 50MMCFD equivalent of Natural Gas capacity.

4. Sui Northern Gas Consultancy Services for Evaluation of the following 2012-2013 Pipelines Limited bids for Design, Supply of Installation & Commissioning of LPG-Air Mix (SNG) Plants

1. 1x2 MMCFD (80 MMBTU/Hr) of Natural Gas Equivalent 2. 1x5 MMCFD (200 MMBTU/Hr) of Natural Gas Equivalent 3. 1x10 MMCFD (400 MMBTU/Hr) of Natural Gas Equivalent 4. 2x20 MMCFD (800 MMBTU/Hr) of Natural Gas Equivalent

Page 55

APPLIED ENGINEERING

GENERAL WORKS

Page 56

APPLIED ENGINEERING

METER READING

S. Agency / Name of Client Description Year No. Location

1. Sui Southern Domestic & Commercial Meter Reading in Karachi & 16th Nov, 2000 to Gas Company Karachi & Hyderabad Regions Hyderabad 15th Nov, 2001

2. // Domestic & Commercial Meter Reading in Karachi & 16th Nov, 2001 to Karachi & Hyderabad Regions Hyderabad 15th Feb, 2002

3. // Commercial Meter Reading in Hyderabad Hyderabad 16th Apr, 2002 to Region 15th Apr, 2003

4. // Domestic & Commercial Meter Readings in Hyderabad, July, 2005 to June, Hyderabad, Larkana & Sukkur Regions Larkana & 2007 Sukkur

5. // Domestic & Commercial Meter Reading in Nawabshah July, 2005 to June, Nawabshah Region 2007

6. // Domestic & Commercial Meter Reading in Hyderabad July, 2007 Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur September, 2007 Nawabshah

7. // Domestic & Commercial Meter Reading in Hyderabad October, 2007 Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur December, 2007 Nawabshah

8. // Domestic & Commercial Meter Reading in Hyderabad January, 2008 Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur June, 2008 Nawabshah

9. // Domestic & Commercial Meter Reading in Hyderabad July, 2008 Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur December, 2008 Nawabshah

10 // Domestic & Commercial Meter Reading in Hyderabad January, 2009 Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur June, 2009 Nawabshah

11 // Domestic & Commercial Meter Reading in Hyderabad July, 2009 Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur December, 2009

Page 57

APPLIED ENGINEERING

Nawabshah January, 2010 12 Sui Southern Domestic & Commercial Meter Reading in Hyderabad to Gas Company Hyderabad, Larkana, Sukkur & Larkana March, 2010 Nawabshah Sukkur Nawabshah

13 // Domestic & Commercial Meter Reading in Hyderabad April, 2010 Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur June, 2010 Nawabshah

14 // Domestic & Commercial Meter Reading in Hyderabad July, 2010 Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur December, 2010 Nawabshah

Domestic & Commercial Meter Reading in Hyderabad January, 2011 15 // Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur June, 2011 Nawabshah

Domestic & Commercial Meter Reading in Hyderabad July, 2011 16 // Hyderabad, Larkana, Sukkur & Larkana to Nawabshah Sukkur September, 2011 Nawabshah

Gas Meter Reading at Hyderabad Region Hyderabad & 16th October, 2011 17 // and Malir Zone of Karachi Region Malir, Karachi to 15th October, 2012

Gas Meter Reading at Hyderabad Region Hyderabad & October, 2012 to 18 // and Malir Zone of Karachi Region Malir, Karachi September, 2013

Gas Meter Reading at Hyderabad Region Hyderabad & October, 2013 to 19 // and Malir Zone of Karachi Region Malir, Karachi June, 2014

Gas Meter Reading at Hyderabad Region Hyderabad & July, 2014 to 20 // and Malir Zone of Karachi Region Malir, Karachi December, 2014

Page 58

APPLIED ENGINEERING

HAND DELIVERY OF BILLS

S. Agency / Name of Client Description Year No. Location

1. Sui Southern Gas Hand Delivery of Industrial, Hyderabad 16th August, 2002 Company Commercial & Domestic Gas Bills at to 15th August, Hyderabad Region. 2004

2. // Hand Delivery of Industrial, Hyderabad 16th August, 2004 Commercial & Domestic Gas Bills at to Hyderabad Region. 15th October, 2004

3. // Hand Delivery of Industrial, Hyderabad 16th Nov, 2004 Commercial & Domestic Gas Bills at Nawabshah to Hyderabad & Nawabshah Regions. 15th Nov, 2005

4. // Hand Delivery of Industrial, Hyderabad 16th Nov, 2005 Commercial & Domestic Gas Bills at to Hyderabad Region. 15th Dec, 2005

5. // Hand Delivery of Industrial, Nawabshah 16th Nov, 2005 Commercial & Domestic Gas Bills at to Nawabshah Region. 15th Nov, 2006

6. // Hand Delivery of Industrial, Nawabshah 16th Nov, 2006 Commercial & Domestic Gas Bills at to Nawabshah Region. 15th Mar, 2007

7. // Hand Delivery of Industrial, Nawabshah 16th Mar, 2007 Commercial & Domestic Gas Bills at to Nawabshah Region. 15th June, 2007

8. // Hand Delivery of Industrial, Nawabshah 16th June, 2007 Commercial & Domestic Gas Bills at to Nawabshah Region. 15th July, 2007

9. // Hand Delivery of Domestic, Hyderabad 16th July, 2007 Commercial & Industrial Gas Bills at Karachi to Hyderabad Region & Domestic & 15th July, 2008 Commercial Gas Bills at Karachi Region.

Page 59

APPLIED ENGINEERING

10. Sui Southern Gas Hand Delivery of Domestic, Hyderabad 16th July, 2008 Company Commercial & Industrial Gas Bills at Karachi To Hyderabad & Karachi Regions. 15th July, 2009

11 // Hand Delivery of Domestic, Hyderabad 16th July, 2009 to Commercial & Industrial Gas Bills at Karachi 15th Sep, 2009 Hyderabad & Karachi Regions.

12. // Hand Delivery of Domestic, Hyderabad 16th Sep, 2009 Commercial & Industrial Gas Bills at Karachi to Hyderabad & Karachi Regions. 15th Nov, 2009

13. // Hand Delivery of Domestic, Hyderabad 16th Nov, 2009 Commercial & Industrial Gas Bills at Karachi to Hyderabad & Karachi Regions. 15th Feb, 2010

14 // Hand Delivery of Domestic, Hyderabad Commercial & Industrial Gas Bills at Karachi 16th Feb, 2010 Hyderabad & Karachi Regions. to 15th May, 2010

15 // Hand Delivery of Domestic, Hyderabad 16th May, 2010 Commercial & Industrial Gas Bills at Karachi to Hyderabad & Karachi Regions. 15th Nov, 2010

16 // Hand Delivery of Domestic, Hyderabad 16th Nov, 2010 Commercial & Industrial Gas Bills at Karachi to Hyderabad & Karachi Regions. 15th Feb, 2011

1. Sui Northern Gas Gas Bill Distribution in Multan Region. Mu ltan 1st Sep, 2007 Pipeline Limited To 31st Aug, 2008

2. // Gas Bill Distribution in Multan Region. Mu ltan 2nd Sep, 2008 To 1st Sep, 2009

3. // Gas Bill Distribution in Multan Region. Mu ltan 1st Sep, 2009 To 31st Aug, 2010

Page 60

APPLIED ENGINEERING

4. Sui Northern Gas Gas Bill Distribution in Multan Region. Mu ltan 1st Sep, 2010 Pipeline Limited To 30st Oct, 2010

1 Pakistan Distribution of Bills for Lyari Karachi Jan, 2009 to Dec, Telecommunication Exchange, Karachi 2009 Company Limited

1 Karachi Electric Electricity Bill Distribution Service for Karachi Mar, 2011 to Feb, Supply Company VIBC Lyari & Lyari 2, Karachi 2012 Limited

2 // Electricity Bill Distribution Service for Karachi 01.03.2012 to VIBC Lyari & Lyari 2, Karachi 28.02.2013

3 // Electricity Bill Distribution Service for Karachi 01.03.2013 to VIBC Lyari & Lyari 2, Karachi 28.02.2014

4 // Electricity Bill Distribution Service for Karachi March, 2014 to VIBC Lyari & Lyari 2, Karachi May, 2014

5 // Electricity Bill Distribution Service for Karachi June, 2014 VIBC Lyari & Lyari 2, Karachi

6 // Electricity Bill Distribution Service for Karachi July, 2014 to VIBC Lyari & Lyari 2, Karachi June, 2015

7 // Electricity Bill Distribution Service for Karachi July, 2015 to VIBC Lyari & Lyari 2, Karachi June, 2016

Page 61

APPLIED ENGINEERING

Gas Leakage Rectification and Survery

S. Agency / Name of Client Description Year No. Location

1. Sui Southern Gas Leakage Rectification of Domestic Karachi Apr, 2005 Gas Company and Commercial connection of 11,666 To Meters. Sep, 2005

2. // Gas Leakage Rectification of Domestic Karachi Jan, 2007 and Commercial connection of 11,360 To Meters. June, 2007

3. // Gas Leakage Rectification of Domestic Karachi May, 2008 to and Commercial connection of 6,666 October, 2008 Meters.

4. // Gas Leakage Rectification of Domestic & Hyderabad September, 2009 Commercial Connection of 20,000 Meters to February, 2014 at Hyderabad

5. // Overhead Gas Leakage Survey & Karachi 22nd Jan, 2010 to Rectification Work of 6,428 Connections 8th June, 2010 at Karachi

6. // Overhead Gas Leak Survey & Karachi October, 2010 to Rectification of 10,000 Connections at February, 2012 Karachi

7 // Overhead Gas Leak Survey and Karachi April, 2012 to Rectification Work of 8,182 Connections October, 2012 at Karachi Region

Page 62

APPLIED ENGINEERING

EQUIPMENT & INSTRUMENTS

Page 63

APPLIED ENGINEERING

A. LIST OF EQUIPMENTS / MACHINERY & TOOLS

S.NO. EQUIPM ENT NAM E WITH ACCESS ORIES QUANTITY CONDITION REMARKS

1 Welding Plant 500 Ampere 6 Nos. Satisfactory

2 Welding Rectifiers 500 Ampere 6 Nos. Satisfactory

3 Air Compressor 380 CFM 1 No. Satisfactory

4 Crane 5 Ton To 20 Ton 3 Nos. Satisfactory

5 Side Boom 1 No. Satisfactory

6 Generator 90 Kva 1 No. Satisfactory

7 Excavator 1 No. Satisfactory

8 Hydrostatic Pump 1 No. Satisfactory

9 De Watering Pump 4 Nos. Satisfactory

10 Dozer 1 No. Satisfactory

11 Tractor 2 Nos. Satisfactory

12 Vehicle 4 Nos. Satisfactory

13 Grinder Angle 9" 8 Nos. Satisfactory

14 Grinder Angle 7" 4 Nos. Satisfactory

15 Grinder Angle 5" 4 Nos. Satisfactory

16 Pencil Grinder 2 Nos. Satisfactory

17 Baby Grinder 4 Nos. Satisfactory

18 Bevel Machine 2 Nos. Satisfactory

19 Cutting Set 3 Nos. Satisfactory

20 External Clamp ( 6" To 20" Dia ) 1 No. Satisfactory

21 Fabrication Clamp ( 4" to 20" Dia ) 1 No. Satisfactory

22 Spanner 1 No. Satisfactory

23 Stacking Spanner ( 2" to 10"Dia ) 2 Nos. Satisfactory

Page 64

APPLIED ENGINEERING

B. LIST OF EQUIPMENTS / INSTRUMENTS FOR SURVEY & MONITORING / INSPECTION OF CATHODIC PROTECTION SYSTEM

S.NO. EQUIPM ENT NAM E WITH ACCESS ORIES QUANTITY CONDITION REMARKS Cathodic Protection 1 Nilson Current Interrupter 1 No Satisfactory 2 Soil Resistivity Meter (Tink er & Rasor) 1 No Satisfactory 3 Current Supply Unit 10 Volts, 10 Amp (Tinker & Rasor) 1 No Satisfactory 4 Soil Resistivity Meter (Vibroground) 1 No Satisfactory 5 Holiday Detector Complete (Tinker & Rasor) 1 Set Satisfactory 6 Pearson Survey Meter (Tinker & Rasor) 1 No Satisfactory 7 Half Cells (Tinker & Rasor) 05 Nos Satisfactory 8 Multi Combination Meter 3 Nos Satisfactory 9 Insulation Tester (TES-3660) 1 No Satisfactory 10 Digital Multimeter (215) 1 No Satisfactory 11 Digital Multimeter (Kyoritsu Model 1008) 1 No Satisfactory 12 Digital Multimeter (Kyoritsu Model 2001) 1 No Satisfactory 13 Other Accessories and Tools Lot Satisfactory

Page 65

APPLIED ENGINEERING

C. LIST OF EQUIPMENTS / INSTRUMENTS FOR NON-DESTRUCTIVE TESTING (NDT) AND THIRD PARTY INSPECTION

S.NO. EQ UIPM ENT NAM E WITH ACCESS ORIES QUANTITY CONDITION REMARKS

NDT and Third Party Inspection Sentinel Delta 880 Gamma Ray Projector with Remote Control 1 04 Nos Satisfactory Winding Mec hanism Tech Ops Model 660 Gamma Ray Projector with Remote 2 08 Nos Satisfactory Control Winding Mechanism 3 Isotope Four Channel Trans port Container 03 Nos Satisfactory 4 Complete Radiographic Accessories Kit 15 Nos Satisfactory 5 Films Processing unit with Accessories 15 Units Satisfactory 6 Films Cassettes with Lead Intensifying Screens 1000 Nos. Satisfactory 7 Films Viewers 12 Nos Satisfactory 8 Films Densitometer 03 Nos Satisfactory 9 Radiation Survey Meter 14 Nos Satisfactory 10 Radiation Dosimeters with Charging Unit 25 Nos. Satisfactory 11 Long Tong (2 Meter) 09 Nos Satisfactory 12 Collimators 12 Nos Satisfactory 13 Hi-Lo Gauge 05 Nos Satisfactory 14 Cirometer Tape 06 Nos Satisfactory 15 Micro Meter (INSIZE) &( MITUTOYO) 02 No Satisfactory 16 Vernier Calipers 04 Nos Satisfactory 17 Digital Vernier Caliper (INSIZE) 01 No Satisfactory 18 Digital Clamp Meter 01 No Satisfactory 19 Digital Clamp Meter – TES-3020 01 No Satisfactory 20 Dial Indicator (Thickness Gauge) Pecock Y01529 01 No Satisfactory 21 Infra Red Thermometer, Summit SIR 100 R 03 No Satisfactory 22 Measurement Tape 15 Meter (KNIGHT) 05 No. Satisfactory 23 Bevel Gauge 02 Nos Satisfactory 24 Thread Gauge 02 Nos Satisfactory 25 Ultrasonic Thickness Gauge 01 No Satisfactory 26 Ultrasonic Testing Unit USM3 02 No Satisfactory 27 Calibration Block (V1) 02 No Satisfactory 28 Magnetic Particle Testing Unit (Yoke) 01 Set Satisfactory As 29 Dye penetrate Test Satisfactory required 30 Tong Tester – Ac / Dc 01 No Satisfactory

Page 66

APPLIED ENGINEERING

D. LIST OF EQUIPMENTS / INSTRUMENTS FOR GAS LEAKAGE SURVEY

S.NO. EQUIPM ENT NAM E WITH ACCESS ORIES QUANTITY CONDITION REMARKS

Gas Leakage Survey

1 Bender Machine 01 Satisfactory 2 Pipe Range Spanner 12” 20 Satisfactory 3 Pipe Range Spanner 14” 20 Satisfactory 4 Screw Spanner 10 Satisfactory 5 Screw Set 10 Satisfactory 6 Vice 05 Satisfactory 7 Die Set 10 Satisfactory 8 Hammer 10 Satisfactory 9 Nail 10 Satisfactory 10 Hacksaw Blade 10 Satisfactory 11 Whole Punch 10 Satisfactory 12 Measurement Tape 10 Satisfactory

Page 67

APPLIED ENGINEERING

CERTIFICATE & LICENCES

Page 68

APPLIED ENGINEERING

PRE-QUALIFICATIONS

Page 69

APPLIED ENGINEERING

PRE-QUALIFIED WITH THE FOLLOWING ORGANIZATION:

1) Sui Northern Gas Pipelines Limited (SNGPL) 2) Sui Southern Gas Company Limited (SSGC) 3) Pakistan Refinery Limited (PRL) 4) National Refinery Limited (NRL) 5) Pakistan State Oils Limited (PSO) 6) Shell Pakistan Limited 7) Tullow Pakistan (Developments) Limited 8) Water & Power Development Authority (WAPDA) 9) Indus Steel Pipe Limited (ISPL) 10) Siemens Pakistan Engineering Company Limited 11) Pakistan Petroleum Limited (PPL) 12) Oil & Gas Development Corporation Limited (OGDCL) 13) Caltex Oil (Pakistan) Limited 14) K Electric 15) Agha Khan University / Hospital 16) Descon Engineering (Pvt) Limited, Lahore 17) Mari Petroleum Company Limited (MPCL) 18) British Petroleum (BP) 19) SGS Pakistan 20) PSS Asia Pakistan (Pvt) Limited 21) Petroleum Exploration Limited 22) Kerui Group, China 23) Capital Development Authority 24) Fauji Fertilizer Bin Qasim Limited