APPENDIX D

PEDESTRIAN SCHEMES FUTURE WORK PROGRAMME

Year Location Requested by Comments Estimated Total cost £’000 2007/2008 £’000

Stopsley 2004/2005 Installation of junction, School 25 Way/Hitchin Scheme Crossing Patrol and Road/Vauxhall Way pedestrian improvements designed in 2004/2005

Hitchin Road 2004/2005 Improved pedestrian facilities 10 Scheme between Round Green and (rolled over from Vauxhall Way 06/07)

Eaton Green Road Ward Forum Investigation into the 10 (near to Lalleford provision of improved Road) pedestrian facilities

Whitehorse Vale Correspondence Pedestrian refuge 10 (rolled over from 06/07)

Barton Road Ward Forum and Improved pedestrian facilities 25 correspondence at the Quantock Rise/Turnpike Drive roundabout

Accessibility LTP and BVPI Accessibility improvements to 10 improvements to performance pedestrian crossings e.g existing pedestrian indicators tactile paving crossings

School Crossing Road Safety Continued improvement of 10 Patrols Team sites

Dropped crossings Ward Forums & Continued programme of 20 120 and tactile paving correspondence installation

Year Location Requested by Comments Estimated Total cost £’000 2008/2009 £’000 Ward Forum Hancock Drive - Improved pedestrian facilities 10 shopping parade Ward Forum Road Pedestrian crossing near to 15 Sundon Arch bridge Ward Forum Minor junction improvements 10 Road/Neville Road to assist pedestrians. See Small Scale Traffic Management priority list

London Road Letter Pedestrian guard rail outside 1 entrances to Christian Fellowship

Farley Hill Ward Forum Improved pedestrian facilities 10 (rolled over from 06/07)

A6 by Pasque Sustrans New traffic island to help 15 Hospice pedestrians and cyclists to cross road and to improve access to the countryside

Tomlinson Avenue Promoting Possible raised table to help 20 by shops at Independence elderly and residents at Dominic Square Team Applegrove and be of benefit to nearby school

Colwell Rise Sheltered Pedestrian refuge to assist 10 Housing Manager access from Colwell Court (sheltered housing) to new doctors surgery along Road

School Crossing Road Safety Continued improvement of 10 Patrols Team sites

Accessibility LTP and BVPI Accessibility improvements to 15 improvements to performance pedestrian crossings e.g. existing pedestrian indicators tactile paving crossings

Dropped crossings Ward Forums & Continued programme of 20 and tactile paving correspondence installation

Completion of 15 150 previous years schemes including work arising out Road Safety Audit

2009/2010 Location Requested by Comments Estimated Total cost £’000 £’000

Hitchin Road Street New footpath from pedestrian 10 Seen/Street crossing to crematorium Champions Handcross Road at Request from New pedestrian refuge 10 Wigmore Lane resident

Toddington Ward Forum Improved pedestrian facilities 20 Road/Grange (funding dependent on overall Avenue ATS improvement)

Butely Road at Ward Forum Improved pedestrian facilities 20 Pirton Hill schools

Limbury Correspondence Improved pedestrian facilities 20 Road/Trinity Road between Marsh Road and Blundell Road

Crawley Green School request Improved pedestrian facilities 15 Road near to Cockernhoe Lane

Wigmore Lane near Parent of school Possible zebra crossing 20 to Twyford Drive children subject to criteria being met

Wheatfield Road Petition from res Improved pedestrian crossing 20 report to area facilities near to Wheatfield committee on Court 10th Oct 2006

Completion of 15 150 previous years schemes including work arising out Road Safety Audit

Year Location Requested by Comments Estimated Total cost £’000 2010/11 £’000

Hitchin 2006/7 Scheme Installation of pedestrian 10 Road/Cannon Lane to be reviewed crossings on Hitchin Road. +(£30k) Review of design carried out from in 2006/7 part funded as part Butterfield of Butterfield agreement (£30k). See drawing no. 72038.

Stockingstone Correspondence Pedestrian crossing facility 10 Road near to Elmwood Crescent

High Town School access to Speed table and 20 mph 20 between Cobden St leisure centre zone extension and York Street

Completion of 15 previous years schemes including work arising out Road Safety Audit

A6 north of Riddy High Improved pedestrian facilities 10 Lane school, Icknield just north of Riddy Lane Ward Forum roundabout

Putteridge Road Cllr Dolling Move bus stop/ bus shelter to 10 end of turning circle reduce the amount of high school children walking across turning circle and increase the amount of space for infant children and parents to walk without being impeded by queue for bus.

Silver Street David French Improvements for pedestrians 15 Partnership at the exit of the Arndale Car parks.

Whitehorse Vale Pedestrian refuges near 20 Primary Woodmere, Burford Close and Underwood Close to assist pedestrians going to walking bus

Quantock Rise and Mrs Edwards – Investigation into zebra 15 Icknield way parent of pupil crossing to assist walking to from Warden Hill Bramingham Primary and living in Quantock Warden Hill Infant and Rise area Juniors from Quantock Rise area

It is anticipated that this list will increase as further requests and needs are identified.