LIST OF VALID REFINERY PROJECT LICENSES AS AT MARCH 2021 S/NO NAME LOCATION STATE CAPACITY PLANT LICENSE LICENSE LICENSE LICENSE STATUS (BPSD) CONFIGURATION GRANTED GRANT EXPIRY DATE DATE 1 Waltersmith Refining & Ibigwe Imo 5,000 Topping Plant ATC Mar-17 NA Construction completed; Petrochemical Plant successfully Company Limited Commissioned. 2 OPAC Refineries Umuseti, Kwale Delta 7,000 Topping Plant ATR Sep-17 NA Construction completed; Plant at Commissioning Stage 3 Niger Delta Petroleum Ogbele Rivers 5,000 Hydro-skimming ATC Dec-18 Dec-20 Construction completed; Resources (Train 3) Plant Commissioning ongoing.

4 Dangote Oil Refinery Lekki Free Trade Zone Lagos 500,000 Conversion Plant ATC Dec-17 NA Valid; Plant Overall Company Installation above 80.3%

5 Edo Refinery and Ikpoba-Okha L.G.A. Edo 6,000 Hydro-skimming ATC Mar-19 NA Construction completed; Petrochemical Company Plant Plant at Commissioning limited Stage 6 Lowrie Refinery Limited Ika North LGA Delta 5,000 Topping plant ATC Sept-20 Sept-22 Valid 7 Excel Refinery Limited Peretorugbene Bayelsa 5,000 Topping Plant LTE Sept- 20 Sept-22 Valid Community, Ekeremor L.G.A 8 Conodit Refinery Umukwata Delta 20,000 Hydro-skimming ATC Jul-19 Jul-21 Valid Limited Plant 9 Duport Midstream Egbokor, Orhionmwon Edo 10,000 Hydro-skimming ATC Sep-19 Sep-21 Valid L.G.A. plant 10 Clairgold Oil & Gas Koko Delta 20,000 Hydro-skimming ATC Dec-19 Dec-21 Valid Engineering Limited Plant 11 Ogini Refinery Limited Ogini, Kwale Delta 5,000 Topping Plant LTE Dec-19 Dec-21 Valid 12 Etopo Energy Plc Delta 30,000 Hydro-skimming ATC Jan-20 Jan-22 Valid Plant 13 Gasoline Associates Ipokia Ogun 100,000 Conversion Plant ATC Feb-20 Fe-22 Valid International Limited 14 NPDC/ND WESTERN OML 34 field, Delta 10,000 Topping Plant LTE Feb-20 Feb-22 Valid OML 34 JV East, LGA 15 Frao Oil Nigeria Limited Uzere Delta 12,000 Hydro-skimming ATC Mar-20 Mar-22 Valid Plant 16 Kingdom Global Trading Okwagbe, Delta 12,000 Hydro-skimming LTE Mar-20 Mar-22 Valid Petroleum & Gas Nig. L.G.A Plant Ltd. 17 Resource Petroleum & Ibeno Akwa Ibom 100,000 Conversion Plant ATC Mar-20 Mar-22 Valid Petrochemicals International Incorporated 18 Gazingstock Petroleum Abalagada Community, Delta 5,000 Topping Plant ATC Mar-20 Mar-22 Valid Company Limited Ndokwa East LGA 19 Amakpe International Ibeno, Eket Akwa Ibom 12,000 Topping Plant ATC June-20 June-22 Valid Refineries Limited

20 Atlantic International Okpoama, Brass Bayelsa 2,000 Topping Plant ATC Sept-20 Sept - 22 Valid Refineries and Petrochemical Limited

21 Azikel Petroleum Obunagha, Yenagoa Bayelsa 12,000 Hydro-skimming ATC Sept-20 Sept-22 Valid Limited L.G.A Plant

22 Allegiance Energy and Esit Eket Akwa Ibom 55,000 Conversion Plant ATR Oct-20 Oct-22 Valid Power Limited State

23 Alexis Refinery Limited Aboh, Ndokwa East Delta 2,000 Topping Plant ATC Dec-20 Dec-22 Valid L.G.A

Key: NA (Not Applicable) means ATC expiration for the company does not apply, because overall work progress is beyond 50% mechanical completion for the project, in line with Sec III Subsection 3 of the Guidelines for the Establishment of Hydrocarbon Processing Plants (Petroleum Refinery and Petrochemicals) in Nigeria.