Office Floor Plan Layout
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
078400S02 FIRESTOPPING – Mechanical Room Floor Penetrations
078400S02 FIRESTOPPING – Mechanical Room Floor Penetrations The following standard applies to all added floor penetrations in any existing mechanical room, electrical room or penthouse mechanical area above slab level in all facilities maintained by the University of Kentucky. Affected penetrations include, but are not limited to, the following: conduit, pipes, and ductwork. For new facilities, housekeeping curbs should be constructed during the initial building construction which would eliminate the need for this standard. 1.0 All penetrations must be fire stopped per the applicable NFPA (National Fire Protection Association) and State of Kentucky Building Codes with the appropriate UL listed fire stop assembly being utilized. The UL listing documentation must be available for the installed assembly upon request by the inspecting authority or by the University representative. 2.0 In addition to the required fire stopping outlined in section 1.0 above, all penetrations are to be protected by materials meeting an UL Tested Class 1 W-rating to restrict the flow of water. 3.0 For pipes and conduits, a curb is to be installed around the opening with a self leveling, single- component, silicone-based firestop sealant used in the slab and the curb. The installation is to consist of a steel angle mechanically fastened to the floor to create a curb with the firestop sealant installed in the curb and slab sealing up to the penetrating item. The sealant is to be white in color. See drawing 1 below for better clarification. 4.0 For ductwork, a curb is to be installed around the opening with a self leveling, single-component, silicone-based firestop sealant used in the slab and the curb. -
The Fireplace, Rekindled
The fireplace, rekindled. PRECISION-ENGINEERED MASONRY FIREPLACES FireRock offers a simple way to build a high-end, all-masonry fireplace and chimney. This smartly designed system installs in a matter of hours for less than half the cost of a traditional brick & mortar fireplace. Not only does it look great, it lasts forever. Why FireRock? Installs Fast. Installs in less than a day compared to 1 to 2 weeks for traditional brick & mortar. Strong. 3000 PSI compressive strength. The strongest on the market. Smart. Costs 50% less than traditional brick & mortar, and is precision-engineered to draw correctly. Stunning. Looks better and lasts longer than a “metal box” fireplace. Long Lasting. All models come with a 20 year warranty and a 100 year life expectancy. You could spend twice as much building a traditional brick & mortar fireplace, but the only person that would know would be your accountant. CONVENTIONAL RUMFORD OUTDOOR • FireRock’s traditional model • Taller opening allows for a larger • FireRock’s solution for use in outdoor • Angled back wall for better heat reflection fire and greater heat reflection living spaces • Can be installed on a combustible floor using • Great for homes with high ceilings • Firebox and chimney deliver on LiteRock installation application • Accommodates FireRock masonry or a single pallet • Accommodates FireRock masonry or approved metal chimney system Available in three sizes: 30”, 36”, and 42” approved metal chimney system Available in four sizes: 30”, 36”, 42”, and 48” Available in six sizes: 30”, 36”, -
Bilco Floor, Vault and Sidewalk Doors Provide Reliable Access to Equipment Stored Underground Or Below/Between Building Floors
Floor & Vault Doors Bilco Floor, Vault and Sidewalk Doors provide reliable access to equipment stored underground or below/between building floors. Commonly used by gas, electric and water utilities for frequent access by service personnel, Bilco doors are available in many different sizes and configurations to suit any application. Floor & Vault Doors Advantages of Floor, Vault and Sidewalk Doors Bilco Floor, Vault and Sidewalk Doors are ruggedly constructed to provide many years of dependable service. Doors are available in a wide range of sizes and configurations, and all models offer the following standard features and benefits: • Engineered lift assistance for smooth, easy door operation, regardless of cover size and weight • Automatic holdopen arm that locks the cover in the open position to ensure safe egress • Type 316 stainless steel slam lock to prevent unauthorized access • Constructed with corrosion resistant materials and hardware • Heavy duty hinges, custom engineered for horizontal door applications Positive latching mechanism Structurally reinforced cover with finished edges Heavy-duty hinges Automatic hold-open arm with convenient release handle Lift assistance counterbalances cover Type J-AL door shown Typical Applications • Airports • Manufacturing Facilities • Schools • Correctional Facilities • Natural Gas Utilities •Telecommunications Vaults • Electric Utilities • Office Buildings •Transit Systems • Factories • Processing Plants •Warehouses • Hospitals • Retail Structures •Water/Waste Treatment Plants Drainage Doors Type J Steel Type J Type J-AL Aluminum With Drainage Channel Frame For use in exterior applications where there is concern about water or other liquids entering the access opening. Type J H20 Steel Type J H20 Type J-AL H20 Aluminum With Drainage Channel Frame For use in exterior applications where the doors will be subjected to vehicular traffic. -
One Stop Shop News
“Where One Call Does It All!” One Stop Shop News Volume 5, Issue 41 | 90 Stillwater Ave Orono, ME 866-5690 | January 2017 Preview 3D Models Before Don't Miss Any Upgrades or Remodeling to Your Home, Have a Plan Bringing the Hammer Home maintenance is much easier to tackle with a priority list. One Stop Home One Stop Home Repair is happy to Repair recommends starting the year with a checklist for all the projects you want announce the ability to provide to and should tackle throughout the year. Your list may or not be this extensive, you, the homeowner, with a but the list below is a good place to start. detailed digital representation of your remodel or new construction Interior – Beginning from the floor and working your way up, you can quickly project in 3D before we start. We give your house a thorough inspection to plan which repairs or upgrades you want now have a professionally trained interior designer who can assist to complete before the year's end. Having a running list at the beginning the year you in achieving the perfect look will help you to achieve what your house needs. and feel based on your style and ● Check your Electrical Outlets – Loose outlets can result in a fire if budget. Call our office to use this anything falls in the gap between the outlet and plug. great service. ● Repair Damaged Walls and Ceilings – Water damaged walls should be taken care of immediately. Pay attention to both cosmetic damage and These design plans will help you obvious water damage. -
Basement Flood Mitigation
1 Mitigation refers to measures taken now to reduce losses in the future. How can homeowners and renters protect themselves and their property from a devastating loss? 2 There are a range of possible causes for basement flooding and some potential remedies. Many of these low-cost options can be factored into a family’s budget and accomplished over the several months that precede storm season. 3 There are four ways water gets into your basement: Through the drainage system, known as the sump. Backing up through the sewer lines under the house. Seeping through cracks in the walls and floor. Through windows and doors, called overland flooding. 4 Gutters can play a huge role in keeping basements dry and foundations stable. Water damage caused by clogged gutters can be severe. Install gutters and downspouts. Repair them as the need arises. Keep them free of debris. 5 Channel and disperse water away from the home by lengthening the run of downspouts with rigid or flexible extensions. Prevent interior intrusion through windows and replace weather stripping as needed. 6 Many varieties of sturdy window well covers are available, simple to install and hinged for easy access. Wells should be constructed with gravel bottoms to promote drainage. Remove organic growth to permit sunlight and ventilation. 7 Berms and barriers can help water slope away from the home. The berm’s slope should be about 1 inch per foot and extend for at least 10 feet. It is important to note permits are required any time a homeowner alters the elevation of the property. -
Corporate Office Employee Analysis: Transformation from Closed Office Layout to Open Floor Plan Environment
University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Theses from the Architecture Program Architecture Program Winter 12-1-2011 CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT Stephanie J. Fanger University of Nebraska-Lincoln, [email protected] Follow this and additional works at: https://digitalcommons.unl.edu/archthesis Part of the Interior Architecture Commons, and the Other Architecture Commons Fanger, Stephanie J., "CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT" (2011). Theses from the Architecture Program. 123. https://digitalcommons.unl.edu/archthesis/123 This Article is brought to you for free and open access by the Architecture Program at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in Theses from the Architecture Program by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT by Stephanie Julia Fanger A THESIS Presented to the Faculty of The Graduate College at the University of Nebraska In Partial Fulfillment of Requirements For the Degree of Master of Science Major: Architecture Under the Supervision of Professor Betsy S. Gabb Lincoln, Nebraska December, 2011 CORPORATE OFFICE EMPLOYEE ANALYSIS: TRANSFORMATION FROM CLOSED OFFICE LAYOUT TO OPEN FLOOR PLAN ENVIRONMENT Stephanie J. Fanger, M.S. University of Nebraska, 2011 Advisor: Betsy Gabb The office workplace within the United States has undergone monumental changes in the past century. The Environmental Protection Agency (EPA) has cited that Americans spend an average of 90 percent of their time indoors. As human beings can often spend a majority of the hours in the day at their workplace, more so than their home, it is important to understand the effects of the built environment on the American office employee. -
Installation Manual
DUET SUPREME FIREPLACES FACTORY-BUILT FIREPLACE MODEL DUET, DUET 4 SEASONS Tested and certified by Intertek • UL 127 • ULC-S610 OWNER’S MANUAL INSTALLATION OPERATION MAINTENANCE Keep these instructions for future use. Manufactured by: 3594 Jarry East, Montreal, QUEBEC, H1Z 2G4 Phone: 1-877-593-4722 Fax: (514) 593-4424 www.supremem.com [email protected] 1 Revised: July 2018 DUET SUPREME FIREPLACES TABLE OF CONTENTS 1. SAFETY GUIDELINES FOR YOUR DUET ………………………………………………….................... 3 2. OPERATING INSTRUCTIONS ……………………………………………………………………................. 4 2.1 Fuel …………………………………………………………………………………………………………… 4 2.2 First Fires ……………………………………………………………………………………………………. 4 2.3 The Combustion Air Control ………………………………………………………………………………. 4 2.3.1 Operating the Combustion Air Control ……………………………………………………………… 4 2.4 Starting a Fire ………………………………………………………………………………………………... 5 2.5 Adding a New Load of Wood ………………………………………………………………………………. 6 2.6 Smoking ……...……………………………………………………………………………………………… 6 2.7 Built-in Barbecue ……………………………………………………………………………………………. 6 3. MAINTENANCE OF THE DUET …………………………………………………………………………. 7 3.1 Creosote – Formation and Need for Removal ……………………………………………………………… 7 3.2 Chimney Maintenance ………………………………………………………………………………………. 7 3.3 Chimney Sweeping Cap …………………………………………………………………………………….. 7 3.4 Paint …………………………………………………………………………………………………………. 8 3.5 Disposal of Ashes ……………………………………………………………………………………………. 8 3.6 Glass Cleaning ………………………………………………………………………………………………... 8 3.7 Glass Replacement ………………………………………………………………………………………….. 9 3.8 Gasket Replacement -
Butterflymx Elevator Control System (ECS) by Using a Few Specific Use-Cases
Elevator Controls SUPPORT: P: 571-480-6579 ext. 2 (Mon-Fri, 6am-10pm EST) elevator-control-setup-v8-2021-02-24 E: The purpose of this document is to demonstrate the versatility of the ButterflyMX elevator control system (ECS) by using a few specific use-cases. These are all real-world scenarios where the ButterflyMX system has been installed with elevator controls. This document assumes that the reader has a basic level of familiarity with our hardware, for example making sure one wire is terminated to B, and one to IN. For additional documentation on our elevator control system refer to: http://butterflymx.com/resources Scenario 1: “I want a floor-by-floor lockout.” Floor 6 Solution: The lockout scheme determined by the elevator controller is accommodated by the Floor 5 ButterflyMX ECS. Each floor is locked out by default and there is a card reader in the elevator cab. Residents use their key fob to access the Floor 4 floor that they live on. When a visitor calls a resident from the ButterflyMX Touchscreen at Floor 3 the building access point, the resident grants them access and the floor that the resident lives on is unlocked in the elevator cab. There is a Floor 2 customizable timer that determines the length of time the floor is unlocked for. Floor 1 Hardware Required: 1. ButterflyMX Smart Intercom BMX 2. Elevator Control Hardware Elevator Cab Elevator Wiring Diagram Floor-by-Floor Lockout Elevator Controls SUPPORT: P: 571-480-6579 ext. 2 (Mon-Fri, 6am-10pm EST) elevator-control-setup-v8-2021-02-24 E: Scenario 2: “There are multiple elevator cabs in one bank in the building, with a floor-by-floor lockout. -
SOHO Design in the Near Future
Rochester Institute of Technology RIT Scholar Works Theses 12-2005 SOHO design in the near future SooJung Lee Follow this and additional works at: https://scholarworks.rit.edu/theses Recommended Citation Lee, SooJung, "SOHO design in the near future" (2005). Thesis. Rochester Institute of Technology. Accessed from This Thesis is brought to you for free and open access by RIT Scholar Works. It has been accepted for inclusion in Theses by an authorized administrator of RIT Scholar Works. For more information, please contact [email protected]. Rochester Institute of Technology A thesis Submitted to the Faculty of The College of Imaging Arts and Sciences In Candidacy for the Degree of Master of Fine Arts SOHO Design in the near future By SooJung Lee Dec. 2005 Approvals Chief Advisor: David Morgan David Morgan Date Associate Advisor: Nancy Chwiecko Nancy Chwiecko Date S z/ -tJ.b Associate Advisor: Stan Rickel Stan Rickel School Chairperson: Patti Lachance Patti Lachance Date 3 -..,2,2' Ob I, SooJung Lee, hereby grant permission to the Wallace Memorial Library of RIT to reproduce my thesis in whole or in part. Any reproduction will not be for commercial use or profit. Signature SooJung Lee Date __3....:....V_6-'-/_o_6 ____ _ Special thanks to Prof. David Morgan, Prof. Stan Rickel and Prof. Nancy Chwiecko - my amazing professors who always trust and encourage me sincerity but sometimes make me confused or surprised for leading me into better way for three years. Prof. Chan hong Min and Prof. Kwanbae Kim - who introduced me about the attractive -
Floor Fire Door Pleased to Offer a Series of Technical Bulletins De- Flush-Mounted Floor Doors Are Widely Used in Buildings for Access Between Floors
BILCO TECHNICAL BULLETIN The Bilco Company, a Performance Criteria for a world leader in the design and manufacture of spe- cialty access products, is Floor Fire Door pleased to offer a series of technical bulletins de- Flush-mounted floor doors are widely used in buildings for access between floors. signed to address issues As fire protection standards become more stringent, code officials and specifiers related to access prod- have identified the need for a floor door with a fire rating that matches the floor- ucts within the construc- ceiling assembly. This bulletin examines the product performance criteria for this tion industry. demanding application. Vertical fire doors are Penetrations in floor-ceil- common place in modern ing assemblies must perform building construction. De- (in a fire protection sense) as signed for fire protection of well as the rated deck to en- Stairwell openings in wall systems, sure containment of the fire. or Elevator these doors are generally Since the door is flush Shaft tested in accordance with mounted in the floor, it is not ASTM E152 (NFPA 252) reasonable to assume that and are UL Listed. Essen- combustible items will not be tially, vertical fire doors located near or stored directly serve only to block the pas- on the door. Heat transmis- sage of flames between lat- sion becomes a critical issue. 1&1/2-Hr Vertical Fire Doors eral compartments or rooms For this reason, the floor fire 2-Hr Walls within the building. door must meet a signifi- 2-Hr Floor/Ceiling Assembly A questionable area ex- cantly higher performance ists in that if combustibles standard than its vertical ASTM E152 ASTM E119 (ie: furniture, drapery, sup- counterpart. -
Ac 2008-325: an Architectural Walkthrough Using 3D Game Engine
AC 2008-325: AN ARCHITECTURAL WALKTHROUGH USING 3D GAME ENGINE Mohammed Haque, Texas A&M University Dr. Mohammed E. Haque is a professor and holder of the Cecil O. Windsor, Jr. Endowed Professorship in Construction Science at Texas A&M University at College Station, Texas. He has over twenty years of professional experience in analysis, design, and investigation of building, bridges and tunnel structural projects of various city and state governments and private sectors. Dr. Haque is a registered Professional Engineer in the states of New York, Pennsylvania and Michigan, and members of ASEE, ASCE, and ACI. Dr. Haque received a BSCE from Bangladesh University of Engineering and Technology, a MSCE and a Ph.D. in Civil/Structural Engineering from New Jersey Institute of Technology, Newark, New Jersey. His research interests include fracture mechanics of engineering materials, composite materials and advanced construction materials, architectural/construction visualization and animation, computer applications in structural analysis and design, artificial neural network applications, knowledge based expert system developments, application based software developments, and buildings/ infrastructure/ bridges/tunnels inspection and database management systems. Pallab Dasgupta, Texas A&M University Mr. Pallab Dasgupta is a graduate student of the Department of Construction Science, Texas A&M University. Page 13.173.1 Page © American Society for Engineering Education, 2008 An Architectural Walkthrough using 3D Game Engine Abstract Today’s 3D game engines have long been used by game developers to create dazzling worlds with the finest details—allowing users to immerse themselves in the alternate worlds provided. With the availability of the “Unreal Engine” these same 3D engines can now provide a similar experience for those working in the field of architecture. -
Subsymmetry Analysis of Archiectural Designs, Some Examples
Environment and Planning B: Planning and Design 2000, volume 27, pages 121- 136 Sub symmetry analysis of architectural designs: some examples Jin-Ho Park Department of Architecture and Urban Design, University of California, Los Angeles, CA 90095, USA; e-mail: [email protected] Received 1 December 1998; in revised form 28 April 1999 Abstract. An analytic method founded on the mathematical structure of symmetry groups is defined and some applications to the analysis of architectural designs are shown. In earlier work by March and Park, architectural designs were analyzed with respect to a partial ordering of subsymmetries associated with the symmetry of the square and then classified by lattice diagrams of the subsymmetries. The analytic approach dem- onstrates how different subsymmetries may be revealed in each part of the design and how various symmetric transformations combine to achieve the whole design. At first glance, the individual designs seem intricate and without obvious symmetry. However, an analysis of the sub symmetries and symmetric transformations clearly exposes the underlying structure. In this paper, the methodology employed in previous papers is substantially recounted, but new architectural examples have been added. The methodology of subsymmetry analysis In the methodology, various types of symmetry, or subsymmetries, are superimposed in individual designs and illustrate how symmetry may be employed strategically in the design process. An account of the mathematical structure of symmetry groups in analyzing architectural designs has been given over the last ten years by Lionel March in his graduate lectures at UCLA on the Fundamentals of Architectonics: Symmetry (reading materials for this course include Baglivo and Graver, 1976; March, 1995; + March and Steadman, 1971; see also Budden, 1972; Grossman and Magnus, 1964; Griinbaum and Shephard, 1987; Shubnikov and Kopstik, 1974; Weyl, 1952).