RCPLWE

NH/SH/ MDR Single Intermediate Double Lane Lane Lane

NH-2 3.875 7.75 -- -- NH-33 9.4 18.8 01 Nos --

SH-07 47.05 94.10 11 Nos. 59 Nos. MDR-069 9.80 14.37 1 No. 21 Nos. MDR-070 29.20 43.20 3 Nos. 29 Nos.

MDR-093 28.00 28.00 0 Nos. 29 Nos. MDR-094 1.775 3.55 0 No. 03 Nos.

MDR-096 9.60 14.07 1 No. 09 Nos. MDR-097 8.40 12.32 0 Nos. 17 Nos. MDR-098 7.25 7.25 0 Nos. 09 Nos. MDR-099 25.92 25.92 0 Nos. 66 Nos. ODR 30.038 45.06 - 77 Nos. (NH-33) (NH-33) (NH2) ODR 31.383 47.07 - 36 Nos. - (SH-07) ODR 12.400 12.40 2 Nos. 8 Nos.

ODR 32.10 48.15 - 36 Nos. ODR

ODR ODR

ODR

ODR - 3 Nos.

ODR - 2 Nos.

(NH-33) ODR - 1 No.

ODR -

ODR -

ODR -

ODR -

ODR - 4 Nos.

ODR - 2 Nos. (NH-33)

ODR -

ODR -

NH-100 NH-100 ODR - NH-100 ODR ODR - 2 Nos. (NH-2) ODR

ODR

-

ODR

-

ODR

(MDR-096) (MDR-069) ODR

ODR (MDR-070)& - 6 Nos. (NH-33) ODR

- 27 Nos. ODR 1 No. 12 Nos. ODR

(SH-07) 1 No. 14 Nos. ODR MDR - 41 Nos. ODR (NH-100 (MDR- 01 No. 42 Nos. 070) ODR

- - - ODR ODR - - -

ODR - - -

ODR - - -

ODR - - -

ODR - - -

468.588 628-152 22 Nos. 555 Nos.

(i) S/L (ii) I/L (iii) D/L

Page – 2 DPW-R ROAD CONSTRUCTION DEPARTMENT, (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March18 18-19 18-19 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Widening, - 32.100 5927.156 13.10.2014 6412.38500 Dt. 21.05.15 46310021 21(SBD) of 4622.90120 0.00000 0.00000 4622.90121 82.00% Strengthening 32.450 Dy. Secretary, Chief Engineer 15-16 (CDO) RCD Reconstruction of revised RCD, 06.08.15 Jharkhand, Suppl. Barkatha (NH-2) length Jharkhand Ranchi Lt. 02(SBD) of to Tetran Road for Ranchi's Lt. 638(Enc) 777.5800911 2016-17 dt. the Year 2014-15 No. 7631 (S) Rev. Lt. No. 228.48798 481 dt. 5637.06928 10.05.16 30.05.16 Supp P-II Revised 33SBD of 6882.906 16-17 dt. 30.12.16

2 Widening & - 32.50 8302.57 23.07.2015 8302.57000 08.05.15 6093.03 08.12.15 5798.27885 0.00000 0.00000 5798.27885 95.00% Strenthening of Dy. Sec., RCD, C.E., CDO, 40(SBD) of Mahto-Aahara- Jharkhand RCD, 2015-16 Rampur- Ranchi Lt. No. Jharkhand, (Chouparan) in KM 0 5158(S) Ranchi Lt. to 32.50 (Total No. 433 Length 32.50 Km) for the Year 2015-16 3 Widening & - 9.80 Km 6563.988 dt. 10.7.2015 6563.988 dt. 09.06.2015 1796.98 19.12.15 1729.78896 0.00000 0.00000 1729.78896 100.00% Strengthening work of Dy. Sec., RCD, CE.CDO, RCD, 45(SBD) of two lane with Pved Jharkhand Jharkhand, Ranchi Lt. No. 2015-16 shoulder in Jihu Itkhori Ranchi Lt. No. 563 Road from 0 to 9.8 Km 4824(S) (Total Road 9.801Km)

Page-3 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 4 Construction of - 441.254 05.11.2015 441.25400 Dt. 449.6091618 20.04.16 481.33634 0.00000 0.00000 481.33634 100.00% Rotary and Dy. Secretary, 04.11.15 01(SBD) of Development of RCD, Chief 16-17 Intersection at Jharkhand Engineer Barhi Chowk Ranchi's Lt. (CDO) (Hazaribag) at the No. 7633 (S) RCD Junction of NH-2, Jharkhand, NH-31, NH-33 for Ranchi Lt. the Year 2015-16 1271(Enc)

5 Widening and - 10.48 Km 2409.538 05.02.2016 2409.53800 Dt. 2186.38 4SBD of 1886.43184 0.000000 0.00000 1886.43184 100.00% strengthening/Rec Dy. Secretary, 11.12.15 2016-17 dt. onstruction of RCD, Chief 13.05.16 Gauriya Karma Jharkhand Engineer (MDR-096) to Ranchi's Lt. (CDO) Kewta Bridge No. 785 (S) RCD (MDR 069) in Km Jharkhand, 0.00 to 10.48 total Ranchi Lt. length 10.48Km) 1396(Enc) for the Year 2015- 16

Page-5 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 6 Widening & - 5.10 Km 3454.7529 23.05.2016 3454.75200 Dt. 1482.03 11SBDof 1478.33260 0.00000 0.00000 1478.33260 99.00% Strengthening of Dy. Secretary, 28.03.16 16-17 dt. Charhi-Ghato RCD, Chief 20.10.16 Road (Total Jharkhand Engineer Length 5.20Km) Ranchi's Lt. (CDO) No. 3228 (S) RCD Jharkhand, Ranchi Lt. 160(Enc)

7 Widening & - 7.965 1338.66900 26.09.2016 1338.66900 Dt. 1295.290884 01SBDof 1217.61866 0.00000 0.00000 1217.61866 94.00% Strengthening/Rec Joint Secretary, 14.09.16 17-18 dt. onstruction of RCD, Chief 05.05.17 Kallu Chowk Jharkhand Engineer (MDR-07) to Ranchi's Lt. (CDO) Sindur (NH-33) No. 6193 (S) RCD Via Mandai Jharkhand, Khurd Road for Ranchi Lt. the Year 2016-17 918(Enc)

3210.47712 1303.62658 Page-7 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 8 Widening & - 8.070 1876.3510 27.02.2017 1876.35100 Dt. 1676.17365 44(SBD) 0.00000 150.00000 100.00000 100.00000 5.96% Strengthening of Joint Secretary, 11.08.16 of 2017-18 Road from 11th RCD, Chief dt. 14.12.17 Km of NH-33 Jharkhand Engineer Padma Mahal Ranchi's Lt. (CDO) Main Gate (Thana No. 1155 (S) RCD Chowk) to Padma Jharkhand, Bazar Via Hawa Ranchi Lt. Mahal, Block 810(Enc) Office, S. Railway Station with H.C. 9 Widening & - 6.725 1820.8400 28.02.2017 1820.84000 Dt. 1415.652 43(SBD) 440.53940 650.00000 300.00000 740.53940 52.30% Strengthing/Recon Joint Secretary, 14.10.16 dt. 2017-18 struction of RCD, Chief dt. 11.12.17 Shankarpur- Jharkhand Engineer Narsingh Asthan- Ranchi's Lt. (CDO) Kapasia Kundil No. 1187 (S) RCD Bagi (SH-07) with Jharkhand, H.L. Bridge for Ranchi Lt. the Year 216-17 1035(Enc)

Page-9 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 10 Widening & - 16.790 4706.4600 21.09.2016 4706.46000 Dt. 3208.28928 dt. 309.53247 450.00000 446.00000 755.53247 23.40% Strengthening/Rec Joint Secretary, 09.08.16 15.09.2017 onstruction of RCD, Chief 18 SBD of 2017-18 Palma Moskodih- Jharkhand Engineer Choubey- Ranchi's Lt. (CDO) Keshwari road for No. 6036 (S) RCD the Year 2016-17 Jharkhand, Ranchi Lt. 801(Enc)

11 Reconstruction of - 17.825 5877.10300 03.05.2017 5897.10300 Dt.28.11.1 4516.87944 dt. 135.31250 800.00000 200.00000 335.31250 7.42% Ichak more (NH- Joint Secretary, 6 31.10.2017 33) Dumraon RCD, Chief 34 SBD of 2017-18 Bahimar Chowk Jharkhand Engineer PWD Road from Ranchi's Lt. (CDO) Km 0.00 to No. 2440 (S) RCD 17.825 (Total Jharkhand, Length 17.825 Ranchi Lt. Km) under Road 1230(Enc) Divison, Hazaribag for the

Page-11 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 12 Reconstruction of 21.25 6931.03 Joint Secretary, 6931.028 C.E. 5070.72607 16.01.18 of 326.58526 700.00 700.0000 1026.58526 20.22% Ram Nagar to RCD., (CDO) 48(SBD) Charwa Via Jharkhand, Jharkhand, of 2017-18 Bishnupuri, Ranchi Lt. No. Ranchi Lt. Godokhar Salgawan 3055 (S) dt. 1208(Enc) Pelawal, Kasturikhap Sultana 05.06.17 dt. More Road for the 24.11.16 13 Consruction of H.L. 100m 5331.74 Joint Secretary, 5331.74 C.E. 4945.44994 dt. 0 800.00 200.0000 200.0000 4.00% Bridge with Approach RCD., (CDO) 09.11.17 approach road road Jharkhand, Jharkhand, 36(SBD) between Malkana & 7.0Km Ranchi Lt. No. Ranchi Lt. of 2017-18 Larahi at Barhi 3251 (S) dt. 1168 dt. (Chauparan for the Year 2017-18 13.06.17 13.11.16 14 IRQP work of 1.775 Km 164.921 Dy. Secretary, 164.921 C.E. 146.8325 16.11.17 of 100.0000 46.0000 0.0000 100.0000 68.00% Hazaribag Bagodar RCD., (CDO) 39F2 of Road (MDR-94) (St. Jharkhand, Jharkhand, 2017-18 Columba's College Ranchi Lt. No. Ranchi Lt. to Korrah Chowk) 5049 (S) dt. 1025 (Enc.) from Km 0.00 to 1.775 for the Year 01.09.17 dt. 2016-17 07.10.16

Page-13 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March18 18-19 18-19 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

15 IRQP work of Konar 9.40 Km 679.660 Dy. Secretary, 679.66 C.E. 649.26 15.02.18 of 0.0000 649.2600 649.2600 649.2600 100.00% Bridge to Hawai RCD., (CDO) 49(SBD) Adda road (NH-33) Jharkhand, Jharkhand, 2017-18 Town portion from Ranchi Lt. No. Ranchi Lt. Km 30.15 to 40.35 5473 (S) dt. 1147 (Enc.) for the Year 2016- 17 04.10.17 dt. 19.10.16

Page-15 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March18 18-19 18-19 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 W/S (i) Jack & Jill School 7.047 Km 2853.348 Dy. Secretary, 2853.348 C.E. 1900.27965 dt. 315.70053 800.00 300.0000 615.7003 32.34% to Bisheshwar Dayal Chowk Via Zakir Hussain RCD., (CDO) 21.12.17 Marg, Chhoti Gowal Toli, Jharkhand, Jharkhand, 45(SBD) Gilan Chowk Pustakayan Ranchi Lt. No. Ranchi Lt. of 2017-18 Chowk (1 Km) (ii) Main Road Drug House to 5658 (S) dt. 972 (Enc.) Karzan Statium road 11.10.17 dt. (0.925 Km) (iii) Dipugarha Irrigation 27.07.17 Colony to Canary residential colony Via RWD Circle Office, Divine Mercy Ashram, Police Acadmy on NH-33 (1.525 Km) (iv) Pagoda Chowk to Kallu Chowk Via New area and Jamun tree Lohsingna to Manna Singh Chowk (2.102 Km) (v) Krishnapuri NH-100 to Krishnapuri Talab peripheral road (0.920 Km) and (vi) Heera bag Chowk to Government B. Ed. College road via DVC Chowk (0.575 Km) under Road Division, Hazaribag for the Year 2017-18

5045.26000 2895.26 Page-17 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date in Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 (Y/N)30 31 1 M/s Ganesh 32.2 32.2 32.0 31.4 29.0 - 35 N 98% 05.02.17 31.03.18 IP N iFk dk;Z iw.kZA ds LFkku ij Yadav, 32.0194 32.0194 32.0194 32.0194 32.0194 36 Stone Masonary Drain RCC dh lS)kfUrd lgefr eq[; vfHk;ark] Anandnagar casted Drain dsfUnz; fu:i.k laxBu] i-fu-fo-] >kj[k.M] P.O.-ISM Drain- 5.8 Saraidhela, jk¡ph ds i=kad 214 fnukad 15-02-2018 ds Km }kjk izkIr gSaA lkFk gh Hkwfe vf/kxzg.k dk;Z 6.5 Km izfØ;k esaA Protection wall 1.20Km 1.8 Km

2 M.G. 32.78 32.78 32.78 31.364 31.364 1.416 67 Nos. Y 100% 07.08.17 - CP N Work Complete Contractor 31.364 31.364 1.416 71 Nos. 31.12.17 Land acquisition work in Process 32.78 32.78 32.78 completed Pvt. Ltd., HLB Punchkula, 2/4 Haryana Drain 4.80 5.545

3 M/s Hill 9.8 9.8 9.8 9.8 9.8 - - Y 100% 18.06.17 - CP Y Work Complete Trade R.K. Land acquisition work in Process (JV)

Page-4 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 4 M/s Puja 1.1 Km 1.1 Km 1.1 Km 1.1Km 1.1 Km - - Y 100% 19.08.16 06.12.16 CP N Work complete Enterprises, Agreemented work was done in time. Simaria, Extra work & Electric Shifting work was Chatra. started delayed when it was sanctioned by the department, actually work completed on dated 06.12.2016. Contractor has applied for Sanction of extention of time i.e. under Process..

5 R.K. Infra 10.48 Km 10.48 - 10.48 10.48 0.086 27.00 Y 100% 12.01.17 - CP Y Work complete Corporation 10.48 10.48 10.48 0.086 37.00 Land acquisition work in Process Pvt. Ltd., H. No. 1/172, Dwarka Nagar, Kadapa, Hydrabad

Page-6 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 6 Classic 5.20 5.20 5.20 5.20 5.20 - 3 Nos. Y 100% 19.10.17 - CP N Work complete Engicon Pvt. 5.20 5.20 5.20 5.20 5.20 3.Nos. 31.12.17 Land acquisition work in Process Ltd., Ranchi Culvert complete 3.00 3 No. HL in Progress Drain 2.980 Km 2.900 7 M/s 6.834 7.24 6.234 8.09 8.09 1.131 Drain Y 100% 04.11.17 - CP N Work Complete Samleshwari 6.834 7.24 Km 6.234 8.09 8.09 1.131 12.10 Road Builders, 12.10 Bokaro Culvert 08 08

Page-8 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 8 M/s Sidhartha ------4 - 15% 13.08.19 - IP - Earth working in Progress. GSB in Construction, 12 Progress Hazaribag.

9 M/s Sidhartha 5.725 5.700 3.017 2.911 0 1.079 9 - 60% 10.419 - IP - 9 Nos. Culvert complete, 2.911/4.642 Construction, 6.725 6.725 6.725 4.642 5.725 2.083 18 DBM done and 1.079/2.083 PQC done Hazaribag. Culvert Complete 1050m Drain Complete

Page-10 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 10 Hills Trade- 11.00Km 10.00 Km 4.50 - - 1 - 45% 14.01.19 - IP - GSB & WMM work in Progress and RK(JV) 16.79 16.79 16.79 27 09 Nos. Culvert Stone Masonary in Gurgaon Progress

11 M & S 13.00 10.00 0 0 0 - 0/44 - 20% 30.01.19 - IP - Earth work and Subgrade (Stone Dust) Company, 17.825 17.825 17.825 17.825 17.825 Culvert, 10.00 Km Progress and GSB 8.00 Km Dumka 0/1HLB complete work in Progress

Page-12 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 12 M/s Sidhartha 8.00 8.00 5.00 2.00 - - 11 - 35% 15.04.19 - IP - WMM , Culvert and Drain in Progress Construction, 21.25 21.25 21.25 21.25 49 Hazaribag Drain 0.500 12.201

13 M/s Ganesh 4.50 2.50 - - - - 2 - 20% 08.11.19 - IP - Both side Earth filling in Yadav, Anand 7.20 7.20 13 progress and Four Nos. Box Nagar, Saraidhela, Culvert in also progress Dhanbad

14 M/s Puja - - - 1.775 1.775 - 1345 - 95% 15.02.18 - IP - Bituminous work and drain complete. Enterprises, 1.775 1.775 1600 Sinage & Board work in Progress Simaria, Chatra

Page-14 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date in Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

15 M/s Puja - - - 9.40 9.40 - - - 100% 14.05.18 - IP - Work Complete Enterprises, 9.40 9.40 Simaria, Chatra

Page-16 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date in Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 16 M/s 3.299 3.299 1.085 0.51 0.51 2.154 - - 40% 20.06.18 - IP - (i) In Dipugarha road 1.804/1.804 Shidhartha 7.047 7.047 7.047 PQC done & 0.636/0.636 DBM & BC Construction, done Hazaribag. (ii) Main road Drug House to Karjan Ground Bituminous work 0.570/0.570 and PQC 350/350 done (iii) Krishnapuri road 350m complete R/W Drain work in Progress 440/920 PQC compl. (iv) Heerabag road GSB & WMM, DBM/BC 0.515/0.515 Work complee (v) Jack & Jill Box culvert complete and WMM work in Progress

Page-18

Executive Engineer RCD, Road Division, Hazaribag DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 Ordinary repair work in KM - - 10.000 dt. 23.05.18 9.99971 dt. 09.06.18 ------2(P) to 5(P), 11(P) and Eng.-in-Chief, E.E., RCD, 21(P) at Dwari Roll road for RCD, Jharkhand Hazaribag ) the Year 2018-19 Ranchi's Lt. No. 3007(S)

2 Ordinary repair work in KM - - 8.000 dt. 23.05.18 7.99361 dt. 15.06.18 ------0 to 9.30 of Ichak-Jhumra Eng.-in-Chief, E.E., RCD, road for the year 2018-19 RCD, Jharkhand Road Division, Ranchi's Lt. No. Hazaribag 3007(S)

3 Ordinary repair work in KM - - 15.000 dt. 23.05.18 14.87494 dt. 09.06.2018 ------0 to 30.038 of Hazaribag Eng.-in-Chief, E.E., RCD, (St. Columbus College)- RCD, Jharkhand Road Divison, Church Hatyari Road for Ranchi's Lt. No. Hazaribag the Year 2018-19 3007(S)

Page-19 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

4 Ordinary repair work in KM - - 15.000 dt. 23.05.18 14.99944 dt. 09.06.18 ------0 to 31.383 of Ichak Eng.-in-Chief, E.E., RCD, Barkatha road for the Year RCD, Jharkhand Road Div., 2018-19 Ranchi's Lt. No. Hazaribag 3007(S)

5 Surface renewal work of - - 18.000 dt. 23.05.18 17.99849 dt. 15.06.18 ------total Length 1.10 Km Eng.-in-Chief, S.E., RCD, Boddom Bzar Mahabir RCD, Jharkhand Road Circle, Mandir to Kallu Chowk for Ranchi's Lt. No. Hazaribag Lt. the Year 2018-19 3007(S) No. 346 (Encl.)

6 Surfce renewal work of - - 50.000 dt. 23.05.18 49.95407 dt. 15.06.18 ------Total Length 3.00 Km of in Eng.-in-Chief, S.E., RCD, Jain Middle School Chowk RCD, Jharkhand Road Circle, to Bishnupuri chowk Via Ranchi's Lt. No. Hazaribag Lt. Ramnagar Masjid Chowk 3007(S) No. 351 for the Year 2018-19 (Encl.)

Page-21 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

7 Ordinary Repair work in KM - - 15.000 dt. 23.05.18 14.99912 dt. 15.06.18 ------0 to 28 of Banaso Eng.-in-Chief, E.E., RCD, Budgadda via Galaobar RCD, Jharkhand Road Div., Penk road for the Year Ranchi's Lt. No. Hazaribag 2018-19 3007(S)

8 Special repair work in - - 40.000 dt. 23.05.18 39.95975 dt. 15.06.18 ------Nilamber Pitamber chowk Eng.-in-Chief, S.E., RCD, to SBI Road (230m Length RCD, Jharkhand Road Circle, between Post Office Ranchi's Lt. No. Hazaribag Lt. Chowk to PWD Chowk) for 3007(S) No. 349 the Year 2018-19 (Encl.)

9 Surface renewal work in - - 18.000 dt. 23.05.18 15.19610 dt.15.06.18 ------Nilamber Pitamber chowk Eng.-in-Chief, S.E., RCD, to SBI Road (650 m Length RCD, Jharkhand Road Circle, between Nilamber Pitamber Ranchi's Lt. No. Hazaribag Lt. chowk to PWD Chowk) 3007(S) No. 348 (Encl.)

Page-23 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

10 Special repair work in West - - 10.000 dt. 23.05.18 9.97793 dt. 15.06.18 ------side and North side Eng.-in-Chief, S.E., RCD, Boundary wall of RCD, Jharkhand Road Circle, Barkagaon Rest Shed for Ranchi's Lt. No. Hazaribag Lt. the Year 2018-19 3007(S) No..347 (Encl.)

11 Special repair work in - - 10.000 dt. 23.05.18 9.99391 dt. 15.06.18 ------Barkagaon Rest shed and Eng.-in-Chief, S.E., RCD, Staff quarter for the Year RCD, Jharkhand Road Circle, 2018-19 Ranchi's Lt. No. Hazaribag Lt. 3007(S) No. 350 (Encl.)

12 Special repair work in - - 8.000 dt. 23.05.18 7.99896 dt. 15.06.18 ------South side and East side Eng.-in-Chief, S.E., RCD, Boundary wall of Road Sub- RCD, Jharkhand Road Circle, division 2 Office and Ranchi's Lt. No. Hazaribag Lt. Superitendent Engineer 3007(S) No.345 (Encl.) Office, for the Year 2018- 19

Page-25 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

13 Special repair work in - - 8.000 dt. 23.05.18 7.90615 dt. 15.06.18 ------Boundary wall of RCD Eng.-in-Chief, S.E., RCD, Hazaribag Inspection RCD, Jharkhand Road Circle, Bunglow for the Year 2018- Ranchi's Lt. No. Hazaribag Lt. 19 3007(S) No. 343 (Encl.)

14 Speical repair work in - - 5.000 dt. 23.05.18 4.99931 dt. 15.06.18 ------Kitchen, Pump House and Eng.-in-Chief, S.E., RCD, Garriage of RCD Hazaribag RCD, Jharkhand Road Circle, Inspection Bunglow for the Ranchi's Lt. No. Hazaribag Lt. Year 2018-19 3007(S) No.344 (Encl.)

15 Ordinary repair work in - - 3.500 dt. 23.05.18 3.49764 dt. 15.06.18 ------Government Residence of Eng.-in-Chief, E.E., RCD, Executive Engineer, RCD, RCD, Jharkhand Road Div., Road Division, Hazaribag Ranchi's Lt. No. Hazaribag for the Year 2018-19 3007(S)

Page-27 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

16 Special - - 26.927 dt. 23.05.18 26.92700 dt. 15.06.18 ------repair/Reconstruction of Eng.-in-Chief, S.E., RCD, Ç'type Quarter Doubl story RCD, Jharkhand Road Circle, Approach road and Ranchi's Lt. No. Hazaribag Lt. Garriage at Zulu Park 3007(S) No. 353 Lakra Godown for the Year (Encl.) 2018-19 17 Special repair work in care - - 8.000 dt. 23.05.18 7.96302 dt.15.06.18 ------taker Quarter of RCD, Eng.-in-Chief, S.E., RCD, Hazaribag Inspection RCD, Jharkhand Road Circle, Bunglow for the Year 2018- Ranchi's Lt. No. Hazaribag Lt. 19 3007(S) No. 352 (Encl.)

18 Paver Block work in 1(P) - - 100.000 dt. 23.05.18 99.99709 dt. 13.06.18 ------and 2(P) of Hazaribag- Eng.-in-Chief, C.E., RCD, Barkagaon-Tandwa road RCD, Jharkhand Ranchi Lt. No. (Town Portion) for the Year Ranchi's Lt. No. 1051 (Encl.) 2018-19 3007(S)

Page-29 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

19 Paver Block in Bagodar- - - 90.000 dt. 23.05.18 89.94661 dt.13.06.18. ------Hazaribag Road (Korra Eng.-in-Chief, C.E., RCD, Chowk to St. Columbus RCD, Jharkhand Ranchi Lt. No. College More) for the Year Ranchi's Lt. No. 1052 (Encl.) 2018-19 3007(S)

20 Ordinary repair work in - - 15.000 dt. 23.05.18 - dt. ………. ------town road under Sub Eng.-in-Chief, E.E., RCD, division No. 1 for the Year RCD, Jharkhand Road Div., 2018-19 Ranchi's Lt. No. Hazaribag 3007(S)

21 Ordinary Repair work in - - 16.000 dt. 23.05.18 - dt. ………. ------town road under Sub Eng.-in-Chief, E.E., RCD, Division no. 2 for the Year RCD, Jharkhand Road Div., 2018-19 Ranchi's Lt. No. Hazaribag 3007(S)

Page-31 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Under Vivekadhin 1 Painting of Guard wall, Culvert, - - 30.000 dt. 10.05.18 1.28362 Dt. 12.05.18 ------Bridge and Bushes cutting of Secretary, RCD, EE,RCD, Ichak More to Barkatha Road Jharkhand Hazaribag from Km 29 & 30 Under Ranchi's Lt. No. Vivekadhin for the Year 2018- 19 80(S)A

2 Tree reflector in Ichak More - - - dt. 10.05.18 2.42740 Dt. 15.06.18 ------NH 33 to Barkatha road in Km Secretary, RCD, EE,RCD, 21.383 to 31.383 and NH 33 Jharkhand Hazaribag Hawai Adda to Konar Bridge Ranchi's Lt. No. with tree painting under Vivekadhin for the Year 2018- 80(S)A 19

Page-33 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

1 ------fufonk fuLrkj dh izfØ;k esaA

1 ------fufonk fuLrkj dh izfØ;k esaA

1 ------fufonk fuLrkj dh izfØ;k esaA

Page-20 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

4 ------fufonk fuLrkj dh izfØ;k esaA

5 ------2nd Call Tender will be Open on 20.07.2018

6 ------fufonk fuLrkj dh izfØ;k esaA

Page-22 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

7 ------fufonk fuLrkj dh izfØ;k esaA

8 ------fufonk fuLrkj dh izfØ;k esaA

9 ------fufonk fuLrkj dh izfØ;k esaA

Page-24 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

10 ------fufonk fuLrkj dh izfØ;k esaA

11 ------fufonk fuLrkj dh izfØ;k esaA

12 ------fufonk fuLrkj dh izfØ;k esaA

Page-26 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

13 ------fufonk fuLrkj dh izfØ;k esaA

14 ------fufonk fuLrkj dh izfØ;k esaA

15 ------fufonk fuLrkj dh izfØ;k esaA

Page-28 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

16 ------fufonk fuLrkj dh izfØ;k esaA

17 ------fufonk fuLrkj dh izfØ;k esaA

18 ------Tender will be opened on 04.07.2018

Page-30 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

19 ------Tender will be opened on 04.07.2018

20 ------Tender will be opened on 20.07.2018

21 ------Tender will be opened on 20.07.2018

Page-32

Executive Engineer, RCD, Road Division, Hazaribag DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

Under Vivekadhin 1 Sri Rajendra Yadav, - - 100% - CP Y Work completed Banadag, Hazaribag

2 Sri Virendra Rajak, Hazaribag - - 100% - CP Y Work completed

Executive Engineer, RCD, Road Division, Hazaribag

Page-34 izi= & 3 egkys[kkdkj dks lefiZr ys[kk ,oa iqujhf{kr QkeZ & 51 dh v|ru fLFkfr ¼foÙkh; o"kZ 2018&19½ ize.My dk uke %& iFk fuekZ.k foHkkx] iFk ize.My] gtkjhckxA Øñlañ ekfld ys[kk dh fooj.kh egkys[kkdkj dk;kZy; ls QkeZ& 51 dh fooj.kh ekgokjh O;; dh fooj.kh 'ks"k jkf'k dh fooj.kh ¼:ñ vH;qfDr ekfld ys[kk dk lR;kiu ¼:ñ yk[k esa½ yk[k esa½ ekg izlax ekg izlax 'kh"kZ 5054 'kh"kZ 3054 'kh"kZ 5054 'kh"kZ 3054 1 2 3 4 5 6 7 8 9 10 11 1- ebZ*2018 iñ&660-vuqñ ekpZ*2018 rd ebZ*18 iñ&768¼vuq-½ 2895.26000 0.00000 2150.00000 30.00000 - fnñ 02-06-2018 fnñ&27-06-2018 dk;Z en esa izkIr vkoaVu ,oe C;; %& izkIr vkoaVu C;; 'ks"k jkf'k ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼iqy dk;Z½& 0.00000 0.00000 0.00000 ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼iFk dk;Z½& 5045.26000 2895.26000 2150.00000 ;kstuk en&'kh"kZ&5054&iFkksa ds D.P.R. 0.00000 0.00000 0.00000 5045.26000 2895.26000 2150.00000 Utility shifting of Hazaribag-Katkamsandi in KM 4 to 32.2 0.00000 0.00000 0.00000 Utility shifting of Hazaribag-Barkagaon-Tandwa Road in KM 0 to 47.05 0.00000 0.00000 0.00000 5054 Construction of Ring Road 0.00000 0.00000 0.00000 ¼5054½ dqy 5045.26000 2895.26000 2150.00000 ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼csyh czht½& 0.00000 0.00000 0.00000 xSj ;kstuk en & 'kh"kZ & 3054& lM+ds ,oa iqy ,oa ¼foosdk/khu½ 30.00000 0.00000 30.00000 ¼3054½ dqy 30.00000 0.00000 30.000000 LFkkiuk en esa izkIr vkoaVu ,oe C;; izkIr vkoaVu C;; 'ks"k jkf'k 3054 & lM+ds vkSj iqy & osru & 300.00000 86.60053 213.39947 ;k=k C;; & 0.40000 0.06335 0.33665 dk;kZy; C;; & 0.40000 0.40000 0.00000 eksVjxkMh & 0.40000 0.40000 0.00000 nwjHkk"k & 0.15000 0.07846 0.07154 fo|qr & 0.00000 0.00000 0.00000 dk;Zikyd vfHk;ark] ,yñ Vhñ lhñ & 0.00000 0.00000 0.00000 iFk fuekZ.k foHkkx] onhZ & 0.80000 0.00000 0.80000 iFk ize.My] gtkjhckx e'khu ,oa miLdj 0.00000 0.00000 0.00000 Page- 35 lafonk HkÙkk 3.15600 1.66280 1.49320 fof/k izHkkj 0.00000 0.00000 0.00000