Chapter 16 Riviersonderend Riviersonderend
Total Page:16
File Type:pdf, Size:1020Kb
THEEWATERSKLOOF SPATIAL DEVELOPMENT FRAMEWORK ––– VOLUME II CHAPTER 16: RIVIERSONDEREND CHAPTER 111666 RIVIERSONDEREND Socio-economic: • High level of poverty with limited economic growth opportunities and 77% of the population earning less than R3500 per month. 16.1 BACKGROUND Infrastructure Backlog RIVIERSONDEREND AT A GLANCE • The need for subsidised and GAP housing - subsidised housing backlog: 470 Total Population ± 5142people Role and function Agricultural service centre (Housing database, 2009) Rank order of town Local node; 3nd order town • 175 Households do not have direct access to waterborne sanitation; 306 erven Comparative locational advantage Stop-over between South Cape and Cape are listed on the municipal indigent list. Town via N2 Country town character Direct exposure of CBD to N2 traffic 16.3 DEVELOPMENT INFORMANTS Economic base Agriculture Growth Potential Ranked 56 for 131 towns in the Western Cape There are patches of Central Rûens Shale Renosterveld (having a “critically TTTABLE 16.116.1:::: RRRIVIERSONDEREND AT A GLANCE endangered” ecosystem status) and largely intact portions of Cape Lowland Alluvial Vegetation (having a “critically endangered” ecosystem status) within the urban edge – these areas are listed as Critical Biodiversity Areas. The role of Riviersonderend within the context of the Theewaterskloof municipal area is The Sonderend River, which skirts the northern boundaries and eastern of that of an agricultural service centre. The town is categorized as a local node. Riviersonderend, is an important ecological corridor. There are wetlands and/or The town’s main comparative economic advantage is the N2 and exposure to passing floodplain areas associated with the Sonderend River system that are similarly an traffic between Cape Town and the Southern Cape. important part of this ecological corridor. Economic activities are mainly linked to agriculture. Two areas are possibly subject to flooding and/or classifiable as wetlands - this would require confirmation by a more detailed level of investigation. Restrict development on valuable agricultural land to the south and west of the town; 16.2 KEY SPATIAL CHALLENGCHALLENGESESESES Urban efficiency/Spatial separation: 16.4 THE SPATIAL DEVELOPMDEVELOPMENTENT CONCEPT • The N2 national road bisects the town into northern and southern halves. This The spatial concept is a schematic representation of the broad based spatial development phenomenon of the urban structure limits social and spatial integration as proposals. The spatial concept informs the more detailed strategies and proposals. development south of the N2 is isolated from development north of the N2. North-south linkages across the N2 are partly restricted by traffic and safety 16.4.1 The Spatial Vision concerns. • A poor sense of place due to poor streetscape along the N2. Promote Riviersonderend as a tourism destination and agricultural service centre and • Infiltration of industrial/business uses into residential areas. derive maximum economic growth from the N2. • Large underdeveloped and/or vacant land within the urban edge FEBRUARY 2012 URBAN DYNAMICS WESTERN CAPE 16-1 THEEWATERSKLOOF SPATIAL DEVELOPMENT FRAMEWORK ––– VOLUME II CHAPTER 16: RIVIERSONDEREND 16.4.2 The Spatial Concept Plan (Refer Figure 16.116.1) The following main structuring elements informed the spatial vision and future growth potential of Riviersonderend. The concept is illustrated in FiFiFigureFi gure 11161666....1111. • Existing Nodes: − The CBD area. − The primary cluster of community facilities located in Oostergloed. • Existing Routes − The main activity street in Riviersonderend is the N2 national road that bisects the town. − Muller Street − Alpha Street − Voortrekker Street • Edges: − Kleinberg Mountain to the north of Riviersonderend FFFIGURE 16.16.1111:::: RRRIVIERSONDEREND SPATISPATIALAL CONCEPT PLAN − The Sonderend River to the east of the town. − Intensive agricultural land to the south and west of the town. 16.4.3 Principles for iimplementingmplementing the spatial concept 111 • Encourage − the spatial integration of the Riviersonderend CBD and the Oostergloed business node (b) − the strengthening of the commercial sector activities in Main Road (a) − the development of public amenities and services north of the N2 (a) • Promote 1 Western Cape Provincial Spatial Development Framework - Areas of Intervention (a) Socio-Economic Development – alleviate poverty (b) Settlement Restructuring – promote spatial and social integration (c) Environmental Sustainability - promote environmental protection FEBRUARY 2012 URBAN DYNAMICS WESTERN CAPE 16-2 THEEWATERSKLOOF SPATIAL DEVELOPMENT FRAMEWORK ––– VOLUME II CHAPTER 16: RIVIERSONDEREND • Restrict − Riviersonderend as a popular stop-over destination between the Southern Cape and Cape Town (a) − development on flood prone areas (c) − a socio-economic gradient between different levels of income groups (b) − small scale farming activities where potential health hazards exist with regard to abutting residential communities (a) • Maintain / Protect − the rural character of Riviersonderend (a) • Contain − development within the urban edge of Riviersonderend (c) 16.4.4 Spatial Restructuring Forthcoming from the proposed spatial concept the need derives for strategic interventions (spatial restructuring) to create an integrated and compact urban form. The aim will be to restructure Riviersonderend so as to break down the spatial barriers and to make the town more convenient and pleasant to live in. These interventions are schematically illustrated in FFFigFigigigureure 16.16.2222 and include: • Spatial Integration − Encourage spatial integration between the Riviersonderend CBD and the Oostergloed local neighbourhood node through promoting Alpha and Muller Street as link routes. − Strengthen Voortrekker Road as a spatial link between the Northern and southern parts of the town. • Densification − Promote densification measures i.e. infill development, sub-divisions of erven, second dwellings etc in accordance with the densification guidelines set out in SSSectionSection 16.16.7777....2222.... − Encourage mixed use development along. Muller Street, Alpha Street and the N2. • New Growth Areas FEBRUARY 2012 URBAN DYNAMICS WESTERN CAPE 16-3 THEEWATERSKLOOF SPATIAL DEVELOPMENT FRAMEWORK ––– VOLUME II CHAPTER 16: RIVIERSONDEREND need for additional community facilities, it is projected that approximately 20 ha of land will − Future urban growth is proposed in: be required to address urban growth over the next 10 years. Table 16.2 illustrates the projected land requirements until 2019. o a northern direction to accommodate residential development; o an eastern direction for industrial development purposes. DENSIFICATION Densification Assumption Units Vacant erven 10% vacant erven developed 8 2nd Dwellings 10% of single residential erven developed 74 (excluding high density areas) Sub-divisions 10% of single residential erven developed 74 (excluding high density areas) Vacant land 30% of vacant land developed @ 20du/ha 368 Total 25du/ha (gross average density) 524 (21ha) RESIDENTIAL: 2019 Density Category Existing Housing Population Units Required Projected land Ha required Backlog Increase required ((HaHaHaHa)))) including densification (Ha) FIGURE 16.16.2222:::: RRRIVIERSONDEREND SSSPATIAL IIINTEGRATION CCCONCEPT PPPLAN Low 218 73 7 2 Medium 364 91 5 1..5 High 873 175 5 1..5 16.5 POPULATION GROWTH ANANDD LAND USE REQUIREMEREQUIREMENTSNTS Subsidy 470 470 13 13 Total 1455 809 33303000 181818(18 (((AAAA)))) Population projections based on historic trends for Riviersonderend indicated that the Assumptions: population growth rate of 6% p.a. was recorded between 2001 and 2007. The high population growth rate can be contributed towards in-migration of farm workers, a trend that is not Average Density Category: % of population Household Density expected to continue. Projections are therefore based on a population growth rate of 3% p.a. i.e. 50% of the historic growth rate. Based on the population projections, approximately 31ha Low Density 15% 3 10du/ha of land is required to address the projected residential land requirements for the next 10 Medium Density 25% 4 20du/ha years until 2019. Taking into consideration other variables i.e. the effect of densification and High Density 60% 5 35du/ha FEBRUARY 2012 URBAN DYNAMICS WESTERN CAPE 16-4 THEEWATERSKLOOF SPATIAL DEVELOPMENT FRAMEWORK ––– VOLUME II CHAPTER 16: RIVIERSONDEREND COMMUNITY FACILITIES 222 16.6 URBAN EDGE Community Dwelling Unit Hectare per facility Riviersonderend land Facilities per facility requirements (ha) In determining the urban edge for the Riviersonderend urban area, consideration was given to Primary School 1100 2.8 2.1 the following: Secondary School 2500 4.8 - Clinic 2500 0.2 0.3 Community 18000 1.5 - The historic growth patterns and development form: The town originated along Main Hospital Road (the N2); Library 4000 0.05 - The intrinsic and systemic value of the natural areas: The Sonderend River and its flood Community 6000 0.35 - plain acts as a natural barrier to development in an eastern direction. The Centre environmental sensitivity and steep slopes of the Kleinberg limits urban growth in a Sport Field / 1200 1.4 0.9 northern direction and intensive agricultural land to the south and west of the town Parks (Tygerhoek Experimental farm) limits urban growth in both these directions. (neighbourhood) Fire Station 20000 0.3 - Projected future urban growth: According to projections for Riviersonderend