Regional Transportation Plan (RTP)

The RTP reflects plans What is an RTP? prepared by local agencies Sun Corridor MPO Planning Area § 20-year blueprint for transportation § Required by law to be updated every 4 years § Plans how to invest federal funds - fiscally constrained Outcomes of the RTP: § Investment strategy for future funding § Planned performance and safety benefits § Policy guidance § Demonstration of air quality conformity

Sun Corridor MPO Regional Transportation Plan Goals

1 Population and Employment Growth

Population Growth

284,960 236,727 300,000 127,960 200,000

100,000

- 2017 2035 2040

Employment Growth

89,552 100,000 69,913 80,000 32,548 60,000 40,000 20,000 - 2017 2035 2040

2 Sun Corridor MPO Region’s Transportation Systems

3 Roads and Streets

4 Traffic Safety

Crash Types 2015-2017 1,200 55 Programmed Safety Projects: 1,100 50 • Jimmie Kerr Blvd: Dilemma Zone 1,000 45 900 Warning System, Rumble Strips 40 800 35 • Macrae Rd: Rumble Strips 700 30 • Peart Rd: Left Turn Lane, Transverse 600 25 Rumble Strips 500 20 400 • Multiple Roads: Rumble Strips 15 300 • Cottonwood Ln/Kadota Ave: Pedestrian 10 200 Hybrid Beacon (PHB) 100 5 • Multiple intersections: Systemic LED 0 0 stop sign replacement project

Total Crashes Severe Crashes

5 Transit

§ Two public transit systems – CART and the Cotton Express in Coolidge § Casa Grande and Eloy considering transit systems § Several organizations provide transit services for seniors and persons with disabilities § Pinal County Transit Governance Study is studying regional coordination of transit

6 Bicycle and Pedestrian Transportation

Goals: § Increase facilities over time § Include bike and pedestrian facilities in road improvement projects Major project: CAP Recreational Trail/ Nona Road trailhead

7 Aviation

§ Four municipal in the SCMPO region: § Casa Grande Municipal § Coolidge Municipal Airport § Eloy Municipal Airport §

2017 Airport Operations Number of Air Taxi Total Annual Facility Name Housed or Operations Operations Based Aircraft Casa Grande 92 2,000 119,680 Municipal Coolidge 43 0 4,250 Municipal Eloy Municipal 22 0 30,000 Pinal Airpark 15 0 56,857

8 Best Practices Implementation

Best Practices - Ways the region is providing better, smarter transportation

New dust More visible stop detection system signs at critical on I-10, Sunshine locations Blvd to Picacho Peak Road

Complete streets Improved to serve all road multimodal users, such as crossings, such Eloy Main Street as this beacon project on Florence Blvd.

9 RTP Recommendations - Roadway Implementation Plan

Recommended Investment Strategy (FY 2020-2025) §Already programmed in the Recommended Investment RTP has • 20 - year planning horizon (2040) FY 2016-2025 TIP Strategy (FY 2026-2040) implementation • RTP must be fiscally constrained Recommended Investment plans for • Projects that are funded must be on Strategy (FY 2026-2040) 15% roadway, transit, the TIP to be programmed for §Preservation: maintenance, 35% and aviation construction and reimbursement road resurfacing §Modernization: upgrades to improve efficiency or safety 50% • Surface Transportation Block Grant without adding capacity Roadway Program – approx. $591,000 per year §Expansion: adding new • Highway Safety Improvement Program lanes, new roads Funding Sources funds – for projects that improve Preservation Modernization safety – competitively awarded Should additional funds Expansion become available: §Projects of opportunity have been identified by each jurisdiction

10 RTP Recommendations – Transit Implementation Plan

Key Funding Programs and Transit Providers Section 5310 - Section 5307- Section 5311 - Enhanced Mobility of Urbanized Area Seniors and Individuals Rural Areas Formula Funding with Disabilities

- Funds for - Capital, planning, - Capital, planning, programs to serve and operating and operating the needs of assistance assistance transit-dependent - Urban areas with - Rural areas with populations populations of less populations - Competitive than 50,000 greater than grant program 50,000 - Current funding - Recent grant to CART and - Available to Casa awardees include Cotton Express Grande when/if the Opportunity they implement Tree and Pinal transit service Hispanic Council

11 RTP Recommendations – Airport Implementation Plan Recently funded projects listed below. A complete list of planned projects are contained in the RTP Coolidge Municipal Airport §$9.5M FAA grant to develop a new , new lighting, and lighting controls §$450k grant runway/lighting reconstruction and navigation aid Eloy Municipal Airport §$150k FAA grant for taxiway reconstruction