Project Proponent Iscon City Center LLP Type of Project Building construction project Category of Project ‘8(a)-B2’

Sr. Details Summary No. i. Project name and location (Village, Dist, “Iscon Commercial Complex” State, Industrial State (if applicable) (Commercial Building) Survey No : 25,27/B/1,31,38, Final TPS No. 18, Sarangpur area, FP no. 32/Paiki, Village :Rajpur-Hirpur, Tal :, District : , ii. Address for Correspondence (Name, Mr. G. Venkatramana Designation and complete address) President ISCON HOUSE OPP. ASSOCIATE PETROL PUMP OFF. C G ROAD AHMEDABAD – 380009, Gujarat E-mail : [email protected] iii. Land use & Land Area • Land Use: As per zoning of AMC, falls under industrial zone (land of closed mill obtained through Auction) • Plot area : 8764.20 sq. m. • Ground built up area :4173.50 sq. m. • Built up area :43,695.51 sq. m. iv. Capital cost of the project Rs. 280 Crores v. Resource Requirement • Land Area: 8,764.20 m2 • Water Requirement: 90 KLD • Source of water supply: Ahmedabad Municipal Corporation • PowerRequirement& Source: 1500 KW from Torrent Power Grid Supply • Backup power supply : DG Set of 500 KVA vi. Project Brief • This project is of building construction having built up area of 43,695.51 m2 having G+6 structures (587 shops) • There will be 6 blocks (A to F), out of which 5 blocks (A to E) will be having G+6 structures whereas Block F will have Ground floor only , exclusively for utility purpose vii. Anticipated Waste Generation • Sewage generation from the project is anticipated @ 70 KLD, to be disposed off to AMC drain. • Municipal solid waste anticipated to be generated @ 0.302 TPD, out of which @ 0.18

Executive Summary of Proposed Building Construction Project 1 M/s. Iscon City Center LLP (Iscon Commercial Complex) Sr. Details Summary No. TPD will be recyclable and sent to scrap vendors, whereas @ 0.122 TPD(non-recyclable) will be sent to nearest collection point of AMC viii. Descriptions of Environmental sensitivity • The land is in the midst of city which inhabited in 10 km radius form the site. Selection of by people. the project – Nature of land – • RIVER: @ 2.5 KM WEST Agricultural (single/double crop), barren, • : @ 1.0 KM SOUTH Govt/private land, status of is • L.G. HOSPITAL: @ 2 KM SOUTH acquisition, nearby (in 2-3 km.) water • DIWAN BALLUBHAI SCHOOL: @ 3.4 KM WEST body, population, with in 10km other • VED MANDIR: @ 1.0 KM SSW industries, forest, eco-sensitive zones, • VIVEKANAND COLLEGE: @ 0.75 KM WEST accessibility. • TRANSSTADIA FOOTBALL STADIUM & EKA CLUB: @ 1.5 KM SSW • There is no protected area notified under the Wild Life (Protection) Act (1972) & Eco - sensitive area notified under Section 3 of the Environment (Protection) Act – 1986 falls within 10 Km radius areas from the Plant Site. ix. Person to be employed. @ 25 -30 workers for construction phase @1200 persons have employment opportunity for operative phase. x. Emergency preparedness plan in case of Fire protection measures have been planned to natural or in plant emergencies provide to curb with the emergency in case of fire during operative phase of the project . • Fire extinguishers like DCP (Dry chemical powder- 5.0 kg) & CO2 (4.5 kg) type extinguisher will be provided on each floor in each staircase of building block (from A to E) as per GDCR guidelines. (5 blocks, 7 floors, Total 35 nos. each) • 100 KL (1 Nos.) of underground Water tank with partition 50 KL for fire and 50 KL for domestic use will be provided as per IS: 3844 & 20 KL of overhead water tank with partition 10 KL for fire and 10 KL for domestic use on block A to E will be provided. • Automatic sprinkler system will be provided @ One no. per 12 m² of floor area in all basements and fire indication panel at ground level will also be provided. • The nearest fire station of is approx. 1.5 km away from the project site; means require approximate 5-8 min travel time in case of emergency. xi. Occupational Health Measures • Construction workers will be provided adequate drinking water supply and proper sanitation facilities. • PPEs, first aid room with first aid kit & welfare facilities as per the Gujarat Building & Other Construction Workers Rules will also be

Executive Summary of Proposed Building Construction Project 2 M/s. Iscon City Center LLP (Iscon Commercial Complex) Sr. Details Summary No. provided to the workers. • First aid emergency kit will be provided at various locations during construction phase. • Personal protective equipments like Helmets, Safety Shoes, Hand Gloves, Goggles, Clothing, etc. will be provided during construction works. • Workers will not be allowed to work at night time.

Executive Summary of Proposed Building Construction Project 3 M/s. Iscon City Center LLP (Iscon Commercial Complex)