Classic Conduit Composition Mount QMCC

,7(012 '(6&5,37,21 47< 7+,6('*(72:$5'6522)5,'*(  )/$6+,1*;;0,//   4%/2&.&21'8,770,//   :$6+(56($/,1*,';2'(3'0  %21'('66  /$*6&5(:+(;+($'[66 

$9$,/$%/(,10,//&/($5$12',=(' $1'%521=($12',=('),1,6+(6



&21'8,7&/$03  127,1&/8'(' 

  

 



 

7,7/( 40&&&/$66,&&21'8,7  &20326,7,2102817

81/(6627+(5:,6(63(&,),(' 6,=( '5$:1%< 5$' 5(9 ',0(16,216$5(,1,1&+(6 72/(5$1&(6 )5$&7,21$/  $ '$7(   35235,(7$5<$1'&21),'(17,$/ 7:23/$&('(&,0$/  7+(,1)250$7,21&217$,1(',17+,6'5$:,1*,67+(62/(3523(57<2)48,&.0281739$1<5(352'8&7,21,13$5725$6 '21276&$/('5$:,1* $:+2/(:,7+2877+(:5,77(13(50,66,212)48,&.0281739,6352+,%,7(' 7+5((3/$&('(&,0$/  6&$/( :(,*+7  6+((72)

    

Lag pull-out (withdrawal) design values (lbs) in typical sheathing: Lag Bolt Specifications

Specific Gravity 1/4" shaft per 1/2" thread depth 1/4" shaft per 1" thread depth

Plywood .45 72 144

OSB .45 72 144

Sources: APA - The Engineered Association, TT-051C, 2011 Note: Lag pull-out (withdrawal) ultimate capacity = 350 lbs. in 1/2" or 1/2" OSB. IMPORTANT: To maintain waterproofing it is important that the aluminum flashing (item 1) is properly placed under one full course above the mounting block with at least some of the flashing extending up under the course above that as well. See instructions on back.

925-478-8269 | www.quickmountpv.com | [email protected] BI 7.2.3-8 2700 Mitchell Dr. | Walnut Creek, CA 94598 Nov-2015, Rev 6 Classic Conduit Mounting Instructions Installation Tools Required: tape measure, roofi ng bar, chalk line, stud fi nder, caulking gun, 1 tube of appropriate sealant, with 1/8" bit, drill or impact gun with 7/16" deep socket.

WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment. 1 2 3

Choose placement of conduit mounts along path Lift composition roof shingle with roofi ng bar, just Slide conduit mount into desired position. Remove of conduit. above placement of conduit mount. any nails that confl ict with getting the mount fl ush with front edge of shingle course. Mark center for drilling. 4 5 6

Using drill with 1/8" long bit, drill pilot hole into Clean off any , and fi ll hole with roof Lift shingle and slide conduit mount into place. roof, taking care to drill to the roof. manufacturer's approved sealant. Prepare lag bolt with sealing washer and single hole (not included) as shown.

All roofi ng manufacturers’ 7 written instructions must also be followed by anyone modifying a roof system. Please consult the roof manufacturer's specs and instructions prior to touching the roof.

Insert lag through hole in block, and position clamp over conduit. Using drill with 7/16" socket, drive lag until block is tight.

925-478-8269 | www.quickmountpv.com | [email protected] BI 7.2.3-8 2700 Mitchell Dr. | Walnut Creek, CA 94598 Nov-2015, Rev 6 BI 7.2.3-8 Nov-2015, Rev 6 ©2015 by Quick Mount PV. All rights reserved.