SULIYARI COAL BLOCK SUMMARY

PART A

Sr. Features Details No. 1. Location Coal Block Suliyari Belwar Coal Block Latitude N 230 55’ 28” to 230 58’ 15” Longitude E 820 18’ 52” to 820 20’ 58” Topo Sheet No. 65 I/15 Coalfield Coalfield Villages Aamdand, Amraikoh, Belwar, Dongri, Jheleri, Majholipath & Seerswah Tehsil/ Taluka Waidhan District Singrauli State 2. Connectivity with Block Nearest Rail Head Gajrabahera at about 11km. railway station on Chopan- Singrauli-Katni of Central railway is about 25km away. Road Public road passing in the property from Suliyari village to Dongri village. Waidhan- SH via Bargawan traverses 25km north of the block. Airport Varanasi at about 250km from Waidhan. Waidhan is about 45km from the block. 3. Area Geological Block Area 1298 Ha. However, only 832.85 Ha is proposed in the present Mining Plan. Mining Lease Area (As per 832.85 Ha Mining Plan) Project Area 1080.99 Ha (includes an area of 248.14 Ha falling outside the coal block for proposed service facilities) Forest Area Nil Non-Forest Area 1080.99 Ha 4. Climate and Topography Average Annual Rainfall 1132.7 mm Temperature (Min. – Max.) Local Surface Drainage Drainage controlled by Hurdul nala. Channels Rivers Mahan River (in the north of the block) 5. Exploration Status Explored Exploration Agency MECL Total Number of Boreholes 136 boreholes with total meterage of 20311.50m with meterage Borehole Density 10.48 boreholes per sq km General Dip of Seams Upto 50 General Strike Direction NE – SW to E – W Faults 16 faults (F1 to F16), throw ranging from 0 to 45m. 6. Workable coal Seam details (As per the Mining Plan) Coal Seams/ Parting Thickness Depth Geological Extract Grade Mining Range Range Reserve able Method Reserv (UG/OC/ e Mixed) a Seam R-II 1.98 31.87-88.90 3.15 2.76 3580 OC b Seam R-I 3.62 31.85-123.56 9.38 5.94 4271 OC c Local-III 0.52 39.00-233.00 3.75 2.30 5048 OC d VII Top 2.09 27.00-239.41 24.28 16.54 4995 OC e VII Middle (Upper) 2.48 35.00-220.50 9.36 7.42 4745 OC f VII Middle Lower (Top) 0.68 35.00-93.23 1.75 1.39 4287 OC g VII Middle Lower (Bott.) 0.63 177.00-245.00 1.88 1.42 4407 OC h VII Middle Lower 0.91 37.00-224.10 1.59 1.31 4739 OC i VII Middle (Merged) 4.08 41.00-249.50 28.61 25.26 4795 OC j VII Bottom (Upper) 0.71 51.00-72.20 0.66 0.51 4657 OC k VII Bottom (Lower) 0.87 34.18-75.92 0.62 0.43 5174 OC l VII Bottom 1.09 45.00-253.13 10.28 6.53 5375 OC Total 95.31 71.81 5056 OC (Refer para 4.3.3 for depth range in pages 4.16-4.19 and Table in Page no 4.23 of Mining Plan, March 2014 for rest.)

PART B

Sr. No. Features Details 1. Previous Allocation Name and Address of Allocatee Andhra Pradesh Mineral Development Corporation, Rear Block, 3rd Floor, HMWSSB premises, Khairatabad, P.O. Hyderabad-500073. State: Andhra Pradesh. 2. Target Capacity as per Mining 5.0 MTY/6.0 MTPA(Peak) by OC Plan 3. Status of Clearances/Approvals Mining Plan/ Mine Closure Plan Mining Plan, March 2014 submitted to MOC on 01.04.2014. Approval awaited as on 13.01.2015. Forest Clearance Environmental Clearance Mining Lease Land Acquisition No. of PAFs as per Mining Plan/ 1341 (Ref F. (d) of Summarised data in Page xi of Mine Closure Plan Mine Plan, March 2014) 4. Surface Infrastructure already built, if any.