- AMRUT REFORMS -

Coimbatore – City Sanitation Plan

58

Coimbatore City Municipal Corporation

City Sanitation Plan

CITY SANITATION PLAN CONTENTS

I. GENERAL INFORMATION City Sanitation Task Force Town Map Swachhata Approach And Methodology Components Of CSP National Urban Sanitation Policy City Sanitation Plan Need For CSP What Is CSP Why CSP City Profile General Profile Land Use City Map Ward Wise Households &Population

II. OPEN DEFECATION FREE Open Defecation Free City Pie Chart Profile Location Of Community/Public Toilet Map Showing Location Of Toilet Public Toilet/Free Urinal Image Individual Household Toilet Image

III. SOLID WASTE MANAGEMENT Solid Waste Management Need For SWM The Objectives Of Project Demographics Municipal Administration Population Growth Projection Of Population and Generation of Solid Waste Details Of House Holds & Other Infrastructures The MSW Mandate Components And Status Of Compliance Quantification Of Solid Waste Characterization Of Solid Waste

City Sanitation Plan Page 3

Solid Waste Management Completed Works Transportation &Equipments Biomethanation Plant Waste Pyramid Process Design For MSW Composting Unit Recovery Of Recycling Green Belt Development Solid Waste Management Improvement 2015-2016

IV. WATER SUPPLY City Salient Features Map Showing Water Supply Distribution System Schematic Diagram Existing & Proposed Water Supply System Amrut 2016-2017

V. UNDER GROUND DRAINAGE SYSTEM UGSS Details City Salient Features UGS Pumping Station Details STP Sludge Digester Amrut 2016- 2017

VI. OPEN DRAIN & STORM WATER CHANNEL Desilting Report Desilting Of Channels Estimate Length Of Drains Mosquito Control

VII. INFORMATION EDUCATION & COMMUNICATION Public Participation In SWM Decentralized Waste Management System Public Information,Education,Communication Programs(Iec) Capacity Building In Msw Management Safety And Precautions In Swm

City Sanitation Plan Page 4

GENERAL INFORMATION

City Sanitation Plan Page 5

City Sanitation Task Force • Special officer / Chairman / Councilors

• Corporation Commissioner

• City Health Officer

• Executive Engineer

• Assistant Executive Engineer / Assistant Enginner

• Sanitary Officers

• Sanitary Inspectors

• Sanitary Supervisors

• NGO / Voluntary Organization / SHGS

• Stake holders

• Sanitation Private Agency

• Sanitary Workers

City Sanitation Plan Page 6

City Corporate cum Business Plan - Coimbatore

Map 2.1: Administrative wards of Coimbatore Corporation Overlay Legend Above 45000 Persons/Sq.Km

25001 - 45000 Persons/Sq.Km

65 72 15001 - 25000 Persons/Sq.Km

66 10001 - 15000 Persons/Sq.Km 71 63 60 62 8831 - 10000 Persons/Sq.Km 61 64 17 3 67 1 70 68 69 Below 8830 Persons/Sq.Km 34 33 2 59 32 30 57 35 18 29 31 16 49 19 10 4 58 50 28 20 9

51 36 21 48 27 15 47 8 52 26 14 37 46 22 11 5 56 45 25 38 23 53 55 44 40 43 41 24 39 7 42 6 12 54 13

9

Methodology For CSP:

City Sanitation Plan Page 8

• City Sanitation Mainly based on the five basic amenities illustrated in the diagram Shown below.

City Sanitation Plan Page 9

Approach and Methodology

City Sanitation Plan Page 10

COMPONENTS OF CSP

Water Supply

• Sewage

• Storm water drainage

• Solid Waste Management

• Information, Education and Communication

• Environment

• Open defection free

City Sanitation Plan Page 11

National Urban sanitation Policy (NUSP)

National Urban Sanitation Policy (NUSP) has been formulated by Government of with a vision to provide appropriate Sanitation facilities in all cities/towns. State have to prepare State Sanitation Strategies and cities/towns are required to prepare city Sanitation Plans (CSPs) as per NUSP guidelines,so as to improve health and environmental outcomes. The CSP is a vision document on sanitation with 20 to 25 years horizon with short term town level action plans for five years to achieve sanitation goals. CSP envisages achieving the following outputs

Open Defecation free status. Elimination of manual Scavenging and safety of sanitry workers. Prepare disposal of rain water and storm water drainage. Recycle and reuse of treated waste water for non- potable applications. Solid waste fully collected and safely disposed of scientifically. Serving the unserved with basic minimum services. Measures for improved public health and environmental standards .

City Sanitation Plan Page 12

CITY SANITATION PLAN

• Open defecation free town

• Providing individual households toilets to all households in the city

• Maintenance of Community / Public Toilets in a hygenic manner

• Providing protected water supply to all households in the town.

• Safe disposal of sewage water in UGD scheme.

• Providing UGD connection to all households / Commercial / Public & Private institutions.

• Drainage and storm water drainage to be strengthened and well maintenance of the same.

• 100% door to door Segregated Garbage Collection.

• Bulk waste garbage generators to dispose bio waste.

• Municipal solid waste to be collected and disposed scientifically.

• Reclamation of existing dumpsite.

• Dry recyclable waste are to be collected once in a week.

• Recyclable waste are to be sold to the recyclers and the amount disbursed among sanitary workers concerned.

• Garbage free to be achieved.

• Providing safety equipments to all sanitary workers.

• Setting up of MCC centers so that all bio waste are disposed at the site.

• Capacity building / Training programs for all staff.

City Sanitation Plan Page 13

• Medical camp / Eye camp to be organized at periodical intervals.

• Providing Medical facilities to all citizens in the town.

Need for CSP

• To achieve the goal of universal sanitation • To develop access to safe and hygienic sanitation facility and arrangements (individual or community toilets) to all urban population so that no one defecates in the open

• To develop adequate availability and 100 percent upkeep and management of public sanitation facilities in all urban areas like commercial areas, offices, institution and service centres etc.

• To ensure scientific collection, treatment and safe disposal and establish appropriate and feasible technology of disposal system for human excreta & liquid waste from all sanitation facilities and establish appropriate system of operation & maintenance of the disposal system.

City Sanitation Plan Page 14

What is CSP?

The CSP is a vision document on Sanitation with 20 to 25 years horizon with short term town level action plans for 3-5 years to achieve sanitation goals as per above stated objections.

Broad areas to be covered in CSP are:

• Awareness generation

• Sanitary choices and Technical options

• Operation & Maintenance and service Delivery system

• Institutional Responsibilities

• Reaching the un-served and poor households

• Legal and Regulatory Institutional Responsibilities

• Planning and Financing

• Capacity Building & Training

• Implementation Management

• Monitoring & Evaluation and supervision • City Reward Schemes.

City Sanitation Plan Page 15

WHY CSP

• Facilitate vision on a long term perspective.

• Sanitation aspect should be approached to ensure effectiveness

• Long term vision on transion to a 100% sanitized city.

• To understand the cost and user charges implications.

• Ensure proper assessment of codex and investment phasing

• Awareness and sensitization of community.

City Sanitation Plan Page 16

CITY PROFILE

GENERAL PROFILE

NAME OF ULB : COIMBATORE CITY MUNICIPAL CORPORATION

AREA IN SQ.KM : 257 Sq.Km

POPULATION AS PER 2011 : 16.01 LAKH CENSUS

NUMBER OF WARDS : 100

NUMBER OF STREETS : 7460

NUMBER OF SANITARY : 100 DIVISION

NO.OF HOUSE HOLDS : 494404

NO.OF SLUMS : 182

NO.OF GOVT.HOSPITAL : 1

NO.OF URBAN PHC : 24 City Corporate cum Business Plan - Coimbatore

IV. PLANNING AND LAND USE MANAGEMENT

A. Planning Efforts in the Past

1. Master Plan Outline

135. Government of has notified a Local Planning Area for Coimbatore, extending over an area of 1,287 sq.km under the Town and Country Planning Act, 1971 with a population of 42.71 lakhs according to 2001 census.

136. Coimbatore municipality has been upgraded from Special grade municipality to Corporation with effect from 1-12-1978 as per G.O.Ms.No.1771, RD&LA dt.17.11.1978. The Corporation of Coimbatore covers an area of 105.60 sq. kms and includes the added areas of Singanallur Municipality, Kumarapalayam town panchayat, Sanganoor town panchayat, Telungupalayam town panchayat, Coimbatore rural, Ganapathy town panchayat, and portion of Vilankurichy town panchayat.

137. The city is divided into 4 zones namely north, south, east and west for administrative purposes. These zones are in turn divided into 72 wards, with 18 wards under the jurisdiction of each zone as presented in Table 4.1.

Table 4.1: City Zones Zone Ward Numbers East Zone 4,5,6,7,8,9,10,11,14,15,16,19,20,21,22,23,24,26 North Zone 1,2,3,17,18,29,30,31,32,33,65,66,67,68,69,70,71,72 South Zone 12,13,25,27,28,36,37,38,39,40,41,42,43,44,45,46,47,54 West Zone 34,35,48,49,50,51,52,53,55,56,57,58,59,60,61,62,63,64 Source: Coimbatore Corporation

B. Land Use Management

1. Land Use Pattern – Current and Future Figure. 4.1: Proposed Land use pattern – 2001 138. Review of the land use pattern of Coimbatore, for an area of 105.60 sq.km as indicated in Coimbatore Public & Semi- Educational public Master Plan 1993, indicates that approximately 76 7% 3% Industrial percent of land is put to development use, whereas 7%

approximately 23 percent of the land is still being Commercial put to agricultural use, water bodies, vacant areas 5% and heritages sites. Almost 80 percent of the developed area is put to residential use. In the proposed land use plan for 2001, it is noted that the city is predominantly expected to develop in

residential area and in industrial area. The existing Residential 78%

35 City Corporate cum Business Plan - Coimbatore

and proposed land use pattern for 1993 and 2001 respectively as indicated in Coimbatore Master Plan is presented in Table 4.2.

Table 4.2: Land use – Coimbatore Corporation Land use Category Existing in 1993 Proposed for 2001 Area % to Total Area % to Total Extent of Town Extent of Town Sq.Km % Sq.Km % Residential 65.2736 61.81 70.7121 66.96 Commercial 2.3634 2.24 4.058 3.84 Industrial 4.4 4.17 5.8439 5.53 Education 6.6045 6.25 6.6045 6.25 Public & Semi- public 2.3735 2.25 2.6252 2.49 Agriculture 24.5191 23.22 15.6901 14.86 Total 105.6 100.00 105.6 100.00 Source: Master plan for Coimbatore

36 City Corporate cum Business Plan - Coimbatore

Map 4.1: Land use plan for Coimbatore - 1991 ResidentialResidential

EducationInstitutional

CommercialCommercial

PublicPark & SemiPlayground Public

I 9 T 0 I

D T

2 H

A - Y A

19. C

I P H H

O N T R R

M A U

50. A S K

D O N

E T

A

V

L

A

I

N V

SANGANUR N

I O T

D.D.P.No.9 H C SANGANUR SANGANUR O Industrial D.D.P.No.10 D.D.P.No.11 T 13. PART AD Industrial O I R AT H A R B H GANAPATHY D.D.P.No.3

GANAPATHY D.D.P.No.2 SANGANUR GANAPATHY D.D.P.No.1

49. KAVUNDAMPALAYAM D.D.P.No.8

M SANGANUR D.D.P.No.7 GANAPATHY D.D.P.No.4

A G Agricultural

SANGANUR Agriculture A D I

VILANKURICHI H A D.D.P.No.6 S

51. GANAPATHY T W A D A H O

M D.D.P.No. 6 PART N

T P A R A S AK T VILANKURICHI D.D.P.No.8 I H I V

A O M IL L

S A C O D D I SIA 79. O T N G T A N IN T ECH U R PA LLA M GANAPATHY D.D.P.No.6 GANAPATHY SINGANALLUR 58. SANGANUR SINGANALLUR TO D.D.P.No.5 D.D.P.No. 24 D.D.P.No. 23

R O A D S A N G A N U R M A IN Water Bodies SANGANUR Water Bodies I L D.D.P.No.5 B H A R A T H P E T R O LE U M SINGANALLUR D.D.P.No.26 AL V SANGANUR D.D.P.No.3 A CTC DEPOT. D 52. KRISHNARAYAPURAM VA TELUNGUPALAYAM D.D.P.No.6 SINGANALLUR TELUNGUPALAYAM SANGANUR D.D.P.No.1 SANGANUR D.D.P.No.2 TO D.D.P.No.25 D.D.P.No.7 GANAPATHY D.D.P.No.7

D 13. VILANKURICHI PART A O GANAPATHY D.D.P.No.8 SINGANALLUR D.D.P.No.17 R VILANKURICHI AVILA M G R D A D.D.P.No.10 CONVENT L 26. A C O L L EG E G N A S M A SANGANUR D.D.P.No.4 A N Y G H T A A N S T E XT O U O L R P SINGANALLUR VILANKURICHI MURUGAN AL SINGANALLUR D.D.P.No.27 K A N N IYA G O V T . TELUNGUPALAYAM D.D.P.No.5 L SINGANALLUR D.D.P.No. 16 D.D.P.No 15 D.D.P.No.9 G U R U K U LA M GCT MILLS A P O L Y T EC H N IC PSG COLLEGE COIMBATORE D.D.P.No.6 M A V A R A M P A L AYA M G O P A L SC H O O L N A ID U S C H O O L S G P AM M AL M ED ICA FCI P IT A L K R ISH N L H O S C O L L EG E W O M EN S CO LL E G E P F GODOWN R A M A K R IS H N A CIT H O S P ITA L SINGANALLUR D.D.P.No 13 Q U A R T E R S I G R G A RAJU NAIDU ROAD

D SINGANALLUR M T IR U A O BHARATHI CBE D.D.P. SCHEME No.5 P P U R RU D.D.P.No 18 D PARK A T E XT ILE S AM SINGANALLUR SINGANALLUR R V A JA N A S A LA LPA O L OFFICE D.D.P.No 14 O I AVINASHILINGAM HOME SCIENCE D.D.P.No. 19 S C H P.N.PUDUR RO V A R D H A R AJA AD 28. TELUNGUPALAYAM COLLEGE M ILL CIVIL AIRPORT P SG T E CH SINGANALLUR D.D.P.No. 1 AGRI UNIVERSITY 1 0 0 F E E T R O A D T N H B Q R S. NON SCHEME AREA TELUNGUPALAYAM NORTH COIMBATORE SHEELA HOSPITAL CBE D.D.P. JUNCTION POWER D.D.P.No.1 NORTH KOVAI HOUSE KONGUNADU HOSPITAL No. 16 P SG M E D IC AL AGRI FLYOVER G O V T. CBE D.D.P.No. 15 SINGANALLUR D.D.P.No 6 SINGANALLUR D.D.P.No. 31 L A W OFFICE C E XP R E S S D L E Y R O S S C UT R O A D SINGANALLUR A RO TNHB B U S S TA N TNHB D

TELUNGUPALAYAM D.D.P.No.4 A D FOREST COLLEGE SINGANALLUR O R

COWLEY BROWN ROAD D.D.P.No 28

D.D.P.No 29 R TNHB QUARTERS A

J SEERANAYAKKANPALAYAM A S BH A R A T H IA R R C B E T A N D O A D W P R SIHS COLONY

T C O R P N . A TELUNGUPALAYAM D.D.P.No.2 S

A M SINGANALLUR D.D.P.No. 3

SINGANALLUR D.D.P.No. 20 A

N K

I

A G R A M A N U JA M N AG AR TNHB D O A D M A N I QUARTERS A N O S C H O O L K AL I SINGANALLUR D.D.P.No. 32 R U M A S A SINGANALLUR R M M 53. SOWRIPALAYAM P A L A YA CBE D.D.P.No. 27 A AD D.D.P.No 2 R CBE D.D.P.No. 3 O L A K SH M I P H IN D U ST A N A R CBE D.D.P.No.7 K U P P U S A M Y I A SINGANALLUR D H M ILL S L C O LL SINGANALLUR D.D.P.No. 30 N A EG E N L D.D.P.No 8 C E N T R A L JA U H O S P IT A L VI CBE D.D.P.No. 14 IL S A A CBE D.D.P.No.4 A M L A SINGANALLUR B CHINNA 79. IRUGUR SOWRIPALAYAM D.D.P.No. 33 TELUNGUPALAYAM D.D.P.No.3 KRISHNAMPATHI TANK A T T C O L O N Y NEELIKONAM M U T H U R R O A D N O N S C H EM E T O T H O N D A M U TH U R T H O N D A M E E N A E ST AT E SINGANALLUR BALASUBRAMANI SINGANALLUR A R EA P O LIC E A M M AN PALAYAM R E C R U TE D.D.P.No 7 MILL TNHB D.D.P.No. 35 M E N T K U L AM S C H O O L QTRS. SELVAMPATHI ERI S T A N ES TANK KALESWARA V O C P A R K H IG H S CH O O L ESI SINGANALLUR D.D.P.No. 4 D E FE N C E A R EA RAMAKRISHNA KUMARASAMY MILL HOSPITAL PURAM JANARTHANA TANK CBE D.D.P.No. 28 55. UPPILIPALAYAM VARADHA MILL CBE D.D.P.No. 24 SINGANALLUR RAJAPURAM T O IR U G U R G R EY NARASAMPATHIERI TANK SOMASUNDARA CBE D.D.P.No. 1 T O W N CBE D.D.P. MILL D.D.P.No. 21 E R OA D C H R U C H No. 20 C O U R S GANDHI FLY OVER Y W C A R A C E KUMARAPALAYAM PARK C M D H A KUMARAPALAYAM PONNAIYARAJA C SI C SI D UPPILIPAYAM V A R A A A M JAYENDRA KUMARAPALAYAM D.D.P.No.2 PURAM C H R U CH C O L L EG E O A JA P U R D.D.P.No.3 R SINGANALLUR R COLLEGE D.D.P.No.1 M K A M A LA KRISHNAPURAM D S P LA SINGANALLUR D.D.P.No. 34 U PERKS LLS C O F FIC E K M I A D.D.P.No. 22 CBE D.D.P.No.17 O LI SCHOOL . 1 I C O LL E C T O R CBE D.D.P.No. 8 U SINGANALLUR D.D.P.No. 5 .N o 2 M KUMARAPALAYAM C B E D .D .P M A S A N IC P P A N K AJA B O FF ICE SINGANALLUR D.D.P.No. 10 D.D.P.No.4 A H O S P IT A L N IR M A L A M ILL SINGANALLUR D.D.P.No. 36 T SAROJA O C O L L EG E SINGANALLUR D.D.P.No. 9 R S T A T E G O V T . A R T S MILL E C O L LE G E CBE D.D.P.No. 2 R J B A N K U U S U JIN I A N A LLU R M I LL G N S IN G KOTHARI V AS AN T H A R U CSI C CBE D.D.P.No. 29 M IL LS S S T A N D I .D .P.N o . 2 2 T B U CTC T O CBE D.D.P.No. 18 C B E D I MILL O JAYA KUMARAPALAYAM N SRI DEPOT LAKSHMI KUMARAPALAYAM E U R O P EA N RANI 30. D.D.P.No.6 CBE D.D.P. MILL CBE C O N V E N T A LV E N IA K R ISH N A VE N I FAC. H Y RO A D No. 25 G H M IL L T R IC EAST R L Y. H O S P IT A L C O N V E N T T O 29.KUMARAPALAYAM RAJA ST. ST. MICHAEL ZONE SINGANALLUR D.D.P.No. 38 T R IC D.D.P.No.5 M KT. S T A T IO N H Y KU M A R A N SCHOOL CBE D.D.P.No. 12 S T O C OPEN JAIL N D K H -6 SELVA A R AJAL A K SH M I M ILL 7 CBE D.D.P.No. 19 O E X C H A N G E SINTHAMANI CORPORATION CBE D.D.P.No. 30 R 54. SINGANALLUR KULAM OFFICE /O C EN T R AL SINGANALLUR D.D.P.No. 37 CBE D.D.P.No. 31 L KONIAMMAN R S A T U D IO KOVIL V U LL SINGANALLUR D.D.P.No. 46 A CBE D.D.P.No. 26 V A L A N K U LAM V CBE D.D.P.No. 23 U LG E S D IR TR I KUMARAPALAYAM R O A H U S KUMARAPALAYAM A S S T IN D NESAVALAR D.D.P.No.7 B Y E P SINGANALLUR D.D.P.No. 11 N D.D.P.No.8 COLONY O CBE D.D.P.No. 9 Y A

L

R D

I CBE D.D.P.No. 11 CBE D.D.P.No. 13 A K AL IM AD AI

V KUMARAPALAYAM CBE D.D.P.No. 10 O

E R

R SINGANALLUR

D.D.P.No.9 SINGANALLUR D.D.P.No. 51 M SINGANALLUR SINGANALLUR

A D.D.P.No. 12 SINGANALLUR SINGANALLUR D.D.P.No. 52 R

U D.D.P.No. 45

P SINGANALLUR D.D.P.No. 41

A D.D.P.No. 40 D.D.P.No. 39 D

N

B IS U SINGANALLUR H O P J

C O L L EG E N A TANK

KUMARAPALAYAM N TWAD D.D.P.No.10 CBE RURAL SINGANALLUR D.D.P.No. 42 D.D.P.No. 3 56. CBE RURAL D.D.P.No. 1 PERIAKULAM CBE RURAL D.D.P.No. 4 SINGANALLUR D.D.P.No. 47 ER 57. IV CBE D.D.P.No. 32 L R SINGANALLUR D.D.P.No. 43 Y A N O N R O Y V E SINGANALLUR D.D.P.No. 44 AL R I SINGANALLUR D.D.P.No. 50

CBE RURAL D.D.P.No. 2 KARUMBUKADAI 45. CHETTIPALAYAM 47. COIMBATORE (RURAL) SINGANALLUR D.D.P.No. 48 SINGANALLUR D.D.P.No. 53 M 93. PATTANAM U R A D A P JU N N A N ANUPARPALAYAM VILLAGE SINGANALLUR D.D.P.No. 49 60. KUNIAMUTHUR

M

A

70. VELLALUR N

A

T

T

R A

U N P O H Y AL R I T V E R O

U PO R T M D U

A AN L

K UR A

A R L

D 59. O A L

N D E

U V

S I

H O

O 9 T C T 0

A R

2 I L

T

- U L H

A

H C N O

H T

A

N A

P A G L L D L H

O O

A O G T P L P P A O P O O T T T O T

37 City Corporate cum Business Plan - Coimbatore

196. It can be read from the figure that, about 76 percent of the waste is Biodegradable, which primarily originates from the residential solid waste and from the markets. The industries and the commercial establishments contribute about 10 percent of the total waste. The salient features and details of the source of waste generation are presented in Table 5.19.

Table 5.19: Waste Generation Waste Generated MT % of total waste Domestic 349.54 58.16 Industries 18.39 3.06 Commercial and Others 39.25 6.53 Segregated waste from Market 193.88 32.26 Total 601.00 100 Source: Coimbatore Corporation

197. Primary Collection: Door to Door, Door-to-Door Collection collection of segregated solid waste is practiced for primary collections with 287 nos. of pushcarts. Road sweeping and mopping is also carried out with 12 nos. of road sweeping flipper machines to clean the roads. It can be noted from the tables below that, 489 vehicles are used for primary collection, of which almost 57 percent being push carts and 27 percent being bullock carts. The usage of bullock carts is slowly being phased out. There are about 100 containers of 2 MT capacities, which are placed at important locations in the town. 36 private tractors are being used for collection of waste from the bins. About 288 MT of waste being collected and disposed at the secondary collection points by these tractors.

198. Vegetable markets waste is being collected Road Mopping in the night conservancy in South and West Zones. Mopping of bus stand floors are being done in the night on all Saturdays. 2137 sanitary workers are involved in the conservancy works, which works out to be about 275 m of road length per conservancy workers, which is low according to the norms. The infrastructure and indicators of primary collection is presented in Table 5.20 and Table: 5.21.

59 City Corporate cum Business Plan - Coimbatore

Table 5.20: Primary Collection – Infrastructure Type of Vehicle Vehicles Capacity No of trips Total Nos. MT Nos. MT Auto 15 0.5 3.5 26.2 Bullock Carts 139 0.5 2.0 139.0 Push carts 287 0.2 2.0 114.8 Mini Lorries 9 2.0 2.0 36.0 Lorries 3 4.0 2.0 24.0 Private Tractors 36 2.0 4.0 288.0 Total / Average 489 2.7* 628.1 Dumper placer 17 2.0 3.0 102.0 Containers 100 2.0 - 200.0 Road sweeping flipper machines 12 - - - Source: Analysis * Average figure

Table 5.21: Primary Collection - Indicators Indicator Unit Nos Collection capacity of the containers & vehicles of corporation MT 340.1 Collection capacity of the private vehicles* MT 288.0 Total collection capacity# MT 628.1 Source: Analysis * for primary collection with 4 trips daily, # with an average of 2.7 trip a day

199. Secondary Collection: There are 4 nos. of Transfer stations. Viz

ƒ Peelaimedu, ƒ , ƒ Sathy Road, ƒ Transfer Station 200. The existing two prime movers with four trailers in Coimbatore City Municipal Corporation are used for secondary transportation from transfer station to the compost yard / landfill site. It can also be noted from the Table 5.22 that 53 Lorries are hired to dispose waste from the transfer stations to the disposal yard. Secondary Collection 201. Private Participation in SWM Secondary Transport: Private lorries are disposing about 50-70 percent of the total waste collected. The detail of the rents given to the hired vehicles is presented in Table 5.22a.

60 City Corporate cum Business Plan - Coimbatore

Table 5.22: Secondary Collection - Infrastructure Type of Vehicle Vehicles Avg. Capacity Trips Vehicle Capacity Nos. MT Nos. MT Private Lorries 53 3 4 636 Bulk Refuse Carrier 4 4 4 64 Total 700 Prime mover vehicles 8 2 2 32.0 JCB 4 - - - Source: Analysis

Table 5.22a: Rental Details of Hired Vehicles Type of Vehicles Rentals Maximum Trips Rs./Trip Nos. Lorry 608.32 4 Tractor 92 4

202. Disposal Sites: There are 4 disposal yards out of which only one is operational at sewage farm. The landfill site at Vellalore has been operational for the last View of the Disposal Site two years, subsequent to the closure of the city’s earlier dumpsites. The corporation has obtained permission from the Tamil Nadu Pollution Control Board (TNPCB) to use this land for municipal solid waste disposal. The Vellalore compost yard has an extent of 604 acres of dry land acquired from farmers with one Weigh Bridge and 30 acres of greenery around it. The Coimbatore Corporation initially acquired this property for the sewage disposal.

203. It is noted that waste dumps are spread over an area of about 40 -50 percent of the property and different techniques of disposals are being applied in different areas and at different times. It appears that, at certain locations the wastes are dumped on the ground surface while at other locations waste is being dumped in parallel trenches or in large pits having varying depths. In certain location of the site, there seems to be area filling as well. Paved roads have been laid in the site for this purpose. In general, there appears to be no compaction of the waste. The other disposal sites Viz. at Ondipudur and is not in use and has a quantity of about 6300 MT and 4000 MT of waste which is yet to be disposed.

204. Service Adequacy and Key Issues: Based on the available data, discussions with the officials, and field survey, the following the key issues and the performance indicators are arrived. The comparative analysis for SWM is illustrated in Table 5.23.

61 City Corporate cum Business Plan - Coimbatore

Table 5.23: Solid Waste Management – Service Indicators Indicator Unit Existing Situation Benchmark Source segregation % 10 100 House to House Collection % 20 100 Daily sweeping and mopping % 70 100 Per Capita Generation Gms/ 606 NA Day Collection Performance % 91 100 (% Collected to Generated) Total Vehicle Capacity / Waste Generated % 28 NA (with Corporation Vehicles) Total Vehicle Capacity / Waste Generated % 120 100 (with Total Fleet) Source: Analysis

The issues and deficiency in the present system is as follows

205. Primary Collection

ƒ Source Segregation and house to house collection practiced in 10% area ƒ Uncontrolled littering along main roads, streets and Drains ƒ Present container capacity is enough only for 70% removal of the accumulated solid water ƒ Lack of adequate community participation in primary collection ƒ Mismanagement of the hired vehicles ƒ Lock of records to track hired and owned vehicles.

206. Secondary Collection

ƒ Inefficient fleet management system ƒ Lack of workshop facilities ƒ No Synchronized system between primary and bulk wastage storage facility ƒ Higher expenditure on maintenance of vehicles used in secondary transportation

207. Processing and Disposal of Waste

ƒ No scientific treatment and disposal of garbage ƒ Lack of adequate infrastructure in compost yard.

5. Roads and Traffic Management

208. The Corporation, State Highways & Rural Works, and the National Highways maintain roads in the city. However, the highways passing through the city account for about 48 kms alone. Road improvement works and planning in residential areas is the prerogative of the Corporation.

209. Existing Situation: The Corporation maintains a large road network of 635.52 kms. Of the total road length 83.6 percent are Black Topped roads, 10.4 percent are Concrete roads, and the balance 6 percent include Earthen and other roads. The road length does not

62