QUARTERLY REPORT

APRIL – JUNE 2019 YEAR 1 – QUARTER 3 USAID/ COMMUNITY SUPPORT PROGRAM

July 30, 2019 This publication was produced for review by the United States Agency for International Development. It was prepared by Chemonics International Inc.

SENSITIVE BUT UNCLASSIFIED

DISCLAIMER

The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States government.

SENSITIVE BUT UNCLASSIFIED CSP IDIQ QUARTERLY REPORT

JULY 30, 2019

IDIQ Contract No. 72026818D00005 Task Order No. 1 72026818F00002 Task Order No. 2 72026818F00003 USAID/Lebanon Community Support Program (CSP) Chemonics International Inc. Fattal-Dolphin Building, 4th Floor, Sin el Fil Beirut, Lebanon

Front cover photo: El Qaa Municipality worker learning how to use water pumps recently donated by CSP. These suction pumps will help the Qaa Municipality address and respond to flooding that is common in this part of the Beqaa.

Back cover photo: Students enjoying improved learning conditions at the Qabiit Public Mixed School. The school was recently equipped by CSP with basic education equipment. This equipment will serve more than 338 students and 39 instructors. Qabiit is located in the Akkar region, one of the most remote and underdeveloped areas of northern Lebanon.

DISCLAIMER

The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States government.

SENSITIVE BUT UNCLASSIFIED CONTENTS

Acronyms...... 1 Executive Summary ...... 2 I. Introduction and Background ...... 4 A. Background and Country Context ...... 4 B. Program Objectives ...... 5 C. Collaborative Design of New CSP Task Orders ...... 6 II. Task Order 1: Management ...... 8 A. Management and Operations ...... 8 A1. Human Resources ...... 8 A2. Accounting and Finance ...... 8 A3. Grants, Subcontracts, and Procurement ...... 9 B. Cross-Cutting Technical Support ...... 9 B1. Engineering and Environmental Compliance ...... 10 B2. Monitoring, Evaluation, and Learning ...... 10 B3. Communications and Outreach ...... 12 B4. Gender and Social Inclusion (GESI) ...... 13 III. Task Order 2: Community Support Program ...... 14 A. Community Identification and Selection ...... 14 B. Activity Design ...... 15 C. Implementation Status ...... 16 D. Activity Highlights ...... 19 E. Implementation Challenges, Solutions, and Next Steps ...... 21 IV. Lessons Learned ...... 14 V. Annexes ...... 24 Annex A. Organizational Chart ...... 24 Annex B. Quarterly Financial Report ...... 27 Annex C. Vetting Tracker ...... 30 Annex D. Environmental Compliant Summary Report ...... 31 Annex E. Indicators Performance Tracking Table ...... 33 Annex F. Progress Made Towards Targets ...... 34

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | i

SENSITIVE BUT UNCLASSIFIED Annex G. List of Pre-selected Communities ...... 38 Annex H. List of Selected Communities ...... 38 Annex I. Map of Selected Communities ...... 41 Annex J. Activity Concept and Implementation Tracker ...... 42 Annex K. Map of TO2 Activities ...... 49 Annex L. Map of TO2 Funding Levels ...... 50 Annex M. Success Story – CSP Intervention in Arsal ...... 51

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | ii

SENSITIVE BUT UNCLASSIFIED ACRONYMS

AAP activity approval package BTD Bureau Technique pour le Développement CSP Community Support Program ELARD Earth Link & Advanced Resources Development ERAC environmental review and assessment checklist GESI gender and social inclusion IDIQ indefinite delivery, indefinite quantity IQS indefinite quantity subcontract LSA local system approach MEL monitoring, evaluation, and learning MSS mechanism for social stability NGO nongovernmental organization QCP quality control plan RAD Rapid Analysis Design RFA Request for Application STTA short-term technical assistance TO task order UNDP United Nations Development Program USAID United States Agency for International Development

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 1

SENSITIVE BUT UNCLASSIFIED EXECUTIVE SUMMARY

The Community Support Program (CSP) in Lebanon is an $80 million, five-to-seven-year single- holder indefinite delivery, indefinite quantity (IDIQ) designed to provide a range of support to underserved and vulnerable communities. CSP seeks to improve the delivery of essential services and enhance economic opportunities to improve lives and reduce tensions that contribute to conflict and violence, primarily in Lebanon’s North, South, and Beqaa regions.

To achieve this objective, USAID issues task orders according to the following components: 1) community stabilization; 2) community development; and 3) technical assistance/capacity building. CSP uses a fast, flexible, and participatory approach to address a broad range of needs in Lebanon’s most underserved and vulnerable communities in response to evolving political, security, and economic conditions. Activities include small-scale community stabilization interventions intended to address acute tensions in areas that are prone to conflict and violence. CSP also implements medium-scale community development interventions that are intended to address the underlying causes of tension. CSP is not sector specific. Rather, the program implements visible repairs and rehabilitation of community infrastructure; procures and delivers essential equipment such as water tanks, generators, and electrical transformers; and supports livelihoods in partnership with local governments, civil society organizations, and the private sector. Where appropriate, CSP complements infrastructure improvements and provides equipment assistance with targeted and specialized technical assistance and capacity building to enhance the sustainability of interventions among beneficiary communities.

The following quarterly report, a required deliverable CURRENT CSP TASK ORDERS under Task Order No. 1 (TO 1) of the subject IDIQ, TO 1: Management provides details on the third quarter of Year 1, • $19.7 million – 5 years covering the period from April to June 2019. The • Management, operations, and cross-cutting technical report includes a description and analysis of all support to technical task activities conducted under the current task orders orders during the reporting period (see text box). TO 2: Community Support • $16.5 million – 30 months During this period, CSP continued to focus on the • Identification, implementation, and management of implementation of all activities and tasks designated in community assistance the Year 1 work plan. Under TO 1, CSP made interventions to achieve CSP significant progress on the recruitment of staff for objectives under Components vacant positions and finalized all subcontracts with its 1 and 2. institutional partners. CSP advanced its communications and outreach through its social media presence and trainings. A key monitoring, evaluation, and learning (MEL) achievement was the approval of the program’s MEL plan. Additionally, CSP held a midyear review to celebrate the program’s accomplishments, discuss challenges and lessons learned, and recommend improvements to facilitate the achievement of the program’s ambitious expected results.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 2

SENSITIVE BUT UNCLASSIFIED

Under TO 2, CSP expanded its reach through its KEY TO 2 ACHIEVEMENTS community profiling exercise to identify the most • 112 community profiles underserved and vulnerable communities. The team completed continued to design technically sound assistance • 65 concept notes submitted interventions through continuous coordination and • 29 activity approval packages collaboration with multiple stakeholders in the field and (AAP) submitted made incremental progress toward expected results • 23 activities approved (see text box). Internally, the team reflected on • 9 activities completed challenges and worked closely with the TO 1 team to • $1,090,778 in assistance being fine-tune internal systems to enhance operations and provided to 22 communities reduce any bottlenecks.

This report is organized by task order and divided into five primary sections: Introduction and Background; Task Order 1: Management; Task Order 2: Community Support Program; Lessons Learned; and a series of Annexes to expand upon and help visualize the narrative, including organizational charts, financial reports, and a series of maps of selected communities and interventions.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 3

SENSITIVE BUT UNCLASSIFIED I. INTRODUCTION AND BACKGROUND

A. BACKGROUND AND COUNTRY CONTEXT During the April – June 2019 reporting period, Lebanon faced a number of issues related to its political stability, security, and economy. Some of the main challenges facing the government were the consequences of the adoption of the national budget, ongoing issues related to the sustained presence of Syrian refugees, and several security-related incidents. On another note, the government of Lebanon has taken positive measures to improve the provision of electricity in the country.

Budget Adoption amid Popular Unrest. Since the creation of Prime Minister Saad Hariri’s new government in January 2019, the government of Lebanon has faced several political disputes hindering the adoption of a new budget. Hariri and the international community have been calling for reforms and cuts in spending in this year’s budget, crucial to receiving CEDRE funds and loans.1 On May 27, the Cabinet endorsed the final draft budget to be submitted to Parliament for ratification. The budget — one of the "most austere in the history of Lebanon" according to Prime Minister Hariri — features several measures to raise revenues and decrease spending. According to projections of the new budget, Lebanon’s deficit should be reduced from 11.5 to 7.5 percent. Many controversies exist surrounding the budget cuts made to reduce the deficit, especially those related to retirement salaries for army personnel and pension cuts for other municipal and state employees. As a result, there have been a series of demonstrations and road blockades over the past three months in protest of the austerity measures. While the budget was not ratified during the reporting period, it is seen as an important test of Lebanon’s will to enact reforms that could stabilize its debt trajectory in a state plagued by financial crisis. President Michel Aoun has signed a decree to open an extraordinary legislative session in Parliament from early June to late October to enable the legislature to pass the draft state budget.

As the country is on the verge of bankruptcy and financial collapse, the austere national budget could have a negative impact on a large number of citizens, pushing more and more Lebanese into poverty. This would likely create further tensions in Lebanon’s most underserved and marginalized communities, requiring further intervention from CSP to mitigate the sources of the tensions.

Rising Tensions with Refugees. In the past three months, anti-Syrian refugee sentiment has been on the rise in Lebanon. The country hosts the highest number of refugees per capita in the world, and many are starting to blame the presence of the refugees for Lebanon’s economic crisis. For example, Lebanese authorities have lately made more assertive calls for the repatriation of Syrian refugees and are taking actions to promote their return. While anti-

1 On April 6, 2018, France hosted an international conference in support of Lebanon’s development and reforms, known by its French acronym CEDRE. The objective of CEDRE was to support the development and the strengthening of the Lebanese economy as part of a comprehensive plan for reform and infrastructure investments.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 4

SENSITIVE BUT UNCLASSIFIED refugee sentiment in Lebanon is not new, it was previously limited to public anger over Syria’s nearly 30-year occupation of Lebanon. More recently, the anger has shifted toward the refugees’ impact on Lebanon’s delicate sectarian balance and its struggling economy. Sympathy for the refugees and their sustained presence in Lebanon has been steadily decreasing.

Examples of concrete actions taken against refugees by Lebanese authorities include increased efforts to dismantle permanent structures and close unregistered foreign-owned (primarily Syrian)businesses. Amid the broader crackdown on mostly Syrian businesses, the Lebanese Army ordered the dismantling of the nontented housing in the village of Aarsal. This decision came after the Lebanese authorities began to dismantle camps along the Litani River with quasi- permanent sewage systems deemed a ‘public health threat.’ In addition, the Lebanese labor minister has given employers deadlines to legalize the situation of their foreign employees or face harsh penalties. If they do not meet the deadline, the penalty increases and the company may be closed.

During the reporting period, the Lebanese Army has increased its efforts to demilitarize the Mieh w Mieh Palestinian refugee camp, located near Saida, South Lebanon. This is an important step in limiting the violence around the area and hopefully allow residents to better access desperately needed services. Given CSP’s flexible approach and rapid-response capabilities, it is well equipped to deal with tensions resulting from these issues by responding to community needs throughout the country. The program’s dual focus on stabilization and development, in partnership with local partners (including municipalities and civil society), can contribute to mitigating tensions. Electricity Plan. In response to recommendations from international donors, the Cabinet and Parliament have passed a new plan to reform the electricity sector. Dysfunctional since the civil war, the electricity sector has been a major contributor to the rise of public debt. Lebanese residents currently do not receive 24-hour electricity from public utilities and must supplement their supply with privately owned generators. The new plan comprises both short-term and long-term solutions like raising production to 24 hours per day, building new plants, shutting down current inefficient plants, introducing renewable energy such as wind and solar, and increasing prices as production goes up.

B. PROGRAM OBJECTIVES Against this backdrop of Lebanon’s underlying and emerging political, security, and economic challenges, CSP aims to support municipalities and underserved and vulnerable communities in providing better services and enhanced economic opportunities to improve lives and reduce tensions that contribute to conflict and violence, primarily in Lebanon’s North, South, and Beqaa regions. To accomplish the program’s goals, task orders under the IDIQ are geared toward reinforcing Lebanon’s resiliency and stability across three components:

1) Community Stabilization support assists local communities in meeting immediate- term stabilization needs to fill urgent gaps in resource accessibility in order to mitigate tensions, with activity implementation expected to last up to nine months

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 5

SENSITIVE BUT UNCLASSIFIED 2) Community Development support provides medium- to long-term assistance, with implementation expected to last up to 18 months to meet priority local development needs; and 3) Technical Assistance support for key essential services is directed toward municipalities and other local partners receiving assistance under Components 1 and 2.

Under TO 2, target communities are selected on a rolling basis according to urgency of needs, the presence of refugees, prevalence of tensions over limited resources, and other priorities specified by the community. CSP selects interventions based on an inclusive and participatory approach that involves a wide variety of community members to help CSP better understand challenges and opportunities, followed by a collaborative design of sustainable solutions. Community stabilization interventions can include the repair and rehabilitation of light infrastructure and the procurement of equipment such as water tanks, generators, and electrical transformers. Community development interventions are geared toward more sustainable improvements to quality of life through investments in solid waste management, solar energy solutions, agricultural equipment, or job support.

By implementing mostly community-led stabilization and service delivery improvement projects — reinforced by capacity building efforts — CSP is contributing to USAID’s existing efforts to promote a stable and independent Lebanon.

C. COLLABORATIVE DESIGN OF NEW CSP TASK ORDERS Concurrent with the implementation of TO 1 and TO 2, substantial progress was made on the design of new CSP task orders during the April – June 2019 reporting period.

TO 3 Capacity Building. To complement CSP’s investments under TO 2, CSP will be providing technical assistance and capacity building to local partners under TO 3 to sustain and enhance community support assistance interventions. Following the submission of the initial proposal for this task order on April 1, 2019, Chemonics and USAID had several meetings to hone and refine the technical approach, cost objective, and contract type. In response, Chemonics made numerous changes and tweaks to its proposal, as reflected in its revised proposals submitted on May 21, June 10, and July 10.

TO 4 Workforce Development. As with TO 3, USAID and Chemonics held a feedback session about the workforce development activity under TO 4, following the submission of Chemonics’ initial proposal on May 14, 2019. The purpose of TO 4 is to improve labor skills and employment opportunities through partnerships with Technical and Vocational Education and Training (TVET) organizations, municipal governments, and the private sector. To incorporate all requested changes to its technical and cost proposals, Chemonics submitted two subsequent proposal revisions on June 24 and July 15. As a private-sector, market-led activity, TO 4 will be managed out of USAID/Lebanon’s Economic Growth Office.

TO 5 Wastewater Management. Chemonics submitted its draft proposal for the wastewater management task order on June 26, 2019, which was followed by the submission of a full and complete proposal on July 15. The purpose of the wastewater management task order is to: 1) identify context-appropriate wastewater management interventions; 2) implement wastewater

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 6

SENSITIVE BUT UNCLASSIFIED management interventions that mitigate pollution in selected areas; and 3) build capacity for wastewater management to enhance the sustainability of the provided interventions. The iterative proposal process for TO 5, including intentionally designating time for collaborative design and incorporation of feedback, was an innovation that helped to facilitate the proposal process.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 7

SENSITIVE BUT UNCLASSIFIED II. TASK ORDER 1: MANAGEMENT

A. MANAGEMENT AND OPERATIONS During the first two quarters of FY2019, CSP completed its mobilization and established a functional TO 1 team that is well postitioned to provide operational, management, and cross- cutting technical support to TO 2 and other technical task orders as they are initiated. During this third quarter, as activities ramped up, operational systems and processes were fine-tuned and adjusted to improve the overall efficiency, quality, and delivery time of technical activities.

A1. HUMAN RESOURCES During this quarter and in line with the program’s staffing plan and organizational chart in Annex A, CSP completed recruitment and onboarding for all vacant positions in the staffing plan, with the exception of the TO 1 operations and finance assistant and the TO 2 MEL field officer for the Beqaa. Candidates have since been identified for both, and the positions are expected to be filled early next quarter.

Other notable human resource updates include the introduction of a new position and the approval of two key personnel under TO 2. Following the rapid increase in the pace and volume of activities under TO 2, CSP recommended a new program implementation manager position — reporting to the TO 2 director — to increase efficiencies in the activity design and implementation process and to streamline interactions with the TO 1 Activity Fund team. CSP also secured the approval of USAID’s contracting officer for two key personnel, Mr. Bilal Al Ayoubi as TO 2 director and Mr. Gabriel Bayram as Component 2 (Community Development) technical adviser. With the approval of these positions, all key personnel positions have been filled across both current task orders.

A2. ACCOUNTING AND FINANCE Task Order 1. During Quarter 3, CSP expended a total of $786,089 under TO 1, with an average burn rate of $262,030month. In terms of available funds, CSP has $16,920,048, or 86 percent, remaining in its contract ceiling. To date (September 2018 – June 2019), CSP has spent $2,826,703 under TO 1, which represents 17 percent of our current obligation ($16,593,619.70) and 14 percent of the project’s total budget for life of project ($19,746,752). Of note in Q3, CSP began invoicing costs incurred under the subcontracts with our three institutional partners: BTD, ELARD and Quantum. In addition, CSP saw a leveling off of other direct costs following the start-up and mobilization period. That said, CSP expects to see an increase in subcontract spending in Quarter 4 as associated activities under TO 2 ramp up, particularly those that require technical support in construction design, supervision, and environmental compliance from our partners.

Task Order 2. During Quarter 3, CSP expended a total of $712,704 under TO 2, with an average burn rate of $237,568/month. To date (September 2018 – June 2019), CSP has spent $1,493,555 under TO 2, which represents 11 percent of our current obligation ($16,154,623) and 9 percent of our total contract ceiling ($16,536,562). In terms of available funds, CSP has $15,042,907.55, or 91 percent, remaining. As anticipated, CSP experienced a significant ramping

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 8

SENSITIVE BUT UNCLASSIFIED up in technical activities and associated spending in Q3 as it continued to emerge from start-up and hone in on the implementation of technical activities. CSP expects Activity Fund expenditure to increase in Q4 as programming throughout the North, South and Beqaa ramps up, particularly on higher-value community development activities. See Exhibit 1 below and Annex B for additional details about CSP’s quarterly and life-of-project finances.

Exhibit 1: TO1 and TO2 Expenditure Since Start-up: Sep'18-Jun'19 $800,000.00 $600,000.00 Year 1 Quarter 3 $400,000.00 $200,000.00 $-

Task Order 01 Task Order 02

A3. GRANTS, SUBCONTRACTS, AND PROCUREMENT Subcontracts with Institutional Partners. During this quarter, CSP received consent to subcontract with Quantum Communications from USAID’s contracting officer for the provision of services to augment in-house strategic communications and outreach capabilities. The subcontract was fully executed in May, enabling CSP to start using Quantum’s services to improve CSP’s visibility and outreach. Examples of such services include commissioning strategic guidance on effective uses of digital/social media and producing a video about a completed activity in the Beqaa.

Following the execution of the IQS-type subcontract with BTD for engineering design and supervision last quarter, CSP faced some delays in the issuance of the first few subtask orders for construction design. In response, senior leadership from both CSP and BTD swiftly intervened to address the issues — which included differences of opinion about pricing and technical scope — and has since issued six subtask orders.

Vetting. CSP adhered to USAID’s Vetting Mission Order 15/03 related to the National Security Screening of Awards and has established a system to gather information from partners and beneficiaries at the field level in order to expedite the vetting process for key individuals. All Partner Information Forms submissions during this quarter were tracked using the vetting tracker as shown in Annex C.

B. CROSS-CUTTING TECHNICAL SUPPORT In addition to back-office support in management and operations, the TO 1 team also provides cross-cutting technical support in the following areas: engineering and environmental

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 9

SENSITIVE BUT UNCLASSIFIED compliance; monitoring, evaluation, and learning; communications and outreach; gender and social inclusion.

B1. ENGINEERING AND ENVIRONMENTAL COMPLIANCE Quality Control Plan. During the Q3 period, CSP drafted and submitted to USAID a construction quality control plan (QCP) that outlines and details the quality control processes related to the infrastructure, rehabilitation, and construction projects implemented under CSP’s technical task orders. Approved on July 9, the QCP includes a new requirement to include an activity risk assessment report in the activity approval packages (AAPs) that are submitted to USAID for approval. The purpose of this report is to specify the level of risk associated with the anticipated activity to determine the quality control process that will be followed during implementation.

Improved Team Linkages. Based on the recommendations from the program’s midyear review to improve efficiencies and balance workloads, the field officers with an engineering background on TO 2 are supporting environmental assessments and mitigation plans for activities in their respective areas. To build their capacity to support such matters, the field officer engineers were trained by ELARD, CSP’s environmental compliance subcontractor. This has helped to shorten the activity design preparation time and has led to deeper engagement with and understanding of environmental matters on the projects they oversee.

Environemental Management. On May 22, ELARD conducted a training on the purpose and usage of the environmental review and assessment checklist (ERAC) for CSP’s TO 1 and TO 2 staff. The training highlighted how the checklist is the first step to manage and mitigate potentially adverse impacts on the environment. Overall, the training pushed the team to design environmentally sound program interventions from the start, keeping in mind that ELARD will remain the primary resource on all environmental management matters under CSP.

An environmental compliance summary report consisting of a consolidated list of all the ERACs submitted to USAID throughout this quarter can be found in Annex D.

B2. MONITORING, EVALUATION, AND LEARNING CSP Performance Monitoring, Evaluation and Learning (PMEL) Plan. During Q3, the CSP MEL team submitted a number of revisions of the PMEL following a series of recommendations from USAID and its support services contractor, Social Impact. The final version, inclusive of an indicators tracking table (See Annex E), was approved by USAID on July 2. Having a finalized MEL plan, slate of indicators, definitions, and targets will greatly facilitate the work of the MEL team to shape and orient technical activities that contribute to CSP’s expected results.

Performance Monitoring: Progress Made Toward Targets Set. During Q3, CSP was able to report the results of two newly completed activities:

• NTH001 Improving Sorted Solid Waste Collection Capacity of Union of Al Fayha' Municipalities

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 10

SENSITIVE BUT UNCLASSIFIED • BQA008 Provision of Fuel Vouchers in Response to Local Grievances II

The results collected and reported remain less than the targets set for the current quarter, with the following notable reported results: • 24,610 out of 70,750 people benefited from US government assistance. • 61 percent proportion of female participants in US government-assisted programs (against a target of 30 percent). • 11 out of 200 community members have participated in the CSP activity cycle. • 9,150 out of 70,750 people reporting have access to adequate essential services. While these results fall short of the targets for the quarter, it is worth mentioning that the deviation is mainly a result of 18 activities still under implementation, which involve engineering elements. These water, electricity, and infrastructure repairs offer enormous opportunities to enhance the delivery of essential services, but they must first be completed before reporting results. Exhibit 2 displays CSP’s quarterly reported indicators results achieved against the targets set. It is also supported by Annex F, which provides justification of any deviation from targets.

Exhibit 2: Progress Made Toward Provisional Targets – Q3 FY2019 Y1Q3 Achieved Results vs Targets

Y1Q3 Target Actual

24,610 1 61% 11 1 6 1 9,150

70,750 25 30% 200 25 25 17 70,750

01- NUMBER OF 02- NUMBER OF 03- PROPORTION OF 08- NUMBER OF 09- NUMBER OF 11- NUMBER OF 12- NUMBER OF 13- NUMBER OF PEOPLE BENEFITING LOCAL ACTORS WITH FEMALE COMMUNITY ACTIVITIES USAID-ASSISTED ESSENTIAL SERVICES PEOPLE WITH ACCESS FROM USG ENHANCED ABILITIES PARTICIPANTS IN USG MEMBERS WHO HAVE IMPLEMENTED WITH LOCAL ACTORS PROVIDED, INSTALLED TO ADEQUATE LEVELS ASSISTANCE AS A RESULT OF USG ASSISTED PROGRAMS PARTICIPATED IN THE PARTICIPATION FROM ENGAGED IN OR UPGRADED OF ESSENTIAL SUPPORT CSP ACTIVITY CYCLE LOCAL STAKEHOLDERS COMMUNITY, SERVICES REGIONAL AND NATIONAL PROGRAMS

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 11

SENSITIVE BUT UNCLASSIFIED B3. COMMUNICATIONS AND OUTREACH This section discusses the progress achieved during the quarter on the program’s communications and outreach efforts. It also includes details about the submission of weekly reports and highlights to USAID, as well as the photography training that our partner Quantum provided for CSP field staff.

Promoting CSP Activities. CSP continued to focus on promoting its activities and program impact through social media, particularly Facebook and Instagram. The CSP pages promote various field events such as equipment delivery, important meetings, and activity-related updates. Social media is being used not only to raise awareness about CSP’s impact and achievements among target audiences, but also to raise the profile of CSP’s local partners.

Exhibit 3: CSP Facebook Page Highlighting Ongoing Activities

Exhibit 4: Example of CSP’s Instagram Page Used to Update Followers of the Program

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 12

SENSITIVE BUT UNCLASSIFIED Submission of Weekly Reports and Highlights to USAID. CSP has consistently submitted weekly reports to USAID since September 2018. The weekly reports summarize TO 1 and TO 2 tasks, activities, and achievements from the previous week. The reports also include weekly highlights and photos to demonstrate how CSP is positively affecting beneficiaries and how the assistance interventions are having an impact on vulnerable communities. While compiling the report, CSP also seeks to include photos, quotes, and testimonials from beneficiaries. Additionally, starting in the month of June and following a request from USAID, CSP summarizes tensions and security threats mentioned in the local media, as well as conducting atmospheric reporting from field-based staff about tensions in communities in CSP’s areas of operation.

Photography Training Provided for CSP Field Staff. On May 30, CSP provided a one-day photography training to its field-based staff and regional program managers. The training was provided by Quantum as part of its subcontract to augment CSP’s capacity in communications. The training focused on storytelling, taking photos, disseminating information, and producing short videos. The trainer informed the team about useful applications to enhance the quality of videos and photos. The director of communications and outreach stressed the importance of taking quality photos before, during, and immediately after activity implementation. In addition to trainings and capacity building, CSP uses Quantum’s services for photos and videos of high- profile activities that merit higher visibility. B4. GENDER AND SOCIAL INCLUSION (GESI) Women-focused programming. CSP initiated several new community assistance interventions under TO 2 this quarter. While designing new activities, CSP took into consideration women’s vulnerable status in Lebanon, and designed activities that respond specifically to women’s needs. Of note this quarter, CSP exceeded its target for the proportion of female participants. For example, most of the reported beneficiaries are women heads of household supported by the emergency response in the Beqaa area or female students in schools, associations, and/or universities who benefited from the activity that improved the Union of Al Fayha’ Municipalities’ capacity to collect sorted solid waste. Additionally, for all activities, CSP is taking into consideration constraints and opportunities for women to participate in and benefit from the assistance. CSP will continue to identify and mainstream GESI considerations in the design of future activities.

USAID Gender Training. On June 26 and 27, CSP’s community stabilization technical adviser attended the USAID Gender Integration Workshop. The workshop discussed key concepts and policy recommendations in gender integration and women’s economic empowerment. The attendees learned how to identify opportunities and approaches to better integrate gender in the programming cycle. Throughout the sessions, the participants had the opportunity to reflect on and discuss their own programs’ integration of gender considerations.

As a result of the workshop and in association with the ramping up of CSP technical activities, the program will be conducting a GESI training for its field staff and another training for prospective grantees undertaking community engagement work. During the GESI training for CSP staff, the program will also select a “gender champion” for each region of CSP implementation. Finally, the team will review the program’s methodology to ensure gender considerations are built into every step.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 13

SENSITIVE BUT UNCLASSIFIED III. TASK ORDER 2: COMMUNITY SUPPORT PROGRAM

During the third quarter of FY2019, the TO 2 team expanded the reach of CSP through its community profiling exercise and the continuous coordination and collaboration with multiple stakeholders in the field, including municipalities, munipality unions, governors, water establishments, local and international NGOs, donors, USAID implementing partners, and other governmental entities. Internally, the team reflected on challenges and worked closely with the TO 1 team to fine-tune internal systems to enhance operations and reduce any bottlenecks.

A. COMMUNITY IDENTIFICATION AND SELECTION Situation Monitoring: Preselection. During this quarter, the CSP team continued to utilize the preselection data that was initially used to score 851 villages in the North, Beqaa, and South. Accordingly, the new cohort of communities preselected for community profiling consisted mostly of new villages and localities that are considered to be among the 15 percent highest- scoring communities in their respective districts, along with other referrals (see Annex G for details). The pre-existing sources of data that inform preselection will be updated during the fourth quarter to update the scoring for the second year of programming. In the meantime, the team continues to use the same formula for scoring, as shown below:

푆 = (0.1)푉 + (0.2)푅 + (0.1)퐼 + (0.3)푇 + (0.2)푀 + (0.1)푃

S= Score V= Vulnerability R= Refugees I= Incidents T= Tensions M= Municipality status P= Poverty

Community Profiles: Final Selection. During Quarter 3, CSP field teams in the North, Beqaa, and South profiled 32 communities, bringing the total number of communities profiled to 125 (44 in the North, 35 in the Beqaa, and 46 in the South). These profiles help the team understand the status of available services, economic opportunities, and municipality status, as well as the general atmospherics in these communities related to tensions and conflict. In future reporting periods, the pace of community profiling is expected to be approximately 10 per month, or 30 per quarter.

A community profile is conducted for all villages that are pre-selected. CSP’s field teams will fill out the community profile questionnaire in meetings with one elected official (mayor, municipal council member, or moukhtar) and one other key stakeholder, preferably one who is known to have a different perspective or view from the elected official. On average, each meeting takes about 60 minutes. Once these are completed, each RPM will discuss the results with the TO2 director, SPM, and technical advisers, and the team will decide whether to continue with a rapid analysis and design (RAD) or a local systems approach (LSA) for identification and selection of the appropriate activity. If the community profile revealed an urgent need causing CSP-focus tensions in the town, then the team will decide to adopt a

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 14

SENSITIVE BUT UNCLASSIFIED separate, faster, program-led approach. Subsequently, the team will engage with relevant community members and stakeholders to better understand the details of the problem, identify a solution, assess its technical and financial feasibility, and present a concept note accordingly.

The digitization of the tool toward the end of Q3 meant that the community profiling exercise became faster and more efficient as data is directly captured on CSP’s database. The process of digitizing also helped the team revise and tighten the tool for optimal response time. During the work planning for Year 2, the TO2 team will again review and further shorten the tool to reflect the experience of the past year. For example, the team now has a good understanding of which type of infrastructure projects are not an area of interest for CSP — such as road maintenance — and thus can remove any questions related to that issue. Overall, however, the community profiling meetings are proving to be a good first step in not only understanding the town’s needs but in building rapport and a relationship with key decision makers such as the mayors. CSP has received only positive feedback about the tool from local stakeholders and has not discerned any fatigue from participation in these interviews.

Annexes H and I provide the list and map of all the communities selected for assistance interventions by CSP during quarters 1, 2, and 3 of FY 2019. This list includes communities where the TO 2 team submitted at least one concept note or activity approval request, even if it was red-lit or later retracted by the team.

B. ACTIVITY DESIGN Community engagement. The TO 2 team capitalized on the fact that all field teams were fully staffed during this quarter by increasing engagement with the various targeted communities through meetings, key stakeholders’ interviews, and site visits. The intensive field engagement, especially during the community profiling phase, enabled the team to identify various entry points to design interventions with the goal of enhancing lives and reducing tensions in targeted communities.

Although the design of all activities did not follow the RAD or LSA methodology, all program- led interventions were still designed in consultation with local stakeholders and cleared with concerned residents or beneficiaries. Examples of these activities include BQA012 and NTH008 for constructing retaining walls in Ghazze and Markebta, respectively. These walls will enhance public safety and reduce the pressure on the respective municipalities and support them in managing resources and other more critical priorities. In other cases, such as NTH012 that aims to support livelihoods, through improving sales for a rural cooperative in Fnaideq, CSP responded to a request from the local authorities to support a women-led cooperative. CSP hopes that other municipalities will take similar initiatives, as these program-led community stabilization interventions can help communities address acute tensions.

Some CSP activities were designed following community engagement efforts by other donors such as the UNDP Mechanisms for Social Stability (MSS). In these cases, the CSP team validated the findings and built on the existing networks to decide on its interventions. Eleven of the 125 villages profiled were MSS towns. Of those, three AAPs were approved in the South, none in the North, and two in the Beqaa. For instance, BQA011, which aims to enhance the efficiency of water provision to reduce tensions in Deir El Ahmar, was coordinated with the municipality

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 15

SENSITIVE BUT UNCLASSIFIED and validated through meetings with the MSS committee and other key stakeholders such as the Beqaa Water Establishment. In the south, STH006 will provide better water services in Bqasta through the construction of an elevated water tank, another activity that builds on the MSS process.

RFA for community engagement. CSP issued a request for Applications (RFA) at the end of May to solicit applications from experienced Lebanese organizations to augment CSP’s capabilities to execute the community engagement methodology (RAD and LSA). Twenty applications were received by the submission deadline of June 20, and the CSP evaluation committee started reviewing these applications according to the established evaluation criteria. In July, the results will be shared with the short-listed partners and more robust community engagement will be launched following USAID’s approval of the grants.

Summary of Design of Community Stabilization and Development Concepts. During this quarter, the TO 2 team submitted a total of 24 concept notes during Yellow Light meetings, that were regionally distributed as follows:

• 11 in the North. • 10 in the Beqaa. • 3 in the South.

Of the 24 submitted concepts, 18 were yellow-lit (10 in the North, six in the Beqaa, two in the South) for further design and development, while six were red-lit. Reasons why activities are red-lit include the proposed activity not being a priority for CSP; not being technically feasible; having an environmental risk that cannot be mitigated; or because the team could not fulfill a critical requirement such as legal documentation.

Progress was made toward converting a number of yellow-lit concepts into AAPs during Quarter 3 as follows:

• 13 yellow-lit concepts were developed into AAPs and submitted to USAID. • 6 were approved, and one was red-lit by USAID. • 7 are pending either partner vetting eligibility or additional documentation, such as permits from local authorities and ministries. • 16 yellow-lit concept notes are in the queue but need more development before being submitted as AAPs for USAID approval.

C. APPROVED INTERVENTIONS AND IMPLEMENTATION STATUS By the end Quarter 3, CSP had initiated implementation of 23 approved community support activities: 20 Component 1 and three Component 2. Of those 23, nine were technically completed, including five that were completed during Quarter 3. During this quarter, the team followed up with USAID and Social Impact regarding the closeout of three activities that were completed in Quarter 2. CSP will be launching the closeout process for the remaining six completed activities in Quarter 4. Exhibit 7 below provides a summary of CSP’s TO 2 activities under implementation during Quarter 3 while Annex J’s Activity Concept and Implementation Tracker provides additional details about each activity.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 16

SENSITIVE BUT UNCLASSIFIED

Exhibit 5: Summary of TO 2 Activities Completed and Under Implementation Code Location Governorate Activity Description Budget Status Compo- nent 1 BQA001 Britel Baalbek- Providing essential equipment $11,915 Completed C1 Hermel to the Britel Public School 2 BQA002 Ali en Beqaa Providing essential equipment $4,087 Completed C1 Nahri to Ali Nahri Public High School 3 BQA003 Aarsal Baalbek- Provision of fuel vouchers in $24,240 Completed C1 Hermel response to local grievances 4 BQA004 Tannoura Beqaa Providing the municipality with $28,900 Under C1 250 KVA generator and Implementation replacing storm affected accessories 5 BQA005 Joub Beqaa Re-equipping SADA NGO $9,200 Completed C1 Jannine center in Joub Jannine after Norma storm damages 6 BQA007 Fissane Baalbek- Expanding Fissane $20,200 Under C1 Hermel Cooperative Implementation 7 BQA008 Aarsal Baalbek- Provision of fuel vouchers in $175,479 Completed C2 Hermel response to local grievances II 8 BQA009 El Qaa Baalbek- Equipping El Qaa municipality $3,005 Completed C1 Hermel for storm response 9 BQA011 Deir El Baalbek- Enhancing the efficiency of $120,000 Under C2 Ahmar Hermel water provision to reduce Implementation tensions in Deir el Ahmar 10 BQA012 Ghazze Beqaa Improving Public Safety in $21,400 Under C1 Ghazze through Retaining Implementation Wall 11 NTH001 Tripoli North Improving sorted solid waste $45,452 Completed C1 collection capacity of the Union of Al Fayha’ Municipalities 12 NTH002 Qabaait Akkar Supporting Qabaait Public $54,160 Completed C1 Middle School 13 NTH003 Jabal Akkar Enhance strained water $15,000 Under C1 Akroum services in Jabal Akroum Implementation 14 NTH004 Akroum Akkar Supporting olive tree farmers $61,000 Under C1 in Akroum through a decanter Implementation and generator 15 NTH008 Markabta North Building a supporting wall in $32,000 Under C1 Markabta Implementation 16 NTH009 Jdaidet el Akkar Supporting Jdeidet el Qaitaa $56,200 Under C1 Qaitaa Women’s Cooperative for Implementation Agricultural Products 17 NTH012 Fnaideq Akkar Supporting Livelihoods $30,000 Under C1 through Improving Sales for a Implementation Rural Cooperative in Fnaideq 18 NTH015 En Noura Akkar Providing support for farmers $10,400 Completed C1 in Noura affected by the Syrian conflict 19 STH001 Saida South Installing solar Led lights in $46,300 Under C1 Old Saida alleys to enhance Implementation sense of security

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 17

SENSITIVE BUT UNCLASSIFIED Code Location Governorate Activity Description Budget Status Compo- nent 20 STH002 El Miye w South Enhance solid waste collection $20,000 Under C1 Miye and sorting from source efforts Implementation in “Miyeh w Miyeh” 21 STH003 El Qariye South Equipping the municipality with $37,040 Under C1 a generator to reduce cost and Implementation enhance sense of safety 22 STH005 Hasbaiya Nabatieh Providing water filtration for $79,800 Under C1 Hasbaiya water tank Implementation 23 STH006 Bqasta South Providing better water services $185,000 Under C2 in Bqasta Implementation Total Budget Committed to Approved Activities by end of Q3 $1,090,778 Remainder from $8.5 million Activity Fund $7,409,222

Geographic and sector distribution. Exhibits 8 and 9 as well as the maps in Annexes K and L show the geographic and sectoral distribution of CSP’s community assistance interventions under TO 2 during the first three quarters. Based on the experience of the last few quarters, it is becoming more evident that there is correlation between the high numbers of refugees in the North and Beqaa and tensions over resources and perceptions related to competition over jobs. As a result, the field teams in both areas have been able to generate ideas for concept notes that respond to CSP’s mandate in higher numbers than in the South.

Exhibit 8: Geographic Distribution of Approved Activities

10 8

5

BEQAA NORTH SOUTH

Exhibit 9: Sector Distribution of Approved Activities

4 4 4 3 3 3 2

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 18

SENSITIVE BUT UNCLASSIFIED D. ACTIVITY HIGHLIGHTS El Qaa Water Pumps Enhance the Municipality’s Readiness to Mitigate Turbulent Weather During this quarter, the CSP team successfully delivered three pumps to the Al Qaa municipality to help them mitigate the impact of flooding in their community. This part of Lebanon has experienced harsh weather during the past few winters. CSP’s assistance is helping the municipality to respond more expeditiously and more effectively, thereby decreasing the feelings of frustration and abandonment among its residents. Through this assistance, CSP expects around 900 Photo 1. El Qaa municipal workers and SRT attending an Lebanese and 1,250 Syrian refugees to benefit operation and maintenance training for CSP-provided pumps from improved flood response services. Local municipal workers along with El Qaa’s Support and Rescue Team (SRT), attended the training provided by the vendor on how to use and maintain the equipment provided.

El Qaa has suffered from insecurity and political tensions during the past few years following the 2016 suicide bombings by ISIS operatives in the village square. This happened only one month after the 2016 municipal elections; hence, elected officials have been focusing on restoring security rather than addressing the community’s development priorities for some time. While international donors have firmly supported the village in a number of areas, none have dealt with the issue of flood preparedness until CSP provided the pumps.

Sada NGO Center Puts CSP-Provided Equipment in Action to Serve the Most Vulnerable CSP supported Sada al Beqaa NGO in Joub Jannine at the end of last quarter to replace equipment that was damaged during a flood. The equipment assistance included a sound system with speakers, an LCD projector, two laptops, a large refrigerator, a photocopy machine, and a large diesel stove heater. During this reporting period, Sada was able to put this equipment into action to benefit more than 360 individuals through a range of services. For example, the NGO was able to continue its programs that work on women’s empowerment and psychosocial support for Picture 2. SADA NGO kitchen in use during Ramadan 2019 young participants. with CSP-provided equipment

Sada NGO, located in West Beqaa, is a hub that provides services and training to both Lebanese and Syrian refugees residing in the region. Through its work, Sada provides a safe space for beneficiaries to meet, interact, and make positive contributions to the community.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 19

SENSITIVE BUT UNCLASSIFIED CSP’s assistance contributed to friction reduction in West Beqaa by providing equitable distribution of assistance between Syrians and their Lebanese hosts.

CSP Mobilizes Resources and Civil Society to Improve Solid Waste Management in Tripoli During the last quarter, CSP finalized its support to the Al Fayha’ Sorts initiative, led by the Union of Al Fayha’ Municipalities. The activity aimed to improve solid waste management in the northern city of Tripoli and the contiguous areas of El Mina, Qalamoun, and Beddawi. CSP provided the Union with 30 sorting cages, distributed across 15 locations, including schools, university campuses, and strategic public spaces in the city. Thirty large bins were also distributed to 15 locales across the city and its surroundings, as well as 30 smaller garbage bins, which were placed in public gardens and on public staircases and pedestrian areas. The activity has already reached 9,150 beneficiaries and is expected to reach almost 15,000 beneficiaries once the academic year resumes. This significantly enhances local authorities’ capacity to serve citizens in underserved areas and respond to priority needs in Lebanon’s second-largest city and its suburbs.

In addition to providing assistance for the bins themselves, CSP was able to successfully galvanize local stakeholders for collective action. For example, CSP’s North team facilitated joint planning sessions between the union, the Municipality of Tripoli, and various local civil society organizations to leverage CSP’s support to amplify the impact of the assistance intervention. The meeting resulted in an agreement on the sorting points across the three cities and a tangible timeline for the delivery of the large containers and bins to those points. Participants also agreed to develop a marketing strategy and action plan to publicize the effort of the sorting initiative. This includes the production of a video showcasing how this community-based recycling initiative came to life. The video is expected to reach 50,000 residents.

In a city that has suffered from sectarian violence for years, such collaborative efforts are significant. Since 2008, clashes between Sunnis and Alawites in some neighborhoods have impaired local actors’ ability to deliver quality services, and severely hindered the community’s economic and social development. Though security has returned, the city has struggled to address its other problems. The absence of municipal planning and good governance practices led to a solid waste crisis, with the landfill in Tripoli reaching three times its maximum capacity. The smell of garbage has overwhelmed the city and tensions were on the rise once again. This activity provided necessary support for a joint municipal and community initiative that was struggling to achieve its targets. It also enabled people to work effectively together Picture 3. Tripoli resident disposing of plastic recyclables in a CSP-provided bin in the garden of to address the serious common challenge of solid an elderly home as part of the Al Fayha’ sorting waste management. from source campaign

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 20

SENSITIVE BUT UNCLASSIFIED E. IMPLEMENTATION CHALLENGES, SOLUTIONS, AND NEXT STEPS Streamlining the activity approval process. Quarter 3 was characterized by a slowdown of activity design and implementation as the TO 2 team worked to revisit some of the systems and programming approaches in coordination with USAID. This involved putting more time and effort into developing more detailed and complete concept notes and AAPs to reduce the back- and-forth on each submission. To facilitate this process, CSP is now requiring earlier input from subcontractors ELARD and BTD for environmental compliance and design inputs. The effort to design more robust activities has also led to the increased utilization of several short-term technical assistance (STTA) to help with the technical designs in Rmeich, Chebaa, and Fissane.

Coordination with external stakeholders. External factors beyond CSP’s control continued to cause implementation delays during this quarter, especially those related to activities requiring approvals or consent from regional water establishments, the Ministry of Energy and Water, or the Council for Reconstruction and Development. Examples of such delayed activities include BQA006 to enhance the water supply through constructing a water tank in El Fourzol, NTH007 to support the wastewater management system in El Mahmra, and STH007 to enhance water provision in El Ghazieh region through construction of a water tank. These activities are all pending permits and revisions by regional and national authorities before CSP can start implementation. The field teams and senior management continue to follow up on a weekly basis with the various stakeholders to seek the needed approvals and documentation.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 21

SENSITIVE BUT UNCLASSIFIED IV. LESSONS LEARNED

CSP is actively implementing USAID’s approach of collaboration, learning, and adaptation (CLA). The program strives to promote a culture of openness related to sharing information, opinions, ideas, and perspectives and one that prioritizes continuous learning, inclusiveness, communication, and transparency. As part of the CLA process, CSP held a midyear review on May 14 to celebrate the program’s achievements so far and to discuss the challenges that are inhibiting the achievement of the program’s ambitious expected results, particularly under TO 2. Taking time for this type of self-reflection and introspection is key element of CSP’s MEL plan, which calls for iterative learning and adaptive management during implementation.

The full-day event yielded several opportunities, challenges, and recommendations for improved performance. In all, the team put forward more than 20 recommendations based on its experience designing and implementing more than 20 community support assistance interventions across Lebanon’s North, South, and Beqaa regions. The main findings from the midyear review were as follows:

• Pressure to meet targets is driving CSP to emphasize program-led activities. • Complex and bureaucratic requirements (vetting, environmental compliance, and construction quality control and assurance) are deterring CSP from implementing rapid- response activities that address acute tensions or flare-ups. • Different perspectives about the definition of “community stabilization” are leading to confusion about CSP priorities, emphasis, and appropriateness of interventions.

From streamlining the activity approval process to reallocating workloads, CSP is making several management adaptations to accelerate programming and improve performance. CSP is also making a concerted effort to have a more balanced portfolio of small-scale community stabilization activities and larger-scale community development activities. By integrating learning into the program lifecycle and making adaptive management changes, CSP is well positioned to maximize impact and results.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 22

SENSITIVE BUT UNCLASSIFIED

U.S. Agency for International Development 1300 Pennsylvania Avenue NW Washington, D.C. 20523 Tel: (202) 712-0000 Fax: (202) 216-3524 www.usaid.gov

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 23

SENSITIVE BUT UNCLASSIFIED V. ANNEXES

ANNEX A. ORGANIZATIONAL CHART

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 24

SENSITIVE BUT UNCLASSIFIED

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 25

SENSITIVE BUT UNCLASSIFIED

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 26

SENSITIVE BUT UNCLASSIFIED ANNEX B. QUARTERLY FINANCIAL REPORT

Quarterly Financial Report: Year 1 Quarter 3 (April-June 2019) Task Order 1 Current Obligation ($) $ 16,593,619.70

Remaining Obligation ($) $ 13,766,916.23

Remaining Obligation (%) 83% Monthly Burn Rate Y1Q3 $ 262,029.84 ($) Budget Line Item Y1Q3 Cumulative Budget Total ($) Available Funding ($) Available Expenditure* ($) Expenditure ($) Funding (%)

Salaries $ 252,315.81 $ 707,673.84 $ 5,426,817.00 $ 4,719,143.16 87% Fringe Benefits $ 129,279.25 $ 336,874.79 $ 2,776,673.00 $ 2,439,798.21 88% Overhead $ 181,686.86 $ 521,720.80 $ 3,551,361.00 $ 3,029,640.20 85% Travel and $ 958.07 $ 75,250.11 $ 415,559.00 $ 340,308.89 82% Transportation Allowances $ 34,122.64 $ 173,401.70 $ 1,111,359.00 $ 937,957.30 84% Other Direct Costs $ 90,105.57 $ 331,858.04 $ 1,122,128.00 $ 790,269.96 70% Equipment, Vehicles and $ 5,380.00 $ 89,177.99 $ 337,958.00 $ 248,780.01 74% Freight Subcontractors $ 45,442.92 $ 45,442.92 $ 2,673,607.00 $ 2,628,164.08 98% General and $ 29,767.39 $ 113,658.00 $ 950,122.00 $ 836,464.00 88% Administrative Fixed Fee $ 17,031.00 $ 431,645.28 $ 1,381,168.00 $ 949,522.72 69% TOTAL $ 786,089.51 $ 2,826,703.47 $ 19,746,752.00 $ 16,920,048.53 86% * Y1Q3 expenditure includes actual expenses from April and May 2019 and expected expenditure from June 2019 (Accruals)

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 27

SENSITIVE BUT UNCLASSIFIED

Quarterly Financial Report Year 1 Quarter 3 (April-June 2019) Task Order 2 Current Obligation ($) $ 16,154,623.18

Remaining Obligation ($) $ 14,661,067.74

Remaining Obligation (%) 91% Monthly Burn Rate Y1Q3 $ 237,568.06 ($) Budget Line Item Y1Q3 Expenditure* Cumulative Budget Total ($) Available Funding ($) Available ($) Expenditure ($) Funding (%)

Salaries $ 180,643.50 $ 375,426.64 $ 1,757,420.00 $ 1,381,993.36 79% Fringe Benefits $ 62,882.32 $ 108,359.79 $ 1,012,263.00 $ 903,903.21 89% Overhead $ 136,368.70 $ 261,424.38 $ 1,441,620.00 $ 1,180,195.62 82% Travel and $ 13,028.92 $ 16,240.03 $ 190,227.00 $ 173,986.97 91% Transportation Allowances $ 266.89 $ 916.89 $ 189,905.00 $ 188,988.11 100% Other Direct Costs $ 3,660.38 $ 24,847.50 $ 69,256.00 $ 44,408.50 64% Equipment, Vehicles and $ 1.86 $ (0.01) $ - N/A N/A Freight Activity Fund $ 259,681.39 $ 346,233.85 $ 8,500,000.00 $ 8,153,766.15 96% Grants $ - $ - $ 1,500,000.00 $ 1,500,000.00 100% General and $ 31,120.09 $ 57,064.24 $ 797,542.00 $ 740,477.76 93% Administrative Fixed Fee $ 25,050.13 $ 303,042.13 $ 1,078,230.00 $ 775,187.87 72% TOTAL $ 712,704.18 $ 1,493,555.44 $ 16,536,462.00 $ 15,042,907.55 91% * Y1Q3 expenditure includes actual expenses from April and May 2019 and expected expenditure from June 2019 (Accruals) * The $1.86 under EVF will be corrected on an upcoming invoice and there will be no future charges to EVF under TO 2

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 28

SENSITIVE BUT UNCLASSIFIED Task Order 01 and Task Order 02 Month Task Order 01 Task Order 02 Sep-18 $ 104,436.51 $ - Oct-18 $ 246,370.11 $ 84,178.71 Nov-18 $ 280,264.79 $ 261,544.92 Dec-18 $ 589,242.02 $ 68,370.59 Jan-19 $ 338,828.91 $ 103,592.24 Feb-19 $ 202,071.53 $ 86,581.13 Mar-19 $ 279,400.09 $ 176,583.67 Apr-19 $ 286,760.63 $ 246,026.92 May-19 $ 245,798.45 $ 232,258.01 Jun-19 $ 253,529.93 $ 234,419.25 TOTAL $ 2,826,702.97 $ 1,493,555.44

TO1 and TO2 Expenditure Since Start-up: Sep'18-Jun'19

$700,000.00 $600,000.00 $500,000.00 $400,000.00 $300,000.00 $200,000.00 $100,000.00 $-

Task Order 01 Task Order 02

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 29

SENSITIVE BUT UNCLASSIFIED ANNEX C. VETTING TRACKER Vendors PIF # Name (Last, First, MI) Vetting result 67591 Ghaddar Machinery CO s.a.l Approved

67607 Re-vetting / Wassim Al Houjairy &Co. Auto Part , Solidarity Company Approved

67608 Re-vetting / Ezzeddine gas station Approved

67609 Re-vetting / Ain El Shaab Gaz station Approved

67663 Chedid building / Renting field office -Zahleh Approved

67696 Khaled Naaman Establishment Approved

67798 Imad Al Derbas / Renting field office -Tripoli Pending

67901 El Moghrabi office / Renting field office -Saida Approved

CSP Key Individuals PIF # *Name (Last, First, MI) Vetting Result 67699 Gabriel Bayram Approved

Recipients of Assistance (MOU, Grants) PIF # Organization proposed to receive award / Name Vetting Result 67477 Kfar Hilda Municipality Approved

67546 Cooperative Association for Production of Agricultural Products in Fnaideq Approved

67579 Deir Al Ahmar Municipality Approved

67538 Fayha Union of Municipalities Approved

67760 Re- vetting / Tannoura Municipality Approved

67767 Jdaidet El Qaitaa Women Cooperative for Agricultural Products Approved

67876 Re- vetting / Deir Al Ahmar Municipality Approved

68105 El Khiara Municipality Approved

68219 Aachach Municipality Approved

68358 Municipality Approved

68430 Re vetting / Mechmech Municipality Approved

68543 Re- vetting / Tannoura Municipality Approved

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 30

SENSITIVE BUT UNCLASSIFIED ANNEX D. ENVIRONMENTAL COMPLIANT SUMMARY REPORT

Activity Area Activity Title Number ERAC status Beqaa Britel BQA001 Providing Essential Equipment to the Approved by Britel Public School USAID Beqaa Tannoura BQA004 Providing the municipality with 250 KVA Approved by generator and replacing storm affected USAID accessories

Beqaa Joub BQA005 Re-equipping SADA NGO center in Joub Approved by Jannine Jannine after Norma storm damages USAID

Beqaa El Fourzol BQA006 Enhancing water supply through Under Review constructing a water tank by CSP Beqaa Fissane BQA007 Expanding Fissane Cooperative Under Review by CSP Beqaa El Qaa BQA009 Equipping El Qaa Municipality for Storm Approved Response from USAID Beqaa Deir El BQA011 Enhancing the efficiency of water Under Review Ahmar provision to reduce tensions in Deir el by CSP Ahmar Beqaa Ghazze BQA012 Improving Public Safety in Ghazze Pending through Retaining Wall USAID feedback Beqaa Souaih BQA013 Enhancing Economic Opportunities for Pending and Farmers in Hermel Outskirts USAID Chehairy feedback Beqaa Hawch er BQA014 Reducing Tensions through Equipping the Pending Rafqa Intermediate Public School of Hawch El USAID Arab feedback

Beqaa El Khiara BQA015 Enhancing Safety and Security through Pending Solar Lighting in El Khiara USAID feedback North Tripoli NTH001 Improving sorted solid waste collection Approved by capacity of the Union of Al Fayha’ USAID Municipalities

North Qabaait NTH002 Supporting Qabaait Public Middle School Approved by USAID North Jabal NTH003 Enhance Strained Water Services in Approved by Akroum Jabal Akroum USAID North Akroum NTH004 Supporting Olive Tree Farmers in Akroum Pending through a decanter and generator USAID feedback

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 31

SENSITIVE BUT UNCLASSIFIED Activity Area Activity Title Number ERAC status North Markebta NTH008 Building a supporting wall in Markabta Approved by USAID North Jdaidet el NTH009 Supporting Jdeidet el Qaitaa Women’s Under Review Qaitaa Cooperative for Agricultural Products by CSP

North Kfar Hilda NTH010 Ensuring a proper water flow in the channels Pending of Kfar Hilda USAID feedback North Fnaideq NTH012 Supporting Livelihoods through Improving Under Review Sales for a Rural Cooperative in Fnaideq by CSP

North Mouanse NTH013 Rehabilitation of the pumping system for the Pending borehole feeding Mouanse village USAID feedback North En Noura NTH015 Providing support for farmers in Noura Approved by affected by the Syrian conflict USAID

North Bebnine NTH016 Supporting Al Mourabia Marzouka Al Pending Mouzakzek Public School for Girls in Bebnine USAID feedback

North Bebnine NTH017 Supporting Salam Public Mixed School in Pending Bebnine USAID feedback South Saida STH001 Installing solar Led lights in Old Saida alleys Under Review to enhance sense of security by CSP

South El Miye w STH002 Enhance solid waste collection and sorting Approved by Miye from source efforts in “Miyeh w Miyeh” USAID

South El Qariye STH003 Equipping the municipality with a generator to Under Review reduce cost and enhance sense of safety by CSP

South Hasbaiya STH005 Providing Water Filtration for Hasbaiya Water Pending Tank USAID feedback South Bqasta STH006 Providing better water services in Bqasta Under Review by CSP

South El Ghazieh STH007 Enhancing Water Provision in El Ghazieh Under Review Region through Construction of a Water Tank by CSP

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 32

SENSITIVE BUT UNCLASSIFIED ANNEX E. INDICATORS PERFORMANCE TRACKING TABLE

Please refer to the email attachment labeled “Annex E. Indicators Performance Tracking Table.”

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 33

SENSITIVE BUT UNCLASSIFIED ANNEX F. PROGRESS MADE TOWARD TARGETS Quarter 2 Quarter Quarter Quarter Y1 TO2 Y1 TO2 Freq. of 10% ± Justification of deviation Indicator Title Target 2 3 3 Targets Results Reporting Deviation from target Actual Target Actual Project Goal: Municipalities and underserved and vulnerable communities enjoy better services and enhanced economic opportunities that improve lives and reduce tensions CSP reached 34.78% from the quarter target. The achieved results are the outputs of the two activities that were, or are about to be, completed during this reporting period. The provision of fuel vouchers in response to local grievances BQA008, and NTH001; Number of improving sorted solid waste people collection capacity of Union of 01 benefiting from Quarterly 70,750 8,951 70,750 24,610 (65,21%) 212,250 33,561 Al Fayhaa’ Municipalities. of USG The deviation from the target is assistance [PMP] because many ongoing activities including construction work need to be completed prior to reporting results. During Q3, CSP is reporting the results of 2 completed activities out of 18 ongoing activities. CSP will continue reporting the results of the ongoing and upcoming activities. CSP reached 4% from this quarter’s target. CSP is Number of local currently implementing 18 actors with activities that aim to enhance enhanced 02 Quarterly 25 5 25 1 (96%) 75 6 abilities of local actors. abilities as result However, CSP reports only on of USG support local actors who successfully [PMP] completed activities supported by USG.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 34

SENSITIVE BUT UNCLASSIFIED CSP exceeded the target set for this quarter. Most of the reported beneficiaries are women head Proportion of of households, supported by the female emergency response in the 03 participants in Quarterly 30% 37% 30% 61% 104.3% 30% 57% Beqaa area or are female USG assisted students in schools, associations programs and/or universities who benefited from improving sorted solid waste collection capacity of Union of Al Fayhaa’ Municipalities activity. Purpose Level: Priority Needs in Underserved and Vulnerable Communities Met Result 1 Level: Ability of local actors to mobilize development resources demonstrated No resources or assets were mobilized by local actors to Value of respond to communities’ resources and priority needs, as one of the or assets reported activities was an mobilized by emergency response and does 06 Quarterly $ 33,000.00 $ - $ 33,000.00 0 $ (100%) $ 99,000.00 $ - local actors to not involve resource respond to mobilization. The second communities’ activity was to improve a priority needs preexistent and functioning process of sorted solid waste management. IR 1.1 Level: Development resources accessed by communities Number of community resources and 07 or assets Quarterly 15 - 15 0 (100%) 45 - Same as indicator #6. involved in USG assisted activities Number of CSP reached 5.5% of the community quarter’s target, as the 2 08 Quarterly 200 24 200 11 (94.5%) 600 35 members who completed, or about to be have completed, and reported

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 35

SENSITIVE BUT UNCLASSIFIED participated in activities in Quarter 3 are the CSP activity community stabilization cycle interventions and don’t involve many community members participating and engaged in CSP activity cycle, as opposed to the type of activities to be implemented under component 2, community development. IR 1.2 Level: Capacity of local actors to mobilize resources developed CSP reached 4% from this Number of quarter’s target in this indicator. activities Notably, the total number of implemented activities that are being 09 with Quarterly 25 6 25 1 (96%) 75 7 implemented with participation participation from local stakeholders is 18. from local Most of the activities under stakeholders implementation will be reported during Quarter 4. Result 2 Level: Community members benefit from local development collaboration

Number of USAID-assisted local actors CSP reached 24% from this (including CSOs, quarter’s target in this indicator. Private sector This indicator used to be annual 11 organizations) Quarterly 25 0 25 6 (76%) 75 6 and was altered to quarterly engaged in during the review of the MEL community, plan. All results achieved are regional and reported under this quarter. national programs IR 2.1 Level: Essential Services delivered or improved CSP reached 5.88% from this Number of quarter’s target. Nevertheless, essential the number of essential services services 12 Quarterly 15 6 17 1 (94.11%) 50 7 provided are 18. provided, CSP only reports successfully installed or completed activities supported upgraded by USG.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 36

SENSITIVE BUT UNCLASSIFIED CSP reached 12.93% from this Number of quarter’s target, as only 1 out of people with 18 activities being implemented access to 13 Quarterly 47,167 2,061 70,750 9,150 (87.07%) 141,500 11,211 to provide people with access adequate levels to adequate levels of essential of essential services was completed during services the current reporting period. IR 2.2 Level: Economic opportunities increased Number of people directly No results achieved during this benefiting from quarter related to people increased directly benefiting from economic 15 Quarterly 225 0 225 0 (100%) 675 0 increased economic opportunities as opportunities. CSP expects to a result of USG- report results on this indicator assistance in during Quarter 4. local communities Number of No results achieved during this MSMEs quarter under this indicator, as 16 Quarterly 1 0 4 0 (100%) 8 0 supported by the reported partnership was USG assistance with union of municipalities.

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 37

SENSITIVE BUT UNCLASSIFIED ANNEX G. LIST OF PRESELECTED COMMUNITIES Village District Governorate Score Referral entity if present North Aarqa Akkar Akkar 3.9 Deir Dalloum Akkar Akkar 3.8 BALADI Meryata Zgharta North Lebanon 3.2 El Mhamra Akkar Akkar 3 BALADI Akroum Akkar Akkar 2.9 Zgharta Zgharta North Lebanon 2.8 Minieh- Bakhoun North Lebanon 2.7 Donnieh Mouanseh Akkar Akkar 2.6

En Noura El Tahta and Fawqa Akkar Akkar 2.5

Zouq el Housniyye Akkar Akkar 2.4 Kfartoun Akkar Akkar 2.3 Aashash Zgharta North Lebanon 2.2 Ain Tenta Akkar Akkar 2.2 BALADI Ayoun Akkar Akkar 2.2 BALADI Kfar Aaqqa El Koura North Lebanon 2.1 Bechmizzine El Koura North Lebanon 2 Rachine Zgharta North Lebanon 2 Beqaa El Qaa Baalbek Baalbek-Hermel 3.7 BALADI/MSS Deir El Ahmar Baalbek Baalbek-Hermel 3.1 MSS El Manara West Beqaa Beqaa 2.3 MSS El Fourzol Zahleh Beqaa 2.2 USAID Jdita Zahleh Beqaa 2.2 Aita El Foukhar Rachaiya Beqaa 1.9 Kfarmishke Rachaiya Beqaa 1.9 South Sarafand Saida South Lebanon 2.8 Qaouzah Bent Jbeil Nabatieh 2.5 Taaid Jezzine South Lebanon 2.4 Jinsnaya Jezzine South Lebanon 2.2 Alma Shaab Tyre South Lebanon 2 Kawkaba Hasbaiya Nabatieh 1.9

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 38

SENSITIVE BUT UNCLASSIFIED Qlaaiya Marjeyoun Nabatieh 1.9 Rachaiya El Foukhar Hasbaiya Nabatieh 1.9 BALADI CAP

ANNEX H. LIST OF SELECTED COMMUNITIES Village District Governorate Aabra Saida South Aachach Zgharta North Aarsal Baalbek Baalbek-Hermel Ain Ebel Nabatieh Ain Kfar Zabad Zahleh Beqaa Akroum Akkar Akkar Ali en Nahri Zahleh Beqaa Arde Zgharta North Bebnine Akkar Akkar Bechmezzine El Koura North Bqaa Safrine Minieh-Dannieh North Bqasta Saida South Britel Baalbek Baalbek-Hermel Chebaa Hasbaiya Nabatieh Deir Aamar Minieh-Dannieh North Deir El Ahmar Baalbek Baalbek-Hermel Douris Baalbek Baalbek-Hermel El Fourzol Zahleh Beqaa El Ghazieh Saida South El Khiara West Beqaa Beqaa El Laboue Baalbek Baalbek-Hermel El Mahmra Akkar Akkar El Manara West Beqaa Beqaa El Miye w Miye Saida South El Qaa Baalbek Baalbek-Hermel El Qariye Saida South En Noura Akkar Akkar Erkay Saida South Es Saksakiye Saida South Fissane Hermel Baalbek-Hermel Fnaideq Akkar Akkar Ghazze West Beqaa Beqaa Hasbaiya Hasbaiya Nabatieh Hawch er Rafqa Baalbek Baalbek-Hermel Jdaidet el Qaitaa Akkar Akkar Jezzine Jezzine South Joub Jannine West Beqaa Beqaa

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 39

SENSITIVE BUT UNCLASSIFIED Kawkaba Hasbaiya Nabatieh Kfar Aaqqa El Koura North Kfar Hilda Batroun North Village District Governorate Kfar Mechki Rachaya Beqaa Kfar Toun Akkar Akkar Kfar Zabad Zahleh Beqaa Markebta Minieh-Dannieh North Mechmech Akkar Akkar Meryata Zgharta North Mouanse Akkar Akkar Qabaait Akkar Akkar Rmoul Akkar Akkar Sahel Akkar Akkar Akkar Saida Saida South Souh and Chouheiry Hermel Baalbek-Hermel Tall Aabbas ech Charqi Akkar Akkar Tannoura Rachaya Beqaa Tripoli Tripoli North

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 40

SENSITIVE BUT UNCLASSIFIED ANNEX I. MAP OF SELECTED COMMUNITIES Please refer to the email attachment labeled “Annex I. Map of Selected Communities”

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 41

SENSITIVE BUT UNCLASSIFIED ANNEX J. ACTIVITY CONCEPT AND IMPLEMENTATION TRACKER Lebanon CSP Activity Concept, Design, and Implementation Tracker Code Location District Governorate Region Activity Description Comp Estimated Notes/Status Partner Value

BQA001 Britel Baalbek Baalbek- Beqaa Providing Essential 1 $11,915 Completed. SI Britel Public Hermel Equipment to the Britel visited. Pending School Public School USAID approval of ACP for close-out BQA002 Ali en Nahri Zahleh Beqaa Beqaa Providing Essential 1 $4,087 Completed. SI Ali El Nahri Public Equipment to Ali Nahri visited. Pending School Public High School USAID approval of ACP for close-out BQA003 Aarsal Baalbek Baalbek- Beqaa Provision of Fuel 1 $24,240 Completed Aarsal Hermel Vouchers in Response to Municipality Local Grievances BQA004 Tannoura Rachaya Beqaa Beqaa Providing the 1 $28,900 Under Tannoura municipality with 250 Implementation Municipality KVA generator and replacing storm affected accessories BQA005 Joub Jannine West Beqaa Beqaa Beqaa Re-equipping SADA 1 $9,200 Completed. SADA El Beqaa NGO center in Joub ACP sent to NGO Jannine after Norma COR storm damages BQA006 El Fourzol Zahle Beqaa Beqaa Enhancing water supply 2 $85,000 AAP submitted, El Fourzol through constructing a pending Water Municipality water tank Establishment and/or MOEW consent to receive USAID approval BQA007 Fissane Hermel Baalbek- Beqaa Expanding Fissane 1 $20,200 Under Agricultural Hermel Cooperative Implementation Cooperative Fissane

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 42

SENSITIVE BUT UNCLASSIFIED BQA008 Aarsal Baalbek Baalbek- Beqaa Provision of Fuel 1 $175,479 Completed Aarsal Hermel Vouchers in Response to Municipality Local Grievances II BQA009 El Qaa Baalbek Baalbek- Beqaa Equipping El Qaa 1 $3,005 Under El Qaa Hermel Municipality for Storm Implementation Municipality Response BQA011 Deir El Baalbek Baalbek- Beqaa Enhancing the efficiency 1 $120,400 Under Deir El Ahmar Ahmar Hermel of water provision to Implementation Municipality reduce tensions in Deir el Ahmar BQA012 Ghazze West Beqaa Beqaa Beqaa Improving Public Safety 1 $21,400 Under Ghazze in Ghazze through Implementation Municipality Retaining Wall BQA013 Souaih and Hermel Baalbek- Beqaa Enhancing Economic 1 $40,000 AAP submitted, Chehairy Hermel Opportunities for pending vetting Farmers in Hermel and more Outskirts guidance from USAID BQA014 Hawch Er Baalbek Baalbek- Beqaa Reducing Tensions 1 $27,290 AAP submitted, Hawch El Arab Rafqa Hermel through Equipping the pending USAID Public School Intermediate Public approval School of Hawch El Arab BQA015 El Khiara West Beqaa Beqaa Beqaa Enhancing Safety and 1 $58,000 AAP submitted, Security through Solar pending USAID Lighting in El Khiara approval Pending Kfar Michke Rachaya Beqaa Beqaa Optimizing Irrigation for 1 $90,000 Yellow-Lit. Farmers in Kfar Michke Pending AAP Pending Kfar Zabad Zahleh Beqaa Beqaa Improving Safety and 1 $80,000 Yellow-Lit. Security through Street Pending AAP Lighting in Kfar Zabad Pending El Manara West Beqaa Beqaa Beqaa Improving Water Supply 1 $96,000 Yellow-Lit. in El Manara Pending BRPM feedback from COR to proceed NTH001 Tripoli Tripoli North North Improving sorted solid 1 $45,452 Completed Union of Fayha’ waste collection capacity Municipalities of the Union of Al Fayha’ Municipalities

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 43

SENSITIVE BUT UNCLASSIFIED NTH002 Qabaait Akkar Akkar North Supporting Qabaait 1 $54,160 Completed Qabaait Public Public Middle School Middle School

NTH003 Jabal Akkar Akkar North Enhance Strained Water 1 $15,000 Under Akroum Akroum Services in Jabal Akroum Implementation Municipality

NTH004 Akroum Akkar Akkar North Supporting Olive Tree 1 $61,000 Under Cooperative for Farmers in Akroum Implementation Production and through a decanter and Processing olives generator in Akroum and surroundings NTH007 El Mahmra Akkar Akkar North Supporting the 2 $71,400 AAP submitted, El Mahmra wastewater management eligibility notice Municipality system in El Mahmra received. Pending the Tripoli Waste Water Facility confirmation to receive El Mahmra waste water to submit to USAID for approval NTH008 Markebta Minieh- North North Building a supporting 1 $32,000 Under Markebta Dannieh wall in Markebta Implementation Municipality NTH009 Jdaidet el Akkar Akkar North Supporting Jdaidet el 2 $56,200 Under Jdaidet el Qaitaa Qaitaa Qaitaa Women’s Implementation Municipality Cooperative for Agricultural Products NTH010 Kfar Hilda Batroun North North Ensuring a proper water 1 $70,400 AAP Submitted, Kfar Hilda flow in the channels of pending USAID Municipality Kfar Hilda approval NTH011 Tall Aabbas Akkar Akkar North Construction of a 1 $75,000 Yellow-Lit. Tall Aabbas ech ech Charqi Reinforced Concrete Pending AAP Charqi Water Irrigation Channel Municipality for Tall Aabbas ech Charqi village NTH012 Fnaideq Akkar Akkar North Supporting Livelihoods 1 $30,000 Under Cooperative through Improving Sales Implementation Association for Production of

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 44

SENSITIVE BUT UNCLASSIFIED for a Rural Cooperative Agricultural in Fnaideq Products in Fnaideq NTH013 Mouanse Akkar Akkar North Rehabilitating the 1 $80,400 AAP Submitted, North Lebanon pumping system for the pending USAID Water artesian well feeding approval Establishment Mouanse and Nsoub villages NTH015 En Noura Akkar Akkar North Providing support for 1 $10,400 Under Noura Municipality farmers in Noura affected Implementation by the Syrian conflict Pending Sahel Akkar Akkar Akkar North Supporting the Potato 1 $30,000 Yellow-Lit. Farmers Cooperatives in Pending AAP Sahel Akkar Pending Sahel Akkar Akkar Akkar North Supporting the Potato 1 $30,000 Yellow-Lit. Farmers Cooperatives in Pending AAP Sahel Akkar Pending Sahel Akkar Akkar Akkar North Supporting the Potato 1 $30,000 Yellow-Lit. Farmers Cooperatives in Pending AAP Sahel Akkar Pending Sahel Akkar Akkar Akkar North Supporting the Potato 1 $30,000 Yellow-Lit. Farmers Cooperatives in Pending AAP Sahel Akkar Pending Bqaa Safrine Minieh- North North Connect Beshtayel site 1 $100,000 Yellow-Lit. NLWE Dannieh to the water-network in Pending AAP Bqaa Safrine Pending Kfar Aaqqa Koura North North Water Treatment system 1 $40,000 Yellow-Lit. in Kfar Aaqqa to produce Pending AAP drinking water Pending Mechmech Akkar Akkar North Providing electrical 1 $30,000 Yellow-Lit. station (Transformer) for Pending AAP Mechmech sorting facility Pending Bebnine Akkar Akkar North Supporting Al Mourabia 1 $60,000 Yellow-Lit. Marzouka Al Mouzakzek Pending AAP Public School for Girls in Bebnine Pending Bebnine Akkar Akkar North Supporting Salam Public 1 $55,000 Yellow-Lit. Mixed School in Bebnine Pending AAP Pending Aachach/Mer Zgharta North North Rehabilitation of the 1 $75,000 Yellow-Lit. iata/Arde irrigation channel for the Pending AAP

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 45

SENSITIVE BUT UNCLASSIFIED villages of Aachach, Meriata, and Arde STH001 Saida Saida South South Installing solar Led lights 1 $46,300 Under Saida Municipality in Old Saida alleys to Implementation enhance sense of security STH002 El Miye w Saida South South Enhance solid waste 1 $20,000 Under El Miye W Miye Miye collection and sorting Implementation Municipality from source efforts in “Miye w Miye” STH003 El Qariye Saida South South Equipping the 1 $37,040 Under El Qariye municipality with a Implementation Municipality generator to reduce cost and enhance sense of safety STH005 Hasbaiya Hasbaiya Nabatieh South Providing Water Filtration 1 $79,800 Under Hasbaiya for Hasbaiya Water Tank Implementation Municipality STH006 Bqasta Saida South South Providing better water 2 $185,000 Under Bqasta services in Bqasta Implementation Municipality STH007 El Ghazieh Saida South South Enhancing Water 2 $250,000 AAP submitted, South Lebanon Provision in El Ghazieh pending SLWE Water Region through documentation Establishment Construction of a Water of land Tank ownership to receive USAID approval Pending Bent Jbeil Nabatieh South STTA ongoing. Concept note to be submitted Pending Chebaa Hasbaiya Nabatieh South Supporting farmers 2 $100,000 Yellow-Lit. through providing water Pending AAP irrigation systems Pending Ain Ebel Bent Jbeil Nabatieh South Improving Economic 2 $120,000 Yellow-Lit. Opportunities in Ain Ebel Pending AAP by Supporting Community Investments

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 46

SENSITIVE BUT UNCLASSIFIED Lebanon CSP Red-lit Activity Tracker Location District Governorate Region Activity Description Notes/Status

Saida Saida South South Supplying Equipment to the Old Saida Red Lit: Idea was not deemed to respond to vital needs Municipal Fire Brigade that trigger tensions Kfar Toun Akkar Akkar North Enhancing paramedical Services in Red Lit: High human hazard risk and liability Kfartoun through equipping an ambulance for the municipality El Laboue Baalbek Baalbek- Beqaa Re-equipping MOSA SDC in Laboue after Red Lit: Ministry of social affairs and other central Hermel Norma storm damages government run facilities (excluding public schools) are not envisioned to be priority assistance entities at this stage under CSP. Kfar Toun Akkar Akkar North Responding to a storm damage by Red-lit: CSP priority to focus on more vital activities. reconstructing a graveyard retention wall to replace an old faulty graveyard wall in Kfartoun Tripoli Tripoli North North providing waterproofing and storm water Red Lit: the proposed construction related intervention will pipes for a Displaced Fund residential not solve underlying significant maintenance issues for the compound Ein Qobbe residential compound and central government owned/run facilities (excluding public schools) are not envisioned to be priority assistance entities at this stage under CSP. Aabra Saida South South Supporting the expansion of the “Famille Red lit: supporting health-related or institutions was Saint Elie - Aabra” care center deemed not a priority for CSP at this stage.. Es Saksakiye Saida South South Efficient Lighting System for Es Saksakiye Red lit: The activity was not deemed as responding to a Entrance vital need or essential service. Bqaa Safrine Dannieh North North Water pipeline connections and Red lit: By TO2 team after NLWE updated the team that accessories in Bqaa Safrine another donor is going to fund the activity. Deir Aamar Minieh- North North Providing the Deir Aammar football field Red lit: The activity was not deemed a priority by USAID, Dannieh with water irrigation network and it was rejected after AAP phase. Ain Kfar Zabad Zahleh Beqaa Beqaa Activating a Public Sports Space in Ain Red lit: The activity was not deemed a priority by USAID Kfar Zabad Erkay Saida South South Rehabilitating and Equipping the Erkay Red lit: The school is not owned by MEHE and CSP cannot Public Elementary School rehabilitate for the current owners Et tabbaneh Tripoli North North Supporting Water System in Et Tabbaneh Red lit: The idea of correcting other donors' activities in such a volatile environment was deemed complex and risky Kfar Mechki Rachaiya Beqaa Beqaa Establishing Local Governance Offices in Red lit: Rehabilitating or furnishing local gov premises is Kfar Mechki not a CSP priority

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 47

SENSITIVE BUT UNCLASSIFIED Douris Baalbek Baalbek- Beqaa Equipping the Lebanese University Red lit: The activity was not deemed a priority by USAID Hermel campus of Douris under Component 1 assistance at this stage. The tension/conflict over resources element was absent/minor. Mechmech Akkar Akkar North Providing electrical transformer for water Red lit: The municipal council refused to hand over the well in Mechmech water resources of the village to the NLWE and therefore CSP cannot get the blessings of the NLWE on the activity. It was retracted at the AAP phase. Et Tabbaneh Tripoli North North Supporting the formalization of water Red lit: Activity was retracted by CSP team during design provision in Et Tabbaneh, Tripoli phase since it was deemed quite risky and complex. No AAP will be submitted to USAID Kawkaba Hasbaiya Nabatieh South Construction of a Waste Collection and Red lit: Activity was retracted by CSP team during design Composting Facility in Kawkaba phase since it was deemed quite risky and complex. No AAP will be submitted to USAID

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 48

SENSITIVE BUT UNCLASSIFIED ANNEX K. MAP OF TO2 ACTIVITIES Please refer to the email attachment labeled “Annex K. Map of TO2 Activities”

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 49

SENSITIVE BUT UNCLASSIFIED ANNEX L. MAP OF TO2 FUNDING LEVELS Please refer to the email attachment labeled “Annex L. Map of TO2 Funding Levels”

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 50

SENSITIVE BUT UNCLASSIFIED ANNEX M. SUCCESS STORY – CSP INTERVENTION IN ARSAL Please refer to the email attachment labeled “Annex M. Success Story - CSP Intervention in Arsal”

LEBANON CSP IDIQ QUARTERLY REPORT- YEAR 1 QUARTER 3 | 51

SENSITIVE BUT UNCLASSIFIED