Harbourfront Commission Task Force on Kai Tak Harbourfront Development
Revitalisation of Tsui Ping River Stage 1 Public Engagement
(Paper No. TFKT 01/2017)
13 January 2017
1 Content
• To introduce preliminary design concepts of “Revitalisation of Tsui Ping River”
• To introduce the schedule of Stage 1 Public Engagement
• To seek Members’ views on the Project
2 Background
King Yip Street Nullah • Constructed more than 50 years ago • Located along Tsui Ping Road, King Yip Lane and King Yip
Street, between Kai Lim Road and the harbour
Shing Yip Street Yip Shing
Hing Yip Street Yip Hing
Wai Yip Street Wai Yip Hung To Road ToHung
King Yip Street
Wai Fat Road
3 Background
Energizing Kowloon East • Transformation of Kowloon East into an attractive alternative Core Business District 2 • Five main focuses under the Conceptual Master Plan version 5.0 promulgated by EKEO in November 2016 Walkability & Mobility Green CBD Smart City Socio-economic Vibrancy The Spirit of Creation • The proposed revitalisation of Tsui Ping River will be a key feature of the Green CBD. 4 Background
Revitalisation of Tsui Ping River
• Situated in the centre of Kwun Tong District, coupled with its inherent riverine characteristics, the watercourse is a precious space lending itself very well to being transformed into a riverside environment for public enjoyment.
• We aspire to create a Tsui Ping River that is revitalised environmentally and ecologically, and well connected with the neighbourhood, to serve the dual purposes of not only an upgraded drainage infrastructure, but also a water-friendly public amenity.
5 Key Objectives
1. Reducing Flood Risk To enhance the flood conveyance function of the existing river channel 2. Revitalising the River To provide waterscape, landscape, ecological and water quality enhancement To provide green riverine corridor 3. Improving Walkability and Connectivity To provide walkways alongside the river To provide cross-river walkways and landscaped decks 4. Fostering a Vibrant Riverine Public Space To make Tsui Ping River a landmark where one can experience the riverine scenery and leisure activities 6 Works Items
• Revitalisation of the existing River, through the provision of waterscape design and water features
• Provision of landscaped walkways and footbridges along the River to enhance walkability and connectivity
• Provision of landscaped decks over the River
• Modification and face-lifting of the Kwun Tong Road Footbridge
• Related enhancement work in the vicinity of the River
7 Preliminary Design Concepts
Zone D Zone C Zone B Zone A
8 Zone A (Between Kai Lim Road and Kwun Tong Road)
3
View 1
View 2 View 3
9 Zone A (Between Kai Lim Road and Kwun Tong Road)
Lift and staircase Existing ramp to under construction be demolished (by CEDD)
Engineered wetland
Kwun Tong Kwun Tong Swimming Recreation Pool Ground Possible re-provisioning of footbridge ramp (feasibility to be further established)
10 Zone A A1 (Between Kai Lim Road and Kwun Tong Road) Photomontage A1 (near Kwun Tong Recreation Ground)
A2
11 Zone A A1 (Between Kai Lim Road and Kwun Tong Road) Photomontage A2 (near Kwun Tong Swimming Pool)
A2
12 Zone B (Between Kwun Tong Road and Shing Yip Street)
3
View 1
View 2 View 3 13 Zone B
(Between Kwun Tong Road and Shing Yip Street) Shing YipShingStreet
Existing footbridge
Footbridge Landscaped Deck
14 Zone B (Between Kwun Tong Road and Shing Yip Street) Photomontage B1 (near Shing Yip Road)
B1
15 Zone C (Between Shing Yip Street and Wai Yip Street)
2 4
View 1
View 2
View 3 View 4 16 Zone C
(Between Shing Yip Street and Wai Yip Street)
Hung ToHung Road Yip Hing Street
Water Gate Floating Landscaped Pontoon Deck King Yip Street Tsui Ping River Garden (by LCSD)
Landscaped Terraced Deck Landscaped Deck
17 Zone C C1 (Between Shing Yip Street and Wai Yip Street) C2 Photomontage C1 (near Tsui Ping River Garden)
C3
C4
C5
18 Zone C C1 (Between Shing Yip Street and Wai Yip Street) C2 Photomontage C2 (near Tsui Ping River Garden)
C3
C4
C5
19 Zone C C1 (Between Shing Yip Street and Wai Yip Street) C2 Photomontage C3 (near Hung To Road / Proposed Water Gate)
C3
C4
C5
20 Zone C C1 (Between Shing Yip Street and Wai Yip Street) C2 Photomontage C4 (near Hung To Road)
C3
C4
C5
21 Zone C C1 (Between Shing Yip Street and Wai Yip Street) C2 Photomontage C5 (near Wai Yip Street)
C3
C4
C5
22 Zone D (Between Wai Yip Street and Victoria Harbour)
Kwun Tong View 1 Preliminary Treatment Works 1 3 Victoria
Harbour 2 Wai Yip Kwun Tong Street Sewage Pumping Station
View 2 View 3
23 24
Wai Yip Street Floating Islands Floating Kwun Tong Tong Kwun Preliminary Treatment Works Treatment
harbourfront Walkway towards towards Walkway
(Between Wai Yip Street and Victoria Street Harbour) and Victoria Yip (Between Wai Zone D D Zone Stage 1 Public Engagement
• Consultation with District Facilities Management Committee under Kwun Tong District Council (12 Jan 2017) • Consultation with Task Force on Kai Tak Harbourfront Development under Harbourfront Commission (13 Jan 2017) • Roving Exhibition (16 Jan to 5 Mar 2017) EKEO Exhibition Hall Kwun Tong Promenade Kwun Tong MTR Station Tsui Ping Commercial Complex Kwun Tong Swimming Pool Phase 1 Laguna City Clubhouse Laguna Park E-Plaza Shing Yip Street Rest Garden • Community Workshop (11 Feb 2017) • Project Website:www.tsuipingriver.hk
25 Study Progress
• The Project is now in the investigation phase
• The Stage 1 Public Engagement activities have just begun
• Detailed design is anticipated to commence within 2017
26 Members’ views on the Project are welcome.
Thank you!
27