Developer Hoi Hup Development Pte Ltd 16 Jalan Kilang #07-01 Hoi Hup Building S(159416) Tel: 6311 9555 Fax: 6271 9282 ROC: 201605324Z

General Description PROPOSED EXECUTIVE CONDOMINIUM HOUSING DEVELOPMENT COMPRISING 9 BLOCKS OF 15-STOREY RESIDENTIAL UNITS WITH SWIMMING POOL, ANCILLARY FACILITIES (TOTAL 531 UNITS) AND 1 BASEMENT CARPARK ON LOT 09798K MK 22 AT YIO CHU KANG ROAD (HOUGANG PLANNING AREA)

Address 9798K MK 22 at Yio Chu Kang Road

Status Executive Condominium Location District 19 Total no. of units 531 Site Area 18,422.90m2 Plot ratio 3.0799 GFA 56,739.82m2 Tenure of land 99 years from 30 May 2016 Developer’s licence no. C1214 Lot no. LOT 09798K MK 22 BP approval A2325-01161-2016-BP01 dated 15 May 2017 Legal TOP / Legal completion 28 February 2020/ 28 February 2023 Encumbrances on the land Mortgage in favor of Oversea-Chinese Banking Corporation Limited Project account Oversea-Chinese Banking Corporation Limited for Project A/c No. 695-608398-001 of Hoi Hup Hougang Development Pte Ltd TT details: Beneficiary Bank: OCBC Bank UOB SWIFT Code: OCBCSGSG UOB Bank Code: 7339 OCBC Ltd for United Overseas Bank Ltd for Project A/c No. 695- 608398-001 of Beneficiary A/c Hoi Hup Hougang Development Name: Pte Ltd Beneficiary A/c No.: 695-608398-001

Page 1/8 For internal circulation only, information accurate at time of print –9 June 2017

Breakdown of units No. of units Size range 3 bedroom (inclusive of high ceiling units) 441 82 sqm- 114sqm 883 sqft – 1227 sqft 4 bedroom (inclusive of high ceiling units) 60 118 sqm – 133sqm 1270 sqft – 1432 sqft 5 bedroom (inclusive of high ceiling units) 30 142 sqm – 152 sqm 1528 sq ft – 1636 sqft

Development Features No. of carpark lots Basement Carpark with 531 carpark lots & 5 handicapped lots No. of bicycle lots 89 Open Net Provision The project is provided with optical fiber infrastructure and unshielded twisted pair cables (Category 6)/RJ45 outlets within Apartments. The Purchaser is responsible to liaise with their preferred telecommunication operators and/or internet service/content providers for service connection and subscription. The Purchaser is liable to pay annual fees, subscription fees and any other such fees to the operator/service provider for their service connection and subscription. Refuse disposal system Centralized Disposal System Type of window Powder coated aluminum framed casement and/or sliding (sliding or casement) and/or top-hung and/or fixed glass panel Selling Points - Sale of Unit and CPF Housing Grant subjected to Eligibility Conditions - Different Types of CPF Housing Grants Applicable (If eligible) - Penthouse Units on 15th Storey comes With High Ceiling at Living/ Dining Area (Terms & Conditions applies for High Ceiling) - Rare EC in a matured estate and near to city. - Free Shuttle Bus Service to nearby MRT station for 15 months upon TOP. (Operational timing and drop off MRT station is not finalized at this moment and it is subjected to Developer’s discretion.) - SMART home features with Wireless SMART home system • 1 no. SMART home centre lite • 1 no. IP camera • 1 no. Lighting control and 1 no. Air-con control (to be installed in Living/Dining or any other location specified by the developer) • 1 no. Zwave module for digital lockset control for all units. • 1 no. Digital Lockset for main entrance (to be installed in Living/Dining or any other location specified by the developer)

The above features can be controlled remotely via an app, provided the Home owner has subscribed to their own internet services. - SMART living concept that allows booking of condominium facilities, online payment of maintenance fees, arrange for home cleaning services, parties all via an app. - Unique layout with kitchen connected to balconies (promotes a different lifestyle)

Page 2/8 For internal circulation only, information accurate at time of print –9 June 2017

- All units have north-south orientation that maximize natural ventilation and no west sun - Facilities for all ages and generation (Fitness station, wellness pool, ample kids facilities) - Ample Bicycle parking lots and bicycle wash - Connectivity MRT Stations (5 mins drive) • Hougang MRT station • Buangkok MRT station • Kovan MRT station • Serangoon MRT station Bus Interchange (5 mins drive) • Serangoon bus interchange • Kovan bus interchange - Education Within 1km • Rosyth School • Hougang Primary School & Secondary School • Xinmin Primary School & Secondary School • Bowen Secondary School Within 2km • Punggol Primary School • Yio Chu Kang Primary School • Holy Innocents’ Primary School • Zhonghua Primary School • Peicai Secondary School • Montfort Junior & Secondary School • Serangoon Junior College Preschools • Pat’s Schoolhouse • Mindchamps • Whiz Kids • Montessori • PCF Sparklelots Preschool • My FirstSkool • Discovery Planet Ltd Partnership • Eshkol Valley Preschool • Little Footprints Preschool • Lucas Children Academy

Page 3/8 For internal circulation only, information accurate at time of print –9 June 2017

Ceiling Height Schedule Ceiling Height (m) Room Floor to underside of Floor to underside of Slab False Ceiling Type C1-G, C1, C2-G, C2, C3-G, C3, C4-G, C4, C5-G, C5, C6-G, C6, C7-G, C7,C8-G, C8, C9-G, C9 Type D1-G, D1, D2-G, D2 Type E1-G, E1 Living & Dining 2.7 - Entrance Foyer (where applicable) - 2.5 Master Bedroom 2.7 - Junior Suite (where applicable) 2.7 - Bedroom 2/3/4 (where applicable) 2.7 - Kitchen - 2.4 Master Bath / Junior Bath/ Bath 2 (where - 2.4 applicable) Hallway - 2.5 Balcony 2.7 - Balcony (lower/higher) (Change in ceiling height for units #14-02, 2.8 / 3.4 - #14-13, #14-19, #14-24 & #14-35) Study (where applicable) 2.7 - Utility (where applicable) 2.7 - Yard 2.7 - WC (where applicable) - 2.3 PES (where applicable) 2.7 - DB - 2.4 AC ledge 2.7 -

Type C1-PH, C2-PH, C3-PH, C4-PH, C5-PH, C6-PH, C8-PH Living 4.0 - Dining 2.7 - Living & Dining (for units #15-25, #15-26, #15-29 4.0 - & #15-30 only) Entrance Foyer (where applicable) - 2.5 Master Bedroom 2.7 - Bedroom 2/3 (where applicable) 2.7 - Kitchen - 2.4 Master Bath / Bath 2 (where applicable) - 2.4 Hallway - 2.5 Balcony 3.5 - Study (where applicable) 2.7 - Utility (where applicable) 2.7 - Yard 2.7 - WC (where applicable) - 2.3 DB - 2.4 AC ledge 2.7 - Type C7-PH, C9-PH, D1-PH, D2-PH, E1-PH Living 4.0 - Dining 2.7 -

Page 4/8 For internal circulation only, information accurate at time of print –9 June 2017

Entrance Foyer - 2.5 Master Bedroom 2.7 - Junior Suite (where applicable) 2.7 - Bedroom 2/3/4 (where applicable) 2.7 - Kitchen - 2.4 Master Bath / Junior Bath/ Bath 2 (where - 2.4 applicable) Hallway - 2.5 Balcony (lower/higher) (Change in ceiling height for units #15-04, 2.8 / 3.5 - #15-05, #15-07, #15-10, #15-12 & #15-15) Balcony (Living & Bedroom 4) (for units #15-03, #15-08, #15-11 3.5 - & #15-16 only) Balcony (Master Bedroom) (for units #15-03, #15-08, #15-11 2.8 - & #15-16 only) Study (where applicable) 2.7 - Utility (where applicable) 2.7 - Yard 2.7 - WC (where applicable) - 2.3 DB - 2.4 AC ledge 2.7 -

Page 5/8 For internal circulation only, information accurate at time of print –9 June 2017

Floor finishes Entrance Foyer, Living, Dining, :Tiles with skirting Hallway, Yard, Balcony and Utility Kitchen, Bathroom, WC and :Tiles DB, PES Bedroom and Study :Vinyl flooring with skirting Unit Provision Cooker hood, hob and built-in oven – Elba Air-con – Mitsubishi Shower head and mixer – Grohe Kitchen Sink – Monic Kitchen tap – Grohe Sanitary wares –Duravit (wall hung Water Closet and Wash Basin to Master Bathroom and Common Bathroom only) Rain Shower (For Type E1-G, E1 & E1-PH) – Grohe (Disclaimer: Brand and model subjected to changes) Master Bath (For all unit types except E1-G, E1 & E1-PH) - 1 shower cubicle with shower mixer and hand shower set - 1 basin with mixer tap and cabinet - 1 water closet - 1 mirror with cabinet - 1 toilet paper holder - 1 bib tap - 1 towel rail Master Bath (For types E1-G, E1 & E1-PH) - 1 shower cubicle with shower mixer and hand shower set - 1 basin with mixer tap and cabinet - 1 water closet - 1 mirror with cabinet - 1 toilet paper holder - 1 bib tap - 1 towel rail - 1 Overhead Rain Shower Bath 2, Bath 3* & Junior Bath* (*where applicable) - 1 shower cubicle with shower mixer and hand shower set - 1 basin with mixer tap and cabinet - 1 water closet - 1 mirror with cabinet - 1 toilet paper holder - 1 bib tap - 1 towel rail WC (where applicable) - 2 way tap with hand shower set - 1 basin with tap - 1 water closet - 1 mirror - 1 toilet paper holder - 1 bib tape to washing machine area

Page 6/8 For internal circulation only, information accurate at time of print –9 June 2017

FACILITIES a. Arrival Plaza b. Resident’s Side Gate c. Guard House d. Entrance Reflective Pool with Palms e. Welcome Plaza f. Tier Planters and Seatwalls g. Water Cascades and Grand Steps h. Palms Clubhouse with h1. Media Room (1st storey) h2. Steam Room (1st storey) h3. Male & Female Changing Room (1st storey) h4. Function Room (1st storey) h5. Gymnasium (2nd storey) h6. Star Gazing Deck (2nd storey) i. 50m Lap Pool (approximately 500 sqm) j. Sunning Lawn k. Cabana Deck l. Palm Deck m. Jacuzzi n. Wellness Pool o. Meditation Deck p. Aqua Gym Pool q. Family Pool r. Picnic Lawn s. Hedges Garden t. Kid’s Party Room u. Bubbles Pool v. Teppanyaki Deck w. Lounger Deck x. Lazy River y. Kid’s Waterplay z. Kid’s Pool (approximately 70 sqm) aa. Kid’s Playhouse bb. Fitness Area cc. Kid’s Playground dd. BBQ Deck ee. Multi-Purpose Recreational Court (approximately 485 sqm) ff. Outdoor Shower gg. Rain Gardens hh. Yoga Deck ii. Pet’s Corner jj. Reflexology Path kk. Rain Garden Pavilion ll. Timber Boardwalk mm. Bicycle Parking Area (1st storey) nn. Bicycle Wash Area (1st storey) oo. Green Fingers Corners

Page 7/8 For internal circulation only, information accurate at time of print –9 June 2017

Other facilities 1. Managing Agent Office (1st storey) 2. Main Distribution Frame Room (1st storey) 3. Electrical Substation 4. Bin Centre 5. Generator Set

BEDROOM TYPE SHARE UNIT TYPE VALUE Estimated Maintenance Fund C1 – C8 (inclusive of Ground floor and 3-Bedroom 6 $340 PH) C9, D1, D2, E1 3-Bedroom, 4-Bedroom, (inclusive of Ground floor and 7 $385 5-Bedroom PH)

Consultants Architect Consortium 168 Architects Pte Ltd Main Contractor Straits Construction Singapore Pte Ltd Structural Engineer BC Koh & Partners M&E Consultants Rankine & Hill (S) Pte Ltd Landscape Architect Sitetectonix Project Interior Designer Expression Galleries Pte Ltd Showflat Interior Designer 2nd Edition Pte Ltd Marketing Agent Huttons & ERA KT Tan 98577 618 (Huttons) Bryan Tian 88282020 (ERA) Solicitor Rajah & Tann

Contact Details Sales Gallery Opens Opens 28 June 2017 (Wed) E-application period 28 Jun – 10 Jul Mode of sale Walk in Selection Sales Gallery Location At the junction of Hougang Ave 2 and Yio Chu Kang Road, infront of Yio Chu Kang Chapel Booking day 15 Jul 2017 (Sat) Tel no. 6913 8650 Fax no. 6913 8720 Website Address http://www.hundredpalmsresidences.com.sg/ Email Enquiry [email protected] Opening Hours 11am - 7pm

Page 8/8 For internal circulation only, information accurate at time of print –9 June 2017