LIVERPOOL RESIDENTIAL DEVELOPMENT UPDATE

November 2019

Foreword

After many decades of decline, ’s population began to grow after 2011 and by 2018 had done so by 6.3%. This growth outperformed both the National UK rate (5.0%) and the (3.0%). In 2018 our city’s population stood at 494,000, and by the end of 2020 it is expected to exceed 500,000. A growing population needs more homes, and – for us – the task is to ensure that enough homes are built in the coming years to match that growth. Based on our current estimates, we need to develop over 30,000 new homes by 2030.

Source: 2018 Mid-Year Population Estimates, Offic e for National Statistics. June 2019 Office of the Chief Executive, Policy, Intelligence and Performance Division

Since I became Mayor in April 2012, over 12,500 homes have been built by both the public and private sectors. Some 6,709 of these were under the Housing Delivery Plan (which I originally set with a target of 5,000); and – more importantly – 3,140 of these (47%) were “affordable”, having been made available at social/affordable rent, as part of shared ownership schemes, or at market rent. On page 55 of this document you can see a breakdown of our achievements in this goal, and I am committed to pushing forward our agenda to continue to build yet more, including the type of homes that our citizens want that meet their diverse needs.

As you can see in this document, the number of homes being built with public sector support is continuing and this council will be working with our development partners to bring yet more affordable homes to the city over the coming years. We will also be doing more to encourage reductions in carbon emissions from the homes that we and the private sector builds.

COVER PHOTOS CLOCKWISE FROM TOP LEFT: ON As Liverpool and its economy grows, we are now attracting SITE – “PARLIAMENT SQUARE, GREAT GEORGE more and better paid jobs in our offices, digital/media industries, STREET; ON SITE – “18 LIVINGSTONE”, LIVINGSTONE and technology development sectors. People with better paid DRIVE; COMPLETED – ; jobs aspire to moving up the housing ladder, so we also COMPLETED – “HARRINGTON ROW”, PARK STREET. welcome higher quality and more spacious executive style housing to the mix our city can offer.

I hope that the data included in the following schedules will be useful to individuals and organisations involved in regeneration.

Joe Anderson, OBE Mayor of Liverpool

Contents

Executive Summary 1

City Centre: Residential Accommodation 3

City Centre: Student Accommodation 15

Neighbourhoods: Public Sector Assisted Schemes 21

Neighbourhoods: Liverpool Foundation Homes Ltd 29

Neighbourhoods: Refurbishment & Empty Homes 33

Neighbourhoods: Private Sector 35

Neighbourhoods: Student Accommodation 51

Affordability: Helping residents to buy their 55 first home, and giving tenants more choice

DISCLAIMER: All information provided in this document is correct as known at the time of publication based on information provided by developers, architects and agents. cannot be held responsible for alterations to completion due dates, values or other where such occur for reasons beyond our control.

3 RESIDENTIAL DEVELOPMENT UPDATE //

ON SITE: “KINGS DOCK MILL – PHASE 2”, BALTIC CREATIVE, CITY 2019 has been yet another year which seen CENTRE the pace of home-building across the city pick up. Both the City Centre and Neighbourhoods have seen several large scale residential and student schemes completed but also new ones start. Over 1,600 new residential homes have been completed across the city since January 2019, whilst a further 7,729 are currently on site with a total value of £1.4 billion. Over 3,600 student bedspaces have been provided, and 2,659 are under construction.

Meanwhile, fresh applications continue to come in from both public and private sector developers. Over 14,600 homes are either seeking permission or have already been granted and are awaiting start. This is almost double the number reported in this document in October 2018, and illustrates the interest that exists as developers find sites and put proposals forward, as well as demonstrating the increased volume of applications which our Planning Department is currently handling.

Key new investment hotspots are emerging, with the Pumpfields and Baltic Creative areas of the City Centre attracting interest for residential ; the Fabric District has already claimed the no. 1 spot for student living schemes. Meanwhile, in the Neighbourhoods, investors are looking at and wards, but also at refurbishing the Victorian of South Liverpool in the Princes Park and St Michael’s wards.

Liverpool Foundation Homes Ltd are the “new kids on the block”, with their first scheme completed and more either on site or coming forward as proposals.

NEW HOMES (Non-student) 1,676 COMPLETED since January EXECUTIVE 2019 (City-wide) Estimated total development £240m SUMMARY value of the above schemes NEW HOMES CURRENTLY ON 7,729 ACTIVE DEVELOPMENTS (City- wide)

Estimated total development £1.4bn value of the above schemes

STUDENT ROOMS/BEDSPACES 3,606 COMPLETED since January 2019 (City-wide)

Estimated total development £217m value of the above

STUDENT ROOMS/BEDSPACES 2,659 CURRENTLY ON SITE (City-wide)

Estimated total development £130m value of the above schemes

RESIDENTIAL DEVELOPMENT UPDATE // 1

LIVERPOOL’S HOUSING REQUIREMENTS FOR FUTURE YEARS IDENTIFIED IN LOCAL PLAN

All local planning authorities are required to prepare a 2020. The majority of this need will be met by planning Local Plan to guide the long term, strategic spatial permissions for new homes, with the Local Plan allocating a development of their area. The Liverpool Local Plan range of sites across the City to accommodate 2,320 new provides a long-term spatial vision, strategic priorities and homes. These allocated sites include: policies for future development in the city over the next 15 to 20 years, specifically with regard to the quantity and • Land at University Hospital, Longmoor Lane, location of new homes, employment provision, shops, L10 - 180 dwellings facilities and other services, transport and other • Former Fruit and Vegetable Market infrastructure provision, climate change mitigation and Road – 150 dwellings adaption and the conservation and enhancement of the • Land at Former Spekeland Road Sidings -330 natural and historic environment. The Local Plan will soon dwellings be endorsed and will replace the outdated Unitary • North of Dock Road, Garston, – 775 Development Plan which currently guides development dwellings activity in Liverpool. • Land At Banks Road, Garston, -Garston - 305 Going forward, the City Council through its emerging Local dwellings Plan is seeking to ensure the delivery of new homes across the City to meet Liverpool’s future housing needs, and In addition to ensuring the provision of enough new homes, contribute to social and economic regeneration, through the City Council – through the Local Plan – is also seeking to prioritising brownfield sites in sustainable locations. A key ensure that specific needs are met including for families, objective is also to ensure that the City’s existing residential young people and older people; and that new homes are neighbourhoods are vibrant, sustainable and attractive accessible and of a high quality design. Work undertaken places to live. on behalf of the City Council indicates that the City needs a range of housing types of between 10 and 15% detached Over the next 20 years, Liverpool’s housing requirement is for homes, 25 - 30% semi-detached, 25 - 30% terraced and 30- 34,780 net additional dwellings, which will be met through 35% flat/maisonette dwellings; with a need for 25% - 45% existing planning consents, allocations within the Local Plan comprising two bedrooms, 30% - 50% three bedrooms and and windfall sites. These figures will be subject to scrutiny at 5% - 25% four or more bedrooms. the Local Plan Examination, due to take place in Spring

MOVING TO LOW CARBON HOUSING

Around a quarter of the UK’s current carbon emissions In July 2019 a cross party Liverpool City Council motion comes from our homes. These are primarily from direct use established a target across the city of a net zero carbon of fossil fuels – mostly natural gas – which are burned for target for 2030 and our homes have a large part to play in heating, hot water and cooking, and as a result of helping the city reach this target. generating the electricity needed to meet domestic demand. Improving the quality of our housing and its The amount of energy required to heat and power new heating and insulation methods will enable us to meet the homes and non-domestic buildings is now lower today than UK’s international and domestic obligations to reduce ever before. There are still, however, many opportunities for emissions. further progress, particularly as low carbon technologies improve and costs reduce. We are already starting to see The Government has published policy proposals for Part L “all-electric” developments utilising heat pumps, whilst and Part F of Building Regulations, to come into force in modular buildings will increase the speed at which we can 2020. For 2020, the proposals being consulted upon include construct. A larger proportion of new homes will uplifts on Part L 2013, which would result in either a 20% or incorporate smart technologies, such as battery storage, 31% reduction in emissions from new build homes, with a Electric Vehicle Charging, Demand Side Response, LED noted Government preference for the latter. lighting/controls and smart thermostats. All of these have great potential to disrupt the way we currently waste It has also published outline proposals and transitional energy in buildings. arrangements for the Future Homes Standard in 2025. The Government has indicated that the new standard will It is not just energy efficiency of buildings that is influential represent around a 75-80% reduction in emissions for new construction. Local policy can influence other areas compared to Part L 2013, with further details to be that are relevant to the energy strategy – such as transport developed through the convening of a Future Homes infrastructure, development design, location and industry taskforce to be established next year. accessibility.

RESIDENTIAL DEVELOPMENT UPDATE // 2

SECTION 1 CITY CENTRE SEES INCREASINGLY LARGER RESIDENTIAL SCHEMES COMMENCING

Since the start of this year, the City Centre has seen CITY CENTRE several large volume residential schemes start and which are set to deliver an unprecedented volume of accommodation in the coming years. Amongst RESIDENTIAL the largest schemes to go on site since January this year are “Infinity”, (1,002 units); “Parliament Square” (505 units), “Fabric Village” (449 units; “The Tannery” ACCOMMODATION (381 units); and “One Baltic Square”, (296 units) amongst others.

982 units have been completed this year so far, already outstripping previous years’ volumes; whilst the larger schemes referred to above will guarantee that unit numbers completed in the next few years will remain high. Some 4,792 units are currently on Number of new City Centre homes site, whilst there is also a growing pool of new completed since January 2019 schemes announced which have the potential to 982 * does not include homes or phases completed on deliver over 9,400 more homes. unfinished schemes that are still on site

Number of non-student residential units completed or on site in

Number of City Centre homes on since 2013 active developments to be 4,792 1600 1,885 completed Residential units completed Residential units on site 1400

1,555 437 1200 Number of potential new City Centre homes either announced, seeking or 1000 9,467 with planning permission, but not

982

800 yet started on site 907

845 844

600

400

200

262

198

9

1 0 114

3 4

5

2

17 18 16

20 20

20 2020

201 201

2019

201

2021 201 Year

1101

Larger volume schemes continue coming in for approval. Amongst the crop of proposed developments which have come forward this year are 646 apartments at land to the west of Waterloo Dock as part of Liverpool Waters; two phases totalling 395 apartments at Naylor Street in Pumpfields; and 134 apartments at Paul Street/Oriel Street also in Pumpfields. With “Inifinity” and “The Tannery” already on site there,

ON SITE SINCE SEPTEMBER 2019: LEGACIE DEVELOPMENTS’ “PARLIAMENT SQUARE” Pumpfields is emerging as the major new residential hot-spot in the City Centre. Along with the 1,383 units

already on site, the number of units proposed either with or seeking approval, or otherwise in the pipeline with the Pumpfields zone stands at over 4,300.

RESIDENTIAL DEVELOPMENT UPDATE // 3

CITY CENTRE: RESIDENTIAL ACCOMMODATION

C65 C66 LIVERPOOL C63 C64 PUMPFIELDS C61 B26 WATERS C62 C60 C51 (Waterloo- C56 C57 C59 Princes) C58 B25 C52 C19 MARYBONE C55 C35 B21 COMMERCIALC16 C53 B22 C31 C36 DISTRICT C54 KNOWLEDGE QUARTER: B23 C32 KNOWLEDGE B10 B13 FABRIC DISTRICT B24 C17 B12 ST GEORGE’S C37 QUARTER: B14 QUARTER C76 A6 HEALTH CAMPUS B11 C30 C18 HISTORIC C77 DOWNTOWN

A5 C23 C21 KNOWLEDGE B15 B16 C20 A10 C22 KNOWLEDGE QUARTER KNOWLEDGE C24 B17 B18 C67 QUARTER:C33 UPPER QUARTER: C26 C68 PADDINGTON B19 C25 C27 C34 VILLAGE MAIN RETAIL C69 C28 C29 B20 C38 AREA C70 B27 C71 C75 A7 KNOWLEDGE A11 ROPEWALKS B30 B28 C39 C40 QUARTER: A12 B29 C41 C74 C72 HOPE STREET C42 A8 C1 A13 C43 C73 A9 C2 C44 CANNING C45 C48 C13 C46 C49 GEORGIAN B2 B9 C50 A4 QUARTER B1 C14 C47 CHINATOWN B3 C4 C15 C7 C3 B4 C12 B5 C6 A3 STRAND C5 BALTIC C8 C9 WATERFRONT CREATIVE B6 Residential scheme completed since November 2018 C79 A2 A1 B7 C10 C80 Residential scheme under construction C11 B8 Residential scheme proposed

City Centre Residential

Schemes

C78 Crown copyright and database rights 2019 Ordnance Survey 100018351

RESIDENTIAL DEVELOPMENT UPDATE // 4

CITY CENTRE: RESIDENTIAL ACCOMMODATION

SCHEME: “The Tower at X1 The Quarter, Sefton Street SCHEME: ”Percy Place”, 40-50 Percy Street DEVELOPER: X1 Developments Ltd DEVELOPER: The Elliott Group COST: £26.7 million COST: £3.2 million UNITS: 196 apartments UNITS: 18 (6 townhouses and 12 apartments) STATUS: Completed February 2019 STATUS: Completed September 2019

SCHEME: “One Wolstenholme Square”, Ropewalks SCHEME: “Chavasse Building”, Lydia Ann Street DEVELOPER: Wolstenholme Square Developments Limited DEVELOPER: Living Projects COST: £40 million COST: £4.5 million UNITS: 469 apartments UNITS: 47 apartments STATUS: Completed July 2019 STATUS: Completed July 2019

SCHEME: “Kings Dock Mill – Phase 2”, Hurst Street SCHEME: “One Baltic Square”, Grafton Street/Hill Street DEVELOPER: YPG Developments Ltd DEVELOPER: YPG Developments Ltd COST: £15 million COST: £12 million UNITS: 204 apartments UNITS: 296 apartments STATUS: On site for completion Spring 2020 STATUS: On site for completion December 2020

RESIDENTIAL DEVELOPMENT UPDATE // 5

CITY CENTRE: RESIDENTIAL ACCOMMODATION

Schemes Completed since November 2018 (Total: 1,083 units)

Key Address Developer Description No of Date of units Completion Zone: BALTIC A1 “The Tower” at X1 The X1 Developments To erect 25 building containing 196 196 February 2019 Quarter, Sefton Street/ Ltd residential apartments Parliament Street A2 “Parliament Residence – Asset Corp To redevelop site to provide 56 residential PRS 56 November 2018 Phase 1”, 32-34 apartments Parliament Street Zone: CANNING GEORGIAN QUARTER A3 “Percy Place”, 40-50 The Elliott Group Conversion of existing flats to 6 townhouses and 18 September 2019 Percy Street 12 x 1 bedroom apartments. A4 73 Canning Street Robert & Patricia To sub divide vacant town house to form two self- 2 November 2018 Wilson contained dwellings Zone: HISTORIC DOWNTOWN A4 Reliance House, 20 Legacie Conversion to 139 apartments 139 Completed Water Street Developments January 2019 A5 81 Princes Building, LAAB Properties Conversion to 41 apartments 41 November 2018 & 11-13 Cheapside Zone: KNOWLEDGE QUARTER: HOPE STREET A6 “Ropemaker Place”, 89- Citylife To erect 8 storey building with 74 residential units 74 July 2019 99 Renshaw Street Developments Ltd and ground floor retail/office uses A7 70 Rodney Street Not disclosed Conversion from office to dwelling house 1 December 2018 A8 72 Rodney Street Rodney Street Ltd Conversion of existing outbuilding to house 1 December 2018 Zone: MAIN RETAIL AREA A9 42-44 Stanley Street The Flanagan Group Conversion of first to fourth floors from offices to 20 September 2019 20 x 1 bed apartments. Zone: ROPEWALKS A10 “One Wolstenholme Wolstenholme Mixed use development of four blocks between 3 469 July 2019 Square ”, 5 Parr Street & Square and 10 storeys, with commercial units and studio Wolstenholme Square Developments apartments on upper floors; and conversion of Limited existing warehouse to commercial uses and studio apartments above. A11 3-5 York Street Living Brick Conversion and extension to 17 x 1 bed 19 April 2019 apartments and 2 penthouses A12 “Chavasse Building”, Living Brick Projects To erect 7 storey block with 47 apartments, 47 July 2019 Former Council Depot ground floor retail and parking Site, Lydia Ann Street

Schemes On Site (Total: 4,792 units) Key Address Developer Description No of Estimated units Completion Zone: BALTIC CREATIVE B1 “Kings Dock Mill: Phase 2”, YPG Develop- To erect 11/12 storey block containing 204 204 Spring 2020 land at Hurst Street ments Limited apartments B2 “Art Apartments”, Vacant Baltic Cool Limited To erect 10/11 storey residential block 55 April 2020 land at Tabley Street to provide 55 apartments. B3 Land bounded by Blundell Ingenious Tribe To erect 2 blocks of 7-9 storeys creating 200 200 September 2020 Street, Kitchen Street and (Blundell Street) apartments, ground floor commercial floorspace Simpson Street Development Ltd and basement car parking. B4 “The Baldocks”, HUP (BALTIC) To convert vacant warehouse into 5 town houses, 9 December 2019 Bridgewater Street/ erect 4 x 4 storey town houses with basement car Watkinson Street parking and commercial unit. B5 “Baltic View”, Norfolk Exclusive To erect part 11 part 9 storey building comprising 129 Summer 2020 Street /Brick Street Investment 3 129 apartments with some ground and first floor creative workshop space. B6 “Parliament Square”, Legacie To erect mixed use development over four 505 Autumn 2021 Greenland Street, Developments buildings (8 to 18 storeys) comprising 505 Parliament Street, Great apartments, spa and facilities, 12 commercial George Street, Newhall units and car parking Street and St James Street B7 “Parliament Residence – Asset Corp To erect a part 8/part 11 storey building with 145 145 April 2020 Phase 2”, 12-30 Parliament PRS apartments and ground floor commercial Street unit B8 “One Baltic Square”, YPG Develop- To erect between 4 and 9 storeys containing 296 296 December 2020 Grafton Street, Hill Street & ments Limited apartments with ground floor commercial units Brassey Street

RESIDENTIAL DEVELOPMENT UPDATE // 6

CITY CENTRE: RESIDENTIAL ACCOMMODATION

CITY CENTRE: RESIDENTIAL ACCOMMODATION

Schemes on site continued Key Address Developer Description No of Estimated units Completion Zone: CHINATOWN B9 “Eight by Illiad”, Grenville Iliad Cosgrove Ltd To replace former community building with 2 blocks 120 (not Scheme stalled Street/Upper Pitt Street (max 7 storey) of 120 apartments, ground floor included when contractor commercial and community uses. in total) liquidated. Completion delayed Zone: COMMERCIAL DISTRICT B10 60 Old Hall Street Signature Living Conversion to 155 apartments for private sale 155 Spring 2020 B11 Silkhouse Court, Tithebarn Fortis Conversion to 193 apartments 193 December 2019 Street Zone: HISTORIC DOWNTOWN B12 Kingsway House, Hatton Signature Living Conversion from offices to 76 x 1 and 3 bedroom 76 March 2020 Garden apartments B13 14 Cheapside GMD Investments Conversion of two unused commercial units on 6 Spring 2020 Ltd mezzanine floor to 6 x 1 and 2 bedroom apartments. B14 33-35 Cheapside Mr Ali Conversion of office building to create 2 x 5 2 (HMOs) August 2019 bedroom HMO's over three floors and two storey extension to the rear. B15 “The Residence”, 8 Water Prospect Capital Rooftop extension to add 27 more apartments 27 December 2020 Street B16 7 Water Street Aqua Commercial Conversion of upper floors to 10 apartments 10 November 2019 Ltd B17 Existing car park, Drury CRC To erect building 8-11 storeys to provide 125 'co- 125 Summer 2021 Lane and Brunswick Street living' residential units with associated communal facilities (kitchen/dining/lounge/laundry/gym/ cinema) together with associated cycle storage and ground floor commercial unit B18 44 Castle Street JSM Company Conversion of offices to 8 apartments 8 December 2019 Group B19 “Strand Plaza”, The Strand Primesite Conversion of offices to 138 apartments 138 December 2019 Developments B20 Strand House, 21 Strand Patten Properties Replacement 16/19 storey mixed use development 383 for PRS August 2020 Street and Panacea comprising 383 apartments with residents gym, rent Property cinema, roof ), and two ground floor Development commercial units Zone: KNOWLEDGE QUARTER: FABRIC DISTRICT B21 “Fabric Village”, Gildart YPG To erect three residential blocks between 7 and 10 449 March 2021 Street/ Devon Street Developments storeys high comprising 449 residential apartments Limited with ground floor retail. B22 48-50 Stafford Street Mr Chu To erect four storey extension to the rear, change 9 Spring 2020 use of ground floor to restaurant/bar and separate shop and 9 residential units to first, second and third floors. Zone: LIVERPOOL WATERS: WATERLOO-PRINCES B23 “Plaza 1821”, William Peel/The Regenda New tower with 105 one and two-bedroom PRS 105 June 2020 Jessop Way Group apartments and ground floor commercial B24 “The Lexington”, William Moda Living 34 storey residential block with 304 PRS apartments 304 September 2020 Jessop Way Zone: PUMPFIELDS B25 “Infinity”, Street/Pall The Elliot Group Three towers of 39, 33 and 27 floors to include 1,002 1,002 November 2022 Mall apartments B26 “The Tannery”, Bevington NR Scorpio LLP To demolish existing buildings and erect 3 new 381 June 2021 Bush/ Gardners Row/ buildings (7, 9 & 15 storey) for 381 residential Edgar Street apartments Zone: ROPEWALKS B27 “The Address at One Wolstenholme 11 storey block with 200 luxury apartments, spa, 200 June 2020 Wolstenholme Square”, 18- Square pool and ground floor commercial space 24 Seel Street Developments Ltd B28 65 Duke Street/14 Lady Mia Ltd To replace existing buildings with a 3 to 7 storey 69 December 2019 Wolstenholme Square building with 69 apartments with retail at ground floor. B29 84-86 Seel Street Mr Gleeson To demolish existing garage and erect new 4 Winter 2019 bar/restaurant with 4 studio apartments above B30 101-103 Bold Street Dr A Sahab Conversion of basement and ground floor from 6 October 2019 offices to café/restaurant, and extension to rear to provide 2 x 2 and 4 x 1 bed apartments on upper floors.

RESIDENTIAL DEVELOPMENT UPDATE // 7

CITY CENTRE: RESIDENTIAL ACCOMMODATION

SCHEME: “Parliament Residence – Phases 1 & 2”, Parliament Street SCHEME: Strand House, 21 Strand Street DEVELOPER: Asset Corp DEVELOPER: Patten Properties and Panacea Property Development COST: £38 million COST: £86 million UNITS: 201 apartments over 2 phases UNITS: 395 PRS apartments STATUS: On site for completion April 2020 STATUS: On site for completion August 2020

SCHEME: ”Strand Plaza”, The Strand SCHEME: “Infinity”, Leeds Street/Pall Mall DEVELOPER: Jupiter Investments Ltd DEVELOPER: The Elliot Group COST: £6 million COST: £250 million UNITS: 122 apartments (10 x 3 beds, 56 x 2 beds, 56 x 1 bed) UNITS: 1,002 apartments (63 x 3 bed apartments, 457 x 2 beds, 163 x 1 STATUS: On site for completion December 2019 beds and 232 studios) STATUS: On site for phased completion from 2021/2022

SCHEME: “Plaza 1821”, William Jessop way, Princes Dock/Liverpool SCHEME: ”Fabric Village”, Gildart Street/Devon Street Waters DEVELOPER: YPG Developments Limited DEVELOPERS: Peel/The Regenda Group COST: £53 million COST: £21 million UNITS: 449 UNITS: 105 PRS apartments STATUS: On site for completion Summer 2021 STATUS: On site for completion September 2020

RESIDENTIAL DEVELOPMENT UPDATE // 8

CITY CENTRE: RESIDENTIAL ACCOMMODATION

CITY CENTRE: RESIDENTIAL ACCOMMODATION

Anticipated Schemes (Total: 9,467 units) Note: The granting of planning permission does not guarantee that a particular scheme will actually be built Key Address Developer Description No of Comments (status) units Zone: BALTIC CREATIVE

C1 “One Park Lane”, Land One Park Lane To erect two buildings of up to 9 and 16 storeys, 90 Permission regranted bounded by Park Lane, Limited comprising 90 apartments, 260 hotel rooms with January 2018. Revised Pownall Street, Liver Street ancillary restaurant, gym and business centre, and application 19F/2441 and Beckwith Street a commercial. submitted September 2019.

C2 “Baltic Square”, Park Lane, Inhabit Conversion of existing Mill into 138 residential 138 Permission granted Beckwith Street, apartments; and to redevelop land around it with private December 2017 Carpenters Row and three blocks, 10, 11 and 14 storeys, to provide 194 and 194 Cornhill (former Heap's residential apartments, 200 serviced apartments) for PRS Rice Mill) and, ground floor commercial rent

C3 66-68 Kitchen Street Waterfront Conversion/extension of fourth floor to create new 16 Permission granted Holdings restaurant/cafe; and outline application to erect 4 September 2019 storeys of 16 flats above warehouse.

C4 35 Bridgewater Street Eloquent Conversion of ground floor to leisure/ commercial 43 Application 17F/2758 Yinyang Building uses, and three upper floors to 19 apartments. 4 awaiting signing of Limited storey rooftop extension to form 16 additional legal agreement since apartments. June 2018

C5 Land between Norfolk LPS Real Estate To erect a part ten, nine and seven storey building, 56 Application 18F/2835 Street and Brick Street to provide 56 self-contained apartments and awaiting signing of ground floor commercial/retail legal agreement since June 2019

C6 Jamaica Street and land Baltic House To replace existing structures with 9 storey building 89 Application 16F/0809 between Norfolk Street Developments containing 89 studio apartments, 8 ground floor submitted April 2016 and Brick Street Limited commercial units; and conversion of 43 Jamaica Street to self-contained offices.

C7 “Baltic Tower”, Land The Elliot Group To erect 15 storey mixed used development 50 Permission granted between Norfolk Street, comprising 306 bed hotel, 50 residential apartments May 2018 Watkinson Street with gym, spa, restaurant, conferencing/ banqueting facilities, entrepreneurial hub, sky lounge, basement parking.

C8 Former Bogans Carpets, Miami Ltd To erect 10 storey block creating 202 apartments 202 Application 16F/2922 New Bird Street ground floor commercial space and parking resubmitted May 2018

C9 “St James Court”, Site Hillmore To erect part 11/part 12 storey block containing 217 217 Application 17F/3527 bounded by Greenland Developments apartments with two ground floor commercial units submitted December Street/New Bird Street and Limited (alternative scheme to 15F/2835). 2017 St James Court

C10 Cains Brewery Village, Cains Brewery New tourism, leisure and retail destination including 450 Permission granted Stanhope Street four screen cinema, food store, food market, hotel, March 2014. Food restaurants, spa, gym, function rooms, 400 space market completed car park and 450 flats. Summer 2017.

C11 Land east of Brassey Street Eloquent Global To erect a part 8/part 9 storey building comprising 174 Permission granted Limited 174 apartments, with 96 parking spaces June 2018 Zone: CANNING GEORGIAN QUARTER

C12 109-109A Upper Parliament Liverpool Conversion to 9 self-contained apartments 9 Permission granted Street Housing Trust February 2017

C13 Liverpool Community New 5 to 6 storey building with 106 apartments, and 106 Application 19F/2515 Probation Centre, 180 Developments a 6 storey building with 63 student bedspaces submitted October Falkner Street 2019 Zone: CHINATOWN

C14 “The Address”, 8 Upper Pitt HDCO EPL1 To erect 7 storey building containing 46 x studios + 2 48 Permission granted Street Limited x 1 bedroom apartments with residents’ gym March 2018

C15 Great George Street Great George To demolish existing structures and erect a mixed 503 Outline permission Project Street use development over 7 buildings comprising 466 granted February 2016 Developments apartments and 37 townhouses, 9,178sqm of to previous developer. commercial space. New application imminent.

RESIDENTIAL DEVELOPMENT UPDATE // 9

CITY CENTRE: RESIDENTIAL ACCOMMODATION

Anticipated Schemes continued Key Address Developer Description No of Comments (status) units Zone: COMMERCIAL DISTRICT

C16 30-36 Pall Mall Anwyl Part 10/part 22 storey tower with 336 apartments 336 for Permission granted July Construction and ground floor commercial units PRS rent 2017

C17 Honeycomb, Edmund Paladium Conversion from offices to 35 residential 35 Application 17PO/2509 Street Group apartments submitted September 2017

C18 5 Fazakerley Street AR2 Conversion of semi-basement to office space, 9 Application 18F/1223 Developments and erect a three storey roof top extension to submitted June 2018 Limited provide 9 apartments

C19 Ovatus 1, 122 Old Hall 122 Old Hall To erect 27 storey residential development with 168 for Permission granted Street Street Limited 168 PRS apartments PRS rent December 2017 Zone: HISTORIC DOWNTOWN

C20 Union House, 19-21 Victoria Pure Manage- To convert office to residential with two storey 9 Permission granted April Street ment Inc rooftop and central circulation core extension. 2018

C21 16 Queens Avenue Madre Holdings Conversion from offices to 15 flats 15 Application 19F/0702 2 Ltd submitted March 2019

C22 19 Castle Street Machett Ltd Conversion from retail/offices to cafeteria with 9 9 Permission granted April self-contained flats on the upper floors. 2017

C23 New Zealand House, 18 The Flanagan Conversion from office to 16 x 1 bed apartments 16 Permission regranted Water Street Group May 2019

C24 Beetham Plaza, 25 The Beetham Plaza Conversion of part of 1st floor to 8 apartments 8 Permission granted July Strand Ltd with ground floor lobby and residents gym and 2019 erection of ground floor commercial unit

C25 Crown House, 10-12 James District & Urban Conversion of office building to 23 x 1 bedroom 23 Permission granted Street apartments October 2017

C26 National Bank Building, 24 Adderstone Conversion of 8th floor of former office/staff 1 Permission granted Fenwick Street Developments accommodation to two bed penthouse January 2017 (103) Ltd

C27 Victoria House, 7-11 James Oakstore Ltd Conversion of office building to 78 apartments 78 Permission granted Street January 2019 Zone: KNOWLEDGE QUARTER

C28 89-91 Mount Pleasant Mr Paul Wilson Conversion from 18 bed hotel to 9 x 1 bedroom 9 Application 19F/0344 apartments submitted February 2019

C29 Land on the corner of JD Estates To erect 9 storey building with 60 residential 60 Application 17F/2249 Pomona Street and Limited apartments above café and auditorium submitted August 2017 Cathedral Walk

C30 12 Pembroke Place Mr Shmulik Conversion from day nursery to 12 bedroom 12 Application 18F/2752 Faruchi house in multiple occupation submitted October 2018 Zone: KNOWLEDGE QUARTER: FABRIC DISTRICT

C31 Bianca House, 80 Devon JD Estates Extension and conversion of existing 19 bed HMO 8 + 1 Permission granted Street/54-56 Stafford Limited to 8 flats and 11 bedroom HMO HMO March 2018 Street (11 beds)

C32 23 Stafford Street Mr Singh Conversion of ground floor and basement to HMO Permission granted May extend existing HMO with 3 additional rooms (3 2017 beds) Zone: KNOWLEDGE QUARTER: UPPER CENTRAL

C33 66 Lime Street Golding Conversion of 1st-3rd floors from office space to 3 Permission granted July 3 apartments with roof top extension. 2018

C34 16-18 Mount Pleasant Mr W Riley Conversion of first and second floors from single HMO (8 Permission granted dwelling to 8 bedroom HMO beds) February 2019 Zone: KNOWLEDGE QUARTER: HEALTH CAMPUS C35 12-14 Moss Street Everbright To erect eight storey building for 42 studio 42 Application 18F/1989 Developments apartments and ground floor commercial submitted July 2018 Limited business use C36 19-21 Prescot Street Mr Norman To erect 4 storey apartment block, consisting of 6 Permission granted April Cowley 6 apartments. 2018 C37 194 Road BPL Conversion of first and second floors from 6 Permission granted offices to 6 x 2 bed apartments November 2017

RESIDENTIAL DEVELOPMENT UPDATE // 10

CITY CENTRE: RESIDENTIAL ACCOMMODATION

SCHEME: Paul Street/Oriel Street SCHEME: ”Naylor Street – Phase 1”, west of St Bartholomew Road, south DEVELOPER: Vauxhall Developments Limited of Paul Street and North of Naylor Street COST: £15 million DEVELOPER: Smith Young Architecture Limited UNITS: 134 apartments COST: £30 million STATUS: Application 18F/0585 resubmitted April 2019 UNITS: 240 apartments amidst water gardens STATUS: Application 18F/1035 resubmitted June 2019

SCHEME: 9-27 Freemasons Row SCHEME: “Bevington Bush”, Bevington Bush/Aldersey Street DEVELOPER: Vinco Group Limited with John and Elaine Sutch DEVELOPER: Bevington Developments Limited COST: £80 million COST: £65 million UNITS: 656 apartments UNITS: 614 apartments STATUS: Permission granted September 2017 STATUS: Permission granted October 2018

SCHEME: Plot C02, Liverpool Waters SCHEME: “Parliament Square”, Greenland Street/Parliament Street DEVELOPER: Romal Capital Limited and Peel Lane & Property DEVELOPER: Legacie Developments (Ports) Limited COST: £90 million COST: £150 million UNITS: 505 apartments UNITS: 646 apartments STATUS: On site for completion Autumn 2021 STATUS: Application 18F/3247 submitted December 2018

RESIDENTIAL DEVELOPMENT UPDATE // 11

CITY CENTRE: RESIDENTIAL ACCOMMODATION

CITY CENTRE: RESIDENTIAL ACCOMMODATION

Anticipated Schemes continued Key Address Developer Description No of Comments (status) units Zone: KNOWLEDGE QUARTER: HOPE STREET

C38 64 Mount Pleasant Mr G Knibb Conversion to create office space to basement 5 Application 19F/2007 & ground floor, and 5 self contained one submitted August 2019 bedroomed apartment to the upper floors

C39 1-3 Leece Street Mr Haralambus To erect 3 storey extension to the front and 2 Application 16F/2357 Michael change single dwelling to 2 x 2 bedroom flats. submitted September 2016

C40 35-37 Leece Street Elite Properties Conversion of upper floors of building to 6 6 Permission granted Liverpool Limited residential apartments. 2018

C41 63 Roscoe Street Mr Tim Cowley To demolish existing vacant garage and 2 Application 18F/1946 construction of a new build garage with 2 no. submitted August 2018 apartments with dormer to rear above

C42 39 Rodney Street Solidum Limited To create 3 bed apartment at basement level 1 Permission granted April 2017

C43 45 Rodney Street The Bear's Den To demolish existing garages fronting Pilgrim 2 Permission granted Street and erect two dwelling houses. October 2016

C44 66 Rodney Street BGH Properties To convert property to 8 residential units (4 x 1 8 Application 18F/0070 Limited and 2 bedroom flats and 4 studios). submitted January 2018

C45 57 Rodney Street RWMC Property Conversion of medical consulting rooms to 2 2 Application 15F/3170 Management dwellings submitted Dec 2015

C46 91 Roscoe Street The Global Property Conversion of outbuilding to dwellinghouse 1 Permission granted June Agency Limited 2017

C47 80 Rodney Street Mr Michael Murphy To convert property and outbuilding to create 11 Permission granted 11 studios/apartments December 2017

C48

C49 37 Hope Street Signature Living To convert to 5 self contained apartments. 5 Permission granted September 2018

C50 10 Back Canning Street Mr Miles Falkingham To convert existing coach house into annexe 1 Permission granted accommodation with external alterations. January 2018

Zone: LIVERPOOL WATERS: WATERLOO-PRINCES

C51 Plot C02, Liverpool Romal Capital To erect residential development comprising 646 Application 18F/3247 Waters Limited and Peel 646 apartments with ground floor commercial submitted December Lane & Property space, in six blocks of between 10 to 14 storeys 2018 (Ports) Limited in height, with single storey concierge pavilion building, associated partial dock infill, access, parking, servicing, soft and hard landscaping/public open space, including two floating timber jetties and dockside walkway.

C52 Site bounded by Hugh Frost c/o To demolish existing building and erect 17- 140 Application 19F/1290 Waterloo Road/ Paisley LBWRL (Beetham storey building comprising 140 residential units submitted May 2019 Street/ Roberts Street/ Rockmount) with associated mezzanine, residents lounge Greenock Street and gym, basement car park, and ground/mezz floor commercial unit.

C53 “NuVu Living”, William NuVu Living To erect 30 storey tower with 276 PRS (private 276 Permission granted Jessop Way, Princes rented sector) apartments and “premium January 2018 Dock (Liverpool Waters) restaurant and bistro facilities”, with 24-hour concierge Zone: MARYBONE

C54 Trueman Court, 21 Alexander Property Conversion from offices to 4 residential 4 Permission granted May Trueman Street Group apartments 2017

C55 55 - 63 Great Crosshall Bridgewater To convert former school building into 9 124 Permission granted Street Services Limited apartments and construction of 6-10 storey December July 2018 building accommodating 115 apartments

RESIDENTIAL DEVELOPMENT UPDATE // 12

CITY CENTRE: RESIDENTIAL ACCOMMODATION

CITY CENTRE: RESIDENTIAL ACCOMMODATION

Anticipated Schemes continued Key Address Developer Description No of Comments (status) units Zone: PUMPFIELDS

C56 “North Point”, 70-90 Pall Replacement Redevelopment with 3 to 18 storey mixed use 507 Scheme stalled. Mall, L3 developer being buildings comprising 507 live/work units studios, Completion unknown. sought 1, 2 & 3 bedroom apartments and duplexes, multi-storey car park, ground floor retail, café/bar, restaurants, spa & commercial offices and first floor gym.

C57 “The Northern Quarter”, Eldonian Projects Redevelopment with 5 blocks from 4 to 12 914 Application 15F/3121 Leeds Street/Vauxhall Limited storeys containing 914 x 1 and 2 bed apart- submitted March 2016 Road/ Pumpfields Road ments, retail/commercial/employment space on ground floors plus 364 car parking spaces.

C58 “The Metalworks”, Acentus Real To demolish buildings and erect two linked 319 Application 18F/0216 Vauxhall Road, Estate blocks (13 and 15 storeys) comprising 319 awaiting signing of Freemason's Row, apartments, ground floor commercial space legal agreement since and parking for 66 cars August 2018

C59 9-27 Freemasons Row Vinco Group To erect 11 to 15 storey interconnected blocks 656 Permission granted Limited with John with commercial space at ground floor and 656 September 2017 and Elaine Sutch PRS apartments above.

C60 “Naylor Street – Phase 1”, Smith Young To erect 3 buildings from 6 to 11 storeys 240 Application 18F/1035 Land to the west of St Architecture containing 240 residential apartments in a mix resubmitted June 2019 Bartholomew Road, Limited of studios, 1 and 2 bedrooms, car parking and south of Paul Street and lower ground/ground floor mixed commercial North of Naylor Street uses

C61 "Naylor Street - Phase 2", Smith Young To erect connected buildings 6 and 11 storeys 155 Application 19F/2005 Land to North of Oriel Architecture containing 155 residential apartments. Cycle submitted August 2019 Street and South of Paul Limited and car parking at lower and upper ground Street levels totalling 50 spaces. Commercial space at lower ground and ground floor levels.

C62 4 Paul Street Vauxhall To erect 20 x 3/4 storey town houses following 20 Application 16F/1088 Developments Ltd demolition of existing buildings submitted July 2016

C63 Paul Street/Oriel Street Vauxhall To redevelop part of site (Phase 1) by the 134 Application 18F/0585 between Vauxhall Road Developments Ltd erection of part 7/part 8 storey block consisting resubmitted April 2019 and St Bartholomew of 134 residential apartments, together with Road commercial uses on the ground floor and 16 space car park.

C64 23 Blackstock Street Caro Developments To erect 11 storey residential block containing 560 Application 19F/2446 560 studios, 1 bed and 2 bed apartments submitted September 2019

C65 Land between W.F. Doyle and Co. New building of between 5 and 8 storeys 200 Permission granted Blackstock Street & Paul Ltd. comprising 200 flats, together with associated February 2014. Partially Street parking and landscaping implemented.

C66 “Bevington Bush”, Bevington To demolish existing buildings and erect three 614 Permission granted Bevington Bush/Aldersey Developments 9-17 storey blocks of residential November 2018 Street Limited accommodation containing 614 apartments with ground floor communal space, gym, commercial unit Zone: MAIN RETAIL AREA

C67 9-13 Temple Court JSM Ltd To erect two floor extension above existing 6 Application 18F/3218 building to create 6 one-bed apartments submitted December 2018

C68 2-8 Church Street NFU Mutual Conversion of upper floors to 18 apartments 18 Permission granted Insurance Society May 2018 Limited Zone: ROPEWALKS

C69 9-19 Bold Street AEW UK To change use of part of ground, second and 10 Permission granted May third floor from offices to create 10 apartments. 2017

C70 62A Bold Street Mr Mark Rea To convert 1st & 2nd floors above ground floor 3 Permission granted rental unit into 3 apartments September 2019

C71 108 Bold Street Glennonston To erect 4 storey building consisting of 3 Application 17F/1382 Properties Limited commercial unit on ground floor and 3 x 3 submitted May 2017 bedroom apartments on upper three floors.

RESIDENTIAL DEVELOPMENT UPDATE // 13

CITY CENTRE: RESIDENTIAL ACCOMMODATION

SCHEME: ”Brunswick Quay”, Atlantic Way SCHEME: 118-126 Duke Street DEVELOPER: Maro Developments Ltd DEVELOPER: Henry Space Development Limited COST: £100 million COST: £12 million UNITS: 552 apartments UNITS: 151 apartments STATUS: Application 18F/1932 submitted July 2018 STATUS: Permission granted June 2016

Anticipated Schemes continued Key Address Developer Description No of Comments (status) units Zone: ROPEWALKS continued

C72 108 Wood Street Mr Tareq Alblooshi To erect 4 storey building, comprising 3 Permission granted commercial unit to ground floor and 3 self- September 2017 contained apartments above

C73 181-185 Duke Street Ropeworks Ltd To erect 3 storey building with 3 apartments 3 Permission granted above ground floor retail October 2017

C74 Land adjacent to Hodge Hill To erect a 4 storey building consisting of 6 x 1 6 Permission granted Argyle Court, Argyle Securities bedroom apartments January 2019 Street

C75 Gostins Building, 32-36 Hanover Holding Conversion of ground to 6th floor to 154 47 Application 18F/1162 Hanover Street Limited bedroom hotel, 7th floor and rooftop extension awaiting signing of legal to create 47 apartments agreement since September 2018 Zone: ST GEORGES QUARTER

C76 50-58 London Road Jay Development Conversion of vacant first and second floor of 6 Permission granted premises to 6 self-contained flats August 2017

C77 1-5 Ward Street Jay Development Conversion of 2 office units into 2 self- 2 Permission granted May Limited contained residential flats. 2019 Zone: STRAND WATERFRONT

C78 Brunswick Quay, Maro To erect 4 blocks with 552 apartments with 552 Application 18F/1932 Atlantic Way Developments Ltd ground floor commercial space submitted July 2018

C79 “The Keel” – phase 2, Barings Real Estate To erect 2 x 8 storey buildings of 257 PRS 257 for Permission granted Kings Parade apartments PRS rent March 2017

C80 The Keel, Kings Parade Barings Real Estate To erect residents pavilion (containing 6 Application 19F/1875 management facilities and communal submitted July 2019 resident amenities including lounge, co- working space and gym) and six townhouses with associated landscaping and works including demolition of existing gym building

RESIDENTIAL DEVELOPMENT UPDATE // 14

SECTION 2 RECORD YEAR FOR STUDENT COMPLETIONS

2019 will see the largest number of student bedrooms completed in the City Centre in one year. CITY CENTRE STUDENT for several years. By the time Liverpool International College at Paddington Village completes at the end of the year, some 2,712 bedrooms will have been added to the existing stock – a combined £180 ACCOMMODATION million of investment since January. (Schemes of 5 units or more) Several large volume schemes have been completed recently and in time for the new student intake, particularly in the upcoming Fabric District to the north of the City Centre. Amongst them was 738 bedspaces at “Calico”, and 137 bedrooms at “One Islington Plaza”; both were built by the Islington Regeneration Company. Not far away, next to Lime Street Station, Unite completed “Horizon Heights” at Skelhorne Street (1,027 bedrooms).

2020 is also looks like it will be significant year, with Number of student bedrooms over 2,200 bedrooms still on site representing a further £120 million. Again, the Fabric District features 2,453 completed since January 2019 with “Aura” at Erskine Street (1,007) units, “Natex” (566 units, Devon House (208 bedrooms) and 9-11 Camden Street (44 bedrooms). Elsewhere in the City Centre, NR Capricornus is well underway at “The Sawmill”, the former Renshaw Hall with 292 units that will sit behind a Moxy brand hotel. Number of student bedrooms Number of student bedrooms completed or 2,502 currently under construction on site in Liverpool City Centre since 2012

2 ,800

259

2 ,400

2,583 Number of potential student 2,453 2 ,000 2,243 1,851 bedrooms either with or seeking 2,318

planning approval 1 ,600

1 ,200 1,535

1,244

1,259 1,259

800 1,102

871 400

0

6

19 20

18

17

20 20

20

2012 20

2013 2014

2015 201 Year

Student bedrooms Student bedrooms completed on site

Amongst the crop of new schemes that have been submitted this year are 420 bedrooms at the former Hondo supermarket at 3-9 Upper Duke Street; and 111 bedrooms at 4 Roscoe Street which is close to Oldham Square where 210 student bedrooms at 3 Oldham Place were granted permission in November 2018.

The increase in students coming to Liverpool is down to the city’s universities which have been investing in new buildings and facilities in previous years, and offering new courses which have attracted a growing number of new students – in particular, from China with which the University of Liverpool has a significant link with the Xi'an Jiaotong University it has established over there.

PROPOSED: 4 ROSCOE STREET RESIDENTIAL DEVELOPMENT UPDATE // 15

CITY CENTRE: STUDENT ACCOMMODATION

CITY CENTRE: STUDENT ACCOMMODATION

PUMPFIELDS LIVERPOOL WATERS: WATERLOO PRINCES MARYBONE

D2 E5 E4 COMMERCIAL KNOWLEDGED1 F7 F6 QUARTER: E3 KNOWLEDGE DISTRICT FABRIC DISTRICT QUARTER: E2 F8 ST GEORGE’S HEALTH QUARTER E8 CAMPUS F4 F5

HISTORIC KNOWLEDGE QUARTER: DOWNTOWN D3 KNOWLEDGE PADDINGTON D5 KNOWLEDGE QUARTER VILLAGE MAIN RETAIL QUARTER: E7 AREA GATEWAY

E6 F12 F10 ROPEWALKS F11 F14 D4 D6 F13 D7 KNOWLEDGE F3 QUARTER: F1 F9 HOPE STREET CANNING GEORGIAN F2 CHINATOWN QUARTER

E1

STRAND BALTIC Student accommodation scheme WATERFRONT CREATIVE completed since November 2018

Student scheme under construction

Student scheme proposed

City Centre Student Accommodation Schemes since November 2018

Crown copyright and database rights 2018 Ordnance Survey 100018351

RESIDENTIAL DEVELOPMENT UPDATE //16

CITY CENTRE: STUDENT ACCOMMODATION

Schemes Completed since November 2018 (Total: 2,458 bedrooms/bedspaces) Key Address Developer/ Description Bedrooms/ Completed Owner bedspaces Zone: KNOWLEDGE QUARTER: FABRIC DISTRICT D1 “Calico”, Site at the Islington 3 blocks of 8, 11 and 15 storeys providing 738 738 September 2019 corner of Islington and Regeneration student bedrooms with ground floor communal Norton Street Company welfare, leisure and management facilities. D2 "One Islington Plaza", 1- Islington Regen- To erect 8/10 storey block with 317 student 317 September 2019 10 Devon Street eration Company bedrooms and ground floor commercial space Zone: KNOWLEDGE QUARTER: GATEWAY D3 “Horizon Heights”, Unite Mixed use development comprising two blocks 1,027 September 2019 Skelhorne Street, Bolton up to 20 storeys high providing ground floor Street, Hilbre Street commercial uses with student accommodation. Zone: KNOWLEDGE QUARTER: HOPE STREET

D4 Hardman House & Haigh Liverpool Edge To erect 2 interlinked blocks between 5-8 storeys, 355 September 2019 Building, Hardman (Hardman Street) containing 51 student accommodation cluster Street/Maryland Street Ltd apartments (355 bedspaces). Zone: MAIN RETAIL AREA D5 31-33 Tarleton Street Peelclose Conversion of two upper floors into 2 x 5 10 Spring 2019 Properties Limited bedroom (student) apartments. Zone: ROPEWALKS D6 14 Colquitt Street Postvine Ltd Conversion of upper floors to 5 student flats 5 December 2018 D7 147 Duke Street Mr A Bishop To convert building to 6 x 1 bed student studios 6 September 2019

Schemes On Site (Total: 2,502 bedrooms/bedspaces) Key Address Developer/ Description Bedrooms/ Completion Owner bedspaces Expected Zone: BALTIC CREATIVE E1 “Baltic 56”, 56 Norfolk Borden Properties To erect 10 storey block creating 126 student 126 August 2020 Street/ Jamaica Street Ltd apartments, 2 units of commercial space Zone: KNOWLEDGE QUARTER: FABRIC DISTRICT E2 9-11 Camden Street Mr Tony Shirley To erect 5 storey student block with 5 cluster units 44 September (44 bedrooms). 2020 E3 “Natex”, Land at Norton Anwyl Construction To erect two blocks of 10 and 16 storeys with 566 566 September Street/ Islington Limited student bedrooms above commercial units. 2020 E4 Devon House, 33 Devon YPG Devon House New part 6/part 8 storey building with ground 208 September Street Ltd floor retail and 208 student studio bedrooms 2020 Zone: KNOWLEDGE QUARTER: HEALTH CAMPUS

E5 "Aura", Erskine Street Elliot Property Two buildings up to 14 storeys with 1,007 student 1,007 September Construction Ltd & bedrooms 2020 Equity Group Ltd Zone: KNOWLEDGE QUARTER: HOPE STREET E6 “The Sawmill”, former NR Capricornus Redevelopment with 292 student bedrooms 292 December Renshaw Hall, Benson 2020 Street Zone: KNOWLEDGE QUARTER: PADDINGTON VILLAGE E7 Liverpool International Kaplan Liverpool New live/learn facility including 259 student 259 December College Limited bedspaces in 30 studios and 46 clusters. 2019 Zone: ST GEORGES QUARTER E8 “The Paramount”, 28 Pinnacle Student To erect new student accommodation building 488* Stalled - not London Road Developments Ltd known

* an undisclosed number of these are currently occupied even though the building is far from complete. This figure not included in total. RESIDENTIAL DEVELOPMENT UPDATE // 17

CITY CENTRE: STUDENT ACCOMMODATION

SCHEME: “Calico”, Islington/Norton Street SCHEME: “One Islington Plaza", 1-10 Devon Street DEVELOPER: Islington Regeneration Company DEVELOPER: Islington Regeneration Company COST: £60 million COST: £30 million BEDROOMS: 738 BEDROOMS: 317 STATUS: Completed September 2019 STATUS: Completed September 2019

SCHEME: “Horizon Heights”, Skelhorne Street/Bolton Street SCHEME: Hardman House & Haigh Building, Hardman/Maryland Street DEVELOPER: Unite DEVELOPER: Liverpool Edge (Hardman Street) Ltd COST: £70 million COST: £20 million BEDROOMS: 1,027 BEDROOMS: 355 STATUS: Completed September 2019 STATUS: Completed September 2019

SCHEME: “Aura”, Erskine Street SCHEME: ”Natex”, land at Norton Street/Islington DEVELOPER: Elliot Property Construction Ltd & Equity Group Ltd DEVELOPER: Anwyl COST: £100 million COST: £45 million BEDROOMS: 1,002 BEDROOMS: 566 STATUS: On site for completion September 2020 STATUS: On site for completion September 2020

RESIDENTIAL DEVELOPMENT UPDATE // 18

CITY CENTRE: STUDENT ACCOMMODATION

Anticipated Schemes (Total: 1,851 bedrooms/bedspaces) Note: The granting of planning permission does not guarantee that a particular scheme will actually be built

Key Address Developer/ Description Bedrooms/ Status Owner bedspaces Zone: CANNING GEORGIAN QUARTER F1 Myrtle Court, 200 Unite Group PLC To erect 3 storey extension within existing car 51 Permission granted Crown Street park to provide additional 51 student bedrooms January 2017 F2 Liverpool Falkner Street New 5 to 6 storey building with 106 apartments, 63 Application 19F/2515 Community Developments and a 6 storey building with 63 student submitted October 2019 Probation bedspaces Centre, 180 Falkner Street F3 109-113 Mulberry Property Capital Plc To demolish 109-113 Mulberry Street and erect 11 366 Application 18F/0686 Street storey building comprising student submitted March 2018 accommodation (366 studios) and ground floor commercial space Zone: KNOWLEDGE QUARTER F4 “Copperas Liverpool Edge To demolish former police station and erect 9 294 Application 19F/0454 House”, (Copperas Hill) Ltd storey block for student accommodation awaiting signing of legal Copperas Hill comprising 35 clusters of 294 bedrooms agreement since Police Station, October 2019 Copperas Hill F5 2 Great Newton Stockton Properties To erect 4 storey extension to provide an 12 Application 19F/2467 Street additional 2 x 6 bedroom flats submitted October 2019 Zone: KNOWLEDGE QUARTER: FABRIC DISTRICT F6 31 Gildart Street Gildart Street To demolish existing building and erect 8 storey 48 Application 19F/0612 Limited building containing 48 student bedrooms submitted March 2019 F7 “The Drapery”, Devon Street To redevelop vacant car park into seven storey 124 Permission granted April land at Devon Limited block, consisting of 2 commercial units on the 2018 Street ground floor and 44 studio apartments and 10 student clusters (80 bedrooms) on upper floors. F8 Hughes House, Town Square To erect part 6/part 8 storey building for student 100 Application 17F/2414 101-113 London Developments accommodation (100 bedrooms) from ground to awaiting signing of legal Road Limited 4th floor, 82 residential apartments from 5th to 7th agreement since April floors, retail units on ground floor, car parking to 2019 the basement and roof gardens. Zone: KNOWLEDGE QUARTER: HOPE STREET F9 Former Hondo Fusion Students To redevelop with 4 to 6 storey building 420 Application 19F/0099 Supermarket, 3-9 containing 420 student bedrooms submitted August 2019 Upper Duke Street F10 4 Roscoe Street Frenson Limited To demolish existing building and erect part 111 Application 19F/1165 4/part 6 storey building with 111 student studio awaiting signing of bedrooms legal agreement since October 2019 F11 3 Oldham Place Menworth To erect 8 storey building comprising 210 210 Permission granted Liverpool student bedrooms and 1 retail unit November 2018 Investment Limited F12 1 Rodney Street/ Great Places Conversion of former supported living 32 Permission granted 1a Rodney Housing Assoc & accommodation to provide for 32 units of May 2019 Street/ 76 Mount Mansford Core 2 student accommodation Pleasant Managing Trustee No1 Limited Zone: ROPEWALKS F13 56 Parr Street G & W Stamper To demolish garage and redevelop with a four 7 Permission regranted storey, 7 bedroom student town house September 2017 F14 32 Slater Street G Stamper To erect 4 storey building comprising student 13 Permission granted accommodation (13 bedrooms) with ground November 2017 floor management office.

RESIDENTIAL DEVELOPMENT UPDATE // 19

CITY CENTRE: STUDENT ACCOMMODATION

SCHEME: 180 Falkner Street SCHEME: 109-113 Mulberry Street DEVELOPER: Falkner Street Developments DEVELOPER: Property Capital Plc COST: Not stated COST: £30 million BEDROOMS: 63 BEDROOMS: 366 STATUS: Application 19F/2515 submitted October 2019 STATUS: Application 18F/0686 submitted March 2018

SCHEME: Copperas Hill Police Station, Copperas Hill SCHEME: “The Drapery”, Devon Street DEVELOPER: Study Inn Ltd DEVELOPER: Devon Street Ltd COST: £20 million COST: £10 million BEDROOMS: 220 BEDROOMS: 124 STATUS: Application 17F/1029 awaiting signing of legal agreement STATUS: Permission granted April 2018 since October 2019

SCHEME: Hughes House, 101-113 London Road SCHEME: 3 Oldham Place DEVELOPER: Town Square Developments Limited DEVELOPER: Menworth Liverpool Investment Limited COST: £25 million COST: £20 million BEDROOMS: 100 (plus 82 residential apartments) BEDROOMS: 210 STATUS: Application 17F/2414 awaiting signing of legal agreement STATUS: Permission granted November 2018 since April 2019

RESIDENTIAL DEVELOPMENT UPDATE // 20

SECTION 3 HOMES BUILDING PROGRAMME LEAVES ORIGINAL TARGET BEHIND

Since 2012, the City Council has been working proactively with a range of partners including Registered Providers and developers through various NEIGHBOURHOODS: programmes and use of its land and property to deliver new homes through various initiatives such as the Housing Delivery Plan (HDP) and the Strategic PUBLIC SECTOR Housing Development Plan (SHDP).

With some 367 units completed this year so far ASSISTED SCHEMES (January to September), the total number of homes registered as completed has now reached 6,709, well beyond the original target of 5,000.

(Built or improved by Housing Association Key Development Activity

partners, or by private developers with significant Several large schemes have completed since the input/assistance from Liverpool City Council, including start of this year: “ Park” on the site of the use of City Council land or assets.) former Gateacre Comprehensive School completed in September bringing 231 new homes; “Blackbird Grange” at the former Walton Hospital site brought 195 homes; “Regency Manor” at the former Holly Lodge school site brought 60 homes; and Keepmoat completed Phase 4 of “The Parks” in (106 homes). Further large volume Number of new homes with schemes are due to complete in the coming public sector involvement months, including Countryside Properties’ “The Avenue” at Village (269 units), LHT’s 6,709 completed since April 2012. “Clifton Gardens” on the site for former Turner Home (24 units); Buckland Street (12 units); and South Liverpool Homes’ “18 Livingstone” on the site of the former Moredale Childrens Home at Livingstone Drive.

Number of new homes on active Amongst the new schemes that have started on site developments with public sector since the start of this year are Keepmoat’s “The 759 Parks” Phase 5 (86 units); Your Housing’s “Market involvement Grange” on the site of the former Kensington Market (84 units) and land at the former Millwood Primary School at Greenway Road in Speke (119 units).

Number of potential public sector New schemes which have come forward for approval this year include Cobalt Housing’s new homes either with or seeking “Stonedale Crescent” (56 units); and West Tree 846 Estates Ltd’s 80 unit scheme on sites at Ducie Street. planning permission, but not yet started on site The number of new schemes coming forward under this plan is continuing even whilst the Council engages on other programmes subsequently announced and started, including the new flagship ethical housing company, Liverpool Foundations Homes.

AFFORDABILITY TARGETS ACHIEVED

One of the mayor’s key priorities was that a significant amount of these new homes should be “affordable”, having been grant funded by the government’s Homes & Communities Agency are either sold outright, or on a shared ownership basis, or otherwise rented out by registered housing providers.

To date, some 53% of the 6,709 new properties built under this programme have been for outright sale (including First Buy and other schemes to help homeowners), with the remainder being a mixture of social/affordable rent (2,312 or 34.5%), shared ownership (568 or 8.5%) and market rent (260 or 4%). More details are provided on page 55.

ON SITE: “THE APPROACH”, RESIDENTIAL DEVELOPMENT UPDATE // 21

NEIGHBOURHOODS: PUBLIC SECTOR ASSISTED

Housing scheme completed since October 2018

Housing scheme under construction FAZAKERLEY Housing scheme proposed

WARBRECK CX1

NORRIS WB1 GREEN COUNTY

CLUBMOOR NG1

KD2 WEST ANFIELD DERBY KD1 AN2 KIRKDALE EV3 AN1 EV4 KD3 TS1 WD1 EV6 EV2 & KA1 EV5 EVERTON EV7 KD4 EV1 KF3 KENSINGTONKF1 & OLD SWAN FAIRFIELDKF2 CENTRAL PN1 PN2

PICTON PRINCES PARKPP4 BV3 RS2 PP1 BV1 PP5 RIVERSIDE PP2 PP6 PP3 WN1

RS3 RS1 CHURCH BV2 SM1 SM3 SM2ST MICHAELS

MOSSLEY HILL BELLE VALE

CRESSINGTON ALLERTON & CN2 CN1 HUNTS CROSS

SG5 Public Sector facilitated* housing schemes since SPEKE SG7 GARSTON SG2 October 2018 by ward SG4 SG6 SG3 SG1 * Built or improved in conjunction with Registered Provider of Social Housing partners, or by private developers with significant input/assistance from Liverpool City Council, including use of City Council land or assets.

Crown copyright and database rights 2019 Ordnance Survey 100018351

RESIDENTIAL DEVELOPMENT UPDATE // 22

NEIGHBOURHOODS: PUBLIC SECTOR ASSISTED

SCHEME: “Bakewell Gardens”, Dorset Court, Liverpool L25 SCHEME: Ogden’s Clock Tower, Everton, Liverpool L6 5JG DEVELOPER: Riverside Housing Group DEVELOPER: Liverpool Mutual Homes COST: £1.6 million COST: £2 million HOMES: 16 bungalows HOMES: 19 flats COMPLETED: February 2019 COMPLETED: December 2018

SCHEME: “Blackbird Grange”, Clock Tower Drive, Liverpool L9 1AE SCHEME: ”Parklands” (Ellergreen) Phase 3, Norris Green, Liverpool L11 DEVELOPER: Mulbury Homes / Riverside Housing Association / One DEVELOPER: New City Vision Vision Housing / Sovini Group COST: £18 million COST: £25 million HOMES: 168 homes HOMES: 195 homes for rent, shared ownership and private sale COMPLETED: December 2018 COMPLETED: June 2019

SCHEME: “Regency Manor”, Mill Lane, , Liverpool L12 7LE SCHEME: “Gateacre Park”,Grange Lane, Woolton, Liverpool L25 4SB DEVELOPER: Redrow Homes Ltd DEVELOPER: Countryside Properties (UK) Ltd COST: £14.7 million COST: £36.4 million HOMES: 60 homes HOMES: 200 homes COMPLETED: July 2019 COMPLETED: September 2019

RESIDENTIAL DEVELOPMENT UPDATE // 23

NEIGHBOURHOODS: PUBLIC SECTOR ASSISTED

Schemes completed since October 2018 *Note: This schedule only includes number of homes completed where the entire scheme has been finished. Some of the homes on the schemes listed here will have been completed prior to November 2019, but are only shown here when the full scheme has ended. Completed homes on schemes that are still active are not included in this list, although they are included in the “completed homes” figure on page 21.

Key Address Developer Description No of Date of homes Completion Ward: ANFIELD AN1 Anfield Village HCA/Your Housing/LCC Refurbishment of 374 homes 374 (RF) Summer 2019 Ward: BELLE VALE BV1 “Bakewell Gardens”, Land at Dorset Riverside Housing To erect 16 bungalows 16 February 2019 Court, off Madiera Drive Ward: EVERTON EV1 “Ogden’s Clock Tower”, Imperial Liverpool Mutual Homes To convert existing Listed office 19 December Tobacco Ltd, Boundary Lane building to form 19 apartments 2018 EV2 “The Parks” – phase 4 Keepmoat New 2, 3 and 4 bedroom houses of 106 March 2019 mixed tenure EV3 Notre Dame Catholic School Site, Liverpool Mutual Homes To erect 3 storey block comprising 12 76 November Everton Valley flats, two storey block comprising 12 2019 flats, 4 bungalows and 48 two storey houses. Ward: KIRKDALE KD1 "Claremont Gardens", Easby Road/ David Wilson Homes 271 houses and 14 apartments. 285 October 2018 Westminster Road Ward: NORRIS GREEN NG1 “Parklands”, (Ellergreen Phase 3) New City Vision To build 168 new homes for private 168 December sale 2018 Ward: RIVERSIDE RS1 Land bounded by Park Street and Plus Dane Group To erect 6 x 2 storey houses and 12 18 October 2018 South Grove flats in a 3 storey building Ward: SPEKE GARSTON SG1 Land between Dam Wood Road South Liverpool Homes To erect 23 houses 23 February 2019 and Hale Road SG2 Land at Burnage Close/ Oldbridge South Liverpool Homes To erect 16 new houses on 3 sites 16 September Road 2019 Ward: WB1 “Blackbird Grange”, Clock Tower Mulbury Homes Ltd for To erect 195 dwellings for mix of 195 Summer 2019 Drive, (former Walton Hospital Site), Riverside Housing and shared ownership and affordable rent Rice Lane One Vision Housing Ward: WEST DERBY WD1 “Regency Manor”, Former Holly Redrow Homes Ltd 51 new houses and conversion of 60 July 2019 Lodge School, Mill Lane Sandheys, Fremont and annex buildings to nine residential units Ward: WOOLTON WN1 “Gateacre Park”, Grange Lane Countryside Properties To erect 231 dwellings with 231 September (UK) Ltd associated landscaping, roads and 2019 new accesses to Grange Lane and Cuckoo Lane

(RF) = Refurbishments

RESIDENTIAL DEVELOPMENT UPDATE // 24

NEIGHBOURHOODS: PUBLIC SECTOR ASSISTED

SCHEME: Land at former 209-299 Prescot Road, Liverpool L7 0LG SCHEME: Holly Cottage and land at Wood Lane, Netherley, Liverpool L27 DEVELOPER: Riverside Housing Group DEVELOPER: Pierhead Housing Association COST: £3.5 million COST: £4.2 million HOMES: 28 new houses HOMES: 26 houses and 12 apartments STATUS: On site for completion April 2020 STATUS: On site for completion January 2020

SCHEME: “Market Grange” Prescot Road, Liverpool L7 SCHEME: “Clifton Gardens”, Turner Home, Dingle Lane, Liverpool L17 DEVELOPER: Your Housing DEVELOPER: Liverpool Housing trust COST: £8 million COST: £3.8 million HOMES: 54 flats and 30 houses HOMES: 24 homes STATUS: On site for completion November 2020 STATUS: On site for completion January 2020

SCHEME: “Orwell Road”, Orwell Road/Leven Street, Liverpool L4 1XU SCHEME: “Mill Brow”, Central Avenue, Speke, Liverpool L24 0TL DEVELOPER: Alliance Property Services NW Ltd DEVELOPER: Keepmoat Homes COST: £2 million COST: £18 million HOMES: 15 new homes HOMES: 132 homes for private sale STATUS: On site for completion Spring 2020 STATUS: On site for completion June 2020 PRICES: From £129,950

RESIDENTIAL DEVELOPMENT UPDATE // 25

NEIGHBOURHOODS: PUBLIC SECTOR ASSISTED

Active Developments (Total: 1,678 units*) *Note: This is total number of homes on active schemes. Some of these homes on larger developments are actually completed, some on site, others awaiting start. Those completed on schemes that are still on site are recorded on the chart on page 2. The figure shown on this page will therefore differ from that shown on page 21.

Key Address Developer Description No of Expected homes Completion Ward: BELLE VALE BV2 Holly Cottage and land off Wood Pierhead Housing To erect 26 x 2 bed houses and 12 x 1 bed 38 January Lane Association apartments 2020 BV3 “Joseph Williams Place”, Land at Compendium Living To erect 106 homes and public open 106 September Naylorsfield Drive space 2020 Ward: CRESSINGTON CN1 “Pavilion Point”, Land at 8 Redwings Living/ To erect 14 apartments with car parking 14 December Beechwood Gardens Regenda 2019 Ward: EVERTON EV4 The Parks – Phase 5 Keepmoat plc 86 new homes 86 December 2020 Ward: KENSINGTON & FAIRFIELD KF1 “Market Grange”, Former Your Housing To erect 2 blocks comprising 54 flats, 84 November Kensington Market, Prescot Road together with 30 houses 2020 KF2 10 Holly Road Sanctuary Group To erect two storey block of 8 flats and 9 June 2020 convert existing outbuilding to form house KF3 Land at former 209 - 299 Prescot Riverside Housing Group To erect 28 dwelling houses 28 April 2020 Road Ward: KIRKDALE KD2 “Orwell Road”, Orwell Road/Leven Alliance Property To erect 15 new houses following demolition 15 March 2020 Street Services NW Ltd. of existing buildings Ward: NORRIS GREEN NG2 “The Avenue”, Norris Green Village Countryside Properties 269 homes for rent and private sale 269 December – Phase 4 2019 Ward: PICTON PN1 “Williamson Place” phases 4, 5 and Bellway Homes 146 x 2, 3 and 4 bedroomed homes 146 March 2020 6, Royston Street, Gladstone Road, Durning Road PN2 “The Approach, Edge Lane” Liverpool Mutual Homes To erect 145 dwellings (in blocks of up to 4 145 September storeys) comprising 38 houses, 50 2020 apartments, 57 duplex apartments Ward: PRINCES PARK PP1 Former St. Bernards Church, 95a Housing People Building Conversion of church into 11 dwellings, 16 December Kingsley Road Communities Working and 4 new build flats and 1 detached 2019 with Onward Homes house PP2 Welsh Streets (Placefirst) Placefirst Conversion of 400 terraced houses into 298 2022 298 homes PP3 Welsh Streets (Plus Dane) Plus Dane Housing Conversion of 127 terraced houses into 99 99 Spring 2021 affordable homes Ward: SPEKE GARSTON SG3 Land at Greenway Road (site of Keepmoat Homes To erect 119 new homes 119 December Former Millwood County Primary 2020 School) SG4 “Mill Brow”, Central Avenue Keepmoat Homes To erect 132 new homes 132 June 2020 SG5 Land at Junction of King Street & Contour Homes Ltd To erect 12 supported living apartments 12 February Dale Street with communal facilities 2020 Ward: ST MICHAEL’S SM1 “Clifton Gardens”, The Turner Liverpool Housing Trust To erect 24 dwellings with new area of 24 November Home, Dingle Lane/Colebrooke public open space 2019 Road SM2 Land off Buckland Street Proactive Property Ltd/ To erect 2/3 storey block of 12 apartments 12 February 2020 Symphony Housing SM3 “18 Livingstone”, former Moredale South Liverpool Homes To erect 2 apartments blocks of 22 26 December Childrens Home, Livingston Drive and Praya Homes apartments for shared ownership and 2019 erect 4 mews homes following demolition of vacant childrens home

RESIDENTIAL DEVELOPMENT UPDATE // 26

NEIGHBOURHOODS: PUBLIC SECTOR ASSISTED

SCHEME: 15-27 Rockfield Road, Anfield, Liverpool L4 0SE SCHEME: “Ivy Mews”, 25 Garston Old Road, Liverpool L19 9AD DEVELOPER: Your Housing Group DEVELOPER: Liverpool Mutual Homes COST: £1 million COST: £4.7 million HOMES: 7 new terraced houses HOMES: 27 apartments STATUS: Permission granted September 2018 STATUS: Permission granted February 2019

SCHEME: 179-199 Oakfield Road, Anfield, Liverpool L4 0UF SCHEME: 1-25 Ducie Street and land south of Ducie Street, L8 2UT DEVELOPER: Homebaked CLT DEVELOPER: West Tree Estates Ltd COST: Not disclosed COST: £8 million HOMES: 8 homes and 3 commercial units from 9 former terraced HOMES: 80 homes houses STATUS: Application 18F/3166 awaiting signing of legal agreement STATUS: Permission granted July 2019 since August 2019

SCHEME: 177 Western Avenue, Speke, Liverpool L24 3UP SCHEME: “Eldon Grove”, Burlington Street, Liverpool L3 6JF DEVELOPER: South Liverpool Homes DEVELOPER: Liverpool Mutual Homes Ltd COST: £2.7 million COST: £6.6 million HOMES: 20 flats for affordable rent HOMES: 51 homes STATUS: Application 17F/2244 submitted August 2017 STATUS: Permission granted December 2016

RESIDENTIAL DEVELOPMENT UPDATE // 27

NEIGHBOURHOODS: PUBLIC SECTOR ASSISTED

Proposed Schemes (Total: 846 units*) * Note: The granting of planning permission does not guarantee that a particular scheme will actually be built Key Address Developer Description No of Status Expected homes Completion Ward: ANFIELD AN2 15-27 Rockfield Road Your Housing To erect 7 dwelling houses and 7 Permission granted Not known Group associated works. September 2018 AN3 Gurnall Triangle Site, Your Housing To erect 5 bungalows 5 Permission granted Not known Blessington Road Group September 2019 Ward: CRESSINGTON CN2 “Ivy Mews”, former works Liverpool Mutual To erect 27 apartments 27 Permission granted June 2020 yard adjacent 25 Garston Homes February 2019 Old Road Ward: CROXTETH CH1 Stonedale Crescent Cobalt Housing To erect 33 houses and 24 flats with 56 Application 19F/2184 Not known associated parking and submitted landscaping September 2019 Ward: EVERTON EV5 The Parks – Phase 2A Keepmoat plc 20 new homes 22 Awaiting planning Not known application EV6 179 - 199 Oakfield Road Homebaked To refurbish row of 9 terraced 8 Permission granted Not known CLT dwellings to create 8 homes and July 2019 three commercial units EV7 Former Central Tin Factory Liverpool Mutual To demolish existing buildings and 36 Permission granted Not known Site, Wilbraham/ Dryden Homes erect 16 houses and 3 two storey November 2015 Street blocks comprising 20 flats Ward: KIRKDALE KD3 “Sandhills Village – Phase New Regen Ltd To erect four storey block and 2 x 2 78 Permission granted Not known 2”, Lemon Street, Heriot storey blocks comprising 78 flats December 2018 Street, Great Mersey Street KD4 Eldon Grove, Burlington Liverpool Mutual Refurbishment of 45 derelict flats 130 Permission granted Not known Street Homes and erection of 85 new flats December 2016 Ward: KNOTTY ASH KA1 111 Mill Lane Liverpool Mutual To erect 4 storey building to 34 Application 18F/3298 May 2020 Homes create 34 self-contained submitted December apartments 2018 Ward: PRINCES PARK PP4 Land at Beaumont Street, Gleeson Homes Hybrid planning application for 41 57 Application 17F/0928 Not known Grierson Street, Lodge & Regeneration houses (detailed) and 16 houses submitted June 2017 Lane and Dove Street Ltd (outline) PP5 1-25 Ducie Street and West Tree To erect 45 apartments to the 80 Permission granted Not known vacant land to the south Estates Limited north side of Ducie Street and August 2019 of Ducie Street erect 4 storey apartment building on land to the south of Ducie Street to provide 35 apartments. PP6 Former Mount Carmel Gleeson Homes To erect 49 residential units over 49 Application 17F/0322 Not known School, and adjoining & Regeneration two adjacent sites submitted March 2017 land at North Hill Street Ltd Ward: RIVERSIDE RS2 Land between Upper Urban Space Redevelopment with 3, 4 and 5 178 Outline permission Not known Stanhope Street, Dexter Ltd storey blocks of 178 flats with two granted July 2015 Street and Chester Street internal courtyards and under- ground parking RS3 Mill Street/Harlow Street Gleesons To erect 45 homes on 3 sites 45 Permission granted Not known December 2016 Ward: SPEKE SG6 177 Western Avenue South Liverpool To erect a 2 to 4 storey building 20 Application 17F/2244 Not known Homes providing 20 apartments for senior awaiting signing of living, ground floor retail units legal agreement since January 2018 SG7 30-34 Hale Road South Liverpool To erect 17 bungalows and 17 Application 19F/2336 Not known Homes convert 3 existing cottages to form submitted September tenancy ‘hub’ 2019 Ward: TUEBROOK & STONEYCROFT TS1 Vacant land adjacent to The Regenda To erect 12 three bed dwelling 14 Permission granted September church of 'Latter Day Group houses and 2 two bed with October 2018 2020 Saints', Mill Bank associated access and parking.

RESIDENTIAL DEVELOPMENT UPDATE // 28

SECTION 4 Opening doors, nurturing neighbourhoods

Liverpool Foundation Homes Ltd (Foundations) is Liverpool City Council’s ethical housing company. LIVERPOOL The council is the sole shareholder of Foundations, which has been set up to improve the availability of good quality, affordable homes in the city. FOUNDATION HOMES Launched in 2018, the company is the flagship housing policy for the Mayor of Liverpool Joe LIMITED Anderson, who wants to use Foundations to improve the city’s housing stock, revolutionise the rent-to-buy sector and drive up council tax receipts for the council.

(Homes being delivered through In its first year of operation, Foundations has developed a strong pipeline of housing and Liverpool City Council’s own ethical regeneration projects across the city. The housing company) company is set to deliver the first phase of a multi- million pound build and refurbishment programme over the next two years, which will deliver thousands of new homes for local communities.

Foundations wants to rejuvenate Liverpool’s housing sector and ensure that high quality, affordable homes are accessible to all. It will Number of new homes create bespoke properties, including family completed under Foundations homes, starter homes, apartments and homes for people with special requirements, such as the 14 since January 2019 elderly, people with disabilities and foster families.

As well as creating thousands of new homes, the company wants to help bolster home ownership among local people. Money from the sale and Number of new homes being built rent of Foundations properties will be reinvested in or refurbished on active the company to help even more people benefit from the opportunities it offers. 115 Foundations developments

All 14 homes on first completed scheme snapped up within 2 hours of Number of potential new homes release

either with or seeking planning Harrington Row, Park Street, Dingle saw 14 x 3 236 permission, but not yet started on bedroom homes completed in March 2019 under Foundations’ flagship rent-to-buy scheme. All 14 site were reserved within two hours of release. Under the scheme, people were able to rent a home at 80% of the market rent, so that they could save the other 20% towards a deposit in order to secure a mortgage to buy the property. Residents will be given an option to buy the home between years 2 and 5, at a fair market price based on an independent valuation at the time of purchase.

Help-to-Buy is available to people who live or work in Liverpool and are either first time buyers or people who have had to sell a home because of a relationship breakdown. Other criteria include being in work but unable to buy a home on the open market because the household is unable to save a sufficient deposit due to living costs.

As an ethical landlord, Foundations is committed to going the extra mile for its tenants. The company has enhanced its new homes at “Harrington Row” on Park Street to include a range of items, including alarms, blinds, white goods and electric appliances, flooring and additional planting to create a high standard of home and also reduce the financial burden of tenants moving in.

ON SITE: ACKERS HALL AVENUE RESIDENTIAL DEVELOPMENT UPDATE // 29

N’HOODS: LIVERPOOL FOUNDATION HOMES LTD

Housing scheme completed since January 2019

FAZAKERLEY Housing scheme under construction

Housing scheme proposed

WARBRECK

NORRIS CROXTETH GREEN COUNTY

CLUBMOOR

WEST ANFIELD DERBY KD6 KIRKDALE YEW TREE

TUEBROOK & STONEYCROFT EVERTON YT1 KD5 KNOTTY ASH KENSINGTON & OLD SWAN EV8 FAIRFIELD

CENTRAL KF4

PICTON PP7 WAVERTREE PRINCES PARK CHILDWALL

PN3 RIVERSIDE BELLE VALE PP8 PP10 GREENBANKGB1 RS4 PP9 CHURCH WOOLTON RS5 ST MICHAELS

MOSSLEY HILL

CRESSINGTON ALLERTON & HUNTS CROSS

SPEKE Foundations facilitated GARSTON housing schemes since January 2019 by ward

Crown copyright and database rights 2019 Ordnance Survey 100018351

RESIDENTIAL DEVELOPMENT UPDATE // 30

N’HOODS: LIVERPOOL FOUNDATION HOMES LTD

SCHEME: “Harrington Row”, Liverpool L8 6QF SCHEME: Birchfield Street, Everton, Liverpool L3 DEVELOPER: FBMUK Ltd DEVELOPER: SPACE COST: £1.61 million COST: £0.7 million HOMES: 14 semi-detached homes HOMES: 4 houses STATUS: Completed March 2019 STATUS: On site for completion November 2019

SCHEME: Denford Road/Ackershall Avenue SCHEME: Ullet Road, Liverpool DEVELOPER: Lovells DEVELOPER: Vision Group Developments COST: £13.6 million COST: £6.3 million HOMES: 105 x 2, 3 and 4 bedroomed houses HOMES: 36 x 1, 2 and 3 bedroom apartments STATUS: Due on site imminently for completion October 2022 STATUS: Planning application imminent

Foundations is partnering with Blackburne House, one of the country’s leading educational centres for women, to launch a £1 million mixed-use scheme in the city centre. The collaboration will create a joint education and BELLE VALE residential scheme in the ground floor space of 68 Falkner Street. Foundations will take half of the ground floor unit to create six apartments for rent, comprising four, one- bedroom apartments and two, two-bedroom apartments. The remaining space will be taken by Blackburne House to provide digital and entrepreneurship programmes to expand their portfolio in the digital sector. This will create opportunities for women to access exciting careers in the digital sector, together with a wide range of support to strengthen entrepreneurs whilst promoting digital wellness SCHEME: Falkner Place, 68 Falkner Street . DEVELOPER: Cunard Construction COST: £1 million HOMES: 6 x 1 and 2 bedroom apartments STATUS: On site for completion October 2022

RESIDENTIAL DEVELOPMENT UPDATE // 31

N’HOODS: LIVERPOOL FOUNDATION HOMES LTD

Completed Developments (Total: 14 units)

Key Address Developer Description No of Date of homes Completion Ward: RIVERSIDE RS4 “Harrington Row”, Land bounded FBMUK Ltd To erect 14 dwelling houses with 14 March 2019 by Street, Park Street and parking Upper Essex Street

Active Developments (Total: 115 units)

Key Address Developer Description No of Expected homes Completion Ward: EVERTON EV8 Birchfield Street SPACE Installation of 4 bedroom modular 4 November homes 2019 Ward: PRINCES PARK PP7 Falkner Place, 68 Falkner Street Cunard Construction Conversion of redundant ground floor 6 October 2019 education space to 6 x 1 and 2 bedroom apartments Ward: YEW TREE YT1 Ackers Hall Avenue/ Denford Road Lovells To erect 2, 3 and 4 bedroom homes 105 October 2022

Indicative Proposed Developments (subject to Foundations Board and Council approval) (Total: 236+ units)

Key Address Developer Description No of Status Expected homes Completion Ward: GREENBANK GB1 Lathbury House, Ullet Vision Group To erect part 3/part 4 storey 35 Application 18F/0885 November Road Developments building for 35 apartments following submitted April 2018 2020 demolition of Lathbury House Ward: KENSINGTON & FAIRFIELD KF4 Toft Street tbc Mix of 2 and 3 bedroom homes 39 In appraisal. tbc Community consultation to be held prior to planning application Ward: KIRKDALE KD5 Limekiln Lane/Wright tbc Mix of 2,3 and 4 bedroom homes 67 In appraisal. tbc Street Community consultation to be held prior to planning application KD6 Kirkdale Canalside In conjunction Following community consultation tbc Planning application tbc with currently out to procure a multi- anticipated development disciplinary team to work up partner feasibility.

Ward: PICTON PN3 Moss Grove tbc Feasibility work commenced to c.30 In appraisal. tbc determine mix and numbers of new Community homes on LCC brownfield land consultation to be held prior to planning application Ward: PRINCES PARK PP8 Devonport Street tba Feasibility work commenced to c.37 Planning application tbc determine mix and numbers of new anticipated homes on LCC brownfield land PP9 North Hill & Malta St tbc Feasibility work commenced to c.13 Planning application tbc determine mix and numbers of new anticipated homes on LCC brownfield land PP10 Former Mount Carmel In partnership A mix of 2, and 3 bedroom new 15 Planning permission tbc School site with Plus Dane homes granted

RESIDENTIAL DEVELOPMENT UPDATE // 32

SECTION 5 BRINGING EMPTY HOMES BACK INTO USE

A target-based approach has been adopted to the implementation of the empty homes strategy. A Mayoral target was set to bring 2,000 empty homes NEIGHBOURHOODS: back into use by March 2017. The target focused on properties brought back into use where there had been an intervention or action by the Vacant Properties REFURBISHMENT & Team. The following were recorded:  vacant properties brought back into use through Housing Renewal programmes; EMPTY HOMES  vacant properties brought back into use in Spatial Priority areas; PROGRAMME  vacant properties brought back into use following responsive intervention A total of 3,427 properties came back into use in these categories. This is a very positive outturn figure. However, (Schemes where the Council has had a other properties continue to become vacant which acts significant input in bringing forward major area as a counterbalance to the overall impact of bringing homes back into use and illustrates the underlying issues refurbishment schemes ensuring the longevity of low housing demand in some areas of the city. of traditional homes, and bringing void units The setting of targets has provided a clear focus for the back into use as homes for local people) work of the Vacant Properties Team. The team has developed new ways of working since its location in the Regeneration Directorate. This has resulted in the work of EMPTY HOMES INITIATIVE the team being closely aligned to key housing renewal priorities. The team has been organised to enable pro- active targeting of voids in priority areas whilst also Number of empty homes returned to responding to complaints and dealing with statutory and public health nuisances arising from empty habitation under the Mayor’s second 3,427 properties. target from April 2015 Progress has been made in bringing forward new initiatives aimed at tackling empty properties. There are a number of examples of this:  Homes for a Pound scheme. This is now making a significant impact on the Picton area with 64 £1 houses that are completed and occupied - with WELSH STREETS another 32 homes in progress. In addition, 26 further empty homes in the regenerating streets are now set to become Council houses after Number of homes completed by Mayor Joe Anderson negotiated with Placefirst and Plus Dane’s government for a major debt to be removed. 124 programmes to provide a total 393  Empty Homes Loan. A new Financial Assistance new/refurbished homes Policy has been approved by Cabinet which includes the facility to provide empty homes loans.  Matchmaking Scheme. This facilitates the engagement of empty property owners with developers and investors interested in bringing empty homes back into use The Empty Homes Plan is being revised and will build on the progress made to date by focusing on the following strategic objectives:  achieving a continued reduction in the overall numbers of vacant properties;  tackling concentrations of void properties and problematic neighbourhoods;  making interventions that support key housing renewal schemes;  targeting enforcement activity on long standing vacant properties and properties that are in prominent locations A target has been set to bring 1,000 properties per annum back into use following direct involvement by the Council and its partner organisations. ON SITE: PLUS DANE’S CGI OF HOMES IT IS REFURBISHING AT THE WELSH STREETS

RESIDENTIAL DEVELOPMENT UPDATE // 33

NEIGHBOURHOODS REFURBISHMENT PROGRAMME

PROPOSALS BY HOMEBAKED COMMUNITY LAND TRUST FOR 179-181 OAKFIELD ROAD, ANFIELD

MORE INVESTMENT FOR ANFIELD business that will cross finance charitable and community activities within Anfield and Everton with Making Liverpool’s neighbourhoods more attractive places to surplus profits made by producing beer and non- live remains a key priority. Your Housing Group have alcoholic drinks. The space within their building will commenced the second phase of a £2 million outdoor also be used for hosting social events. improvement programme in ‘Anfield Village’, including tree- With the new pop-up retail space, the CLT’s aim is to lined pedestrian areas on Blessington Road, private side encourage new start-up retail and other businesses, gardens and secure communal refuse stores, providing a facility nurturing them and giving them time to establish never previously available for residents of homes with restricted- before they may wish to move to larger premises space alleyways. These works are scheduled for completion in when they have grown sufficiently to do so. February 2020. This follows the environmental works undertaken on Burnand Street in 2018. YHG have also secured planning The plans also meet the aspirations which the Council permission for a number of housing infill plot schemes in Anfield has for revitalising Anfield’s high street with new retail Village, which they will look to deliver over the next year. space and a programme of improved public realm works which are expected to start when funding has With an estimated investment of £255 million and the creation been secured. of over 700 jobs, more than 600 new and 600 refurbished homes have already been delivered within the adjacent Anfield Project area. With Keepmoat’s fifth and final phase of the £47.4 MILLION REFURBISHMENT Anfield Parks Development, and Your Housing Group’s housing CONTINUES AT WELSH STREETS proposals for ‘Anfield Village’ and the wider Anfield area, another 150 new and remodelled homes are to be added to The Council are working in partnership with Place First the neighbourhood. and Plus Dane to transform the dilapidated Victorian

Plans are advancing, which will hopefully see the housing of the Welsh Streets into contemporary family commencement of a high-end brand hotel with training homes. element at ‘Anfield Square’ from 2020. This will coincide with the Place First are transforming five terraced streets with delivery of three new/refurbished retail frontages planned for existing houses being remodelled and rear alleyways Walton Breck Road. The comprehensive public realm turned into shared gardens. The first pilot phase of the improvement scheme for Anfield High Street and adjoining refurbishment works saw 25 homes redeveloped and streets scheduled between 2020 – 2021 will be the diamond in completed in January 2018. Phase two completed the crown in completing the wider Anfield Regeneration more recently in April 2019 and has provided a further Project. 90 homes. A total of 115 x 2, 3 and 4 bedroom homes

across both phases have now been completed and all are fully occupied. HOMEBAKED SUBMITS PLANS TO REVIVE DERELICT ANFIELD HOMES A third phase of 94 units commenced on site in November 2018 and is expected to complete in Homebaked Community Land Trust (CLT) has been granted September 2020. A planning application to build 52 new permission to refurbish a block of vacant terraced properties homes on vacant land at Wynstay Street, Voelas Street, alongside their existing community bakery in Anfield, close to Rhiwlas Street and South Street has been approved and the Liverpool Football Club . The proposals will see 8 work started on site in August 2019 and is due to new homes created, alongside a community-run micro-brewery complete September 2020. There is also a further and pop-up shops. scheme proposed at Kelvin Grove which will provide 16

units. The CLT’s vision also includes an expansion to the current Homebaked bakery to house a training and production Plus Dane are working to remodel 127 houses into 99 workshop which will double as café seating during busier times. modern new homes for affordable rent and shared ownership. The pilot phase created six units and A new community organisation, the Homegrown Collective, completed in 2018 and Plus Dane are now on site with will occupy a unit at the opposite end of the terrace to the the rest of the scheme which is due to complete in 2020. bakery, from where they will run a sustainable community-led

RESIDENTIAL DEVELOPMENT UPDATE // 34

In addition to the various initiatives of the Council to SECTION 6 build new homes in collaboration with private sector and other partners, there are several new homes being provided by the private sector directly without using Council land or other assistance. Liverpool City Council continues to encourage private developers to bring NEIGHBOURHOODS: forward innovative new housing schemes that will provide further choice in size and quality for residents PRIVATE SECTOR seeking homes to buy.

SIGNIFICANT INCREASE IN POOL OF (Schemes of 5 units or more, built PRIVATE SECTOR SCHEMES AWAITING independently of Council/public funding START

assistance and outside of the Housing Delivery Throughout 2019, Liverpool’s house prices have Plan and other corporate plans) continued to rise faster than anywhere else in the UK, coming joint first with Edinburgh, with average house prices up 5.8% annually to £125,500 in figures from Zoopla’s latest UK Cities House Price Index published in August 2019, which looks at price inflation and affordability across the country. In August 2018 Liverpool experienced annual house price growth of Number of private sector new +3.8%, meaning house price inflation is accelerating.

homes completed since October These prospects have resulted in a plethora of new 2018* schemes commencing on site, and new applications 739 * Where the entire development has been completed. flooding in for planning approval. Over 2,000 new This count does not include completed homes on active homes are currently on site, whilst the pool of homes developments either with or seeking permission is just over 4,000. Amongst the most significant schemes that have commenced since the start of this year has been: Number of private sector new homes on active developments **  100 luxury 4 and 5 bedroomed homes at Redrow’s “Allerton Gardens” where prices start 2,061 ** Either completed, on site or about to commence at the top end of the market from £600,000; in future phases on an ongoing scheme  62 x 2, 3 and 4 bedroom homes at the . Flanagan Groups “Sterling Park” in Kirkdale;  185 new homes at Barratt Homes’ “Imagine Number of potential private sector Place” which they commenced as soon as they had finished and sold out of their first new homes either with or seeking development “Imagine Park”; 4,019 planning permission, but not yet  “Poet’s Place”, Clegg Street where Caro started on site Developments was granted permission in March 2019 to build 127 apartments;

whilst among the new schemes which have come forward for planning include:

 the tormer Allerton Police Station where Torus Developments submitted plans for conversion to 42 sheltered apartments, 5 town houses and 2 other dwellings;

 land on Upper Parliament St between Mulgrave Street and Kingsley Road School where FBM UK submitted plans for 95 apartments;

 17-19 Road, 28 Alexandra Drive, and land at 25/27 Alexandra Drive where a mixture of conversions and new built by the Crossfield Group will bring a total of 73 apartments;

 former nursery and land at the corner of Boaler Street and Madeley Street where West Tree Estates Ltd were granted permission to erect a 4 storey block containing 34 flats; and

 “Cotswold Place” at Cotswold Street/Holt Road where Wincome Properties were granted PROPOSED: PERMISSION WAS GRANTED FOR THE £12 MILLION “POETS PLACE” AT CLEGG STREET, permission in July 2019 for 26 studio apartments EVERTON, IN MARCH 2019. IT WILL BRING 127 APARTMENTS TO NORTH LIVERPOOL and 5 x 2 bedroom apartments.

RESIDENTIAL DEVELOPMENT UPDATE // 35

NEIGHBOURHOODS:NEIGHBOURHOODS: PRIVATEPRIVATE SECTORSECTOR

FY1 Housing scheme completed since October 2018 FY2 FY3 Housing scheme under construction FY4 FAZAKERLEY Housing scheme proposed WARBRECK

WB4 CROXTETH WB3 WB2 NORRIS CX2 GREEN COUNTY CY1 CY2 KD25 CY5 KD26 CY3 CLUBMOOR KD10 CY4 CM1 WEST KD7 YT6 KD21KD2 2 KD11 DERBY YT5 KD20 ANFIELD KD19 KD24 KD23 TS3 KIRKDALE KD8 YT4 YT7 KD12 TS8 YT3 EV9 EV22 TS9 YEW TREE KD18 TS10 KD17 TUEBROOK & TS11 YT2 EV21 TS12 KD16 STONEYCROFT KD9 EV20 TS13 TS14 TS2 KD14 KD13 EVERTON EV19 TS5 KA2 TS15 TS7 EV10 EV18 TS6 TS4 KA5 KD15 EV17 KA6 EV11 OS2 EV12 OS5 KA4 EV13 EV16 KF9 KA7 KENSINGTONKF8 &KF5 OS4 EV14 EV15 OS6 KA3 KF6 KF12 OLD SWAN KNOTTY ASH KF7 FAIRFIELDKF11 KF14 OS3 OS1 KF10 KF13

CENTRAL CW1

WT1 WT3 WT2 PN3 PN4 PICTON WT8 WT7 WT6 WT4 WT5 PP18 CHILDWALL PP15 WAVERTREE PP16 PP19 BV4 PP17 PP14 PP20 GB2 RIVERSIDE PRINCES BV5 BV6 RS13 PP21 PP11 WN4 PARK GREENBANKGB4 CH4 BELLE VALE GB3 CH1 PP13 PP12 RS12 RS11 RS7 SM6 RS6 CHURCH WOOLTON SM7 SM8 WN6 WN5 WN2 RS9 SM9 CH5 SM10 SM12 GB5 GB6 BV7 RS8 SM11 SM13 AH1 RS10 MH1 CH2 SM4 MH5 MH4 AH3 ST MICHAELS WN3 MH2 AH4 CH3 MH3 SM5 MOSSLEY HILL AH2 CRESSINGTON ALLERTON & HUNTS CROSS CN4 CN3 CN5 AH5 SG10 SG11 SG12

SG13 SG8 SG14 SG9 SPEKE SG16 GARSTON SG15 Private Sector housing schemes since October 2018 by ward

Crown copyright and database rights 2019 Ordnance Survey 100018351

RESIDENTIAL DEVELOPMENT UPDATE //36

NEIGHBOURHOODS: PRIVATE SECTOR

SCHEME: Former Cat’s Whiskers, Hartsbourne Avenue, Liverpool L25 SCHEME: Foley Street & Westminster Road, Liverpool L4 4LT 2RY DEVELOPER: DDDC Developments DEVELOPER: N&P Developments COST: £1 million COST: £1 million HOMES: 9 apartments HOMES: 9 x 4 bedroom terraced houses for sale STATUS: Completed December 2018. STATUS: Completed December 2018

SCHEME: 35 Dudlow Lane, Liverpool L18 2EX SCHEME: ”Edenhurst”, Windermere Terrace, Liverpool L8 DEVELOPER: FAS Developments Ltd DEVELOPER: Bellerive FCJ Catholic College COST: £2.5 million COST: £4 million HOMES: 6 apartments and 2 luxury houses HOMES: 44 apartments (Edenhurst & Silvermere) STATUS: Completed August 2019 STATUS: Completed March 2019

SCHEME: , Silvester Street, Woodstock Street & SCHEME: ”Imagine Park”, Speke, Liverpool L24 1UX Westmoreland Place, Liverpool L5 5FA DEVELOPER: Barratt Homes DEVELOPER: Blackstock Ltd COST: £28.5 million COST: £3 million HOMES: 268 houses HOMES: 26 x 2 bedroom apartments STATUS: Completed December 2018. STATUS: Completed September 2019

RESIDENTIAL DEVELOPMENT UPDATE //37

NEIGHBOURHOODS: PRIVATE SECTOR

NEIGHBOURHOODS: PRIVATE SECTOR

Schemes completed since October 2018 (Total: 739 units) *Note: This schedule only includes number of homes completed where the entire scheme has been finished. Completed homes on schemes that are still active are not included. Key Address Developer Description No of Date of homes Completion Ward: ALLERTON & HUNTS CROSS AH1 1 Yew Tree Road Simon Kinsella 5 apartments in a new block 5 September 2019 Ward: BELLE VALE BV4 Former Cat’s Whiskers, N&P Developments To erect 9 houses 9 January 2019 Hartsbourne Avenue Ward: CHURCH CH1 35 Dudlow Lane FAS Developments Ltd Conversion from bedsits to 6 apartments 8 August 2019 and erect 2 detached luxury houses Ward: COUNTY CY1 254-256 County Road M & MA Services Ltd Conversion of former shop and offices to 8 April 2019 8 self-contained flats. CY2 217-229 County Road P.M.E. Estates To convert upper floors to 14 flats. 14 Jun 2019 Ward: CRESSINGTON CN3 “Ollerton Grange”, Nursery Morris Homes Limited To erect 83 houses 83 March 2019 Lane Ward: CROXTETH CX2 Former Dog & Gun Public Mr Alan Wardle To erect 6 houses 6 December 2018 House, Lane Ward: KENSINGTON & FAIRFIELD KF5 2 Prescot Drive Mr Mehdi Wajiuddin Conversion/extension to form 7 flats 7 November 2018 KF6 Land at Coleridge Street MK Developments NW Ltd To erect 8 houses and 3 apartments 11 December 2018 Ward: KIRKDALE KD7 Queens Arms, 202 Walton Stockton Properties Conversion from pub to ground floor 5 April 2019 Road commercial with 5 flats above. KD8 Vacant land off Foley Street & DDDC Developments To erect 3 storey building comprising 9 9 December 2018 Westminster Road flats KD9 Scotland Road, Silvester Blackstock Ltd To erect 3 x 4 storey blocks with 30 x 2 30 September 2019 Street, Woodstock Street bedroom apartments with parking Ward: KNOTTY ASH KA2 Alder Grange, Central Drive Downfield Homes Ltd Conversion of former nursing home to 13 20 September 2018 flats, plus 7 new build houses Ward: OLD SWAN OS1 363 Prescot Road Rivergate Limited To convert upper floors to form 8 flats 8 April 2019 Ward: PRINCES PARK PP11 1-3 Croxteth Road LSH Developments Conversion of nursing home to 9 HMO 9 HMOs August 2019 units with a total of 49 bedrooms (49 beds) PP12 “Edenhurst”, Windermere Bellerive FCJ Catholic To convert existing buildings to 44 44 March 2019 Terrace, (Bellerive College Site) College apartments PP13 Devonshire House, 13 Signature Developments Conversion to 9 apartments 9 July 2019 Devonshire Street Ltd Ward: SPEKE GARSTON SG8 “Imagine Park”, Barratt Homes 268 new build homes 268 December 2018 Avenue Ward: ST MICHAELS SM4 “Aigburth Grange”, Aigburth Elan Homes To erect 55 dwellings with associated 55 April 2019 Road/Tramway Road garages Ward: TUEBROOK & STONEYCROFT TS2 Bankfield College, Bankfield Signature Living PHASE 1: conversion to 98 apartments, 98 March 2019 Road including gym and concierge. Ward: WARBRECK WB2 171-177 Rice Lane Mr R Melia Conversion of ground floor of to 6 x 1 6 June 2019 bedroom flats WB3 220-230 Rice Lane Direct Developments Conversion of 1st floor to 6 flats 6 December 2018 Ward: YEW TREE YT2 49 Ruscombe Road Markbuild Limited To erect 3 storey block comprising 19 flats 21 May 2019 and 2 houses.

RESIDENTIAL DEVELOPMENT UPDATE //38

NEIGHBOURHOODS: PRIVATE SECTOR

Schemes currently active (Total: 2,061 units) *Note: Some of these homes on larger developments are actually completed, some on site, others awaiting start. Key Address Developer Description No of Expected homes Completion Ward: ALLERTON & HUNTS CROSS

AH2 “Allerton Gardens”, Allerton Redrow Homes North To erect 100 new homes 100 September 2023 Road West and Allerton Priory LLP Ward: CHURCH

CH2 280 Allerton Road Mr Mark Young To replace existing house with 3 storey 10 Summer 2020 building with 10 flats

CH3 160-164 Greenhill Road Mr & Mrs Riley To extend existing property and convert 9 Stalled – partly into 9 self-contained flats. completed Ward: FAZAKERLEY

FY1 9A – 13A Clock Tower Park, Next Big Thing To erect single storey block of 6 x 1 6 December 2019 Longmoor Lane Developments bedroom flats Ward: KENSINGTON & FAIRFIELD

KF7 “The Rise”, Land at Low Hill The Lofts (Ormskirk) New 7 storey development with 316 flats, 316 2020/21 Management Ltd & 80 student flats, 13 student cluster flats (61 Deutsche Pad Ltd bed spaces), and 4 commercial units. Ward: KIRKDALE

KD10 Junction of Carisbrooke Road, SFY Construction Limited To erect 15 houses 15 Winter 2020 Harlech Street and Roxburgh Street

KD11 Tetlow Church, Tetlow Street J Moss Development Conversion of former church to 6 flats 6 December 2019

KD12 “Sterling Park”, Land at Sterling The Flanagan Group To erect 62 houses 62 Summer 2020 Way/Latham Street

KD13 “Vauxhall Wharf”, 285-289 M V Canal Ltd To erect 3 apartment blocks with 74 74 September 2020 Vauxhall Road flats

KD14 “Tobacco Warehouse Stanley Dock Properties Conversion of Tobacco Warehouse to 538 September 2021 Apartments”, Stanley Dock Ltd 538 apartments, offices, exhibition space

KD15 Liverpool Waters: “Quay Central” Romal Capital Limited To erect 8 to 14 storey building with 237 237 March 2020 and “Park Central”, Plot C04 and and Peel Lane & apartments and ground floor C06, land to west of Waterloo Property (Ports) Limited commercial space and parking Road, Central Docks Ward: MOSSLEY HILL

MH1 “Mossley Gardens”, Dale Hall, Elan Homes To erect 60 houses and 6 flats following 66 June 2021 Elmswood Road demolition of existing halls of residence

MH2 Former Kelton Convent, Ashbury Doyle Convert to 8 flats, plus build 27 new flats 36 March 2020 Woodlands Road Developments and a 2 storey house

MH3 Sir Thomas Moore R C Church, Bespoke Construction Convert former church into 7 self- 7 October 2019 Rundle Road Ltd contained apartments and parking Ward: OLD SWAN

OS2 56 Derwent Road East GSSJ Developments Convert and extend existing building to 10 December 2019 Ltd provide 10 flats with parking.

OS3 25-27 Derby Lane Thorndyke To convert and extend to 10 flats 10 December 2019 Developments

OS4 Land at 6 Derwent Road West Mr Anthony Devine To erect 6 houses. 6 August 2020 Ward: PICTON

PN3 Land to rear of St Dunstan's Fernside Developments To erect 7 x 3 storey dwelling houses. 7 December 2019 Parish Church, Fernside Street Limited Ward: PRINCES PARK

PP14 26 Princes Avenue The Five Dimensions Conversion from community centre to 6 9 December 2019 Limited x 1 bed flats, 2 x 2 bed flats and 1 x studio flat

RESIDENTIAL DEVELOPMENT UPDATE //39

NEIGHBOURHOODS: PRIVATE SECTOR

SCHEME: Allerton Gardens, Allerton Road, Liverpool L25 7UL SCHEME: “The Rise”, Low Hill L6 1BP DEVELOPER: Redrow Homes DEVELOPER: The Lofts (Ormskirk) Management Ltd/Deutsche Pad Ltd COST: £20 million COST: £40 million HOMES: 100 luixury homes HOMES: 316 apartments STATUS: On site for completion in Autumn 2023 STATUS: On site for completion 2020/2021 PRICES: From £590,000

SCHEME: “Sterling Park”, Sterling Way/Latham Street, Liverpool L5 2SJ SCHEME: “Quay Central” and “Park Central”, Central Docks DEVELOPER: The Flanagan Group DEVELOPER: Romal Capital Limited and Peel Land & Property Ltd COST: £7 million COST: £30 million HOMES: 62 x 2,3 & 4 bed terraces, semi-detached and detached HOMES: 237 apartments houses STATUS: On site for completion March 2020 STATUS: On site for completion December 2020. TENURE: Private Rented Sector

SCHEME: “Tobacco Warehouse Apartments”, Stanley Dock, L3 SCHEME: “Mossley Gardens”, Elmswood Road, Liverpool L18 8DQ DEVELOPER: Stanley Dock Properties Ltd DEVELOPER: Elan Homes COST: £50 million COST: £10 million HOMES: 538 apartments HOMES: 60 x 4 and 5 bedroom homes and 6 luxury apartments STATUS: On site for phased completions from Spring 2020 onwards STATUS: On site for completion Summer 2021.

PRICES: From £395,000

RESIDENTIAL DEVELOPMENT UPDATE //40

NEIGHBOURHOODS: PRIVATE SECTOR

NEIGHBOURHOODS: PRIVATE SECTOR

Schemes currently active continued Key Address Developer Description No of Expected homes Completion Ward: RIVERSIDE

RS6 Former Beresford Arms, 158 Alexander Ware To erect part 2/part 3 storey apartment 8 December 2019 Beresford Road Developments block containing 8 apartments

RS7 “City Terraces”, Park Court, Mr Graham Clarke Conversion and extension to form 34 34 January 2020 Park Street self-contained flats

RS8 Herculaneum Quay, Royden Herculaneum Quay New 8 to 16 storey building with 119 119 May 2020 Way, Riverside Drive Investor (HQI) Group residential apartments

RS9 349 Mill Street Churchill Eastern Ltd To erect part 3/part 4 storey bock of 13 13 December 2019 self-contained supported living apartments Ward: SPEKE GARSTON

SG9 “Imagine Place”, Land off Barratt Homes Ltd To erect 185 new homes 185 December 2021 Speke Hall Avenue Ward: ST MICHAELS

SM5 19 Fulwood Park Mr Gavin Whiteside To convert former care home to 3 5 Spring 2020 apartments and build 2 new houses Ward: TUEBROOK & STONEYCROFT

TS3 “Darmonds Green Avenue”, Mount Property Group To erect 11 townhouses with amenity 11 June 2020 space and parking.

TS4 1A Denman Drive Actually Property Limited Conversion to 10 flats 10 November 2019

TS5 Land at Silverdale Avenue, Sterling Construction Ltd To erect 18 dwelling houses 18 November 2019 Hilberry Avenue, Sutton Street

TS6 Former St George PH, 135 Green Lane To erect 15 dwelling houses 15 November 2019 Green Lane Developments

TS7 163-165 Moscow Drive MGS Estates UK Limited Conversion to 8 flats 8 October 2019 Ward: WARBRECK

WB4 15 Brook Road Brook Road Developments New 4 storey with 9 flats 9 February 2020 Ward: WAVERTREE

WT1 “Heygreen Park”, Edington NuVu Living / MCI To erect 38 houses and 10 flats 48 July 2020 Street Developments

WT2 25-27 South Drive DKE Wavertree Ltd To convert existing villas into 16 16 December 2019 supported living, self-contained flats Ward: WOOLTON

WN2 42 Gateacre Brow Gateacre Brow Ltd To erect 3 storey building with 9 self- 9 December 2019 contained apartments

WN3 33 Rodick Street Rodick Developments To erect 10 apartments in 2 blocks with 10 December 2019 associated car parking Ward: YEW TREE

YT3 Fur & Feathers Club, Mab Bedford and Grove Homes To erect 15 x 3 storey houses and 4 x 2 19 December 2019 Lane Limited bed apartments

RESIDENTIAL DEVELOPMENT UPDATE //41

NEIGHBOURHOODS: PRIVATE SECTOR

SCHEME: Land to rear of St Dunstan's Parish Church, Fernside Street, SCHEME: “Imagine Place”, Speke Hall Avenue, Liverpool Liverpool L7 6AE DEVELOPER: Barratt Homes Ltd DEVELOPER: Fernside Developments Limited COST: £20 million COST: £1.2 million HOMES: 185 x 3 and 4 bedroom homes HOMES: 7 x 3 storey dwelling houses STATUS: On site for completion December 2021 STATUS: On site for completion December 2019 PRICES: £174,995 to £239,995

SCHEME: Darmonds Green Avenue/Townsend Lane, Liverpool L6 0BB SCHEME: “Heygreen Park”, Edington Street, Liverpool L13 DEVELOPER: Mount Property Group DEVELOPER: NuVu Living/MCI Developments COST: £1.5 million COST: £6.1 million HOMES: 11 terraced homes HOMES: 38 houses and 10 flats STATUS: On site for completion in December 2019 STATUS: On site for completion July 2020 PRICES: From £224,950

SCHEME: 33 Rodick Street, Woolton, Liverpool L25 7SE SCHEME: Former Fur & Feathers, Mab Lane, Liverpool L12 6QN DEVELOPER: Rodick Developments DEVELOPER: Bedford and Grove Homes Limited COST: £1.8 million COST: £1.9 million HOMES: 10 apartments HOMES: 15 houses and 4 apartments STATUS: On site for completion December 2019 STATUS: On site for completion December 2019

RESIDENTIAL DEVELOPMENT UPDATE //42

NEIGHBOURHOODS: PRIVATE SECTOR

Proposed Schemes (Total: 4,019 units) Note: The granting of planning permission does not guarantee that a particular scheme will actually be built Key Address Developer Description No of Status homes Ward: ALLERTON & HUNTS CROSS

AH3 Parkview, Allerton Road Your Exclusive To erect 3 storey block of 9 9 Permission granted March Developments Ltd apartments with basement parking 2019

AH4 440 Allerton Road Nicholas Vale To erect 6 x 2 bed apartments in a 2 6 Permission granted April 2017 Homes storey development

AH5 Cheshire Lines Sports & Forth Homes Ltd To erect 14 houses 14 Revised application 18F/2260 Recreation Club, submitted May 2019 Southmead Road, Garston Ward: BELLE VALE

BV5 304 Childwall Valley Road Rockmount PS Conversion from offices to 12 12 Permission granted apartments September 2018

BV6 Land At Naylors Road at FPB Property To erect 7 houses 7 Application 17F/3513 junction with Paveley Bank Rental submitted December 2017

BV7 Vine , 1 Old Wood Mr John Tamman To erect 5 dwellings 5 Outline permission granted Lane November 2016 Ward: CHILDWALL

CW1 Former Robinson Willey site, Derwent Group To erect 11 houses 11 Application 18RM/0159 Mill Lane submitted January 2018

CW2 Land adjacent to Liverpool Mr Allan To erect 16 houses with new access 16 Application 18F/1171 Royal Naval Association Cunningham from Glendevon Road awaiting signing of legal Club, 38 Bowring Park Road agreement since January North 2019 Ward: CHURCH

CH4 Maldon Lodge, Woolton LAG Pritchard Outline application to erect 25 25 Outline permission granted Road residential apartments March 2017

CH5 Former Allerton Police Torus Developments To partially demolish police station 49 Application 19F/2053 Station, Rose Lane, Former building, and convert to 42 submitted August 2019 Fire Station, Mather sheltered apartments.; Demolition Avenue and two semi- of the fire station tower, workshop detached houses on The and garage, and conversion of the Quadrangle fire station into 5 townhouses; Conversion of fire station living quarters into 2 separate dwellings facing onto the Quadrangle; and to layout associated parking and landscaping

CH6 Crawford House, Royal Mr DJ Mcqueen Partial demolition, extension and 22 Outline application 19O/2160 British Legion, 161 Rose change of use of main building to 8 submitted August 2019 Lane apartments, with 14 new build apartments in adjacent grounds Ward: CLUBMOOR

CM1 Former Clarence Hotel, Clarence View New 74 bed care home with 24 98 Permission granted April 2018 Utting Avenue Lodge Limited extra care residential flats Ward: COUNTY

CY3 69 Ripon Street and 81 City Ms Dawn Morris To convert properties to form 5 flats 5 Permission granted April 2019 Road

CY4 Land Bounded by Walton Gauld Property To erect part four/part five storey 94 Application 18F/1316 Lane, Bullens Road and Partnership block comprising 94 flats with car awaiting signing of legal Diana Street parking agreement since July 2018

CY5 15 Lilly Grove Romaltra Limited To erect part 1 to 5 storey building 52 Application 19F/2594 comprising of 52 apartments for submitted October 2019 over 55's Ward: CRESSINGTON

CN4 Former St Austin's Church, Austinlake Ltd Conversion of existing building to 14 23 Permission granted June 2017 Presbytery and Chaloner apartments and new building of 9 Hall, Aigburth Road houses

CN5 Former Greenways School FAS Developments To erect 4-storey building of 11 11 Application 19F/1411 Site, Beechwood Road South Ltd apartments submitted June 2019

RESIDENTIAL DEVELOPMENT UPDATE //43

NEIGHBOURHOODS: PRIVATE SECTOR

Proposed Schemes continued Key Address Developer Description No of Status homes Ward: EVERTON

EV9 Devonshire Arms Public Mr P Tynian To erect 4 houses and 1 bungalow 5 Permission granted May 2017 House, St Domingo Road following demolition of public house

EV10 “Rose Place”, Virgil Street/ Soller Two Limited To erect a 9 storey block containing 277 Permission granted July 2017 Great Homer Street 277 residential apartments

EV11 “Poet’s Place”, Clegg Caro Developments To erect 6/7 six storey block with 127 Permission granted March Street 127 residential apartments 2019

EV12 Land at Corner Salisbury Humberto Gregorio To erect 2 linked blocks with 70 70 Permission granted April 2017 Street/Everton Brow Barrera Mojica apartments and undercroft parking

EV13 “Azure Residence”, Rose Legacie To erect 8 storey block with 127 flats 127 Permission granted May 2018 Place Developments and ground floor commercial units

EV14 “Citipads”, Land at Fox Pointfield To erect 3 residential blocks ranging 325 Permission granted August Street/St Anne’s Street Developments from 5 to 7 storeys of 325 flats. 2018

EV15 1-3 Everton Road Mr Oliver Gilkes Conversion to 6 flats 6 Permission granted May 2018

EV16 West Derby Road, Caird Croft Housing To erect 2 blocks up to 6 storeys 115 Application 18F/1637 awaiting Street, Association comprising 115 sheltered flats signing of legal agreement since October 2018

EV17 99-101 West Derby Road Mr Hamid Conversion to form HMO of 3 x 7 3 Permission granted July 2019 bedroom units with communal facilities

EV18 160-162 Breck Road Mr T Higginson To erect 4 storey block with apart- Permission granted October ments above ground floor retail 2017

EV19 Strawberry Tavern, M.C.I Developments To demolish former public house 30 Permission granted October Road South Ltd & Liverpool and erect three storey block 2017 Investment Solutions comprising 30 flats car parking

EV20 12-14 St Domingo Grove Frank Rogers To erect 3 storey building consisting 12 Application 19F/0848 Construction Limited 12 x 2 bed apartments with parking submitted April 2019

EV21 68 Mere Lane Mr L Battle To convert derelict building to 27 27 Application 19F/1579 apartments (21 x 1 bed and 6 x 2 submitted July 2019 bed) with associated parking.

EV22 2 York Villas, Walton Breck LEV Properties Conversion to 8 flats 8 Permission granted July 2019 Road Limited Ward: FAZAKERLEY

FY2 Land to junction of Collateral UK To erect residential block with 17 17 Application 18F/0009 Warbreck Moor and Hall apartments and parking awaiting signing of legal Lane agreement since April 2018

FY3 Aintree & Fazakerley Social AFS Liverpool To erect 10 houses following 10 Application 19F/1670 Club, 31 Harradon Road Limited demolition of existing building awaiting signing of legal agreement since September 2019

FY4 Former Site of Aintree Architecture Julien To erect 20 apartments in part four/ 20 Application 17F/1125 Institute, 1 Longmoor Lane Denis Ltd part five storey block with car park awaiting signing of legal agreement since July 2017 Ward: GREENBANK

GB2 95 Hartington Road Mr A Hart Conversion and extension from 5 1 HMO Permission granted August flats into a 2 x 6 bed and 1 x 4 bed (16 2019 HMO beds)

GB3 2 Sefton Drive Pear Tree Estates Conversion to 6 flats 6 Permission granted July 2017

GB4 Greenbank Synagogue, Green Drive Conversion of synagogue to 22 x 1 58 Permission granted June 2017 Greenbank Drive Liverpool Ltd and 2 bed apartments, and to erect part 4/part 5 storey block with 36 x 2 and 3 bed apartments

GB5 3 Carnatic Road Backhouse Replacement of existing house with 16 Permission granted on Developments Ltd a 4 storey block of 16 apartments appeal April 2018

GB6 5 Carnatic Road Mr Kevin Crickett Replacement of existing house with 15 Permission granted October a 4 storey block of 15 apartments 2019

RESIDENTIAL DEVELOPMENT UPDATE //44

NEIGHBOURHOODS: PRIVATE SECTOR

SCHEME: Land adjacent to Liverpool Royal Naval Association Club, SCHEME: Former Allerton Police Station, Rose Lane, Liverpool L18 38 Bowring Park Road North, Liverpool L14 3NN DEVELOPER: Torus Developments DEVELOPER: Allan Cunningham COST: £6 million COST: £2.5 million HOMES: 42 sheltered apartments, 5 townhouses and 2 houses HOMES: 16 detached and semi-detached houses STATUS: Application 19F/2053 submitted August 2019 STATUS: Application 18F/1171 awaiting signing of legal agreement since January 2019

SCHEME: Former Clarence Hotel, Utting Avenue, Liverpool L4 8SX SCHEME: 1 Longmoor Lane, Fazakerley, Liverpool L9 0EA DEVELOPER: Clarence View Lodge Limited DEVELOPER: Architecture Julien Denis Ltd COST: £5 million COST: £3 million HOMES: 74 bed care home with 24 extra care residential flats HOMES: 20 flats for rent STATUS: Permission granted April 2018 STATUS: Application 17F/1125 awaiting signing of legal agreement since July 2017

SCHEME: “Azure Residence”, Rose Place, Liverpool L3 3BN SCHEME: “Tobacco Wharf”, Commercial Road, Liverpool L5 5BY DEVELOPER: Legacie Developments DEVELOPER: Trophy Homes Ltd COST: £20 million COST: £12 million HOMES: 127 flats with ground floor commercial units HOMES: 110 apartments STATUS: Permission granted May 2018 STATUS: Outline approval granted February 2018

RESIDENTIAL DEVELOPMENT UPDATE //45

NEIGHBOURHOODS: PRIVATE SECTOR

Proposed Schemes continued Key Address Developer Description No of Status homes Ward: KENSINGTON & FAIRFIELD KF8 Former Nursery, Land West Tree Estates To erect 4 storey block comprising 34 34 Permission granted August corner of Boaler Street and Ltd flats with ground floor commercial 2019 Madeley Street space KF9 40 Hampstead Road Vedran Beader Conversion to 6 flats 6 Permission granted April 2019 KF10 “Cotswold Place”, Cotswold Wincome Properties 26 new studio apartments and 5 x 2 31 Permission granted July 2019 Street/Holt Road bed apartments FK11 Elm Park, 1 Elm Vale SFY Construction To erect 3 storey building with 11 x 1 11 + 1 Revised application 19F/1073 Limited bedroom apartments and 1 x 5 bed awaiting signing of legal HMO agreement since Sept 2019 KF12 Land off Laurel Road and Mr Stone Oak To erect 38 houses 38 Permission granted Laburnum Road November 2017 KF13 174 Prescot Road Genii Develop- Conversion of existing building to 1 9 Permission granted October ments Limited studio and 8 flats above existing retail 2016 KF14 11-15 Fairfield Street Merco To erect 8 semi-detached houses 8 Application 19F/0001 Developments submitted January 2019 Ward: KIRKDALE KD16 St Sylvester’s RC Church, Trophy Homes Ltd Conversion of former church to 13 13 Application 18F/1188 Silvester Street flats awaiting signing of legal agreement since August 2019 KD17 “Tobacco Wharf”, Phase 2, Trophy Homes Ltd To erect 7 storey building with 100 110 Outline permission granted Site between 43 Tobacco apartments February 2018 Wharf & Commercial Road KD18 Land bounded by Whittle Fast Growth Homes To erect 5/6 storey building with 177 177 Permission granted August Street, Smith Street and Limited residential apartments, commercial, 2018 Kirkdale Road residents gym, lounge and parking. KD19 220-224 Stanley Road ARMS Group Ltd Conversion of upper floors to self- 6 Application 18F/0417 contained flats awaiting signing of legal agreement since August 2019 KD20 Land at Walton Road/ FBMUK Ltd To erect 7 dwelling houses and 3 31 Permission granted April 2018 Woodhouse Close storey block comprising of 24 flats KD21 Land adjacent to 5 Orwell Mr Greg Pope To erect 4 storey building comprising 19 Application 18O/2273 Road 19 apartments submitted August 2018 KD22 46 Orwell Road Choice Homes Conversion of ground floor of public 5 Permission granted Group house to form 5 studio flats. September 2019 KD23 Land at Royal Street/ Mr Paul King To erect 12 houses 12 Application 15F/2444 awaiting Everton Brow signing of legal agreement since December 2015 KD24 Land at Fountains Close Mr Heffey To erect 9 houses 9 Application 19F/1166 submitted June 2019 KD25 Former Princes Bingo Hall, JJC Developments To erect part 4/6 storey block 37 Application 17F/1220 awaiting Brewster Street & Selwyn Ltd comprising 37 apartments and signing of legal agreement Street ground floor commercial unit since August 2018 KD26 The Cabin, 49 Marsh Street Sina Construction Conversion of pub to 6 flats 6 Permission granted June 2019 Limited Ward: KNOTTY ASH

KA3 Land at Queens Drive East Prescot Road To erect building of between 2 and 26 Application 19F/2400 Stoneycroft and Corner of Homes Limited 7 storeys in height consisting of 26 x submitted September 2019 Lexham Road 1, 2 and 3 bedroom apartments with parking KA4 Former Knotty Ash Care Knotty Ash To convert residential care home to 15 Application 19F/1503 Home, 69 East Prescot Road Residential Care form 14 flats and 1 studio flat submitted June 2019 Home Limited KA5 Former Alder Hey Hospital, Alder Hey Children's To redevelop part of former hospital Not yet Revised application awaited Eaton Road NHS Foundation site for residential accommodation known Trust KA6 Greyhound Public House, Secure Property Extension to ground floor to create 9 Permission granted June 2015 343 East Prescot Road Developments two restaurants, with 9 flats. KA7 10-12 Thomas Lane, Little Homefast Ltd 4 x 2 storey new houses and 3 x 3 30 Outline application 16O/1385 Bongs storey blocks with 26 flats following awaiting signing of legal demolition of existing building agreement since July 2018

RESIDENTIAL DEVELOPMENT UPDATE //46

NEIGHBOURHOODS: PRIVATE SECTOR

Proposed Schemes continued Key Address Developer Description No of Status homes Ward: MOSSLEY HILL

MH4 Geel And Hitchen Court, Ashbury Estates To erect 2 storey and 3 storey attic 14 Application 19F/1223 Woodlands Road Management apartment buildings containing 14 submitted May 2019 Limited apartments

MH5 3 Aigburth Vale Pear Tree Estates To convert premises into 7 self 7 Application 19F/2619 contained flats submitted October 2019 Ward: OLD SWAN

OS5 8 Derwent Road West Churchill Eastern To erect three storey block of flat 7 Application 18F/3067 Limited flats and 2 linked bungalows to submitted November 2018 provide supported living accommodation

OS6 514-520 Prescot Road All Elite Conversion of upper floors to 9 x 1 9 Permission granted Management bedroom flats September 2019 Ward: PICTON

PN4 25-29 Lawrence Road Namit Investments New 4 storey block with 6 flats and 6 Permission granted July 2019 ground floor retail/ commercial space Ward: PRINCES PARK

PP15 Land on Upper Parliament St FBM UK To erect 95 x 1and 2 bed 95 Application 18F/3306 between Mulgrave St and apartments in 2 blocks comprising awaiting signing of legal Kingsley Rd School of 3, 4 and 5 storeys with associated agreement since June 2019 parking and landscaping.

PP16 2 Princes Road Mr Hayel New 4 storey building with 8 flats 8 Permission granted March above ground floor commercial 2017

PP17 Land on Rosebery Street to Mr Kenneth Guy To erect 11 x 4 storey houses 11 Application 18F/1511 the rear of Hatherley Street awaiting signing of legal agreement since August 2018

PP18 Saunders House, Parliament Mr John Evans Conversion to 6 x 2 bedroom 6 Application 18F/1625 Business Park apartments submitted July 2018

PP19 Land at Junction of Lodge Mr Wahee Ahmed New 3 storey building with 9 flats 9 Permission granted March Lane and Solway Street over commercial space 2017

PP20 45 Bentley Road Grangeford New 4 storey block of 28 flats with 28 Application 17F/0722 ground floor commercial space submitted August 2017

PP21 115-117 Windsor Street Zane Abdo To erect 3 storey building with 8 flats 8 Permission granted above ground floor café September 2017 Ward: RIVERSIDE

RS10 Land Between Sefton Street Eloquent Global To erect two buildings of 8 and 6 198 Permission granted May 2018 and Caryl Street Ltd storeys comprising 198 apartments

RS11 319 Grafton Street Mr Kenny To replace derelict factory with 29 x 29 Outline application 19O/0860 Boughton 1 bed supported living apartments in submitted May 2019 a part 4/part 6 storey building with communal and staff support facilities.

RS12 “Brunswick Quay”, Land North West 11 storey residential building 240 Permission granted July 2018 bounded by Brunswick Industrial Estates consisting of 240 flats with ground Dock, Summers Road and Ltd floor commercial space and 192 car Century Buildings parking spaces

RS13 Former Dick Jennings Public Genii Conversion of former pub to 2 x 4 3 Permission granted July 2019 House, 106 Hill Street Developments bedroom and 1 x 3 bedroom HMO’s Limited (3 units; 11 bedrooms total)

RESIDENTIAL DEVELOPMENT UPDATE //47

NEIGHBOURHOODS: PRIVATE SECTOR

Proposed Schemes continued Key Address Developer Description No of Status homes Ward: SPEKE GARSTON SG10 98-100 St Marys Road Mr Mohamed al Conversion of building 10 flats 10 Permission granted September 2019 Mansoori SG11 9-33 Speke Road Knightsbridge To erect 3 blocks of 3/4 storey 79 Application 19F/2522 submitted buildings to provide 79 October 2019 apartments and 6 ground floor retail units with car parking SG12 Land off Church Road / Lovell To erect 16 dwelling houses 16 Permission granted October 2015 Railway Street, Garston Partnership Ltd SG13 “Church Fields”, 44-48 Lovells To erect 4 x 2 bed and 6 x 3 bed 10 Permission granted January 2016 Window Lane dwelling houses SG14 Land bounded by Backhouse To redevelop part of the existing 169 Outline application 17O/3256 Blackburne Street, Developments industrial estate for 169 houses submitted January 2018 Brunswick Street and York Ltd and pocket park. Street SG15 47 Parade Crescent Anchor Hanover Conversion of vacant day care 15 Permission granted October 2019 centre to 13 retirement flats and 2 apartments. SG16 Former St Aidans Church, Ascot To demolish former church and 28 Application 17F/0550 awaiting Parade Crescent build 28 houses signing of legal agreement since April 2018 Ward: ST MICHAELS SM6 Land adjacent to 1 Linnet Mr Richard To erect 3.5 storey apartment 10 Permission granted February 2017 Lane Hesmondhalgh block containing 8 apartments and 2 coach houses SM7 17-19 Aigburth Road, 28 Crossfield Group To erect 5 storey apartment 73 Application 19F/1157 awaiting Alexandra Drive, and land block containing 39 apartments signing of legal agreement since at 25/27 Alexandra Drive following demolition of existing September 2019 buildings at 17/19 Aigburth Road; to change use of 28 Alexandra drive from offices into 14 apartments; and to erect part 3/ part 4 storey apartment block containing 20 apartments at land between 25/27 Alexandra Drive, all with associated parking and landscaping. SM8 27-29 Ivanhoe Road Mr Steven To erect four storey block 16 Application 18F/1494 awaiting Moranto comprising 16 apartments signing of legal agreement since July 2018 SM9 82-84 Aigburth Road Mrs Angela Conversion of upper floors to 6 6 Permission granted June 2019 Heslop self contained apartments SM10 23 Aigburth Road and 34 Vinco Group To replace 23 Aigburth Road with 76 Application 17F/3289 awaiting Alexandra Drive Ltd/Places for 4 to 5 storey building with 56 signing of legal agreement since People apartments, and conversion of February 2018 34 Alexandra Drive into 20 more SM11 Site of Former St Charles Sundial Omega To erect 4 storey apartment 16 Permission granted March 2019 Parochial Centre, Tramway Limited block containing 16 apartments Road SM12 13 Normanton Avenue Mr Ben To convert to a care leavers hub 6 Permission granted July 2018 Seabrook with 5 self contained flats, 1 training flat, associated office/ training accommodation SM13 9 Normanton Avenue Redrock To convert existing dwelling to 8 8 Permission granted September 2019 Contractors Ltd apartments

RESIDENTIAL DEVELOPMENT UPDATE //48

NEIGHBOURHOODS: PRIVATE SECTOR

SCHEME: Whittle Street/Smith Street/Kirkdale Road, Liverpool L5 SCHEME: Land on Upper Parliament St between Mulgrave St and DEVELOPER: Fast Growth Homes Limited Kingsley Rd School, Liverpool L8 COST: £20 million DEVELOPER: FBM UK HOMES: 177 apartments COST: £12 million STATUS: Application 18F/0417 awaiting signing of legal agreement HOMES: 95 apartments since August 2018 STATUS: Application 18F/3306 awaiting signing of legal agreement since June 2019

SCHEME: West Derby Road/Caird Street/Grant Gardens, Liverpool L6 SCHEME: Land at Sefton Street/Caryl Street, Riverside, Liverpool L8 6SD DEVELOPER: Croft Housing Association DEVELOPER: Eloquent Global COST: £10 million COST: £18 million HOMES: 116 sheltered flats for the over 55’s HOMES: 198 apartments around an internal; courtyard STATUS: Application 18F/1637 awaiting signing of legal agreement STATUS: Permission granted September 2017 since October 2018

SCHEME: 17-19 Aigburth Road, and land at 25/27 Alexandra Drive SCHEME: “Baycliff Gardens”, Baycliff Road, Liverpool L12 6QT DEVELOPER: Crossfield Group DEVELOPER: Osco Homes COST: £7 million COST: £2 million HOMES: 73 apartments HOMES: 19 modular 3 bedroom family homes STATUS: Application 19F/1157 awaiting signing of legal agreement STATUS: Application 18F/1369 awaiting signing of legal agreement since September 2019 since August 2018

RESIDENTIAL DEVELOPMENT UPDATE //49

NEIGHBOURHOODS: PRIVATE SECTOR

NEIGHBOURHOODS: PRIVATE SECTOR

NEIGHBOURHOODS: PRIVATE SECTOR

Proposed Schemes continued Key Address Developer Description No of Status homes Ward: TUEBROOK & STONEYCROFT TS8 90-94 Townsend Lane Mr Mark Keane To erect three storey block with 3 5 Permission granted September 2017 townhouses and 2 flats TS9 Former Edinburgh Park Persimmon To erect 232 houses 232 Application 18F/0111 submitted Dockers Club, Townsend Homes (North January 2018 Lane West) Limited TS10 Land at 20-28 Glamis Road Mr John To erect 2 x 3 storey blocks 14 Application 15F/2186 awaiting signing Routledge comprising 14 flats with parking of legal agreement since March 2016 TS11 12-14 Marlborough Road Marlborough To erect detached building 7 Application 19F/1203 submitted May Living Ltd comprising 7 flats with car 2019 parking TS12 19 Breckside Park Mr Gavin To erect 12 houses with parking 12 Permission regranted February 2017 Whiteside TS13 425 West Derby Road Mr A Finnigan Conversion of former pub to 3 15 Application 17F/2099 awaiting signing retail units and 15 one bed flats of legal agreement since 2017 TS14 439 West Derby Road Oakmere To erect 4 storey block with 39 39 Permission granted June 2016 Services Ltd flats and 2 retail units TS15 Trinity Methodist Church, Larch Housing To erect four storey block of 17 17 Permission granted August 2017 West Derby Road flats and community room above retail unit. Ward: WAVERTREE WT3 120 Wellington Road Lacy Roofing To erect 26 dwelling houses and 26 Permission granted May 2016 Company Ltd layout new access road WT4 12 Shanklin Road Shanklin Conversion to 10 flats with car 10 Permission granted April 2019 Develop parking WT5 Chillies, 57-61 High Street, Chillies Conversion of public house to 6 10 Permission granted November 2017 Wavertree flats, and erect 4 houses at rear WT6 Thatched House, 68 High Mr Paul Murphy To convert public house to form a 1 HMO Permission granted July 2017 Street, Wavertree 7 bedroom house in multiple (7 beds) occupation WT7 89 High Street, Wavertree TJ Thomas Conversion of public house to 1 HMO Permission granted January 2019 Group supported accommodation (17 (17 bedrooms) with meeting room beds) and office. WT8 63-69 High Street Vitality Homes Conversion of public house to 17 Permission granted January 2019 supported accommodation (17 bedrooms) with meeting room Ward: WOOLTON WN4 The Crying Tree, Grange Mr Lee Conversion to 10 apartments, 15 Permission granted April 2017 Lane Goldsmith and erect 5 new dwellings following partial demolition of existing building WN5 Springhill, Runnymede Springhill Replacement of existing house 10 Application 19F/1748 submitted July Close Woolton Ltd. with a 3 storey building of 10 2019 apartments and basement parking WN6 St Gabriels Convent, St Gabriels To convert main building into 35 52 Permission granted August 2016 Beaconsfield Road (Liverpool) Ltd apartments; erect 16 new houses; refurbish lodge as single dwelling. Ward: YEW TREE YT4 Liverpool Football Club, Liverpool To erect 160 houses 160 Outline permission granted February Training Football Club 2018 Ground, Deysbrook Lane YT5 “Baycliff Gardens”, Osco Homes To erect 19 x 2.5 storey, 3 bedroom 19 Application 18F/1369 awaiting signing Baycliff Road dwellings and associated works. of legal agreement since August 2018 YT6 Black Angus, Barons Hey Mr Michael To erect 10 houses following 10 Permission granted May 2017 Quinn demolition of existing public house YT7 Land at corner of Finch Yewtree To erect 10 x 2 bedroom and 7 x 3 17 Application 18F/3177 awaiting signing Lane and Haydn Road Developments 3 bedroom two storey houses of legal agreement since April 2019 Ltd

RESIDENTIAL DEVELOPMENT UPDATE //50

SECTION 7 SIGNIFICANT MAJOR DEVELOPMENTS

IN NEIGHBOURHOODS CONCLUDE

Two major student accommodation schemes in Liverpool’s neighbourhoods were completed in NEIGHBOURHOODS autumn 2019, bringing to a close a two year period of significant investment outside of the City Centre.

STUDENT  Greenbank Student Village saw the rebuilding of older student rooms at the University of Liverpool’s campus in South Liverpool, with the addition of new ones, bringing a total of 1,370 ACCOMMODATION bedrooms. 870 were completed in September 2018, with the remainder finished this year;

 “Unity Square” at Shaw Street overlooking Everton Park also concluded in October 2019. Taken over by MCR Developments, the scheme had previously lain half finished for two years after the collapse of its original developer, Pinnacle. The £17 million scheme Number of student bedrooms brought 240 bedrooms. 1,159 completed since October 2018

Number of student bedrooms 1,593

built per annum in Liverpool’s Neighbourhoods since 2013 Number of student bedrooms

1000 1,153 157 currently under construction

800

49

762 600 Number of potential student

529 bedrooms either with or seeking 135 400 planning approval 460

200

202

159 0 157

3 4 5 6

18

17 20

20

201 201 201 20

201

20 2019 Year Student bedrooms completed by year Student bedrooms on site – suggested completion

Two schemes with a total value of £42.2 million between them remain on site; the largest – “The Rise” at Low Hill is a mix of 316 apartments with an additional student accommodation element bringing 141 bedrooms. It is currently anticipated to complete in September 2020.

This year, only one new student scheme application has been submitted – for 13 bedrooms (and 1 apartment) at the Grade II* listed Hermitage at Liverpool Hope University’s residential campus off St Michaels Road.

COMPLETED: GREENBANK STUDENT VILLAGE, GREENBANK LANE

RESIDENTIAL DEVELOPMENT UPDATE //51

NEIGHBOURHOODS: STUDENT ACCOMMODATION

Student accommodation scheme completed since October 2018

Student accommodation scheme FAZAKERLEY under construction

Student accommodation scheme WARBRECK proposed

CROXTETH NORRIS GREEN COUNTY

CLUBMOOR

WEST ANFIELD DERBY

KIRKDALE YEW TREE

TUEBROOK & EV24 STONEYCROFT EVERTON EV25 KNOTTY ASH EV23 EV22 OLD SWAN KENSINGTON KF14 & FAIRFIELD KF15 CENTRAL PN7 PN6

PICTON WAVERTREE CHILDWALL RIVERSIDE PN5 PN8 PRINCES PARK BELLE VALE GREENBANK

GB6 CHURCH WOOLTON ST MICHAELS SM13

MOSSLEY HILL BELLE VALE

CRESSINGTON ALLERTON & HUNTS CROSS

SPEKE GARSTON Student accommodation schemes since October 2018 by ward

Crown copyright and database rights 2019 Ordnance Survey 100018351

RESIDENTIAL DEVELOPMENT UPDATE //52

NEIGHBOURHOODS: STUDENT ACCOMMODATION

Schemes completed since October 2018* (Total: 1,159 bedrooms/bedspaces) Key Address Developer Description No of Date of Completion units Ward: EVERTON EV22 “Unity Square”, Shaw MCR Property New 6 storey building with 240 student 240 October 2019 Street Group apartments and lower ground car park Ward: GREENBANK GB6 “Greenbank Student University of To erect new halls of residence and refurbish 870 September 2019 Village”, Greenbank Liverpool Derby Old Court (1,370 bedrooms in total) in 4, Lane (Phase 2) 5 & 6 storey buildings, along with a 2 storey sports hall and sports pavilion, and sports pitches/ facilities. Ward: PICTON PN5 120 Smithdown Road Mr Frank Conversion/redevelopment to provide 2 49 October 2018 Campbell houses, 14 apartments, 2 x 7 bed HMOs, laundry, parking, all for 49 students.

Schemes currently on site (Total: 157 bedrooms/bedspaces) Key Address Developer Description No of Expected units Completion Ward: KENSINGTON & FAIRFIELD KF14 “The Rise”, Land at Low The Lofts To erect a block of residential units and student 141 September 2020 Hill (Ormskirk) accommodation of up to 7 storeys in height Management Ltd comprising 316 self-contained flats, 80 self & Deutsche Pad contained student flats and 13 student cluster Ltd flats (61 bed spaces), with ancillary communal facilities and 4 commercial units. Ward: PICTON PN6 Land adjacent to Sydney N and F Properties To erect 4 storey building to create 4 student 16 December 2019 Place, and 16-18 Limited cluster apartments (16 beds) with associated Grinfield Street communal facilities

Schemes stalled Key Address Developer Description No of Expected units Completion Ward: EVERTON EV23 “Fox Street Village” Linmari Group 160 apartments and communal facilities (total 160 Scheme stalled – on (Phase 2), Swainbanks (now liquidated) scheme has 400, some of which are already hold Limited, 50 Fox Street occupied).

Proposed Schemes (Total: 135 bedrooms) Note: The granting of planning permission does not guarantee that a particular scheme will actually be built Key Address Developer Description No of Status units Ward: EVERTON EV24 14-20 Breckfield Road Kingston Estates To erect 21 student bedrooms in a three storey 21 Permission granted North Limited block following demolition of existing October 2016 properties. EV25 Telegraph Service Mr A Patel To erect four storey building to provide 16 16 Outline application Station, Scotland Road student studios 18O/3094 submitted December 2018 Ward: KENSINGTON & FAIRFIELD KF15 25-27 Deane Road C D Properties To erect four storey block to provide 8 cluster 35 Permission granted flats comprising 35 bedrooms of student October 2018 accommodation with associated works. Ward: PICTON PN7 1A, 3A, 5A and 7A Premier Housing To convert existing building to form 20 x 1 bed 20 Permission granted Wavertree Road flats and studios April 2019 PN8 12-14 Wellington Avenue Astra To convert existing properties to form 6 30 Permission granted Developments bedroom and 9 bedroom houses in multiple October 2018 occupation and erect three storey block comprising 15 student bedspaces Ward: ST MICHAELS SM13 The Hermitage, Liverpool Liverpool Hope To carry out repair, restoration and 13 Application 19F/1871 Hope University, St University refurbishment works to provide 13 bedrooms submitted August 2019 Michaels Road student accommodation and 1 residential apartment in basement 1

RESIDENTIAL DEVELOPMENT UPDATE //53

NEIGHBOURHOODS: STUDENT ACCOMMODATION

SCHEME: “Unity Square”, 26 Shaw Street, Everton, Liverpool SCHEME: “Greenbank Student Village”, Greenbank Lane DEVELOPER: MCR Property Group DEVELOPER: University of Liverpool COST: £17 million COST: £90 million BEDROOMS: 240 BEDROOMS: 1,370 STATUS: Completed October 2019 STATUS: Completed September 2019

SCHEME: 20 Smithdown Road, Liverpool SCHEME: Grinfield Street / Sidney Place DEVELOPER: Private developer DEVELOPER: N & F Properties Ltd COST: £2 million COST: £1.2 million BEDROOMS: 49 BEDROOMS: 16 STATUS: Completed October 2018 STATUS: On site for completion December 2019

SCHEME: ”The Rise”, Low Hill SCHEME: The Hermitage, St Michaels Road, Liverpool L17 7JQ DEVELOPER: The Lofts (Ormskirk) Management Ltd/Deutsche Pad Ltd DEVELOPER: Liverpool Hope University COST: £43 million COST: £1.5 million BEDROOMS: 141 (plus 316 non-student apartments) BEDROOMS: 13 STATUS: On site for completion September 2020 STATUS: Application 19F/1871 submitted August 2019

RESIDENTIAL DEVELOPMENT UPDATE //54

NEIGHBOURHOODS: STUDENT ACCOMMODATION

Owning your own home remains a major ambition for many people. In recent times, however, realising that SECTION 8 dream has often seemed difficult. Mayor Anderson’s pledge, made when he came into office back in 2012, was that 5,000 new homes would be built in the city, with the additional promise that a significant proportion of these would be “affordable”. AFFORDABILITY Building new or refurbishing existing homes is an expensive business, but there are a number of ways in which Helping residents buy their first Liverpool’s developers and housing providers are supported with money from various sources and initiatives home, and giving tenants more which help to keep overall costs down, making homes more affordable. choice With some 6,709 homes now built under the various public sector assisted schemes between April 2012 and September 2019, and over 1,000 more currently on site, we Breakdown by type of homes completed under can now look with more detail at how many of these have the Housing Delivery Plan and Strategic Housing been made affordable, and how they have been supported. Development Partnership (out of a total 6,709) as at 01 November 2019  AFFORDABLE HOMES PROGRAMME: 2,700 homes built (40% of 6,709 total to date) The Affordable Homes Programme (AHP) is grant funding that developers and registered providers 260 receive from the government’s Homes & Communities 568 (4%) (8.5%) Agency (HCA) to develop new or refurbish existing homes. Homes are then either sold outright, or on a shared ownership bases, or otherwise rented out by registered housing providers.

 HOUSING RENEWAL: 3,569 1,844 homes built (27.5% of 6,709 total to date) 2,312 (53%) This involves the redevelopment of brownfield (34.5%) (previously developed) sites within designated housing renewal areas. New homes are built for mixed tenure in partnership between the council, registered providers and other developer partners.

 HOUSING CONSORTIUM: 171 homes built (2.5% of 6,709 total to date) These consist of council owned sites which are being released to registered provider partners for subsidised OUTRIGHT SALE mixed tenure housing developments. includes “Help to Buy”, “First Buy” and “Mortgage Guarantee” schemes  MIXED/PRIVATE SCHEMES: 536 homes built (8% of 6,709 total to date) SOCIAL/AFFORDABLE RENT Affordable Rent is subject to rent controls that require a rent of These are where the Council has given a significant no more than 80% of the local market rent (including service level of support to private developers, including charges where applicable) having sold land to them for redevelopment.

SHARED OWNERSHIP  REGENERATION LIVERPOOL: provided through Housing Associations where buyers buy a 1,002 homes built (15% of 6,709 total to date) mortgage share of a home (between 25% and 75% of its value) This is a partnership between the Council and and pay rent on the remaining share regeneration specialists Sigma Inpartnership Ltd, in MARKET RENT which the Council makes some of its surplus land property which is let on the open market without any available for redevelopment. reductions applied to the rent charged  SCHOOLS INVESTMENT PLAN: 133 homes built (2% of 6,709 total to date) These are new homes that have been built on land released as a result of moving schools to other sites.

 STRATEGIC HOUSING DEVELIVERY PLAN: 323 homes built (5% of 6,709 total to date) These are new homes that have been built as part of the partnership between Liverpool City Council, Redrow, Liverpool Mutual Homes and Willmott Dixon.

RESIDENTIAL DEVELOPMENT UPDATE //55

ON SITE: “JOSEPH WILLIAMS PLACE”, BELLE VALE

ON SITE: “PAVILION POINT”, CRESSINGTON

RESIDENTIAL DEVELOPMENT UPDATE //56

KEY CONTACTS FOR REGENERATION QUERIES:

Claire Slinger Assistant Director, Regeneration Investment & Development, Liverpool City Council Tel: 0151 233 0262 Email: [email protected] www.regeneratingliverpool.com Twitter: @Regen_Lpool

Mark Kitts Chief Executive, Liverpool Foundation Homes Limited 0151 233 0990 Email: [email protected] www.liverpoolfoundationhomes.co.uk

RESIDENTIAL DEVELOPMENT UPDATE //57