Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress
Total Page:16
File Type:pdf, Size:1020Kb
Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress (name redacted) Specialist in Naval Affairs January 9, 2012 Congressional Research Service 7-.... www.crs.gov RL34476 CRS Report for Congress Prepared for Members and Committees of Congress Navy LPD-17 Amphibious Ship Procurement Summary The Navy’s proposed FY2012 budget requested funding for the procurement of an 11th and final San Antonio (LPD-17) class amphibious ship. The ship had received $184.0 million in prior-year advance procurement (AP) funding, and the Navy’s proposed FY2012 budget requested the remaining $1,847.4 million needed to complete the ship’s estimated procurement cost of $2,031.4 million. The Navy’s FY2012 30-year shipbuilding plan calls for the procurement of a new class of amphibious ship called the LSD(X) starting in FY2017. Some observers have suggested using the LPD-17 design as the basis for the LSD(X). Navy officials do not stress this option and instead appear more interested in developing an all-new design for the LSD(X). If a decision were made to use the LPD-17 design as the basis for the LSD(X), then procuring a 12th LPD-17 in FY2014 or FY2015 would help keep the LPD-17 production line open until the procurement of the first LSD(X) in FY2017, which in turn might help reduce LSD(X) production costs. Issues for Congress in 2011 included whether to approve, reject, or modify the Navy’s proposed funding request for the 11th LPD-17, whether to encourage or direct the Navy to use the LPD-17 design as the basis for the design of the LSD(X), and—particularly if the LPD-17 design is used as the basis for the LSD(X)—whether to fund the procurement of a 12th LPD-17 in FY2014 or FY2015. Congressional Research Service Navy LPD-17 Amphibious Ship Procurement Contents Introduction...................................................................................................................................... 1 Background...................................................................................................................................... 1 Amphibious Ships in General.................................................................................................... 1 Roles and Missions of Amphibious Ships........................................................................... 1 Amphibious Lift Goal ......................................................................................................... 2 Current and Projected Force of Amphibious Ships............................................................. 3 LPD-17 Program ....................................................................................................................... 3 Program Origin.................................................................................................................... 3 Construction Shipyards ....................................................................................................... 4 Procurement History ........................................................................................................... 4 Cost Growth, Schedule Delays, and Construction Problems .............................................. 5 Option of Using LPD-17 Design as Basis for LSD(X)....................................................... 5 FY2012 Funding Request.................................................................................................... 5 Issues for Congress.......................................................................................................................... 5 Legislative Activity For FY2012 ..................................................................................................... 7 FY2012 Funding Request..........................................................................................................7 FY2012 National Defense Authorization Act (H.R. 1540/P.L. 112-81) .................................... 7 House................................................................................................................................... 7 Senate (S. 1867) .................................................................................................................. 8 Senate (S. 1253) .................................................................................................................. 8 Conference .......................................................................................................................... 8 FY2012 Military Construction and Veterans Affairs and Related Agencies Appropriations Act (H.R. 2055/P.L. 112-74).......................................................................... 8 Conference .......................................................................................................................... 8 FY2012 DOD Appropriations Act (H.R. 2219)......................................................................... 8 House................................................................................................................................... 8 Senate .................................................................................................................................. 9 Conference .......................................................................................................................... 9 Figures Figure 1. LPD-17 Class Amphibious Ship....................................................................................... 4 Tables Table 1. Projected Number of Amphibious Ships, FY2012-FY2041 .............................................. 3 Table 2. LPD-17 Procurement, FY1996-FY2012............................................................................ 5 Table A-1. Amphibious Lift Goals Since 1980.............................................................................. 10 Table A-2. MEB AE Lift Elements................................................................................................ 12 Table A-3. Ships Required for Various Potential Lift Goals.......................................................... 13 Congressional Research Service Navy LPD-17 Amphibious Ship Procurement Appendixes Appendix A. Additional Information on Amphibious Lift Goal.................................................... 10 Appendix B. May 25, 2011, Navy Testimony on LPD-17 Program.............................................. 15 Appendix C. LPD-17 Cost Growth and Construction Problems ................................................... 18 Contacts Author Contact Information........................................................................................................... 59 Congressional Research Service Navy LPD-17 Amphibious Ship Procurement Introduction This report provides background information and issues for Congress on the San Antonio (LPD- 17) class amphibious ship program. The Navy’s proposed FY2012 budget requested funding for the procurement of an 11th and final San Antonio (LPD-17) class amphibious ship. Issues for Congress in 2011 included whether to approve, reject, or modify the Navy’s proposed funding request for the 11th LPD-17, whether to encourage or direct the Navy to use the LPD-17 design as the basis for the design of the LSD(X) class of amphibious ships that the Navy wants to begin procuring in FY2017, and—particularly if the LPD-17 design is used as the basis for the LSD(X)—whether to fund the procurement of a 12th LPD-17 in FY2014 or FY2015. Congress’s decisions on these issues can affect, among other things, Navy and Marine Corps funding requirements and capabilities, and the shipbuilding industrial base. Background Amphibious Ships in General1 Roles and Missions of Amphibious Ships The primary function of Navy amphibious ships is to lift (i.e., transport) U.S. Marines and their equipment and supplies to distant operating areas, and enable Marines to conduct expeditionary operations ashore in those areas. Although amphibious ships are designed to support Marine landings against opposing military forces, they are also used for operations in permissive or benign situations where there are no opposing forces. Due to their large storage spaces and their ability to use helicopters and landing craft to transfer people, equipment, and supplies from ship to shore without need for port facilities,2 amphibious ships are potentially useful for a range of 3 non-combat and combat operations. 1 Navy amphibious ships can be divided into two main groups—the so-called “big-deck” amphibious assault ships, designated LHA and LHD, which look like medium-sized aircraft carriers, and the smaller (but still sizeable) amphibious ships designated LSD or LPD, which are sometimes called “small-deck” amphibious ships. U.S. Navy amphibious ships have designations starting with the letter L, as in amphibious landing. LHA can be translated as landing ship, helicopter-capable, assault. LHD can be translated as landing ship, helicopter-capable, well deck. LSD can be translated as landing ship, well deck. LPD can be translated as landing ship, helicopter platform, well deck. Whether noted in the designation or not, all these ships have well decks. The LHAs and LHDs have large flight decks and hangar decks for embarking and operating numerous helicopters and VTOL fixed-wing aircraft, while the LSDs and LPDs have much smaller flight decks and hangar decks for embarking and operating smaller numbers of helicopters. The LHAs and LHDs, as bigger ships, in general can individually embark more Marines and equipment than the LSDs and LPDs. 2 Amphibious ships