District Environmental Action Plan for

(As per Hon’ble NGT order in O.A.No.710-713/2017 dated 15.07.2019)

Prepared by. District Environment committee, Banaskantha

1

INDEX

Chapter Detail Page no.

Chapter 1 Introduction 3

Chapter 2 Waste Management Plan 4

2.1 Solid Waste Management 4

2.2 Plastic Waste Management 6

2.3 C&D Waste Management 8 2.4 Biomedical Waste Management 9

2.5 Hazardous Waste Management 13

2.6 E-Waste Management 16

Chapter 3 Water Quality Management Plan 19

Chapter 4 Domestic Sewage Management Plan 23

Chapter 5 Industrial Wastewater Management Plan 25

Chapter 6 Air Quality Management Plan 28

Chapter 7 Mining Activity Management plan 31

Chapter 8 Noise Pollution Management Plan 33

Chapter 9 Conclusion 35

Chapter 10 Annexure 38

District Environment Committee

2

1. INTRODUCTION

1.1. Brief about Location & Geographical Area of Banaskantha District.

Banaskantha District includes the area around the Bank of Banas River. The District is situated between 23.33 to 24.45 north latitude and72.15 to 73.87 east longitude. Banaskantha District lies on north-west side of State. The District is surrounded by Marwad and Sirohi regions of State in the north, Sabarkantha District in the east, Mehshana District in the south and in the west.

1.2. Brief about Hon’ble National Green Tribunal in O.A.No. 710-713 / 2017 dated 15.07.2019.

Hon’ble National Green Tribunal in O.A.No. 710-713 / 2017 dated 15.07.2019 ordered regarding constitution of District Committee (as a part of District Planning Committee under Article 243 ZD) under Articles 243 G, 243 W, 243 ZD read with Schedules 11 and 12 and Rule 15 of the Solid Waste Management Rules, 2016. In the above said order, it is stated that among others

‘Chief Secretaries may personally monitor compliance of environmental norms (including BMW Rules) with the District Magistrate once every month. The District Magistrates may conduct such monitoring twice every month. We find it necessary to add that in view of Constitutional provisions under Articles 243 G, 243 W, 243 ZD read with Schedules 11 and 12 and Rule 15 of the Solid Waste Management Rules,2016 it is necessary to have a District Environment Plan to be operated by a District committee (as a part of District Planning Committee under Article 243 ZD)’

In this regard, Principal Secretary to Government / Chairman (FAC) vide D.O. letter dated 26.07.2019 requested District Collectors to prepare District Environmental plans by constituting District Committee (as a part of District Planning Committee under Article 243 ZD) with representatives from Panchayats, Local Bodies, Regional Officers, State PCB and a suitable officer representing the administration, which may in turn be chaired and monitored by the District Collector / District Magistrate twice every month and shall host the same in the website for a period of one year on or before 01.08.2019 & furnish monthly progress report to Chief Secretary to Government every month and copy of the same earmarked to GPC Board accordingly. As per the directions, District committee was formed in the Banaskantha District comprising of following members to evolve and execute District Environmental Plan.

The District Environment Plans cover the following environmental issues: 1. Solid Waste Management 2. Biomedical Waste Management 3. Plastic Waste Management 4. Construction and Debris Waste (C & D) 5. Rejuvenation of Polluted River Stretches 6. Industrial Pollution Control 7. Utilization of Treated Sewage 8. Conservation of Water Bodies 9. Air Quality Management Plan 10. E-Waste Management 11. Mining (Prevention of Sand Mining) 12. Noise Pollution Management Plan 3

2. Waste Management Plan

2.1 Solid Waste Management

The Ministry of Environment, Forest and Climate Change, Government of has notified the Solid Waste Management Rules, 2016. As per the Rules, the role of local body has been specified as per Rule 15 of Solid Waste Management Rules, 2016 and as per Rule16 of the said Rules, Gujarat Pollution Control Board shall enforce these Rules through local bodies.

With respect to effective implementation of Solid Waste Management Rules, 2016, Hon’ble NGT had laid down several orders, of which, Hon’ble National Green Tribunal, Principal Bench on 22nd December 2016 has passed judgment in Original Application No.199 of 2014 filed by Mrs. Almitra Patel with regard to solid waste management.

Further, for effective implementation of the said Rules, the Hon’ble NGT in its orders dated 31.08.2018 had constituted Apex Committee, Regional Committee and State Committee.

Solid Wastes generation in Banaskantha District:

In Banaskantha District, there are six Nagarpalikas (namely , , Thara, Bhabhar, , ). The solid waste generated from the said local bodies is being collected. The wet solid waste is either composted or micro composted. The plastic waste is collected and partly used for recycling and the inert material is disposed on the solid waste dump site. In Banaskantha district, scientific solid waste disposal land fill site is yet not developed.

As per Hon’ble NGT order dated 15.07.2019 in O.A. No. 710-713/2017, the detailed guidelines to be followed in respect of Solid Waste Management Rules, 2016 are illustrated below:

Sr. Responsibility of District Plan of Action Stake holders responsible No. Committee 1. Collection, Segregation  To carry out 100% door to door  All Chief officers of and treatment of solid collection with segregation at Nagarpalikas waste source.  All Executive Officers  Quantification of generation of (Taluka Panchayat) solid wastes (Biodegradable, Non- biodegradable, inert etc.).  Methodology of composting, bio- methanation, waste to energy etc. to be adopted.  Domestic hazardous waste such as discarded paint drums, used batteries, CFL bulbs etc. to be collected separately and handed over to Hazardous Waste Disposal facilities authorized by the GPCB.

4

2. Issue of Authorisation  Local bodies generating solid  All Chief officers of under SWM Rules,2016 waste greater than 5 tons/day Nagarpalikas shall obtain Authorisation as per  All Executive Officers SWM Rules, 2016 (Taluka Panchayat)  2 No. of ULBs having valid  Regional Officer, GPCB, Authorization as on 31/12/2019. Palanpur 3. Air Quality Monitoring,  To carry out Air Quality  All Chief officers of Water Quality Monitoring Monitoring, Water Quality Nagarpalikas of dumpsites & Compost Monitoring (ground water) &  All Executive Officers quality as per Schedule I Compost quality in and around (Taluka Panchayat) & II of SWM Rules, 2016 processing facilities & dumpsites  Regional Officer, GPCB, at all Corporations and as per Schedule I & II of SWM Palanpur Nagarpalikas Rules, 2016 at all Corporations  Executive Engineer, and sensitive /ecological GWSSB Municipalities Periodicity of  Executive Engineer, Water Quality Monitoring: Irrigation Summer, Monsoon and Post Monsoon. 4. Creating Awareness to  Special Task Force shall  All Chief officers of the public at all the periodically review once in a Nagarpalikas districts through Special month on the status of creating  All Executive Officers Task Force constituted as awareness and also on the (Taluka Panchayat) per. Hon’ble NGT prevention of dumping of solid  Regional Officer, GPCB, Principle bench, New waste and discharge of sewage in Palanpur original Application water bodies, action against open  Public Relation Officer, No.606/2018, burning of solid wastes etc. District Banaskantha dated.16/01/2019.  Awareness shall be carried out  Education Officer, District through Eco-clubs in Schools, NSS Level & NCC in colleges  District legal services Authority (DLSA), Banaskantha  Superintendent of Police, Banaskantha

Solid waste management Plan is attached as Annexure-I

5

2.2 Plastic Waste Management:

In Banaskantha District, there are six Nagarpalikas. The local bodies are directed to ensure that the plastic waste generated from all the local bodies are to be segregated and recyclable plastic waste are sold to the recyclers and the remaining inert are disposed for landfill.

In order to give thrust on plastic waste minimization, source segregation, recycling, involving waste pickers, recyclers and waste processors in collection of plastic waste fraction either from households or any other source of its generation or intermediate material recovery facility and adopt polluters pay principle for the sustainability of the Waste Management system, MoEF&CC has notified Plastic Waste Management Rules, 2016 as amended.

These rules shall apply to every waste generator, local body, Village Panchayat, manufacturer, Importers and producers.

With respect to effective implementation of Plastic Waste Management Rules, 2016, Hon’ble NGT had laid down several orders, of which, Hon’ble NGT in its order Dated. 12.03.2019 in Original Application No. 247/2017 among other things has directed all the States to prepare respective action plans for compliance of Rules and the same was submitted to the CPCB on 01.05.2019. The Action plan to be followed in respect Plastic Waste Management Rules 2018 as amended are given below:

Sr. Responsibility of District Plan of Action Stake holders responsible No. Committee  All Chief officers of  No. of Material Recovery facilities Segregation and Nagarpalikas established, quantity received Quantification of Plastic  All Executive Officers 1. and sent for beneficial uses. Wastes (Taluka Panchayat)  Quantification of generation of  Regional Officer, GPCB, plastic wastes Palanpur  All Chief officers of  Recycling of waste plastics Nagarpalikas Channelizing the  Mixed with bitumen for Road  All Executive Officers collected waste 2. laying (Taluka Panchayat) plastics(T/M)  Co-processing in cement plants  Regional Officer, GPCB,

 Pyrolysis plants Palanpur

 No. of recycling units identified for Registration, and issued with Issue of Registration as  Regional Officer, GPCB, Registration as on 31/12/2019 per PWM Rules, Palanpur 3.  No. of multi layered plastic units

2018 as amended identified for Registration and

issued with Registration as on 31/12/2019.

6

 Zone wise surprise inspections  All Chief officers of will be carried out once in a Nagarpalikas month and if any banned use Action regarding User  All Executive Officers 4. &throwaway plastic &Throwaway Plastic ban (Taluka Panchayat) manufacturers found, Directions  Regional Officer, GPCB, for Closure &disconnection of Palanpur power supply will be effected.  Education officer, Banaskantha  Awareness shall be carried out Awareness creation  Regional Officer, GPCB, 5. through Eco clubs in Schools, NSS Palanpur & NCC in colleges  NGOs

Plastic waste management Plan is attached as Annexure-II

7

2.3 Construction and Debris (C & D) Waste Management:

In Banaskantha district, municipalities and town panchayats are advised to ensure that the Construction and Demolition wastes are disposed without affecting the Environment.

As per Hon’ble NGT order dated: 15.07.2019 in OA. No. 710 – 713 /2017, the detailed guidelines to be followed in respect of C&D Waste Management Rules, 2016 by the District Committee as given below:

Responsibility of District Sr. Committee Plan of Action Stake holders responsible No.

 All Chief officers of Nagarpalikas  Identification & Establishment of Handling of construction  All Executive Officers 1. site for Construction and and demolition waste (Taluka Panchayat) Demolition processing facility  Regional Officer, GPCB Palanpur  To grant authorization to C&D  GPCB, 2. Issue of Authorization waste processing facility

Construction and Debris (C & D) waste management Plan is attached as Annexure-III

8

2.4 Biomedical Waste Management:

In Banaskantha District, the Biomedical waste generated from the government and private health care facilities is treated and disposed through the Common Bio Medical Waste Facility owned by M/s. Rhythm Biocare BMW Incinerator which is located at Village – Vedancha, Ta – Palanpur, Banaskantha. The detailed guidelines to be followed in respect of Bio Medical Waste Management Rules, 2016 by the District Committee are given below:

Responsibility of District Sr. Committee / District Level Plan of Action Stake holders responsible No. Monitoring Committee 1. Inventerisation of  Number of bedded and non-  Chief District Health Occupiers and data on bedded Government and Private officer, Banaskantha bio-medical waste Health Care Facilities in the  Health officer, Animal generation, treatment Districts Husbandry, Banaskantha &disposal  Number of Blood Banks, Clinical  Regional Officer, GPCB, labs in the Districts Palanpur  Veterinary Institution & Animal Husbandry  Forensic Labs & RD labs etc., 2. Issue of Bio Medical  As and when Inventerisation is  Regional Officer, GPCB, Waste authorization added. Palanpur under Bio Medical Waste Management Rules 2016 and issue of consent under Water (P&CP) Act,1974 as amended and under Air (P&CP) Act, 1981as amended 3. In each district,  Set up of Common Bio Medical  Regional Officer, GPCB, promoting a full-fledged Waste Treatment Facilities Palanpur Common Bio Medical (CBMWTFs) consisting of Waste Treatment Incinerator having residence time Facilities within one Year of 2 seconds, shredder with autoclaving facility, sanitary landfills, ash pit etc., 4. Monitoring of  To Verify the number of  Regional Officer, GPCB, compliance under Bio dedicated collection vehicles Palanpur Medical Waste matching with the quantity of Bio  CBMWTFs operators Management Rules,2016 Medical Waste quantity generation and duration of travel  To verify the operation of GPS in each of the dedicated vehicles and functioning of the tracking system in the respective CBMWTFs portal.  verification of Autoclave& incinerable waste generated by HCFs through individual HCFs

9

websites  To ensure all the HCFs of hospitals, nursing homes, clinics, dispensaries, veterinary institutions, animal houses, pathological laboratories, blood banks, Ayush hospitals, clinical establishments, research or educational institutions, health camps, medical or surgical camps, vaccination camps, blood donation camps, first aid rooms of schools, forensic laboratories and research labs are collecting and sending the Bio Medical waste to common facility  Unauthorized deep burial to be prevented.  Periodic inspection at the CBMWTFs to verify the process parameters for the autoclave, incinerator are being followed. 5. District Environmental  District Environmental Plans of  District Collector, Plans to be posted in the the District Planning Committee, Banaskantha Website  Minutes of the Monthly Meeting shall be made available in the individual district Website under the name of District planning Committee for Environment Protection. 6. Monitoring of Monthly  Monitoring of Monthly Reports to  District Collector, Reports be submitted to Chief Secretary, Banaskantha Gujarat State every month.  Regional Officer, GPCB, Palanpur

(iv) Biomedical Waste Management Plan Details of Please enter Curre Desira Time Data Measurable Measurable No. Action Areas nt ble GAP limit for Requiremen Outcome Outcome for status Level GAP t District

Palanpur, Deesa, [name of Name of ULB Thara, Bhabhar, ULB] Tharad, Dhanera

[Nos as per Population 350238 2011 census]

10

Inventory of Biomedical BMW1 Waste Generation ------Total no. of BMW1 [Nos] / [No bedded 478 a inventory] Hospitals ------Total no. of BMW1 non- [Nos] / [No 610 b bedded inventory] HCF ------BMW1 Total no. [Nos] / [No 610 c Clinics inventory] ------No of BMW1 [Nos] / [No Veterinary 1 d inventory] Hospitals ------BMW1 [Nos] / [No Path labs 61 e inventory] ------BMW1 Dental [Nos] / [No 53 f Clinics inventory] ------BMW1 Blood [Nos] / [No 3 g Banks inventory] ------BMW1 Animal [Nos] / [No 0 h Houses inventory] ------Bio- BMW1 [Nos] / [No research 0 i inventory] Labs ------BMW1 [Nos] / [No Others 9 j inventory] ------Authorization BMW2 of HCFs by SPCBs / PCCs March – BMW2 Bedded [Nos 420 420 478 58 2021 (SCN a HCFs Authorized] issued to HCU) Non- March – BMW2 [Nos 2021 (SCN bedded 382 382 610 228 b Authorized] issued to HCFs HCU) Biomedical Waste BMW3 Treatment

a and Disposal Facilities (CBMWTFs) BMW3 No of [Nos] / None 1 a CBMWTFs ------BMW3 Linkage [Yes] / [no Yes b with linkage] ------11

CBMWTFs

[Adequate] / BMW3 Capacity of [Not Adequate c CBMWTFs adequate] ------Requireme [Require] / BMW3 nts of [not Not required d CBMWTFs required] ------Captive BMW3 Disposal [Nos] / None e Facilities of [None] HCFs ------Compliance by BMW4 CBMWTFs [Meeting] / Compliance BMW4 [Not to Meeting a meeting] / standards [NA] ------Barcode [100%] / BMW4 tracking by March [Partly %] / None None 100 100 b HCFs / 2021 [None] CBMWTFs Daily BMW BMW4 lifting by [Kg / day] 1600 c CBMWTFs ------Status of Compliance by BMW5 Healthcare Facilities [100%] / [partly %] / BMW5 Pre- [None] 100% a segregation

------Linkage [100%] / BMW5 with [partly %] / 100% b CBMWTFs [None] ------

12

2.5 Hazardous waste management

“Hazardous waste” means any waste which by reason of characteristics such as physical, chemical, biological, reactive, toxic, flammable, explosive or corrosive, causes danger or is likely to cause danger to health or environment, whether alone or in contact with other wastes or substances.

Sr. Action Points Strategy and approach Stake holders No responsible 1. Preparation of  Including Manufacturer /recycler/  Regional Officer - GPCB ‘Inventory of refurbished /handler of Lead Acid Palanpur Hazardous Waste battery, and other lead  All Chief officer of scrap/ashes/residues not covered Nagarpalikas Generators’ under Batteries (Management and  PCB, Gujarat Handling) Rules, 2001.

2. Awareness/training of  ULBs take necessary steps for public  Regional Officer -GPCB Waste awareness and importance of Palanpur Generators segregation of potentially hazardous  All Chief officer of domestic waste. Nagarpalikas  Training on Handling/disposal will be provided to informal sector persons who are engaged in trading, dismantling, and recycling of e- waste/batteries. 3. Authorization of  To grant authorisation for storage,  GPCB Industries transport and disposal of hazardous waste. 4. Waste deposition  ULBs will establish waste deposition  All Chief officer of centres for domestic centres for domestic hazardous waste Nagarpalikas hazardous waste and give direction for waste generators to deposit domestic hazardous wastes at this centre for its safe disposal. 5. Monitoring of  To monitor the compliance of the  GPCB, RO Palanpur Compliance provisions of Hazardous Waste Management Rules. 

(v) Hazardous Waste Management Plan

Please enter Time Details of Data Measurable Measurable Current Desirable limit No. Action Areas GAP Requirement Outcome Outcome for status Level for District GAP Inventory of HW1 Hazardous Waste 13

No of HW HW1a Generating [Nos.] 44 Industry ------Quantity of HW1b [MT/Annum] 7952.69 HW ------

Quantity of HW1c [MT/Annum] 117.3 Incinerable HW ------Quantity of HW1d land-fillable [MT/Annum] 796.59 HW ------Quantity of HW1e Recyclable / [MT/Annum] 7038.8 utilizable HW ------Contaminated Sites and illegal HW2 industrial hazardous waste dumpsites No of HW [Nos] / HW2a None dumpsites [None] ------Probable [Nos] HW2c Contaminated 0 (provide list) Sites ------Authorization by HW3 SPCBs/PCCs No of HW3a industries [Nos] 44 authorized ------Display Board of HW HW3b [Nos] 44 Generation in front of Gate ------Availability of Common HW3 Hazardous Waste TSDF [Exists] / [No] Sent to Other / [Sent to HW3a Common TSDF District Other District within State within State] ------Industries HW3b linkage with [Nos.] 44 TSDF ------

14

Linkage of ULBs HW4 in District with Common TSDF ULBs linked to Common TSDFs for Yes (6 nos Dec - HW4a [Yes] / [No] No 0 100% Domestic ULB) 2020 Hazardous Waste

15

2.6 E-waste management

Electronic waste or E - waste describes discarded electrical or electronic devices. Used electronics which are destined for refurbishment, reuse, resale, salvage recycling through material recovery or disposal are also considered E - waste. At present E-waste management is in nascent stage in the district and only informal trading, dismantling, and recycling of e-waste exists in the District.

Sr No Action Points Strategy and approach Stake holders Responsible

• Collection Centre to be  All Chief officer of established by ULBs in District 1. Collection of E-Waste • Door to door collection Nagarpalikas • Authorizing E-Waste collectors

 District Administration, Control E-Waste • Creation of Awareness on E-Waste  All Chief officer of related pollution and 2. handling and disposal Nagarpalikas Awareness  NGOs

(vi) E-Waste Waste Management Plan

Please enter Time Action Details of Data Measurable Measurable Current Desirable No. GAP limit for Areas Requirement Outcome Outcome for status Level GAP District

Status of facilitating EW1 authorized collection of E-Waste Does the citizen are able to deposit or provide Dec - EW1a [Yes] / [No] No No Yes 100% E-Waste through 2020 Toll-free Numbers in the District Collection centres [Nos] / Dec - EW1c established by None None 6 6 [None] 2020 ULB in District Collection centres No established by [Nos] / producer EW1d Producers or their None None 0 0 [None] exist in PROs in the ULB District

16

Does the district has linkage with Dec - EW1e authorized E- [Yes] / [No] No No Yes 100% 2020 Waste recyclers / Dismantler No of authorized [Nos] / EW1f E-Waste recyclers None None 0 0 Not exist [None] / Dismantler Status of EW2 Collection of E-Waste No E – Authorizing E- [Authorized] Waste EW2a None None 0 0 Waste collectors / [None] collector exist Involvement of [Yes] / [No] No NGO EW2b No No 0 0 exist in NGOs / [Nos] ULB Does Producers have approached No NGOs/ Informal [Yes] / [No] Producer EW2c No No 0 0 Sector for setting /[Nos] exist in up Collection ULB Centres. Does ULBs have linkage with Dec - EW2d authorized [Yes] / [No] No No 6 6 2020 Recyclers / Dismantlers Control E- Waste EW4 related pollution Does informal trading, dismantling, and EW4a [Yes] / [No] No No ------recycling of e- waste exists in District Does the administration [Yes] / [No] Not EW4b closed illegal E- Yes Yes Yes 0 / [Nos] noticed Waste recycling in the District No of actions taken to close Not EW4c illegal trading or [Nos] 0 ------noticed processing of E- Waste Creation of Awareness EW5 on E-Waste handling and disposal

17

Does PROs / Producers No conducted any [Yes] / [No] Producer EW5a No No 0 0 District level / [Nos] exist in Awareness ULB Campaigns Does District Administration conducted any [Yes] / [No] Dec - EW5c No No Yes 100% District level / [Nos] 2020 Awareness Campaigns

18

3 Water Quality Management Plan

Central Pollution Control Board in association with State Pollution Control Boards monitors the water quality of major Rivers and Lakes under the Global Environmental Monitoring System (GEMS) and Monitoring of Indian National Aquatic Resources System (MINARS) programme.

Based on the consolidated reports of GEMS and MINARS during the year 2005 to 2011, the CPCB has identified 351 polluted river stretches in the country.

Polluted River Stretches in Gujarat:

For Gujarat, CPCB has identified 20 numbers of Polluted River Stretches based on the Bio-Chemical Oxygen Demand (BOD).

Hon’ble NGT (PB) has directed all the States and Union Territories to prepare action plans within 31.01.2019 for bringing all the polluted river stretches to be fit at least for bathing purposes (i.e., BOD < 3mg/l & FC < 500 MPN/100ml) within six months from the date of finalisation of the action plans and subsequently the time limit extended for two years i.e. within 31.03.2021 vide its order dated 08.04.2019.

As per CPCB identification, no polluted river stretches in Banaskantha district. However, the local body officers are advised to ensure that all the encroachments are removed in the river of Banaskantha district. Moreover, the local bodies have been directed to ensure that no sewage is discharged in to the river.

2.0 Water Quality Management Plan Please Tim enter e Details of Data Measurable Current Desirable No. Action Areas Measurable GAP limit Requirement Outcome status Level Outcome for for District GAP Inventory of water WQ1 resources in District [Nos] and 2 Nos and WQ1a Rivers [Length in 179 Km Km] ------Length of WQ1b [in Km] 0 Coastline ------Nalas/Drains WQ1c [Nos] 92 meeting Rivers ------[Nos] and WQ1d Lakes / Ponds [Area in 2310 nos Hectares] ------

19

Total Quantity of sewage and [Automatic] WQ1e industrial (SW1a+IW1 26 discharge in b) District ------Control of Groundwater Water Quality Estimated WQ2a number of bore- [Nos] 1038 wells ------No of permissions given Dec - WQ2b [Nos] 0 0 1038 1038 for extraction of 2020 groundwater Number of Dec - WQ2c groundwater [Nos] 286 286 0 286 2020 polluted areas [adequate] / Groundwater WQ2d [not Adequate Availability adequate] ------Availability of WQ3 Water Quality Data Creation of WQ3a [Yes] / [No] Yes monitoring cell ------Access to Surface water and [Available] WQ3b groundwater or [Not Available quality data at available] DM office ------Control of WQ4 River side Activities [Fully Controlled] Control of / [Partly River Side open Fully WQ4a River side controlled] defecation Controlled Activities /[no Measures taken] ------[Fully Controlled] / [Partly Dumping of SW Fully WQ4b controlled] on river banks Controlled /[no Measures taken] ------20

[Measures taken] / [Measures Control measures taken post Measures WQ4c for idol immersion] taken immersion / [No Measures taken] ------Control of Water WQ5 Pollution in Rivers [%] Percentage of (automatic Dec - WQ5a untreated 100% 100% 0% 100% SM1g/SM1a 2020 sewage ) [Monitored] Monitoring of / [Not Action Plans for Not WQ5b monitored] Rejuvenation of applicable [not Rivers applicable] ------No of directions given to industries for Discharge of WQ5c [Nos] 0 Untreated industrial wastewater in last 12 months ------Awareness WQ6 Activities District level [Nos in campaigns on WQ6a previous 12 protection of year] water quality ------Oil Spill Disaster WQ6b Contingency Plan Creation of District Oil Spill [Created] / Not WQ6a Crisis [Not applicable Management Created] Group ------Preparation [Prepared] / District Oil Spill Not WQ6b [Not Disaster applicable Prepared] Contingency Plan ------

21

Protection of WQ7 Flood plains Encroachment of WQ7a flood plains is [Yes] / [No] No regulated. ------Rainwater

Harvesting [Implement Action plan for ed] / [Not Implement WQ8a Rain water implemente ed harvesting d] ------

22

4 Domestic Sewage Management Plan

Domestic untreated sewage being discharged in to Oxidation pond, Open Land etc. and same is used for irrigation purpose through pumping. The GPCB has been directed to monitor any domestic as well as industrial discharge into the rivers. Moreover, the Local bodies have been directed to ensure that no sewage is discharged into the river.

Sr. Responsibility of District Plan of Action Stake holders responsible No. Committee 1. Domestic wastewater  To provide STP and to utilize  All Chief officer of discharge treated sewage as per State Nagarpalikas Government policy

3.0 Domestic Sewage Management Plan Please enter Time Details of Data Measurable Measurable Current Desirable limit No. Action Areas GAP Requirement Outcome Outcome for status Level for District GAP Inventory of SM1 Sewage Management Total Quantity of Sewage generated in SM1a [MLD] 34 District from Class II cities and above ------No of Class-II SM1b towns and [Nos] 0 above ------No of Class-I SM1c towns and [Nos] 2 above ------No of Towns Dec - SM1d [Nos] 2 0 2 2 needing STPs 2020

No of Towns Dec - SM1e [Nos] 0 0 2 2 STPs installed 2020 Quantity of treated sewage SM1f [MLD] 0 flowing into Rivers (directly or indirectly) ------

23

Quantity of untreated or partially SM1g treated [Automatic] 34 sewage (directly or indirectly) ------Quantity of sewage SM1h [MLD] 0 flowing into lakes ------No of SM1i industrial [Nos] 0 townships ------Adequacy of Available SW2 Infrastructure for Sewage Treatment % sewage Dec - SM2a [Automatic] 0 0 100 100 treated in STPs 2020 Total available Dec - SM2b Treatment [MLD] 0 0 34 34 2020 Capacity Additional treatment Dec - SM2c [MLD] 34 0 34 34 capacity 2020 required Adequacy of SM3 Sewerage Network No of ULBs having partial SM3a underground [Nos] 6 sewerage network ------No of towns not having SM3b [Nos] 0 sewerage network ------

% population covered under SM3c [Automatic] 100% sewerage network ------

24

5 Industrial Wastewater Management Plan:

Banaskantha district is known for industries of various sectors such as Vegetable/Non vegetable oil processing unit, dairy and dairy product, food industry and Common Biomedical Waste Incinerator Facilities for disposal of Biomedical Waste etc.

The details of Industries located in Banaskantha district as follows:

Category Number of Industries Red 280 Orange 248 Green 147 Total 675

All the units generating wastewater are provided with Effluent Treatment Plant to control water pollution.

4.0 Industrial Wastewater Management Plan Please enter Measurab Measurab Time Details of Data Current Desirable No. Action Areas le le GAP limit for Requirement status Level Outcome Outcome GAP for District Inventory of industrial IWW1 wastewater Generation in District No of Industries IWW1a discharging [Nos] 29 wastewater ------Total Quantity of industrial IWW1b [MLD] 6 wastewater generated ------

Quantity of treated IWW1c IWW discharged into [MLD] 0 Nalas / Rivers ------

Quantity of un- treated or partially IWW1d [MLD] 0 treated IWW discharged into lakes ------

25

[Agro based] / [ Chemical – Dye Dairy and etc.] / Dairy [Metallur products, gical] / Milk [Pharma] Chilling / plant, [Pesticide Food and Prominent Type of ] / [Power Food IWW1e Industries Plants] / processin [Mining] / g, [Automob Pharmace ile] : uticals, Multiple Vegetable selection oil based on manufact size of uring. operation and number ------[Nos] / Common Effluent IWW1f [No No CETP Treatment Facilities CETPs] ------Status of compliance by IWW2 Industries in treating wastewater No of Industries IWW2a [Nos] 23 meeting Standards ------

No of Industries not [Automati Dec - IWW2b meeting discharge 6 6 0 6 c] 2020 Standards

No of complaints received or number of recurring IWW2c [Nos] 0 complaints against industrial pollution in last 3 months ------Status of Action taken for not AWW4 meeting discharge standards

26

No industries closed for exceeding IWW4a [Nos] 0 standards in last 3 months ------No of industries where IWW4b Environmental [Nos] 0 Compensation was imposed By SPCBs ------

27

6 Air Quality Management Plan

Main Sources of Air pollution in the district are stone crushing activity, mining activity, Vehicular traffic, and Domestic cooking (Rural areas). This plan aims to reduce the sources and amount of pollutants responsible for reducing the ambient air quality.

Sr. Stake holders Point of Action Strategy and approach No responsible 1 Air Quality Monitoring and  To be monitor by GPCB for air  GPCB, RO Palanpur Collection off data quality  PCB will be requested to set up facility in Banaskantha district to Monitor Air Quality

 Inventory of potential Air  GPCB, RO Palanpur Inventory of Air Pollution 2 Polluting Sources will be made for Sources better monitoring.   Station will be given for setting RTO, Banaskantha up more Auto Emission Testing  Police department, Centres in the district in addition to Banaskantha the existing centres. 3 Monitoring of polluting  RTO will ensure that all Auto vehicle Emission Testing Centres functions as per Govt. norms. Monitoring of compliance  To be monitor  RO- GPCB, Palanpur 4 by Industries/Brick kilns

 Public awareness to be created with  District Administration/ 5 Creation of Awareness participation of NGOs, students. NGOs  RTO  GPCB

5.0 Air Quality Management Plan Please enter Time Measurabl Details of Data Measurable Current Desirab limit No. Action Areas e GAP Requirement Outcome for status le Level for Outcome District GAP Availability of Air Quality AQ1 Monitoring Network in District Manual Air Quality AQ1 [Nos] / monitoring stations of 1 a [None] SPCBs /CPCB ------

28

Automatic monitoring AQ1 [Nos] / stations Operated by None c [None] SPCBs / CPCB ------Inventory of AQ2 Air Pollution Sources [Large Industry] / [Small Industry] / [Unpaved Roads] / [Unpaved [Burning Roads] / Identification of AQ2 of Waste [Burning of prominent air polluting a Stubble] / Waste sources [Brick Kiln] Stubble] / / [Brick Kiln] [Industrial Estate] / [Others] (Multiple selection) ------AQ2 No of Non-Attainment [Nos / None b Cities [None] ------[Prepared] AQ2 Action Plans for non- Not / [Not yet c attainment cities applicable prepared] ------Availability of Air Quality AQ3 Monitoring Data at DMs Office

Access to air quality data [Available] AQ3 Not yet from SPCBs & CPCB / [Not yet a Available through Dashboard Available] ------Control of AQ4 Industrial Air Pollution No of Industries meeting AQ4 Standards [Nos] 20 a ------No of Industries not AQ4 Dec - meeting discharge [Nos] 5 5 0 5 b 2020 Standards

29

Control of Non-industrial AQ5 Air Pollution sources [Nos of AQ5 Control open burning of fire 0 a Stubble –during winter incidents] ------

Control Open burning of AQ5 Waste – Nos of actions [Nos] 0 b Taken ------[SOP SOP AQ5 100 Dec - Control of forest fires available] No SOP No SOP availabl c % 2020 / [No SOP] e AQ5 Vehicle pollution check [% ULBs 100% d centres covered] ------Dust Suppression AQ5 [% ULBs Vehicles 100% e covered] ------Development of Air Pollution AQ6 complaint redressal system Mobile App / Online based air pollution [Available] AQ6 complaint redressing / [Not Available a system of SPCBs. available]

------6.0 Mining Activity M

30

7 Mining Activity Management plan

Mining Activity Management plan for the district is as follows

Sr. Action Points Strategy and approach Stakeholders responsible No

Preventing  Identification of illegal mining 1  Mining Department illegal mining  GPCB, RO Palanpur  Checking for Violation of approved  Mining Department, 2 Monitoring mining plan/environmental norms Banaskantha

6.0 Mining Activity Management plan Please enter Time Details of Data Measurable Measurable Current Desirable limit No. Action Areas GAP Requirement Outcome Outcome for status Level for District GAP

Inventory of MI1a Mining in District

[Sand Mining] / [Iron Ore] / Base metal, [Bauxite] / Lime stone [Coal] / Other [specify] ------Marble, Granite, Lime Type of Mining stone, MI1a Activity Quartzite, Multiple other selection in building order of stone, soft magnitude of murrum, operations Hard murrum, Ordinary sand, Calcite ------No of Mining MI1b licenses given [Nos] 479 in the District ------Area covered MI1c [Sq. Km] 18.152972 under mining ------

31

MI1d Area of District [Sq. Km] 10703 ------Yes (Lease- MI1e Sand Mining [Yes] / [No] 274) ------[River bed] / River bed Area of sand [Estuary] / MI1f (1181.63.59 Mining [Non -river Heactor) deposit] ------Compliance to MI2 Environmental Conditions No of Mining areas meeting MI2a Environmental [Nos] 350 Clearance Conditions ------No of Mining areas meeting MI2b Consent [Nos] 32 Conditions of SPCBs / PCCs ------Mining related MI3a environmental Complaints No of pollution related complaints MI3b [Nos] 2 against Mining Operations in last 1 year ------Action against MI4 non-complying mining activity No of Mining operations suspended for MI4a [Nos] 20 violations to environmental norms ------No of directions MI4b [Nos] 0 issued by SPCBs ------

32

8 Noise Pollution Management Plan

Noise can be defined as unwanted or undesired sound and Noise pollution simply means when there is a lot of noise in the environment which is consequentially harming the environment. Noise pollution affects active and passive recipients when noise levels cross certain safe boundaries. Noise pollution affects both human health and behaviour. Noise pollution also impacts the health and well-being of wildlife.

Sr. Action Points Strategy and approach Stake holders responsible No 1 Noise level  PCB or its authorized Agency will conduct  PCB Monitoring Noise Level Monitoring.  Monitoring equipment/ noise measuring  Police Department devices will be procured 2 Categorization of  Categorisation of areas into industrial,  All Chief officer of areas commercial residential or silence Nagarpalikas areas/zones will be completed soon.  Sign boards will be installed in Silent zones.

3 Restriction on  Loud speaker or a public address  District Administration use of loud system will not have allowed to be used speakers without obtaining written permission from the authority.  A loud speaker will not be allowed at night hours (between 10.00 p.m. to 6.00 a.m.)  Special team for monitoring during festivals. 4 Monitoring of  RTO will take steps for monitoring/ checking  RTO, Banaskantha polluting vehicle of vehicles to ensure environmental norms are followed by the vehicles. 5 Creation of  Steps will be taken to make awareness  NGOs Awareness

7.0 Noise Pollution Management Plan Please enter Time Measura Curre Details of Data Measurable Desirable limit No. Action Areas ble nt GAP Requirement Outcome Level for Outcome status for District GAP Availability NP1 Monitoring equipment No. of noise [Nos] / Dec - NP1a measuring devices None None 100% 100% [None] 2020 with district

33

administration No. of noise [Nos] / NP1b measuring devices 1 [None] with SPCBs ------Capability to conduct noise level NP2 monitoring by State agency / District authorities capability to conduct noise level [Availabl NP2a monitoring by State e] / [Not available agency / District available] authorities ------Management of NP2 Noise related complaints No of complaints received on noise [Nos] NP2a 1 pollution in last 1 year ------No of complaints NP2b [Nos] 1 redressed ------Compliance to NP3 ambient noise standards [Regular Implementation of Activity] Ambient noise / NP3a standards in Occasional [Occasio residential and silent nal] / zones [Never] ------[carried out] / Noise monitoring not carried NP3b [not study in district out carried out] ------Sign boards in towns [Installed and cities in silent ] / NP3c zones [Partial] / Partial [Not Installed] ------

34

Annexure –I

1.0 Waste Management Plan

(i) Solid Waste Management Plan (for each ULB)

Please enter

Units of Details of Data Measurable No. Action Areas Measurable

GAP

Requirement Outcome for ULB 1 ULB 2 ULB 3 ULB 4 ULB 5 ULB 6 Outcome District

Current Status Current Status

Desirable limit limit Desirable

Time line for GAP line Time

Palanpur, Deesa, Name of Urban Tharad,

[name of ULB] Nagarpalika

Nagarpalika

Nagarpalika

Nagarpalika Local Body (ULB) Thara,

Nagarpalika

Bhabhar,

Dhanera Thara

Deesa

Tharad

Bhabhar

Dhanera Nagarpalika Dhanera Palanpur No of ULBs in the [Nos] 6 ------1 1 1 1 1 1 District [Nos as per Population 350238 ------141592 111160 27954 18060 21894 29578 2011 census] Report on inventory of total SW1 solid waste Generation [in MT/Day] or Total solid waste SW1a [Not 143 ------65 40 12 6 8 12 Generation estimated] [in MT/Day] or Qty. of Dry Waste SW1b [Collection Not 91 ------45 26 7 2 5 6 segregated initiated] [in MT/Day] or Qty. of Wet SW1c [Collection Not 50.5 ------20 13.5 5 3.5 2.5 6 Waste segregated initiated] [in MT/Day] or Qty. of C&D SW1d [Collection Not 3.4 ------2 0.1 0.4 0 0.4 0.5 Waste segregated initiated] [in MT/Day] or Qty. of Street SW1e [Not 13.4 ------4 3 2.0 0.5 2 1.9 Sweeping estimated] [in MT/Day] or SW1f Qty. of Drain Silt [Not 1.8 ------1 0.5 0.1 0 0.1 0.1 estimated] Qty. of Domestic Hazardous [in MT/Day] or SW1g 0 ------0 0 0 0 No Facility No Facility Waste(DHW) [No Facility] collected Qty. of Other Waste [in MT/Day] or SW1h (Horticulture, [Qty. not 0 ------0 0 0 0 0 0 sanitary waste, estimated] etc.) No of Old dump [Nos] or SW1i 6 ------1 1 1 1 1 1 sites [None] Qty. stored in [MT] or [Not SW1j 190220 ------100000 85000 1500 1500 1220 1000 dumpsites estimated] No of Sanitary [Nos] or SW1k 1 ------1 0 0 No SLF None 0 landfills [None] SW1l No of wards [no’s] 48 ------11 11 7 6 6 7 Compliance by SW2 Bulk Waste ------

Generators [numbers] or No of BW SW2a [inventory not 18 ------15 2 1 0 0 0 Generators done] No of on-site [numbers] or SW2b facilities for Wet 1 ------1 0 0 0 0 0 [No data] Waste

Compliance in segregated waste SW3 ------Collection SW Collection

[Automatic] SW3a Total generation 143 ------65 40 12 6 8 12 from SW1a [in MT/Day] or SW3b Wet Waste [Collection Not 51 ------20 13.5 5 4 2.5 6 initiated] [in MT/Day] or SW3c Dry Waste [Collection Not 91.5 ------45 26 7 2 5.5 6 initiated] [in MT/Day] or SW3d C&D Waste [Collection Not 3.4 ------2 0.1 0.4 0 0.4 0.5 initiated] Waste SW4 Management ------

Operations [100%] / Door to Door SW4a [partial %] / 100% ------100% 100% 100% 100% 100% 100% Collection [not initiated] [100%] / Mechanical Road SW4b [partial%] / Partial ------40% 40% 100% 20% Partial-10% 100% Sweeping [not initiated] [100%] / SW4c Manual Sweeping 100% ------60% 60% 100% 80% 100% 100% [partial%] [100%] / Segregated Waste SW4d [partial %] / 100% ------60% 80% 100% 100% 100% 100% Transport [not initiated] Digesters (Bio- [% of WW] / SW4e Not required ------0 not initiated Not required 0 Not required Not required methanation) [not initiated] Composting [% of WW] / SW4f 4% ------0 not initiated Not initiated 40% Not initiated Not initiated operation [not initiated] [MRF used] / 3 Nos ULB SW4g MRF Operation ------MRF used MRF used Not installed MRF used Not installed Not installed [not installed] MRF used [% of SW Use of Sanitary SW4h collected] / [no No SLF ------0% No SLF No SLF No SLF No SLF No SLF Landfill SLF]

Reclamation of [initiated] / SW4i initiated ------initiated initiated Initiated initiated initiated initiated old dumpsites [not initiated]

Linkage with Waste to Energy [initiated] / Not SW4j Not required ------not required Not required Not required Not required Not required Boilers / Cement [not initiated] required Plants

Linkage with [initiated] / 5 Nos ULB SW4k ------initiated not initiated initiated initiated initiated initiated Recyclers [not initiated] initiated

Authorization of [initiated] / SW4l initiated ------initiated initiated initiated initiated initiated initiated waste pickers [not initiated]

Linkage with TSDF [initiated] / SW4m Not initiated ------not initiated not initiated Not initiated Not initiated not initiated Not initiated / CBMWTF [not initiated]

Involvement of [initiated] / No NGO No NGO SW4n No NGO exist ------No NGO exist No NGO exist No NGO exist No NGO exist NGOs [not initiated] exist exist Linkage with [initiated] / No Producer No Producer No Producer No Producer No Producer No Producer No Producer SW4o Producers / Brand ------[not initiated] exist exist exist exist exist exist exist Owners

Authorisation of [initiated] / SW4p Initiated ------Initiated Initiated Initiated initiated initiated initiated Waste Pickers [not initiated]

Issuance of ID [initiated] / SW4q Initiated ------initiated initiated Initiated initiated initiated initiated Cards [not initiated] Adequacy of SW5 ------Infrastructure [Nos. Waste Collection Required] / SW5a 38 ------14 14 2 3 3 2 Trolleys [Nos. Available]

[Nos. Mini Collection Required] / SW5b 36 ------11 3 6 5 5 6 Trucks [Nos. Available] [yes] / [no] / Segregated SW5c [% area 100% ------60% 100% 100% Yes Yes Yes Transport covered] [Nos. Required] / SW5d Bulk Waste Trucks 1 ------1 0 0 0 0 0 [Nos. Available]

[Nos. Required] / Waste Transfer [Nos. SW5e Not required ------0 0 Not available 0 0 Not Available points Available] /[Not available]

[Nos. Bio-methanation Required] / SW5f Not required ------0 0 Not available 0 0 Not Available units [Nos. Available]

[Nos. Required] / SW5h Composting units 17 ------0 14 0 Not available 1 2 [Nos. Available]

[used or Material Recovery 3 Nos ULB used or SW5i installed] / ------1 1 Not available Not available Not available Facilities used installed [not available] [Required] / Waste to Energy Not Not SW5k [Nos. Not Required ------Not Required Not Required Not required Not required (if applicable) Required Required Available] [Required] / Not Not SW5l Waste to RDF [Nos. Not Required ------Not Required Not Required Not required Not required Required Required Available] [Nos] / [Nos. SW5m Sanitary Land fills 1 ------1 0 0 0 0 Not required Available]

Capacity of [MT] / / [Nos. SW5n 100000 ------100000 0 0 0 0 Not required sanitary landfills Available]

Waste Deposit [Nos] / [Nos. SW5o 0 ------0 0 0 0 0 0 Centres (DHW) Available]

[give or select SW5p Other facilities No facility ------0 0 No facility No facility No facility No facility from list] Notification and SW6 Implementation ------

of By-Laws [done] / [in Notification of By- SW6a progress] / Done ------Done Done Done Done Done Done laws [not initiated] [done] / [in Implementation SW6b progress] / Done ------Done Done Done Done Done Done of by-laws [not initiated] Adequacy of SW7 Financial Status of ------

ULB [INR] / [Not SW7a CAPEX Required 12.69 Cr ------6 CR 37.68 Lakh 1.84 Cr 1.41 Cr 1.12 Cr 1.95 Cr required] [INR per Year] SW7b OPEX / [% of 8.9 Cr ------1.7 CR 4.60 Cr 0.99 Cr 0.32 Cr 0.58 Cr 0.71 Cr requirement]

SW7c Adequacy of OPEX [Yes] / [No] Yes ------YES Yes Yes Yes Yes Yes

Annexure –I

1.0 Waste Management Plan

(i) Solid Waste Management Plan (for each ULB)

Details of Data Units of Measurable Palanpur Current Time line No. Action Areas Desirable level Gap Remarks Requirement Outcome Nagarpalika Status for gap Name of Urban Palanpur [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 141592 141592 census] Report on inventory of total SW1 solid waste Generation Total solid waste [in MT/Day] or [Not ---- SW1a 65 65 0 0 0 Generation estimated] [in MT/Day] or ---- Qty. of Dry Waste SW1b [Collection Not 45 45 0 0 0 segregated initiated] [in MT/Day] or ---- Qty. of Wet Waste SW1c [Collection Not 20 20 0 0 0 segregated initiated] [in MT/Day] or ---- Qty. of C&D Waste SW1d [Collection Not 2 2 0 0 0 segregated initiated] [in MT/Day] or [Not ---- SW1e Qty. of Street Sweeping 4 4 0 0 0 estimated] [in MT/Day] or [Not ---- SW1f Qty. of Drain Silt 1 1 0 0 0 estimated] Qty. of Domestic ---- [in MT/Day] or [No Dec - SW1g Hazardous Waste(DHW) 0 0 0.01 0.01 Facility] 2020 collected Qty. of Other Waste ---- [in MT/Day] or [Qty. SW1h (Horticulture, sanitary 0 0 0 0 0 not estimated] waste, etc.) Dec - ---- SW1i No of Old dump sites [Nos] or [None] 1 1 0 1 2020 [MT] or [Not Dec - Revise DPR under SW1j Qty. stored in dumpsites 100000 100000 0 100000 estimated] 2020 process SW1k No of Sanitary landfills [Nos] or [None] 1 1 0 0 0

SW1l No of wards [no’s] 11 11 0 0 0 Compliance by SW2 Bulk Waste

Generators [numbers] or SW2a No of BW Generators 15 15 0 0 0 [inventory not done] No of on-site facilities for Dec – Revise DPR under SW2b [numbers] or [No data] 1 1 15 14 Wet Waste 2020 process Compliance in segregated waste SW3 Collection SW Collection [Automatic] from --- SW3a Total generation 65 65 0 0 0 SW1a [in MT/Day] or --- SW3b Wet Waste [Collection Not 20 20 0 0 0 initiated] [in MT/Day] or --- SW3c Dry Waste [Collection Not 45 45 0 0 0 initiated] [in MT/Day] or --- SW3d C&D Waste [Collection Not 2 2 0 0 0 initiated] Waste SW4 Management

Operations [100%] / [partial %] / --- SW4a Door to Door Collection 100% 100% 100% 0 0 [not initiated] Mechanical Road [100%] / [partial%] / Dec – Revise DPR under SW4b 40% 40% 40% 0% Sweeping [not initiated] 2020 process SW4c Manual Sweeping [100%] / [partial%] 60% 60% 60% % 0 --- Segregated Waste [100%] / [partial %] / Dec – Revise DPR under SW4d 60% 60% 100% 60% Transport [not initiated] 2020 process Digesters (Bio- [% of WW] / [not SW4e 0 0 0 0 0 ---- methanation) initiated] [% of WW] / [not SW4f Composting operation 0 0 0 0 0 ---- initiated] [MRF used] / [not SW4g MRF Operation MRF used MRF used MRF used 0 0 ----- installed] [% of SW collected] / Dec - Revise DPR under SW4h Use of Sanitary Landfill 0% 0% 0 0 [no SLF] 2020 process Reclamation of old [initiated] / [not Dec - Revise DPR under SW4i initiated initiated 100% 100% dumpsites initiated] 2020 process Linkage with Waste to [initiated] / [not not not not SW4j Energy Boilers / Cement not required not required initiated] required required required Plants [initiated] / [not Dec - Revise DPR under SW4k Linkage with Recyclers initiated initiated 1 1 initiated] 2020 process Authorization of waste [initiated] / [not SW4l initiated initiated 50 0 0 ------pickers initiated] Linkage with TSDF / [initiated] / [not not Dec - SW4m not initiated 1 0 ------CBMWTF initiated] initiated 2020 [initiated] / [not SW4n Involvement of NGOs initiated initiated 1 0 0 ------initiated] Linkage with Producers / [initiated] / [not SW4o 0 0 0 0 0 No producer exist Brand Owners initiated] Authorisation of Waste [initiated] / [not SW4p Initiated initiated 0 0 0 ------Pickers initiated] [initiated] / [not SW4q Issuance of ID Cards initiated initiated 50 0 0 ------initiated] Adequacy of SW5 ------Infrastructure [Nos. Required] / [Nos. SW5a Waste Collection Trolleys 14 14 14 0 0 Adequate Available] [Nos. Required] / [Nos. SW5b Mini Collection Trucks 11 11 11 0 0 Adequate Available] [yes] / [no] / [% area Dec - SW5c Segregated Transport 60% 60% 100% 40% ------covered] 2020 [Nos. Required] / [Nos. SW5d Bulk Waste Trucks 1 1 1 0 0 Adequate Available] [Nos. Required] / [Nos. SW5e Waste Transfer points Available] /[Not 0 0 0 0 0 Not required available] [Nos. Required] / [Nos. 0 SW5f Bio-methanation units 0 0 0 0 Not required Available] [Nos. Required] / [Nos. 0 Dec - SW5h Composting units 0 1 1 ------Available] 2020 Material Recovery [used or installed] / SW5i 1 1 1 0 0 ------Facilities [not available] Waste to Energy (if [Required] / [Nos. SW5k 0 0 0 0 0 Not required applicable) Available]

[Required] / [Nos. SW5l Waste to RDF 0 0 0 0 0 Not required Available] 0 0 ------SW5m Sanitary Land fills [Nos] / [Nos. Available] 1 1 1 Capacity of sanitary [MT] / / [Nos. 0 0 ------SW5n 100000 100000 100000 landfills Available] Waste Deposit Centres 0 0 SW5o [Nos] / [Nos. Available] 0 0 0 Not required (DHW) [give or select from 0 0 ------SW5p Other facilities 0 0 0 list] Notification and SW6 Implementation

of By-Laws [done] / [in progress] / 0 0 ------SW6a Notification of By-laws Done Done Done [not initiated] Implementation of by- [done] / [in progress] / 0 0 ------SW6b Done Done Done laws [not initiated] Adequacy of SW7 Financial Status of

ULB

SW7a CAPEX Required [INR] / [Not required] 6 CR 6 CR 0 0 0 ------[INR per Year] / [% of 0 0 0 ------SW7b OPEX 1.7 CR 1.7 CR requirement] 0 0 0 ------SW7c Adequacy of OPEX [Yes] / [No] YES YES

Annexure –I

1.0 Waste Management Plan (i) Solid Waste Management Plan (for each ULB)

Details of Data Units of Measurable Deesa Current Time line No. Action Areas Desirable level Gap Remarks Requirement Outcome Nagarpalika Status for gap Name of Urban Deesa [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 111160 111160 census] Report on inventory of total SW1 solid waste Generation Total solid waste [in MT/Day] or [Not SW1a 40 40 0 0 0 Generation estimated] [in MT/Day] or Qty. of Dry Waste SW1b [Collection Not 26 26 0 0 0 segregated initiated] [in MT/Day] or Qty. of Wet Waste SW1c [Collection Not 13.5 13.5 0 0 0 segregated initiated] [in MT/Day] or Qty. of C&D Waste SW1d [Collection Not 0.1 0.1 0 0 0 segregated initiated] [in MT/Day] or [Not SW1e Qty. of Street Sweeping 3 3 0 0 0 estimated] [in MT/Day] or [Not SW1f Qty. of Drain Silt 0.5 0.5 0 0 0 estimated] Qty. of Domestic [in MT/Day] or [No Dec - SW1g Hazardous Waste(DHW) 0 0 0.01 0.01 Facility] 2020 collected Qty. of Other Waste [in MT/Day] or [Qty. SW1h (Horticulture, sanitary 0 0 0 0 0 Not applicable not estimated] waste, etc.) Dec- SW1i No of Old dump sites [Nos] or [None] 1 1 0 0 2020 [MT] or [Not SW1j Qty. stored in dumpsites 85000 85000 0 85000 Dec-2020 estimated] SW1k No of Sanitary landfills [Nos] or [None] 0 0 0 0 0 Not required

SW1l No of wards [no’s] 11 11 0 0 0 Compliance by SW2 Bulk Waste Generators [numbers] or SW2a No of BW Generators 2 2 0 0 0 [inventory not done] No of on-site facilities for SW2b [numbers] or [No data] 0 0 2 (OWC) 2 Dec-2020 Wet Waste Compliance in segregated waste SW3 Collection SW Collection [Automatic] from SW3a Total generation 40 40 0 0 0 SW1a [in MT/Day] or SW3b Wet Waste [Collection Not 13.5 13.5 0 0 0 initiated] [in MT/Day] or SW3c Dry Waste [Collection Not 26 26 0 0 0 initiated] [in MT/Day] or SW3d C&D Waste [Collection Not 0.1 0.1 0 0 0 initiated] Waste SW4 Management Operations [100%] / [partial %] / SW4a Door to Door Collection 100% 100% 100% 0 0 [not initiated] Mechanical Road [100%] / [partial%] / Approachable road SW4b 40% 40% 0 0 0 Sweeping [not initiated] swept by machine SW4c Manual Sweeping [100%] / [partial%] 60% 60% 60% 0 0 Segregated Waste [100%] / [partial %] / SW4d 80% 80% 100% 20% Dec-2020 Transport [not initiated] Digesters (Bio- [% of WW] / [not not SW4e not initiated 0 0 0 methanation) initiated] initiated [% of WW] / [not not SW4f Composting operation not initiated 100% 100% Dec-2020 initiated] initiated [MRF used] / [not SW4g MRF Operation MRF used MRF used MRF Used 0 0 installed] [% of SW collected] / SW4h Use of Sanitary Landfill No SLF No SLF No SLF No SLF No SLF Not required [no SLF] Reclamation of old [initiated] / [not not DPR DPR is at approval SW4i Initiated Initiated Dec-2020 dumpsites initiated] initiated Prepared level Linkage with Waste to [initiated] / [not Not Not Not SW4j Energy Boilers / Cement Not required Not required initiated] required required required Plants [initiated] / [not not SW4k Linkage with Recyclers not initiated Initiated Initiated Dec-2020 initiated] initiated Authorization of waste [initiated] / [not SW4l initiated initiated 21 0 0 pickers initiated] Linkage with TSDF / [initiated] / [not not SW4m not initiated Initiated Initiated Dec-2020 CBMWTF initiated] initiated [initiated] / [not SW4n Involvement of NGOs initiated initiated 0 0 0 initiated] Linkage with Producers / [initiated] / [not SW4o initiated initiated 0 0 0 Brand Owners initiated] Authorisation of Waste [initiated] / [not SW4p Done 21 21 0 0 Pickers initiated] [initiated] / [not SW4q Issuance of ID Cards Done 21 21 0 0 initiated] Adequacy of SW5 Infrastructure [Nos. Required] / [Nos. SW5a Waste Collection Trolleys 14 14 14 0 0 Adequate Available] [Nos. Required] / [Nos. SW5b Mini Collection Trucks 3 3 3 0 0 Adequate Available] [yes] / [no] / [% area SW5c Segregated Transport 100% 100% 100% 0 0 100 % area covered covered] [Nos. Required] / [Nos. SW5d Bulk Waste Trucks 0 0 0 0 0 Not required Available] [Nos. Required] / [Nos. SW5e Waste Transfer points Available] /[Not 0 0 0 0 0 Not required available] [Nos. Required] / [Nos. SW5f Bio-methanation units 0 0 0 0 0 Not required Available] [Nos. Required] / [Nos. SW5h Composting units 14 14 14 0 0 Adequate Available] Material Recovery [used or installed] / SW5i 1 1 5 4 Mar-2020 Facilities [not available] Waste to Energy (if [Required] / [Nos. SW5k 0 0 0 0 0 Not required applicable) Available]

[Required] / [Nos. SW5l Waste to RDF 0 0 0 0 0 Not required Available] SW5m Sanitary Land fills [Nos] / [Nos. Available] 0 0 0 0 0 Not required Capacity of sanitary [MT] / / [Nos. SW5n 0 0 0 0 0 Not applicable landfills Available] Waste Deposit Centres SW5o [Nos] / [Nos. Available] 0 0 0 0 0 Not required (DHW) [give or select from SW5p Other facilities 0 0 0 0 0 Not required list] Notification and SW6 Implementation of By-Laws [done] / [in progress] / SW6a Notification of By-laws Done Done Done 0 0 [not initiated] Implementation of by- [done] / [in progress] / SW6b Done Done Done 0 0 laws [not initiated] Adequacy of SW7 Financial Status of ULB SW7a CAPEX Required [INR] / [Not required] 37.68 Lakh 37.68 Lakh 0 0 0 DPR cost [INR per Year] / [% of SW7b OPEX 4.60 Cr 4.60 Cr 0 0 0 requirement]

SW7c Adequacy of OPEX [Yes] / [No] Yes Yes 0 0 0

Annexure –I

1.0 Waste Management Plan

(i) Solid Waste Management Plan (for each ULB)

Details of Data Units of Measurable Tharad Current Time line No. Action Areas Desirable level Gap Remarks Requirement Outcome Nagarpalika Status for gap Name of Urban Tharad [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 27954 27954 census] Report on inventory of total SW1 solid waste Generation Total solid waste [in MT/Day] or [Not SW1a 12 12 Generation estimated] [in MT/Day] or Qty. of Dry Waste SW1b [Collection Not 7 7 segregated initiated] [in MT/Day] or Qty. of Wet Waste SW1c [Collection Not 5 5 segregated initiated] [in MT/Day] or Qty. of C&D Waste SW1d [Collection Not 0.4 0.4 segregated initiated] [in MT/Day] or [Not SW1e Qty. of Street Sweeping 2.0 2.0 estimated] [in MT/Day] or [Not SW1f Qty. of Drain Silt 0.1 0.1 estimated] Qty. of Domestic [in MT/Day] or [No Dec - SW1g Hazardous Waste(DHW) 0 0 0.01 0.01 Facility] 2020 collected Qty. of Other Waste [in MT/Day] or [Qty. SW1h (Horticulture, sanitary 0 0 not estimated] waste, etc.) Dec - SW1i No of Old dump sites [Nos] or [None] 1 1 0 1 2020 [MT] or [Not Dec - SW1j Qty. stored in dumpsites 1500 1500 0 1500 estimated] 2020 SW1k No of Sanitary landfills [Nos] or [None] 0 0 0 0 0 Not required

SW1l No of wards [no’s] 7 7 Compliance by SW2 Bulk Waste

Generators [numbers] or SW2a No of BW Generators 1 1 [inventory not done] No of on-site facilities for Dec - SW2b [numbers] or [No data] 0 0 1 1 Wet Waste 2020 Compliance in segregated waste SW3 Collection SW Collection [Automatic] from SW3a Total generation 12 12 SW1a [in MT/Day] or SW3b Wet Waste [Collection Not 5 5 initiated] [in MT/Day] or SW3c Dry Waste [Collection Not 7 7 initiated] [in MT/Day] or SW3d C&D Waste [Collection Not 0.4 0.4 initiated] Waste SW4 Management

Operations [100%] / [partial %] / SW4a Door to Door Collection 100% 100% [not initiated] Mechanical Road [100%] / [partial%] / SW4b 100% 100% Sweeping [not initiated] SW4c Manual Sweeping [100%] / [partial%] 100% 100% Segregated Waste [100%] / [partial %] / SW4d 100% 100% Transport [not initiated] Digesters (Bio- [% of WW] / [not Not Not Not SW4e Not required Not required methanation) initiated] required required required [% of WW] / [not Not Dec - SW4f Composting operation Not initiated 100 % 100 % initiated] initiated 2020 [MRF used] / [not Not Dec – SW4g MRF Operation Not installed MRF used MRF used installed] installed 2020 [% of SW collected] / SW4h Use of Sanitary Landfill No SLF No SLF No SLF No SLF No SLF Not required [no SLF] Reclamation of old [initiated] / [not SW4i Initiated Initiated Initiated dumpsites initiated] Linkage with Waste to [initiated] / [not Not Not Not SW4j Energy Boilers / Cement Not required Not required initiated] required required required Plants [initiated] / [not SW4k Linkage with Recyclers initiated initiated initiated] Authorization of waste [initiated] / [not SW4l initiated initiated pickers initiated] Linkage with TSDF / [initiated] / [not Not Dec – SW4m Not initiated 1 0 CBMWTF initiated] initiated 2020 [initiated] / [not No NGO No NGO No NGO SW4n Involvement of NGOs No NGO exist No NGO exist initiated] exist exist exist No No No Linkage with Producers / [initiated] / [not No Producer No Producer SW4o Producer Producer Producer Brand Owners initiated] exist exist exist exist exist Authorisation of Waste [initiated] / [not Dec - SW4p Initiated Initiated 9 Person 9 Person Pickers initiated] 2020 [initiated] / [not Dec - SW4q Issuance of ID Cards Initiated Initiated 9 Person 9 Person initiated] 2020 Adequacy of SW5 Infrastructure [Nos. Required] / [Nos. SW5a Waste Collection Trolleys 2 2 2 0 Adequate Available] [Nos. Required] / [Nos. SW5b Mini Collection Trucks 6 6 6 0 Adequate Available] [yes] / [no] / [% area SW5c Segregated Transport 100% 100% covered] [Nos. Required] / [Nos. SW5d Bulk Waste Trucks 0 0 0 0 Not required Available] [Nos. Required] / [Nos. Not Not SW5e Waste Transfer points Available] /[Not Not available 0 0 available required available] [Nos. Required] / [Nos. Not Not SW5f Bio-methanation units Not available 0 0 Available] available required [Nos. Required] / [Nos. Dec - SW5h Composting units 0 0 2 2 Available] 2020 Material Recovery [used or installed] / Not Dec - SW5i Not available 1 1 Facilities [not available] available 2020 Waste to Energy (if [Required] / [Nos. Not SW5k Not required 0 0 0 applicable) Available] Required [Required] / [Nos. Not SW5l Waste to RDF Not Required 0 0 0 Available] Required

SW5m Sanitary Land fills [Nos] / [Nos. Available] 0 0 0 0 0 Not required Capacity of sanitary [MT] / / [Nos. SW5n 0 0 0 0 0 Not required landfills Available] Waste Deposit Centres SW5o [Nos] / [Nos. Available] 0 0 0 0 0 Not required (DHW) [give or select from SW5p Other facilities No facility No facility 0 0 0 list] Notification and SW6 Implementation

of By-Laws [done] / [in progress] / SW6a Notification of By-laws Done Done [not initiated] Implementation of by- [done] / [in progress] / SW6b Done Done laws [not initiated] Adequacy of SW7 Financial Status of

ULB

SW7a CAPEX Required [INR] / [Not required] 1.84 Cr 1.84 Cr 0 0 0 DPR value [INR per Year] / [% of SW7b OPEX 0.99 Cr 0.99 Cr 0 0 0 requirement]

SW7c Adequacy of OPEX [Yes] / [No] Yes Yes 0 0 0

Annexure –I

1.0 Waste Management Plan (i) Solid Waste Management Plan (for each ULB)

Details of Data Units of Measurable Thara Current Time line No. Action Areas Desirable level Gap Remarks Requirement Outcome Nagarpalika Status for gap Name of Urban Thara [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 18060 18060 census] Report on inventory of total SW1 solid waste Generation Total solid waste [in MT/Day] or [Not SW1a 6 6 0 0 0 Generation estimated] [in MT/Day] or Qty. of Dry Waste SW1b [Collection Not 2 2 0 0 0 segregated initiated] [in MT/Day] or Qty. of Wet Waste SW1c [Collection Not 3.5 3.5 0 0 0 segregated initiated] [in MT/Day] or Qty. of C&D Waste SW1d [Collection Not 0 0 0 0 0 No generation segregated initiated] [in MT/Day] or [Not SW1e Qty. of Street Sweeping 0.5 0.5 0 0 0 estimated] [in MT/Day] or [Not SW1f Qty. of Drain Silt 0 0 0 0 0 estimated] Qty. of Domestic [in MT/Day] or [No Dec - SW1g Hazardous Waste(DHW) 0 0 0.01 0.01 Facility] 2020 collected Qty. of Other Waste [in MT/Day] or [Qty. SW1h (Horticulture, sanitary 0 0 0 0 0 Not required not estimated] waste, etc.) Dec - SW1i No of Old dump sites [Nos] or [None] 1 1 0 0 2020 [MT] or [Not SW1j Qty. stored in dumpsites 1500 1500 0 1500 Dec.2020 estimated] SW1k No of Sanitary landfills [Nos] or [None] No SLF No SLF No SLF No SLF No SLF Not required

SW1l No of wards [no’s] 6 6 0 0 0 Compliance by SW2 Bulk Waste Generators [numbers] or SW2a No of BW Generators 0 0 0 0 0 Not exist [inventory not done] No of on-site facilities for SW2b [numbers] or [No data] 0 0 0 0 Not required Wet Waste Compliance in segregated waste SW3 Collection SW Collection [Automatic] from SW3a Total generation 6 6 0 0 0 SW1a [in MT/Day] or SW3b Wet Waste [Collection Not 4 4 0 0 0 initiated] [in MT/Day] or SW3c Dry Waste [Collection Not 2 2 0 0 0 initiated] [in MT/Day] or SW3d C&D Waste [Collection Not 0 0 0 0 0 No generation initiated] Waste SW4 Management Operations [100%] / [partial %] / SW4a Door to Door Collection 100% 100% 100% 0 0 [not initiated] Mechanical Road [100%] / [partial%] / Approachable road SW4b 20% 20% 20% 0 0 Sweeping [not initiated] swept by machine SW4c Manual Sweeping [100%] / [partial%] 80% 80% 80% 0 0 Segregated Waste [100%] / [partial %] / SW4d 100% 100% 100% 0 0 Transport [not initiated] Digesters (Bio- [% of WW] / [not SW4e 0 0 0 0 0 Not required methanation) initiated] [% of WW] / [not Dec - SW4f Composting operation 40% 40% 100% 60% initiated] 2020 [MRF used] / [not SW4g MRF Operation MRF used MRF used 0 0 0 installed] [% of SW collected] / No SLF No SLF No SLF SW4h Use of Sanitary Landfill No SLF No SLF Not required [no SLF] Reclamation of old [initiated] / [not DPR Dec - DPR is at approval SW4i initiated Initiated Initiated dumpsites initiated] Prepared 2020 level Linkage with Waste to [initiated] / [not Not Not Not SW4j Energy Boilers / Cement Not required Not required Not required initiated] required required required Plants [initiated] / [not SW4k Linkage with Recyclers initiated initiated 0 0 0 initiated] Authorization of waste [initiated] / [not SW4l initiated initiated 0 0 0 pickers initiated] Linkage with TSDF / [initiated] / [not Not Dec - SW4m Not initiated Initiated Initiated CBMWTF initiated] initiated 2020 [initiated] / [not SW4n Involvement of NGOs 0 0 0 0 0 Not exist initiated] Linkage with Producers / [initiated] / [not SW4o 0 0 0 0 0 Not exist Brand Owners initiated] Authorisation of Waste [initiated] / [not SW4p initiated initiated 0 0 0 Pickers initiated] [initiated] / [not SW4q Issuance of ID Cards initiated initiated 0 0 0 initiated] Adequacy of SW5 Infrastructure [Nos. Required] / [Nos. SW5a Waste Collection Trolleys 3 3 3 0 0 Adequate Available] [Nos. Required] / [Nos. SW5b Mini Collection Trucks 5 5 5 0 0 Adequate Available] [yes] / [no] / [% area SW5c Segregated Transport Yes Yes Yes 0 0 100 % area covered covered] [Nos. Required] / [Nos. SW5d Bulk Waste Trucks 0 0 0 0 0 Not required Available] [Nos. Required] / [Nos. SW5e Waste Transfer points Available] /[Not 0 0 0 0 0 Not required available] [Nos. Required] / [Nos. SW5f Bio-methanation units 0 0 0 0 0 Not required Available] [Nos. Required] / [Nos. Not Dec - SW5h Composting units Not available 1 1 Available] available 2020 Material Recovery [used or installed] / used or used or SW5i 0 0 0 Facilities [not available] installed installed Waste to Energy (if [Required] / [Nos. Not Not Not SW5k Not Required Not Required applicable) Available] Required Required Required

[Required] / [Nos. Not Not Not SW5l Waste to RDF Not Required Not Required Available] Required Required Required SW5m Sanitary Land fills [Nos] / [Nos. Available] 0 0 0 0 0 Not Required Capacity of sanitary [MT] / / [Nos. SW5n 0 0 0 0 0 Not applicable landfills Available] Waste Deposit Centres SW5o [Nos] / [Nos. Available] 0 0 0 0 0 Not Required (DHW) [give or select from SW5p Other facilities No facility No facility 0 0 0 Not Required list] Notification and SW6 Implementation of By-Laws [done] / [in progress] / SW6a Notification of By-laws Done Done Done 0 0 [not initiated] Implementation of by- [done] / [in progress] / SW6b Done Done Done 0 0 laws [not initiated] Adequacy of SW7 Financial Status of ULB SW7a CAPEX Required [INR] / [Not required] 1.41 Cr 1.41 Cr 0 0 0 [INR per Year] / [% of SW7b OPEX 0.32 Cr 0.32 Cr 0 0 0 requirement]

SW7c Adequacy of OPEX [Yes] / [No] Yes Yes 0 0 0

Annexure –I

1.0 Waste Management Plan (i) Solid Waste Management Plan (for each ULB)

Details of Data Units of Measurable Bhabhar Current Time line No. Action Areas Desirable level Gap Remarks Requirement Outcome Nagarpalika Status for gap Name of Urban Bhabhar [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 21894 21894 census] Report on inventory of total SW1 solid waste Generation Total solid waste [in MT/Day] or [Not SW1a 8 8 Generation estimated] [in MT/Day] or Qty. of Dry Waste SW1b [Collection Not 5 5 segregated initiated] [in MT/Day] or Qty. of Wet Waste SW1c [Collection Not 2.5 2.5 segregated initiated] [in MT/Day] or Qty. of C&D Waste SW1d [Collection Not 0.4 0.4 segregated initiated] [in MT/Day] or [Not SW1e Qty. of Street Sweeping 2 2 estimated] [in MT/Day] or [Not SW1f Qty. of Drain Silt 0.1 0.1 estimated] Qty. of Domestic [in MT/Day] or [No Dec - SW1g Hazardous Waste(DHW) No Facility No Facility 0.01 0.01 Facility] 2020 collected Qty. of Other Waste [in MT/Day] or [Qty. SW1h (Horticulture, sanitary 0 0 not estimated] waste, etc.) Dec - SW1i No of Old dump sites [Nos] or [None] 1 1 0 1 2020 [MT] or [Not Dec - SW1j Qty. stored in dumpsites 1220 1220 0 1500 estimated] 2020 SW1k No of Sanitary landfills [Nos] or [None] None None 0 0 0 Not required

SW1l No of wards [no’s] 6 6 Compliance by SW2 Bulk Waste Generators [numbers] or SW2a No of BW Generators 0 0 [inventory not done] No of on-site facilities for SW2b [numbers] or [No data] 0 0 Wet Waste Compliance in segregated waste SW3 Collection SW Collection [Automatic] from SW3a Total generation 8 8 SW1a [in MT/Day] or SW3b Wet Waste [Collection Not 2.5 2.5 initiated] [in MT/Day] or SW3c Dry Waste [Collection Not 5.5 5.5 initiated] [in MT/Day] or SW3d C&D Waste [Collection Not 0.4 0.4 initiated] Waste SW4 Management Operations [100%] / [partial %] / SW4a Door to Door Collection 100% 100% [not initiated] Mechanical Road [100%] / [partial%] / Approachable road SW4b Partial-10% Partial-10% Sweeping [not initiated] swept by machine SW4c Manual Sweeping [100%] / [partial%] 100% 100% Segregated Waste [100%] / [partial %] / SW4d 100% 100% Transport [not initiated] Digesters (Bio- [% of WW] / [not Not Not Not SW4e Not required Not required methanation) initiated] required required required [% of WW] / [not Not Dec - SW4f Composting operation Not initiated 1 1 initiated] initiated 2020 [MRF used] / [not Not Dec – SW4g MRF Operation Not installed MRF used MRF used installed] installed 2020 [% of SW collected] / SW4h Use of Sanitary Landfill No SLF No SLF No SLF No SLF No SLF Not required [no SLF] Reclamation of old [initiated] / [not SW4i initiated initiated Initiated DPR prepared dumpsites initiated] Linkage with Waste to [initiated] / [not Not Not Not SW4j Energy Boilers / Cement Not required Not required initiated] required required required Plants [initiated] / [not SW4k Linkage with Recyclers initiated initiated initiated] Authorization of waste [initiated] / [not SW4l initiated initiated pickers initiated] Linkage with TSDF / [initiated] / [not not Dec – SW4m not initiated 1 0 CBMWTF initiated] initiated 2020 [initiated] / [not No NGO No NGO No NGO SW4n Involvement of NGOs No NGO exist No NGO exist initiated] exist exist exist No No No Linkage with Producers / [initiated] / [not No Producer No Producer SW4o Producer Producer Producer Brand Owners initiated] exist exist exist exist exist Authorisation of Waste [initiated] / [not Dec - SW4p initiated initiated 5 Person 5 Person Pickers initiated] 2020 [initiated] / [not Dec - SW4q Issuance of ID Cards initiated initiated 5 Person 5 Person initiated] 2020 Adequacy of SW5 Infrastructure [Nos. Required] / [Nos. SW5a Waste Collection Trolleys 3 3 3 0 Adequate Available] [Nos. Required] / [Nos. SW5b Mini Collection Trucks 5 5 5 0 Adequate Available] [yes] / [no] / [% area SW5c Segregated Transport Yes Yes 100% area covered covered] [Nos. Required] / [Nos. SW5d Bulk Waste Trucks 0 0 0 0 Not required Available] [Nos. Required] / [Nos. SW5e Waste Transfer points Available] /[Not 0 0 0 0 Not required available] [Nos. Required] / [Nos. SW5f Bio-methanation units 0 0 0 0 Not required Available] [Nos. Required] / [Nos. SW5h Composting units 1 1 1 0 44 Nos of beds Available] Material Recovery [used or installed] / Not Dec - SW5i Not available 1 1 Facilities [not available] available 2020 Waste to Energy (if [Required] / [Nos. Not SW5k Not required 0 0 applicable) Available] required [Required] / [Nos. Not SW5l Waste to RDF Not required 0 0 0 Available] required SW5m Sanitary Land fills [Nos] / [Nos. Available] 0 0 0 0 0 Not required Capacity of sanitary [MT] / / [Nos. SW5n 0 0 0 0 0 Not required landfills Available] Waste Deposit Centres SW5o [Nos] / [Nos. Available] 0 0 0 0 0 Not required (DHW) [give or select from SW5p Other facilities No facility No facility 0 0 0 list] Notification and SW6 Implementation of By-Laws [done] / [in progress] / SW6a Notification of By-laws Done Done [not initiated] Implementation of by- [done] / [in progress] / SW6b Done Done laws [not initiated] Adequacy of SW7 Financial Status of ULB SW7a CAPEX Required [INR] / [Not required] 1.12 Cr 1.12 Cr 0 0 0 DPR value [INR per Year] / [% of SW7b OPEX 00.58 Cr 0.58 Cr 0 0 0 Installation given requirement]

SW7c Adequacy of OPEX [Yes] / [No] Yes Yes 0 0 0

Annexure –I

1.0 Waste Management Plan

(i) Solid Waste Management Plan (for each ULB)

Details of Data Units of Measurable Dhanera Current Time line No. Action Areas Desirable level Gap Remarks Requirement Outcome Nagarpalika Status for gap Name of Urban Dhanera [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 29578 29578 census] Report on inventory of total SW1 solid waste Generation Total solid waste [in MT/Day] or [Not SW1a 12 12 Generation estimated] [in MT/Day] or Qty. of Dry Waste SW1b [Collection Not 6 6 segregated initiated] [in MT/Day] or Qty. of Wet Waste SW1c [Collection Not 6 6 segregated initiated] [in MT/Day] or Qty. of C&D Waste SW1d [Collection Not 0.5 05 segregated initiated] [in MT/Day] or [Not SW1e Qty. of Street Sweeping 1.9 1.9 estimated] [in MT/Day] or [Not SW1f Qty. of Drain Silt 0.1 0.1 estimated] Qty. of Domestic [in MT/Day] or [No Dec - SW1g Hazardous Waste(DHW) No Facility No Facility 0.01 0.01 Facility] 2020 collected Qty. of Other Waste [in MT/Day] or [Qty. SW1h (Horticulture, sanitary 0 0 not estimated] waste, etc.) Dec - SW1i No of Old dump sites [Nos] or [None] 1 1 0 1 2020 [MT] or [Not Dec - SW1j Qty. stored in dumpsites 1000 1000 0 1500 estimated] 2020 SW1k No of Sanitary landfills [Nos] or [None] 0 0 0 0 0 Not required

SW1l No of wards [no’s] 7 7 Compliance by SW2 Bulk Waste

Generators [numbers] or SW2a No of BW Generators 0 0 [inventory not done] No of on-site facilities for SW2b [numbers] or [No data] 0 0 Wet Waste Compliance in segregated waste SW3 Collection SW Collection [Automatic] from SW3a Total generation 12 12 SW1a [in MT/Day] or SW3b Wet Waste [Collection Not 6 6 initiated] [in MT/Day] or SW3c Dry Waste [Collection Not 6 6 initiated] [in MT/Day] or SW3d C&D Waste [Collection Not 0.5 0.5 initiated] Waste SW4 Management

Operations [100%] / [partial %] / SW4a Door to Door Collection 100% 100% [not initiated] Mechanical Road [100%] / [partial%] / SW4b 100% 100% Sweeping [not initiated] SW4c Manual Sweeping [100%] / [partial%] 100% 100% Segregated Waste [100%] / [partial %] / SW4d 100% 100% Transport [not initiated] Digesters (Bio- [% of WW] / [not Not Not Not SW4e Not required Not required methanation) initiated] required required required [% of WW] / [not Not Dec - SW4f Composting operation Not initiated 100 % 100 % initiated] initiated 2020 [MRF used] / [not Not Dec – SW4g MRF Operation Not installed MRF used MRF used installed] installed 2020 [% of SW collected] / SW4h Use of Sanitary Landfill No SLF No SLF No SLF No SLF No SLF Not required [no SLF] Reclamation of old [initiated] / [not SW4i initiated initiated Initiated dumpsites initiated] Linkage with Waste to [initiated] / [not Not Not Not SW4j Energy Boilers / Cement Not required Not required initiated] required required required Plants [initiated] / [not SW4k Linkage with Recyclers initiated initiated initiated] Authorization of waste [initiated] / [not SW4l initiated initiated pickers initiated] Linkage with TSDF / [initiated] / [not Not Dec – SW4m Not initiated 1 0 CBMWTF initiated] initiated 2020 [initiated] / [not No NGO No NGO No NGO SW4n Involvement of NGOs No NGO exist No NGO exist initiated] exist exist exist No No No Linkage with Producers / [initiated] / [not No Producer No Producer SW4o Producer Producer Producer Brand Owners initiated] exist exist exist exist exist Authorisation of Waste [initiated] / [not Dec - SW4p initiated initiated 7 Person 7 Person Pickers initiated] 2020 [initiated] / [not Dec - SW4q Issuance of ID Cards initiated initiated 7 Person 7 Person initiated] 2020 Adequacy of SW5 Infrastructure [Nos. Required] / [Nos. SW5a Waste Collection Trolleys 2 2 2 0 Adequate Available] [Nos. Required] / [Nos. SW5b Mini Collection Trucks 6 6 6 0 Adequate Available] [yes] / [no] / [% area SW5c Segregated Transport Yes Yes covered] [Nos. Required] / [Nos. SW5d Bulk Waste Trucks 0 0 0 0 Not required Available] [Nos. Required] / [Nos. Not SW5e Waste Transfer points Available] /[Not Not Available 0 0 Not required Available available] [Nos. Required] / [Nos. Not SW5f Bio-methanation units Not Available 0 0 Not required Available] Available [Nos. Required] / [Nos. SW5h Composting units 2 2 2 0 Available] Material Recovery [used or installed] / Not Dec - SW5i Not available 1 1 Facilities [not available] available 2020 Waste to Energy (if [Required] / [Nos. Not SW5k Not required 0 0 applicable) Available] required [Required] / [Nos. Not SW5l Waste to RDF Not required 0 0 0 Available] required

Not SW5m Sanitary Land fills [Nos] / [Nos. Available] Not required 0 0 0 Not required required Capacity of sanitary [MT] / / [Nos. Not SW5n Not required 0 0 0 Not required landfills Available] required Waste Deposit Centres SW5o [Nos] / [Nos. Available] 0 0 0 0 0 Not required (DHW) [give or select from SW5p Other facilities No facility No facility 0 0 0 list] Notification and SW6 Implementation

of By-Laws [done] / [in progress] / SW6a Notification of By-laws Done Done [not initiated] Implementation of by- [done] / [in progress] / SW6b Done Done laws [not initiated] Adequacy of SW7 Financial Status of

ULB SW7a CAPEX Required [INR] / [Not required] 1.95 Cr 1.95 Cr 0 0 0 DPR value [INR per Year] / [% of SW7b OPEX 0.71 Cr 0.71 Cr 0 0 0 Installation given requirement]

SW7c Adequacy of OPEX [Yes] / [No] Yes Yes 0 0 0

Annexure –II

(ii) Plastic Waste Management (for each ULB)

Please

limit limit

enter

Status Status

Details of Data Measurabl No. Action Areas Measurabl

GAP

Requirement e Outcome ULB 1 ULB 2 ULB 3 ULB 4 ULB 5 ULB 6 e Outcome

Current

for District Desirable

Time line for GAP line Time

Palanpur, Deesa, [name of Tharad, Name of ULB

ULB] Thara, Nagarpalika

Bhabhar, Dhanera

Thara

Deesa Nagarpalika Deesa

Tharad Nagarpalika Nagarpalika Tharad

Bhabhar Nagarpalika Bhabhar

Dhanera Nagarpalika Dhanera ------Nagarpalika Palanpur [Nos as per Population 2011 350238 ------141592 111160 27954 18060 21894 29578 census] Inventory of PW1 plastic waste

generation Estimated Quantity of [MT/day] / Not PW1a plastic waste [Not 6 5 0.7 0.1 0.1 0.1 estimated generated in Estimated] District ------Implementation PW2 of Collection [100%] / Door to Door [partial %] PW2a 100% 100% 100% 100% 100% 100% 100% collection / [not initiated] ------Segregated [100%] / PW2b Partial % 60% 80% 0 75% 25% 100% Waste collection [partial %] ------Plastic waste [MRF used] collection at 4 Nos ULB PW2c / [not MRF used MRF used MRF used MRF used Not initiated Not initiated Material MRF used installed] Recovery Facility ------Authorization of [Nos] / [not PW2d 73 50 21 Not initiated 3 initiated Not initiated PW pickers initiated] ------

[Nos] / [not PW collection Not PW2e established 3 1 1 Not initiated 1 Not initiated Centres Established ] ------Establishment of PW3 linkage with

Stakeholders Established [Nos] / [not No Not No producer Not PW3a linkage with PROs established producer 0 0 0 established exist established of Producers ] exist ------

Established [Nos] / [not No NGO Not Not PW3b linkage with established 0 0 0 No NGO exist exist established established NGOs ] ------Availability of facilities for PW4 Recycling or utilization of PW No. of PW PW4a [Nos] Not exist 0 0 0 0 0 0 recyclers ------No PW4b [Nos] Not exist 0 0 0 0 0 0 Manufacturers ------No of pyrolysis oil PW4c [Nos] Not exist 0 0 0 0 0 0 plants ------[Quantity PW4d Plastic pyrolysis in MT sent Not exist 0 0 0 0 0 0 per Month] ------[Quantity Use in road Not PW4e MT used 0 0 0 0 0 0 making required per Month] ------[Quantity Co-processing in Not PW4f in MT sent 0 0 0 0 0 0 Cement Kiln required per Month] ------Implementation of PW W5 Management Rules, 2016 Sealing of units [All sealed] W5a producing < 50- / [Partial] / All sealed All sealed All sealed All sealed All sealed All sealed All sealed micron plastic [no action] ------

[Prohibited Prohibiting sale ] / [Partial] PW5b of carry bags < 50 Prohibited Prohibited Prohibited Prohibited Prohibited Prohibited Prohibited / [no micron action] ------Ban on Carry [Implement bags and other ed] / single use plastics Implement PW5c [Partial] / Implemented Implemented Implemented Implemented Implemented Implemented as notified by ed [no action] State / [No Ban] Government ------Implementation of Extended Producers PW6 Responsibility

(EPR) through Producers/Brand -owners No of Producers [Nos] / PW6a associated with None None None None None None None [None] ULBs ------Financial support by Producers / [Nos] / PW6b None None None None None None None Brand owners to [None] ULBs ------Amount of PRO PW6c [Rs…] 0 None None 0 0 0 0 Support ------Infrastructure support by [Nos of PW6d Producers / Producers] None None None None None None None Brand owners to / [None] ULBs ------No of collection centres established by [Nos] / PW6e None None None None None None None Producers / [None] Brand owners to ULBs ------

Annexure –II

(ii) Plastic Waste Management (for each ULB) Time Details of Data Units of Measurable Palanpur Current No. Action Areas Desirable level Gap line for Remarks Requirement Outcome Nagarpalika Status gap Name of Urban Palanpur [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 0 Population 141592 141592 0 0 --- census] Inventory of PW1 plastic waste generation Estimated Quantity of 0 [MT/day] / [Not PW1a plastic waste generated in 5 5 0 0 --- Estimated] District Implementation PW2 of Collection [100%] / [partial %] / 0 --- PW2a Door to Door collection 100% 100% 100% 0 [not initiated] Segregated Waste 0 --- PW2b [100%] / [partial %] 60% 60% 100% 0 collection Plastic waste collection at [MRF used] / [not 0 --- PW2c MRF used MRF used MRF used 0 Material Recovery Facility installed] Authorization of PW 0 --- PW2d [Nos] / [not initiated] 50 50 50 0 pickers [Nos] / [not 0 PW2e PW collection Centres 1 1 1 0 DPR PREPARED established] Establishment of PW3 linkage with Stakeholders Established linkage with [Nos] / [not 0 PW3a 0 0 0 0 No producer exist PROs of Producers established] Established linkage with [Nos] / [not 0 PW3b 0 0 0 0 No NGO exist NGOs established] Availability of facilities for PW4 Recycling or utilization of PW PW4a No. of PW recyclers [Nos] 0 0 0 0 0 Not exist PW4b No Manufacturers [Nos] 0 0 0 0 0 Not exist

PW4c No of pyrolysis oil plants [Nos] 0 0 0 0 0 Not exist [Quantity in MT sent PW4d Plastic pyrolysis 0 0 0 0 0 Not exist per Month] [Quantity MT used per Not required PW4e Use in road making 0 0 0 0 0 Month] Co-processing in Cement [Quantity in MT sent Not required PW4f 0 0 0 0 0 Kiln per Month] Implementation of PW W5 Management Rules, 2016 Sealing of units producing [All sealed] / [Partial] / 0 ----- W5a All sealed All sealed All sealed 0 < 50-micron plastic [no action] Prohibiting sale of carry [Prohibited] / [Partial] 0 ----- PW5b Prohibited Prohibited Prohibited 0 bags < 50 micron / [no action] Ban on Carry bags and 0 [Implemented] / other single use plastics as PW5c [Partial] / [no action] / Implemented Implemented Implemented 0 ----- notified by State [No Ban] Government Implementation of Extended Producers PW6 Responsibility (EPR) through Producers/Brand- owners No of Producers 0 PW6a [Nos] / [None] None None 0 0 No producer exist associated with ULBs Financial support by 0 PW6b Producers / Brand owners [Nos] / [None] None None 0 0 No producer exist to ULBs PW6c Amount of PRO Support [Rs…] None None 0 0 0 No PRO exist Infrastructure support by 0 [Nos of Producers] / PW6d Producers / Brand owners None None 0 0 No producer exist [None] to ULBs No of collection centres 0 PW6e established by Producers [Nos] / [None] None None 0 0 No producer exist / Brand owners to ULBs

Annexure –II

(ii) Plastic Waste Management (for each ULB) Time Details of Data Units of Measurable Deesa Current No. Action Areas Desirable level Gap line for Remarks Requirement Outcome Nagarpalika Status gap Name of Urban Deesa [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 111160 111160 census] Inventory of PW1 plastic waste generation Estimated Quantity of [MT/day] / [Not PW1a plastic waste generated in 700 KG/Day 700 KG/Day 700 KG/Day 0 0 Estimated] District Implementation PW2 of Collection [100%] / [partial %] / PW2a Door to Door collection 100% 100% 100% 0 0 [not initiated] Segregated Waste PW2b [100%] / [partial %] 80% 80% 100% 20% Dec-21 collection Plastic waste collection at [MRF used] / [not PW2c MRF used MRF used MRF used 0 0 Material Recovery Facility installed] Authorization of PW PW2d [Nos] / [not initiated] 21 21 21 0 0 pickers [Nos] / [not PW2e PW collection Centres 1 1 1 0 0 established] Establishment of PW3 linkage with Stakeholders Established linkage with [Nos] / [not PW3a 0 0 0 0 0 No producer exist PROs of Producers established] Established linkage with [Nos] / [not PW3b 0 0 0 0 0 No NGO exist NGOs established] Availability of facilities for PW4 Recycling or utilization of PW PW4a No. of PW recyclers [Nos] 0 0 0 0 0 No exist PW4b No Manufacturers [Nos] 0 0 0 0 0 No exist

PW4c No of pyrolysis oil plants [Nos] 0 0 0 0 0 Not required [Quantity in MT sent PW4d Plastic pyrolysis 0 0 0 0 0 Not required per Month] [Quantity MT used per PW4e Use in road making 0 0 0 0 0 Not required Month] Co-processing in Cement [Quantity in MT sent PW4f 0 0 0 0 0 Not required Kiln per Month] Implementation of PW W5 Management Rules, 2016 Sealing of units producing [All sealed] / [Partial] / W5a All sealed All sealed All sealed 0 0 < 50-micron plastic [no action] Prohibiting sale of carry [Prohibited] / [Partial] PW5b Prohibited Prohibited Prohibited 0 0 bags < 50 micron / [no action] Ban on Carry bags and [Implemented] / other single use plastics as PW5c [Partial] / [no action] / Implemented Implemented Implemented 0 0 notified by State [No Ban] Government Implementation of Extended Producers PW6 Responsibility (EPR) through Producers/Brand- owners No of Producers PW6a [Nos] / [None] None None 0 0 0 No producer exist associated with ULBs Financial support by PW6b Producers / Brand owners [Nos] / [None] None None 0 0 0 No producer exist to ULBs PW6c Amount of PRO Support [Rs…] None None 0 0 0 No PRO exist Infrastructure support by [Nos of Producers] / PW6d Producers / Brand owners None None 0 0 0 No producer exist [None] to ULBs No of collection centres PW6e established by Producers [Nos] / [None] None None 0 0 0 No producer exist / Brand owners to ULBs

Annexure –II

(ii) Plastic Waste Management (for each ULB)

Time Details of Data Units of Measurable Tharad Current No. Action Areas Desirable level Gap line for Remarks Requirement Outcome Nagarpalika Status gap Name of Urban Tharad [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 27954 27954 census] Inventory of PW1 plastic waste

generation Estimated Quantity of [MT/day] / [Not Not Not Dec – PW1a plastic waste generated in 50 Kg/Day 50 Kg/Day Estimated] estimated estimated 2020 District Implementation PW2 of Collection [100%] / [partial %] / PW2a Door to Door collection 100% 100% [not initiated] Segregated Waste Dec - PW2b [100%] / [partial %] 0 0 100% 100% collection 2020 Plastic waste collection at [MRF used] / [not PW2c MRF used MRF used Material Recovery Facility installed] Authorization of PW Dec - PW2d [Nos] / [not initiated] Not initiated Not initiated 9 9 pickers 2020 [Nos] / [not Dec - PW2e PW collection Centres Not initiated Not initiated 1 1 established] 2020 Establishment of PW3 linkage with

Stakeholders Established linkage with [Nos] / [not Not Not PW3a 0 0 0 No Producer exist PROs of Producers established] established established Established linkage with [Nos] / [not Not Not PW3b 0 0 0 No NGO exist NGOs established] established established Availability of facilities for PW4 Recycling or utilization of PW PW4a No. of PW recyclers [Nos] 0 0 0 0 0 No recycler exist PW4b No Manufacturers [Nos] 0 0 0 0 0 Not exist

PW4c No of pyrolysis oil plants [Nos] 0 0 0 0 0 Not exist [Quantity in MT sent PW4d Plastic pyrolysis 0 0 0 0 0 Not required per Month] [Quantity MT used per PW4e Use in road making 0 0 0 0 0 Not required Month] Co-processing in Cement [Quantity in MT sent PW4f 0 0 0 0 0 Not required Kiln per Month] Implementation of PW W5 Management Rules, 2016 Sealing of units producing [All sealed] / [Partial] / W5a All sealed All sealed 0 0 0 < 50-micron plastic [no action] Prohibiting sale of carry [Prohibited] / [Partial] PW5b Prohibited Prohibited 0 0 0 bags < 50 micron / [no action] Ban on Carry bags and [Implemented] / other single use plastics as PW5c [Partial] / [no action] / Implemented Implemented 0 0 0 notified by State [No Ban] Government Implementation of Extended Producers PW6 Responsibility

(EPR) through Producers/Brand- owners No of Producers PW6a [Nos] / [None] None None 0 0 0 No Producer exist associated with ULBs Financial support by PW6b Producers / Brand owners [Nos] / [None] None None 0 0 0 No Producer exist to ULBs PW6c Amount of PRO Support [Rs…] 0 0 0 0 0 No PRO exist Infrastructure support by [Nos of Producers] / PW6d Producers / Brand owners None None 0 0 0 No Producer exist [None] to ULBs No of collection centres PW6e established by Producers [Nos] / [None] None None 0 0 0 No Producer exist / Brand owners to ULBs

Annexure –II

(ii) Plastic Waste Management (for each ULB) Time Details of Data Units of Measurable Thara Current No. Action Areas Desirable level Gap line for Remarks Requirement Outcome Nagarpalika Status gap Name of Urban Thara [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 18060 18060 0 0 0 census] Inventory of PW1 plastic waste generation Estimated Quantity of [MT/day] / [Not PW1a plastic waste generated in 0.1 MT/Day 0.1 MT/Day 0.1 MT/Day 0 0 Estimated] District Implementation PW2 of Collection [100%] / [partial %] / PW2a Door to Door collection 100% 100% 100% 0 0 [not initiated] Segregated Waste Dec - PW2b [100%] / [partial %] 75% 75% 100% 25% collection 2020 Plastic waste collection at [MRF used] / [not PW2c MRF used MRF used MRF used 0 0 Material Recovery Facility installed] Authorization of PW PW2d [Nos] / [not initiated] 3 3 3 0 0 pickers [Nos] / [not PW2e PW collection Centres 1 1 1 0 0 established] Establishment of PW3 linkage with Stakeholders Established linkage with [Nos] / [not PW3a 0 0 0 0 0 No producer exist PROs of Producers established] Established linkage with [Nos] / [not PW3b 0 0 0 0 0 No NGO exist NGOs established] Availability of facilities for PW4 Recycling or utilization of PW PW4a No. of PW recyclers [Nos] 0 0 0 0 0 Not exist PW4b No Manufacturers [Nos] 0 0 0 0 0 Not exist

PW4c No of pyrolysis oil plants [Nos] 0 0 0 0 0 Not exist [Quantity in MT sent PW4d Plastic pyrolysis 0 0 0 0 0 Not required per Month] [Quantity MT used per PW4e Use in road making 0 0 0 0 0 Not required Month] Co-processing in Cement [Quantity in MT sent PW4f 0 0 0 0 0 Not required Kiln per Month] Implementation of PW W5 Management Rules, 2016 Sealing of units producing [All sealed] / [Partial] / W5a All sealed All sealed All sealed 0 0 < 50-micron plastic [no action] Prohibiting sale of carry [Prohibited] / [Partial] PW5b Prohibited Prohibited Prohibited 0 0 bags < 50 micron / [no action] Ban on Carry bags and [Implemented] / other single use plastics as PW5c [Partial] / [no action] / Implemented Implemented Implemented 0 0 notified by State [No Ban] Government Implementation of Extended Producers PW6 Responsibility (EPR) through Producers/Brand- owners No of Producers PW6a [Nos] / [None] None None 0 0 0 No producer exist associated with ULBs Financial support by PW6b Producers / Brand owners [Nos] / [None] None None 0 0 0 No producer exist to ULBs PW6c Amount of PRO Support [Rs…] 0 0 0 0 0 No PRO exist Infrastructure support by [Nos of Producers] / PW6d Producers / Brand owners None None 0 0 0 No producer exist [None] to ULBs No of collection centres PW6e established by Producers [Nos] / [None] None None 0 0 0 No producer exist / Brand owners to ULBs

Annexure –II

(ii) Plastic Waste Management (for each ULB) Time Details of Data Units of Measurable Bhabhar Current No. Action Areas Desirable level Gap line for Remarks Requirement Outcome Nagarpalika Status gap Name of Urban Bhabhar [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 21894 21894 0 0 0 census] Inventory of PW1 plastic waste generation Estimated Quantity of [MT/day] / [Not PW1a plastic waste generated in 0.1 0.1 0.1 MT/Day 0 0 Estimated] District Implementation PW2 of Collection [100%] / [partial %] / PW2a Door to Door collection 100% 100% 100% 0 0 [not initiated] Segregated Waste Dec - PW2b [100%] / [partial %] 25% 25% 100% 25% collection 2020 Plastic waste collection at [MRF used] / [not Dec - PW2c Not initiated Not initiated MRF used 100% Material Recovery Facility installed] 2020 Authorization of PW Dec - PW2d [Nos] / [not initiated] initiated initiated 5 person 5 person pickers 2020 [Nos] / [not Not Not Dec - PW2e PW collection Centres 1 100% established] Established Established 2020 Establishment of PW3 linkage with Stakeholders Established linkage with [Nos] / [not No producer No producer PW3a 0 0 0 No producer exist PROs of Producers established] exist exist Established linkage with [Nos] / [not PW3b No NGO exist No NGO exist 0 0 0 No NGO exist NGOs established] Availability of facilities for PW4 Recycling or utilization of PW PW4a No. of PW recyclers [Nos] 0 0 0 0 0 Not exist PW4b No Manufacturers [Nos] 0 0 0 0 0 Not exist

PW4c No of pyrolysis oil plants [Nos] 0 0 0 0 0 Not exist [Quantity in MT sent PW4d Plastic pyrolysis 0 0 0 0 0 Not required per Month] [Quantity MT used per PW4e Use in road making 0 0 0 0 0 Not required Month] Co-processing in Cement [Quantity in MT sent PW4f 0 0 0 0 0 Not required Kiln per Month] Implementation of PW W5 Management Rules, 2016 Sealing of units producing [All sealed] / [Partial] / W5a All sealed All sealed All sealed 0 0 < 50-micron plastic [no action] Prohibiting sale of carry [Prohibited] / [Partial] PW5b Prohibited Prohibited Prohibited 0 0 bags < 50 micron / [no action] Ban on Carry bags and [Implemented] / other single use plastics as PW5c [Partial] / [no action] / Implemented Implemented Implemented 0 0 notified by State [No Ban] Government Implementation of Extended Producers PW6 Responsibility (EPR) through Producers/Brand- owners No of Producers PW6a [Nos] / [None] None None 0 0 0 No producer exist associated with ULBs Financial support by PW6b Producers / Brand owners [Nos] / [None] None None 0 0 0 No producer exist to ULBs PW6c Amount of PRO Support [Rs…] 0 0 0 0 0 No PRO exist Infrastructure support by [Nos of Producers] / PW6d Producers / Brand owners None None 0 0 0 No producer exist [None] to ULBs No of collection centres PW6e established by Producers [Nos] / [None] None None 0 0 0 No producer exist / Brand owners to ULBs

Annexure –II

(ii) Plastic Waste Management (for each ULB)

Time Details of Data Units of Measurable Dhanera Current No. Action Areas Desirable level Gap line for Remarks Requirement Outcome Nagarpalika Status gap Name of Urban Dhanera [name of ULB] Local Body (ULB) Nagarpalika No of ULBs in the [Nos] ------District [Nos as per 2011 Population 29578 29578 0 0 0 census] Inventory of PW1 plastic waste

generation Estimated Quantity of [MT/day] / [Not PW1a plastic waste generated in 0.1 0.1 0 0 0 Estimated] District Implementation PW2 of Collection [100%] / [partial %] / PW2a Door to Door collection 100% 100% 100% 0 0 [not initiated] Segregated Waste PW2b [100%] / [partial %] 100% 100% 100% 0 0 collection Plastic waste collection at [MRF used] / [not Dec - PW2c Not initiated Not initiated MRF used 100% Material Recovery Facility installed] 2020 Authorization of PW Dec - PW2d [Nos] / [not initiated] Not initiated Not initiated 7 Person 7 Person pickers 2020 [Nos] / [not PW2e PW collection Centres Not initiated Not initiated 1 1 Dec 20 established] Establishment of PW3 linkage with

Stakeholders Established linkage with [Nos] / [not Not Not PW3a 0 0 0 No Producer exist PROs of Producers established] established established Established linkage with [Nos] / [not Not Not PW3b 0 0 0 No NGO exist NGOs established] established established Availability of facilities for PW4 Recycling or utilization of PW PW4a No. of PW recyclers [Nos] 0 0 0 0 0 No recycler exist PW4b No Manufacturers [Nos] 0 0 0 0 0 Not exist

PW4c No of pyrolysis oil plants [Nos] 0 0 0 0 0 Not exist [Quantity in MT sent PW4d Plastic pyrolysis 0 0 0 0 0 Not required per Month] [Quantity MT used per PW4e Use in road making 0 0 0 0 0 Not required Month] Co-processing in Cement [Quantity in MT sent PW4f 0 0 0 0 0 Not required Kiln per Month] Implementation of PW W5 Management Rules, 2016 Sealing of units producing [All sealed] / [Partial] / W5a All sealed All sealed 0 0 0 < 50-micron plastic [no action] Prohibiting sale of carry [Prohibited] / [Partial] PW5b Prohibited Prohibited 0 0 0 bags < 50 micron / [no action] Ban on Carry bags and [Implemented] / other single use plastics as PW5c [Partial] / [no action] / Implemented Implemented 0 0 0 notified by State [No Ban] Government Implementation of Extended Producers PW6 Responsibility

(EPR) through Producers/Brand- owners No of Producers PW6a [Nos] / [None] None None 0 0 0 No Producer exist associated with ULBs Financial support by PW6b Producers / Brand owners [Nos] / [None] None None 0 0 0 No Producer exist to ULBs PW6c Amount of PRO Support [Rs…] 0 0 0 0 0 No PRO exist Infrastructure support by [Nos of Producers] / PW6d Producers / Brand owners None None 0 0 0 No Producer exist [None] to ULBs No of collection centres PW6e established by Producers [Nos] / [None] None None 0 0 0 No Producer exist / Brand owners to ULBs

Annexure –III

(iii) C&D Waste Management

Please enter

Details of Data Measurable Measurable No. Action Areas

GAP GAP

Requirement Outcome Outcome for ULB 1 ULB 2 ULB 3 ULB 4 ULB 5 ULB 6 District

Time line for line Time

Current Status

Desirable limit Desirable

Palanpur,

Deesa, [name of Tharad, Name of ULB ULB] Thara,

Tharad Tharad

Dhanera Dhanera

Palanpur Palanpur

Bhabhar, Nagarpalika

Nagarpalika Nagarpalika

Dhanera TharaNagarpalika

Deesa Nagarpalika Deesa

Nagarpalika Bhabhar [Nos as per Population 350238 ------141592 111160 27954 18060 21894 29578 2011 census] Inventory of CD1 C&D waste

generation [Kg/Day] / Estimated CD1a [Not 3400 ------2000 100 KG/Day 400 Kg/Day 0 400 Kg/Day 500 Kg/Day Quantity estimated] Implement scheme for CD2 permitting bulk

waste generators Issuance of [Initiated] / Not Not CD2a Permissions by [Not Not initiated ------Not initiated Not initiated 0 Not initiated initiated initiated ULBs initiated] Establishment of C&D Waste CD3 Deposition centres Establishment 2 Nos ULB CD3a of Deposition [Yes] / [No] ------Yes Yes No No No No established Points C&D Deposition 2 Nos ULB CD3b [Yes] / [No] ------Yes Yes No No No No point identified identified Implementation of By-Laws for CD4 CD Waste Management [notified] / Implementation CD4a [not Notified ------Notified Notified Notified Notified Notified Notified of By-laws notified] Collection of [Initiated] / 4 Nos ULB Not CD4b Deposition / [Not ------Initiated Initiated Not initiated initiated Initiated Initiated initiated disposal Charges initiated] Establishment of C&D Waste CD5 recycling plant

or linkage with such facility [Established] / [Sent to Establishment shared No facility No facility No facility No facility No facility No facility No facility CD5a CD Waste ------Facility] / exists exists exists exists exists exists exists Recycling Plant [No facility exists] Capacity of CD [MT/Day] / Not Not Not Not Not Not CD5b Waste Recycling [Not Not available ------available available available available available available Plant available]

Annexure –III

(iii) C&D Waste Management

Details of Data Palanpur Current Desirable Time line for No. Action Areas Measurable Outcome Gap Remarks Requirement Nagarpalika Status level gap Palanpur Name of ULB [name of ULB] Nagarpalika [Nos as per 2011 Population 141592 141592 ------census] Inventory of C&D waste CD1 generation [Kg/Day] / [Not CD1a Estimated Quantity 2000 2000 0 0 0 -- estimated] Implement scheme for CD2 permitting bulk waste

generators Issuance of [Initiated] / [Not CD2a Not initiated Not initiated Initiated Initiated Dec - 2020 -- Permissions by ULBs initiated] Establishment of C&D CD3 Waste Deposition

centres Establishment of CD3a [Yes] / [No] Yes Yes 0 0 0 -- Deposition Points C&D Deposition point CD3b [Yes] / [No] Yes Yes 0 0 0 -- identified Implementation of By- CD4 Laws for CD Waste

Management Implementation of By- [notified] / [not CD4a Notified Notified Notified 0 0 -- laws notified] Collection of [Initiated] / [Not CD4b Deposition / disposal Initiated Initiated Initiated 0 0 -- initiated] Charges Establishment of C&D Waste recycling plant or CD5 linkage with such facility [Established] / [Sent to Establishment CD No facility No facility No facility Used for low laying CD5a shared Facility] / [No 0 0 Waste Recycling Plant exists exists exists area filling facility exists] Capacity of CD Waste [MT/Day] / [Not Not Used for low laying CD5b Not available Not available 0 0 Recycling Plant available] available area filling

Annexure –III

(iii) C&D Waste Management

Details of Data Deesa Current Desirable Time line for No. Action Areas Measurable Outcome Gap Remarks Requirement Nagarpalika Status level gap Deesa Name of ULB [name of ULB] Nagarpalika [Nos as per 2011 Population 111160 111160 ------census] Inventory of C&D waste CD1 generation [Kg/Day] / [Not CD1a Estimated Quantity 100 KG 100 KG 100 KG 0 0 estimated] Implement scheme for CD2 permitting bulk waste

generators Issuance of [Initiated] / [Not CD2a Not initiated Not initiated Initiated Initiated Dec - 2020 Permissions by ULBs initiated] Establishment of C&D CD3 Waste Deposition

centres Establishment of CD3a [Yes] / [No] Yes Yes 0 0 0 Deposition Points C&D Deposition point CD3b [Yes] / [No] Yes Yes 0 0 0 identified Implementation of By- CD4 Laws for CD Waste

Management Implementation of By- [notified] / [not CD4a Notified Notified Notified 0 0 laws notified] Collection of [Initiated] / [Not CD4b Deposition / disposal Initiated Initiated Initiated 0 0 initiated] Charges Establishment of C&D Waste recycling plant or CD5 linkage with such facility [Established] / [Sent to Establishment CD No facility No facility No Facility Used for filling in low CD5a shared Facility] / [No 0 0 Waste Recycling Plant exists exists exists lay areas facility exists] Capacity of CD Waste [MT/Day] / [Not Not Used for filling in low CD5b Not available Not available 0 0 Recycling Plant available] available lay areas

Annexure –III

(iii) C&D Waste Management

Details of Data Tharad Current Desirable Time line for No. Action Areas Measurable Outcome Gap Remarks Requirement Nagarpalika Status level gap

Tharad Name of ULB [name of ULB] Nagarpalika [Nos as per 2011 Population 27954 27954 ------census] Inventory of C&D waste CD1 generation [Kg/Day] / [Not CD1a Estimated Quantity 400 Kg/Day 400 Kg/Day 0 0 0 estimated] Implement scheme for CD2 permitting bulk waste

generators Issuance of [Initiated] / [Not CD2a Not initiated Not initiated Initiated Initiated Dec - 2020 Permissions by ULBs initiated] Establishment of C&D CD3 Waste Deposition

centres Establishment of CD3a [Yes] / [No] No No 1 1 Dec - 2020 Deposition Points C&D Deposition point CD3b [Yes] / [No] No No 1 1 Dec - 2020 identified Implementation of By- CD4 Laws for CD Waste

Management Implementation of By- [notified] / [not CD4a Notified Notified 0 0 0 laws notified] Collection of [Initiated] / [Not CD4b Deposition / disposal Not initiated Not initiated Initiated Initiated Dec – 2020 initiated] Charges Establishment of C&D Waste recycling plant or CD5 linkage with such facility [Established] / [Sent to Use for filing of low Establishment CD No facility No facility CD5a shared Facility] / [No 0 0 0 laying area & port Waste Recycling Plant exists exists facility exists] holes Use for filing of low Capacity of CD Waste [MT/Day] / [Not CD5b Not available Not available 0 0 0 laying area & port Recycling Plant available] holes

Annexure –III

(iii) C&D Waste Management

Details of Data Thara Current Desirable Time line for No. Action Areas Measurable Outcome Gap Remarks Requirement Nagarpalika Status level gap Thara Name of ULB [name of ULB] Nagarpalika [Nos as per 2011 Population 18060 18060 ------census] Inventory of C&D waste CD1 generation [Kg/Day] / [Not CD1a Estimated Quantity 0 0 0 0 0 No generation estimated] Implement scheme for CD2 permitting bulk waste

generators Issuance of [Initiated] / [Not CD2a 0 0 0 0 0 Not required Permissions by ULBs initiated] Establishment of C&D CD3 Waste Deposition

centres Establishment of CD3a [Yes] / [No] No No 0 0 0 Not required Deposition Points C&D Deposition point CD3b [Yes] / [No] No No 0 0 0 Not required identified Implementation of By- CD4 Laws for CD Waste

Management Implementation of By- [notified] / [not CD4a Notified Notified 0 0 0 laws notified] Collection of [Initiated] / [Not CD4b Deposition / disposal initiated initiated 0 0 0 initiated] Charges Establishment of C&D Waste recycling plant or CD5 linkage with such facility [Established] / [Sent to Establishment CD No facility No facility Use for filling in low CD5a shared Facility] / [No 0 0 0 Waste Recycling Plant exists exists laying area facility exists] Capacity of CD Waste [MT/Day] / [Not Use for filling in low CD5b Not available Not available 0 0 0 Recycling Plant available] laying area

Annexure –III

(iii) C&D Waste Management

Details of Data Bhabhar Current Desirable Time line for No. Action Areas Measurable Outcome Gap Remarks Requirement Nagarpalika Status level gap Bhabhar Name of ULB [name of ULB] Nagarpalika [Nos as per 2011 Population 21894 21894 ------census] Inventory of C&D waste CD1 generation [Kg/Day] / [Not CD1a Estimated Quantity 400 Kg/Day 400 Kg/Day 0 0 0 estimated] Implement scheme for CD2 permitting bulk waste

generators Issuance of [Initiated] / [Not CD2a Not initiated Not initiated Initiated 100% Dec – 2020 Permissions by ULBs initiated] Establishment of C&D CD3 Waste Deposition

centres Establishment of CD3a [Yes] / [No] No No 1 1 Dec – 2020 Deposition Points C&D Deposition point CD3b [Yes] / [No] No No 1 1 Dec – 2020 identified Implementation of By- CD4 Laws for CD Waste

Management Implementation of By- [notified] / [not CD4a Notified Notified 0 0 0 laws notified] Collection of [Initiated] / [Not CD4b Deposition / disposal Initiated Initiated 0 0 0 initiated] Charges Establishment of C&D Waste recycling plant or CD5 linkage with such facility [Established] / [Sent to Establishment CD No facility No facility Use for filling in low CD5a shared Facility] / [No 0 0 0 Waste Recycling Plant exists exists laying area facility exists] Capacity of CD Waste [MT/Day] / [Not Use for filling in low CD5b Not available Not available 0 0 0 Recycling Plant available] laying area

Annexure –III

(iii) C&D Waste Management

Details of Data Dhanera Current Desirable Time line for No. Action Areas Measurable Outcome Gap Remarks Requirement Nagarpalika Status level gap Dhanera Name of ULB [name of ULB] Nagarpalika [Nos as per 2011 Population 29578 29578 ------census] Inventory of C&D waste CD1 generation [Kg/Day] / [Not CD1a Estimated Quantity 500 Kg/Day 500 Kg/Day 0 0 0 estimated] Implement scheme for CD2 permitting bulk waste

generators Issuance of [Initiated] / [Not CD2a Not initiated Not initiated Initiated Initiated Dec - 2020 Permissions by ULBs initiated] Establishment of C&D CD3 Waste Deposition

centres Establishment of CD3a [Yes] / [No] No No 1 1 Dec - 2020 Deposition Points C&D Deposition point CD3b [Yes] / [No] No No 1 1 Dec - 2020 identified Implementation of By- CD4 Laws for CD Waste

Management Implementation of By- [notified] / [not CD4a Notified Notified 0 0 0 laws notified] Collection of [Initiated] / [Not CD4b Deposition / disposal Not initiated Not initiated Initiated Initiated Dec – 2020 initiated] Charges Establishment of C&D Waste recycling plant or CD5 linkage with such facility [Established] / [Sent to Use for filing of low Establishment CD No facility No facility CD5a shared Facility] / [No 0 0 0 laying area & port Waste Recycling Plant exists exists facility exists] holes Use for filing of low Capacity of CD Waste [MT/Day] / [Not CD5b Not available Not available 0 0 0 laying area & port Recycling Plant available] holes

Annexure IV 3.0 Domestic Sewage Management Plan Please enter Time Details of Data Measurable Measurable Current Desirable No. Action Areas GAP limit for Remarks status Level Requirement Outcome Outcome for GAP District Inventory of Palanpur Palanpur SM1 Sewage Nagarpalika Nagarpalika Management Total Quantity of Sewage generated in DEC- SM1a [MLD] 15 15 15 0 -- District from Class II 2020 cities and above No of Class-II towns and SM1b [Nos] 0 0 0 0 0 --- above No of Class-I towns and SM1c [Nos] 1 0 0 0 0 --- above STP will STP will installed installed No of Towns needing SM1d [Nos] 1 0 1 1 within within STPs Dec - Dec - 2020 2020 No of Towns STPs DEC- SM1e [Nos] 0 0 1 1 --- installed 2020 Quantity of treated sewage flowing into 0 SM1f [MLD] 0 0 0 0 --- Rivers (directly or indirectly) Quantity of untreated DEC- or partially treated SM1g [Automatic] 15 MLD 15 MLD 100% 100% --- sewage (directly or 2020 indirectly) Annexure IV Quantity of sewage SM1h [MLD] 0 0 0 0 0 --- flowing into lakes No of industrial SM1i [Nos] 0 0 0 0 0 --- townships Adequacy of Available SW2 Infrastructure for Sewage Treatment % sewage treated in SM2a [Automatic] 0 0 0 0 0 --- STPs Total available DEC- SM2b [MLD] 0 0 15 MLD 15 MLD --- Treatment Capacity 2020 Additional treatment SM2c [MLD] 0 0 0 0 0 --- capacity required Adequacy of SM3 Sewerage Network No of ULBs having SM3a partial underground [Nos] 1 1 1 0 0 --- sewerage network No of towns not having SM3b [Nos] 1 1 1 0 0 --- sewerage network % population covered DEC- SM3c under sewerage [Automatic] 40% 40% 100% 60% --- 2020 network

Annexure IV 3.0 Domestic Sewage Management Plan Please enter Details of Data Measurable Measurable Current Desirable Time limit No. Action Areas GAP Remarks Requirement Outcome Outcome for status Level for GAP District Inventory of Deesa Deesa SM1 Sewage Nagarpalika Nagarpalika Management Total Quantity of Sewage generated in SM1a [MLD] 19 19 19 0 Dec-2020 District from Class II cities and above No of Class-II towns SM1b [Nos] 0 0 0 0 0 and above No of Class-I towns SM1c [Nos] 0 0 0 0 0 and above No of Towns needing SM1d [Nos] 0 0 0 0 0 STPs 26 MLD STP No of Towns STPs SM1e [Nos] 0 0 1 1 Under installed Construction Quantity of treated sewage flowing into SM1f [MLD] 0 0 100% 100% Dec-20 Rivers (directly or indirectly) Quantity of untreated or partially treated SM1g [Automatic] 19 19 100% 100% Dec-20 sewage (directly or indirectly) Quantity of sewage SM1h [MLD] 0 0 0 0 0 flowing into lakes Annexure IV No of industrial SM1i [Nos] 0 0 0 0 0 townships Adequacy of Available SW2 Infrastructure

for Sewage Treatment % sewage treated in SM2a [Automatic] 0 0 0 0 0 STPs Total available SM2b [MLD] 0 0 26 26 Dec-20 Treatment Capacity Additional treatment SM2c [MLD] 26 26 26 0 Dec-20 capacity required Adequacy of SM3 Sewerage

Network No of ULBs having SM3a partial underground [Nos] 1 1 1 0 0

sewerage network No of towns not SM3b having sewerage [Nos] 0 0 0 0 0

network % population covered SM3c under sewerage [Automatic] 75% 75% 100% 25% Dec-20

network