ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) AL -- Alabama NATR_2A17 FY2015 AL Lauderdale Overlay Park Road MP 334.5 to MP 344.5 2R PRA Between $1,000,000 Title 23 EFLHD In Acquisition No change AL-05 NPS_SE and $5,000,000

NATR_2B5 FY2015 AL Lauderdale Natchez Trace Parkway John Coffee Memorial Bridge Rail Painting BRRH PRA Between $1,000,000 Title 23 EFLHD In Acquisition No change AL-05 NPS_SE and $5,000,000

NATR_2B6 FY2015 AL Lauderdale NATCHEZ TRACE TN River Bridge Pier Cap Emergency Repair BRRH_LSR FLTP Between $1,000,000 Title 23 EFLHD Planned New project AL-05 NPS_SE PARKWAY and $5,000,000

AR -- Arkansas AR_FLAP_UNION_JLR(1) FY2015 AR Union Felsenthal National Wildlife Rehabilitation of 3 miles of Jones Lake Road. 3RH_3RL FLAP Between $1,000,000 Title 23 LOCAL Planned New project AR-04 FWS_R4 Refuge and $5,000,000

FW_FELS_2009970969 FY2015 AR Ashley Felsenthal National Wildlife Rehabilitate Headquarters/Visitors Center Turn Lane 3RL FLTP Between $25,000 Title 23 FWS Planned Name changed from FELSENTHAL to AR-04 FWS_R4 Refuge (Route 10) at Highway 82 and $100,000 FW_FELS_2009970969 FW_BAKN_2014248780 FY2017 AR White Bald Knob National Wildlife Rehabilitate Norton Road. 3RL FLTP Between $250,000 Title 23 FWS Planned Name changed from BALD KNOB to AR-02 FWS_R4 Refuge and $500,000 FW_BAKN_2009949112 FW_WHRI_13(1) FY2017 AR Arkansas White River National Wildlife Rehabilitate Jack's Bay Road (Route 13) 3RL FLTP Between $1,000,000 Title 23 EFLHD Planned No change AR-01 FWS_R4 Refuge and $5,000,000

FW_FELS_11(1) FY2018 AR Ashley Felsenthal National Wildlife Rehabilitate Pine Island Road (Route 11) 3RL FLTP Between $1,000,000 Title 23 EFLHD Planned New project AR-04 FWS_R4 Refuge and $5,000,000

AR_FLAP_HTSPR_TRL(1) FY2015 AR Garland Hot Spring National Park Construct decorative brick path along sidewalks from MISC FLAP Between $25,000 Title 23 LOCAL Planned New project AR-04 NPS_MW HS Creek Greenway Trail to HSNP Visitor Center and $100,000 HOSP_10(3) FY2015 AR Garland Hot Springs National Park Repair and Stabilize Stone Retaining Wall on Hot Springs RW REIMB Between $250,000 Title 23 EFLHD In Acquisition No change AR-04 NPS_MW Mountain Road and $500,000 AR_FLAP_DOT_220(1) FY2015 AR Crawford and Ozark National Forest Reconstruct 4.75 miles of AR 220 and construct a 3RH_BRRP FLAP Between $1,000,000 Title 23 USFS Planned New project AR-03 USFS_R8 Washington bridge at the low-water crossing of Fall Creek. and $5,000,000

AR_FLAP_POLK_64(1) FY2016 AR Polk Ouachita National Forest Grade the next phase of County Route 64 from the 4R FLAP Between $500,000 Title 23 EFLHD Planned New project AR-04 USFS_R8 overlook to the historic arch culvert. and $1,000,000 DC -- District of Columbia GWMP_11(6) FY2015 DC District of Columbia George Washington Emergency Repairs to Arlington Memorial Bridge, 1R FLTP Between $1,000,000 Title 23 EFLHD Planned New change - NPS_NC Memorial Parkway resurface deck and repair trunnion posts. and $5,000,000

NAMA_17(1) FY2015 DC District of Columbia National Mall & Memorial Repair / Rehabilitate Watergate Bridge, NPS Storage 3RL PRA Between $1,000,000 Title 23 EFLHD In Acquisition No change - NPS_NC Parks Area Bridge, mill & overlay of Parkway Drive and $5,000,000

NAMA_502(5) FY2015 DC District of Columbia National Mall and Memorial Rehabilitation of Kutz Bridge 3RL PRA Between $5,000,000 Title 23 EFLHD In Acquisition No change - NPS_NC Parks and $10,000,000

ROCR_10(5) FY2015 DC District of Columbia Rock Creek Park Rehab. Beach Drive MISC PRA More than Title 23 EFLHD In Acquisition No change - NPS_NC $10,000,000 ROCR_503(1) FY2015 DC District of Columbia Rock Creek Park Waterside Dr. Roadway reconstruction, drainage, 3RH_BRRP PRA Between $1,000,000 Title 23 EFLHD In Design No change - NPS_NC guardrail, & street light replacement & misc and $5,000,000

CHOH_238(1) FY2016 DC District of Columbia Chesapeake & Ohio Canal CHOH 238(1) Replacement of Structure No. 3100-029P BRRP FLTP Between $100,000 Title 23 EFLHD Planned New change - NPS_NC National Historical Park (Fletcher's Boathouse Bridge #1) and $250,000 DC_FLAP_DOT_14TRL(1) FY2016 DC District of Columbia National Mall & Memorial Remove and relocate an overhead sign on the 14th MISC FLAP Between $250,000 Title 23 EFLHD Planned New project - NPS_NC Parks Street Bridge. and $500,000 DC_FLAP_DOT_GALWY(1) FY2016 DC District of Columbia Rock Creek Park Construct a trail along Galloway Street to reduce the MISC FLAP Between $250,000 Title 23 EFLHD Planned New project - NPS_NC creation and use of social trails. and $500,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) DC_FLAP_DOT_TILDN(1) FY2016 DC District of Columbia Rock Creek Park Const. trail along Tilden St. & raised ped. crosswalk to MISC FLAP Between $100,000 Title 23 EFLHD Planned New project - NPS_NC provide access to Peirce Mill Spring House. and $250,000 NACE_17(2)_18(2)_ETC FY2016 DC District of Columbia East Fort DuPont Resurface, restore & rehabilitate Routes 17, 18, 19, 118, 3RH FLTP Between $1,000,000 Title 23 EFLHD In Design Name changed from NACE_17(2)_18(2) - NPS_NC and 206 in Fort DuPont and Fort Davis and $5,000,000 to NACE_17(2)_18(2)_ETC

NAMA_11(6) FY2016 DC District of Columbia National Mall & Memorial Rehab Inlet Bridge (3400-033) BRRH FLTP Between $500,000 Title 23 EFLHD Planned New project - NPS_NC Parks and $1,000,000 NAMA_16(2)_20(2)_ETC FY2016 DC District of Columbia National Mall & Memorial Rock Creek and Potomac Parkway, 17th st, Ind Ave & 3RL FLTP Between $5,000,000 Title 23 EFLHD Planned Name changed from NAMA_16(2) to - NPS_NC Parks West Tidal Basin Turnaround pavement rehab. and $10,000,000 NAMA_16(2)_20(2)_ETC

ROCR_24(1) FY2016 DC District of Columbia Rock Creek Park Pavement rehabilitation, geotechical investigation of RW FLTP Between $1,000,000 Title 23 EFLHD In Design New project - NPS_NC Repair retaining wall collapse and repair and $5,000,000

ROCR_27(1)_910(1) FY2016 DC Washington DC Rock Creek Park Rehab Struct 3450-029P Broad Branch and 033P BRRH FLTP Between $250,000 Title 23 EFLHD Planned New project - NPS_NC Edgewater Stable and $500,000 CHOH_238(2) FY2017 DC District of Columbia Chesapeake & Ohio Canal Fletcher's entrance placeholder 3RH FLTP Between $1,000,000 Title 23 EFLHD Planned New project - NPS_NC National Historical Park and $5,000,000

GWMP_11(4) FY2017 DC District of Columbia George Washington Arlington Memorial Bridge Permanent Repairs 3RL NPS Between $1,000,000 Title 23 EFLHD In Design No change - NPS_NC Memorial Parkway and $5,000,000

NAMA_12(3) FY2017 DC District of Columbia National Mall & Memorial Rehab Outlet Bridge & resurface East Basin Dr. 3RL_BRRH FLTP Between $1,000,000 Title 23 EFLHD Planned New project - NPS_NC parks and $5,000,000

NAMA_21(2)_501(3) FY2017 DC District of Columbia National Mall & Memorial 15th St & Jefferson Dr Resurfacing 3RL FLTP Between $1,000,000 Title 23 EFLHD Planned New project - NPS_NC Parks and $5,000,000

NCR_PMS_FY17 FY2017 DC District of Columbia National Capital Region Pavement Management outside Beltway 2R FLTP Between $500,000 Title 23 EFLHD Planned New project - NPS_NC and $1,000,000 ROCR_14(1)_17(1) FY2017 DC District of Columbia Rock Creek Park Light pave rehab & replace drainage system on Bingham 3RL FLTP Between $1,000,000 Title 23 EFLHD Planned New project - NPS_NC and Morrow Dr and $5,000,000

NAMA_11(7) FY2018 DC District of Columbia National Mall & Memorial Rehabilitate Ohio Dr, W Basin Dr & WB to EB Turnaround 3RL FLTP Between $1,000,000 Title 23 EFLHD Planned New project - NPS_NC Parks and $5,000,000

ROCR_12(1)_19(1) FY2018 DC District of Columbia Rock Creek & Potomac Park Rehab Wise & Glover Roads 3RL FLTP Between $1,000,000 Title 23 EFLHD Planned New project - NPS_NC and $5,000,000

DE -- Delaware FW_BOHO_HPP_3894 FY2015 DE Kent Bombay Hook National Rehabilitate Refuge Entrance Road (Route 10) and Auto 3RL SAFETEA-LU Between $250,000 Title 23 FWS Planned New project DE-00 FWS_R5 Wildlife Refuge Tour Route/ Raymond Pool Loop (Route 11) and $500,000 FW_PRHO_10(1) FY2018 DE Sussex Prime Hook National Wildlife Entrance Road (Route 10) from Turkle Pond Road at 3RH FLTP Between $250,000 Title 23 EFLHD Planned New project DE-00 FWS_R5 Refuge Refuge boundary to Visitor Center parking area. and $500,000 FL -- Florida FW_JNDA_2008870481 FY2015 FL Lee J.N. Ding Darling National Rehabilitate Tarpon Bay Road (Route 101) 3RL FLTP Between $100,000 Title 23 FWS Planned Name changed from JN DING DARLING to FL-14 FWS_R4 Wildlife Refuge and $250,000 FW_JNDA_2008870481 FW_LOSU_2006532572 FY2015 FL Levy Lower Suwannee National Rehabilitate Shell Mount Road (Route 107) 3RL FLTP Between $25,000 Title 23 FWS Planned Name changed from LOWER SUWANNEE FL-05 FWS_R4 Wildlife Refuge and $100,000 to FW_LOSU_2006532572 FW_MEIS_2014248737 FY2015 FL Brevard Merritt Island National Rehabilitate Shiloh Marsh Road (Route 133). 3RL FLTP Between $100,000 Title 23 FWS Planned New project FL-24 FWS_R4 Wildlife Refuge and $250,000 FW_NADE_2006415475 FY2015 FL Monroe National Key Deer National Rehabilitate Watson Nature Trail Parking Lot (Route 901) 3RL FLTP Between $100,000 Title 23 FWS Planned Name changed from NATIONAL KEY FL-18 FWS_R4 Wildlife Refuge and $250,000 DEER to FW_NADE_2006415475 FW_LOXA_2005216526 FY2016 FL Palm Beach Arthur R. Marshall Rehabilitate Hillsboro Recreation Area Parking Lot (Route 3RL FLTP Between $100,000 Title 23 FWS Planned Name changed from LOXAHATCHEE to FL-19 FWS_R4 Loxahatchee National 901) and $250,000 FW_LOXA_2005216526 Wildlife Refuge

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) FW_LOXA_2005255653 FY2016 FL Palm Beach Arthur R. Marshall Repair Lee Road (Route 10). 3RL FLTP Between $100,000 Title 23 FWS Planned Name changed from LOXAHATCHEE to FL-19 FWS_R4 Loxahatchee National and $250,000 FW_LOXA_2005255653 Wildlife Refuge FW_FLPA_419(1) FY2017 FL Collier Florida Panther National Rehabilitate Fritz Road (Route 419) 3RL FLTP Between $500,000 Title 23 EFLHD Planned New project FL-25 FWS_R4 Wildlife Refuge and $1,000,000 GUIS_12(2) FY2015 FL Escambia Gulf Islands National Cyclic Asphalt Overlay & Roadway Rehabilitation as 3RL PRA Between $1,000,000 Title 23 EFLHD In Design No change FL-01 NPS_SE Seashore necesssary on Fort Pickens Road (Route 12) and $5,000,000

EVER_196127 FY2016 FL Miami-Dade Everglades National Park Prepare NEPA for 10.7 miles of Tamiami Trail and D/B to 4R OTHER More than Title 23 STATE Planned No change FL-25 NPS_SE build 2.66 mi section with bridge(s) $10,000,000 GUIS_11(2) FY2016 FL Escambia Gulf Islands National Park Cyclic Asphalt Overlay and Roadway Rehabilitation as 3RL_2R PRA Between $1,000,000 Title 23 EFLHD In Design No change FL-01 NPS_SE necessary on JEB Way (Santa Rosa Rd Rte 11) and $5,000,000

GA -- Georgia FW_HANE_2006559687 FY2015 GA McIntosh Harris Neck National Wildlife Repair Barbour River Landing Parking Lot (Route 907) 3RL FLTP Between $250,000 Title 23 FWS Planned Name changed from HARRIS NECK to GA-01 FWS_R4 Refuge and $500,000 FW_HANE_2006559687 FOPU_10(3) FY2015 GA Chatham Fort Pulaski National Replacement of the Fort Pulaski Bridge BRRH PRA Between $5,000,000 Title 23 EFLHD In Design No change GA-01 NPS_SE Monument and $10,000,000

SER_BMS_FY14_BASE FY2015 GA Various Various REGION WIDE BRIDGE PREVENTATIVE MAINTENANCE 1R PRA TBD Title 23 EFLHD In Design No change _VARIOUS NPS_SE PROJECTS OCMU_10(2) FY2016 GA Bibb Ocmul Gee National Rehabilitate Park Roads 3RL PRA Between $1,000,000 Title 23 EFLHD Planned Name change from OCMU 10(1) to OCMU GA-08 NPS_SE Monument and $5,000,000 10(2)

GA_CE_Savannah(1) FY2015 GA Richmond New Savannah Bluff Lock Butler Creek Bridge erosion control MISC FLTP Between $25,000 Title 23 NPS Planned New project GA-12 USACE_MV and $100,000 D CE_WFG_Lock(1) FY2016 GA Clay County Walter F George Lake Pavement rehabilitation at the Walter F George Lake 3RH_3RL FLTP Between $500,000 Title 23 EFLHD In Design New project GA-02 USACE_MV and $1,000,000 D IA -- Iowa NLS_10(1) FY2015 IA Jasper Neal Smith National Wildlife Rehabilitate Entrance Road (Route 10), bridges, and 3RL FLTP Between $5,000,000 Title 23 EFLHD In Acquisition No change IA-03 FWS_R3 Refuge parking areas (4.8 miles, existing asphalt) and $10,000,000

MWR_PMS_IA(1) FY2016 IA Harpes Ferry Effigy Mounds National Pavement Preservation at EFMO and HEHO 2R FLTP Between $500,000 Title 23 EFLHD In Design New project IA-04 NPS_MW Monument and $1,000,000 IA_FLAP_DM_NSTRL(1) FY2015 IA Polk U.S. Army Corps of Resurface and widen 1 mile of the Neal Smith Trail MISC FLAP Between $250,000 Title 23 LOCAL Planned New project IA-03 USACE_MV Engineers, Saylorville Lake beginning at Riverview Park and heading north and $500,000 D IL -- Illinois IL_FLAP_PLSK_PV1R(1) FY2015 IL Pulaski Cypress Creek NWR Place bituminous surface treatment (Class A2) to 2R FLAP Between $100,000 Title 23 LOCAL Planned New project IL-15 FWS_R3 existing aggregate roadway (Butter Ridge Road) and $250,000 FW_CROR_2006526009 FY2016 IL Williamson Crab Orchard National Remove Little Creek Bridge & Tripp Trail East Bridge MISC FLTP Between $25,000 Title 23 FWS Planned No change IL-12 FWS_R3 Wildlife Refuge and $100,000 FW_CROR_2011207970 FY2016 IL Williamson Crab Orchard National Resurface Routes B.P. 5 3RL FLTP Between $1,000,000 Title 23 FWS Planned No change IL-12 FWS_R3 Wildlife Refuge and $5,000,000

FW_CROR_2006402607 FY2018 IL Williamson Crab Orchard National Rehabilitate Devil's Kitchen Bridge BRRH FLTP Between $25,000 Title 23 FWS Planned New project IL-12 FWS_R3 Wildlife Refuge and $100,000 FW_CROR_2010121878 FY2018 IL Williamson Crab Orchard National Rehabilitate Little Grassy Bridge BRRH FLTP Between $100,000 Title 23 FWS Planned New project IL-12 FWS_R3 Wildlife Refuge and $250,000 IN -- Indiana IN_FLAP_SANTA_TRL(1) FY2015 IN Spencer Lincoln Boyhood National Construct 1800 feet of CR 1650N. Construct 2300 feet NEW FLAP Between $250,000 Title 23 USFS Planned New project IN-08 NPS_MW Memorial of an asphalt trail along SR162. and $500,000 GERO_900(1) FY2017 IN Knox George Rogers Clark Reconstruct Visitor Center Parking Area and Entrance 1R NPS Between $500,000 Title 23 EFLHD In Design No change IN-08 NPS_MW National Historical Park Road and $1,000,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) IN_FLAP_MNROE_343(1) FY2015 IN Monroe Hoosier National Forest Acquire right-of-way and preliminary engineering for the MISC FLAP Between $250,000 Title 23 STATE Planned New project IN-09 USFS_R9 roadway improvements to Hunters Creek Road. and $500,000 KY -- Kentucky MACA_102(1) FY2015 KY Edmonson Mammoth Cave Rehabilitate Cedar Sink Road 3RL PRA Between $1,000,000 Title 23 EFLHD In Design No change KY-02 NPS_SE and $5,000,000

KY_CE_Markland(1) FY2015 KY Gallatin Markland Locks and Dam Markland Locks and Dam Bridge Rehabilitation BRRH FLTP Between $500,000 Title 23 NPS Planned New project KY-04 USACE_GLO and $1,000,000 RD KY_FS_2014-1(1) FY2015 KY Trigg, Stewart Land Between the Lakes ERFO repairs to four sites in the Land Between the 3RH ERFO Between $250,000 Title 23 EFLHD Planned New project KY-01 USFS_R8 Recreation Area Lakes NF and $500,000 LA -- Louisiana FW_BLLA_2014248727 FY2015 LA Ouachita Black Bayou Lake National Repair Observation Tower Road (Route 103) 3RL FLTP Between $100,000 Title 23 FWS Planned No change LA-05 FWS_R4 Wildlife Refuge and $250,000 FW_TERI_11(1) FY2016 LA Madison Tensas River National Rehabilitate Wildlife Drive MISC FWS Between $1,000,000 Title 23 EFLHD In Design No change LA-05 FWS_R4 Wildlife Refuge and $5,000,000

FW_CATA_2010127131 FY2017 LA Catahoula Parish Catahoula National Wildlife Replace Minnow Pond Road Bridge BRRP FLTP Between $500,000 Title 23 FWS Planned Name changed from CATAHOULA to LA-05 FWS_R4 Refuge and $1,000,000 FW_CATA_2010127131 MA -- Massachusetts FW_ASRI_101(1) FY2017 MA Middlesex Assabet River National Rehabilitate White Pond Road, aka North Entrance Road 3RH FLTP Between $250,000 Title 23 EFLHD Planned New project MA-05 FWS_R5 Wildlife Refuge (Route 101). and $500,000 CACO_10(2) FY2016 MA Barnstable Cape Cod National Seashore Pavement Overlay on Doane Road. 3RL FLTP Between $250,000 Title 23 EFLHD Planned New project MA-10 NPS_NE and $500,000 MD -- Maryland FW_PATU_HPP_4304 FY2015 MD Prince Georges Patuxent Research Refuge Rehab. American Holly Dr (Rte 10), Beech Forest Rd 3RL SAFETEA-LU Between $250,000 Title 23 FWS Planned New project MD-04 FWS_R5 (Rte 100), & 3 Parking Lots (Rtes 900, 901, 902). and $500,000 MD-Dorchester_139(1) FY2015 MD Dorchester Blackwater National Wildlife Engineering/Hydraulic Study of Maple Dam Road (County 4R PLHD Between $250,000 Title 23 EFLHD Planned No change MD-01 FWS_R5 Refuge Rte. 139) thru Blackwater NWR & Dorchester Co. and $500,000

BAWA_1(3)_2(3) FY2015 MD Prince George's Baltimore Washington Resurface and Restore approx. 5.3 mi. of the BW Pkwy, 3RH FLTP Between $5,000,000 Title 23 EFLHD In Design No change MD-05 NPS_NC Parkway in both directions from I495 to MD 197 and $10,000,000

CATO_900(1) FY2015 MD Frederick Catoctin Mountain Park Replacement of the Visitor Center Bridge at Catoctin BRRP PRA Between $1,000,000 Title 23 EFLHD In Design No change MD-06 NPS_NC Mountain National Park and $5,000,000

CHOH_10(1) FY2015 MD Montgomery Chesapeake and Ohio Canal Safety Improvements on the Great Falls Entrance Road 3RH PRA Between $250,000 Title 23 EFLHD In Acquisition No change MD-08 NPS_NC National Historical Park and $500,000

BAWA_1A26_E20 FY2016 MD Anne Arundel Baltimore Washington Rehabilitate walls along Baltimore Washington Parkway RW PLHD Between $1,000,000 Title 23 EFLHD In Design No change MD-05 NPS_NC Parkway near Rt 197. and $5,000,000

CATO_11(2) FY2016 MD Frederick Catoctin Mountain Park Repair Rte 11 Section 0 Foxville-Deerfield Road 3RL FLTP Between $250,000 Title 23 EFLHD Planned New project MD-06 NPS_NC and $500,000 CHOH_10(2) FY2016 MD Montgomery Chesapeake and Ohio Canal Access Road and Parking Lots PM & L3R 3RL FLTP Between $500,000 Title 23 EFLHD Planned New project MD-08 NPS_NC National Historical Park and $1,000,000

GREE_11(1) FY2016 MD Prince George's Greenbelt Park Main Enrtance Rd. & Park Central Rd. Bridge 3RH_BRRP PRA Between $1,000,000 Title 23 EFLHD In Design No change MD-05 NPS_NC Replacement and Resurfacing of Rtes. 10, 11, 200 & and $5,000,000 201 GWMP_6(1)_7(2) FY2016 MD Montgomery and George Washington Clara Barton Pkwy mill and overly includes guardrail and 3RH FLTP Between $1,000,000 Title 23 EFLHD Planned New project _VARIOUS NPS_NC Prince George's Memorial Parkway guardwall and $5,000,000

SUIT_1(2)_2(2) FY2016 MD Prince George's National Capital Parks-East Improve Ped Cross at SUIT Prky & Forestville Rd incl. MISC FLTP Between $100,000 Title 23 EFLHD Planned New project MD-05 NPS_NC sdwlk, signals, lights, signing, pvmt markings and $250,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) BAWA_1(4)_2(4) FY2017 MD Prince George's, Baltimore Washington Resurface BW Parkway 3RL FLTP Between $1,000,000 Title 23 EFLHD Planned New project _VARIOUS NPS_NC Anne Arundel Parkway and $5,000,000

MD_ASIS_2013-1(3) FY2015 MD Worcester Assateague Island National ERFO-Hurricane Sandy relocation of Bayside and South MISC ERFO Less than $25,000 Title 23 EFLHD In Design No change MD-01 NPS_NE Seashore Beach PAs MI -- Michigan FW_JORI_10(1)_900(1) FY2017 MI Antrim Jordan River National Fish Reconstruct Entrance Road (Route 10) and Visitor 3RH FLTP Between $1,000,000 Title 23 EFLHD Planned Name changed from FW_JORI 10(1) to MI-01 FWS_R3 Hatchery Parking Lot (Route 900) and $5,000,000 FW_JORI_10(1)_900(1)

FW_SENE2013226922 FY2018 MI Schoolcraft Seney National Wildlife Rehabilitation of Marsh Creek Outflow Bridge & Upper BRRH FLTP Between $25,000 Title 23 FWS Planned New project MI-01 FWS_R3 Refuge Driggs River Bridge. and $100,000 FW_SENE_10(1)_900(1) FY2018 MI Schoolcraft Seney National Wildlife Reconstruct Entrance Road (Route 10), Visitor Center 3RL FWS Between $500,000 Title 23 EFLHD Planned New project MI-01 FWS_R3 Refuge Parking (Rte 900), & HQ Parking (Rte 901) and $1,000,000 MWR_PMS_MI(3) FY2015 MI Leelanau MidWestRegion Pavement preservation work for National Parks at 3RL PRA Between $1,000,000 Title 23 EFLHD In Design No change MI-04 NPS_MW Sleeping Bear Dunes National Lakeshore (SLBE) and $5,000,000

MN -- Minnesota FW_MIVA_2014242386 FY2016 MN Hennepin Minnesota Valley National Rehabilitate OCAB Parking Lot (Route 903) 3RL FLTP Between $500,000 Title 23 FWS Planned No change MN-02 FWS_R3 Wildlife Refuge and $1,000,000 FW_TAMA_10(1)_900(1) FY2016 MN Becker Tamarac National Wildlife Resurface Entrance Road (Route 10); reconstruct & 3RL_4R FLTP Between $500,000 Title 23 EFLHD In Design No change MN-07 FWS_R3 Refuge realign Visitor Center Parking Area (Route 900) and $1,000,000 FW_DELA_2008863735 FY2018 MN Polk Detroit Lakes Water Rehabilitate Mee Handicap Access 3RL FLTP Between $25,000 Title 23 FWS Planned New project MN-07 FWS_R3 Management District and $100,000 FW_FEFA_2012218766 FY2018 MN Otter Tail Fergus Falls Water Rehabilitate PWLC Trail 3RL FLTP Between $500,000 Title 23 FWS Planned New project MN-07 FWS_R3 Management District and $1,000,000 MWR_PMS_MN(1) FY2016 MN Koochiching Voyageurs National Park Pavement Preservation in Voyageurs NP 2R FLTP Between $500,000 Title 23 EFLHD In Design New project MN-08 NPS_MW and $1,000,000 MWR_PMS_MN(2) FY2016 MN Allamakee Pipestone National Pavement Preservation at Pipestone National Monument 2R FLTP Between $500,000 Title 23 EFLHD Planned New project MN-01 NPS_MW Monument and $1,000,000 MO -- Missouri MO_FLAP_DOT_118(1) FY2015 MO Holt Squaw Creek National Resurface and construct 2-ft wide paved shoulders 3RL FLAP Between $500,000 Title 23 STATE Planned New project MO-06 FWS_R3 Wildlife Refuge with rumble stripes to 6.54 miles of MO Rte 118. and $1,000,000 FW_NEOS_2013226938 FY2016 MO Newton Neosho National Fish Rehabilitate South Main Gate Bridge BRRH FLTP Less than $25,000 Title 23 FWS Planned No change MO-07 FWS_R3 Hatchery FW_SQCR_2014243544 FY2016 MO Richardson Squaw Creek National Seal Coat Asphalt Roads MISC FLTP Between $100,000 Title 23 FWS Planned No change MO-06 FWS_R3 Wildlife Refuge and $250,000 FW_SWLA_2014242299 FY2016 MO Calhoun Swan Lake National Wildlife Auto Tour Route Maintenance Action Team Project 3RL FLTP Between $250,000 Title 23 FWS Planned No change MO-06 FWS_R3 Refuge and $500,000 FW_BIMU_107(1) FY2017 MO St. Louis Big Muddy National Fish & Reconstr. Loesing RD (Rt 107) at new HQ site & improve 3RH FLTP Between $500,000 Title 23 EFLHD Planned No change MO-04 FWS_R3 Wildlife Refuge intersctn sfty at Brady LN & State Rt 179/98 and $1,000,000 MO_NP_OZAR_2013-1(1) FY2016 MO Carter, Shannon, Ozark National Scenic ERFO repairs at five sites in the Ozark National Scenic 3RL ERFO Between $500,000 Title 23 EFLHD Planned New project MO-08 NPS_MW Howell Riverway Riverway and $1,000,000 OZAR_10(2) FY2016 MO Carter Ozark National Scenic Replacement of Big Spring Bridge (6640-001P) and BRRH PRA Between $500,000 Title 23 EFLHD In Design No change MO-08 NPS_MW Riverways Rehabilitation of Alley Spring Bridge (6640-005P) and $1,000,000 MS -- Mississippi NATR_3C12_D32 FY2015 MS Lee Natchez Trace Parkway Rehabilitate Parkway from MP 266 to 282 (16.00 Miles) 3RL PRA Between $5,000,000 Title 23 EFLHD In Design No change MS-01 NPS_SE and $10,000,000

NATR_3N15 FY2015 MS Hinds, Madison Natchez Trace Parkway Overlay Park Road from MP 110 to 121 (11.00 Miles) 3RL PRA Between $1,000,000 Title 23 EFLHD In Design No change _VARIOUS NPS_SE and $5,000,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) NATR_3P22 FY2015 MS Hinds Natchez Trace Parkway Spot Repairs, Wedge And Leveling From MP77 to MP111 2R PRA Between $1,000,000 Title 23 EFLHD In Acquisition No change MS-03 NPS_SE and $5,000,000

NATR_3A16_3B8 FY2016 MS PRENTISS & Natchez Trace Parkway Overlay Park Road - MP. 289.16 to MP. 299.16 2R FLTP Between $1,000,000 Title 23 EFLHD In Design New project _VARIOUS NPS_SE TISHOMINGO and $5,000,000

NATR_3P19 FY2016 MS Hinds Natchez Trace Parkway Bridge over County Line Rd + multiuse trail 200 ft W of MISC FLTP Between $1,000,000 Title 23 EFLHD In Design No change MS-02 NPS_SE County Line Rd bridge to MP 96.3 Stream and $5,000,000

NATR_3R13 FY2016 MS Hinds Natchez Trace Parkway Overlay Park Road-MP. 77.136 to MP. 87.136 2R FLTP Between $1,000,000 Title 23 EFLHD In Design New project, Name changed from MS-02 NPS_SE and $5,000,000 NATR_3Q8_3R13 to NATR_3R13

NATR_3G24 FY2017 MS Chickasaw Natchez Trace Parkway Parkway Rehabilitation 3RL PRA Between $1,000,000 Title 23 EFLHD In Design No change MS-04 NPS_SE and $5,000,000

NATR_3P20 FY2017 MS Madison Natchez Trace Parkway Bridge Over Hilda Dr/Illinois Central Railroad including MISC PRA Between $5,000,000 Title 23 EFLHD In Design No change MS-03 NPS_SE multi-use trail and $10,000,000

NATR_3S11_3T10 FY2018 MS Claiborne Natchez Trace Parkway Overlay Park Road-PM Project from MP 45 to 59(14.00 3RL PRA Between $1,000,000 Title 23 EFLHD Planned No change MS-02 NPS_SE Miles) and $5,000,000

NATR_3X7_3W13 FY2018 MS Augusta Natchez Trace Parkway Overlay Park Road-PM Project from MP 0 to 15 (15.00 3RL PRA Between $1,000,000 Title 23 EFLHD Planned No change MS-03 NPS_SE Miles) and $5,000,000

MS_FLAP_PNL_SRDLK(1) FY2015 MS Panola U.S. Army Corps of Resurface, widen, and replace drainage structures 3RL_NEW FLAP Between $500,000 Title 23 LOCAL Planned New project MS-01 USACE_MV Engineers, Sardis Reservoir along 4 mile of Sardis Lake Drive and $1,000,000 D MS_FLAP_FRKN_BR67(1) FY2015 MS Franklin Homochitto National Forest Remove and replace existing bridge #67 along BRRP FLAP Between $100,000 Title 23 LOCAL Planned New project MS-03 USFS_R8 Providence Road. and $250,000 MS_FLAP_FRKN_MDCR(1) FY2015 MS Franklin Homochitto National Forest Remove and replace existing bridges (#026 and #022) BRRP FLAP Between $500,000 Title 23 LOCAL Planned New project MS-03 USFS_R8 along Middleton Creek Road and $1,000,000 MS_FLAP_STONE_117(1) FY2015 MS Stone Desoto National Forest Remove and replace existing bridges (#038 and #040) BRRP FLAP Between $500,000 Title 23 LOCAL Planned New project MS-04 USFS_R8 along King Bee Road and $1,000,000 NC -- North Carolina FW_ALRI_2005219064 FY2015 NC Dare Alligator River National Rehabilitate Bear Road (Route 149). 3RL FLTP Between $500,000 Title 23 FWS Planned New project NC-03 FWS_R4 Wildlife Refuge and $1,000,000 BLRI_2F24 FY2015 NC Watauga Repair & Resurface Deteriorated Road Section "2F" 3RH_3RL PRA Between $5,000,000 Title 23 EFLHD In Design No change NC-05 NPS_SE and $10,000,000

BLRI_2F25 FY2015 NC Watauga Blue Ridge Parkway Repairs to US 421 Bridge 5140-091P BRRH FLTP Between $500,000 Title 23 EFLHD Planned No change NC-05 NPS_SE and $1,000,000 BLRI_2H15 FY2015 NC Avery Blue Ridge Parkway Emergency joint repair on Rough Ridge Bridge (Structure BRRH FLTP Between $25,000 Title 23 EFLHD In Design New project NC-10 NPS_SE 5140-178P) and $100,000 BLRI_ES(1) FY2015 NC Various Blue Ridge Parkway Conduct Slope Stability Study 1R PRA Between $100,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE and $250,000 BLRI_2P19_2T14 FY2016 NC Buncombe, Blue Ridge National Park Repair Tanbark Ridge Tunnel P141 Repair Buck Spring TUN PRA Between $1,000,000 Title 23 EFLHD In Design No change _VARIOUS NPS_SE Henderson Tunnel 150P and $5,000,000

BLRI_2H14 FY2017 NC Avery Blue Ridge Parkway Rehab - replace waterproofing membrane & wearing BRRH FLTP Between $1,000,000 Title 23 EFLHD In Design New project NC-10 NPS_SE surface on Linn Cove Viaduct, Str. 182P, MP 304.02 and $5,000,000

BLRI_2J17 FY2017 NC Avery Blue Ridge National Park Rehabilitate Linville River Bridge MP 316.57, Section 2J BRRH PRA Between $1,000,000 Title 23 EFLHD In Design No change NC-11 NPS_SE and $5,000,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) GRSM_1B22 FY2018 NC Bryson Pavement Preservation of Road, NC Side 2R PRA Between $1,000,000 Title 23 EFLHD Planned No change NC-02 NPS_SE National Park (MP 14.98 to MP 31.96) and $5,000,000

NC_FSR_2013-1(1) FY2015 NC Cherokee Nantahala National Forest ERFO REPAIRS TO FOREST SERVICE ROUTE 423 LSR_3RL ERFO Between $1,000,000 Title 23 EFLHD Planned No change NC-11 USFS_R8 and $5,000,000

NC_FSR_2013-1(2) FY2015 NC Clay Nantahala National Forest ERFO REPAIRS TO FOREST SERVICE ROUTE 440 LSR_3RL ERFO Between $5,000,000 Title 23 EFLHD Planned No change NC-11 USFS_R8 and $10,000,000

NC_FSR_2013-2(1) FY2015 NC McDowell Pisgah National Forest Repair ERFO damage to Point Lookout Trail LSR_3RL ERFO Between $100,000 Title 23 EFLHD Planned New project NC-10 USFS_R8 and $250,000 NC_PFH_102-1(2) FY2015 NC Jackson Nantahala National Forest Recon. Bridge #80 (Caney Cr.) - BRRC FLAP Between $1,000,000 Title 23 EFLHD In Acquisition No change NC-11 USFS_R8 NC_FLAP_DOT_BR80(1) and $5,000,000

NH -- New Hampshire FW_GREA_10(1) FY2015 NH Rockingham Great Bay National Wildlife Rehabilitate Arboretum Drive 3RL FLTP Between $500,000 Title 23 EFLHD In Design No change NH-01 FWS_R5 Refuge and $1,000,000 FW_LAUM103(1)_SICO10 FY2016 NH Coos & Essex Umbagog National Wildlife Umbagog- new box culv. Potter Farm Rd. Replace pipe MISC FLTP Between $500,000 Title 23 EFLHD In Design No change _VARIOUS FWS_R5 Refuge & Silvio O'Conte culverts at 5 sites at Silvio O'Conte NWR. and $1,000,000 FW_NASH_2009956667 FY2016 NH Hillsborough Nashua National Fish Rehabilitate Entrance Road. 3RL FLTP Between $25,000 Title 23 FWS Planned New project NH-02 FWS_R5 Hatchery and $100,000 FW_LAUM_906(1)907(1) FY2017 NH Coos Umbagog National Wildlife Recreational Enhancement Design Project MISC FWS Between $250,000 Title 23 EFLHD In Design No change NH-02 FWS_R5 Refuge and $500,000 NH_FS_White_Mtn(1) FY2015 NH Grafton White Mountain National Russel Pond Roadway Reconstruction 3RH FLTP Between $250,000 Title 23 USFS Planned New project NH-02 USFS_R9 Forest and $500,000 NJ -- New Jersey FW_CAPE_HPP_2611 FY2015 NJ Cape May Cape May National Wildlife Improvements to Rte 100, Rte 101, Rte 901, Rte 907 and 3RL SAFETEA-LU Between $25,000 Title 23 FWS Planned New project NJ-02 FWS_R5 Refuge Rte908 and $100,000 GRS_10(2) FY2015 NJ Morris Great National Rehabilitate Pleasant Plains Road (Route 10) 3RL FLTP Between $500,000 Title 23 EFLHD In Acquisition No change NJ-11 FWS_R5 Wildlife Refuge and $1,000,000 FW_EDFO_2014248940 FY2017 NJ Atlantic Edwin B. Forsythe National Reconstruct Headquarters Parking Lot 3RH FLTP Between $250,000 Title 23 FWS Planned No change NJ-02 FWS_R5 Wildlife Refuge and $500,000 NJ_DEWA_2011-1(3) FY2015 NJ Sussex, Warren Delaware Water Gap ERFO Disaster road repairs phase 2 3RL ERFO Between $100,000 Title 23 EFLHD In Acquisition No change _VARIOUS NPS_NE and $250,000 NY -- New York FW_MONT_10(1) FY2016 NY Seneca Montezuma National Wildlife Rehabilitate Montezuma Entrance Road (Route 10) 3RL FLTP Between $500,000 Title 23 EFLHD In Design No change NY-24 FWS_R5 Refuge and $1,000,000 GATE_JABA_2013-1(2) FY2015 NY Queens Gateway National ERFO-Hurricane Sandy repairs to Canarsie Pier 3RL ERFO Between $500,000 Title 23 EFLHD In Acquisition No change NY-06 NPS_NE Recreation Area and $1,000,000 GATE_JABA_2013-1(5) FY2015 NY Queens Gateway National ERFO Hurricane Sandy repairs to damaged or destroyed 3RH ERFO Between $100,000 Title 23 EFLHD In Design No change NY-06 NPS_NE Recreation Area portions of the Parking Areas and $250,000 NY_FIIS_2013-1(3) FY2015 NY Suffolk Fire Island National ERFO-Hurricane Sandy reconstruction and repairs to the 3RH ERFO Between $500,000 Title 23 EFLHD In Design No change NY-01 NPS_NE Seashore Watch Hill and Sailors Haven Marinas and $1,000,000 GATE_JABA_2013-1(7) FY2016 NY Queens Gateway National ERFO Hurricane Sandy repairs to the destroyed portions BRN ERFO Between $1,000,000 Title 23 EFLHD In Design No change NY-06 NPS_NE Recreation Area of the West Pond Trail and $5,000,000

OH -- Ohio OH_FLAP_SCTO_PNCR(1) FY2015 OH Scioto Wayne National Forest Restoration and improvements to 1.3 miles of Pine Creek MISC FLAP Between $250,000 Title 23 LOCAL Planned New project OH-06 USFS_R9 Road from mile marker 2.4 to mile marker 3.7 and $500,000 OH_FLAP_SCTO_PNCR(2) FY2015 OH Scioto Wayne National Forest Restoration and improvements to 1.1 miles of Pine Creek MISC FLAP Between $250,000 Title 23 LOCAL Planned New project OH-06 USFS_R9 Road from mile marker 1.3 to mile marker 2.4 and $500,000 OH_FLAP_MTGM_HRMN(1) FY2016 OH Montgomery Wright Patterson Air Force Replacement of bridge and reconstruction of Harshman BRRP OTHER Between $100,000 Title 23 LOCAL Planned New project OH-10 X_NA_OTH Base Rd. from Springfield St. to State Route 4 and $250,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) OH_FLAP_PIKE_WFMD(1) FY2016 OH Pike U.S. Department of Energy Rehabilitate 2.23 miles of Wakefield Mound Road 3RL FLAP Between $250,000 Title 23 LOCAL Planned New project OH-02 X_NA_OTH and $500,000 PA -- Pennsylvania FW_JOHE_10(1)_100(1) FY2016 PA Philadelphia John Heinz National Wildlife Resurface Visitor Access Road (Route 10), and Boat 3RL FLTP Between $500,000 Title 23 EFLHD In Design No change PA-07 FWS_R5 Refuge Ramp Access Road (Route 100). and $1,000,000 DEWA_14(17) FY2015 PA Pike Delaware Water Gap NP DEWA 14_17 Repair of arch culvert under Route 209 BRRH FLTP Between $100,000 Title 23 EFLHD In Acquisition New project PA-11 NPS_NE National Recreation Area (4320-008P) and $250,000 PA_FLAP_PAID46958(1) FY2015 PA Philadelphia Department of Defense, Reconstruct and realign Langley Avenue with curbed 4R FLAP Between $1,000,000 Title 23 USFS Planned New project PA-01 X_NA_OTH Philadelphia Navy Yard lane, curbed parking lane, and sidewalks. and $5,000,000

PA/NJ -- Pennsylvania/New Jersey DEWA_211583 FY2015 PA/NJ Sussex, Warren, Delaware Water Gap Complete in depth study of full reconstruction 63 mile MISC FLTP Between $25,000 Title 23 NPS Planned New project _VARIOUS NPS_NE Monroe, Pike National Recreation Area DEWA Arterial Loop Rd. Rtes 10, 14, 15. and $100,000 PR -- Puerto Rico PR_ERFO_FS_2014-1(1) FY2015 PR Rio Grande El Yunque National Forest ERFO repairs to four sites within the El Yunque NF LSR_3RH ERFO Between $1,000,000 Title 23 EFLHD Planned New project PR-98 USFS_R8 and $5,000,000

PR_ST_ER_191(001) FY2015 PR Municipality of Rio El Yunque National Forest Storm damage repair of PR-191 at KM 1.2-1.7 and KM 3RH_3RL ERFO Between $250,000 Title 23 EFLHD Planned New project PR-98 X_NA_OTH Grande 11.8. and $500,000 SC -- South Carolina FW_SANT_2014248709 FY2015 SC Clarendon Santee National Wildlife Rehabilitate Wildlife Drive (Route 12). 3RL FLTP Between $250,000 Title 23 FWS Planned New project SC-06 FWS_R4 Refuge and $500,000 FW_ACBA_100(1) FY2016 SC Charleston ACE Basin Refuge Repair Refuge Perimeter Road (Route 100). Replace 3RL FLTP Between $1,000,000 Title 23 EFLHD In Design No change SC-06 FWS_R4 existing wooden water control structure. and $5,000,000

FW_WACC_2007709576 FY2016 SC Horry Waccamaw National Wildlife Rehabilitate Access Road (East) onto Yauhanna Tract 3RL FLTP Between $25,000 Title 23 FWS Planned Name changed from WACCAMAW to SC-01 FWS_R4 Refuge and $100,000 FW_WACC_2007709576 FW_SAVA_2006559089 FY2018 SC Jasper Savannah National Wildlife Rehabilitate Kingfisher Pond Access Road (Route 103) 3RL FLTP Between $25,000 Title 23 FWS Planned No change SC-01 FWS_R4 Refuge and $100,000 SC_FLAP_DOT_161(1) FY2015 SC York Kings Mountain National Full depth patch, shoulder paving, and overlay of 3.49 3RL FLAP Between $1,000,000 Title 23 STATE Planned New project SC-05 NPS_SE Military Park miles of SC 161 in York County, SC. and $5,000,000

SC_FLAP_DOT_248(1) FY2015 SC Greenwood Ninety Six National Historic Mill, full depth patch, construct paved shoulders, and 3RL FLAP Between $500,000 Title 23 STATE Planned New project SC-03 NPS_SE Site overlay 4.71 miles of SC 248. and $1,000,000 SC_FS_Sumter(1) FY2015 SC Abbeville Sumter National Forest FSR 505 Bridge Replacement BRRP FLTP Between $250,000 Title 23 USFS Planned New project SC-03 USFS_R8 and $500,000 TN -- LIS_10(1) FY2015 TN Lake National Wildlife Rehabilitate Boundary Line Road Phase 1 and Phase 2 3RL FLTP Between $1,000,000 Title 23 EFLHD In Design No change TN-08 FWS_R4 Refuge and $5,000,000

TNS_113(1) FY2015 TN Humphreys Tennessee National Wildlife Rehabilitate Haul Road (Route 113), Levee 1 Road, and 3RL FLTP Between $1,000,000 Title 23 EFLHD In Acquisition No change TN-08 FWS_R4 Refuge Refuge Lane (Route 13) and $5,000,000

FW_TENN_12(1) FY2018 TN Henry. Benton. Tennessee National Wildlife Rehabilitate Big Sandy Road (Route 12) 3RL FLTP Between $1,000,000 Title 23 EFLHD Planned New project TN-08 FWS_R4 Refuge and $5,000,000

GRSM_1A28 FY2015 TN Sevier Great Smoky Mountains Replace stone masonry wall, rehab pavement and 3RL PRA More than Title 23 EFLHD In Acquisition No change TN-01 NPS_SE National Park improve drainage $10,000,000 NATR_1E10 FY2015 TN Lewis Natchez Trace Parkway Repair Bridges over Little Swan (Structure 5570-004) BRRH PRA Between $1,000,000 Title 23 EFLHD In Acquisition No change TN-04 NPS_SE and Big Swan (Structure 5570-002) Creeks and $5,000,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) NATR_1G10 FY2015 TN Wayne Natchez Trace Parkway Overlay Park Road-PM Project from MP 371 to 378 (7.15 3RL PRA Between $1,000,000 Title 23 EFLHD In Design No change _VARIOUS NPS_SE Miles) and $5,000,000

GRSM_11(2) FY2016 TN Sevier Great Smoky Mountains Pavement Preservation of Gatlinburg Spur (US 441) 3RL PRA Between $1,000,000 Title 23 EFLHD In Design No change TN-01 NPS_SE National Park and $5,000,000

GRSM_15(2)_16(1) FY2016 TN Blount, Sevier Great Smoky Mountains Pavement Preservation for Laurel Creek, Tremont and 2R PRA Between $1,000,000 Title 23 EFLHD In Design No change TN-02 NPS_SE National Park Townsend Entrance Roads and $5,000,000

NATR_1A15_1B10 FY2016 TN Wayne, Williamson, Natchez Trace Parkway Overlay Park Road-PM Project from MP 428 to 447 3RL PRA Between $1,000,000 Title 23 EFLHD In Design No change _VARIOUS NPS_SE Davidson (19.00 Miles) and $5,000,000

SHIL_18(1) FY2016 TN Hardin Shiloh Repair Road Surface on Hamburg-Purdy Road 3RL_2R PRA Between $500,000 Title 23 EFLHD Planned No change TN-07 NPS_SE and $1,000,000 FOOT_8E21_F9 FY2017 TN Sevier, Blount Rehabilitation of the Foothills Parkway Sections 8E and 3RL PRA More than Title 23 EFLHD In Design No change _VARIOUS NPS_SE 8F $10,000,000 GRSM_13(1)14(2)18(1) FY2017 TN Sevier, Blount Great Smoky Mountains Pavement Preservation of Fighting Creek Gap, Little 2R PRA Between $1,000,000 Title 23 EFLHD Planned No change TN-02 NPS_SE National Park River Gorge and Elkmont Roads and $5,000,000

TN_FLAP_JSN_VAHC(1) FY2016 TN Washington Dept. of Federal Affairs, Construction of the VA Hospital Connector to improve NEW OTHER Between $500,000 Title 23 LOCAL Planned New project TN-01 X_NA_OTH James H. Quillen VA Medical access to James H. Quillen VA Medical Center and $1,000,000 Center TN_FLAP_MTGMRYLAF(1) FY2016 TN Montgomery Department of the Army Fort Reconstruction and widening of 1,100 feet of Lafayette 3RH_NEW FLAP Between $1,000,000 Title 23 LOCAL Planned New project TN-07 X_NA_OTH Campbell Road and $5,000,000

TN/KY -- Tennessee/Kentucky FW_REEL_100(1) FY2016 TN/KY Obion/Fulton Reelfoot National Wildlife Rehabilitate Running Slough Road (Route 100) 3RL FLTP Between $1,000,000 Title 23 EFLHD In Design No change _VARIOUS FWS_R4 Refuge and $5,000,000

TN/NC -- Tennessee/North Carolina GRSM_ES(2) FY2015 TN/NC Various Great Smoky Mountains Conduct Slope Stability Study FY15 MISC PRA Between $100,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE National Park and $250,000 GRSM_ES(3) FY2016 TN/NC Various Great Smoky Mountains Conduct Slope Stability Study FY16 MISC PRA Between $100,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE National Park and $250,000 VA -- Virginia CHN_10(1) FY2015 VA Accomack Chincoteague National Rehabilitate Beach Access Road (Route 10) 3RL FWS Between $1,000,000 Title 23 EFLHD In Design No change VA-02 FWS_R5 Wildlife Refuge and $5,000,000

FW_GRDI_105(1) FY2016 VA Chesapeake Great Dismal Swamp Rehabilitate Portsmouth Ditch Road 3RL FLTP Between $250,000 Title 23 EFLHD In Design No change VA-04 FWS_R5 and $500,000 FW_OCBA_T302(1) FY2016 VA Prince William Occoquan Bay National Repair Deephole Point Road Trail (Trail Route T302/ RIP 3RH FWS Between $1,000,000 Title 23 EFLHD Planned No change VA-11 FWS_R5 Wildlife Refuge Route 400) and $5,000,000

VA_ERFO_FS_2013-1(1) FY2016 VA Augusta George Washington National ERFO project to repair damaged sections of Hite Hollow 3RH_NEW ERFO Between $250,000 Title 23 EFLHD Planned New project VA-06 FWS_R5 Forest Road in the George Washington National Forest and $500,000 VA_ERFO_FS_2013-1(2) FY2016 VA Craig Jefferson National Forest ERFO project to repair damaged sections of Wildlife 3RH_NEW ERFO Between $100,000 Title 23 EFLHD Planned New project VA-06 FWS_R5 Road. and $250,000 GWMP_1A109 FY2015 VA Alexandria George Washington Resurface, restore & rehab approx 1.6 miles of GWMP 3RH FLTP Between $1,000,000 Title 23 EFLHD In Acquisition New project VA-08 NPS_NC Memorial Parkway NB & SB between Humpback Bridge & Airport and $5,000,000

GWMP_4(2)_5(3) FY2015 VA Arlington George Washington Resurface, Restore & Rehabilitate Pavement on the 3RL FLTP Between $1,000,000 Title 23 EFLHD In Acquisition No change VA-08 NPS_NC Memorial Parkway Spout Run Pkwy E. & W. and Key Bridge Ramps and $5,000,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) GWMP_500(1) FY2015 VA Arlington George Washington Repair/Rehabilitate SB ramp from National Airport 3RL_BRRH PRA Between $1,000,000 Title 23 EFLHD In Design No change VA-08 NPS_NC Memorial Parkway (#027P) and Bridge (#028P) on Route 233 and $5,000,000

PRWI_11(3) FY2015 VA Prince William Prince William Forest Park Repair the historic wooden truss bridge 3700-001P BRRH FLTP Between $250,000 Title 23 EFLHD Planned New project VA-11 NPS_NC and $500,000 GWMP_1(1)_2(1) FY2016 VA Arlington, Fairfax George Washington North GWMP joint & crack sealing 2R FLTP Between $100,000 Title 23 EFLHD Planned New project VA-08 NPS_NC Memorial Parkway and $250,000 GWMP_203(2) FY2016 VA Arlington George Washington Iwo Jima Memorial Access Road Rehab 3RL FLTP Between $500,000 Title 23 EFLHD Planned New project VA-08 NPS_NC Memorial Parkway and $1,000,000 GWMP_210(1) FY2016 VA Fairfax George Washington Spall repair CIA/FHWA bridge structure 3300-003 BRRH FLTP Between $500,000 Title 23 EFLHD Planned New project VA-08 NPS_NC Memorial Parkway and $1,000,000 GWMP_MVT(3) FY2016 VA Arlington George Washington Minor trail realignment and Theodore Roosevelt parking MISC FLTP Between $250,000 Title 23 EFLHD In Design New project VA-08 NPS_NC Memorial Parkway area pavement rehab. and $500,000 GWMP_1(2)_2(2) FY2017 VA Arlington George Washington Reconstruct SB GWMP Spout Run to Pimmit Run & NB 3RL_4R FLTP More than Title 23 EFLHD Planned New project VA-08 NPS_NC Memorial Parkway GWMP PCC joint & crack repair $10,000,000 GWMP_105(1)_106(1) FY2017 VA Fairfax George Washington Fort Hunt Entrance Rd Mill & Overlay 3RL FLTP Between $250,000 Title 23 EFLHD Planned New project VA-05 NPS_NC Memorial Parkway and $500,000 GWMP_1A93 FY2017 VA Fairfax George Washington George Washington MP - Phase 1 - Rehabilitation of VA 3RL PRA More than Title 23 EFLHD In Design No change VA-10 NPS_NC Memorial Parkway Route 123 Interchange $10,000,000 GWMP_1(3)_2(3) FY2018 VA Fairfax, Alexandria George Washington Reconstruct GWMP from CIA interchange to Capital 3RL_4R FLTP More than Title 23 EFLHD Planned New project _VARIOUS NPS_NC Memorial Parkway Beltway $10,000,000 BLRI_1L8 FY2016 VA Botetourt Blue Ridge Parkway Repave/Repair Mainline Road Section 1L - (MP 103.36 to 3RH_3RL FLTP Between $1,000,000 Title 23 EFLHD In Design New project _VARIOUS NPS_SE 106.0) and $5,000,000

BLRI_1E10 FY2017 VA Nelson and Blue Ridge National Park Repave/Repair Mainline Road Section 1E - MP 27.72 to 3RL_2R PRA Between $5,000,000 Title 23 EFLHD In Design No change VA-09 NPS_SE Rockbridge 37.39 and $10,000,000

BLRI_1M20 FY2017 VA Roanoke Blue Ridge National Park Repair Asphalt Wearing Surface and Approaches on BRRH PRA Between $5,000,000 Title 23 EFLHD In Design New project VA-06 NPS_SE Roanoke River Bridge 028P and $10,000,000

VA_FLAP_DOT_625(1) FY2016 VA Wythe Jefferson National Forest Remove and replace bridge (VA Structure #6022). BRRP FLAP Between $1,000,000 Title 23 STATE Planned New project VA-09 USFS_R8 and $5,000,000

VA_ST_TFHRC_50(4) FY2015 VA Fairfax Turner-Fairbank Highway Intersection Control for Cooperative Vehicle/Pedestrian 3RH_NEW FAP Between $25,000 Title 23 EFLHD In Design New project VA-08 X_NA_OTH Research Center Movement. and $100,000 VA/NC -- Virginia/North Carolina BLRI_ES(2) FY2015 VA/NC Various Blue Ridge National Park Conduct Slope Stability Study FY15 MISC PRA Between $25,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE and $100,000 BLRI_ES(3) FY2016 VA/NC Various Blue Ridge National Park Conduct Slope Stability Study FY16 MISC PRA Between $25,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE and $100,000 VI -- Virgin Islands VIIS_20(1) FY2015 VI St John Virgin Islands National Park North Shore Road Repair VI-40 Ft Gabion Wall LSR_3RL FLTP Between $100,000 Title 23 EFLHD Planned New project VI-98 NPS_SE and $250,000 VI_38(2)_C1 FY2015 VI St. Thomas US Virgin Islands Raphune Hill Widening/Intersection Improvements 3RH_3RL NH Between $5,000,000 Title 23 EFLHD In Design No change VI-98 X_NA_OTH Department of Public Works Contract 1 and $10,000,000

VI_66(11) FY2015 VI St. Croix US Virgin Islands Melvin Evans Highway, Ph I - West Airport to Estate 3RH_3RL REIMB More than Title 23 EFLHD In Design New project VI-98 X_NA_OTH Department of Public Works Carlton – 1.2 miles $10,000,000 VI_A30(001) FY2015 VI St. Thomas US Virgin Islands Turpentine Run Bridge Approaches Project 4R NH Between $5,000,000 Title 23 EFLHD In Design No change VI-98 X_NA_OTH Department of Public Works and $10,000,000

VI_DCP_34(1) FY2015 VI St. Thomas US Virgin Islands Improvements to Rte. 30 (Veterans Drive) from West of 3RL_NEW REIMB More than Title 23 EFLHD In Design New project VI-98 X_NA_OTH Department of Public Works Hospital Gade to Long Bay Road $10,000,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) VI_38(2)_C2 FY2016 VI St. Thomas US Virgin Islands Raphune Hill Road and Rte 381 intersection NEW NH Between $1,000,000 Title 23 EFLHD In Design No change VI-98 X_NA_OTH Department of Public Works improvements - Contract 2 and $5,000,000

VI_66(12) FY2016 VI St. Croix US Virgin Islands Melvin Evans Highway Project, Phase II - Estate Carlton 3RH_3RL REIMB More than Title 23 EFLHD In Design New project VI-98 X_NA_OTH Department of Public Works to Hannah’s Rest – 2.2 miles $10,000,000 VI_DCP_34(2) FY2016 VI St. Thomas US Virgin Islands Improvements to Rte. 30 (Veterans Drive), Phase IIa 3RL_NEW REIMB More than Title 23 EFLHD Planned New project VI-98 X_NA_OTH Department of Public Works from Hospital Gade to Vendors’ Plaza $10,000,000 VI_38(2)_C3 FY2017 VI St. Thomas US Virgin Islands Raphune Hill Rd (Rte 38) widdening and improvement 3RH NH More than Title 23 EFLHD In Design No change VI-98 X_NA_OTH Department of Public Works between the Contact 1 and 2 (0.7 mile) $10,000,000 WI -- Wisconsin FW_UPMC_100(1) FY2015 WI Crawford Upper Mississippi River Boat Launch Site Rd aka Winneshiek Rd (Rte 100) & 3RL FLTP Between $500,000 Title 23 EFLHD In Design No change WI-03 FWS_R3 National Wildlife and Fish Parking Improvements and $1,000,000 Refuge FW_HORI_2018 FY2018 WI Dodge Horicon National Wildlife Pavement Preservation 2R FLTP Between $500,000 Title 23 FWS Planned New project WI-06 FWS_R3 Refuge and $1,000,000 FW_NECE_2013226939 FY2018 WI Juneau Necedah National Wildlife Rehabilitate Hanson-Spencer Robinson Bridge & Camp BRRH FLTP Between $25,000 Title 23 FWS Planned New project WI-03 FWS_R3 Refuge Road Bridge. and $100,000 MWR_PMS_WI(1) FY2015 WI Bayfield Apostle Island National Pavement Preservation in Apostle Island NS-SACN 2R FLTP Between $500,000 Title 23 EFLHD In Design New project WI-07 NPS_MW Lakeshore and $1,000,000 MWR_PMS_WI(2) FY2015 WI Various Saint Croix National Scenic Pavement Preservation in Saint Croix NSR 2R FLTP Between $25,000 Title 23 EFLHD In Design New project WI-07 NPS_MW River and $100,000 WI_FLAP_RUSL_LSBR(1) FY2016 WI Bayfield Apostle Islands National Rehabilitation and safety enhancements of a 2.6 mile 3RL FLAP Between $500,000 Title 23 STATE Planned New project WI-07 NPS_MW Lakeshore segment of Little Sand Bay Road and $1,000,000 WI_FLAP_BFLD_CTHM(1) FY2016 WI Bayfield Chequamegon-Nicolet Reconditioning/pavement replacement of 4.5 miles of 3RL FLAP Between $1,000,000 Title 23 STATE Planned New project WI-07 USFS_R9 National Forest CTH M and $5,000,000

WI_FLAP_SWYR_CTHS(1) FY2016 WI Sawyer Chequamegon- Nicolet Reconditioning/pavement replacement of 2.68 miles of 3RL FLAP Between $1,000,000 Title 23 STATE Planned New project WI-07 USFS_R9 National Forest CTH S and $5,000,000

WI_FLAP_TYLR_CTHM(1) FY2016 WI Taylor Chequamegon- Nicolet Reconditioning/pavement replacement of 3.2 miles of 3RL FLAP Between $1,000,000 Title 23 STATE Planned New project WI-07 USFS_R9 National Forest CTH M from Brush Creek Road to Wintersports Road and $5,000,000

WI_BIA_2013_1(1) FY2015 WI Bayfield Red Cliff Indian Reservation ERFO Repair - Red Cliff Tribe Bluberry Creek Bridge BRRP ERFO Between $500,000 Title 23 NPS Planned No change WI-07 X_NA_OTH Replacement and $1,000,000 WV -- West Virginia FW_OHRI_10(1)_100(1) FY2015 WV Pleasants & Brooke Ohio River Islands National Rehabilitate Middle Island Access Road and Buffalo 3RL FLTP Between $500,000 Title 23 EFLHD In Design No change _VARIOUS FWS_R5 Wildlife Refuge Creek Road and $1,000,000 FW_CAVA_102(1) FY2018 WV Tucker Canaan Valley National Major reconstruction of Camp 70 Road (Route 102), and 4R FLTP Between $500,000 Title 23 EFLHD Planned New project WV-01 FWS_R5 Wildlife Refuge new parking area at Mile Post 1.0 (Route 913) and $1,000,000 NCR_PMS_WV(1) FY2016 WV Jefferson Harpers Ferry National NP NCR PMS WV(1) Pavement Management HAFE 2R FLTP Between $500,000 Title 23 EFLHD Planned New project WV-06 NPS_NC Historical Site and $1,000,000 WV_FLAP_RALCO_TRL(1) FY2015 WV Raleigh New River Gorge National Build 5.5 miles of natural trail surface from New River MISC FLAP Between $100,000 Title 23 LOCAL Planned New project WV-03 NPS_NE River Gorge National River to the county airport and $250,000 ZZ -- Multiple States SER_BMS_FY15(1) FY2015 ZZ Various GRSM REGION-WIDE BRIDGE PREVENTATIVE MAINTENANCE 1R PRA Between $500,000 Title 23 EFLHD In Design No change _VARIOUS NPS_SE PROJECTS and $1,000,000 SER_BMS_FY16(1) FY2016 ZZ Various Various REGION-WIDE BRIDGE PREVENTATIVE MAINTENANCE 1R PRA Between $500,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE PROJECTS and $1,000,000 SER_PMS_FY16 FY2016 ZZ Various Various Pavement Preservation Projects for Small Parks 2R PRA Between $1,000,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE and $5,000,000

SER_BMS_FY17(1) FY2017 ZZ Various Various REGION-WIDE BRIDGE PREVENTATIVE MAINTENANCE 1R PRA Between $500,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE PROJECTS and $1,000,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green. FY2015 - FY2018 Transportation Improvement Program Federal Highway Administration Eastern Federal Lands Highway Division October 1, 2014 Last Printed:01Oct14

ESTIMATED PARK, REFUGE, FOREST OR PRIMARY FUNDS ADMIN BY / CONG DIST FLMA PROJECT AWARD FY STATE COUNTY DESCRIPTION CATEGORY PROGRAM AMOUNT Phase CHANGE FROM LAST UPDATE OTHER PARTNER/AGENCY FUND SOURCE FROM TITLE DELIVER BY NUMBER REGION (RANGE) SER_PMS_FY17 FY2017 ZZ Various Various Pavement Preservation Projects for Small Parks 2R PRA Between $1,000,000 Title 23 EFLHD Planned No change _VARIOUS NPS_SE and $5,000,000

SER_BMS_FY18(1) FY2018 ZZ Various Various REGION-WIDE BRIDGE PREVENTATIVE MAINTENANCE 1R PRA Between $500,000 Title 23 EFLHD Planned New project _VARIOUS NPS_SE PROJECTS and $1,000,000 SER_PMS_FY18 FY2018 ZZ Various Various Pavement Preservation Projects for Small Parks 2R PRA Between $1,000,000 Title 23 EFLHD Planned New project _VARIOUS NPS_SE and $5,000,000

Approval signature is shown on the first page packet only. This listing reflects all newly identified and programmed and/or modified projects as of September 29, 2014 - Changes highlighted in green.