The World Bank Report No: ISR4973
Implementation Status & Results Benin BJ-Energy Srvc Delivery APL (FY05) (P079633)
Operation Name: BJ-Energy Srvc Delivery APL (FY05) (P079633) Project Stage: Implementation Seq.No: 13 Status: ARCHIVED Archive Date: 27-Mar-2011 Country: Benin Approval FY: 2005
Public Disclosure Authorized Product Line:IBRD/IDA Region: AFRICA Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Ministere de l Energie et de l Eau (MME), Societe Beninoise d Energie Electrique (SBEE), Communaute Electrique du Benin (CEB) Key Dates Board Approval Date 06-Jul-2004 Original Closing Date 31-Dec-2008 Planned Mid Term Review Date 29-Feb-2012 Last Archived ISR Date 27-Mar-2011 Public Disclosure Copy Effectiveness Date 25-Apr-2005 Revised Closing Date 31-Dec-2011 Actual Mid Term Review Date
Project Development Objectives Project Development Objective (from Project Appraisal Document) The development objectives are to: (a) accelerate, in a commercially viable manner, the use of electricity for economic growth and social services and thus improve the quality of life in un-served and underserved areas (peri-urban and rural); (b) improve governance and ensure the financial sustainability of the sector, through the involvement of the private sector in partnership with the public sector; (c) reduce deforestation and increase access and diversify choice to renewable and cleaner fuels to the household and SME sectors; and (d) promote regional cooperation while protecting the environment in a sustainable manner. Has the Project Development Objective been changed since Board Approval of the Project? Public Disclosure Authorized Yes No
Component(s)
Component Name Component Cost 1. Power Sector Reform 5.00 2. Studies 2.55 3. Investment 26.00 4. Environmental and Social 1.75 5. Institutional Strengthening and Capacity Building 4.00 6. Biomass Energy and Inter-fuel Substitution 5.70 Public Disclosure Authorized Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory
Public Disclosure Copy Overall Risk Rating Low Low
Page 1 of 6 Public Disclosure Authorized The World Bank Report No: ISR4973
Implementation Status Overview the project is making good progress on implementation with 80% of the credit disbursed. The investment component is completed, engineering studies, capacity building and reform of the energy sector are almost completed, while the biomass component deserves special attention. The progress of the project toward achieving its Project Development Objectives remains steady.
Locations Country First Administrative Division Location Planned Actual Benin Not Entered Wore
Benin Not Entered We We
Public Disclosure Copy Benin Not Entered Wawi
Benin Not Entered Vanhoui
Benin Not Entered Tourou
Benin Not Entered Tchaourou
Benin Not Entered Sebou
Benin Not Entered Save
Benin Not Entered Sanson
Benin Departement de l' Atakora Perma
Benin Departement de la Donga Partago
Benin Departement du Borgou Parakou
Benin Not Entered Ouesse
Benin Not Entered Onklou
Benin Not Entered Kpessou
Benin Not Entered Kika
Benin Departement du Borgou Ina
Benin Departement du Borgou Guessou-Sud
Benin Departement du Borgou Guema
Public Disclosure Copy Benin Not Entered Guema
Benin Not Entered Gorobani
Page 2 of 6 The World Bank Report No: ISR4973
Country First Administrative Division Location Planned Actual Benin Not Entered Glazoue
Benin Not Entered Founga
Benin Departement de la Donga Badjoude
Benin Departement de la Donga Djougou
Benin Not Entered Dewa
Benin Not Entered Dassa-Zoume
Public Disclosure Copy Benin Not Entered Dangoussar
Benin Not Entered Boko
Benin Not Entered Beterou
Benin Not Entered Bakou
Benin Not Entered Bakou
Benin Not Entered Angaradebou
Benin Departement de l' Atakora Kouande
Benin Departement de la Donga Ouake
Benin Departement de la Donga Djougou Rural
Benin Departement du Borgou Tchaourou
Benin Departement du Borgou Parakou
Benin Departement du Borgou Ndali
Benin Departement du Borgou Bembereke
Benin Departement de l' Atakora Natitingou
Benin Departement de l' Atakora Kopargo
Results
Project Development Objective Indicators Public Disclosure Copy
Page 3 of 6 The World Bank Report No: ISR4973
Indicator Name Core Unit of Measure Baseline Current End Target Accelerate, in a commercially viable manner, Text Value Limited power availability in The significant annual Reliable power supplied to the use of electricity in underserved areas for northern Benin through electricity cost savings that northern Benin through the economic growth and improved quality of life. diesel-fired powerplant at resulted from the interconnected grid as Parakou and Djougou, which implementation of energy measured in GWh supplied is often not able to operate efficiency measures in public from southern grid. due tolack of diesel. 0 GWh buildings contributed to supplied from southern grid. ensure a rational use of electricity for social services. Also, a rural electrification fund was established based on the recommendations of
Public Disclosure Copy the off-grid electrification study and constitutes a critical milestone in financing rural electrification projects. Date 31-Jul-2004 26-Feb-2011 30-Jun-2010 Comments
Strengthen the capacity of Benin to expand the Text Value SBEE fully publicly owned SBEE financial situation Strategy for off-grid power sector. and low financial and improved electrification developed and technical performance. No endorsed. SBEE outsources studies available to expand key areas and financial and the electricity system. No technical performance strategy or policy for off-grid improved. Higher reliability of electrification. power supply in Cotonou and Porto Novo. Date 31-Jul-2004 26-Feb-2011 30-Jun-2010 Comments
Promote Benin's regional cooperation capacity. Text Value No power provided to Power provided to northern northern Benin through the Benin through the Togolese Togolese power grid. power grid, as measured in GWh supplied. Date 31-Jul-2004 26-Feb-2011 30-Jun-2010 Comments Public Disclosure Copy
Page 4 of 6 The World Bank Report No: ISR4973
Indicator Name Core Unit of Measure Baseline Current End Target Improve governance of the biomass energy Text Value No institutional framework AFIC is established ans is Establ. and effective sub-sector and strengthen the relevant exists. fonctioning. functioning of the the Nat. institutions. Household Energy Commission (CNCD) and the Inter-com. Agency for Nat. Resource Management (AFIC). Effective devolution of nat. resources management. Date 31-Jul-2004 26-Feb-2011 31-Dec-2011 Comments Public Disclosure Copy
Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Feasibility and EIA/RAP Studies for the Text Value No studies available. EIA/RAP completed. Studies completed. transmission lines of Onigbolo-Parakou and Sakete-Porto Novo completed. Date 31-Jul-2004 15-Jan-2009 01-Mar-2009 Comments
Forestry and Ecology Information System Text Value No comprehensive forestry or SIEF is completed and SIEF and SIEP are completed (SIEF) and Energy Sector Information and energy sector information operational and fully operational. Monitoring System (SIEP) operational. system available. Date 31-Jul-2004 26-Feb-2011 30-Jun-2010 Comments
Data on Financial Performance (as of 04-Nov-2011)
Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P079633 IDA-39510 Effective 06-Jul-2004 28-Jul-2004 25-Apr-2005 31-Dec-2011 P079633 IDA-44920 Effective 26-Jun-2008 03-Jul-2008 04-May-2009 31-Dec-2011
Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P079633 IDA-39510 Effective XDR 31.10 31.10 0.00 25.34 5.76 81.00 P079633 IDA-44920 Effective XDR 4.30 4.30 0.00 0.46 3.84 11.00
Public Disclosure Copy Disbursement Graph
Page 5 of 6 The World Bank Report No: ISR4973 Public Disclosure Copy
Key Decisions Regarding Implementation Project restructuring is delayed by the clearance of the Resettlement Policy Framework . The restructuring will (i) extend the closing date of the project and its additional financing from December 31, 2011 to December 31, 2012, (ii) transfer contracts that will likely extend beyond 2012 to the Increased Access to Modern Energy Project, the project follow-on project with similar objectives and activities, and (iii) reallocate credit proceeds. Project Outcomes and its Development Objectives will not be affected. The project scope will remain unchanged and safeguards requirements will not be impacted.
Restructuring History Level two Approved on 28-Jun-2010
Related Projects P111019-Additional Financing for the Benin Energy Services Delivery Project Public Disclosure Copy
Page 6 of 6