Estimated Expenditure For District Taluk Gram Panchayat Year Work Name Type Of Building Expenditure Work status Amount SC/ST Raichure Deodurga Alkod 2006-07 Implimentation of CC Road from Gullar House To Road CC Road 125000 125000 0 Completed Raichure Deodurga Alkod 2006-07 Implimentation of CC Road from jinn to sajjala house at Adakalagudda CC Road 125000 125000 0 Completed Raichure Deodurga Alkod 2006-07 Construction of busstand at alkod thanda Bus Stand 100000 100000 100000 Completed Raichure Deodurga Alkod 2006-07 Implimentation of Shabad Tiles From Maremma Temple To Mudukappa House BS Slabs flooring 150000 150000 150000 Completed Raichure Deodurga Alkod 2006-07 Construction of School buillding at Akala Kumpi Village School Compound and Buildings151000 151000 151000 Completed Raichure Deodurga Alkod 2007-08 IEC IEC 15000 15000 0 Completed Raichure Deodurga Alkod 2007-08 Construction of Study room at anwar Construction Of Library 100000 100000 0 Completed Raichure Deodurga Alkod 2007-08 Construction of anganwadi bullding At adakal gudda Anganavadi building 200000 200000 0 Completed Raichure Deodurga Alkod 2007-08 Construction of public toilet at magala ward Construction of Toilet 200000 200000 0 Completed

Raichure Deodurga Alkod 2007-08 Construction of dreneg from shivathi balaya house to kurbur malaya house At bhumangunda Drainage 50000 50000 50000 Completed

Raichure Deodurga Alkod 2007-08 Construction of dreneg up to narsappa balaya house At bhumangunda Drainage 100000 100000 100000 Completed Raichure Deodurga Alkod 2007-08 Construction of anganwadi bullding At akalakumpi Anganavadi building 200000 200000 200000 Completed Raichure Deodurga Alkod 2008-09 IEC IEC 18000 18000 0 Completed Raichure Deodurga Alkod 2008-09 Anganavadi building Anganavadi building 200000 200000 0 Completed Raichure Deodurga Alkod 2008-09 CC Road CC Road 210000 210000 0 Completed Raichure Deodurga Alkod 2008-09 Shopping mall Shopping mall 500000 500000 0 Completed Raichure Deodurga Alkod 2008-09 Drainage Drainage 150000 150000 150000 Completed Raichure Deodurga Alkod 2008-09 CC Road CC Road 200000 200000 200000 Completed Raichure Deodurga Alkod 2008-09 Anganavadi building Anganavadi building 200000 200000 200000 Completed Raichure Deodurga 2006-07 Ripairs Of GP Builldings Building Repair 100000 99129 0 Completed Raichure Deodurga Arkera 2006-07 Construction of Rangamandira at:Jutmaradi Village Drama Theater 100000 99131 99131 Completed Raichure Deodurga Arkera 2006-07 Construction of Busstand at: H.Jadaladinni village Bus Stand 100000 99453 99453 Completed Raichure Deodurga Arkera 2006-07 Construction of Drainege From Chicklar House To Varadar House Drainage 150000 148481 148481 Completed Raichure Deodurga Arkera 2006-07 Construction of Anaganavadi Buillding at : K.H.Nagar Anganavadi building 150000 149081 149081 Completed Raichure Deodurga Arkera 2007-08 Construction of Ladies School Coumpound At Arkera School Compound and Buildings150000 149800 0 Completed Raichure Deodurga Arkera 2007-08 Formation of dreneg from Hanmanthappa temple To nadgouda Basavanthraya house Drainage 150000 149870 0 Completed Raichure Deodurga Arkera 2007-08 Construction of publik toilet kandaya vard At Arkera Construction of Toilet 200000 199600 199600 Completed Raichure Deodurga Arkera 2007-08 Construction of publik toilet Near dore house At Arkera Construction of Toilet 200000 199600 199600 Completed Raichure Deodurga Arkera 2007-08 Formation of dreneg from Varad Suganna House To Sathepa kate Drainage 227000 225600 225600 Completed Raichure Deodurga Arkera 2008-09 IEC IEC 43000 0 0 progress Raichure Deodurga Arkera 2008-09 Shopping mall Shopping mall 398000 299850 0 Completed Raichure Deodurga Arkera 2008-09 Shopping mall Shopping mall 398000 299850 0 Completed Raichure Deodurga Arkera 2008-09 Shopping mall Shopping mall 398000 299850 0 Completed Raichure Deodurga Arkera 2009-10 Arengment & fitting glass To Computer room gp At Arkera Construction of Gram Panchayat52000 Building 49670 0 Completed Raichure Deodurga Arkera 2009-10 Bussness Complex Galag Road At Arkera Shopping mall 300000 299850 0 Completed Raichure Deodurga Arkera 2009-10 Bussness Complex Galag Road At Arkera Shopping mall 300000 299850 0 Completed Raichure Deodurga Arkera 2009-10 Formation of cc road At Arkera CC Road 300000 299850 299850 Completed Raichure Deodurga Arkera 2010-11 construction of Stups At Arkera Ward No4 other works 65000 0 0 Completed Raichure Deodurga Arkera 2010-11 Samudaya bhavan At Arkera Ward No1 Community Hall 200000 0 0 Completed Raichure Deodurga Arkera 2010-11 Samudaya bhavan At Arkera Ward No4 Community Hall 200000 0 0 Completed Raichure Deodurga Arkera 2010-11 Formation of cc road At Arekera CC Road 250000 0 0 Completed Raichure Deodurga B.ganekal 2006-07 Implimentation of shabad Tailes Near Masjid BS Slabs flooring 50000 50000 0 Completed Raichure Deodurga B.ganekal 2006-07 Construction of Compound wall Near kalamat Compound wall 50000 50000 0 Completed Raichure Deodurga B.ganekal 2006-07 Construction of side wall From anganavadi to Busstand at:B.Ganekal CC Road 100000 100000 0 Completed Raichure Deodurga B.ganekal 2006-07 Filling of Dustbin(Thipigundi) at: Samudra village other works 0 41000 41000 Completed Raichure Deodurga B.ganekal 2006-07 Impliment of CC Road SC Collony at: Samudra Village CC Road 50000 50000 50000 Completed Raichure Deodurga B.ganekal 2006-07 Construction of dreneg From Channapa House to Devijeppa House Drainage 50000 50000 50000 Completed

Raichure Deodurga B.ganekal 2006-07 Impliment of CC Road From Basavanna Temple to Lachmava Temple at: Samudra Village CC Road 75000 75000 75000 Completed

Raichure Deodurga B.ganekal 2006-07 Impliment of CC Road From Devamma Temple To Police Shivappa House at: Pandena village CC Road 75000 75000 75000 Completed

Raichure Deodurga B.ganekal 2006-07 Construction of Dreneg From ranganna House to SC Collony at: Bganekal village Drainage 75000 75000 75000 Completed Raichure Deodurga B.ganekal 2006-07 Implimentation of Road at: Mahilapur Village CC Road 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2006-07 Construction Of Ladeis Toilet at: G N Thanda Construction of Toilet 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2006-07 Construction Of Ladeis Toilet at: Construction of Toilet 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2007-08 Formation of cc road from badegera house to ramadevru house CC Road 100000 100000 0 Completed Raichure Deodurga B.ganekal 2007-08 Formation of dreneg from baberu house to Idga Drainage 100000 100000 0 Completed Raichure Deodurga B.ganekal 2007-08 Construction of houses at samudravasati other works 100000 100000 0 Completed Raichure Deodurga B.ganekal 2007-08 construction of Side wall from water tank to yallama temple Water Tank 100000 100000 0 Completed Raichure Deodurga B.ganekal 2007-08 Implimentation of Stones from mudukappa gali house to agsi other works 105000 105000 0 Completed Raichure Deodurga B.ganekal 2007-08 Marum work From Angana wadi to Bus stop Bus Stand 120000 120000 0 Completed Raichure Deodurga B.ganekal 2007-08 Formation of cc road from sana bantharu house to rangana house at pandyana village CC Road 60000 60000 60000 Completed Raichure Deodurga B.ganekal 2007-08 Construction of ladies toilet at piranayak thanda Construction of Toilet 60000 60000 60000 Completed Raichure Deodurga B.ganekal 2007-08 Formation of dreneg form makal mallay house to rangaya house at b.ganekal Drainage 75000 75000 75000 Completed Raichure Deodurga B.ganekal 2007-08 Formation of dreneg form vorvel to Budeppa house Drainage 75000 75000 75000 Completed Raichure Deodurga B.ganekal 2007-08 Ganganayak rasi kana other works 75000 75000 75000 Completed Raichure Deodurga B.ganekal 2007-08 Formation of cc road at st collony pandyana village CC Road 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2007-08 Formation of dreneg at sc collony Drainage 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2008-09 Community Hall Community Hall 100000 0 0 progress Raichure Deodurga B.ganekal 2008-09 Check dam Check dam 150000 0 0 progress Raichure Deodurga B.ganekal 2008-09 Shopping mall Shopping mall 100000 100000 0 Completed Raichure Deodurga B.ganekal 2008-09 Bus Stand Bus Stand 200000 200000 0 Completed Raichure Deodurga B.ganekal 2008-09 IEC IEC 200000 200000 0 Completed Raichure Deodurga B.ganekal 2008-09 Shopping mall Shopping mall 400000 400000 0 Completed Raichure Deodurga B.ganekal 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2008-09 Anganavadi building Anganavadi building 118000 118000 118000 Completed Raichure Deodurga B.ganekal 2009-10 IEC IEC 20000 20000 0 Completed Raichure Deodurga B.ganekal 2009-10 Implinentation of stone pinching At Pandyana Halla Pitching Work 100000 100000 0 Completed Raichure Deodurga B.ganekal 2009-10 Formation of Roof At Anjinaya Temple Repair Works 100000 100000 0 Completed Raichure Deodurga B.ganekal 2009-10 Complition of Godon work other works 240000 240000 0 Completed Raichure Deodurga B.ganekal 2009-10 Arengment of Drinking water At Vachanayak Thanda Drinking Water Supply 50000 50000 50000 Completed Raichure Deodurga B.ganekal 2009-10 Water Suply At Peranayak tahnda Drinking Water Supply 50000 50000 50000 Completed Raichure Deodurga B.ganekal 2009-10 Formation of Dreneg At Samudra village Drainage 54000 54000 54000 Completed Raichure Deodurga B.ganekal 2009-10 Formation of cc road From suresh nayak thanda to Brige CC Road 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2009-10 Manashappa House To Hanumatha House At Mallapur other works 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2009-10 Imp-limentation of pipe line from Rachanna Godaon To Sc Collony Pipeline 100000 100000 100000 Completed Raichure Deodurga B.ganekal 2009-10 Construction of Busstad At Mailapur Bus Stand 120000 120000 120000 Completed Raichure Deodurga B.ganekal 2009-10 Arengment of Drinking water At Ganganayak Thanda St collony water supply Drinking Water Supply 140000 140000 140000 Completed Raichure Deodurga B.ganekal 2010-11 Construction of tiolet At GP B.Ganekal Construction of Toilet 40000 40000 0 Completed Raichure Deodurga B.ganekal 2010-11 Water Arengment Drinking Water Supply 40000 40000 0 Completed Raichure Deodurga B.ganekal 2010-11 Solar Arengment gp Solar System 40000 40000 0 Completed Raichure Deodurga B.ganekal 2010-11 Formation of cc road from Jinareddy House To MT Land At Samudra CC Road 80000 80000 0 Completed Raichure Deodurga B.ganekal 2010-11 Water Arengment At Mukanayak thanda Drinking Water Supply 40000 40000 40000 Completed Raichure Deodurga B.ganekal 2010-11 Formation of cc road from Huligeppa House To Bhimappa House At Mallapur CC Road 72000 72000 72000 Completed Raichure Deodurga B.ganekal 2010-11 Formation of cc road from Main Road To Thanda At Ganganayak Thanda CC Road 72000 72000 72000 Completed Raichure Deodurga B.ganekal 2010-11 Formation of dreneg At Piranayak Thanda Drainage 80000 80000 80000 Completed Raichure Deodurga B.ganekal 2010-11 Implimentation of ston pinching At Pandyana Rever Pitching Work 88000 88000 88000 Completed Raichure Deodurga B.ganekal 2010-11 Watrer Arengmaent At B.Ganekal Drinking Water Supply 250000 250000 250000 Completed Raichure Deodurga 2006-07 Formation Of CC Road Near agsi At Lingadahalli CC Road 80000 80000 0 Completed Raichure Deodurga Chinchodi 2006-07 Construction of GP Buillding At Chinchodi Construction of Gram Panchayat250000 Building 250000 0 Completed Raichure Deodurga Chinchodi 2006-07 Formation Of CC Road At main road Thinthini Bridge CC Road 70000 70000 70000 Completed Raichure Deodurga Chinchodi 2006-07 Formation Of CC Road At Virot near 3lamp CC Road 72000 72000 72000 Completed Raichure Deodurga Chinchodi 2006-07 Formation Of CC Road at Bukkaladoddi NT.Collony Devigudi CC Road 150000 150000 150000 Completed Raichure Deodurga Chinchodi 2007-08 Formation of cc road At Thinthini Mounesh mata CC Road 60000 60000 0 Completed Raichure Deodurga Chinchodi 2007-08 Construction of Ladies Toilet At Yaragudda Construction of Toilet 70000 70000 0 Completed Raichure Deodurga Chinchodi 2007-08 Fromation of cc road From Maneppa Dypur House To Bannapa Chinchodi CC Road 100000 100000 0 Completed Raichure Deodurga Chinchodi 2007-08 Formation of shabadi Tailes Sc Collony At Chinchodi BS Slabs flooring 50000 50000 50000 Completed Raichure Deodurga Chinchodi 2007-08 Formation of cc road From Virot School To Maruth Temple CC Road 50000 50000 50000 Completed Raichure Deodurga Chinchodi 2007-08 Formation of cc road SC ward At Maremma temple CC Road 50000 50000 50000 Completed Raichure Deodurga Chinchodi 2007-08 Construction of protectio wall At Bonkaladoddi Compound wall 72000 72000 72000 Completed Raichure Deodurga Chinchodi 2007-08 Construction of Ladies Toilet At Lingadalli Construction of Toilet 90000 90000 90000 Completed Raichure Deodurga Chinchodi 2007-08 Formation of cc road From Gangappa House To Rangappa Ganji CC Road 100000 100000 100000 Completed Raichure Deodurga Chinchodi 2007-08 Formation of cc road At Thimappa temple CC Road 100000 100000 100000 Completed Raichure Deodurga Chinchodi 2008-09 IEC IEC 16000 16000 0 Completed Raichure Deodurga Chinchodi 2008-09 CC Road CC Road 60000 60000 0 Completed Raichure Deodurga Chinchodi 2008-09 Compound wall Compound wall 100000 100000 0 Completed Raichure Deodurga Chinchodi 2008-09 CC Road CC Road 120000 120000 0 Completed Raichure Deodurga Chinchodi 2008-09 Pipeline Pipeline 250000 250000 0 Completed Raichure Deodurga Chinchodi 2008-09 CC Road CC Road 60000 60000 60000 Completed Raichure Deodurga Chinchodi 2008-09 CC Road CC Road 60000 60000 60000 Completed Raichure Deodurga Chinchodi 2008-09 CC Road CC Road 60000 60000 60000 Completed Raichure Deodurga Chinchodi 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Chinchodi 2008-09 Compound wall Compound wall 150000 150000 150000 Completed Raichure Deodurga Chinchodi 2009-10 IEC IEC 22000 22000 0 Completed Raichure Deodurga Chinchodi 2009-10 Formation of cc road Golaya House To badeger House At Yaragudda CC Road 50000 50000 0 Completed Raichure Deodurga Chinchodi 2009-10 Implimentation of pipe line rever to village At Lingadahalli Pipeline 100000 100000 0 Completed Raichure Deodurga Chinchodi 2009-10 Permenent study room At Chinchodi Construction Of Library 259000 259000 0 Completed Raichure Deodurga Chinchodi 2009-10 Implimentatiom of tailes Dandappa House To karadigera house BS Slabs flooring 50000 50000 50000 Completed Raichure Deodurga Chinchodi 2009-10 Formatiojn of cc road from Bhimappa ythalwar House to Durgappa House CC Road 100000 100000 100000 Completed Raichure Deodurga Chinchodi 2009-10 Formatiojn of cc road from thimaya House To balaya house At Sidapur CC Road 100000 100000 100000 Completed Raichure Deodurga Chinchodi 2009-10 Formation of cc road from Ganji dyvappa House To Sareemma House At Bunkaldoddi CC Road 100000 100000 100000 Completed Raichure Deodurga Chinchodi 2009-10 Formation of cc road Viot lingappa House to bandesad Lnd CC Road 100000 100000 100000 Completed Raichure Deodurga Chinchodi 2010-11 Solar arengment for computer room in GP Solar System 38000 0 0 Completed Raichure Deodurga Chinchodi 2010-11 Arengment of Water At GP Drinking Water Supply 40000 0 0 Completed Raichure Deodurga Chinchodi 2010-11 Implimentation of Plat Form other works 43000 0 0 Completed Raichure Deodurga Chinchodi 2010-11 Construction of computer lab room in gp At Chinchodi Construction of Gram Panchayat50000 Building 0 0 Completed Raichure Deodurga Chinchodi 2010-11 Arengment of water At Thinthini bruge Drinking Water Supply 50000 50000 50000 Completed Raichure Deodurga Chinchodi 2010-11 Implimentaion of pipe line & Cleneing of dreneg At Bunkaladoddi Pipeline 50000 50000 50000 Completed Raichure Deodurga Chinchodi 2010-11 Implimentaion of pipe line & Cleneing of dreneg At Bunkaladoddi Kurbur Ward Pipeline 50000 50000 50000 Completed Raichure Deodurga Chinchodi 2010-11 Implimentaion of pipe line & Cleneing of dreneg At Bunkaladoddi Angn doddi Pipeline 50000 50000 50000 Completed Raichure Deodurga Chinchodi 2010-11 Implimentaion of pipe line & Cleneing of dreneg At Bunkaladoddi Nagaror doddi Pipeline 50000 50000 50000 Completed

Raichure Deodurga Chinchodi 2010-11 Implimentaion of pipe line & Cleneing of dreneg At Bunkaladoddi Venkateshwar temple Pipeline 50000 50000 50000 Completed

Raichure Deodurga Chinchodi 2010-11 Pipe line cable & arthin for rever Pipeline 190000 190000 190000 Completed Raichure Deodurga Dondambli 2006-07 Formation of CC Road at Benakalu Village CC Road 34000 34000 0 Completed Raichure Deodurga Dondambli 2006-07 Formation of CC Road From Agsi to village CC Road 40000 40000 0 Completed Raichure Deodurga Dondambli 2006-07 Formation of CC Road From Donamdili Police Gouda Jinn to Agsi CC Road 40000 40000 0 Completed Raichure Deodurga Dondambli 2006-07 Formation of CC Road From Vagadambali mesthri house To Mahanthaya House CC Road 68000 68000 0 Completed Raichure Deodurga Dondambli 2006-07 Implimentation of Shabadi Tiles On all roads At Joladhadigi BS Slabs flooring 35000 35000 35000 Completed Raichure Deodurga Dondambli 2006-07 Repair of the public well in At Joladahadigi Repair Works 35000 35000 35000 Completed Raichure Deodurga Dondambli 2006-07 Formation of CC Road at koravar ward and Badiger ward CC Road 40000 40000 40000 Completed Raichure Deodurga Dondambli 2006-07 Formation of CC Road From Nagargundi Agsi To Basavanna Temple CC Road 40000 40000 40000 Completed Raichure Deodurga Dondambli 2006-07 Construction of Ladies toilet at Medaragol Construction of Toilet 45000 45000 45000 Completed Raichure Deodurga Dondambli 2006-07 construction of Busstand in village Bus Stand 60000 60000 60000 Completed Raichure Deodurga Dondambli 2006-07 Formation of CC Road at Kurkuhalli Village CC Road 68000 68000 68000 Completed Raichure Deodurga Dondambli 2006-07 Construction of Drieneg From Honahadigi Lakama House To Main Road Drainage 68000 68000 68000 Completed Raichure Deodurga Dondambli 2006-07 Construction of Ladies toilet at konachapali Construction of Toilet 70000 70000 70000 Completed Raichure Deodurga Dondambli 2007-08 IEC IEC 15000 15000 0 Completed Raichure Deodurga Dondambli 2007-08 Formation of cc road From Imamsab Hotel To Myagar Mallapa CC Road 45000 45000 0 Completed Raichure Deodurga Dondambli 2007-08 Formation of cc road From Sidappa lingappa House To Agsi CC Road 45000 45000 0 Completed Raichure Deodurga Dondambli 2007-08 Formation of cc road From Sidappa House To Maremma Temple CC Road 49000 49000 0 Completed Raichure Deodurga Dondambli 2007-08 Implimentation of tailes At Joladadagi BS Slabs flooring 30000 30000 30000 Completed Raichure Deodurga Dondambli 2007-08 Implimentation of tailes At Konachapli BS Slabs flooring 30000 30000 30000 Completed Raichure Deodurga Dondambli 2007-08 Formation of cc road At Hoovinhadagi CC Road 40000 40000 40000 Completed Raichure Deodurga Dondambli 2007-08 Formation of cc road From Main road To Sasavigera CC Road 40000 40000 40000 Completed Raichure Deodurga Dondambli 2007-08 Formation of cc road At Benakal CC Road 45000 45000 45000 Completed Raichure Deodurga Dondambli 2007-08 Implimentation of Pipe Line At Vagadomli Pipeline 45000 45000 45000 Completed Raichure Deodurga Dondambli 2007-08 Formation of cc road From hanumappa Ganj To Gaddebhavi CC Road 70000 70000 70000 Completed Raichure Deodurga Dondambli 2007-08 Formation of Dreneg At Dondabli Drainage 70000 70000 70000 Completed Raichure Deodurga Dondambli 2008-09 IEC IEC 15000 0 0 Progress Raichure Deodurga Dondambli 2008-09 CC Road CC Road 80000 0 0 Progress Raichure Deodurga Dondambli 2008-09 CC Road CC Road 100000 0 0 Progress Raichure Deodurga Dondambli 2008-09 CC Road CC Road 150000 0 0 Progress Raichure Deodurga Dondambli 2008-09 Compound wall Compound wall 200000 0 0 Progress Raichure Deodurga Dondambli 2008-09 CC Road CC Road 50000 50000 50000 Progress Raichure Deodurga Dondambli 2008-09 CC Road CC Road 50000 50000 50000 Progress Raichure Deodurga Dondambli 2008-09 BS Slabs flooring BS Slabs flooring 80000 80000 80000 Progress Raichure Deodurga Dondambli 2008-09 BS Slabs flooring BS Slabs flooring 80000 80000 80000 Progress Raichure Deodurga Dondambli 2008-09 CC Road CC Road 80000 80000 80000 Progress Raichure Deodurga Dondambli 2008-09 CC Road CC Road 150000 150000 150000 Progress Raichure Deodurga Dondambli 2008-09 CC Road CC Road 200000 200000 200000 Progress Raichure Deodurga Dondambli 2009-10 IEC IEC 10000 0 0 Completed Raichure Deodurga Dondambli 2009-10 Formation of cc road From masidi gudi to mallikarjun house At Vagadambli CC Road 99000 0 0 Completed Raichure Deodurga Dondambli 2009-10 Formation of cc road From Shekrappa house to badiger At Joladadgi CC Road 120000 0 0 Completed Raichure Deodurga Dondambli 2009-10 Formation of cc road siddapa house To nigappa house CC Road 151000 0 0 Completed Raichure Deodurga Dondambli 2009-10 Formation of cc road FromMallapa house To suresh house At Konachapli CC Road 160000 0 0 Completed Raichure Deodurga Dondambli 2009-10 Construction of plat form At Benakal other works 35000 35000 35000 Completed Raichure Deodurga Dondambli 2009-10 Implimentation of tailes At Mydaragol BS Slabs flooring 68000 68000 68000 Completed Raichure Deodurga Dondambli 2009-10 Implimentation of tailes At Hoovinhadagi BS Slabs flooring 70000 70000 70000 Completed Raichure Deodurga Dondambli 2009-10 Formation of cc road From St ward At Joladadgi CC Road 70000 70000 70000 Completed Raichure Deodurga Dondambli 2009-10 Implimentation of tailes SC&St Ward At Karkuhalli BS Slabs flooring 75000 75000 75000 Completed Raichure Deodurga Dondambli 2009-10 Formation of cc road From maremma katte to malladecra gudda temple At Dondamli CC Road 90000 90000 90000 Completed Raichure Deodurga Dondambli 2010-11 IEC IEC 5000 0 0 Completed Raichure Deodurga Dondambli 2010-11 Water Arengment In summer Drinking Water Supply 28000 0 0 Completed Raichure Deodurga Dondambli 2010-11 Solar Fitting in gp Solar System 38000 0 0 Completed Raichure Deodurga Dondambli 2010-11 Water thote At Gade goli Water Tank 80000 0 0 Completed Raichure Deodurga Dondambli 2010-11 Formation of cc road Virupakshi temple to jinn CC Road 160000 0 0 Completed Raichure Deodurga Dondambli 2010-11 Implimentation of clening of water At Konachapli Drinking Water Supply 40000 40000 40000 Completed Raichure Deodurga Dondambli 2010-11 Implimentation of sabadi tailes Vagadambli BS Slabs flooring 80000 80000 80000 Completed Raichure Deodurga Dondambli 2010-11 Formation of cc road Yalamma Temple To Harejan Nigappa House CC Road 80000 80000 80000 Completed Raichure Deodurga Dondambli 2010-11 Construction of ladies toilet At Konachapali Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga 2006-07 Construction of Compound Wall at Vetarnery Hospital Compound wall 100000 100000 0 Completed Raichure Deodurga Gabbur 2006-07 Construction of bus stand Near hemnal road at Gabbur Village Bus Stand 160000 160000 0 Completed Raichure Deodurga Gabbur 2006-07 Construction of Compound Wall atGP.buillding Compound wall 177000 177000 0 Completed Raichure Deodurga Gabbur 2006-07 Construction of Anganavadi Buillding Near Agsi Anganavadi building 160000 160000 160000 Completed Raichure Deodurga Gabbur 2007-08 Formation of cc road form angadi shanthappa house to anganwadi road CC Road 50000 50000 0 Completed Raichure Deodurga Gabbur 2007-08 Constrution of dreneg & road from sugangouda house to kondwada Drainage 80000 80000 0 Completed Raichure Deodurga Gabbur 2007-08 Formation of dreneg & road from Prabanna pathar house to nagappa house Drainage 90000 90000 0 Completed Raichure Deodurga Gabbur 2007-08 Formation of cc road gambali vishwaraya house to water tank CC Road 100000 100000 0 Completed Raichure Deodurga Gabbur 2007-08 Construction of protection wall from Malappa shivangi house to road Compound wall 51000 51000 51000 Completed Raichure Deodurga Gabbur 2007-08 Construction of Study room Construction Of Library 130000 130000 130000 Completed Raichure Deodurga Gabbur 2007-08 Construction of anganwadi building at shanthi nagar Anganavadi building 185000 185000 185000 Completed Raichure Deodurga Gabbur 2008-09 CC Road CC Road 0 0 0 Completed Raichure Deodurga Gabbur 2008-09 Pitching Work Pitching Work 100000 100000 0 Completed Raichure Deodurga Gabbur 2008-09 other works other works 100000 100000 0 Completed Raichure Deodurga Gabbur 2008-09 Drainage Drainage 100000 100000 0 Completed Raichure Deodurga Gabbur 2008-09 IEC IEC 109000 109000 0 Completed Raichure Deodurga Gabbur 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Gabbur 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Gabbur 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Gabbur 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Gabbur 2008-09 Drainage Drainage 100000 100000 100000 Completed Raichure Deodurga Gabbur 2009-10 Formation of cc road Yankanna temple To Bangar bassappa Temple CC Road 50000 50000 0 Completed Raichure Deodurga Gabbur 2009-10 Formation of cc road From Sabugouda house To nagappa House tata house CC Road 150000 150000 0 Completed Raichure Deodurga Gabbur 2009-10 Formation of cc road& dreneg From shalum sab House to Sugappa Houise CC Road 150000 150000 0 Completed Raichure Deodurga Gabbur 2009-10 Formation of cc road From Sharanappa House To myakaya tata house CC Road 177000 177000 0 Completed Raichure Deodurga Gabbur 2009-10 Formation of cc road Babu jinna To Chaluvadi parmeshwara katti CC Road 50000 50000 50000 Completed Raichure Deodurga Gabbur 2009-10 Formation of cc road From Sujathappa House To Deodurga Agsi CC Road 150000 150000 150000 Completed Raichure Deodurga Galaga 2006-07 Fomration of CC Road at Kajebandi CC Road 100000 100000 0 Completed Raichure Deodurga Galaga 2006-07 Construction of Toilet at forest road Construction of Toilet 100000 100000 0 Completed Raichure Deodurga Galaga 2006-07 Construction Of Drenig At galag Drainage 200000 200000 200000 Completed Raichure Deodurga Galaga 2007-08 Construction of School room at gudumaladoddi School Compound and Buildings100000 100000 0 Completed Raichure Deodurga Galaga 2007-08 Construction of Anganavadi Buillding At Chadakalu Gudda Village Anganavadi building 200000 200000 0 Completed Raichure Deodurga Galaga 2007-08 Formation of CC Road At Galag CC Road 200000 200000 0 Completed Raichure Deodurga Galaga 2007-08 Construction of education Center Buillding at Galag IEC 200000 200000 0 Completed Raichure Deodurga Galaga 2007-08 Construction of public Toilet Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Galaga 2008-09 CC Road CC Road 230000 0 0 Completed Raichure Deodurga Galaga 2008-09 BS Slabs flooring BS Slabs flooring 100000 100000 0 Completed Raichure Deodurga Galaga 2008-09 Dhobi Ghat Dhobi Ghat 100000 100000 0 Completed Raichure Deodurga Galaga 2008-09 Compound wall Compound wall 116000 116000 0 Completed Raichure Deodurga Galaga 2008-09 CC Road CC Road 120000 120000 0 Completed Raichure Deodurga Galaga 2008-09 BS Slabs flooring BS Slabs flooring 124000 124000 0 Completed Raichure Deodurga Galaga 2008-09 CC Road CC Road 127000 127000 0 Completed Raichure Deodurga Galaga 2008-09 IEC IEC 200000 200000 0 Completed Raichure Deodurga Galaga 2008-09 BS Slabs flooring BS Slabs flooring 127000 127000 127000 Completed Raichure Deodurga Galaga 2009-10 Gp Contineud Construction of galag Gp At Galag Construction of Gram Panchayat150000 Building 150000 0 Completed Raichure Deodurga Galaga 2009-10 Formation of cc road AtiLGERA House CC Road 200000 200000 0 Completed Raichure Deodurga Galaga 2009-10 Formation of cc road Mata To Gp CC Road 250000 250000 0 Completed Raichure Deodurga Galaga 2009-10 Formation of cc road way of channabasaveshwara mata CC Road 250000 250000 0 Completed Raichure Deodurga Galaga 2009-10 Formation of cc road At old Galag CC Road 120000 120000 120000 Completed Raichure Deodurga Galaga 2010-11 Construction of Compound Walla At Chadakalgudda Compound wall 80000 80000 0 Completed Raichure Deodurga Galaga 2010-11 Repair of Bussness complex gp Repair Works 90000 90000 0 Completed Raichure Deodurga Galaga 2010-11 Construction of Bussness complex gp Shopping mall 280000 280000 0 Completed Raichure Deodurga Galaga 2010-11 Construction Hot food room at Chaluwadidoddi Kitchen Room 80000 80000 80000 Completed Raichure Deodurga Galaga 2010-11 Formation of cc road SC Ward At Galag CC Road 100000 100000 100000 Completed Raichure Deodurga (deodurga) 2006-07 Construction of Toilet at veternery Hospital Construction of Toilet 26000 26000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2006-07 Implementation of shabad tiles at sunadskal village BS Slabs flooring 30000 30000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2006-07 Construction of CD at Sunadakal Village Check dam 40000 40000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2006-07 Construction of Drenege From yallama Temple To Water tank at Makaladoddi Village Water Tank 80000 80000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2006-07 Implementation of shabad tiles at sunadskal village BS Slabs flooring 30000 30000 30000 Completed Raichure Deodurga Ganadhal (deodurga) 2006-07 Implementation of water suply at kakaladoddi village Drinking Water Supply 100000 100000 100000 Completed Raichure Deodurga Ganadhal (deodurga) 2006-07 Implementation of water suply at Kamaladinni village Drinking Water Supply 100000 100000 100000 Completed Raichure Deodurga Ganadhal (deodurga) 2007-08 Formation of cc road fromMakaldoddi narsappa house to agsi CC Road 100000 100000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2007-08 Formation of cc road from govt school to borvell At Sunadkal CC Road 200000 200000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2007-08 Formation of cc road from devendra house to maruthi house At kakkaladoddi CC Road 100000 100000 100000 Completed Raichure Deodurga Ganadhal (deodurga) 2007-08 Construction of Study room at kamaldinni Construction Of Library 100000 100000 100000 Completed Raichure Deodurga Ganadhal (deodurga) 2007-08 Water arengment At Gandal Drinking Water Supply 287000 287000 287000 Completed Raichure Deodurga Ganadhal (deodurga) 2008-09 CC Road CC Road 200000 200000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Ganadhal (deodurga) 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Ganadhal (deodurga) 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Formation of cc road From Mudabal Shed To Desai House At Kakkaladoddi CC Road 30000 30000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Formation of cc road From Shivareddy House To Desai At Kakkaladoddi CC Road 30000 30000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Implimentation of Shabadi tailes Durgappa House To Gundappa At Kamaladinni BS Slabs flooring 50000 50000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Implimentation of Shabadi tailes Durgappa House To Gundappa At Kamaladinni BS Slabs flooring 50000 50000 0 Completed

Raichure Deodurga Ganadhal (deodurga) 2009-10 Implimentation of Shabadi tailes Meti mallapa House To Kumbar parmappa At Mykaladoddi BS Slabs flooring 50000 50000 0 Completed

Raichure Deodurga Ganadhal (deodurga) 2009-10 Construction of room At GP Construction of Gram Panchayat87000 Building 87000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Implimentation of Shabadi tailes Shivamma House To Sedabavi At Kamaladinni BS Slabs flooring 50000 50000 50000 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Implimentation of Shabadi tailes Danappa house To Sedabavi At Kamaladinni BS Slabs flooring 50000 50000 50000 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Implimentation of Shabadi tailes Durgama temple To Agsi At Mykaladoddi BS Slabs flooring 50000 50000 50000 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Implimentation of Shabadi tailes Sunadakal hanumaya house to Sedebhavi BS Slabs flooring 100000 100000 100000 Completed Raichure Deodurga Ganadhal (deodurga) 2009-10 Formation of cc road From Harijan ward to Bouvell At Kakkaladoddi CC Road 200000 200000 200000 Completed Raichure Deodurga Ganadhal (deodurga) 2010-11 Solar arengment for computer room GP Solar System 35000 35000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2010-11 Summer water arengment Drinking Water Supply 40000 40000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2010-11 Construction of Plot form AT Basapa Land other works 40000 40000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2010-11 Public Katte At Kamaladinni Community Hall 70000 70000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2010-11 Construction of compound for vasathi houses At Ganadhal Compound wall 100000 100000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2010-11 Formation of cc road from sannada hadagi agsi To Master House At Sunnadakal CC Road 170000 170000 0 Completed Raichure Deodurga Ganadhal (deodurga) 2010-11 Implimentation of Shabadi tailes At Kakaladoddi BS Slabs flooring 40000 40000 40000 Completed

Raichure Deodurga Ganadhal (deodurga) 2010-11 Implimentation of Shabadi tailes From durgappa House To Dynappa House At Kamaladinni BS Slabs flooring 40000 40000 40000 Completed

Raichure Deodurga Ganadhal (deodurga) 2010-11 Implimentation of Shabadi tailes At Mekaladoddi BS Slabs flooring 40000 40000 40000 Completed Raichure Deodurga Ganadhal (deodurga) 2010-11 Formation of cc road from Parasappa House To Bhimanna House CC Road 90000 90000 90000 Completed Raichure Deodurga Gugal 2006-07 Construction of cc road From Gugal Road to Gov School CC Road 70000 56337 0 Completed Raichure Deodurga Gugal 2006-07 Construction of Ston Teching At Horur River Road CC Road 70000 60207 0 Completed Raichure Deodurga Gugal 2006-07 Construiction of CC Road At Mathapali From Virapana Gouda House to Yallama Temple CC Road 70000 64908 0 Completed Raichure Deodurga Gugal 2006-07 Construction of cc road way of river in CC Road 70000 63297 63297 Completed Raichure Deodurga Gugal 2006-07 Construction of CC Road From Chikarayakumpi agsi to Gov School CC Road 70000 63759 63759 Completed Raichure Deodurga Gugal 2006-07 Construction of cc road up to gugal agsi in gugal CC Road 70000 64486 64486 Completed Raichure Deodurga Gugal 2006-07 Construiction of CC Road At Hirerayakumpi From Madarkal Main Road to S.C.Collony CC Road 100000 97281 97281 Completed Raichure Deodurga Gugal 2007-08 Formation of cc Road fromGovt School To Hanuman Temple At Gugal Village CC Road 71000 69816 0 Completed Raichure Deodurga Gugal 2007-08 Formation of cc Road fromChikarayakumpi Shoool To Verapagouda house CC Road 80000 78729 0 Completed Raichure Deodurga Gugal 2007-08 Formation of cc Road from Poojari House To Kuriyavarakati At Hireraya kumpi CC Road 100000 92098 0 Completed Raichure Deodurga Gugal 2007-08 Formation of cc Road from Hanuman Temple To Padakati At Hirur Village CC Road 85000 93740 0 Completed Raichure Deodurga Gugal 2007-08 Formation of cc construction from Agsi gugal gugal CC Road 100000 99371 0 Completed Raichure Deodurga Gugal 2007-08 Formation of cc Road from Agsi to Nala At Yatagal Village CC Road 186000 159671 0 Completed Raichure Deodurga Gugal 2007-08 Formation of cc Road from Basapa Gouda House To Road At Mathmali Village CC Road 85000 78729 78729 Completed Raichure Deodurga Gugal 2007-08 Formation of cc Road from anganavadi at Itagi Village CC Road 90000 89128 89128 Completed Raichure Deodurga Gugal 2008-09 Drainage Drainage 52000 0 0 Not Started Raichure Deodurga Gugal 2008-09 Check dam Check dam 120000 118726 0 Completed Raichure Deodurga Gugal 2008-09 CC Road CC Road 120000 119046 0 Completed Raichure Deodurga Gugal 2008-09 CC Road CC Road 120000 119046 0 Completed Raichure Deodurga Gugal 2008-09 Pitching Work Pitching Work 60000 58639 58639 Completed Raichure Deodurga Gugal 2008-09 CC Road CC Road 100000 99890 99890 Completed Raichure Deodurga Gugal 2008-09 CC Road CC Road 120000 119046 119046 Completed Raichure Deodurga Gugal 2008-09 Pitching Work Pitching Work 120000 119046 119046 Completed Raichure Deodurga Gugal 2008-09 other works other works 120000 119046 119046 Completed Raichure Deodurga Gugal 2008-09 CC Road CC Road 120000 119046 119046 Completed Raichure Deodurga Gugal 2009-10 Implimentation of ston pinching From maremma Temple To Erappa land At Yatgal other works 50000 46061 0 Completed Raichure Deodurga Gugal 2009-10 Formation of cc road From Veerappa house To Yallama Temple CC Road 80000 68303 0 Completed Raichure Deodurga Gugal 2009-10 Formation of cc road From Siddanna land To Riwar At Gugal CC Road 80000 78226 0 Completed Raichure Deodurga Gugal 2009-10 Formation of cc road From Ishappa House To Ramanna Shop At Hirur CC Road 90000 87445 0 Completed

Raichure Deodurga Gugal 2009-10 Formation of cc road from Mahgadevappa House To Khajappa House At Hireraya Kumpi CC Road 90000 88563 0 Completed

Raichure Deodurga Gugal 2009-10 Formation of cc road From Ali sab House To Docter House At Gugal CC Road 90000 88943 0 Completed Raichure Deodurga Gugal 2009-10 Formation of cc road From Hanumappa temple To Basavaraj House At Itagi CC Road 90000 88943 0 Completed Raichure Deodurga Gugal 2009-10 Basavaraj House To Ambamma House At Yatgal other works 90000 89665 0 Completed Raichure Deodurga Gugal 2009-10 Formation of cc road From Raiman Sab House To Venkatappa House CC Road 60000 54278 54278 Completed

Raichure Deodurga Gugal 2009-10 Formation of cc road from Dodarangayya House To Kanthe Mallaya House At Chikaraya Kumpi CC Road 90000 88943 88943 Completed

Raichure Deodurga Gugal 2010-11 Formation of cc road Agsi To Basavaraj goudqa House At Gugal CC Road 150000 148168 0 Completed Raichure Deodurga Gugal 2010-11 Formation of cc road hirur road At Mapalli CC Road 150000 148458 0 Completed Raichure Deodurga Gugal 2010-11 Formation of cc road Sharanappa House To Basanna Katti At Chikaraya kumpi CC Road 150000 148339 148339 Completed Raichure Deodurga Gugal 2010-11 Formation of cc road Rammapa shop to kardi gudda basappa House At Hirerayakumpi CC Road 150000 148453 148453 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Suganna House To Mallama House At Hemnal CC Road 20000 20000 0 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Katte To Channapa House At Hemnal CC Road 28000 28000 0 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Abdul House To Masjid At Kanapur CC Road 32000 32000 0 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Maremma House ToRamanna House At Kanapur CC Road 32000 32000 0 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Nagappa House To Kallyanrao Housse At Kanapur CC Road 32000 32000 0 Completed Raichure Deodurga Hemanal 2006-07 Construction of school buillding At Kollur School Compound and Buildings50000 50000 0 Completed Raichure Deodurga Hemanal 2006-07 Construction of anganawadi Buillding at Honnatagi Anganavadi building 64000 64000 0 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Amma Swami House To Agsi At Bommanal CC Road 64000 64000 0 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Mallappa House To Siddapa House At Hemnal CC Road 30000 30000 30000 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Hampaya House To Dyavamma Housse At Kanapur CC Road 32000 32000 32000 Completed

Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Thippaya House To Hanumantha Rays Gouda House At Hire Kudalagi CC Road 32000 32000 32000 Completed

Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Agsi To Prabanna House At Hire Kollur CC Road 56000 56000 56000 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Mareppa House To Agsi At Basavanthpur CC Road 64000 64000 64000 Completed Raichure Deodurga Hemanal 2006-07 Formation of CC Road From Sharanappa House To Hanumappa House At Bommanal CC Road 64000 64000 64000 Completed Raichure Deodurga Hemanal 2007-08 IEC Hemnal IEC 39000 39000 0 Completed Raichure Deodurga Hemanal 2007-08 Construction of stups near Nandir house At madakal other works 45000 45000 0 Completed Raichure Deodurga Hemanal 2007-08 Construction of stups near bailappa house At madakal Solar System 45000 45000 0 Completed Raichure Deodurga Hemanal 2007-08 Construction of Fast food room At Basavanthpur Kitchen Room 70000 70000 0 Completed Raichure Deodurga Hemanal 2007-08 Formation of cc road from bomnal malapa house to agsi CC Road 80000 80000 0 Completed Raichure Deodurga Hemanal 2007-08 Formation of cc road from Kanapur kalyana rao house to thatha house CC Road 150000 150000 0 Completed Raichure Deodurga Hemanal 2007-08 Formation of cc road from Badiger house to jambanna house At Kollur CC Road 30000 30000 30000 Completed Raichure Deodurga Hemanal 2007-08 Formation of cc road from Hanumanth House To Malkal Hanmaya At Hirekudlagi CC Road 45000 45000 45000 Completed Raichure Deodurga Hemanal 2007-08 Formation of cc road from durga to ramalingeshwara house At Honnatagi CC Road 80000 80000 80000 Completed Raichure Deodurga Hemanal 2007-08 Formation of cc road from raheman sab house to gudadaiya house At Hemnal CC Road 120000 120000 120000 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 60000 60000 0 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 60000 60000 0 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 60000 60000 0 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 61000 61000 0 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 119000 119000 0 Completed Raichure Deodurga Hemanal 2008-09 Bus Stand Bus Stand 237000 237000 0 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 51000 51000 51000 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 119000 119000 119000 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 120000 120000 120000 Completed Raichure Deodurga Hemanal 2008-09 CC Road CC Road 181000 181000 181000 Completed Raichure Deodurga Hemanal 2010-11 Plat Forma At Homnal other works 40000 40000 0 Completed Raichure Deodurga Hemanal 2010-11 Solar Arengment At Gp Solar System 40000 40000 0 Completed Raichure Deodurga Hemanal 2010-11 Water arengment in summer Drinking Water Supply 41000 41000 0 Completed Raichure Deodurga Hemanal 2010-11 Formation of CC road At Madarkal CC Road 85000 85000 0 Completed Raichure Deodurga Hemanal 2010-11 Formation of CC road Dandappa House To sedebavi At Kanapur CC Road 85000 85000 0 Completed Raichure Deodurga Hemanal 2010-11 Formation of CC road Banappa House To Swami shop At Honnatgi CC Road 85000 85000 85000 Completed Raichure Deodurga Hemanal 2010-11 Formation of CC road Narasamma house To Thippaya At Kanapur CC Road 85000 85000 85000 Completed Raichure Deodurga Hemanal 2010-11 Formation of cc road From Gurusasana To Shivappa Gouder House At Basavanthapur CC Road 90000 90000 90000 Completed Raichure Deodurga Hemanal 2010-11 Formation of dreneg At Bommanal Drainage 90000 90000 90000 Completed Raichure Deodurga Hirebudur 2006-07 Construction of CC Road and Drenege At Ingaladal CC Road and Drainage 60000 60000 0 Completed Raichure Deodurga Hirebudur 2006-07 Formation of CC Road From Hirebur School To Shanthanavar CC Road 60000 60000 0 Completed Raichure Deodurga Hirebudur 2006-07 Formation of school construction at Haddinal School Compound and Buildings132000 132000 0 Completed Raichure Deodurga Hirebudur 2006-07 Construction of CC Road and Drenege At Budinal Village CC Road and Drainage 60000 60000 60000 Completed Raichure Deodurga Hirebudur 2006-07 Formation of CC Road From JD Halli Gugal Road To JD Halli CC Road 60000 60000 60000 Completed Raichure Deodurga Hirebudur 2006-07 Formation of CC Road Nagaral Village to Distributer Nala CC Road 60000 60000 60000 Completed Raichure Deodurga Hirebudur 2006-07 Implimentation of raod Near SC Collony ashray Houses at Shavanthgera CC Road 60000 60000 60000 Completed Raichure Deodurga Hirebudur 2006-07 Construction of Drenege At Mashihal ST.collony and other collony Drainage 60000 60000 60000 Completed Raichure Deodurga Hirebudur 2006-07 Construction of CC Road and Drenege At Hanchinal Village CC Road and Drainage 80000 80000 80000 Completed Raichure Deodurga Hirebudur 2007-08 Formation of road At Nagral CC Road 80000 80000 0 Completed Raichure Deodurga Hirebudur 2007-08 Formation of road From JD Village To Nagral CC Road 80000 80000 0 Completed Raichure Deodurga Hirebudur 2007-08 Formation of road From Shavanthger To hemnal CC Road 80000 80000 0 Completed Raichure Deodurga Hirebudur 2007-08 Construction of compound wall At Budinal Compound wall 80000 80000 0 Completed Raichure Deodurga Hirebudur 2007-08 Formation of drene ashraya houses At Ingaldal Drainage 80000 80000 0 Completed Raichure Deodurga Hirebudur 2007-08 Construction of anganwadi At ashihal Anganavadi building 200000 200000 0 Completed Raichure Deodurga Hirebudur 2007-08 Formation of road From Hanchinal To Hirebudur CC Road 80000 80000 80000 Completed Raichure Deodurga Hirebudur 2007-08 Formation of drene At Hadinnal Drainage 80000 80000 80000 Completed Raichure Deodurga Hirebudur 2008-09 CC Road CC Road 106000 106000 0 Completed Raichure Deodurga Hirebudur 2008-09 Anganavadi building Anganavadi building 200000 200000 0 Completed Raichure Deodurga Hirebudur 2008-09 Anganavadi building Anganavadi building 200000 200000 0 Completed Raichure Deodurga Hirebudur 2008-09 Anganavadi building Anganavadi building 200000 200000 0 Completed Raichure Deodurga Hirebudur 2008-09 IEC IEC 15000 15000 15000 Completed Raichure Deodurga Hirebudur 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Hirebudur 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Hirebudur 2008-09 Construction of Toilet Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Hirebudur 2009-10 Formation of road Anjinaya Temple To benchiwarge At Budinal CC Road 100000 0 0 Completed Raichure Deodurga Hirebudur 2009-10 Construction of dobighat At JD Halli Dhobi Ghat 50000 50000 50000 Completed Raichure Deodurga Hirebudur 2009-10 Implimentation of pipeline Jd Halli To Main road At Nagaral Pipeline 97000 97000 97000 Completed Raichure Deodurga Hirebudur 2009-10 Construction of Dobighat At Shavanthgera Dhobi Ghat 100000 100000 100000 Completed Raichure Deodurga Hirebudur 2009-10 Formar suport room At Hirebudur other works 100000 100000 100000 Completed Raichure Deodurga Hirebudur 2009-10 Formation of pipe line Ashraya collony At Ingaladal Pipeline 100000 100000 100000 Completed Raichure Deodurga Hirebudur 2009-10 Formation of water pool At Hanchinal Water Tank 100000 100000 100000 Completed Raichure Deodurga Hirebudur 2009-10 Construction of school room At Mashihal School Compound and Buildings150000 150000 150000 Completed Raichure Deodurga Hirebudur 2010-11 Water srengment in sumer Drinking Water Supply 40000 0 0 Completed Raichure Deodurga Hirebudur 2010-11 Solar fittin for computer lab in gp Solar System 48000 0 0 Completed Raichure Deodurga Hirebudur 2010-11 Formation of cc road And stups At Amrapur CC Road 60000 0 0 Completed Raichure Deodurga Hirebudur 2010-11 Formation of cc road Ingaladal to budinal CC Road 60000 0 0 Completed Raichure Deodurga Hirebudur 2010-11 Construction of laibrary At Hirebudur village Construction Of Library 90000 0 0 Completed Raichure Deodurga Hirebudur 2010-11 Implimentation of plat form other works 45000 45000 45000 Completed Raichure Deodurga Hirebudur 2010-11 Formaion of cc road At Nagral CC Road 50000 50000 50000 Completed Raichure Deodurga Hirebudur 2010-11 Formation of cc road At Budinal CC Road 50000 50000 50000 Completed Raichure Deodurga Hirebudur 2010-11 Water warengment for JD Halli Village Drinking Water Supply 50000 50000 50000 Completed Raichure Deodurga Hirebudur 2010-11 Formaion of cc road Shvanthgal To Bommanal CC Road 55000 55000 55000 Completed Raichure Deodurga Hirebudur 2010-11 Formation of raod to reach shavanthgere CC Road 55000 55000 55000 Completed Raichure Deodurga Hirebudur 2010-11 Construction of school bullding At Hanchinal School Compound and Buildings60000 60000 60000 Completed Raichure Deodurga Siddapur 2006-07 Implement of CC Road at Sandoddi CC Road 51000 47620 0 Completed Raichure Deodurga Hosur Siddapur 2006-07 Implement of CC Road at: B R Gunda CC Road 61000 56520 0 Completed Raichure Deodurga Hosur Siddapur 2006-07 Construction of CC Road From Samanamaradi Hunde bandi To Dalapathi's House CC Road 200000 195458 0 Completed Raichure Deodurga Hosur Siddapur 2006-07 Implement of CC Road at Sampathrayadoddi CC Road 51000 48942 48942 Completed Raichure Deodurga Hosur Siddapur 2006-07 Implement of CC Road at SC Collony at: B R Gunda CC Road 61000 56756 56756 Completed Raichure Deodurga Hosur Siddapur 2006-07 Fommation of CC Road From Village to Busstop at: H.siddapur Village CC Road 100000 56830 56830 Completed Raichure Deodurga Hosur Siddapur 2006-07 Construction of CC Road Near Durgammatemple at: Bommanahalli CC Road 100000 96456 96456 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of Pipe line from samanamardi thipana bingi House To Hanumappa House Pipeline 35000 32642 0 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of Pipe line from sabana House To sabanna House BR Gunda Pipeline 50000 38362 0 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of cc road From Bommana village Agsi to masjid CC Road 40000 38860 0 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of cc road at S.Doddi CC Road 45000 43776 0 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of tiles From samanmardi Yankapa House to Durgappa House BS Slabs flooring 50000 47335 0 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of Pipe line from durugamma temple Yallama Temple At BR Gunda Pipeline 50000 48017 0 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of cc road from mata to school CC Road 100000 96638 0 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of cc road At Bella ward CC Road 100000 99638 0 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of Pipe line from Samana mardi bhimapa House To charch Pipeline 75000 67808 67808 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of cc road At amaraya doddi CC Road 100000 99638 99638 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of cc road From Bommana village busstand to iligera house CC Road 150000 148962 148962 Completed Raichure Deodurga Hosur Siddapur 2007-08 Formation of tiles From samanmardi bingi mallaya house to rangapa House BS Slabs flooring 60000 583386 583386 Completed Raichure Deodurga Hosur Siddapur 2008-09 Anganavadi building Anganavadi building 145000 99077 0 progress Raichure Deodurga Hosur Siddapur 2008-09 Drinking Water Supply Drinking Water Supply 140000 134982 0 Completed Raichure Deodurga Hosur Siddapur 2008-09 Compound wall Compound wall 145000 141781 0 Completed Raichure Deodurga Hosur Siddapur 2008-09 BS Slabs flooring BS Slabs flooring 145000 141942 0 Completed Raichure Deodurga Hosur Siddapur 2008-09 Building Repair Building Repair 75000 74460 74460 Completed Raichure Deodurga Hosur Siddapur 2008-09 CC Road CC Road 75000 74460 74460 Completed Raichure Deodurga Hosur Siddapur 2008-09 CC Road CC Road 145000 139854 139854 Completed Raichure Deodurga Hosur Siddapur 2008-09 BS Slabs flooring BS Slabs flooring 145000 139854 139854 Completed Raichure Deodurga Hosur Siddapur 2008-09 CC Road CC Road 145000 141856 141856 Completed Raichure Deodurga Hosur Siddapur 2008-09 CC Road CC Road 150000 145967 145967 Completed Raichure Deodurga Hosur Siddapur 2009-10 Implimentation of Tailes From Sethamma House To Narasaya House BS Slabs flooring 40000 40000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Implimentation of Tailes From Pidappa House To Hirekurbur Mallappa House BS Slabs flooring 55000 55000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Implimentation of Tailes At muduvanagadi marutheshwara BS Slabs flooring 55000 55000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Implimentation of Tailes From Hanumayya House To Shivappa House BS Slabs flooring 55000 55000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of dreneg Mareppa House to kariyappa House Drainage 55000 55000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of dreneg Near Tatapa gadi At Utakanoor Drainage 55000 55000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of ston piching rrom Jallai Sidaya House To Mandala Siddya House Pitching Work 55000 55000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Construction of School Compound School Compound and Buildings55000 55000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of cc road from danadoddi To Badager Hodi CC Road 90000 90000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Construction of Ladies Toilet Wall At SC ward Construction of Toilet 90000 90000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of cc road from Agsi To sedibhavi CC Road 110000 110000 0 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of cc road from Gavisiddya Main road To Bassaya house CC Road 55000 55000 55000 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formationof cc road From Jinn to Shivaraj House CC Road 55000 55000 55000 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of cc road from Bellapa House to Rayappa House CC Road 90000 90000 90000 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of cc road from Vadegere Mallaya House To Chanaya House CC Road 90000 90000 90000 Completed Raichure Deodurga Hosur Siddapur 2009-10 Formation of cc road At Cd Durgappa Check dam 155000 155000 155000 Completed Raichure Deodurga Jagirajadaladinni 2006-07 Construction Of Ladeis Toilet at: Jagatakal Construction of Toilet 55000 55000 0 Completed

Raichure Deodurga Jagirajadaladinni 2006-07 Construction Of Dranege From Manachaya House To Pallamma Temple at: Village Drainage 80000 80000 0 Completed

Raichure Deodurga Jagirajadaladinni 2006-07 Implimentation of CC Road From Anginaya Temple To Water Tank at: Maladevaragudda CC Road 100000 100000 0 Completed

Raichure Deodurga Jagirajadaladinni 2006-07 Implimentation of CC Road From Shivamma House To Basaya House CC Road 100000 100000 0 Completed Raichure Deodurga Jagirajadaladinni 2006-07 Construction Of Ladeis Toilet at: Rekalamaradi Construction of Toilet 55000 55000 55000 Completed Raichure Deodurga Jagirajadaladinni 2006-07 Implimentation Of Shabad Tiles SC Collony at:Nagaolli Village BS Slabs flooring 79000 79000 79000 Completed Raichure Deodurga Jagirajadaladinni 2006-07 Formation Of CC Road From Durgamma Temple To Maremma Temple CC Road 79000 79000 79000 Completed Raichure Deodurga Jagirajadaladinni 2007-08 Formation of cc road from anjinayya temple to vilan road At rekalmardi CC Road 90000 90000 0 Completed Raichure Deodurga Jagirajadaladinni 2007-08 Construction of publik toilet at Construction of Toilet 200000 200000 0 Completed Raichure Deodurga Jagirajadaladinni 2007-08 Construction of publik toilet at Nagolli village Construction of Toilet 200000 200000 0 Completed Raichure Deodurga Jagirajadaladinni 2007-08 Construction of small water tank sc ward At Jatagal Water Tank 80000 80000 80000 Completed Implimentation of Shabadi Tailes From Maski Shivappa House To Panchayath katti At Raichure Deodurga Jagirajadaladinni 2007-08 BS Slabs flooring 90000 90000 90000 Completed Maladevaragudda Raichure Deodurga Jagirajadaladinni 2007-08 Formation of cc road from nigappa house to sedi Bhavi At buddini CC Road 90000 90000 90000 Completed Raichure Deodurga Jagirajadaladinni 2007-08 Construction of publik toilet at Markamdinni village Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 100000 100000 0 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 128000 128000 0 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 128000 128000 0 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 150000 150000 0 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 200000 200000 0 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 128000 128000 128000 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 150000 150000 150000 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 150000 150000 150000 Completed Raichure Deodurga Jagirajadaladinni 2008-09 CC Road CC Road 170000 170000 170000 Completed Raichure Deodurga Jagirajadaladinni 2009-10 IEC IEC 19000 0 0 Not Started Raichure Deodurga Jagirajadaladinni 2009-10 New construction of Gp Bullding Construction of Gram Panchayat1000000 Building 800000 0 Completed Raichure Deodurga Jagirajadaladinni 2010-11 Fromation of cc road At Markamdinni CC Road 50000 0 0 Completed Raichure Deodurga Jagirajadaladinni 2010-11 Fromation of cc road At Nagoli CC Road 65000 0 0 Completed Raichure Deodurga Jagirajadaladinni 2010-11 Fromation of cc road At Agrahar CC Road 100000 0 0 Completed Raichure Deodurga Jagirajadaladinni 2010-11 Fromation of cc road At Budinni CC Road 100000 0 0 Completed Raichure Deodurga Jagirajadaladinni 2010-11 Fromation of cc road At J.Jadaladinni CC Road 100000 0 0 Completed Raichure Deodurga Jagirajadaladinni 2010-11 Fromation of cc road At Maladevragudda CC Road 100000 0 0 Completed Raichure Deodurga Jagirajadaladinni 2010-11 Formatio of dreneg At Jagatagal Drainage 100000 0 0 Completed Raichure Deodurga Jagirajadaladinni 2010-11 Implimentation of pipe line At Rekalamardi Pipeline 100000 0 0 Completed Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Amresh House To Nagappa ward no5 at: Jalahalli Village CC Road 15000 14109 0 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Khasim sab House To Shivappa House ward no3 at: Jalahalli Village CC Road 20000 19644 0 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Manchaya House To Shinaz Begum ward no4 at: Jalahalli Village CC Road 23000 21642 0 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Sulthan House To Borvel ward no4 at: Jalahalli Village CC Road 23000 21642 0 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Yellapa House To Kariyappa House ward no4 at: Jalahalli Village CC Road 23000 21642 0 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Balagi House to Masidi ward no2 at: Jalahalli Village CC Road 28000 24269 0 Completed Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road ward no1 at: Jalahalli Village CC Road 30000 28093 0 Completed Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Yousuf House To Hedde ward no3 at: Jalahalli Village CC Road 33000 29429 0 Completed Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Masjid To Channamata ward no2 at: Jalahalli Village CC Road 33000 29470 0 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Ali sab House To Basavaraj House ward no3 at: Jalahalli Village CC Road 33000 31839 0 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Iligera House To Moumed House ward no2 at: Jalahalli Village CC Road 33000 31839 0 Completed

Impliment of CC Road FromVetirnari Hospital To Shivappa Sungar House ward no6 at: Jalahalli Raichure Deodurga Jalahalli 2006-07 CC Road 33000 31839 0 Completed Village Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road ward no1 at: Jalahalli Village CC Road 60000 34003 0 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Nagappa House To Shivappa House ward no5 at: Jalahalli Village CC Road 15000 14816 14816 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Bujangappa House To Water Tank ward no5 at: Jalahalli Village CC Road 15000 14983 14983 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Yallama House To Rudrappa House ward no5 at: Jalahalli Village CC Road 15000 14983 14983 Completed

Raichure Deodurga Jalahalli 2006-07 Construction of dreneg at: Ward no6 Drainage 23000 22223 22223 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Ishwar House To Basaveshwara Temple ward no8 at: Jalahalli Village CC Road 33000 31441 31441 Completed

Impliment of CC Road From Durugamma Temple To Palakamma Temple ward no8 at: Jalahalli Raichure Deodurga Jalahalli 2006-07 CC Road 33000 31839 31839 Completed Village

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road From Hanuman Temple To Kammar House ward no8 at: Jalahalli Village CC Road 33000 31839 31839 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road FromDevamma Temple To Garudappa House ward no7 at: Jalahalli Village CC Road 23000 31879 31879 Completed

Raichure Deodurga Jalahalli 2006-07 Impliment of CC Road FromDevamma Temple To Garudappa House ward no7 at: Jalahalli Village CC Road 33000 31879 31879 Completed

Raichure Deodurga Jalahalli 2006-07 Construction of drainage Ward no7 From Muduramgayya House To Gangappa House Drainage 33000 31879 31879 Completed Raichure Deodurga Jalahalli 2007-08 Formation of cc road from Ayanna Bavi To Devagudi CC Road 35000 34442 0 Completed Raichure Deodurga Jalahalli 2007-08 Formation of cc road from Basavaraj hiremadi House to Bhimanna House CC Road 35000 34468 0 Completed Raichure Deodurga Jalahalli 2007-08 Formation of cc road & Dreneg fron basappa driver House to panchayath CC Road and Drainage 50000 48846 0 Completed Raichure Deodurga Jalahalli 2007-08 Formation of cc road & Dreneg fron Erappa House To Kaipale ramava house CC Road and Drainage 50000 48846 48846 Completed

Raichure Deodurga Jalahalli 2007-08 Formation of cc road & Dreneg fron yarakamati durgapa house to thotadadurgappa house CC Road and Drainage 50000 48846 48846 Completed

Raichure Deodurga Jalahalli 2007-08 Formation of cc road from paramana lingad halli house to Bhimanna House CC Road 50000 48846 48846 Completed Raichure Deodurga Jalahalli 2007-08 Formation of cc road from Kulli HANMANTHRAYA HOUSE TO BIDRINI SHIVRAYA HOUSE At jalahalli CC Road 50000 49485 49485 Completed

Raichure Deodurga Jalahalli 2007-08 Formation of cc road from Thimarur mudranga House To Yallama temple At jalahalli CC Road 50000 49485 49485 Completed Raichure Deodurga Jalahalli 2007-08 Formation of cc road from Kale Shivappa House to Gopalapura At jalahalli CC Road 60000 59001 59001 Completed Formation of cc road from Gangappa mata to thippana pathar house on the way of durgappa Raichure Deodurga Jalahalli 2007-08 CC Road 70000 67717 67717 Completed house Raichure Deodurga Jalahalli 2007-08 Formation of cc road from shatar jinn to vijayarao house CC Road 70000 68231 68231 Completed Raichure Deodurga Jalahalli 2007-08 Construction of stups from vandaler house to ladeis toilet way Construction of Toilet 90000 89834 89834 Completed Raichure Deodurga Jalahalli 2007-08 Implimentation of mitling from malik ahmed House to water tank At jalahalli Water Tank 90000 89834 89834 Completed Raichure Deodurga Jalahalli 2007-08 Formation of cc road from Durgappa udbal house to Durgamma temple At jalahalli CC Road 100000 97701 97701 Completed Raichure Deodurga Jalahalli 2007-08 Formation of cc road from Jumma masjid to channa mata At jalahalli CC Road 100000 98970 98970 Completed Raichure Deodurga Jalahalli 2008-09 Construction of Gram Panchayat Building Construction of Gram Panchayat12000 Building 800000 0 progress Raichure Deodurga Jalahalli 2009-10 Forwarding GP Construction other works 12000 0 0 Completed Raichure Deodurga Jalahalli 2010-11 Construction of Gp rooms Construction of Gram Panchayat400000 Building 0 0 Completed Raichure Deodurga Jalahalli 2010-11 Formation of cc road From Ambedkar Cirkal ToBusstop CC Road 810000 0 0 Completed Raichure Deodurga Jalahalli 2010-11 Construction of protection wall samudaya bhavan At Jalahalli ward no3 Compound wall 75000 75000 75000 Completed Raichure Deodurga Jalahalli 2010-11 Construction of dywad katte At Jalahalli Community Hall 75000 75000 75000 Completed Raichure Deodurga Jeerabandi 2006-07 Formation of raod From salikyapur malaya temple to main road Solar System 32000 32000 0 Completed Raichure Deodurga Jeerabandi 2006-07 Formation of CC raod From Gudugurthi School to Mailari lingesha temple CC Road 80000 80000 0 Completed Raichure Deodurga Jeerabandi 2006-07 Implimentation of Shabadi tiles Up to jerabandi chaluvadi thamamma temple BS Slabs flooring 35000 35000 35000 Completed Raichure Deodurga Jeerabandi 2006-07 Implimentation of tiles at sc st collony sugral other works 40000 40000 40000 Completed Raichure Deodurga Jeerabandi 2006-07 Cunstruction of Drenege at SC collony Chikabudur Drainage 50000 50000 50000 Completed Raichure Deodurga Jeerabandi 2006-07 Stone fiting from Chikabudur Village to Kurkihalli Village CC Road 60000 60000 60000 Completed Raichure Deodurga K.irabgera 2006-07 Formation of Water Supply & Pump House Near SC.Collony At Kothigudda Drinking Water Supply 50000 50000 50000 Completed Raichure Deodurga K.irabgera 2006-07 Implimentation of Water Supply At Iligeradoddi Drinking Water Supply 229000 229000 229000 Completed Raichure Deodurga K.irabgera 2006-07 Implimentation of Water Supply From Bassanna At Bhimarayadoddi Drinking Water Supply 371000 371000 371000 Completed Raichure Deodurga K.irabgera 2007-08 IEC IEC 22000 22000 0 Completed Raichure Deodurga K.irabgera 2007-08 New Boarwell At Jakalardoddi Borewell Work 49000 25450 25450 Completed Raichure Deodurga K.irabgera 2007-08 Implimentation of Shabadi Tailes At Kalappana Thanda BS Slabs flooring 100000 97791 97791 Completed Raichure Deodurga K.irabgera 2007-08 Construction of Busstan At Manashayannadoddi Bus Stand 150000 150000 150000 Completed Raichure Deodurga K.irabgera 2007-08 Water suply Near Amaranna Doddi At K.Irabgera Drinking Water Supply 200000 189825 189825 Completed Raichure Deodurga K.irabgera 2007-08 Construction of Toilet At Manasagal Construction of Toilet 200000 198904 198904 Completed Raichure Deodurga K.irabgera 2007-08 Construction of Anganwadi room At H.N.Thanda Anganavadi building 200000 198932 198932 Completed Raichure Deodurga K.irabgera 2008-09 Anganavadi building Anganavadi building 250000 79000 79000 Progress Raichure Deodurga K.irabgera 2008-09 CC Road CC Road 200000 198259 198259 Completed Raichure Deodurga K.irabgera 2008-09 CC Road CC Road 200000 199136 199136 Completed Raichure Deodurga K.irabgera 2008-09 Drinking Water Supply Drinking Water Supply 237000 232065 232065 Completed Raichure Deodurga K.irabgera 2008-09 CC Road CC Road 250000 249807 249807 Completed Raichure Deodurga K.irabgera 2008-09 CC Road CC Road 300000 296595 296595 Completed Raichure Deodurga K.irabgera 2009-10 Construction of public toilet Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga K.irabgera 2009-10 Construction of public toilet At kalappana Thanda Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga K.irabgera 2009-10 Formation of cc roadf At K.Irabgera CC Road 200000 200000 200000 Completed Raichure Deodurga K.irabgera 2009-10 Construction of busstan At karimardi Bus Stand 235000 235000 235000 Completed Raichure Deodurga K.irabgera 2009-10 Formation of cc roadf AtGuta thanda CC Road 300000 300000 300000 Completed Raichure Deodurga 2006-07 Formation of cc Road From Nadagouda House To Borevell At Hanchasugur CC Road 60000 60000 0 Completed Raichure Deodurga Karadigudda 2006-07 Implimentation of Shabad Tiles From Gopala Pura Nagapa House To Yallama Temple BS Slabs flooring 62000 62000 0 Completed Raichure Deodurga Karadigudda 2006-07 Formation of cc Road From Anjala Jedappa House To Mudurangappa CC Road 40000 40000 40000 Completed Raichure Deodurga Karadigudda 2006-07 Formation of cc Road From Chandraya House To Mudkappa CC Road 62000 62000 62000 Completed Raichure Deodurga Karadigudda 2006-07 Formation of cc Road From Chalavadi agsi To Kumbar paparamanna thippi CC Road 90000 90000 90000 Completed Raichure Deodurga Karadigudda 2006-07 Formation of cc Road Near Maremma Temple At Karigudda CC Road 100000 100000 100000 Completed Raichure Deodurga Karadigudda 2006-07 Formation of cc Road Near Ramanna Mata At Karigudda CC Road 100000 100000 100000 Completed Raichure Deodurga Karadigudda 2006-07 Construction of ladies toilet at vengalapur Construction of Toilet 100000 100000 100000 Completed Raichure Deodurga Karadigudda 2007-08 Implimentation of tailes From Sirime Savaya House To Kadapeyar House At Karigudda BS Slabs flooring 94000 94000 0 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road From Vengalapur Murigemma Temple CC Road 98000 98000 0 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road from Juma Maszid To Agsi CC Road 99000 99000 0 Completed Raichure Deodurga Karadigudda 2007-08 Construction of protection wall from mazid to Agsi Compound wall 48000 48000 48000 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road At Chaluvadi CC Road 48000 48000 48000 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road From Hanumanthraya House To Agsi CC Road 48000 48000 48000 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road from Maremm temple To Rayappa House CC Road 48000 48000 48000 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road from opala pur Main Road To Pamareddy CC Road 48000 48000 48000 Completed Raichure Deodurga Karadigudda 2007-08 Construction of stups At Anjalla other works 48000 48000 48000 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road Sc collony At Anchesoogur CC Road 96000 96000 96000 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road From anjinayya Temple To Kangal Balayya CC Road 98000 98000 98000 Completed Raichure Deodurga Karadigudda 2007-08 Formation of cc road From Vengalapur Hobanayak Thanda CC Road 98000 98000 98000 Completed Formation of cc road from basapa houe to Paramayya House Mallaya House To Shivayya House At Raichure Deodurga Karadigudda 2007-08 CC Road 99000 99000 99000 Completed Karigudda Raichure Deodurga Karadigudda 2008-09 IEC IEC 12000 0 0 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 45000 38192 0 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 45000 38207 0 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 45000 38208 0 Completed Raichure Deodurga Karadigudda 2008-09 CC Road and Drainage CC Road and Drainage 50000 43175 0 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 60000 51476 0 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 59000 58660 0 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 70000 59819 0 Completed Raichure Deodurga Karadigudda 2008-09 Kitchen Room Kitchen Room 100000 87307 0 Completed Raichure Deodurga Karadigudda 2008-09 Construction of Toilet Construction of Toilet 200000 176553 0 Completed Raichure Deodurga Karadigudda 2008-09 Construction of Toilet Construction of Toilet 200000 200000 0 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 40000 34809 34809 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 50000 38221 38221 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 50000 43175 43175 Completed Raichure Deodurga Karadigudda 2008-09 CC Road CC Road 45000 43204 43204 Completed Raichure Deodurga Karadigudda 2009-10 Implimentation of tailes NearMarigemma templi At Adavadigi BS Slabs flooring 100000 100000 0 Completed Raichure Deodurga Karadigudda 2009-10 Formation of water thoti Maligouder Doddi At Karigudda Water Tank 100000 100000 0 Completed Raichure Deodurga Karadigudda 2009-10 Implimentation of tailes Near Somalapur temple At Karadigudda BS Slabs flooring 125000 125000 0 Completed Raichure Deodurga Karadigudda 2009-10 Formation of cc road & Dreneg At vengalapur thimedoddi CC Road and Drainage 100000 100000 100000 Completed Raichure Deodurga Karadigudda 2009-10 Formation of cc road from durgamma temple To anjinaya Temple At Anjala Village CC Road 100000 100000 100000 Completed Raichure Deodurga Karadigudda 2009-10 Formation of cc road From nigappa sugur place to Chandrapathni At Anchesugur CC Road 100000 100000 100000 Completed Raichure Deodurga Karadigudda 2009-10 Formation of cc road Vengalpur Subbana Manathanda CC Road 100000 100000 100000 Completed Raichure Deodurga Karadigudda 2009-10 Implimentation of tailes Near Sc Ward At Anjala Village BS Slabs flooring 125000 125000 125000 Completed Raichure Deodurga Karadigudda 2009-10 Formation of cc road & Dreneg Badepa House To Honnapa House At GopalaPur CC Road and Drainage 200000 200000 200000 Completed Raichure Deodurga Karadigudda 2010-11 Formation of cc road from Chandrappa House To Bavasab Shop At Anchesugur CC Road 40000 40000 40000 Completed Raichure Deodurga Karadigudda 2010-11 Formation of cc road from thipanna house to Shivappa Hosu At Karigudda CC Road 40000 40000 40000 Completed Raichure Deodurga Karadigudda 2010-11 Formation of cc road Yalama temple CC Road 40000 40000 40000 Completed Raichure Deodurga Karadigudda 2010-11 Water Arengment In Summer Drinking Water Supply 40000 40000 40000 Completed Raichure Deodurga Karadigudda 2010-11 Solar arengment in computer room in gp Solar System 40000 40000 40000 Completed Raichure Deodurga Karadigudda 2010-11 Implimentation of Tailes From Gardi House To Chovdi At Anjalapur BS Slabs flooring 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Implimentation of Tailes Kanchamma Temple BS Slabs flooring 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Implimentation of Tailes Herur House To Chikabudur BS Slabs flooring 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Formation of cc road At Paramananda temple CC Road 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Formation of cc road From Agsi To School At Gopulapur CC Road 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Formation of cc road From Nrb Collony To Halat hanmanthraya House CC Road 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Formation of cc road ranganna agsi At Anjalapur CC Road 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Protection wall sidappa temple At Anjalapur CC Road 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Implimentation of dreneg Kenchamma temple To Mallama house drainage 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Implimentaion of pipe line Karigudda Pipeline 45000 45000 45000 Completed Raichure Deodurga Karadigudda 2010-11 Formation of cc road rParshram House To Dyvappa House CC Road 50000 50000 50000 Completed Raichure Deodurga Karadigudda 2010-11 Implimentation of water tank & pipe line At Gundarudoddi Water Tank 50000 50000 50000 Completed Raichure Deodurga Karadigudda 2010-11 Implimentation of water tank & pipe line At Guledgudda Water Tank 55000 55000 55000 Completed Raichure Deodurga Karigudda 2006-07 Construction of Ladies Toilet at: Bhagur Construction of Toilet 85000 85000 0 Completed Raichure Deodurga Karigudda 2006-07 Construction of bus stand at: Herundi Village Bus Stand 88000 88000 0 Completed Raichure Deodurga Karigudda 2006-07 Formation of CC Road at: Medinapur Village CC Road 43000 43000 43000 Completed Raichure Deodurga Karigudda 2006-07 Formation of Roof aganavadi Bullding at:Navilugudda village Anganavadi building 50000 50000 50000 Completed Raichure Deodurga Karigudda 2006-07 Construction of Kichen room LPS amrapur village Kitchen Room 50000 50000 50000 Completed Raichure Deodurga Karigudda 2006-07 Construction of Ladies Toilet at: Herundi Construction of Toilet 60000 60000 60000 Completed Raichure Deodurga Karigudda 2006-07 Construction of Ladies Toilet at: Mudugot Construction of Toilet 85000 85000 85000 Completed Raichure Deodurga Karigudda 2006-07 Construction of Ladies Toilet at: Navilugudda Construction of Toilet 85000 85000 85000 Completed Raichure Deodurga Karigudda 2006-07 Construction of GP Building Construction of Gram Panchayat100000 Building 100000 100000 Completed Raichure Deodurga Karigudda 2007-08 Forwarding formation of GP building Construction of Gram Panchayat100000 Building 100000 0 Completed Raichure Deodurga Karigudda 2007-08 Construction of Angan vadi building at Nilavanji Anganavadi building 200000 200000 0 Completed Raichure Deodurga Karigudda 2007-08 Construction of bus stop at aramapur Bus Stand 200000 200000 0 Completed Raichure Deodurga Karigudda 2007-08 IEC IEC 15000 15000 15000 0 Raichure Deodurga Karigudda 2007-08 Formation of dreneg from yallama temple to kenchama House Drainage 100000 100000 100000 Completed Raichure Deodurga Karigudda 2008-09 BS Slabs flooring BS Slabs flooring 50000 50000 0 Completed Raichure Deodurga Karigudda 2008-09 Compound wall Compound wall 125000 125000 0 Completed Raichure Deodurga Karigudda 2008-09 CC Road CC Road 200000 200000 0 Completed Raichure Deodurga Karigudda 2008-09 Compound wall Compound wall 200000 200000 0 Progress Raichure Deodurga Karigudda 2008-09 CC Road CC Road 71000 71000 71000 Completed Raichure Deodurga Karigudda 2008-09 Construction of Toilet Construction of Toilet 80000 80000 80000 Completed Raichure Deodurga Karigudda 2008-09 BS Slabs flooring BS Slabs flooring 80000 80000 80000 Completed Raichure Deodurga Karigudda 2008-09 BS Slabs flooring BS Slabs flooring 80000 80000 80000 Completed Raichure Deodurga Karigudda 2008-09 BS Slabs flooring BS Slabs flooring 80000 80000 80000 Completed Raichure Deodurga Karigudda 2008-09 CC Road CC Road 130000 130000 130000 Completed Raichure Deodurga Karigudda 2008-09 CC Road CC Road 130000 130000 130000 Completed

Raichure Deodurga Karigudda 2009-10 Implimentation of Ston piching From Shivappa House To Shivamma House At Mudugot Pitching Work 50000 49874 0 Completed

Raichure Deodurga Karigudda 2009-10 Formation of dreneg From Basann gouda House To Balaya House At Navilugunda Drainage 57000 56841 0 Completed Raichure Deodurga Karigudda 2009-10 Implimentation of Ston piching From School to Agsar ward At Mudugot School Compound and Buildings57000 56841 0 Completed Raichure Deodurga Karigudda 2009-10 Formation of dreneg Manappa House To Husenappa House Drainage 64000 63254 0 Completed Raichure Deodurga Karigudda 2009-10 Construction of school At Nilavangi School Compound and Buildings114000 112698 0 Completed Raichure Deodurga Karigudda 2009-10 Construction of School room At Bagur School Compound and Buildings114000 113524 0 Completed Raichure Deodurga Karigudda 2009-10 Construction of laibrari At Herundi Construction Of Library 121000 119874 0 Completed Raichure Deodurga Karigudda 2009-10 Construction of Water Thoti near water tank At Herundi Water Tank 50000 49020 49020 Completed Raichure Deodurga Karigudda 2009-10 Formation of cc road from Maruthi temple To Durgamma Temple At Amarapur CC Road 57000 56841 56841 Completed Raichure Deodurga Karigudda 2009-10 Formation of cc road from Sharanappa Gouda House To Poojari House At Jambaladinni CC Road 57000 56841 56841 Completed Raichure Deodurga Karigudda 2009-10 Construction of school At Nilavangi School Compound and Buildings173000 172569 172569 Completed Raichure Deodurga Karigudda 2010-11 Construction of school bullding At Herundi School Compound and Buildings20000 20000 0 Completed Raichure Deodurga Karigudda 2010-11 Formation of cc road At Mudugot CC Road 30000 30000 0 Completed Raichure Deodurga Karigudda 2010-11 Formation of cc road from Hanuman temle To Medanapur CC Road 30000 30000 0 Completed Raichure Deodurga Karigudda 2010-11 Formation of cc road from Shivappa House ToHanumappa House CC Road 30000 30000 0 Completed Raichure Deodurga Karigudda 2010-11 Implimentation of ston piching At Jambaladinni Pitching Work 33000 33000 0 Completed Raichure Deodurga Karigudda 2010-11 Water arengement in summer Drinking Water Supply 38000 38000 0 Completed Raichure Deodurga Karigudda 2010-11 GP Solar Arenment for system Solar System 38000 38000 0 Completed Raichure Deodurga Karigudda 2010-11 Water Tank Opp Of Gp Water Tank 40000 40000 0 Completed Raichure Deodurga Karigudda 2010-11 Implimentation of ston piching At Kardigudda Pitching Work 56000 56000 0 Completed Raichure Deodurga Karigudda 2010-11 Formation of cc road At Amrapur CC Road 30000 30000 30000 Completed Raichure Deodurga Karigudda 2010-11 New water tank ST collony At Navilugudda Water Tank 40000 40000 40000 Completed Raichure Deodurga Karigudda 2010-11 Fromation of dreneg At Bagur Drainage 45000 45000 45000 Completed Raichure Deodurga Karigudda 2010-11 Formation of cc road At Nilavanji CC Road 50000 50000 50000 Completed Raichure Deodurga Karigudda 2010-11 New water tank At Mudugot Water Tank 50000 50000 50000 Completed Raichure Deodurga Karigudda 2010-11 Formation of cc road from Shivappa House To Dasarayya CC Road 56000 56000 56000 Completed Raichure Deodurga Koppar 2006-07 IEC IEC 25000 25000 0 Completed Raichure Deodurga Koppar 2006-07 Formation of From Muslim Street To Maruthi Temple other works 39000 39000 0 Completed Raichure Deodurga Koppar 2006-07 Construction of Kichen Room LPS Arashingi Kitchen Room 50000 50000 0 Completed Raichure Deodurga Koppar 2006-07 Formation Of CC Road Maruthi Temple To Koppar Road CC Road 100000 100000 0 Completed Raichure Deodurga Koppar 2006-07 Construction of Dreneg From GP To Old Dreneg At Koppar Village Drainage 100000 100000 0 Completed Raichure Deodurga Koppar 2006-07 Construction of Drenege From From Muslim Street To Riwer Way Drainage 100000 100000 0 Completed Raichure Deodurga Koppar 2006-07 Construction Of Ladies Toilet At Kurukihalli Village Construction of Toilet 50000 50000 50000 Completed Raichure Deodurga Koppar 2006-07 Construction Of Ladies Toilet At Arshingi Village Construction of Toilet 50000 50000 50000 Completed Raichure Deodurga Koppar 2006-07 Formation Of CC Road From SC Street to Durga CC Road 75000 75000 75000 Completed Raichure Deodurga Koppar 2006-07 Implimentation Of Road From Kuruki Halli To Yatagal CC Road 100000 100000 100000 Completed Raichure Deodurga Koppar 2007-08 IEC IEC 15000 15000 0 Completed Raichure Deodurga Koppar 2007-08 formation of dreneg from water tank to road at ramnal Water Tank 36000 36000 0 Completed Raichure Deodurga Koppar 2007-08 Formation of cc road from gouder hous to maruthi temple At Honur CC Road 46000 46000 0 Completed Raichure Deodurga Koppar 2007-08 Formation of cc road from maruthi temple to school at Ramnal CC Road 100000 100000 0 Completed Raichure Deodurga Koppar 2007-08 formation of dreneg from gouda house to muslim ward Drainage 100000 100000 0 Completed Raichure Deodurga Koppar 2007-08 Koppar water tank to deodurga road Water Tank 100000 100000 0 Completed Raichure Deodurga Koppar 2007-08 Implimentation of water pipe line at parthapur Pipeline 50000 50000 50000 Completed Raichure Deodurga Koppar 2007-08 Construction of cc road from busstand to sc ward CC Road 75000 75000 75000 Completed Raichure Deodurga Koppar 2007-08 formation of cc road at SC ward CC Road 100000 100000 100000 Completed Raichure Deodurga Koppar 2007-08 Construction of ladies toilet at yamnal Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Koppar 2008-09 IEC IEC 20000 20000 0 Completed Raichure Deodurga Koppar 2008-09 Drinking Water Supply Drinking Water Supply 100000 100000 0 Completed Raichure Deodurga Koppar 2008-09 Drainage Drainage 100000 100000 0 Completed Raichure Deodurga Koppar 2008-09 CC Road CC Road 100000 100000 0 Completed Raichure Deodurga Koppar 2008-09 BS Slabs flooring BS Slabs flooring 100000 100000 0 Completed Raichure Deodurga Koppar 2008-09 Kitchen Room Kitchen Room 80000 80000 80000 Completed Raichure Deodurga Koppar 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Koppar 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Koppar 2008-09 Check dam Check dam 100000 100000 100000 Completed Raichure Deodurga Koppar 2008-09 Bridge work Bridge work 150000 150000 150000 Completed Raichure Deodurga Koppar 2008-09 Construction of Toilet Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Koppar 2009-10 Formation of cc road From Dyvamma Temple To Maruthi temple AtYamnal CC Road 50000 50000 0 Completed Raichure Deodurga Koppar 2009-10 Formation of cc road From Temple To Maruthi temple At Hunoor CC Road 50000 50000 0 Completed Raichure Deodurga Koppar 2009-10 Formation of cc road From Gouder house To Nala At Arshingi CC Road 100000 100000 0 Completed Raichure Deodurga Koppar 2009-10 Formation of cc road From Shivappa krushna House To balappa House At Koppar CC Road 100000 100000 0 Completed Raichure Deodurga Koppar 2009-10 Construction of oli bank At Koppar other works 200000 200000 0 Completed Raichure Deodurga Koppar 2009-10 Construction of Stups At Koppar other works 50000 50000 50000 Completed Raichure Deodurga Koppar 2009-10 Formation of cc road From Deva temple To Sharanappa House CC Road 86000 86000 86000 Completed Raichure Deodurga Koppar 2009-10 Formation of cc road From Mariyappa Shopp To SC Ward well CC Road 100000 100000 100000 Completed Raichure Deodurga Koppar 2009-10 Formation of cc road From Somanna joladadigi To House To Old cc road CC Road 150000 150000 150000 Completed Raichure Deodurga Koppar 2009-10 Formation of cc road From Maruthi Temple To rever At Ramanal CC Road 200000 200000 200000 Completed Raichure Deodurga Koppar 2010-11 Solar Power for Computer lab At gp Solar System 38000 38000 0 Completed Raichure Deodurga Koppar 2010-11 Formation of dreneg & Plat Fomr At Kerkehalli Drainage 45000 45000 0 Completed Raichure Deodurga Koppar 2010-11 Formation of cc road From School To Main Road At Honoor CC Road 50000 50000 0 Completed Raichure Deodurga Koppar 2010-11 Fromation of cc road in muslim ward At Ramanal CC Road 70000 70000 0 Completed Raichure Deodurga Koppar 2010-11 Cika nirmana At Kurkihalli other works 100000 100000 0 Completed Raichure Deodurga Koppar 2010-11 Formation of dreneg at Yamnal Drainage 35000 35000 35000 Completed Raichure Deodurga Koppar 2010-11 Formation of cc road From sharanapa savkar House To Hanumantha At Parthapur CC Road 40000 40000 40000 Completed Raichure Deodurga Koppar 2010-11 Summer Water Arengment At Koppar Drinking Water Supply 40000 40000 40000 Completed Raichure Deodurga Koppar 2010-11 Formation of dreneg Basappa House To Maszid At Arshangi Drainage 92000 92000 92000 Completed Raichure Deodurga Koppar 2010-11 Formation of dreneg At Koppar Drainage 150000 150000 150000 Completed Raichure Deodurga Kothadoddi 2006-07 Construction of Toilets At Kothadoddi(Govt Land) Construction of Toilet 133000 133000 0 Completed Raichure Deodurga Kothadoddi 2006-07 Construction of Toilets At Malinayakanadoddi(Govt Land) Construction of Toilet 76000 76000 76000 Completed Raichure Deodurga Kothadoddi 2006-07 Construction of Toilets At H.Katamali(Govt Land) Construction of Toilet 76000 76000 76000 Completed Raichure Deodurga Kothadoddi 2006-07 Construction of Toilets At Hemanur(Govt Land) Construction of Toilet 76000 76000 76000 Completed Raichure Deodurga Kothadoddi 2006-07 Construction of Toilets At Yelladoddi(Govt Land) Construction of Toilet 76000 76000 76000 Completed Raichure Deodurga Kothadoddi 2006-07 Construction of Toilets At Kachapur(Govt Land) Construction of Toilet 76000 76000 76000 Completed Raichure Deodurga Kothadoddi 2006-07 Construction of Toilets At Kothadoddi(Govt Land) Construction of Toilet 76000 76000 76000 Completed Raichure Deodurga Kothadoddi 2007-08 IEC IEC 15000 15000 0 Completed Raichure Deodurga Kothadoddi 2007-08 Construction of Anganwadi At Kothadoddi Anganavadi building 200000 200000 0 Completed Raichure Deodurga Kothadoddi 2007-08 Formation of dreneg From Busstan To Sc Ward At Mallinayakanadoddi Drainage 50000 50000 50000 Completed Raichure Deodurga Kothadoddi 2007-08 Formation of dreneg From New Bour to Old Bour At Honnakatamalli Drainage 50000 50000 50000 Completed Raichure Deodurga Kothadoddi 2007-08 Formation of Dreneg From Mini water Tank To Kenal At Yalladoddi Water Tank 50000 50000 50000 Completed

Raichure Deodurga Kothadoddi 2007-08 Implimentation of Shabadi Tailes from Agsi To Dyavamma temple At Halli mallinayakanadoddi BS Slabs flooring 100000 100000 100000 Completed

Raichure Deodurga Kothadoddi 2007-08 Maremma temple To Dyavamma Temple At Hemnur other works 129000 129000 129000 Completed Raichure Deodurga Kothadoddi 2007-08 Formation of cc road From basavanna Kate To Sugappa shop At Kothadodi CC Road 300000 300000 300000 Completed Raichure Deodurga Kothadoddi 2008-09 CC Road CC Road 200000 200000 0 Completed Raichure Deodurga Kothadoddi 2008-09 CC Road CC Road 200000 200000 0 Completed Raichure Deodurga Kothadoddi 2008-09 CC Road CC Road 250000 250000 0 Completed Raichure Deodurga Kothadoddi 2008-09 BS Slabs flooring BS Slabs flooring 95000 95000 200000 Completed Raichure Deodurga Kothadoddi 2008-09 Check dam Check dam 200000 200000 200000 Completed Raichure Deodurga Kothadoddi 2008-09 Construction of Toilet Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Kothadoddi 2009-10 IEC IEC 15000 15000 0 Completed Raichure Deodurga Kothadoddi 2009-10 Formation of cc road near bandekatti block no3 At kothadoddi CC Road 100000 100000 0 Completed Raichure Deodurga Kothadoddi 2009-10 Formation of cc road Maremma temple To thegihal At Hemnoor CC Road 150000 150000 0 Completed Raichure Deodurga Kothadoddi 2009-10 Implimentation of ston pinching near shivappa house At kothodi Pitching Work 60000 60000 60000 Completed Raichure Deodurga Kothadoddi 2009-10 Formation of cc road Makanna house to Kobbana House At Yaladoddi CC Road 75000 75000 75000 Completed Raichure Deodurga Kothadoddi 2009-10 Formation of cc road from rayappa house to Kakarga bande At Honnakatamalli CC Road 150000 150000 150000 Completed Raichure Deodurga Kothadoddi 2009-10 Formation of cc road Babbanna House To main road At Kotthadoddi CC Road 300000 300000 300000 Completed Raichure Deodurga Kothadoddi 2010-11 Solar arengment in gp for computer Solar System 40000 40000 40000 Completed Raichure Deodurga Kothadoddi 2010-11 Water arengment in summer Drinking Water Supply 43000 43000 43000 Completed Raichure Deodurga Kothadoddi 2010-11 Implimentation of Plat form At Malinayaknathanda other works 45000 45000 45000 Completed Raichure Deodurga Kothadoddi 2010-11 Construction of New kondwada At Kothadoddi other works 60000 60000 60000 Completed Raichure Deodurga Kothadoddi 2010-11 Formation of cc road At Kachpur CC Road 80000 80000 80000 Completed Raichure Deodurga Kothadoddi 2010-11 Formation of cc road Yalladoddi CC Road 90000 90000 90000 Completed Raichure Deodurga Kothadoddi 2010-11 Construction of Dobighatr At Hemnoor Dhobi Ghat 90000 90000 90000 Completed Raichure Deodurga Kothadoddi 2010-11 Formation of cc road At Hemnoor CC Road 95000 95000 95000 Completed Raichure Deodurga Kothadoddi 2010-11 Formation of cc road from Malenayakana doddi To Halemalli CC Road 170000 170000 170000 Completed Raichure Deodurga Kothadoddi 2010-11 Fromation of dreneg At Kothadoddi Drainage 170000 170000 170000 Completed Raichure Deodurga 2006-07 Drilling of new boarvells at Kyadigera Village Borewell Work 20000 20000 0 Completed Raichure Deodurga Kyadigera 2006-07 Purchese of New water suply Moters Drinking Water Supply 30000 30000 0 Completed Raichure Deodurga Kyadigera 2006-07 Implimentation of Pipe line at Kyadigera Village Pipeline 61000 61000 0 Completed Raichure Deodurga Kyadigera 2006-07 Drilling of new boarvells at Ganapathi thanda Borewell Work 18500 18500 18500 Completed Raichure Deodurga Kyadigera 2006-07 Drilling of new boarvells at Hullakabanda Borewell Work 18500 18500 18500 Completed Raichure Deodurga Kyadigera 2006-07 Drilling of new boarvells at Myagala kurlardoddi Borewell Work 18500 18500 18500 Completed Raichure Deodurga Kyadigera 2006-07 Drilling of new boarvells at kurlardoddi Borewell Work 18500 18500 18500 Completed Raichure Deodurga Kyadigera 2006-07 Drilling of new boarvells at Bageradoddi Village Borewell Work 20000 20000 20000 Completed Raichure Deodurga Kyadigera 2006-07 Drilling of new boarvells and Pipe line at Jundanayak Thanda Pipeline 36500 36500 36500 Completed Raichure Deodurga Kyadigera 2006-07 Drilling of new boarvells at singeradoddi Borewell Work 37000 37000 37000 Completed Raichure Deodurga Kyadigera 2006-07 Construction of toilet at Shavanthagal Village Construction of Toilet 37000 37000 37000 Completed Raichure Deodurga Kyadigera 2006-07 Construction of toilet at Shavanthagal Village Construction of Toilet 37000 37000 37000 Completed Raichure Deodurga Kyadigera 2006-07 Construction of toilet at Shavanthagal Village Construction of Toilet 37000 37000 37000 Completed Raichure Deodurga Kyadigera 2006-07 Drilling of new boarvells at AG.Collony Village Borewell Work 55500 55500 55500 Completed Raichure Deodurga Kyadigera 2006-07 Construction of drenege from school to Shanthappa House School Compound and Buildings55500 55500 55500 Completed Raichure Deodurga Kyadigera 2006-07 Construction of drenege from school to Nala School Compound and Buildings55500 55500 55500 Completed Raichure Deodurga Kyadigera 2006-07 Formation of New Road From Anjinaya Temple To Bumungunda Road CC Road 111000 111000 111000 Completed Raichure Deodurga Kyadigera 2007-08 IEC IEC 15000 15000 0 Completed Raichure Deodurga Kyadigera 2007-08 Formation of cc road From Sabannagowda House to Govindraya land At shavanthgal CC Road 180000 180000 0 Completed Raichure Deodurga Kyadigera 2007-08 Formation of dreneg fron potagowdar house to veternery hospital Drainage 180000 180000 0 Completed Raichure Deodurga Kyadigera 2007-08 Construction of Public toilet At Kurlerdoddi Construction of Toilet 200000 200000 0 Completed Raichure Deodurga Kyadigera 2007-08 Formation of road up to jundenayak Thanda At Durganayak Thanda CC Road 180000 180000 180000 Completed Raichure Deodurga Kyadigera 2007-08 Construction of Houses At ward No 6 other works 180000 180000 180000 Completed Raichure Deodurga Kyadigera 2008-09 CC Road CC Road 50000 50000 0 Completed Raichure Deodurga Kyadigera 2008-09 CC Road CC Road 82000 82000 0 Completed Raichure Deodurga Kyadigera 2008-09 Construction of Toilet Construction of Toilet 200000 200000 0 Completed Raichure Deodurga Kyadigera 2008-09 CC Road CC Road 25000 25000 25000 Completed Raichure Deodurga Kyadigera 2008-09 Borewell Work Borewell Work 35000 35000 35000 Completed Raichure Deodurga Kyadigera 2008-09 Borewell Work Borewell Work 35000 35000 35000 Completed Raichure Deodurga Kyadigera 2008-09 Borewell Work Borewell Work 35000 35000 35000 Completed Raichure Deodurga Kyadigera 2008-09 Borewell Work Borewell Work 35000 35000 35000 Completed Raichure Deodurga Kyadigera 2008-09 Borewell Work Borewell Work 35000 35000 35000 Completed Raichure Deodurga Kyadigera 2008-09 Borewell Work Borewell Work 35000 35000 35000 Completed Raichure Deodurga Kyadigera 2008-09 Borewell Work Borewell Work 40000 40000 40000 Completed Raichure Deodurga Kyadigera 2008-09 Borewell Work Borewell Work 40000 40000 40000 Completed Raichure Deodurga Kyadigera 2008-09 Drainage Drainage 75000 75000 75000 Completed Raichure Deodurga Kyadigera 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Kyadigera 2008-09 CC Road CC Road 125000 125000 125000 Completed Raichure Deodurga Kyadigera 2008-09 Construction of Toilet Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Kyadigera 2008-09 Anganavadi building Anganavadi building 250000 250000 250000 Completed Raichure Deodurga Kyadigera 2009-10 Formation of Dreneg At Rajiv gandi Drainage 150000 150000 0 Completed Raichure Deodurga Kyadigera 2009-10 Formation of cc road From Shavanthgal School To Maremkma Temple At Shavanthgal CC Road 180000 180000 0 Completed Raichure Deodurga Kyadigera 2009-10 Implimentation of shabadi tailes At Jambanayak BS Slabs flooring 80000 80000 80000 Completed Raichure Deodurga Kyadigera 2009-10 Formation of cc road At Sofi nayak Thanda CC Road 180000 180000 180000 Completed Raichure Deodurga Kyadigera 2009-10 Formation of cc road Kaple katti Bandigera To pulls Doddi Kydigera CC Road 180000 180000 180000 Completed Raichure Deodurga Kyadigera 2009-10 Formation of raod At M.g.Collony CC Road 180000 180000 180000 Completed Raichure Deodurga Kyadigera 2009-10 Formation of cc road At Damlanayak thanda CC Road 200000 200000 200000 Completed Raichure Deodurga Kyadigera 2010-11 Water Arengment In summer Drinking Water Supply 38000 38000 0 Completed Raichure Deodurga Kyadigera 2010-11 Implimentation of Hand pump At Mukalagudda Drinking Water Supply 40000 40000 0 Completed Raichure Deodurga Kyadigera 2010-11 Solar aaaaaaaapower areng Ment for Computer Lab At Gp Solar System 40000 40000 0 Completed Raichure Deodurga Kyadigera 2010-11 Formatio of dreneg Rajivgandi Main Road To Muslim Ward Drainage 110000 110000 0 Completed Raichure Deodurga Kyadigera 2010-11 Teo Power Pole At Kydigera Solar System 135000 135000 0 Completed Raichure Deodurga Kyadigera 2010-11 Construction of drenege At M.G.Collony Mylugl Drainage 40000 40000 40000 Completed Raichure Deodurga Kyadigera 2010-11 Implimentation of Hand pump At Kydigera Koli Camp Drinking Water Supply 40000 40000 40000 Completed Raichure Deodurga Kyadigera 2010-11 Implimentation of Hand pump At Sopinayak thanda Drinking Water Supply 40000 40000 40000 Completed Raichure Deodurga Kyadigera 2010-11 Implimentation of Hand pump At Durganayak Thanda Drinking Water Supply 40000 40000 40000 Completed Raichure Deodurga Kyadigera 2010-11 Imlimentation of tailes Mishin Vwnkoba House To Mayappa House BS Slabs flooring 60000 60000 60000 Completed Raichure Deodurga Kyadigera 2010-11 Formation of cc road At Hanumanayak Thanda CC Road 60000 60000 60000 Completed Raichure Deodurga Kyadigera 2010-11 Formatio of dreneg At Bhimanayak Thanda Drainage 110000 110000 110000 Completed Raichure Deodurga Kyadigera 2010-11 Formatio of dreneg Ganapathi thanda To Bhimanayak Thanda Drainage 110000 110000 110000 Completed

Raichure Deodurga Maladakal 2006-07 Implimentation of CC Road From Chandrappa House To Hanmappa House At Karadigudda CC Road 71000 71000 0 Completed

Raichure Deodurga Maladakal 2006-07 Implimentation of CC Road From Agsi To Govindrao Desai House CC Road 120000 120000 0 Completed Raichure Deodurga Maladakal 2006-07 IEC IEC 1000 1000 1000 0 Raichure Deodurga Maladakal 2006-07 Implimentation of CC Road From Agsi To Rudregouda House CC Road 120000 120000 120000 Completed Raichure Deodurga Maladakal 2006-07 Construction of Anganavadi Buillding At N.Ganekal Anganavadi building 150000 150000 150000 Completed Raichure Deodurga Maladakal 2006-07 Construction of CEC Buillding At Maladakal other works 150000 150000 150000 Completed

Raichure Deodurga Maladakal 2007-08 Formation occ road from Shekarappa Gouda House To Benebasavaraj House At Maladakal CC Road 80000 80000 0 Completed

Raichure Deodurga Maladakal 2007-08 Construction of Laibrari At Maladakal Construction Of Library 150000 150000 0 Completed Raichure Deodurga Maladakal 2007-08 Formation occ road from ganngamma House To Babaladi Hotel At Maladakal CC Road 80000 80000 80000 Completed Raichure Deodurga Maladakal 2007-08 Formation of road From chaluvadi Basavaraj To chaluvadi Hanmantha At Karadigudda CC Road 91000 91000 91000 Completed Raichure Deodurga Maladakal 2007-08 Construction of Continues permanent Education room At S.Ganekal IEC 150000 150000 150000 Completed Raichure Deodurga Maladakal 2007-08 Construction of anganwadi Near Basavanna temple At Maladakal Anganavadi building 200000 200000 200000 Completed Raichure Deodurga Maladakal 2008-09 CC Road CC Road 125000 125000 0 Completed Raichure Deodurga Maladakal 2008-09 CC Road CC Road 146000 146000 0 Completed Raichure Deodurga Maladakal 2008-09 CC Road CC Road 120000 120000 120000 Completed Raichure Deodurga Maladakal 2008-09 BS Slabs flooring BS Slabs flooring 165000 165000 165000 Completed Raichure Deodurga Maladakal 2008-09 CC Road and Drainage CC Road and Drainage 450000 450000 450000 Completed Raichure Deodurga Maladakal 2009-10 Contineud Construction of GP At Maladkal Construction of Gram Panchayat69000 Building 69000 0 Completed

Raichure Deodurga Maladakal 2009-10 Formation of cc road & Dreneg from dubaibhai Husainsab house To Babaldi Maszid At Maladkal CC Road and Drainage 700000 700000 0 Completed

Raichure Deodurga Maladakal 2009-10 Formation of cc road from agsi to Somangoudru house At Kardigudda CC Road 125000 125000 125000 Completed Raichure Deodurga Maladakal 2010-11 IEC IEC 18000 0 0 Completed Raichure Deodurga Maladakal 2010-11 Solar syster arengment in computer room in gp Solar System 40000 0 0 Completed Raichure Deodurga Maladakal 2010-11 Arengment of water in summer Drinking Water Supply 50000 0 0 Completed Raichure Deodurga Maladakal 2010-11 Implimentation of drarty water At Masidipur Drinking Water Supply 50000 0 0 Completed Raichure Deodurga Maladakal 2010-11 Construction of compund At GP Compound wall 145000 0 0 Completed Raichure Deodurga Maladakal 2010-11 Formation of cc road From bavi To Babaladi Masjid At Maladkal CC Road 150000 150000 150000 Completed Raichure Deodurga Maladakal 2010-11 Formation of cc road From Didi bavi To Sidalingeshwar House At Maladkal CC Road 150000 150000 150000 Completed Raichure Deodurga 2006-07 Construction of GP Buillding At Masarkal Villege Construction of Gram Panchayat580000 Building 580000 0 Completed Raichure Deodurga Masarkal 2007-08 IEC IEC 15000 15000 0 Completed Raichure Deodurga Masarkal 2007-08 Formation of construction of Gp Buillding At Masarkal Village Construction of Gram Panchayat45000 Building 45000 0 Completed Raichure Deodurga Masarkal 2007-08 Formation of cc road from hublibasavaraj House To School At Masarkal CC Road 60000 60000 0 Completed Raichure Deodurga Masarkal 2007-08 Formation of cc road from Mahebood Sab Katte To Kajanna Sahukar House CC Road 60000 60000 0 Completed Raichure Deodurga Masarkal 2007-08 Formation of Dreneg From Ndagouda Shivaraj House To rever Drainage 100000 100000 0 Completed Raichure Deodurga Masarkal 2007-08 Formation of cc road from Ismail House To Poted Budeppa House At Ward No1 CC Road 60000 60000 60000 Completed

Raichure Deodurga Masarkal 2007-08 Formation of cc road from Janatha Collony Yallama Temple To Bhimana House At Ward No2 CC Road 60000 60000 60000 Completed

Raichure Deodurga Masarkal 2007-08 Formation of cc road from Kameeti Hall To hadinal Rangappa House At Ward No2 CC Road 60000 60000 60000 Completed Raichure Deodurga Masarkal 2007-08 Formation of CC road From Maruthitemple To Dyvamma Temple CC Road 60000 60000 60000 Completed Raichure Deodurga Masarkal 2008-09 IEC IEC 15000 15000 0 Completed Raichure Deodurga Masarkal 2008-09 CC Road CC Road 100000 100000 0 Completed Raichure Deodurga Masarkal 2008-09 CC Road CC Road 148000 148000 0 Completed Raichure Deodurga Masarkal 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Masarkal 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Masarkal 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Masarkal 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Masarkal 2008-09 CC Road CC Road 140000 140000 140000 Completed Raichure Deodurga Masarkal 2008-09 CC Road CC Road 200000 200000 200000 Completed Raichure Deodurga Masarkal 2009-10 Formation of cc road from Sidappa gouda house to Abdul raheman House At ward No2 CC Road 90000 90000 0 Completed Raichure Deodurga Masarkal 2009-10 Formation of cc road from Sidappa gouda house to poojari ramaya gadige At Miyapur CC Road 90000 90000 0 Completed Raichure Deodurga Masarkal 2009-10 Formation of cc road from ismailsab house to Kyathnal nagappa House At ward1 CC Road 94000 94000 0 Completed

Raichure Deodurga Masarkal 2009-10 Formation of road froam chinthalakunte road to marilingeshwara temple At ward No 3 CC Road 95000 95000 0 Completed

Raichure Deodurga Masarkal 2009-10 IEC IEC 15000 15000 15000 Completed Raichure Deodurga Masarkal 2009-10 Formation of cc road from gundaral hanumanthraya House to agsi CC Road 90000 90000 90000 Completed Raichure Deodurga Masarkal 2009-10 Formation of cc road from Nigapa House To hanuman Temple At Chikahonnatgi CC Road 90000 90000 90000 Completed Raichure Deodurga Masarkal 2009-10 Construction of compount from public toilet to road At ward No1 Construction of Toilet 90000 90000 90000 Completed Raichure Deodurga Masarkal 2009-10 Formation of dreneg Laxappa main road At ward1 Drainage 90000 90000 90000 Completed Raichure Deodurga Masarkal 2009-10 Formation of dreneg udavi to murigeppa house At ward1 Drainage 90000 90000 90000 Completed Raichure Deodurga Masarkal 2010-11 IEC IEC 10000 0 0 Completed Raichure Deodurga Masarkal 2010-11 Solar Arengment in computer roon in gp Solar System 38000 0 0 Completed Raichure Deodurga Masarkal 2010-11 Arengment of water In Summer Drinking Water Supply 43000 0 0 Completed Raichure Deodurga Masarkal 2010-11 Implimentation of plat form near aladmara other works 43000 0 0 Completed Raichure Deodurga Masarkal 2010-11 Formation of cc road Ramareddeppa House To Agsi At Guntaral CC Road 76000 0 0 Completed Raichure Deodurga Masarkal 2010-11 Bussness complex At Masarkal Shopping mall 240000 0 0 Completed Raichure Deodurga Masarkal 2010-11 Formation of cc road Mallapa House To Mabubsab At Chikahonna kunti CC Road 76000 76000 76000 Completed Raichure Deodurga Masarkal 2010-11 Formation of cc road Polispatil House To Hanmanthraya patil At Yamiyapur CC Road 76000 76000 76000 Completed Raichure Deodurga Mundaragi 2006-07 Drilling of Borvel at: Katamali Village Borewell Work 40000 40000 0 Completed Raichure Deodurga Mundaragi 2006-07 Construction of Ladies Toilet at: Devathagudda Village Construction of Toilet 100000 100000 0 Completed Raichure Deodurga Mundaragi 2006-07 Construction of Ladies Toilet at: Mandalagudda Village Construction of Toilet 200000 200000 0 Completed Raichure Deodurga Mundaragi 2006-07 Drilling of Borvel at: Suladagudda Village Borewell Work 40000 40000 40000 Completed Raichure Deodurga Mundaragi 2006-07 Instalation of water system Near Dalapathi House at Huliguda Village Drinking Water Supply 50000 50000 50000 Completed Raichure Deodurga Mundaragi 2006-07 Construction of Ladies Toilet at: Village Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Mundaragi 2007-08 Formation of pipe line for drinking water at mandala gudda Drinking Water Supply 100000 0 0 Completed Raichure Deodurga Mundaragi 2007-08 Cunstruction of computer lab at mundargi Construction of Gram Panchayat55000 Building 57200 0 Completed Raichure Deodurga Mundaragi 2007-08 Formation of dreneg from thirupur joshi House to durgama house at mundargi Drainage 121000 120921 0 Completed Raichure Deodurga Mundaragi 2007-08 Cunstruction of veternary building at gajaladinni Hospital work 150000 149294 0 Completed Raichure Deodurga Mundaragi 2007-08 Construction of School Compound at Parapur School Compound and Buildings150000 149920 0 Completed Raichure Deodurga Mundaragi 2007-08 Clening of drinking water Tank At mandala gudda Water Tank 50000 38350 38350 Completed Raichure Deodurga Mundaragi 2007-08 formation of dreneg main road at gajaladinni Drainage 100000 99592 99592 Completed Raichure Deodurga Mundaragi 2007-08 Cunstruction of anganvadi room at suladgudda Anganavadi building 200000 197085 197085 Completed Raichure Deodurga Mundaragi 2008-09 Borewell Work Borewell Work 50000 39150 0 Completed Raichure Deodurga Mundaragi 2008-09 CC Road and Drainage CC Road and Drainage 150000 149643 0 Completed Raichure Deodurga Mundaragi 2008-09 Anganavadi building Anganavadi building 200000 198408 0 Completed Raichure Deodurga Mundaragi 2008-09 Shopping mall Shopping mall 300000 297252 0 Completed Raichure Deodurga Mundaragi 2008-09 Pipeline Pipeline 25000 24939 24939 Completed Raichure Deodurga Mundaragi 2008-09 CC Road CC Road 100000 99434 99434 Completed Raichure Deodurga Mundaragi 2008-09 CC Road CC Road 200000 198907 198907 Completed Raichure Deodurga Mundaragi 2008-09 CC Road CC Road 200000 198907 198907 Completed Raichure Deodurga Mundaragi 2009-10 Hand pump At Katapebhavi Drinking Water Supply 60000 0 0 Completed Raichure Deodurga Mundaragi 2009-10 Hand pump At Katapebhavi Drinking Water Supply 60000 0 0 Completed Raichure Deodurga Mundaragi 2009-10 Construction Toilet At Mundaregi Construction of Toilet 100000 0 0 Completed Raichure Deodurga Mundaragi 2009-10 Construction of GP Compound At Mundargi Compound wall 170000 169594 0 Completed Raichure Deodurga Mundaragi 2009-10 GP Expending At Mundargi other works 550000 549874 0 Completed Raichure Deodurga Mundaragi 2010-11 IEC IEC 16000 0 0 Completed Raichure Deodurga Mundaragi 2010-11 GP Solar Arengment Solar System 40000 0 0 Completed Raichure Deodurga Mundaragi 2010-11 Implimentation of Handpump At Mundargi Drinking Water Supply 50000 49759 0 Completed Raichure Deodurga Mundaragi 2010-11 Implimentation of Handpump AtMundargi Drinking Water Supply 50000 49759 0 Completed Raichure Deodurga Mundaragi 2010-11 Fromation of cc road from Nagappa House To Mallapa House At Ooti CC Road 60000 59229 0 Completed Raichure Deodurga Mundaragi 2010-11 Fromation of cc road from School to Swami house At Mundalagudda CC Road 100000 99461 0 Completed Raichure Deodurga Mundaragi 2010-11 Implimentation of Handpump At Dewvathkore Drinking Water Supply 100000 99778 0 Completed Raichure Deodurga Mundaragi 2010-11 Implimentation of hand pump & cleening of well At Huligudda Drinking Water Supply 50000 49759 49759 Completed Raichure Deodurga Mundaragi 2010-11 Implimentation of Handpump At Gajaladinni Drinking Water Supply 50000 49759 49759 Completed Raichure Deodurga Mundaragi 2010-11 Implimentation of Handpump At Ganajali Drinking Water Supply 50000 49936 49936 Completed Raichure Deodurga Mundaragi 2010-11 Implimentation of Handpump At Solada gudda Drinking Water Supply 50000 50000 50000 Completed Raichure Deodurga Mundaragi 2010-11 Fromation of dreneg & Stups At Parapur Village Drainage 100000 99758 99758 Completed Raichure Deodurga Mustur 2006-07 Constrction of Ladies Toilet At Hunugund Bhad Construction of Toilet 35000 35000 0 Completed Raichure Deodurga Mustur 2006-07 Construction of Drenege At Mushtur Village Drainage 35000 35000 0 Completed Raichure Deodurga Mustur 2006-07 Construction of Busstand At Shivanngi Village Bus Stand 100000 100000 0 Completed Raichure Deodurga Mustur 2006-07 Implimantation of Shabadi Tilese At Haladathi Dhrmanayak Thanda BS Slabs flooring 35000 35000 35000 Completed Raichure Deodurga Mustur 2006-07 Implimantation of Shabadi Tilese Near SC.Collony At Shakapur CC Road 35000 35000 35000 Completed Raichure Deodurga Mustur 2006-07 Construction of anganawadi Buillding At Pilligunda Village Anganavadi building 70000 70000 70000 Completed Raichure Deodurga Mustur 2006-07 Implimantation of Shabadi Tilese From Rachamma House To Agsi At Theggihal BS Slabs flooring 70000 70000 70000 Completed

Raichure Deodurga Mustur 2006-07 Formation of CC Road From Sabu Gouda House To Hanumanthraya House At Geggebavi CC Road 70000 70000 70000 Completed

Raichure Deodurga Mustur 2006-07 Implimantation of Systen At Jerabandi Village other works 70000 70000 70000 Completed Raichure Deodurga Mustur 2006-07 Construction of Toilet Near Ashraya Collony At Chinthalakunta Village Construction of Toilet 104000 104000 104000 Completed Raichure Deodurga Mustur 2007-08 IEC IEC 15000 15000 0 Completed Raichure Deodurga Mustur 2007-08 Anganwadi Construction At Shivanngi Anganavadi building 200000 200000 0 Completed Raichure Deodurga Mustur 2007-08 Construction of Fast Food Room At Theggihal Kitchen Room 60000 60000 60000 Completed Raichure Deodurga Mustur 2007-08 Implimentation of Shabadi Bande Jaradabanndi Villege BS Slabs flooring 70000 70000 70000 Completed Raichure Deodurga Mustur 2007-08 Construction of Water Tank And Pipe line At Pillagunnda Water Tank 70000 70000 70000 Completed Raichure Deodurga Mustur 2007-08 Implimentation of Shabadi Bande Harijana Ward At Thagihall BS Slabs flooring 75000 75000 75000 Completed Raichure Deodurga Mustur 2007-08 Formation of cc road From Badeger House To School At Gaggibhavi CC Road 100000 100000 100000 Completed Raichure Deodurga Mustur 2007-08 Formation of cc road From Mallapana House To Maruthi Temple At Chinthalakunnta CC Road 110000 110000 110000 Completed Raichure Deodurga Mustur 2008-09 IEC IEC 15000 15000 0 Completed Raichure Deodurga Mustur 2008-09 Drainage Drainage 50000 50000 0 Completed Raichure Deodurga Mustur 2008-09 Community Hall Community Hall 160000 160000 0 Completed Raichure Deodurga Mustur 2008-09 Construction Of Library Construction Of Library 200000 200000 0 Completed Raichure Deodurga Mustur 2008-09 CC Road CC Road 50000 50000 50000 Completed Raichure Deodurga Mustur 2008-09 CC Road CC Road 50000 50000 50000 Completed Raichure Deodurga Mustur 2008-09 BS Slabs flooring BS Slabs flooring 71000 71000 71000 Completed Raichure Deodurga Mustur 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Mustur 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Mustur 2008-09 Construction of Toilet Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Mustur 2008-09 Anganavadi building Anganavadi building 200000 200000 200000 Completed Raichure Deodurga Mustur 2009-10 IEC IEC 17000 17000 0 Completed Raichure Deodurga Mustur 2009-10 Implimentation of Water tank cover and katti At Hunugunda Water Tank 35000 35000 0 Completed Raichure Deodurga Mustur 2009-10 Implimentation of tailes At Mnohardoddi House To Honnapa House At Thegihall BS Slabs flooring 100000 100000 0 Completed Raichure Deodurga Mustur 2009-10 Formation of pipe line & shifter At Shivayatata gadige Gejjebhavi Pipeline 100000 100000 0 Completed Raichure Deodurga Mustur 2009-10 Construction of new room At Mushtur GP Construction of Gram Panchayat120000 Building 120000 0 Completed Raichure Deodurga Mustur 2009-10 Formation of cc road from govt school tokatta At Shivangi CC Road 130000 130000 0 Completed Raichure Deodurga Mustur 2009-10 Implimentation of water plate At Pilagunda Drinking Water Supply 40000 40000 40000 Completed Raichure Deodurga Mustur 2009-10 Implimentation of Tailes At Aldarthi BS Slabs flooring 50000 50000 50000 Completed Raichure Deodurga Mustur 2009-10 Implimentation of tailes AtSc collony Shakapur BS Slabs flooring 50000 50000 50000 Completed Raichure Deodurga Mustur 2009-10 Implimentation of Tailes At Pilagunda BS Slabs flooring 65000 65000 65000 Completed Raichure Deodurga Mustur 2009-10 Implimentation of Tailes At Dyvamma ward BS Slabs flooring 100000 100000 100000 Completed Raichure Deodurga Mustur 2009-10 Formation of cc road fromkette to bandigere rachappa house At Jaradabandi CC Road 100000 100000 100000 Completed Raichure Deodurga Mustur 2010-11 IEC IEC 15000 0 0 Completed Raichure Deodurga Mustur 2010-11 Formation of cc road From Aldarthi School To Karipa thatha CC Road 60000 0 0 Completed Raichure Deodurga Mustur 2010-11 Formation of cc road At Mushtur CC Road 90000 0 0 Completed Raichure Deodurga Mustur 2010-11 Formation of cc road Shivangi basaya house to janatha collony CC Road 120000 0 0 Completed Raichure Deodurga Mustur 2010-11 Under road From Gurudev House to Nilakanta rao house At Kanapur CC Road 40000 40000 40000 Completed Raichure Deodurga Mustur 2010-11 Formation of cc road From Anjinaya Temple To rever CC Road 80000 80000 80000 Completed Raichure Deodurga Mustur 2010-11 Formation of cc road From Hanumanthappa House At Pilagund CC Road 80000 80000 80000 Completed Raichure Deodurga Mustur 2010-11 Formation of cc road From School To Thatha Kate At Thegihal CC Road 80000 80000 80000 Completed Raichure Deodurga Mustur 2010-11 Formation of cc road Thejappa House To Water Tank CC Road 80000 80000 80000 Completed Raichure Deodurga Mustur 2010-11 Hot food Room in govt school At Chinthalakunta School Compound and Buildings120000 120000 120000 Completed Raichure Deodurga Nagadadinni 2006-07 Construction of Kichen Room at Gov school Hegadadinni School Compound and Buildings38000 37056 0 Completed Raichure Deodurga Nagadadinni 2006-07 Construction of Toilet in GP Construction of Toilet 49000 50376 0 Completed Raichure Deodurga Nagadadinni 2006-07 Construction of ladies toilet at Thippaldinni vilage Construction of Toilet 75000 64945 0 Completed Raichure Deodurga Nagadadinni 2006-07 Construction of ladies toilet at Yaramarus vilage Construction of Toilet 75000 65670 0 Completed Raichure Deodurga Nagadadinni 2006-07 Construction of ladies toilet at Hegadadinni vilage Construction of Toilet 75000 84941 84941 Completed Raichure Deodurga Nagadadinni 2006-07 Construction of ladies toilet at Ward No1 Nagadadinni vilage Construction of Toilet 100000 88039 88039 Completed Raichure Deodurga Nagadadinni 2006-07 Construction of ladies toilet at Ward No2 Nagadadinni vilage Construction of Toilet 100000 88039 88039 Completed Raichure Deodurga Nagadadinni 2007-08 Formation of CC Road From Thipaldini Manapa House To Mahabali House CC Road 70000 62550 0 Completed Raichure Deodurga Nagadadinni 2007-08 Formation of CC Road From Sugaya Thatha House To Hotel CC Road 100000 94469 0 Completed Raichure Deodurga Nagadadinni 2007-08 Opning of tarus of Gp nagadadinni other works 183000 160475 0 Completed Raichure Deodurga Nagadadinni 2007-08 Formation of CC Road From Masjid To Akanagama House CC Road 63000 60786 60786 Completed Raichure Deodurga Nagadadinni 2007-08 Formation of CC Road From Ambedikar Bhavana To Shahajan House At Thegidini CC Road 95000 82419 82419 Completed Raichure Deodurga Nagadadinni 2008-09 BS Slabs flooring BS Slabs flooring 100000 90000 0 Completed Raichure Deodurga Nagadadinni 2008-09 BS Slabs flooring BS Slabs flooring 100000 90000 0 Completed Raichure Deodurga Nagadadinni 2008-09 CC Road CC Road 110000 95103 0 Completed Raichure Deodurga Nagadadinni 2008-09 CC Road CC Road 175000 153543 0 Completed Raichure Deodurga Nagadadinni 2009-10 Bussness complex At Nagadadinni Shopping mall 200000 0 0 Completed Raichure Deodurga Nagadadinni 2009-10 Construction Confrence Halla At Nagadadinni Community Hall 500000 0 0 Completed Raichure Deodurga Nagadadinni 2009-10 Formation of cc road From Agsi to maramma temple At Yaramarus CC Road 110000 95103 0 Completed Raichure Deodurga Nagadadinni 2010-11 Solar Backup Areng ment At Gp Solar System 38000 0 0 Completed Raichure Deodurga Nagadadinni 2010-11 Sumar sesun water Arengment Drinking Water Supply 40000 0 0 Completed Raichure Deodurga Nagadadinni 2010-11 Formation of pipe line from School To Water Tank School Compound and Buildings95000 0 0 Completed Raichure Deodurga Nagadadinni 2010-11 Construction of compound wall Near Water tank At Nagadadinni Compound wall 100000 0 0 Completed Raichure Deodurga Nagadadinni 2010-11 Implimentation of pipe line Hanmanthraya House To Yankanna House At Nagadadinni Pipeline 40000 40000 40000 Completed Raichure Deodurga Nagadadinni 2010-11 Implimentation of drenaeg At Thipaldinni road Drainage 41000 41000 41000 Completed Raichure Deodurga Nagadadinni 2010-11 Formation of pipe line mata to village At Hegadadinni Pipeline 50000 50000 50000 Completed Raichure Deodurga Nagadadinni 2010-11 Construction of samudaya bhavan compound At Thipaldinni Compound wall 60000 60000 60000 Completed Raichure Deodurga Nagadadinni 2010-11 Repair Of Water tank At Nilgal Water Tank 160000 160000 160000 Completed Raichure Deodurga Palakanamardi 2006-07 Construction of Anganavadi Buillding at Ooti Village Anganavadi building 80000 80000 0 Completed Raichure Deodurga Palakanamardi 2006-07 Formation of CC Road Basavanna Temple To Hude at palakanamaradi CC Road 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2006-07 Formation of CC Road From Mahabaleshwara House To Chavadi At Vandali Village CC Road 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2006-07 Construction of Dobi Ghat At Madarkal Village Dhobi Ghat 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2006-07 Formation of CC Road From Siddapa House To Main Road CC Road 50000 50000 50000 Completed Raichure Deodurga Palakanamardi 2006-07 Formation of CC Road From Bassana House To Bassana House At Vandali CC Road 100000 100000 100000 Completed Raichure Deodurga Palakanamardi 2006-07 Formation of CC Road near SC.Collony at Mudalagunda Village CC Road 100000 100000 100000 Completed Raichure Deodurga Palakanamardi 2007-08 Formation of cc road From main rod to bassana temple At Madarkal CC Road 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2007-08 Formation of cc road From Vandali sanganna house horapete agsi CC Road 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2007-08 Implimentation of cc road from channapa house to husensab house At Palakanamardi CC Road 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2007-08 Construction of study room at ooti Construction Of Library 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2007-08 Formation of cc road from samudaya house to linganagouda house At mudala gunda CC Road 182000 182000 0 Completed Raichure Deodurga Palakanamardi 2007-08 Formation of cc road From Basappa nayak house to main road At devaragudda CC Road 100000 100000 100000 Completed

Raichure Deodurga Palakanamardi 2007-08 Implimentation of cc road from Sadashivappa house to Shivapa harigen house At Palakanamardi CC Road 100000 100000 100000 Completed

Raichure Deodurga Palakanamardi 2007-08 Formation of pipe line sc ward At mudalagunda Pipeline 100000 100000 100000 Completed Raichure Deodurga Palakanamardi 2008-09 IEC IEC 15000 15000 0 Completed Raichure Deodurga Palakanamardi 2008-09 CC Road CC Road 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2008-09 CC Road CC Road 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2008-09 CC Road CC Road 100000 100000 0 Completed Raichure Deodurga Palakanamardi 2008-09 Construction of School Building Construction of School Building200000 200000 0 Completed Raichure Deodurga Palakanamardi 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Palakanamardi 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Palakanamardi 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Palakanamardi 2008-09 CC Road CC Road 130000 130000 130000 Completed Raichure Deodurga Palakanamardi 2008-09 Construction of Toilet Construction of Toilet 210000 210000 210000 Completed Raichure Deodurga Palakanamardi 2009-10 Constrction of Water pool for Cows At ooti near school School Compound and Buildings64000 64000 0 Completed

Raichure Deodurga Palakanamardi 2009-10 Formation of cc road From Kambar Rajappa House To Nigappa House At Palakanamardi CC Road 100000 100000 0 Completed

Raichure Deodurga Palakanamardi 2009-10 Formation of cc road Vandali siddana tata mata To poojari thipanna CC Road 110000 110000 0 Completed Raichure Deodurga Palakanamardi 2009-10 Formation of cc road Yamnappa mali gouder house to agsi At Madarkal CC Road 100000 100000 100000 Completed Raichure Deodurga Palakanamardi 2009-10 Costruction of school buillding At Mudalagunda School Compound and Buildings350000 350000 350000 Completed Raichure Deodurga Palakanamardi 2010-11 IEC IEC 10000 0 0 Completed Raichure Deodurga Palakanamardi 2010-11 Water Poo In summer Water Tank 35000 0 0 Completed Raichure Deodurga Palakanamardi 2010-11 Solar power arengment in gp Solar System 38000 0 0 Completed Raichure Deodurga Palakanamardi 2010-11 Formation of cc road At Madarkal CC Road 90000 0 0 Completed Raichure Deodurga Palakanamardi 2010-11 Implimentation of Pipe Line At Palakanamardi Pipeline 90000 0 0 Completed Raichure Deodurga Palakanamardi 2010-11 Formation of dreneg nearroad At Vandali Drainage 40000 40000 40000 Completed Raichure Deodurga Palakanamardi 2010-11 Water Poo At Devaragudda Village Water Tank 50000 50000 50000 Completed Raichure Deodurga Palakanamardi 2010-11 Formation of cc road From mahanthayya swami house to Danadoddi At Vondali CC Road 70000 70000 70000 Completed Raichure Deodurga Palakanamardi 2010-11 Formation of cc road At Ooti CC Road 90000 90000 90000 Completed Raichure Deodurga Palakanamardi 2010-11 Formation of cc road At Mudalagunda CC Road 100000 100000 100000 Completed Raichure Deodurga Ramadurga 2006-07 Construction of Toilet At Sunkeshral Village Construction of Toilet 50000 50000 0 Completed Raichure Deodurga Ramadurga 2006-07 Implimentation of water supply At Amrapur Village Drinking Water Supply 75000 75000 0 Completed Raichure Deodurga Ramadurga 2006-07 Construction of Toilet At GP Buillding Construction of Toilet 146000 146000 0 Completed Raichure Deodurga Ramadurga 2006-07 Constructon of Toile Near SC.Collony At Ramadurga Village CC Road 80000 80000 80000 Completed Raichure Deodurga Ramadurga 2006-07 Construction of Toilet At Jinnapur Construction of Toilet 80000 80000 80000 Completed Raichure Deodurga Ramadurga 2006-07 Implimentation of CC Road At Kakargal Village CC Road 100000 100000 100000 Completed Raichure Deodurga Ramadurga 2007-08 IEC IEC 17000 17000 0 Completed Raichure Deodurga Ramadurga 2007-08 Implimentation of Ston piching & Formation of road Agsi ward At Ramdurga CC Road 90000 90000 0 Completed Formation of cc road From Dalapathi Mallikarjungouda House To Mudara ranngaya House At Raichure Deodurga Ramadurga 2007-08 CC Road 120000 120000 0 Completed Jinnapur Raichure Deodurga Ramadurga 2007-08 Formation of cc road From Main road to Mata At Kakaragal CC Road 50000 50000 50000 Completed Raichure Deodurga Ramadurga 2007-08 Formation of cc road Janatha Collony At Sankeshwar CC Road 90000 90000 90000 Completed Implimentation of Dreneg From Lakamma Kolla To Agsi ward way agsi& Up to Main Road At Raichure Deodurga Ramadurga 2007-08 Drainage 95000 95000 90000 Completed Kakaragal Raichure Deodurga Ramadurga 2007-08 Formation of cc road From Rannganna Uppar House To ST Reddy House At Amrapur CC Road 120000 120000 120000 Completed Raichure Deodurga Ramadurga 2007-08 Construction of Ladied Toilet myadar Ward At Ramdurga Construction of Toilet 200000 200000 200000 Completed Raichure Deodurga Ramadurga 2008-09 IEC IEC 20000 20000 0 Completed Raichure Deodurga Ramadurga 2008-09 Pipeline Pipeline 100000 100000 0 Completed Raichure Deodurga Ramadurga 2008-09 CC Road CC Road 100000 100000 0 Completed Raichure Deodurga Ramadurga 2008-09 Shopping mall Shopping mall 100000 100000 0 Completed Raichure Deodurga Ramadurga 2008-09 Construction of Toilet Construction of Toilet 200000 200000 0 Completed Raichure Deodurga Ramadurga 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Ramadurga 2008-09 CC Road CC Road 100000 100000 100000 Completed Raichure Deodurga Ramadurga 2008-09 Drainage Drainage 100000 100000 100000 Completed Raichure Deodurga Ramadurga 2008-09 CC Road CC Road 150000 150000 150000 Completed Raichure Deodurga Ramadurga 2009-10 IEC IEC 15000 15000 0 Completed Raichure Deodurga Ramadurga 2009-10 Formation of cc road From Uppar Rangappa House To Dabbi Shop At Amrapur CC Road 100000 100000 0 Completed Raichure Deodurga Ramadurga 2009-10 Formation of cc road FormPolice Gouder House To Kariyappa Tata House At Jinnapur CC Road 112000 112000 0 Completed Raichure Deodurga Ramadurga 2009-10 Construction of Permanent Study At Sunkeshral Construction Of Library 150000 150000 0 Completed Raichure Deodurga Ramadurga 2009-10 Construction of bussness complex At Ramdurga Shopping mall 150000 150000 0 Completed Raichure Deodurga Ramadurga 2009-10 Formation of cc road Form mudurangaya house To Haladathi At Jinnapur CC Road 50000 50000 50000 Completed Raichure Deodurga Ramadurga 2009-10 Construction of Permanent Study At Ramdurga Construction Of Library 100000 100000 100000 Completed Raichure Deodurga Ramadurga 2009-10 Construction of Permanent Study At Kakargal Construction Of Library 100000 100000 100000 Completed