Saving our pavements

One of the most common methods of pavement surfacing is pavement slurry, which is currently being carried out across . This is a low cost measure designed to seal the surface and extend the life of a pavement that is structurally sound.

It involves laying a thin layer of bitumen and aggregate on the existing pavement. It stops water getting in meaning it won’t disintegrate as much and everyone gets a great, new surface to walk on. When the base of a pavement is not strong enough for pavement slurry, we may need to dig it up, rebuild the base and then resurface it which is a much bigger and costly process.

Find out more about pavement slurry by watching our Pavement slurry video.

Surrey County Council works due to be carried out between 26th Aug and 1st Sept

If you have any queries about the Surrey County Council works please contact the Works Communication Team -  [email protected]  0300 200 1003 or visit www.surreycc.gov.uk/roadworks for full details of all works, where you can also set up email alerts for areas you are interested in.

Road Location Description of works Expected Expected Traffic start date completion management date Alfold Road Construction of new 12/08/2019 08/09/2019 Two-Way Lights vehicle entrance (Private works) Milford Road , Tree maintenance works 29/08/2019 29/08/2019 Two-Way Lights Bear Lane Access for high volume of 30/03/2019 09/12/2019 Lane Closure HGV deliveries (private works) Woolmead Farnham Access for high volume of 30/03/2019 09/12/2019 Lane Closure HGV deliveries (private works) Farnham By-Pass Farnham Traffic light refurbishment 29/07/2019 02/09/2019 Multi-Way Lights Downing Street Farnham Pavement reconstruction 05/08/2019 27/09/2019 Lane Closure Station Hill Farnham Traffic light refurbishment 07/08/2019 02/09/2019 Road Closure Potters Gate Farnham Installing new pedestrian 19/08/2019 04/09/2019 Multi-Way Lights crossings for Potters Gate School Broomleaf Road Farnham Kerb improvement works 22/08/2019 27/08/2019 Give Way System Lower Street Construction of new 06/08/2019 13/09/2019 Road Closure drainage system Woolmer Hill Road Haslemere Ground surveys (Private 28/08/2019 29/08/2019 Stop/Go Signs works) Guildford Road Shamley Green, Carriageway retexturing 28/08/2019 29/08/2019 Road Closure Guildford The Green Shamley Green, Carriageway retexturing 28/08/2019 29/08/2019 Road Closure Guildford Tilford Street Tilford, Farnham Tilford East Bridge repair 17/06/2019 12/06/2020 Give Way works System Tilford Street Tilford, Farnham Tilford East Bridge repair 15/08/2019 26/06/2020 Road Closure works Sheephatch Lane Tilford, Farnham Tilford East Bridge repair 15/08/2019 26/06/2020 Road Closure works Cranleigh Road , Carriageway retexturing 28/08/2019 29/08/2019 Road Closure Guildford

Surrey County Council works completed between 19th and 25th August

Road Location Description of works Expected start Expected date completion date Littlewood Cranleigh Carraigeway patching 16/08/2019 20/08/2019 High Street Cranleigh High friction surfacing 22/08/2019 23/08/2019 Wharf Street Godalming Traffic light repair works 19/08/2019 19/08/2019 Link Road Milford, Install new posts 16/08/2019 20/08/2019 Godalming Beales Lane , Carriageway patching 20/08/2019 22/08/2019 Farnham

Link to Highways scheduled works

Works by utility companies due to be carried out between 26th Aug and 1st Sept

There are a high number of works by utility companies carried out across Surrey each day. These can range from a new supply to a private property to a major mains renewal project. With the focus on the potential for traffic disruption, the following is a list of works in the Waverley Borough which either start in the forthcoming week or are continuing into or through the week.

If you have any queries about the utility company works please contact us -  0300 200 1003 or visit www.surreycc.gov.uk/roadworks for full details of all works, where you can also set up email alerts for areas you are interested in.

Road Location Utility Description of works Expected Expected Traffic Company Start Date Completion Management Date Road Churt Southern Gas Emergency Works - 19/08/2019 26/08/2019 Two-Way Networks Gas escape Signals Cox Green Rudgwick Thames Emergency Works - 20/08/2019 27/08/2019 Road Closure Road Water Utilities Burst Water Main Ltd Furzen Ellens Thames Emergency Works - 20/08/2019 27/08/2019 Road Closure Lane Green Water Utilities Repair leaking water Ltd pipe Badshot Badshot GTC Re-excavation of gas 27/08/2019 01/09/2019 Two-Way Lea Road Lea connection hole to Signals complete connection Farnham Haslemere Southern Gas Continued gas mains 15/07/2019 02/09/2019 Road Closure Lane Networks replacement Station Hill Farnham Network Rail - Re - Railing (Removal / 31/08/2019 02/09/2019 Road Closure Promoters Replacement ) of level National crossing Petworth Chiddingfol Southern Gas Continued gas mains 13/08/2019 04/09/2019 Multi-Way Road d Networks replacement Signals The Street Thames Continued water mains 19/08/2019 13/09/2019 Road Closure Water Utilities replacement Ltd Horsham Cranleigh Thames Continued water mains 29/07/2019 26/09/2019 Multi-Way Road Water Utilities replacement Signals Ltd Horsham Rudgwick Thames Continued water mains 29/07/2019 27/09/2019 Multi-Way Road Water Utilities replacement Signals Ltd Bear Lane Farnham Berkeley Traffic management for 30/03/2019 09/12/2019 Lane Closure Homes high volume of HGV deliveries to form a new basement. Woolmead Farnham Berkeley Traffic management for 30/03/2019 09/12/2019 Lane Closure Homes high volume of HGV deliveries to form a new basement.

Please note, all above information was accurate at the time of publication but dates may now differ.