Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 1 ROHITASH NAGAR EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GOVT OF N C T OFFICE‐KASHMERE GATE CCK 1059 990 KVA UNPLANNED 30‐06‐2018 11:23:28 30‐06‐2018 12:10:45 0:47 0.00005222 MUs LALKUAN BAZAR‐SIKRIWALAN‐ NEW HAUZ QAZI, AJMERI GATE‐, KHARI BAWLI‐NAYA BANS‐ LAHORI 2 GATE, LALKUAN BAZAR‐FRASH KHANA, MOSQUE‐LAL KUAN BAZAR CCK 7180 4590 KVA UNPLANNED 14‐06‐2018 20:02:35 14‐06‐2018 20:50:00 0:47 0.00228472 MUs MAIN BAZAR‐KHUSH DIL, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, CHAWRI BAZAR‐KHUSH DIL, LALKUAN BAZAR‐ 3 SIKRIWALAN‐ NEW HAUZ QAZI, HAUZ QAZI‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 2883 2970 KVA UNPLANNED 15‐06‐2018 12:22:36 15‐06‐2018 13:09:52 0:47 0.00005222 MUs ZEENAT BARI‐MORI GATE, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, ROHITASH NAGAR EAST‐SILAMPUR, MAIN MARKET‐KATRA DHOBI, OLD RAILWAY STATION‐CHANDNI CHOWK, KASHMIRI GATE‐MORI GATE, NAYA BAZAR‐ CHANDNI CHOWK, GOVT OF N C T OFFICE‐KASHMERE GATE, SHIVAJI PARK‐BALBIR NAGAR, FATEHPURI‐, TIS 4 HAZARI SADAR BAZAR‐RAJENDRA MARKET CCK 6314 4950 KVA UNPLANNED 29‐06‐2018 05:52:00 29‐06‐2018 06:45:00 0:53 0.00023556 MUs FATEHPURI MASJID‐CHANDNI CHOWK, KHARI BAWLI‐NAYA BANS‐ LAHORI GATE, LALKUAN BAZAR‐FRASH KHANA, RAILWAY STATION‐CHANDNI CHOWK, KATRA BARYAN‐BARA DARI, LALKUAN BAZAR‐SIKRIWALAN‐ NEW HAUZ QAZI, 5 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 7180 4590 KVA UNPLANNED 30‐06‐2018 09:55:00 30‐06‐2018 10:53:00 0:58 0.00132111 MUs

6 TOWN HILL‐KATRA NEEL, NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA CCK 1250 990 KVA UNPLANNED 17‐06‐2018 12:39:09 17‐06‐2018 13:14:14 0:35 0.00001944 MUs

RED FORT‐CHANDNI CHOWK‐RED FORT, LAJPAT RAI MARKET‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK, TOWN HALL‐KUCHA NATWA, BARA MORE SARAI‐CHANDNI CHOWK, MOR SARAY COLONY‐CHANDNI CHOWK, 7 GURUDWAR SHAB LAND‐CHANDNI CHOWK, DELHI PUBLIC LIBARARY‐KUCHA NATWA CCK 2387 2610 KVA UNPLANNED 20‐06‐2018 18:54:33 20‐06‐2018 19:42:00 0:47 0.001175 MUs

NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA, MAIN BAZAR CHANDANI CHOWK‐ 8 SISGANJ, GURUDWAR SHAB LAND‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK CCK 1832 990 KVA UNPLANNED 23‐06‐2018 19:27:00 23‐06‐2018 20:25:00 0:58 0.00153056 MUs RED FORT‐CHANDNI CHOWK‐RED FORT, DARYA GANJ, LAJPAT RAI MARKET‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK, BARA MORE SARAI‐CHANDNI CHOWK, BHAGIRATH PLACE‐CHANDNI CHOWK, MOR SARAY 9 COLONY‐CHANDNI CHOWK CCK 2103 4360 KVA UNPLANNED 25‐06‐2018 00:04:25 25‐06‐2018 00:58:02 0:53 0.00002944 MUs

LIG/MIG RES/NON COMM AREA‐, UNION CLUB OF ‐KATRA NEEL, DELHI PUBLIC LIBARARY‐KUCHA NATWA, FATEHPURI‐KUCHA HASIRAM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PARKING AT FLTLT JERRY MARG FATEH PURI FOR SCOOTER & CARS‐KUCHA HASIRAM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, RAILWAY STATION‐CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, OLD DELHI BUS STOP‐KUCHA HASIRAM, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐ SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, DELHI VIDHYUT BOARD‐KATRA NEEL, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TOWN HILL‐KATRA NEEL, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐ 10 JHILMIL COLONY, PKT A‐BLOCK B CCK 1285 990 KVA UNPLANNED 27‐06‐2018 11:48:00 27‐06‐2018 13:18:00 1:30 0.00115 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, RED FORT‐VIJAY GHAT, NIGAM BODH GHAT CEMETRY‐KASHMERE GATE, LIG/MIG RES/NON COMM AREA‐VIJAY GHAT DRG, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, SWATRANTATA SAINANI SMARAK‐CHANDNI CHOWK‐RED FORT, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐CHANDNI CHOWK‐RED FORT, LIG/MIG RES/NON COMM AREA‐VIJAY GHAT, LIG/MIG RES/NON COMM AREA‐KASHMERE GATE, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐ BHAGIRATHI VIHAR, RED FORT‐CHANDNI CHOWK‐RED FORT, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐ 11 SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B CCK 802 1630 KVA UNPLANNED 28‐06‐2018 08:03:00 28‐06‐2018 09:01:00 0:58 0.00032222 MUs NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAZAR CHANDANI CHOWK‐SISGANJ, GURUDWAR SHAB 12 LAND‐CHANDNI CHOWK, GURUDWARA SISGANJ ROAD‐CHANDNI CHOWK CCK 455 990 KVA UNPLANNED 30‐06‐2018 14:01:36 30‐06‐2018 14:48:48 0:47 0.00005222 MUs 13 DDA FLATS‐SILAMPUR DGN 35 630 KVA UNPLANNED 16‐06‐2018 08:03:21 16‐06‐2018 08:38:41 0:35 0.00001944 MUs 14 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 10 630 KVA UNPLANNED 19‐06‐2018 09:05:00 19‐06‐2018 09:45:00 0:40 0.00002222 MUs 15 RAM NAGAR‐SILAMPUR, BLOCK H‐MANSAROWAR PARK, BLOCK E‐MANSAROWAR PARK DGN 192 990 KVA UNPLANNED 19‐06‐2018 09:06:01 19‐06‐2018 09:40:00 0:33 0.00001833 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR 16 KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DGN 1506 4230 KVA UNPLANNED 20‐06‐2018 07:40:00 20‐06‐2018 08:39:00 0:58 0.00104722 MUs DAMODER PARK‐, BLOCK A‐MANSAROWAR PARK, NEAR SHADARA RAILWAY GODOWN‐SHAHDARA DGN, BLOCK B‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, RAM NAGAR‐SILAMPUR, SANSAR COMPOUND‐ DILSHAD GARDEN, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, BLOCK E‐MANSAROWAR PARK, SACHDEVA INDUSTRIES‐RAM NAGAR EAST, BLOCK F‐SHRI RAM NAGAR, BLOCK H‐MANSAROWAR PARK, DAYANAND HOSPITAL‐ UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, JINDAL BHAWAN‐RAM NAGAR EAST, BLOCK F‐MANSAROWAR PARK, BLOCK C‐MANSAROWAR PARK, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK G‐MANSAROWAR PARK, BLOCK M‐ 17 SHRI RAM NAGAR DGN 4391 3600 KVA UNPLANNED 25‐06‐2018 18:46:30 25‐06‐2018 19:34:23 0:47 0.001175 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SHRI RAM NAGAR, BLOCK S‐PRATAP PURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI TRANSPORT‐WELCOME COLONY, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK M‐SHRI RAM NAGAR, BHAGAT NAGAR‐DAYALPUR, INDIAN GAS‐SHAHDARA DGN, DWARKAPURI‐NAVIN SHAHDARA, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SHAHDRA METRO STATION‐SHAHDARA DGN, PKT R‐BLOCK D, KABUL NAGAR‐ROHITASH NAGAR, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK F‐SHRI RAM NAGAR, BLOCK R‐PRATAP PURA, BLOCK H‐ BHAGIRATHI VIHAR, OLDANPUR‐NAVIN SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, 18 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DGN 2123 4630 KVA UNPLANNED 27‐06‐2018 23:17:37 28‐06‐2018 00:05:00 0:47 0.00092694 MUs BLOCK A‐MANSAROWAR PARK, BLOCK B‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, RAM NAGAR‐SILAMPUR, DDA FLATS‐SILAMPUR, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, KABUL NAGAR‐ROHITASH NAGAR, BLOCK E‐ MANSAROWAR PARK, GOVT SCHOOL NO‐2‐DDA FLATS, BLOCK H‐MANSAROWAR PARK, BLOCK F‐MANSAROWAR PARK, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK C‐MANSAROWAR PARK, DELHI JAL BOARD‐DDA FLATS, BLOCK G‐ 19 MANSAROWAR PARK DGN 7100 7110 KVA UNPLANNED 28‐06‐2018 02:25:36 28‐06‐2018 03:15:00 0:49 0 MUs BLOCK B‐NEW MODERN SHAHDARA, BLOCK 1‐RAM NAGAR, BLOCK D‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐ 20 NEW MODERN SHAHDARA, BLOCK C‐NEW MODERN SHAHDARA, BLOCK B‐JAGAT PURI DGN 4067 2610 KVA UNPLANNED 28‐06‐2018 05:13:38 28‐06‐2018 05:55:00 0:41 0.002255 MUs 21 BLOCK 1‐RAM NAGAR DGN 132 990 KVA UNPLANNED 29‐06‐2018 14:33:34 29‐06‐2018 15:05:41 0:32 0.00002667 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BLOCK A‐, BLOCK A‐OLD SIMAPURI, BLOCK K‐LEPROSY COLONY, BLOCK B‐PREM NAGAR DGN, M.C.P. SCHOOL‐POCKET O, SHANTI KUSTH ASHRAM‐RAJIV NAGAR DGN, HANSRAJ SCHOOL‐POCKET H, DDA FLATS‐RAJIV NAGAR DGN, BLOCK E‐DILSHAD COLONY, J.J.C.‐KALANDER COLONY, DELHI JAL BOARD‐POCKET I, BLOCK B‐DILSHAD COLONY, DDA FLATS‐BLOCK A, BLOCK F‐OLD SIMAPURI, BLOCK D‐DILSHAD COLONY, BLOCK A‐RAJIV NAGAR DGN, BLOCK A‐PREM 22 NAGAR DGN, GANDHI KUSTH ASHARAM‐LEPROSY COLONY DGN 5466 3280 KVA UNPLANNED 15‐06‐2018 01:03:00 15‐06‐2018 01:50:00 0:47 0.00195833 MUs 23 BLOCK A‐ RESI FLATS‐POCKET A DGN 75 990 KVA UNPLANNED 16‐06‐2018 08:02:01 16‐06‐2018 08:37:39 0:35 0.00001944 MUs 24 MCD‐OLD SIMAPURI DGN 40 990 KVA UNPLANNED 17‐06‐2018 07:54:05 17‐06‐2018 08:37:00 0:42 0.00002333 MUs

MIG FLATS‐POCKET F & E, DELHI JAL BOARD‐ PKT A‐JANTA FLATS‐PKT A, POST OFFICE‐DILSHAD GARDEN, GTB MIG FLATS‐ POCKET D, NAGAR NIGAM PUBLIC SCHOOL‐POCKET C, BLOCK D‐JANTA FLATS‐PKT A, M.C.D. HOUSE‐POCKET B, BLOCK R‐ 25 AADINATH BHAWAN‐POCKET R, DELHI JAL BOARD‐POCKET C, GROUP 4‐POCKET B, GROUP I FLATS‐JANTA FLATS‐PKT A DGN 1028 1260 KVA UNPLANNED 21‐06‐2018 12:04:34 21‐06‐2018 12:40:00 0:35 0.00220694 MUs

DELHI JAL BOARD‐ PKT A‐JANTA FLATS‐PKT A, HANSRAJ SCHOOL‐POCKET H, GTB MIG FLATS‐POCKET D, BLOCK D‐JANTA FLATS‐PKT A, BLOCK R‐ AADINATH BHAWAN‐POCKET R, DDA MARKET PKT B & E‐POCKET F & E, DELHI JAL BOARD‐POCKET 26 C, FLORA DALE SECONDARY SCHOOL‐POCKET R, GROUP I FLATS‐JANTA FLATS‐PKT A DGN 712 5660 KVA UNPLANNED 26‐06‐2018 03:38:31 26‐06‐2018 04:27:00 0:48 0.00157333 MUs MENTAL HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, DELHI JAL BOARD‐POCKET C, FACTORY‐DILSHAD 27 GARDEN, BLOCK B‐ GROUP I FLATS‐POCKET B DGN 602 3000 KVA UNPLANNED 27‐06‐2018 07:44:35 27‐06‐2018 08:35:00 0:50 0.001375 MUs 28 BLOCK J & K‐POCKET J&K, DELHI JAL BOARD‐POCKET I DGN 1115 2250 KVA UNPLANNED 27‐06‐2018 07:57:35 27‐06‐2018 08:50:00 0:52 0.00115556 MUs

BLOCK E‐NEW SIMAPURI, J.J.C.‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, BLOCK G‐DILSHAD COLONY, BLOCK B‐NEW SIMAPURI, BLOCK D‐NEW SIMAPURI, BLOCK J‐DILSHAD COLONY, NEAR JIVAN CLINIC‐DILSHAD COLONY, SHIV MANDIR‐ NEW SIMAPURI, BLOCK B‐DILSHAD COLONY, BLOCK F‐OLD SIMAPURI, MCD PRIMARY SCHOOL‐NEW SIMAPURI, JJC‐ DILSHAD COLONY, SIMAPURI BUS DEPOT‐DILSHAD COLONY, BLOCK D‐DILSHAD COLONY, LIG/MIG RES/NON COMM 29 AREA‐SONIA VIHAR, BLOCK E‐NEW SIMAPURI, BLOCK F‐DILSHAD COLONY DGN 4132 1260 KVA UNPLANNED 28‐06‐2018 08:59:35 28‐06‐2018 10:50:00 1:50 0.00250556 MUs 30 BLOCK R‐PRATAP PURA, KABUL NAGAR‐ROHITASH NAGAR DGN 1687 630 KVA UNPLANNED 14‐06‐2018 08:52:34 14‐06‐2018 09:48:00 0:55 0.00010694 MUs 31 NEW JAFFRABAD‐GORAKH PARK DGN 801 990 KVA UNPLANNED 23‐06‐2018 00:50:37 23‐06‐2018 01:12:00 0:21 0.00104417 MUs GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BABARPUR WEST‐BABAR PUR, NEW JAFFRABAD‐ 32 GORAKH PARK, SUBHASH PARK‐GORAKH PARK DGN 1980 1980 KVA UNPLANNED 25‐06‐2018 10:05:30 25‐06‐2018 10:45:17 0:39 0.00080167 MUs GOPAL K.OIL DEPO.‐PRATAP PURA, BLOCK 1‐BALBIR NAGAR, BLOCK R‐PRATAP PURA, ROHITASH NAGAR EAST‐SILAMPUR, 33 BLOCK D‐PRATAP PURA, BLOCK A‐PRATAP PURA, KABUL NAGAR‐ROHITASH NAGAR DGN 9205 4630 KVA UNPLANNED 30‐06‐2018 10:52:40 30‐06‐2018 11:38:00 0:45 0.00085 MUs SUBHASH PARK EXTN.‐GORAKH PARK, DELHI TRANSPORT‐WELCOME COLONY, NEW JAFFRABAD‐GORAKH PARK, 34 PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 1977 3010 KVA UNPLANNED 30‐06‐2018 19:01:39 30‐06‐2018 19:42:59 0:41 0 MUs 35 DARYA GANJ, HAPPY PUBLIC SCHOOL‐PARDA BAGH DRG 55 990 KVA UNPLANNED 20‐06‐2018 12:06:00 20‐06‐2018 12:15:24 0:9 0.0000175 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DDA FLATS‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐ SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, CHITTLI QABAR‐CHANDNI CHOWK, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, CHANDANI MAHAL‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, VISHWAS NAGAR, BLOCK F‐SHIV VIHAR, DELHI POLICE BHAVAN‐PAHARI BHOJLA, JHILMIL INDUSTRIAL AREA 36 JHILMIL COLONY, PKT A‐BLOCK B DRG 7734 4590 KVA UNPLANNED 23‐06‐2018 10:09:37 23‐06‐2018 11:27:52 1:18 0.00320667 MUs DDA FLATS‐ROUSE AVENUE, UNIVERSITY GRANT COMMISSION‐ITO, BLOCK E‐CONNAUGHT PLACE DRG, BAR COUNSIL OF 37 INDIA‐ROUSE AVENUE, MEDICAL COUNCIL OF INDIA‐BAL BHAWAN DRG 168 630 KVA UNPLANNED 24‐06‐2018 13:03:15 24‐06‐2018 13:49:25 0:46 0 MUs

VISHWAS NAGAR‐SHAHDARA, BLOCK A‐VIVEK VIHAR PHASE II, NAYA VISHWAS NAGAR‐SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐JHILMIL COLONY BLOCK E, BLOCK M‐ SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, GOVT GIRLS SECONDARY SCHOOL‐ DDA FLATS, PKT R‐BLOCK D, GEETA COLONY, VIVEKANAND FLATS‐DISTICT PARK, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NEW VISWAS NAGAR‐SHAHDARA, BLOCK F‐SHIV VIHAR, ESI HOSPITAL‐JHILMIL COLONY BLOCK C, JHILMIL INDUSTRIAL AREA‐JHILMIL 38 COLONY, PKT A‐BLOCK B JLM 3459 5890 KVA UNPLANNED 15‐06‐2018 18:17:37 15‐06‐2018 19:45:00 1:27 0.00229583 MUs AMBEDKAR NAGAR‐SHAHDARA, BLOCK_B‐VIVEK VIHAR PHASE II, DDA MIG FLATS‐VIVEK VIHAR PHASE II, JAWALA NAGAR‐ 39 SHAHDARA JLM 1306 990 KVA UNPLANNED 22‐06‐2018 11:18:41 22‐06‐2018 11:53:20 0:34 0 MUs

40 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR‐SHAHDARA, SHAHDARA JLM, EAST ROHTASH NAGAR‐SHAHDARA JLM 1342 4590 KVA UNPLANNED 25‐06‐2018 18:30:00 25‐06‐2018 19:20:00 0:49 0.00133389 MUs BIHARI COLONY‐SHAHDARA, TELIBARA‐SHAHDARA, VISHWAS NAGAR, BHOLA NATH NAGAR‐SHAHDARA, EAST ROHTASH 41 NAGAR‐SHAHDARA, MAHARAM NAGAR‐SHAHDARA, SUNDER PARK‐SHAHDARA JLM 6328 4000 KVA UNPLANNED 27‐06‐2018 23:21:36 28‐06‐2018 00:52:49 1:31 0.00442361 MUs BHAGAT NAGAR‐DAYALPUR, VISHWAS NAGAR‐SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, SHAHDARA JLM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NEW VISWAS NAGAR‐SHAHDARA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 42 BLOCK B JLM 1555 4830 KVA UNPLANNED 28‐06‐2018 01:48:34 28‐06‐2018 02:33:00 0:44 0.00083111 MUs

43 VISHWAS NAGAR EXTN.‐SHAHDARA, VISHWAS NAGAR‐SHAHDARA, SHAHDARA JLM, EAST ROHTASH NAGAR‐SHAHDARA JLM 443 4590 KVA UNPLANNED 29‐06‐2018 06:48:00 29‐06‐2018 07:45:50 0:57 0.000665 MUs 44 ANAND VIHAR BLOCK A JLM 20 990 KVA UNPLANNED 12‐06‐2018 09:00:00 12‐06‐2018 09:37:06 0:37 0.00005139 MUs 45 VIGYAN LOK‐ANAND VIHAR JLM 23 630 KVA UNPLANNED 12‐06‐2018 09:00:00 12‐06‐2018 09:35:57 0:35 0.00004861 MUs 46 SAINI ENCLAVE‐ANAND VIHAR JLM 36 630 KVA UNPLANNED 19‐06‐2018 12:31:11 19‐06‐2018 13:00:00 0:28 0.00038889 MUs 47 AGCR ENCLAVE‐ANAND VIHAR JLM 49 990 KVA UNPLANNED 22‐06‐2018 02:01:44 22‐06‐2018 02:41:30 0:39 0.00054167 MUs 48 ARYA NAGAR‐ANAND VIHAR JLM 166 990 KVA UNPLANNED 27‐06‐2018 10:06:58 27‐06‐2018 10:50:15 0:43 0.00059722 MUs 49 VILL KARKARDOOMA‐KARKAR DUMA JLM 214 990 KVA UNPLANNED 30‐06‐2018 12:10:00 30‐06‐2018 12:54:00 0:44 0.00006111 MUs 50 BLOCK_C‐SAVITA VIHAR JLM 94 990 KVA UNPLANNED 14‐06‐2018 14:00:00 14‐06‐2018 14:45:00 0:45 0.0000625 MUs BLOCK_45‐KRISHNA NAGAR, VISHWAS NAGAR‐SHAHDARA, BLOCK_47‐BEADON PURA, JAWALA NAGAR‐SHAHDARA, KASTURBA NAGAR‐SHAHDARA, AMBEDKAR NAGAR‐SHAHDARA, BLOCK_34P‐KRISHNA NAGAR, MAHARAM NAGAR‐ 51 SHAHDARA JLM 5853 3600 KVA UNPLANNED 15‐06‐2018 18:17:38 15‐06‐2018 19:45:00 1:27 0.00009667 MUs YAMUNA SPORTS COMPLEX‐VIVEK VIHAR, BLOCK E‐JHILMIL COLONY BLOCK E, SURAJMAL VIHAR‐VIVEK VIHAR, ESI 52 HOSPITAL‐JHILMIL COLONY BLOCK C JLM 1295 400 KVA UNPLANNED 17‐06‐2018 15:06:00 17‐06‐2018 16:05:00 0:58 0.00241667 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

VIVEK VIHAR BLOCK C, BLOCK A‐VIVEK VIHAR PHASE II, JHILMIL COLONY BLOCK B, JHILMIL COLONY BLOCK A, BLOCK E‐ JHILMIL COLONY BLOCK E, GOVT GIRLS SECONDARY SCHOOL‐DDA FLATS, ESI HOSPITAL‐JHILMIL COLONY BLOCK C, 53 BLOCK D‐JHILMIL COLONY BLOCK D, VIVEKANAND FLATS‐DISTICT PARK, BLOCK C‐JHILMIL COLONY BLOCK C JLM 2974 3870 KVA UNPLANNED 17‐06‐2018 22:19:41 17‐06‐2018 23:22:00 1:2 0.00203222 MUs 54 BLOCK B‐SURAJMAL VIHAR JLM 34 990 KVA UNPLANNED 28‐06‐2018 06:38:29 28‐06‐2018 07:26:13 0:47 0.00019583 MUs VIVEK VIHAR BLOCK C, BLOCK D‐VIVEK VIHAR, BLOCK B‐VIVEK VIHAR, SUPER BAZAR‐VIVEK VIHAR BLOCK A, TELEPHONE 55 EXCHANGE‐TELEPHONE COLONY, BLOCK A‐VIVEK VIHAR, JANTA COLONY‐VIVEK VIHAR JLM 1790 2350 KVA UNPLANNED 28‐06‐2018 06:43:34 28‐06‐2018 07:24:35 0:41 0.00009111 MUs 56 BLOCK B‐VIVEK VIHAR JLM 15 990 KVA UNPLANNED 29‐06‐2018 10:39:18 29‐06‐2018 11:02:00 0:22 0.00003056 MUs 57 BLOCK 18‐GEETA COLONY KRN 92 990 KVA UNPLANNED 15‐06‐2018 09:06:00 15‐06‐2018 09:51:25 0:45 0.0000375 MUs 58 JHEEL‐JHEEL KHURENJA KRN 20 630 KVA UNPLANNED 15‐06‐2018 17:21:54 15‐06‐2018 17:42:46 0:20 0.00001111 MUs

59 NEW LAHORE EXTENTION‐SHASTRI NAGAR, NEW LAHORE EXTENTION‐SAROJINI PARK, NEW LAHORE‐SUNDER PARK KRN 333 990 KVA UNPLANNED 16‐06‐2018 09:37:17 16‐06‐2018 10:33:29 0:56 0.00001556 MUs 60 BLOCK 10‐GANDHI NAGAR, BLOCK 8A‐GEETA COLONY KRN 192 630 KVA UNPLANNED 26‐06‐2018 14:05:05 26‐06‐2018 14:38:16 0:33 0.00001833 MUs 61 BLOCK B‐SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, BLOCK D‐SOUTH ANARKALI COLONY KRN 87 990 KVA UNPLANNED 16‐06‐2018 09:40:52 16‐06‐2018 10:18:13 0:37 0.00001028 MUs 62 RASHID MARKET‐JAGATPURI, SHIVPURI‐JAGATPURI KRN 526 990 KVA UNPLANNED 28‐06‐2018 10:57:59 28‐06‐2018 11:24:05 0:26 0.00000722 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAHILA COLONY‐SEELAMPUR, BLOCK 10‐GANDHI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 9‐GANDHI NAGAR, BLOCK 9‐GANDHI NAGAR, GANDHI NAGAR‐KAILASH NAGAR, BLOCK M‐SHIV VIHAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, BLOCK 9‐SUBHASH MOHALLA_I, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK 9‐RAGHUBARPURA, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON 63 COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KRN 5880 5940 KVA UNPLANNED 17‐06‐2018 08:18:39 17‐06‐2018 08:38:27 0:19 0.00013194 MUs 64 RAGHUBARPURA NO 2‐SEELAMPUR, OLD SEELAMPUR KRN 4763 3240 KVA UNPLANNED 24‐06‐2018 19:25:40 24‐06‐2018 20:10:00 0:44 0.00113667 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHANKAR NAGAR EXTN‐AZAD NAGAR, OLD SEELAMPUR, CHAND 65 MOHALLA‐RAJGARH COLONY, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK X‐RAJGARH COLONY KRN 5100 3960 KVA UNPLANNED 27‐06‐2018 23:23:37 28‐06‐2018 00:14:00 0:50 0.00161111 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, RAGHUVIR PURA‐SHANKAR NAGAR, RAGHUVIR PURA‐ KANTI NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK 5‐TRILOKPURI PHASE I, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, TRILOKPURI PHASE I‐, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 66 BLOCK B KRN 2948 2610 KVA UNPLANNED 28‐06‐2018 01:55:00 28‐06‐2018 03:20:00 1:25 0.00141667 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHANKAR NAGAR EXTN‐AZAD NAGAR, OLD SEELAMPUR, CHAND 67 MOHALLA‐RAJGARH COLONY, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK X‐RAJGARH COLONY KRN 5100 3960 KVA UNPLANNED 28‐06‐2018 01:57:34 28‐06‐2018 02:45:00 0:47 0.00121417 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHANKAR NAGAR EXTN‐AZAD NAGAR, CHAND MOHALLA‐RAJGARH 68 COLONY, JHEEL‐JHEEL KHURENJA, BLOCK X‐RAJGARH COLONY KRN 4887 2970 KVA UNPLANNED 28‐06‐2018 05:59:00 28‐06‐2018 06:33:38 0:34 0.00086889 MUs 69 BLOCK X‐RAJGARH COLONY KRN 360 990 KVA UNPLANNED 29‐06‐2018 15:59:22 29‐06‐2018 16:17:22 0:18 0.00001 MUs

BLOCK A‐ARJUN NAGAR WEST, BLOCK C‐ARJUN NAGAR WEST, BLOCK E‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR EAST, SHANKAR NAGAR WEST‐AZAD NAGAR, AZAD NAGAR EAST, RADHEY PURI EXTENSION‐ARJUN NAGAR WEST, SUNDER PARK‐SHAHDARA, JHEEL‐KRISHNA NAGAR BLOCK B, BLOCK G‐ARJUN NAGAR WEST, SHALIMAR PARK‐SHAHDARA, 70 ARJUN NAGAR EAST‐ARJUN NAGAR WEST, BLOCK C‐RADHEPURI EXTENSION KRN 2890 3010 KVA UNPLANNED 19‐06‐2018 23:06:00 19‐06‐2018 23:53:07 0:47 0.00092694 MUs 71 BLOCK B‐BLOCK K KRN 229 990 KVA UNPLANNED 26‐06‐2018 14:02:20 26‐06‐2018 14:39:58 0:37 0.00003083 MUs 72 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, AZAD NAGAR EAST, BLOCK E‐KRISHNA NAGAR KRN 112 990 KVA UNPLANNED 27‐06‐2018 09:51:02 27‐06‐2018 10:23:05 0:32 0.00002667 MUs 73 BLOCK H‐KRISHNA NAGAR, BLOCK B‐RADHEPURI EXTENSION KRN 152 630 KVA UNPLANNED 27‐06‐2018 10:01:48 27‐06‐2018 10:54:29 0:52 0.00002889 MUs BLOCK B‐RADHEPURI EXTENSION, BLOCK H‐KRISHNA NAGAR, BLOCK E‐KRISHNA NAGAR, BLOCK F‐KRISHNA NAGAR, 74 BLOCK D‐KRISHNA NAGAR, BLOCK C‐KRISHNA NAGAR KRN 1958 1260 KVA UNPLANNED 29‐06‐2018 17:53:00 29‐06‐2018 18:52:00 0:58 0.00124056 MUs 75 BLOCK A‐ARJUN NAGAR WEST, BLOCK G‐ARJUN NAGAR WEST KRN 14 630 KVA UNPLANNED 30‐06‐2018 09:54:18 30‐06‐2018 10:44:09 0:49 0.00002722 MUs 76 BLOCK B‐GOVIND VIHAR, BLOCK C‐GOVIND VIHAR KWN 222 990 KVA UNPLANNED 12‐06‐2018 08:27:13 12‐06‐2018 09:01:16 0:34 0.00004722 MUs 77 BLOCK E‐GANGA VIHAR KWN 102 990 KVA UNPLANNED 12‐06‐2018 09:58:31 12‐06‐2018 11:38:46 1:40 0.00013889 MUs 78 BLOCK B‐GANGA VIHAR, BLOCK F‐GANGA VIHAR, BLOCK E‐GANGA VIHAR KWN 457 990 KVA UNPLANNED 12‐06‐2018 10:01:21 12‐06‐2018 11:40:29 1:39 0.0001375 MUs JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, LAXMI GARDEN‐ AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, TUNDA NAGAR‐BHAGIRATHI VIHAR, SHIV VIHAR, 79 BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 1376 6215 KVA UNPLANNED 20‐06‐2018 02:26:32 20‐06‐2018 03:55:00 1:28 0.00202889 MUs BHARAT‐AMBEDKAR NAGAR, LAXMI GARDEN‐AMBEDKAR NAGAR, AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI 80 VIHAR KWN 96 990 KVA UNPLANNED 24‐06‐2018 11:45:39 24‐06‐2018 12:33:00 0:47 0.00208889 MUs

JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV 81 VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 29‐06‐2018 19:58:00 29‐06‐2018 20:56:00 0:58 0.00248111 MUs PKT C‐BLOCK E, BLOCK A‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT A‐BLOCK E, BLOCK C‐SADAT PUR, BLOCK D‐WEST KARAWAL NAGAR, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, PKT E‐SADATPUR EXT‐PUSTA AREA‐K 82 BLOCK, PKT A1‐BLOCK E, BLOCK K‐WEST KARAWAL NAGAR KWN 1584 0 KVA UNPLANNED 18‐06‐2018 01:36:00 18‐06‐2018 02:30:00 0:54 0 MUs PKT C‐BLOCK E, BLOCK A‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT A‐BLOCK E, BLOCK C‐SADAT PUR, BLOCK D‐WEST KARAWAL NAGAR, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, PKT E‐SADATPUR EXT‐PUSTA AREA‐K 83 BLOCK, PKT A1‐BLOCK E, BLOCK K‐WEST KARAWAL NAGAR KWN 1584 0 KVA UNPLANNED 18‐06‐2018 23:39:00 19‐06‐2018 00:10:53 0:31 0 MUs

BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK C‐SADAT PUR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, PKT B‐BLOCK B, BLOCK E‐ SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐ WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK D‐MUSTAFABAD 84 (DAYALPUR), BLOCK D‐WEST KARAWAL NAGAR, WEST KARAWAL NAGAR KWN 5685 1660 KVA UNPLANNED 19‐06‐2018 15:21:00 19‐06‐2018 17:20:00 1:59 0.00033056 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐MUSTAFABAD (DAYALPUR), LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐ DAYALPUR, BLOCK A‐RAMA GARDEN, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐ PUSTA AREA‐L BLOCK, BLOCK A‐KHAJURI KHAS, BLOCK D‐TUKMIRPUR, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐ BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐ 85 JHILMIL COLONY, PKT A‐BLOCK B KWN 525 5530 KVA UNPLANNED 24‐06‐2018 05:34:39 24‐06‐2018 07:06:00 1:31 0.00207278 MUs 86 BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI) KWN 222 630 KVA UNPLANNED 25‐06‐2018 17:05:14 25‐06‐2018 17:40:49 0:35 0.00029167 MUs FACTORY (KHASRA)‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL 87 NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR KWN 862 1620 KVA UNPLANNED 26‐06‐2018 12:33:00 26‐06‐2018 13:22:00 0:49 0.00121139 MUs BLOCK B‐KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐ 88 HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR, BLOCK K‐KARAWAL NAGAR (DEHROTI) KWN 862 1620 KVA UNPLANNED 27‐06‐2018 06:47:00 27‐06‐2018 07:40:00 0:53 0.00080972 MUs

ARVIND NAGAR‐GHONDA, PKT F‐BLOCK B, BLOCK F‐WEST KARAWAL NAGAR, BLOCK E‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK H‐GHONDA PATTI, BLOCK I‐BHAGAT SINGH COLONY, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK F‐BHAGAT SINGH COLONY, BLOCK C‐BHAGAT SINGH COLONY, BHAGAT NAGAR‐DAYALPUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK C‐JAI PRAKASH NAGAR, BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK K‐WEST KARAWAL NAGAR, BLOCK C‐GHONDA PATTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK D‐WEST KARAWAL NAGAR, GHONDA PATTI, BLOCK D‐DLF ANKUR VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., WEST KARAWAL NAGAR, BLOCK B‐ 89 KARAWAL NAGAR (DEHROTI), BLOCK C‐BHAGAT SINGH COLONY KWN 5976 5360 KVA UNPLANNED 27‐06‐2018 07:17:33 27‐06‐2018 08:04:49 0:47 0.00096611 MUs BLOCK R‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ MANGALAM VIHAR, BLOCK C‐PATEL VIHAR, BLOCK A‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, BLOCK C‐PRAKASH VIHAR, 90 BLOCK B‐PATEL VIHAR, BLOCK B‐BHAGAT SINGH COLONY KWN 1941 2415 KVA UNPLANNED 28‐06‐2018 04:27:40 28‐06‐2018 05:36:00 1:8 0.00190778 MUs 91 BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐KARAWAL NAGAR (DEHROTI) KWN 68 630 KVA UNPLANNED 28‐06‐2018 13:18:59 28‐06‐2018 13:35:18 0:16 0.00006667 MUs 92 BLOCK D‐PREM VIHAR, BLOCK C‐MAHALAXMI ENCLAVE, BLOCK C‐PREM VIHAR KWN 65 990 KVA UNPLANNED 29‐06‐2018 08:48:32 29‐06‐2018 10:06:00 1:17 0.00010694 MUs 93 BLOCK B‐KARAWAL NAGAR (DEHROTI) KWN 23 630 KVA UNPLANNED 29‐06‐2018 08:54:30 29‐06‐2018 10:06:00 1:11 0.00009861 MUs

LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK A‐JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA‐ 94 SONIA VIHAR, MAUJ PUR COMPLEX 1, YAMUNA RIVER, JAFFRABAD‐MAUJ PUR, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 0 900 KVA UNPLANNED 05‐06‐2018 21:13:00 05‐06‐2018 22:12:00 0:58 0 MUs 95 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 241 630 KVA UNPLANNED 16‐06‐2018 09:15:37 16‐06‐2018 10:01:43 0:46 0.00006389 MUs PKT F‐BLOCK B, BLOCK A‐MUSTAFABAD (DAYALPUR), PKT C1‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK E‐INDIRA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK U‐SHIV VIHAR, PKT A‐BLOCK B, BLOCK 3A‐BLOCK B, BLOCK 5B‐SADAT PUR, PKT E‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 3B‐SADAT PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK 6C‐SADAT PUR, BLOCK 4C‐SADAT PUR, BLOCK 4A‐SADAT PUR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK F‐SADAT PUR, PKT B‐BLOCK A, PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, BLOCK F‐SHIV VIHAR, GEETA COLONY, BLOCK C2‐NEW CHAUHAN PUR, BLOCK H‐BHAGIRATHI VIHAR, PKT 1‐BLOCK A, BLOCK B‐NEW CHAUHAN PUR, PKT EA‐BLOCK B, BLOCK C1‐ SADAT PUR, BLOCK 1D‐SADAT PUR, PKT C2‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., PKT G‐BLOCK A, BLOCK 3C‐SADAT PUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK 2C‐SADAT PUR, PKT E‐BLOCK A, BLOCK 1B‐SADAT PUR, BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK 96 3A‐SADAT PUR, BLOCK 4B‐SADAT PUR, BHAJANPURA‐DAYALPUR, BLOCK N‐SHIV VIHAR, BLOCK A‐SADAT PUR, PKT 2A‐ KWN 6065 4000 KVA UNPLANNED 16‐06‐2018 18:09:00 16‐06‐2018 19:05:00 0:56 0.00256667 MUs BLOCK C‐TUKMIRPUR, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, BLOCK D‐TUKMIRPUR, BLOCK D‐SHERPUR, BLOCK D‐ 97 KHAJURI KHAS, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK B‐CHANDU NAGAR KWN 928 1260 KVA UNPLANNED 17‐06‐2018 15:18:42 17‐06‐2018 17:00:00 1:41 0.00036472 MUs

BLOCK D‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐NEHRU VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A1‐MUNGA NAGAR, BLOCK 9‐GANDHI NAGAR, BLOCK B‐CHANDU NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK A‐ NEHRU VIHAR, BLOCK C‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL 98 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 7559 3870 KVA UNPLANNED 19‐06‐2018 14:59:00 19‐06‐2018 16:35:00 1:36 0.00309333 MUs

BLOCK B‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, BLOCK D‐TUKMIRPUR, BLOCK D‐ 99 SHERPUR, BLOCK D‐KHAJURI KHAS, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK B‐CHANDU NAGAR KWN 928 1260 KVA UNPLANNED 20‐06‐2018 19:12:33 20‐06‐2018 19:30:00 0:17 0.00064694 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK A‐PRAKASH VIHAR, BLOCK C‐KARAWAL NAGAR, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, PKT B‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PHASE I‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐ NEW CHAUHAN PUR, BLOCK B‐MAN SINGH NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON 100 COMM AREA‐SONIA VIHAR KWN 2799 800 KVA UNPLANNED 24‐06‐2018 04:54:00 24‐06‐2018 06:50:00 1:56 0.00283556 MUs

LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐MUSTAFABAD (DAYALPUR), LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM 101 AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 3236 2060 KVA UNPLANNED 24‐06‐2018 07:41:00 24‐06‐2018 08:35:00 0:54 0.001725 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK B‐NEW CHAUHAN PUR, BLOCK D‐OLD MUSTAFABAD, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK T‐ NEHRU VIHAR, BLOCK B‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK A‐RAMA GARDEN, PKT M‐BLOCK D, BLOCK N‐SHIV VIHAR, BLOCK G‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, BLOCK T‐NEHRU VIHAR, BLOCK A‐ NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BLOCK B‐NEW CHAUHAN PUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK A‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK M‐OLD MUSTAFABAD, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐SHIV 102 VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 10712 6530 KVA UNPLANNED 24‐06‐2018 12:54:00 24‐06‐2018 15:05:00 2:11 0.00469417 MUs LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐ 103 BLOCK B KWN 3237 2060 KVA UNPLANNED 28‐06‐2018 07:52:00 28‐06‐2018 08:50:00 0:58 0.00132111 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK A‐PRAKASH VIHAR, BLOCK C‐KARAWAL NAGAR, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, PKT B‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PHASE I‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐ NEW CHAUHAN PUR, BLOCK B‐MAN SINGH NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON 104 COMM AREA‐SONIA VIHAR KWN 2799 800 KVA UNPLANNED 28‐06‐2018 10:17:00 28‐06‐2018 11:14:00 0:56 0.00189778 MUs 105 BLOCK A‐TUKMIRPUR, BLOCK F‐MUSTAFABAD (DAYALPUR) KWN 32 990 KVA UNPLANNED 28‐06‐2018 13:22:23 28‐06‐2018 13:37:20 0:14 0 MUs 106 BLOCK A‐VINOD NAGAR EAST LNR 91 990 KVA UNPLANNED 14‐06‐2018 14:32:28 14‐06‐2018 15:20:01 0:47 0 MUs 107 BLOCK A‐VINOD NAGAR EAST LNR 200 990 KVA UNPLANNED 14‐06‐2018 14:40:43 14‐06‐2018 15:28:47 0:48 0 MUs 108 FAZALPUR‐MANDAWALI VILLAGE, BLOCK U‐CHANDER VIHAR LNR 131 630 KVA UNPLANNED 15‐06‐2018 09:56:01 15‐06‐2018 10:15:22 0:19 0 MUs 109 BLOCK A‐MANDAWALI, BLOCK B‐VINOD NAGAR EAST LNR 63 990 KVA UNPLANNED 15‐06‐2018 10:02:09 15‐06‐2018 10:20:50 0:18 0 MUs 110 BLOCK A‐, BLOCK D‐PANDAV NAGAR LNR 435 990 KVA UNPLANNED 15‐06‐2018 10:17:22 15‐06‐2018 10:30:22 0:13 0 MUs BLOCK E‐GANESH NAGAR, GANESH NAGAR SOUTH‐INDRAPRASTHA EXTENSION, BLOCK D‐PANDAV NAGAR, J.J. COLONY‐ RAVIDAS CAMP, BLOCK C‐GANESH NAGAR, BLOCK A‐GANESH NAGAR, PANDAV NAGAR BLOCK D‐GANESH NAGAR, BLOCK 111 A‐PANDAV NAGAR LNR 4815 3240 KVA UNPLANNED 15‐06‐2018 15:18:00 15‐06‐2018 16:16:00 0:58 0.00228778 MUs BLOCK E‐GANESH NAGAR, GANESH NAGAR SOUTH‐INDRAPRASTHA EXTENSION, BLOCK D‐PANDAV NAGAR, J.J. COLONY‐ RAVIDAS CAMP, BLOCK C‐GANESH NAGAR, BLOCK A‐GANESH NAGAR, PANDAV NAGAR BLOCK D‐GANESH NAGAR, BLOCK 112 A‐PANDAV NAGAR LNR 4815 3240 KVA UNPLANNED 15‐06‐2018 17:28:00 15‐06‐2018 17:50:00 0:22 0.00061111 MUs 113 BLOCK B‐VINOD NAGAR EAST, BLOCK B‐VINOD NAGAR WEST, BLOCK A‐VINOD NAGAR EAST LNR 1111 990 KVA UNPLANNED 26‐06‐2018 12:06:00 26‐06‐2018 12:30:20 0:24 0.00006667 MUs

BLOCK E‐LAKSHMI NAGAR, BLOCK G‐LAKSHMI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK F‐LALITA PARK, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK C‐LALITA PARK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐LALITA PARK, BLOCK D‐ SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK B‐LAKSHMI NAGAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 114 BLOCK B LNR 3078 1620 KVA UNPLANNED 12‐06‐2018 15:56:31 12‐06‐2018 16:45:00 0:48 0.00244 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BANK ENCLAVE‐LAKSHMI NAGAR, BLOCK B‐PRIYADARSANI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, KRISHAN KUNJ‐LAKSHMI NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, EAST END ENCLAVE‐LAKSHMI NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐VISHWAKARMA PARK, GYAN KUNJ‐WEST GURU ANGAD NAGAR, BLOCK M‐SHIV VIHAR, BLOCK B‐KUNDAN NAGAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐ DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GURU ANGAD NAGAR EAST‐SWASTHYA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK A‐GURU RAMDAS NAGAR, JHILMIL INDUSTRIAL AREA‐ 115 JHILMIL COLONY, PKT A‐BLOCK B LNR 4962 3600 KVA UNPLANNED 14‐06‐2018 03:43:34 14‐06‐2018 04:34:56 0:51 0.00255 MUs

MOHAN PARK‐WEST GURU ANGAD NAGAR, BLOCK C‐GURU ANGAD NAGAR WEST, COMMERCIAL COPLEX‐ 116 SWASTHYA VIHAR, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK F‐GURU ANGAD NAGAR WEST LNR 955 990 KVA UNPLANNED 16‐06‐2018 11:47:54 16‐06‐2018 12:07:00 0:19 0.00005278 MUs 117 BLOCK S1‐SCHOOL BLOCK LNR 770 990 KVA UNPLANNED 16‐06‐2018 12:36:55 16‐06‐2018 12:53:47 0:16 0.00004444 MUs

BLOCK WA&O‐SHAKARPUR KHAS, BLOCK G‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, SHAKARPUR EXTN.‐ 118 SHAKARPUR KHAS, BLOCK R&A‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK H‐SHAKARPUR KHAS LNR 4491 3600 KVA UNPLANNED 17‐06‐2018 08:47:40 17‐06‐2018 09:25:00 0:37 0.000555 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK F‐GURU ANGAD NAGAR WEST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐ SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐ 119 JHILMIL COLONY, PKT A‐BLOCK B LNR 1904 990 KVA UNPLANNED 19‐06‐2018 09:50:00 19‐06‐2018 10:17:55 0:27 0.000075 MUs 120 BLOCK M‐JAGAT RAM PARK LNR 65 990 KVA UNPLANNED 19‐06‐2018 10:25:57 19‐06‐2018 10:54:00 0:28 0.00007778 MUs

BHAGAT NAGAR‐DAYALPUR, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK D‐ LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PUSTA‐ LALITA PARK, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐LALITA PARK, BLOCK F‐SHIV VIHAR, JHILMIL 121 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1860 990 KVA UNPLANNED 20‐06‐2018 10:06:00 20‐06‐2018 10:32:35 0:26 0.00007222 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BHAGAT NAGAR‐DAYALPUR, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK D‐ LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PUSTA‐ LALITA PARK, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐LALITA PARK, BLOCK F‐SHIV VIHAR, JHILMIL 122 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1860 990 KVA UNPLANNED 21‐06‐2018 13:15:00 21‐06‐2018 13:43:16 0:28 0.00007778 MUs

YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK S1‐SCHOOL BLOCK, FATEHPURI‐KUCHA HASIRAM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK S‐SCHOOL BLOCK, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, GANESH NAGAR‐SHAKARPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DELHI DEVELOPMENT AUTHORITY‐SCHOOL BLOCK, NEHRU ENCLAVE‐SCHOOL BLOCK, BHAGAT NAGAR‐DAYALPUR, BALI MARAN‐BARA DARI, BLOCK M‐SHIV VIHAR, VISHWAKARMA PARK‐LAKSHMI NAGAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, KATRA NAWAB‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK D‐LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAI SARAK‐ 123 KATRA ASRAFI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 2219 2420 KVA UNPLANNED 24‐06‐2018 12:58:00 24‐06‐2018 15:08:00 2:10 0.00325 MUs

PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, BANK ENCLAVE‐LAKSHMI NAGAR, VISHWAKARMA PARK‐KISHAN KUNJ, VISHWAKARMA PARK‐LAKSHMI NAGAR, BLOCK J‐ VISHWAKARMA PARK, KRISHNA KUNJ‐LAKSHMI NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, KISHAN KUNJ‐SHASTRI 124 NAGAR, BLOCK F‐VISHWAKARMA PARK, RAMESH PARK‐LAKSHMI NAGAR, RAMESH PARK‐NARAYAN NAGAR LNR 5631 5090 KVA UNPLANNED 25‐06‐2018 03:30:30 25‐06‐2018 04:20:00 0:49 0.0015925 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCK M‐SHIV VIHAR, BLOCK A‐ SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK F‐GURU ANGAD NAGAR WEST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐ SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GURU RAMDAS NAGAR‐ 125 LAKSHMI NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1856 990 KVA UNPLANNED 26‐06‐2018 11:55:00 26‐06‐2018 12:25:05 0:30 0.00008333 MUs

PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, BANK ENCLAVE‐LAKSHMI NAGAR, VISHWAKARMA PARK‐KISHAN KUNJ, BLOCK B‐GURU ANGAD NAGAR WEST, VISHWAKARMA PARK‐LAKSHMI NAGAR, BLOCK J‐VISHWAKARMA PARK, KRISHNA KUNJ‐LAKSHMI NAGAR, BLOCK N‐ VISHWAKARMA PARK, KISHAN KUNJ‐SHASTRI NAGAR, RAMESH PARK‐LAKSHMI NAGAR, RAMESH PARK‐NARAYAN NAGAR, 126 BLOCK F‐GURU ANGAD NAGAR WEST, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐VISHWAKARMA PARK LNR 5631 5090 KVA UNPLANNED 28‐06‐2018 01:50:34 28‐06‐2018 02:48:00 0:57 0.00095 MUs BLOCK WA&O‐SHAKARPUR KHAS, BLOCK G‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK D‐LALITA PARK, BLOCK B‐VINOD NAGAR EAST, SHAKARPUR EXTN.‐SHAKARPUR KHAS, BLOCK R&A‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR 127 KHAS, BLOCK H‐SHAKARPUR KHAS LNR 4491 3600 KVA UNPLANNED 28‐06‐2018 02:11:44 28‐06‐2018 03:09:00 0:57 0.002375 MUs LAKSHMI NAGAR BLOCK L, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK M‐JAGAT RAM PARK, BLOCK K‐JAGAT RAM 128 PARK, BLOCK J‐LALITA PARK LNR 1214 990 KVA UNPLANNED 28‐06‐2018 14:06:00 28‐06‐2018 14:32:00 0:26 0.00007222 MUs 129 BLOCK G‐PREET VIHAR LNR 93 990 KVA UNPLANNED 14‐06‐2018 15:27:41 14‐06‐2018 15:54:00 0:26 0.00007222 MUs 130 BLOCK F‐PREET VIHAR, BLOCK G‐PREET VIHAR LNR 88 990 KVA UNPLANNED 16‐06‐2018 10:25:00 16‐06‐2018 10:54:00 0:29 0.00008056 MUs 131 BLOCK B‐SWASTHYA VIHAR, BLOCK A‐SWASTHYA VIHAR LNR 169 990 KVA UNPLANNED 19‐06‐2018 13:15:00 19‐06‐2018 13:44:35 0:29 0.00008056 MUs 132 LIG/MIG RES/NON COMM AREA‐MOTHER DAIRY LNR 86 630 KVA UNPLANNED 16‐06‐2018 11:00:00 16‐06‐2018 11:29:14 0:29 0.00008056 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, INDUSTRIAL AREA‐ PATPAR GANJ INDUSTRIAL AREA, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BHARAT GAS‐GAZIPUR VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TELCO LTD.‐GAZIPUR VILLAGE, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐ 133 JHILMIL COLONY, PKT A‐BLOCK B LNR 441 400 KVA UNPLANNED 21‐06‐2018 18:20:00 21‐06‐2018 18:55:00 0:35 0.0004375 MUs BLOCK A‐MOTHER DAIRY, KURMANCHAL NIKETAN‐MOTHER DAIRY, VIDHI APARTMENT‐MOTHER DAIRY, INDER PRASTHA APARTMENT‐MOTHER DAIRY, SAGAR SADAN‐MOTHER DAIRY, AZAD APARTMENT‐MOTHER DAIRY, BLOCK B‐MOTHER 134 DAIRY, VRINDAVAN APARTMENT‐MOTHER DAIRY LNR 1197 6810 KVA UNPLANNED 24‐06‐2018 12:50:39 24‐06‐2018 14:25:00 1:34 0.00057444 MUs 135 BLOCK B‐MOTHER DAIRY LNR 70 400 KVA UNPLANNED 26‐06‐2018 12:20:00 26‐06‐2018 12:48:00 0:27 0.000075 MUs LIG/MIG RES/NON COMM AREA‐MOTHER DAIRY, SAGAR SADAN‐MOTHER DAIRY, ST. PETER CONVENT SCHOOL‐MOTHER 136 DAIRY LNR 29 1660 KVA UNPLANNED 26‐06‐2018 22:56:32 26‐06‐2018 23:32:00 0:35 0.00005833 MUs 137 BLOCK B‐MOTHER DAIRY LNR 32 630 KVA UNPLANNED 27‐06‐2018 13:10:17 27‐06‐2018 13:25:04 0:14 0.00003889 MUs 138 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 47 990 KVA UNPLANNED 27‐06‐2018 13:14:04 27‐06‐2018 13:28:13 0:14 0.00003889 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, FRIENDS APARTMENT‐MADHU VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, MAYFAIR APPARTMENT‐MADHU VIHAR, ST.ANDREWS SOOTS SCHOOL‐MADHU VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, NAVKRANTI APPARTMENT‐MADHU VIHAR, RAMA KRISHNA VIHAR APARTMENT‐MADHU VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK D‐PREET VIHAR, TRILOK APPARTMENT‐MADHU VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐ SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, VIDHISA APPARTMENT‐MADHU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, VIKALP APPARTMENT‐MADHU VIHAR, LIG/MIG RES/NON COMM 139 AREA‐CHANDER VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1114 4290 KVA UNPLANNED 28‐06‐2018 10:56:35 28‐06‐2018 11:45:47 0:49 0.00039472 MUs 140 BLOCK F‐PREET VIHAR, BLOCK G‐PREET VIHAR LNR 88 990 KVA UNPLANNED 28‐06‐2018 13:38:00 28‐06‐2018 14:03:09 0:25 0.00006944 MUs

C‐101 TO 104‐201 T‐CHILLA‐NAGARJUNA APPARTMENT‐ BLOCK C, OLD NOIDA AUTHORITY‐VASUNDHARA ENCLAVE YAMUNA FLOOD PLAINS, MAYUR VIHAR YAMUNA FLOOD PLAINS, CHILLA‐ A.I.I.M.S. APPARTMENT‐NEW , 141 MAYUR PLACE‐MAYUR VIHAR, NEW ASHOK NAGAR MVR‐VASUNDHARA ENCLAVE MVR MVR 1 100 KVA UNPLANNED 15‐06‐2018 20:12:00 15‐06‐2018 20:57:00 0:45 0.0001375 MUs PRATAP NAGAR‐PHASE I, ACHARYA NIKETAN‐SHASHI GARDEN, PANDAV NAGAR MVR‐SHAKARPUR MVR, MANTOLA 142 MOHALLA‐PAHAR GANJ, PHASE I‐MAYUR VIHAR MVR 2559 5970 KVA UNPLANNED 19‐06‐2018 17:12:00 19‐06‐2018 17:30:00 0:18 0.000525 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAYUR VIHAR EXTN., CL‐CHILLA SARDA BANGAR VILLAGE, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, MAYUR PLACE‐MAYUR VIHAR, PKT A‐ 143 BLOCK B MVR 1708 7670 KVA UNPLANNED 27‐06‐2018 18:15:00 27‐06‐2018 19:12:00 0:56 0.00108889 MUs SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, BLOCK B‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK E‐ 144 GAZIPUR DAIRY FARM, BHARAT GAS‐GAZIPUR VILLAGE, BLOCK A‐GAZIPUR DAIRY FARM MVR 451 1890 KVA UNPLANNED 27‐06‐2018 19:10:00 27‐06‐2018 20:23:00 1:13 0.00064889 MUs SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, BLOCK B‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK E‐ 145 GAZIPUR DAIRY FARM MVR 451 1890 KVA UNPLANNED 27‐06‐2018 22:20:00 27‐06‐2018 23:18:00 0:58 0.00070889 MUs SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, BLOCK B‐GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK E‐ 146 GAZIPUR DAIRY FARM, KALYAN VAS‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR MVR 519 1890 KVA UNPLANNED 29‐06‐2018 10:00:00 29‐06‐2018 10:50:00 0:49 0.00035389 MUs

147 BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 18‐HIMMATPURI MVR 873 1030 KVA UNPLANNED 18‐06‐2018 22:19:00 18‐06‐2018 23:43:00 1:24 0 MUs

BLOCK 20‐KALYAN PURI, BLOCK 36‐HIMMATPURI, BLOCK 7‐TRILOKPURI PHASE I, BLOCK 10‐TRILOKPURI PHASE I, BLOCK 12‐TRILOKPURI PHASE I, MAYUR VIHAR PHASE II, BLOCK 1‐TRILOKPURI PHASE I, BLOCK 15‐TRILOKPURI PHASE II, BLOCK 18‐KALYAN PURI, BLOCK 21‐KALYAN PURI, BLOCK 5‐TRILOKPURI PHASE I, BLOCK 9‐TRILOKPURI PHASE I, BLOCK 26‐ HIMMATPURI, BLOCK 3‐TRILOKPURI PHASE I, BLOCK 24‐TRILOKPURI PHASE II, BLOCK 19‐KALYAN PURI, BLOCK 18‐ HIMMATPURI, BLOCK 19‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 14‐ TRILOKPURI PHASE II, BLOCK 17‐HIMMATPURI, BLOCK 11‐TRILOKPURI PHASE I, BLOCK 22‐HIMMATPURI, BLOCK 8‐ TRILOKPURI PHASE I, BLOCK 23‐TRILOKPURI PHASE II, KALYAN PURI‐MAYUR VIHAR, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 148 4‐TRILOKPURI PHASE I, BLOCK 35‐HIMMATPURI, BLOCK D‐SHRI RAM COLONY MVR 9454 5890 KVA UNPLANNED 23‐06‐2018 13:53:38 23‐06‐2018 14:45:00 0:51 0.001445 MUs 149 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 12‐06‐2018 10:06:00 12‐06‐2018 10:50:00 0:44 0.00100222 MUs 150 BLOCK E‐JAGATPURI EXTN., BLOCK A‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN. NNG 535 990 KVA UNPLANNED 16‐06‐2018 16:14:55 16‐06‐2018 16:48:26 0:33 0.00009167 MUs HARSH VIHAR SUB STATION‐POLICE FARM, POCKET A‐JJ COLONY, DEV PUBLIC SCHOOL‐CHITRAKOOT, AMIG FLATS‐ 151 POCKET A, GTB MIG FLATS‐POCKET F NNG 103 630 KVA UNPLANNED 23‐06‐2018 20:40:00 23‐06‐2018 21:35:00 0:54 0.000975 MUs

BLOCK E‐JAGATPURI EXTN., MCD SCHOOL‐BLOCK C3, BLOCK E‐GTB STAFF COLONY, BLOCK D2‐NAND NAGARI, BLOCK C1‐ NAND NAGARI, TOILET‐GTB STAFF COLONY, ANUP VIHAR‐MANDOLI, BLOCK B3‐NAND NAGARI, SS SCHOOL‐BLOCK B5, PKT C3‐BLOCK C1, BSES YAMUNA POWER LTD‐GTB STAFF COLONY, MCD PRIMARY SCHOOL‐BLOCK D1, BLOCK B4‐NAND NAGARI, BLOCK D‐JAGATPURI EXTN., BLOCK B2‐NAND NAGARI, TYPE B QUARTERS‐GTB STAFF COLONY, BSES OFFICE‐ BLOCK C2, PKT D3‐BLOCK C1, JYOTI COLONY‐BALBIR NAGAR, PKT C4‐BLOCK C1, BLOCK B6‐NAND NAGARI, BLOCK A‐ JAGATPURI EXTN., BLOCK B1‐NAND NAGARI, BLOCK D3‐NAND NAGARI, BLOCK D‐BLOCK C3, BLOCK B5‐NAND NAGARI, 152 BLOCK B‐JAGATPURI EXTN., BLOCK C‐JAGATPURI EXTN., GTB HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG NNG 9930 5220 KVA UNPLANNED 26‐06‐2018 07:16:00 26‐06‐2018 08:14:00 0:58 0.00286778 MUs 153 KACHI MANDIR‐BLOCK E4 NNG 406 630 KVA UNPLANNED 30‐06‐2018 12:35:42 30‐06‐2018 12:37:06 0:1 0.00000222 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐ NARAYAN NAGAR, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK Z‐ O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐LALITA PARK, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐ NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OPD. DR. N.C. JOSHI 154 MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 9494 2610 KVA UNPLANNED 25‐06‐2018 01:30:29 25‐06‐2018 04:00:00 2:29 0.0026075 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐ 155 UTTARANCHAL COLONY NNG 3958 400 KVA UNPLANNED 27‐06‐2018 05:53:00 27‐06‐2018 06:45:00 0:51 0.00079333 MUs BLOCK A‐EAST GOKUL PURI, BLOCK C‐GOKUL PURI, BLOCK B‐SEWA DHAM, BLOCK B‐EAST GOKUL PURI, SABOLI VILLAGE‐ 156 MANDOLI, PKT B‐CHITRAKOOT, G.B.SSS SCHOOL‐GOKUL PURI NNG 2417 3870 KVA UNPLANNED 28‐06‐2018 08:21:35 28‐06‐2018 09:17:00 0:55 0.00126806 MUs TYPE B QUARTERS‐GTB STAFF COLONY, JRD HOSPITAL‐GTB STAFF COLONY, BSES YAMUNA POWER LTD‐GTB STAFF 157 COLONY, BLOCK E‐GTB STAFF COLONY, TOILET‐GTB STAFF COLONY NNG 333 630 KVA UNPLANNED 21‐06‐2018 08:37:34 21‐06‐2018 09:35:00 0:57 0.00001583 MUs

BLOCK B‐KABIR NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐ PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT H‐BLOCK D, DELHI JAL BOARD‐ JYOTI NAGAR, BLOCK A‐HARIJAN BASTI, BABA DA DARGA‐KARDAMPURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐ 158 JHILMIL COLONY, PKT A‐BLOCK B NNG 4475 2250 KVA UNPLANNED 14‐06‐2018 07:00:00 14‐06‐2018 07:58:00 0:58 0.00249722 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK C‐LALITA PARK, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐ SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, BHAJANPURA‐DAYALPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐ NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK 159 A‐KONDALI VILLAGE NNG 9627 4590 KVA UNPLANNED 14‐06‐2018 10:56:34 14‐06‐2018 11:50:00 0:53 0.00138389 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, BLOCK A‐CHANDRA LOK, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK B‐DURGA PURI, BLOCK C‐LALITA PARK, JYOTI COLONY‐BALBIR NAGAR, BLOCK A‐JAGATPURI EXTN., BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐ SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, BHAJANPURA‐DAYALPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐ NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐JAGAT PURI, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, BLOCK B‐CHANDRA LOK, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK 160 A‐KONDALI VILLAGE NNG 9627 4590 KVA UNPLANNED 16‐06‐2018 21:41:39 16‐06‐2018 22:35:00 0:53 0.0022525 MUs 161 BABA DA DARGA‐KARDAMPURI NNG 3 630 KVA UNPLANNED 21‐06‐2018 11:22:35 21‐06‐2018 11:24:17 0:1 0.00000222 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BABARPUR EXTN.‐BABAR PUR, RAGHUBARPURA NO 2‐ SEELAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N SHIV VIHAR, BLOCK C‐KONDALI VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK M‐SHIV VIHAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐ 162 KONDALI VILLAGE NNG 5365 3600 KVA UNPLANNED 22‐06‐2018 00:38:35 22‐06‐2018 01:36:00 0:57 0.00316667 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BABARPUR EXTN.‐BABAR PUR, RAGHUBARPURA NO 2‐ SEELAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N SHIV VIHAR, BLOCK C‐KONDALI VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, CHHAJJUPUR‐BABAR PUR, BHAGAT NAGAR‐DAYALPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK M‐SHIV VIHAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐ KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐ 163 SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE NNG 5365 3600 KVA UNPLANNED 22‐06‐2018 14:13:36 22‐06‐2018 15:08:00 0:54 0.00006 MUs 164 BLOCK M‐DURGA PURI, JAFFRABAD‐MAUJ PUR NNG 1451 990 KVA UNPLANNED 24‐06‐2018 08:39:11 24‐06‐2018 09:24:08 0:44 0.00011 MUs

BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐ BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐ JYOTI NAGAR, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐DURGA PURI, BLOCK B‐ DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BABA DA DARGA‐KARDAMPURI, JYOTI COLONY‐ BALBIR NAGAR, CHHAJJUPUR‐BABAR PUR, BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐NORTH CHHAJUPUR, BLOCK F‐NORTH CHHAJUPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐NORTH CHHAJUPUR, BLOCK D‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR NNG, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐NORTH CHHAJUPUR, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, KARISHMA APPARTMENT‐MOTHER DAIRY, PKT C‐BLOCK B, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐DURGA PURI, PKT H‐BLOCK D, BLOCK A‐HARIJAN BASTI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI 165 VILLAGE NNG 11280 8230 KVA UNPLANNED 27‐06‐2018 20:28:33 27‐06‐2018 22:06:00 1:37 0.00398778 MUs 166 FYAZ GANJ‐NAWAB GANJ, NAWAB GANJ‐SADAR BAZAR, HATHI KHANA‐NAWAB GANJ PHG 4266 4000 KVA UNPLANNED 12‐06‐2018 07:28:31 12‐06‐2018 08:26:00 0:57 0.00150417 MUs CHOWK NAI BASTI‐SADAR BAZAR, KABRISTAN‐SADAR BAZAR B G ROAD, MODEL BASTI‐SADAR BAZAR B G ROAD, BLOCK T‐ AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD, SADAR BAZAR B G ROAD, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, SCHOOL 167 AHATA KEDARA PHG 1791 2610 KVA UNPLANNED 24‐06‐2018 23:45:59 25‐06‐2018 00:20:00 0:34 0.00068944 MUs SADAR BAZAR B G ROAD, SADAR BAZAR ‐ RAM NAGAR, PHARI DHIRAJ‐SADAR BAZAR, FYAZ GANJ‐NAWAB GANJ, TELI 168 WARA‐NAWAB GANJ PHG 4333 4000 KVA UNPLANNED 26‐06‐2018 07:18:00 26‐06‐2018 08:06:26 0:48 0.00076 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, TELI WARA‐NAWAB GANJ, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, FYAZ GANJ‐NAWAB GANJ, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL 169 NAGAR, BLOCK F‐SHIV VIHAR, NAWAB GANJ‐SADAR BAZAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 5494 3810 KVA UNPLANNED 28‐06‐2018 09:57:34 28‐06‐2018 10:45:00 0:47 0.0010575 MUs 170 MANTOLA MOHALLA‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR PHG 61 990 KVA UNPLANNED 12‐06‐2018 22:47:02 12‐06‐2018 23:41:44 0:54 0.00015 MUs 171 MANTOLA MOHALLA‐PAHAR GANJ, PHASE I‐MAYUR VIHAR PHG 324 630 KVA UNPLANNED 17‐06‐2018 16:28:16 17‐06‐2018 17:22:10 0:53 0.00014722 MUs

PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, KASERU WALAN‐ PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, MANTOLA MOHALLA‐PAHAR GANJ, PAHAR GANJ PHG, NEW RATAN MARKET‐PANCHKUIAN ROAD RAILWAY COLONY, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, CHUNA MANDI‐PAHAR GANJ, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SHORA KOTHI‐PAHAR GANJ, BLOCK F‐SHIV 172 VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 3140 3600 KVA UNPLANNED 20‐06‐2018 10:38:32 20‐06‐2018 11:31:59 0:53 0.00126611 MUs

PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK I‐ARAM BAGH, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, AMRIT KAUR MARKET‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, MANTOLA MOHALLA‐PAHAR GANJ, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐ SADATPUR EXT‐PUSTA AREA‐L BLOCK, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, PKT R‐BLOCK D, ST. ANTONYS CHURCH SCHOOL‐ARYA NAGAR, GEETA COLONY, TYPE III HOUSE‐CHUNA MANDI, S.R.T. NAGAR‐ARYA NAGAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, CHUNA MANDI‐PAHAR GANJ, BLOCK H‐ BHAGIRATHI VIHAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE‐CHANDNI CHOWK CCK, LIG/MIG RES/NON 173 COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 5778 6570 KVA UNPLANNED 25‐06‐2018 15:57:30 25‐06‐2018 16:55:00 0:57 0.00383167 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SADAR BAZAR ‐ RAM NAGAR, SIMLA MANDI GOODTRAN‐RUI MANDI, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK T‐ARAM NAGAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK J‐NABI KARIM, BLOCK N‐SHIV VIHAR, ARAM NAGAR‐SADAR BAZAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR B G ROAD, BLOCK M SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, TELI WARA‐NAWAB GANJ, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, 174 PKT A‐BLOCK B PHG 8138 5750 KVA UNPLANNED 14‐06‐2018 12:09:35 14‐06‐2018 12:56:00 0:46 0.00164833 MUs DDA FLATS‐MOTIA KHAN, BLOCK D‐MOTIA KHAN, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR ‐ RAM NAGAR, 175 BLOCK T‐AHATA KEDARA PHG 2341 2380 KVA UNPLANNED 28‐06‐2018 01:19:36 28‐06‐2018 03:06:00 1:46 0.00500556 MUs BLOCK W‐WEST , BLOCK H‐, RESTRICTED AREA MILITARY‐WEST PATEL NAGAR, BLOCK O WEST PATEL NAGAR, BLOCK N‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR, SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK Q‐WEST PATEL NAGAR, BLOCK A‐COTTAGE, BLOCK P‐WEST PATEL NAGAR, DTC FLATS‐SHADIPUR DEPOT, BLOCK U‐ WEST PATEL NAGAR, BLOCK R‐WEST PATEL NAGAR, BLOCK T‐WEST PATEL NAGAR, PATEL NAGAR POLICE STATION‐WEST 176 PATEL NAGAR, BLOCK T‐BALJIT NAGAR PNR 3110 3370 KVA UNPLANNED 21‐06‐2018 09:33:34 21‐06‐2018 10:20:31 0:46 0.00081778 MUs BLOCK 24‐WEST PATEL NAGAR, THAKKAR BAPA NAGAR‐DEV NAGAR, BLOCK 30‐WEST PATEL NAGAR, BLOCK 29‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR, BLOCK 28‐WEST PATEL NAGAR, PREM NAGAR‐BALJIT NAGAR, BLOCK T‐ 177 BALJIT NAGAR, BLOCK L‐WEST PATEL NAGAR PNR 5400 5940 KVA UNPLANNED 27‐06‐2018 21:43:33 27‐06‐2018 22:32:14 0:48 0.00169333 MUs 178 THAKKAR BAPA NAGAR‐BLOCK 16 PNR 540 990 KVA UNPLANNED 12‐06‐2018 18:21:26 12‐06‐2018 18:30:49 0:9 0.00002 MUs BLOCK B‐PUNJABI BASTI, BLOCK 23B‐ PNR, BLOCK 27B‐AJMAL KHAN PARK, BLOCK 25B‐AJMAL KHAN PARK, BLOCK 26B‐AJMAL KHAN PARK, THAN SINGH NAGAR‐ANAND PARBAT, THAKKAR BAPA NAGAR‐BLOCK 16, BABA FARID 179 PURI‐PUNJABI BASTI, ANAND PARBAT, BLOCK A‐PUNJABI BASTI PNR 4014 6250 KVA UNPLANNED 25‐06‐2018 15:56:30 25‐06‐2018 16:48:19 0:51 0.00082167 MUs

BLOCK_8B‐DEV NAGAR, BLOCK 7B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, REHGAR PURA‐DEV NAGAR, BLOCK 1B‐DEV NAGAR, BLOCK B‐KUNDAN NAGAR, BLOCK D‐VIVEK VIHAR, KUNDAN NAGAR‐LAKSHMI NAGAR, VIVEK VIHAR BLOCK C, THAKKAR BAPA NAGAR‐DEV NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK_5B‐DEV NAGAR, BLOCK 3‐DEV NAGAR, 180 BLOCK_2‐DEV NAGAR, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, BLOCK 6B‐DEV NAGAR PNR 8149 3600 KVA UNPLANNED 27‐06‐2018 07:56:35 27‐06‐2018 08:50:27 0:53 0.00064778 MUs

BLOCK_8B‐DEV NAGAR, BLOCK 7B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, REHGAR PURA‐DEV NAGAR, BLOCK 1B‐DEV NAGAR, BLOCK B‐KUNDAN NAGAR, BLOCK D‐VIVEK VIHAR, KUNDAN NAGAR‐LAKSHMI NAGAR, VIVEK VIHAR BLOCK C, THAKKAR BAPA NAGAR‐DEV NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK_5B‐DEV NAGAR, BLOCK 3‐DEV NAGAR, 181 BLOCK_2‐DEV NAGAR, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, BLOCK 6B‐DEV NAGAR PNR 8149 3600 KVA UNPLANNED 27‐06‐2018 15:00:35 27‐06‐2018 15:24:00 0:23 0.00078583 MUs 182 ANAND PARBAT, NAI BASTI‐ANAND PARBAT PNR 298 630 KVA UNPLANNED 23‐06‐2018 10:55:07 23‐06‐2018 11:38:39 0:43 0.00011944 MUs 183 BLOCK_34P‐KRISHNA NAGAR, BLOCK_35M‐BEADON PURA SRD 129 990 KVA UNPLANNED 12‐06‐2018 10:39:27 12‐06‐2018 11:16:51 0:37 0.00006167 MUs

BLOCK 57‐AJMAL KHAN PARK, BLOCK 61‐AJMAL KHAN PARK, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK 60‐AJMAL KHAN PARK, BLOCK 63‐AJMAL KHAN PARK, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR, BLOCK A‐NATHU COLONY, BLOCK 15A‐KAROL BAGH, BLOCK 50‐AJMAL KHAN PARK, BLOCK_39‐NAIWALA, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK 52‐AJMAL KHAN PARK, BLOCK C‐LALITA PARK, BLOCK 53‐AJMAL KHAN PARK, AJMAL KHAN 184 PARK SRD‐KAROL BAGH SRD SRD 5773 8820 KVA UNPLANNED 23‐06‐2018 09:02:00 23‐06‐2018 10:00:00 0:58 0.00164333 MUs 185 BLOCK_1A‐REHAGAR PURA, BLOCK_5A‐SAT NAGAR, BLOCK_10A‐BALMIKI COLONY SRD 357 990 KVA UNPLANNED 19‐06‐2018 13:01:32 19‐06‐2018 14:23:05 1:21 0.0001125 MUs 186 BLOCK_14A‐KAROL BAGH WEST EXTENSION AREA SRD 25 990 KVA UNPLANNED 27‐06‐2018 12:03:58 27‐06‐2018 12:35:58 0:31 0.00003444 MUs SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA 187 NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR SRD 540 990 KVA UNPLANNED 09‐06‐2018 02:12:00 09‐06‐2018 03:51:00 1:39 0 MUs BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR, SIR GANGA RAM 188 HOSPITAL‐CENTRAL RIDGE RESERVED FOREST SRD 22 630 KVA UNPLANNED 26‐06‐2018 10:20:10 26‐06‐2018 10:52:11 0:32 0.00005333 MUs BLOCK_48‐KRISHNA NAGAR, BLOCK 4C‐OLD RAJENDRA NAGAR, BLOCK 4‐OLD RAJENDRA NAGAR, BLOCK_1A‐REHAGAR 189 PURA, BLOCK 4‐KAROL BAGH SRD 21 630 KVA UNPLANNED 29‐06‐2018 10:30:35 29‐06‐2018 11:18:00 0:47 0.00006528 MUs BLOCK 7‐OLD RAJENDRA NAGAR, BLOCK 4C‐OLD RAJENDRA NAGAR, BLOCK 56‐OLD RAJENDRA NAGAR, BLOCK 55‐OLD RAJENDRA NAGAR, BLOCK 24‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK 8A‐OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL‐OLD RAJENDRA NAGAR, BLOCK 6‐OLD RAJENDRA NAGAR, BLOCK 11‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 19‐OLD RAJENDRA NAGAR, BLOCK 25‐OLD RAJENDRA NAGAR, BLOCK 8 OLD RAJENDRA NAGAR, BLOCK 17‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK 58‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR, BLOCK 26‐OLD RAJENDRA NAGAR, BLOCK 4‐OLD RAJENDRA NAGAR, BLOCK 51‐ OLD RAJENDRA NAGAR, BLOCK 20‐OLD RAJENDRA NAGAR, BLOCK 18‐OLD RAJENDRA NAGAR, BLOCK 16‐OLD RAJENDRA NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK 9‐OLD RAJENDRA NAGAR, BLOCK 13‐OLD RAJENDRA NAGAR, BLOCK 59 OLD RAJENDRA NAGAR, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 4D‐OLD RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 12‐OLD RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA NAGAR, BLOCK 27‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR, BLOCK 53‐OLD RAJENDRA NAGAR, BLOCK 60‐OLD RAJENDRA NAGAR, BLOCK 4A‐OLD RAJENDRA NAGAR, BLOCK 54‐OLD RAJENDRA NAGAR, BLOCK 5‐OLD RAJENDRA 190 NAGAR, BLOCK B3‐OLD RAJENDRA NAGAR SRD 5018 3870 KVA UNPLANNED 29‐06‐2018 19:37:37 29‐06‐2018 20:12:00 0:34 0.00061389 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, BLOCK A‐MAYUR VIHAR PHASE III, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, PKT B1‐MAYUR VIHAR PHASE III, PKT B3‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SHAHDARA JLM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT B2‐MAYUR VIHAR PHASE III, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, PKT 1‐MAYUR VIHAR PHASE III, BLOCK B‐VIVEK VIHAR, PKT B4‐MAYUR VIHAR PHASE III, PKT B5‐MAYUR VIHAR PHASE III, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK B‐MOTHER DAIRY, PKT 6‐ NEW KONDALI, PKT R‐BLOCK D, SEC C‐MAYUR VIHAR PHASE III, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, PKT B8‐MAYUR VIHAR PHASE III, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK H‐ BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, 191 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT VSE 8092 3150 KVA UNPLANNED 12‐06‐2018 16:40:31 12‐06‐2018 17:23:00 0:42 0.00103833 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DALLU PURA MVR‐VASUNDHARA ENCLAVE MVR, SEC D‐MAYUR VIHAR PHASE III, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DALLU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐KONDALI VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐KONDALI VILLAGE, BHAGAT NAGAR‐DAYALPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK B‐KONDALI EXTN., BLOCK F‐KONDALI VILLAGE, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, 192 BLOCK A‐KONDALI VILLAGE VSE 2057 2480 KVA UNPLANNED 22‐06‐2018 13:16:36 22‐06‐2018 13:45:00 0:28 0.00073889 MUs

193 HANUMAN MANDIR‐NEW ASHOK NAGAR, SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR VSE 677 4140 KVA UNPLANNED 16‐06‐2018 09:53:38 16‐06‐2018 10:19:00 0:25 0.00020139 MUs 194 BLOCK A & B‐VASUNDHARA ENCLAVE VSE 1538 8470 KVA UNPLANNED 17‐06‐2018 05:18:39 17‐06‐2018 05:55:00 0:36 0.00076 MUs CHILLA‐ TRAFIK BOOTH‐NEW ASHOK NAGAR, CHILLA‐ BLOCK B‐ ALLAHABAD APPARTMENT‐NEW ASHOK NAGAR, BLOCK A & B‐VASUNDHARA ENCLAVE, CHILLA‐ A.I.I.M.S. APPARTMENT‐NEW ASHOK NAGAR, DANIK JANYOG‐VASUNDHARA ENCLAVE VSE, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, NAV JAGRATI APPARTMENT‐VASUNDHARA ENCLAVE VSE, CAPITAL APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK A‐DALLU PURA VSE, PAVITRA APPARTMENT‐DALLU 195 PURA VSE VSE 1439 3680 KVA UNPLANNED 24‐06‐2018 02:06:39 24‐06‐2018 02:28:00 0:21 0.0001925 MUs 196 NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA YVR 456 630 KVA UNPLANNED 16‐06‐2018 11:46:36 16‐06‐2018 12:28:31 0:41 0.00005694 MUs

LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK M‐BRAHM PURI, BLOCK N‐SHIV VIHAR, BLOCK O‐BRAHM PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B‐ BRAHM PURI, BLOCK C‐GHONDA, NORTH GHONDA, BHAGAT NAGAR‐DAYALPUR, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK I‐BRAHM PURI, BLOCK K‐BRAHM PURI, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, BLOCK A‐ SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐JHANDEWALAN, BLOCK H‐BHAGIRATHI VIHAR, JAFFRABAD‐MAUJ PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐ 197 JHILMIL COLONY, PKT A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐BLOCK B YVR 11642 6210 KVA UNPLANNED 27‐06‐2018 00:26:32 27‐06‐2018 01:25:00 0:58 0.00249722 MUs

JAGJEET NAGAR‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK B‐SUBHASH 198 MOHALLA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI, BLOCK C‐GHONDA YVR 6814 3960 KVA UNPLANNED 28‐06‐2018 02:25:39 28‐06‐2018 03:54:00 1:28 0.0044 MUs

JAGJEET NAGAR‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK B‐SUBHASH 199 MOHALLA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI, BLOCK C‐GHONDA YVR 6814 3960 KVA UNPLANNED 28‐06‐2018 08:31:34 28‐06‐2018 09:14:36 0:43 0.001935 MUs 200 JAFFRABAD‐MAUJ PUR YVR 206 990 KVA UNPLANNED 08‐06‐2018 23:18:08 09‐06‐2018 00:03:15 0:45 0 MUs BLOCK B‐DURGA PURI, BLOCK B‐KONDALI VILLAGE, JAFFRABAD‐MAUJ PUR, BLOCK M‐DURGA PURI, BLOCK A‐KONDALI 201 VILLAGE, CHAUHAN BANGAR‐JAFFRABAD YVR 3871 7010 KVA UNPLANNED 12‐06‐2018 00:36:00 12‐06‐2018 01:20:00 0:44 0.00281111 MUs

BLOCK U‐WELCOME COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐WELCOME COLONY, BLOCK A‐ WELCOME COLONY, BLOCK S‐WELCOME COLONY, BLOCK P‐NEW SILAMPURI PHASE III, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK W‐WELCOME COLONY, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐WELCOME COLONY, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐ BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK I‐WELCOME COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK T‐WELCOME COLONY, 202 BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1637 990 KVA UNPLANNED 26‐06‐2018 19:01:44 26‐06‐2018 19:18:57 0:17 0.00004722 MUs 203 BLOCK D‐NEW SILAMPURI PHASE IV, BLOCK C‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 319 4580 KVA UNPLANNED 28‐06‐2018 17:28:38 28‐06‐2018 18:05:00 0:36 0.00117 MUs 204 BLOCK D‐NEW SILAMPURI PHASE IV, BLOCK C‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 319 4580 KVA UNPLANNED 28‐06‐2018 19:19:38 28‐06‐2018 20:17:00 0:57 0.00079167 MUs BLOCK A‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK N‐NEW SILAMPURI PHASE I, DSIDC COMPLEX‐ SEELAMPUR YVR, BLOCK J‐SILAMPUR COLONY, JAFFRABAD‐MAUJ PUR, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐PANDAV NAGAR, JAFFRABAD‐MAUJ PUR, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK G‐SILAMPUR COLONY, BLOCK F‐PANDAV NAGAR, CHAUHAN BANGAR‐ 205 JAFFRABAD YVR 8232 3770 KVA UNPLANNED 14‐06‐2018 16:05:00 14‐06‐2018 17:04:00 0:58 0.00223944 MUs BLOCK B‐DURGA PURI, BLOCK B‐KONDALI VILLAGE, JAFFRABAD‐MAUJ PUR, BLOCK M‐DURGA PURI, BLOCK A‐KONDALI 206 VILLAGE, CHAUHAN BANGAR‐JAFFRABAD YVR 4199 7010 KVA UNPLANNED 20‐06‐2018 18:49:33 20‐06‐2018 19:44:00 0:54 0.00255 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK T‐GAUTAM PURI, PKT R‐BLOCK D, GEETA COLONY, GOVT SARVODAY SCHOOL‐ZERO PUSTA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, MCD COLONY‐NEW KATWARA, BLOCK H‐BHAGIRATHI VIHAR, DELHI VIDHYUT BROAD‐ZERO PUSTA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL 207 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 425 800 KVA UNPLANNED 23‐06‐2018 12:36:00 23‐06‐2018 13:30:00 0:54 0.001095 MUs

BLOCK A‐SILAMPUR COLONY, BLOCK J‐SILAMPUR COLONY, JAFFRABAD‐MAUJ PUR, BLOCK C‐, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK N‐NEW SILAMPURI PHASE I, MANTOLA 208 MOHALLA‐PAHAR GANJ, ZERO PUSTA‐USMAN PUR, PHASE I‐MAYUR VIHAR, BLOCK C‐NEW SILAMPURI PHASE II YVR 3162 6250 KVA UNPLANNED 24‐06‐2018 06:19:00 24‐06‐2018 07:00:00 0:40 0.00046667 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, GOVT SARVODAY SCHOOL‐ZERO PUSTA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, 209 BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 425 800 KVA UNPLANNED 24‐06‐2018 16:04:00 24‐06‐2018 17:02:00 0:58 0.00149833 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK F‐ZERO PUSTA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA, GOVT SARVODAY SCHOOL ZERO PUSTA, BLOCK C‐GHONDA PATTI, MCD COLONY‐NEW KATWARA, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐ 210 SONIA VIHAR, BLOCK H‐GHONDA PATTI, BLOCK H‐ZERO PUSTA, BLOCK G‐ZERO PUSTA YVR 4551 3010 KVA UNPLANNED 25‐06‐2018 01:51:30 25‐06‐2018 02:48:00 0:56 0.0028 MUs

BLOCK A‐SILAMPUR COLONY, JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐ NEW SILAMPURI PHASE II, BLOCK D‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK N‐NEW SILAMPURI PHASE III, 211 NEW SILAMPURI PHASE III, CHAUHAN BANGAR‐JAFFRABAD, BLOCK C‐NEW SILAMPURI PHASE II YVR 9761 3240 KVA UNPLANNED 26‐06‐2018 04:19:31 26‐06‐2018 04:51:00 0:31 0 MUs BLOCK A‐SHASTRI PARK, KAILASH NAGAR YVR, YAMUNA FLOOD PLAINS, LIG/MIG RES/NON COMM AREA‐ 212 SHASTRI PARK YVR 105 400 KVA UNPLANNED 27‐06‐2018 07:37:33 27‐06‐2018 10:24:40 2:47 0.002505 MUs

BLOCK B‐GARI MANDU, NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA, BLOCK F‐ZERO PUSTA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, JAG JEEVAN NAGAR‐NEW KATWARA GHONDA, GOVT SARVODAY SCHOOL ZERO PUSTA, BLOCK C‐GHONDA PATTI, MCD COLONY‐NEW KATWARA, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐ 213 SONIA VIHAR, BLOCK H‐GHONDA PATTI, BLOCK H‐ZERO PUSTA, BLOCK G‐ZERO PUSTA YVR 4553 3010 KVA UNPLANNED 28‐06‐2018 02:29:00 28‐06‐2018 05:21:00 2:52 0.00692778 MUs NORTH GHONDA, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, VISHWAS NAGAR EXTN.‐ SHAHDARA, MUNICIPAL CORPN SCHOOL‐SUBHASH VIHAR, NAYAGAON‐NEW KATWARA, BLOCK B‐SUBHASH MOHALLA, KACHI COLONY‐JAGJEET NAGAR, SUBHASH VIHAR‐YAMUNA VIHAR, JAGJEET NAGAR‐GHONDA, BLOCK B4‐YAMUNA VIHAR, MAUJ PUR COMPLEX 1, TIKONA PARK‐BHAJANPURA, BLOCK B5‐YAMUNA PUR (GONDA) BLOCK B, BLOCK E‐ 214 SUBHASH MOHALLA, VIJAY PARK‐YAMUNA VIHAR YVR 8520 5850 KVA UNPLANNED 14‐06‐2018 03:15:34 14‐06‐2018 03:36:00 0:20 0.00113889 MUs 215 KACHI COLONY‐JAGJEET NAGAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA YVR 261 630 KVA UNPLANNED 15‐06‐2018 08:29:17 15‐06‐2018 08:49:42 0:20 0.00005556 MUs

216 BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 569 990 KVA UNPLANNED 15‐06‐2018 18:34:37 15‐06‐2018 19:30:32 0:55 0.00015278 MUs 217 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR YVR 1389 990 KVA UNPLANNED 17‐06‐2018 09:35:04 17‐06‐2018 10:10:00 0:34 0.00009444 MUs

BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐GARI MANDU, BLOCK D‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐GARI MANDU, BLOCK N‐SHIV VIHAR, BLOCK A‐GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BHAGAT NAGAR‐ DAYALPUR, YAMUNA VIHAR YAMUNA FLOOD PLAINS, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐GHONDA PATTI, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL 218 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 7528 4230 KVA UNPLANNED 22‐06‐2018 12:14:00 22‐06‐2018 13:10:00 0:56 0.00191333 MUs LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, ARVIND NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, BLOCK B‐GARI MANDU, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK D‐BHAJANPURA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK N‐ NEW SILAMPURI PHASE I, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, BLOCK A‐GHONDA PATTI, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK H‐GHONDA PATTI, TANKI ROAD‐C‐BLOCK BHAJANPURA, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, YAMUNA VIHAR YAMUNA FLOOD PLAINS, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, GAUTAM VIHAR‐GHONDA, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK J‐KARTAR NAGAR, BLOCK C‐GHONDA PATTI, BLOCK A‐JHANDEWALAN, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, BLOCK E‐SUBHASH MOHALLA, JAFFRABAD‐MAUJ PUR, BLOCK H‐BRAHM PURI, BLOCK D‐BHAJANPURA, 219 BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐BLOCK B YVR 11652 5460 KVA UNPLANNED 22‐06‐2018 13:33:36 22‐06‐2018 14:24:52 0:51 0.00137417 MUs 220 MAUJ PUR COMPLEX 1 YVR 13 990 KVA UNPLANNED 25‐06‐2018 09:21:12 25‐06‐2018 10:05:17 0:44 0.00012222 MUs BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK 221 C12‐YAMUNA VIHAR YVR 915 990 KVA UNPLANNED 25‐06‐2018 17:36:22 25‐06‐2018 17:37:54 0:1 0.00000278 MUs NORTH GHONDA, BLOCK E‐SUBHASH MOHALLA, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK C‐GHONDA, SUBHASH VIHAR‐ 222 YAMUNA VIHAR YVR 5404 3010 KVA UNPLANNED 27‐06‐2018 07:37:35 27‐06‐2018 08:47:00 1:9 0.00222333 MUs

BLOCK B‐MANUJPUR, ADARSH MOHALLA‐MAUJPUR, BALI MARAN‐BARA DARI, BLOCK A‐CHANDRA LOK, BLOCK C12‐ YAMUNA VIHAR, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, KATRA NAWAB‐CHANDNI CHOWK, KACHI COLONY‐ JAGJEET NAGAR, BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, TOWN HILL‐KATRA NEEL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK B‐DURGA PURI, 223 JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 5040 4950 KVA UNPLANNED 27‐06‐2018 07:43:34 27‐06‐2018 08:40:00 0:56 0.00010889 MUs

BLOCK B‐MANUJPUR, ADARSH MOHALLA‐MAUJPUR, BALI MARAN‐BARA DARI, BLOCK A‐CHANDRA LOK, BLOCK C12‐ YAMUNA VIHAR, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, KATRA NAWAB‐CHANDNI CHOWK, KACHI COLONY‐ JAGJEET NAGAR, BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR, TOWN HILL‐KATRA NEEL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK B‐DURGA PURI, 224 JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 5040 4950 KVA UNPLANNED 27‐06‐2018 20:16:34 27‐06‐2018 20:28:00 0:11 0.00017417 MUs

LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, NORTH GHONDA, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK A‐JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, JAFFRABAD‐MAUJ PUR, BLOCK C‐ 225 GHONDA, LIG/MIG RES/NON COMM AREA‐BLOCK B YVR 3385 630 KVA UNPLANNED 28‐06‐2018 01:48:00 28‐06‐2018 03:17:00 1:28 0.00205333 MUs

BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐GARI MANDU, BLOCK D‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐GARI MANDU, BLOCK N‐SHIV VIHAR, BLOCK A‐GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BHAGAT NAGAR‐ DAYALPUR, YAMUNA VIHAR YAMUNA FLOOD PLAINS, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐GHONDA PATTI, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL 226 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 7519 4230 KVA UNPLANNED 28‐06‐2018 13:20:00 28‐06‐2018 14:15:33 0:55 0.00183333 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 227 BLOCK B4‐YAMUNA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA YVR 1223 990 KVA UNPLANNED 29‐06‐2018 13:28:03 29‐06‐2018 13:53:10 0:25 0.00006944 MUs GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, SADAR BAZAR‐RAJENDRA MARKET, MAIN MARKET‐KATRA 228 DHOBI, OLD DELHI RAILWAY STATION‐CHANDNI CHOWK CCK 1239 990 KVA UNPLANNED 12‐06‐2018 18:15:13 12‐06‐2018 19:07:01 0:51 0.0000425 MUs 229 CHABI GANJ‐MORI GATE, ZEENAT BARI‐MORI GATE, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE CCK 1053 990 KVA UNPLANNED 20‐06‐2018 17:06:00 20‐06‐2018 17:53:07 0:47 0.00005222 MUs ZEENAT BARI‐MORI GATE, KASHMIRI GATE‐MORI GATE, GOVT OF N C T OFFICE‐KASHMERE GATE, CHABI GANJ‐MORI 230 GATE CCK 539 990 KVA UNPLANNED 21‐06‐2018 13:09:18 21‐06‐2018 13:48:37 0:39 0.00004333 MUs 231 CHABI GANJ‐MORI GATE, GOVT OF N C T OFFICE‐KASHMERE GATE CCK 116 990 KVA UNPLANNED 22‐06‐2018 13:01:33 22‐06‐2018 13:55:00 0:53 0.00002944 MUs 232 CHABI GANJ‐MORI GATE, ZEENAT BARI‐MORI GATE, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE CCK 1053 990 KVA UNPLANNED 24‐06‐2018 12:22:35 24‐06‐2018 13:05:16 0:42 0.00002333 MUs GOVT OF N C T OFFICE‐KASHMERE GATE, ROHITASH NAGAR EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, MAIN 233 MARKET‐KATRA DHOBI CCK 1059 990 KVA UNPLANNED 27‐06‐2018 17:21:51 27‐06‐2018 18:18:32 0:56 0.00003111 MUs 234 ROHITASH NAGAR EAST‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GOVT OF N C T OFFICE‐KASHMERE GATE CCK 1059 990 KVA UNPLANNED 29‐06‐2018 11:36:32 29‐06‐2018 12:17:07 0:40 0.00004444 MUs CHIPI WARA‐KUCHA ALAM, NAI SARAK‐JOGIWARA, OLD DELHI RAILWAY STATION‐CHANDNI CHOWK, CHAWRI BAZAR‐ KHUSH DIL, MAIN BAZAR CHANDANI CHOWK‐SISGANJ, MOTIA MAHAL‐CHANDNI CHOWK, ROSHAN PURA‐CHANDNI 235 CHOWK CCK 776 990 KVA UNPLANNED 24‐06‐2018 09:30:11 24‐06‐2018 11:00:00 1:29 0.00024722 MUs RAILWAY STATION‐CHANDNI CHOWK, AJMERI GATE‐CHANDNI CHOWK, LALKUAN BAZAR‐FRASH KHANA, MOSQUE‐LAL 236 KUAN BAZAR CCK 3414 3600 KVA UNPLANNED 14‐06‐2018 11:55:00 14‐06‐2018 12:26:56 0:31 0.00056833 MUs 237 NAYA BAZAR‐CHANDNI CHOWK CCK 978 990 KVA UNPLANNED 14‐06‐2018 15:43:44 14‐06‐2018 16:34:46 0:51 0.00005667 MUs 238 FATEHPURI‐KHARI BAOLI, NAYA BAZAR‐CHANDNI CHOWK CCK 409 990 KVA UNPLANNED 21‐06‐2018 11:04:35 21‐06‐2018 11:37:40 0:33 0.00003667 MUs LALKUAN BAZAR‐SIKRIWALAN‐ NEW HAUZ QAZI, AJMERI GATE‐CHANDNI CHOWK, KHARI BAWLI‐NAYA BANS‐ LAHORI 239 GATE, LALKUAN BAZAR‐FRASH KHANA, MOSQUE‐LAL KUAN BAZAR CCK 2939 990 KVA UNPLANNED 28‐06‐2018 09:49:22 28‐06‐2018 10:09:13 0:19 0.00001056 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, UNION CLUB OF INDIA‐KATRA NEEL, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, DELHI VIDHYUT BOARD‐KATRA NEEL, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TOWN HILL‐KATRA NEEL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, 240 BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B CCK 411 990 KVA UNPLANNED 12‐06‐2018 12:16:19 12‐06‐2018 13:03:55 0:47 0.00005222 MUs

241 TOWN HILL‐KATRA NEEL, NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA CCK 1250 990 KVA UNPLANNED 12‐06‐2018 14:48:00 12‐06‐2018 15:39:25 0:51 0.00005667 MUs

242 TOWN HILL‐KATRA NEEL, NAI SARAK‐KATRA ASRAFI, TOWN HALL‐KUCHA NATWA, MAIN BAJAR‐MALIWARA CCK 1250 990 KVA UNPLANNED 12‐06‐2018 16:40:00 12‐06‐2018 17:32:45 0:52 0.00005778 MUs

243 MAIN BAZAR CHANDANI CHOWK‐SISGANJ, DARIBA KALA‐KATRA MASHRU, NEW LAJPAT RAI MARKET‐CHANDNI CHOWK CCK 1109 990 KVA UNPLANNED 20‐06‐2018 23:20:04 21‐06‐2018 00:08:29 0:48 0.00002667 MUs 244 DARIBA KALA‐KATRA MASHRU, NEW LAJPAT RAI MARKET‐CHANDNI CHOWK CCK 758 990 KVA UNPLANNED 26‐06‐2018 10:27:59 26‐06‐2018 11:24:49 0:56 0.00003111 MUs 245 TOWN HILL‐KATRA NEEL CCK 99 990 KVA UNPLANNED 26‐06‐2018 11:43:02 26‐06‐2018 12:06:00 0:22 0.00001222 MUs

246 RED FORT‐CHANDNI CHOWK‐RED FORT, LIG/MIG RES/NON COMM AREA‐VIJAY GHAT, RED FORT‐VIJAY GHAT CCK 4 400 KVA UNPLANNED 28‐06‐2018 13:30:22 28‐06‐2018 14:26:00 0:55 0.00015278 MUs 247 AJMERI GATE‐CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR CCK 1231 990 KVA UNPLANNED 22‐06‐2018 10:45:51 22‐06‐2018 11:07:07 0:21 0.00001167 MUs

248 BLOCK 1‐RAM NAGAR, BLOCK B‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NEW MODERN SHAHDARA DGN 1144 990 KVA UNPLANNED 01‐06‐2018 00:26:09 01‐06‐2018 00:40:57 0:14 0 MUs 249 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR DGN 1125 990 KVA UNPLANNED 12‐06‐2018 11:26:24 12‐06‐2018 12:07:23 0:40 0.00016667 MUs 250 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR DGN 1125 990 KVA UNPLANNED 12‐06‐2018 17:02:26 12‐06‐2018 18:00:00 0:57 0.0002375 MUs 251 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR DGN 1125 990 KVA UNPLANNED 12‐06‐2018 21:54:26 12‐06‐2018 22:30:00 0:35 0.00014583 MUs 252 BLOCK 1‐BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR, BLOCK 1‐RAM NAGAR EXTN. DGN 1265 630 KVA UNPLANNED 12‐06‐2018 21:59:27 12‐06‐2018 22:30:00 0:30 0.000125 MUs 253 DDA FLATS‐SILAMPUR DGN 110 630 KVA UNPLANNED 14‐06‐2018 12:27:00 14‐06‐2018 17:26:25 4:59 0.00124583 MUs SACHDEVA INDUSTRIES‐RAM NAGAR EAST, BLOCK B‐MANSAROWAR PARK, JINDAL BHAWAN‐RAM NAGAR EAST, 254 SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST DGN 477 990 KVA UNPLANNED 14‐06‐2018 14:09:22 14‐06‐2018 15:06:00 0:56 0.00015556 MUs

255 BLOCK 1‐RAM NAGAR, BLOCK B‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI, BLOCK A‐NEW MODERN SHAHDARA DGN 1144 990 KVA UNPLANNED 15‐06‐2018 03:17:26 15‐06‐2018 03:47:13 0:29 0.00000806 MUs 256 BLOCK H‐MANSAROWAR PARK, DDA FLATS‐SILAMPUR DGN 443 630 KVA UNPLANNED 15‐06‐2018 08:20:00 15‐06‐2018 09:45:00 1:25 0.00044861 MUs 257 RAM NAGAR‐SILAMPUR, DELHI JAL BOARD‐DDA FLATS DGN 852 990 KVA UNPLANNED 19‐06‐2018 22:44:03 19‐06‐2018 23:14:00 0:29 0.00012083 MUs 258 BLOCK F‐SHRI RAM NAGAR, BLOCK B‐SHRI RAM NAGAR DGN 234 990 KVA UNPLANNED 19‐06‐2018 23:20:12 19‐06‐2018 23:44:41 0:24 0.0001 MUs 259 RAM NAGAR‐SILAMPUR, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST DGN 164 990 KVA UNPLANNED 20‐06‐2018 13:08:33 20‐06‐2018 14:00:00 0:51 0.00026917 MUs 260 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 2 630 KVA UNPLANNED 24‐06‐2018 10:33:07 24‐06‐2018 11:04:12 0:31 0.000155 MUs BLOCK B‐NEW MODERN SHAHDARA, BLOCK C‐NEW MODERN SHAHDARA, BLOCK B‐JAGAT PURI, BLOCK D‐JAGAT PURI, 261 BLOCK A‐B&C‐JAGAT PURI DGN 1382 990 KVA UNPLANNED 24‐06‐2018 23:14:00 25‐06‐2018 00:12:00 0:58 0.00025778 MUs

ANUP VIHAR‐MANDOLI, GOVT SCHOOL NO‐2‐DDA FLATS, BLOCK 1‐RAM NAGAR, DELHI JAL BOARD‐DDA FLATS, BLOCK 1‐ 262 BHAGWANPUR KHERA, BLOCK 1‐RAM NAGAR EXTN., SHAHDRA METRO STATION‐SHAHDARA DGN DGN 841 990 KVA UNPLANNED 25‐06‐2018 01:48:12 25‐06‐2018 02:38:56 0:50 0.00022222 MUs

BLOCK A‐MANSAROWAR PARK, BLOCK B‐SHRI RAM NAGAR, RAM NAGAR‐SILAMPUR, BLOCK E‐MANSAROWAR PARK, JINDAL BHAWAN‐RAM NAGAR EAST, DELHI JAL BOARD‐DDA FLATS, DELHI TRANSPORT‐WELCOME COLONY, BLOCK C‐ NEW MODERN SHAHDARA, PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK M‐SHRI RAM NAGAR, DAMODER PARK‐ DILSHAD GARDEN, NEAR SHADARA RAILWAY GODOWN‐SHAHDARA DGN, INDIAN GAS‐SHAHDARA DGN, DWARKAPURI‐ NAVIN SHAHDARA, BLOCK A‐NEW MODERN SHAHDARA, BLOCK J‐SHRI RAM NAGAR, DDA FLATS‐SILAMPUR, SANSAR COMPOUND‐DILSHAD GARDEN, SUDARSHAN STEEL ROLLING MILL‐RAM NAGAR EAST, KABUL NAGAR‐ROHITASH NAGAR, GOVT SCHOOL NO‐2‐DDA FLATS, SACHDEVA INDUSTRIES‐RAM NAGAR EAST, BLOCK F‐SHRI RAM NAGAR, BLOCK B‐NEW MODERN SHAHDARA, BLOCK H‐MANSAROWAR PARK, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL 263 SCIENCES DGN, BLOCK R‐PRATAP PURA, OLDANPUR‐NAVIN SHAHDARA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 7031 8460 KVA UNPLANNED 25‐06‐2018 23:50:28 26‐06‐2018 00:40:22 0:49 0.00381111 MUs

BLOCK H‐MANSAROWAR PARK, BLOCK A‐MANSAROWAR PARK, BLOCK B‐MANSAROWAR PARK, BLOCK F‐MANSAROWAR PARK, BLOCK D‐MANSAROWAR PARK, BLOCK C‐MANSAROWAR PARK, RAM NAGAR‐SILAMPUR, SUDARSHAN STEEL 264 ROLLING MILL‐RAM NAGAR EAST, BLOCK G‐MANSAROWAR PARK, BLOCK E‐MANSAROWAR PARK DGN 1902 630 KVA UNPLANNED 26‐06‐2018 21:50:00 26‐06‐2018 22:03:20 0:13 0.00005417 MUs 265 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 6 990 KVA UNPLANNED 28‐06‐2018 18:06:00 28‐06‐2018 18:40:00 0:33 0.000165 MUs 266 FLORA DALE SECONDARY SCHOOL‐POCKET R, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY DGN 63 990 KVA UNPLANNED 29‐06‐2018 18:39:46 29‐06‐2018 19:12:21 0:32 0.00016889 MUs 267 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 50 990 KVA UNPLANNED 12‐06‐2018 08:40:00 12‐06‐2018 11:44:34 3:4 0.00051111 MUs 268 BLOCK R‐ AADINATH BHAWAN‐POCKET R DGN 53 990 KVA UNPLANNED 12‐06‐2018 10:50:00 12‐06‐2018 11:47:47 0:57 0.00015833 MUs 269 BLOCK A‐JHILMIL INDUSTRIAL AREA DGN 5 990 KVA UNPLANNED 12‐06‐2018 15:14:04 12‐06‐2018 16:13:00 0:58 0.00016111 MUs 270 PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA DGN 98 630 KVA UNPLANNED 12‐06‐2018 15:23:37 12‐06‐2018 15:58:32 0:34 0.00009444 MUs

MENTAL HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, DELHI JAL BOARD‐POCKET C, DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK B‐ GROUP I FLATS‐POCKET B, RAJKIYA SARVODAYA 271 BALVIDYALAYA‐POCKET C, DARGAH SHARIF‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 210 990 KVA UNPLANNED 12‐06‐2018 16:04:32 12‐06‐2018 17:03:00 0:58 0.00016111 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

GTB MIG FLATS‐POCKET D, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, FLORA DALE SECONDARY SCHOOL‐POCKET R, 272 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DGN 795 400 KVA UNPLANNED 12‐06‐2018 21:56:23 12‐06‐2018 22:45:00 0:48 0.00021333 MUs 273 JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY DGN 32 990 KVA UNPLANNED 14‐06‐2018 10:22:18 14‐06‐2018 11:32:59 1:10 0.00019444 MUs 274 M.C.D. HOUSE‐POCKET B, GROUP 4‐POCKET B DGN 211 630 KVA UNPLANNED 14‐06‐2018 12:28:11 14‐06‐2018 14:05:45 1:37 0.00026944 MUs 275 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 47 990 KVA UNPLANNED 14‐06‐2018 15:22:32 14‐06‐2018 17:19:42 1:57 0.00052 MUs 276 BLOCK A‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY, DDA FLATS‐BLOCK A, BLOCK D‐DILSHAD COLONY DGN 1019 990 KVA UNPLANNED 14‐06‐2018 23:40:59 15‐06‐2018 00:17:09 0:36 0.00015 MUs

DDA FLATS‐RAJIV NAGAR DGN, BLOCK F‐OLD SIMAPURI, BLOCK A‐OLD SIMAPURI, BLOCK K‐LEPROSY COLONY, BLOCK B‐ PREM NAGAR DGN, BLOCK A‐RAJIV NAGAR DGN, BLOCK A‐PREM NAGAR DGN, GANDHI KUSTH ASHARAM‐LEPROSY 277 COLONY, SHANTI KUSTH ASHRAM‐RAJIV NAGAR DGN, M.C.P. SCHOOL‐POCKET O DGN 580 630 KVA UNPLANNED 15‐06‐2018 03:13:27 15‐06‐2018 04:12:00 0:58 0.00024167 MUs 278 BLOCK B‐ GROUP I FLATS‐POCKET B DGN 58 750 KVA UNPLANNED 17‐06‐2018 08:03:19 17‐06‐2018 08:31:08 0:27 0.0001425 MUs 279 PETROL PUMP‐POCKET C, SIYARAM‐GHISA, LIG/MIG RES/NON COMM AREA‐JEEVAN SARITA DGN 98 630 KVA UNPLANNED 19‐06‐2018 11:22:32 19‐06‐2018 11:57:47 0:35 0.00018472 MUs 280 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 19‐06‐2018 12:15:46 19‐06‐2018 13:10:00 0:54 0.000285 MUs 281 GOVT. DISPENCERY‐OLD SIMAPURI, BLOCK C‐OLD SIMAPURI, BLOCK E‐OLD SIMAPURI DGN 344 990 KVA UNPLANNED 19‐06‐2018 13:06:28 19‐06‐2018 13:34:16 0:27 0.0001425 MUs 282 SIYARAM‐GHISA DGN 22 630 KVA UNPLANNED 19‐06‐2018 13:35:09 19‐06‐2018 14:20:00 0:44 0.00023222 MUs 283 INDIRA CAMP‐JHILMIL INDUSTRIAL AREA DGN 41 1000 KVA UNPLANNED 19‐06‐2018 16:13:00 19‐06‐2018 17:03:14 0:50 0.00020833 MUs 284 INDIRA CAMP‐JHILMIL INDUSTRIAL AREA DGN 41 1000 KVA UNPLANNED 22‐06‐2018 17:25:00 22‐06‐2018 17:50:00 0:24 0.00013333 MUs BLOCK G‐OLD SIMAPURI, BLOCK D‐OLD SIMAPURI, BLOCK J‐OLD SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURI, MCD‐ 285 OLD SIMAPURI, BLOCK H‐OLD SIMAPURI DGN 555 990 KVA UNPLANNED 22‐06‐2018 19:16:43 22‐06‐2018 20:00:00 0:43 0.00020306 MUs 286 BLOCK A‐NEW SIMAPURI, BLOCK B‐NEW SIMAPURI DGN 11 630 KVA UNPLANNED 22‐06‐2018 22:28:54 22‐06‐2018 22:57:20 0:28 0.00013222 MUs 287 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK B‐MANSAROWAR PARK DGN 24 630 KVA UNPLANNED 22‐06‐2018 23:51:32 23‐06‐2018 00:39:10 0:47 0.00022194 MUs MIG FLATS‐POCKET F & E, HANSRAJ SCHOOL‐POCKET H, HANSRAJ PUBLIC SCHOOL‐POCKET F & E, LIG FLATS‐POCKET F & 288 E, MCD OFFICE‐POCKET F & E DGN 54 990 KVA UNPLANNED 22‐06‐2018 23:56:52 23‐06‐2018 00:27:51 0:30 0.00015833 MUs 289 BLOCK J & K‐POCKET J&K DGN 46 630 KVA UNPLANNED 23‐06‐2018 00:16:58 23‐06‐2018 00:28:10 0:11 0.00005806 MUs 290 BLOCK A‐DILSHAD COLONY DGN 402 630 KVA UNPLANNED 23‐06‐2018 00:53:48 23‐06‐2018 01:21:11 0:27 0.000135 MUs 291 BLOCK F‐DILSHAD COLONY, BLOCK G‐DILSHAD COLONY DGN 195 990 KVA UNPLANNED 23‐06‐2018 17:20:33 23‐06‐2018 17:56:42 0:36 0.00015 MUs 292 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 24‐06‐2018 10:41:43 24‐06‐2018 11:10:14 0:28 0.00014778 MUs 293 BLOCK A‐JHILMIL INDUSTRIAL AREA, DR BHIM RAO AMBEDKAR COLONY‐JHILMIL INDUSTRIAL AREA DGN 29 990 KVA UNPLANNED 24‐06‐2018 12:05:27 24‐06‐2018 12:24:41 0:19 0.00010028 MUs 294 BLOCK F‐DILSHAD COLONY, BLOCK J‐DILSHAD COLONY DGN 651 990 KVA UNPLANNED 24‐06‐2018 16:53:27 24‐06‐2018 17:50:31 0:57 0.0002375 MUs 295 BLOCK B‐DILSHAD COLONY, BLOCK A‐DILSHAD COLONY DGN 380 630 KVA UNPLANNED 24‐06‐2018 23:55:24 25‐06‐2018 00:54:00 0:58 0.00025778 MUs J.J.C.‐NEW SIMAPURI, BLOCK C‐NEW SIMAPURI, BLOCK A‐NEW SIMAPURI, BLOCK B‐NEW SIMAPURI, BLOCK C1‐YAMUNA 296 VIHAR, BLOCK D‐NEW SIMAPURI DGN 397 990 KVA UNPLANNED 25‐06‐2018 01:10:00 25‐06‐2018 02:00:11 0:50 0.00020833 MUs 297 DAYANAND HOSPITAL‐UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 737 630 KVA UNPLANNED 25‐06‐2018 08:00:30 25‐06‐2018 08:24:19 0:23 0.00009583 MUs

298 BLOCK J & K‐POCKET J&K, BLOCK G‐DILSHAD COLONY, BLOCK J‐DILSHAD COLONY, MCD OFFICE‐POCKET F & E DGN 170 630 KVA UNPLANNED 25‐06‐2018 14:32:44 25‐06‐2018 15:46:57 1:14 0.00020556 MUs 299 M.C.D. HOUSE‐POCKET B, GROUP 4‐POCKET B DGN 211 630 KVA UNPLANNED 25‐06‐2018 20:23:10 25‐06‐2018 21:21:52 0:58 0.00024167 MUs 300 M.C.D. HOUSE‐POCKET B, GROUP 4‐POCKET B DGN 211 630 KVA UNPLANNED 25‐06‐2018 21:43:21 25‐06‐2018 22:05:05 0:21 0.0000875 MUs 301 DELHI JAL BOARD‐POCKET C, FACTORY‐DILSHAD GARDEN DGN 116 630 KVA UNPLANNED 27‐06‐2018 09:10:00 27‐06‐2018 10:04:00 0:54 0.000285 MUs 302 GOVT. DISPENCERY‐OLD SIMAPURI, BLOCK C‐OLD SIMAPURI, BLOCK E‐OLD SIMAPURI DGN 344 990 KVA UNPLANNED 27‐06‐2018 14:07:10 27‐06‐2018 15:41:09 1:33 0.00049083 MUs

303 BLOCK C‐OLD SIMAPURI, BLOCK E‐OLD SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURI, BLOCK B‐OLD SIMAPURI DGN 41 990 KVA UNPLANNED 28‐06‐2018 11:16:56 28‐06‐2018 13:36:56 2:20 0.00015556 MUs

SHIV MANDIR‐NEW SIMAPURI, BLOCK E‐NEW SIMAPURI, BLOCK B‐DILSHAD COLONY, BLOCK G‐DILSHAD COLONY, BLOCK B‐OLD SIMAPURI, BLOCK F‐OLD SIMAPURI, JJC‐DILSHAD COLONY, SIMAPURI BUS DEPOT‐DILSHAD COLONY, BLOCK D‐ 304 NEW SIMAPURI, BLOCK D‐DILSHAD COLONY, BLOCK F‐DILSHAD COLONY, BLOCK J‐DILSHAD COLONY DGN 2717 630 KVA UNPLANNED 28‐06‐2018 12:07:34 28‐06‐2018 14:00:00 1:52 0.00077778 MUs

305 BLOCK C‐OLD SIMAPURI, BLOCK E‐OLD SIMAPURI, GOVT. DISPENCERY‐OLD SIMAPURI, BLOCK B‐OLD SIMAPURI DGN 204 990 KVA UNPLANNED 28‐06‐2018 17:25:08 28‐06‐2018 19:08:30 1:43 0.00057222 MUs 306 MUKHRJI SCHOOL‐POCKET L, HANSRAJ SCHOOL‐POCKET H DGN 8 630 KVA UNPLANNED 28‐06‐2018 21:03:05 28‐06‐2018 21:33:45 0:30 0.00016667 MUs 307 BLOCK A‐DILSHAD COLONY, BLOCK E‐DILSHAD COLONY, BLOCK B‐DILSHAD COLONY DGN 1770 630 KVA UNPLANNED 29‐06‐2018 11:06:00 29‐06‐2018 12:52:37 1:46 0.00058889 MUs

INDIRA CAMP‐JHILMIL INDUSTRIAL AREA, SONIA GANDHI JJ CAMP‐JHILMIL INDUSTRIAL AREA, RAJIV COLONY‐JHILMIL 308 INDUSTRIAL AREA, JHILMIL INDUSTRIAL AREA BLOCK A‐JHILMIL COLONY, BLOCK B‐ GROUP I FLATS‐POCKET B DGN 440 990 KVA UNPLANNED 29‐06‐2018 16:41:42 29‐06‐2018 17:12:17 0:30 0.00008333 MUs 309 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 795 990 KVA UNPLANNED 12‐06‐2018 11:05:38 12‐06‐2018 11:39:14 0:33 0.00018333 MUs 310 BLOCK A‐PRATAP PURA, ROHITASH NAGAR‐SILAMPUR DGN 1175 990 KVA UNPLANNED 12‐06‐2018 15:59:01 12‐06‐2018 16:35:55 0:36 0.00015 MUs 311 FANCY APPARTMENT‐VASUNDHARA ENCLAVE VSE DGN 44 630 KVA UNPLANNED 14‐06‐2018 12:04:18 14‐06‐2018 13:01:57 0:57 0.000475 MUs 312 BLOCK A‐PRATAP PURA, ROHITASH NAGAR‐SILAMPUR DGN 1175 990 KVA UNPLANNED 14‐06‐2018 13:04:27 14‐06‐2018 13:53:41 0:49 0.00013611 MUs 313 BALBIR NAGAR EXTN.‐SILAMPUR DGN 1529 630 KVA UNPLANNED 14‐06‐2018 13:54:24 14‐06‐2018 14:27:40 0:33 0.00045833 MUs

314 GORAKH PARK WEST‐SILAMPUR, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 1236 990 KVA UNPLANNED 14‐06‐2018 17:27:02 14‐06‐2018 17:56:55 0:29 0.00012889 MUs SUBHASH PARK EXTN.‐GORAKH PARK, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN 315 SHAHDARA DGN 684 990 KVA UNPLANNED 14‐06‐2018 21:08:42 14‐06‐2018 21:40:00 0:31 0.00012917 MUs 316 BALBIR NAGAR EXTN.‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GORAKH PARK EAST‐SILAMPUR DGN 860 990 KVA UNPLANNED 15‐06‐2018 00:08:45 15‐06‐2018 00:45:34 0:36 0.00016 MUs 317 BALBIR NAGAR EXTN.‐SILAMPUR, SHIVAJI PARK‐BALBIR NAGAR, GORAKH PARK EAST‐SILAMPUR DGN 860 990 KVA UNPLANNED 15‐06‐2018 01:11:42 15‐06‐2018 01:59:10 0:47 0.00019583 MUs 318 OLDANPUR‐NAVIN SHAHDARA DGN 562 630 KVA UNPLANNED 15‐06‐2018 04:16:00 15‐06‐2018 05:04:55 0:48 0.00021333 MUs 319 BLOCK A‐PRATAP PURA DGN 274 990 KVA UNPLANNED 15‐06‐2018 11:34:45 15‐06‐2018 12:29:00 0:54 0.00012 MUs 320 FANCY APPARTMENT‐VASUNDHARA ENCLAVE VSE DGN 44 630 KVA UNPLANNED 15‐06‐2018 15:18:33 15‐06‐2018 16:59:10 1:40 0.00069444 MUs 321 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 248 990 KVA UNPLANNED 16‐06‐2018 16:02:29 16‐06‐2018 16:50:00 0:47 0.00010444 MUs 322 KABUL NAGAR‐ROHITASH NAGAR DGN 154 630 KVA UNPLANNED 17‐06‐2018 01:26:43 17‐06‐2018 02:07:42 0:40 0.0002 MUs BLOCK X‐PRATAP PURA, BLOCK V‐PRATAP PURA, OLDANPUR‐NAVIN SHAHDARA, BLOCK Y‐PRATAP PURA, PANCHSHEEL 323 PARK‐NAVIN SHAHDARA, BLOCK C‐PRATAP PURA DGN 740 990 KVA UNPLANNED 17‐06‐2018 17:04:18 17‐06‐2018 17:57:03 0:52 0.00021667 MUs 324 ROHITASH NAGAR EAST‐SILAMPUR DGN 91 990 KVA UNPLANNED 19‐06‐2018 10:00:15 19‐06‐2018 10:04:38 0:4 0.00002111 MUs 325 BALBIR NAGAR EXTN.‐SILAMPUR DGN 1652 630 KVA UNPLANNED 19‐06‐2018 16:11:31 19‐06‐2018 16:48:54 0:37 0.00016444 MUs 326 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1055 990 KVA UNPLANNED 20‐06‐2018 00:45:56 20‐06‐2018 01:10:06 0:24 0.00010667 MUs 327 BALBIR NAGAR EXTN.‐SILAMPUR DGN 685 630 KVA UNPLANNED 20‐06‐2018 10:24:36 20‐06‐2018 11:14:49 0:50 0.00025 MUs 328 BALBIR NAGAR EXTN.‐SILAMPUR DGN 685 630 KVA UNPLANNED 20‐06‐2018 12:34:00 20‐06‐2018 13:55:00 1:21 0.00045 MUs 329 BALBIR NAGAR EXTN.‐SILAMPUR DGN 685 630 KVA UNPLANNED 20‐06‐2018 14:50:00 20‐06‐2018 15:32:19 0:42 0.00023333 MUs 330 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 795 990 KVA UNPLANNED 21‐06‐2018 11:11:37 21‐06‐2018 11:56:00 0:44 0.00018333 MUs 331 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1054 630 KVA UNPLANNED 21‐06‐2018 15:33:14 21‐06‐2018 16:29:00 0:55 0.00015278 MUs 332 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1055 990 KVA UNPLANNED 22‐06‐2018 00:47:10 22‐06‐2018 01:17:36 0:30 0.00013333 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage BLOCK 1‐BALBIR NAGAR, ROHITASH NAGAR EAST‐SILAMPUR, BALBIR NAGAR EXTN.‐SILAMPUR, GORAKH PARK WEST‐ SILAMPUR, AMBEDKAR NAGAR‐SHAHDARA, GORAKH PARK EAST‐SILAMPUR, BLOCK B‐GORAKH PARK, SHIVAJI PARK‐ 333 BALBIR NAGAR DGN 1283 630 KVA UNPLANNED 22‐06‐2018 01:19:43 22‐06‐2018 02:18:00 0:58 0.00024167 MUs BLOCK A‐DILSHAD COLONY, BABARPUR WEST‐BABAR PUR, ROHITASH NAGAR EAST‐SILAMPUR, NEW JAFFRABAD‐ GORAKH PARK, GORAKH PARK WEST‐SILAMPUR, GORAKH PARK EAST‐SILAMPUR, BLOCK B‐GORAKH PARK, BLOCK A‐ 334 PRATAP PURA, SHIVAJI PARK‐BALBIR NAGAR, ARJUN NAGAR EAST‐SHAHDARA DGN 616 630 KVA UNPLANNED 22‐06‐2018 02:06:00 22‐06‐2018 02:48:47 0:42 0 MUs 335 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 2146 630 KVA UNPLANNED 22‐06‐2018 07:14:02 22‐06‐2018 07:28:32 0:14 0.00006222 MUs BLOCK X‐PRATAP PURA, GOPAL K.OIL DEPO.‐PRATAP PURA, BLOCK H‐PRATAP PURA, OLDANPUR‐NAVIN SHAHDARA, BLOCK D‐PRATAP PURA, BLOCK C‐PRATAP PURA, BLOCK V‐PRATAP PURA, BLOCK A‐PRATAP PURA, BLOCK B‐PRATAP 336 PURA, BLOCK Y‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 3718 2610 KVA UNPLANNED 22‐06‐2018 15:59:19 22‐06‐2018 16:33:24 0:34 0.00037778 MUs GORAKH PARK WEST‐SILAMPUR, BLOCK A‐PRATAP PURA, DDA MIG FLATS‐VIVEK VIHAR PHASE II, NEW JAFFRABAD‐ 337 GORAKH PARK DGN 1034 990 KVA UNPLANNED 23‐06‐2018 01:22:09 23‐06‐2018 02:48:00 1:25 0.000425 MUs 338 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1054 630 KVA UNPLANNED 23‐06‐2018 11:40:05 23‐06‐2018 12:20:00 0:39 0.00021667 MUs SUBHASH PARK EXTN.‐GORAKH PARK, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, KABUL NAGAR‐ROHITASH 339 NAGAR, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 1192 990 KVA UNPLANNED 23‐06‐2018 16:57:21 23‐06‐2018 17:52:00 0:54 0.000225 MUs 340 PANCHSHEEL PARK‐NAVIN SHAHDARA, BLOCK A‐PRATAP PURA DGN 205 990 KVA UNPLANNED 24‐06‐2018 08:05:00 24‐06‐2018 08:33:49 0:28 0.00014 MUs BLOCK X‐PRATAP PURA, DWARKAPURI‐NAVIN SHAHDARA, OLDANPUR‐NAVIN SHAHDARA, BLOCK C‐PRATAP PURA, 341 BLOCK V‐PRATAP PURA, BLOCK Y‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN SHAHDARA DGN 738 990 KVA UNPLANNED 25‐06‐2018 01:55:00 25‐06‐2018 02:39:14 0:44 0.00020778 MUs GORAKH PARK WEST‐SILAMPUR, SUBHASH PARK EXTN.‐GORAKH PARK, BLOCK A‐PRATAP PURA, SUBHASH PARK‐GORAKH 342 PARK DGN 2177 990 KVA UNPLANNED 25‐06‐2018 05:46:54 25‐06‐2018 06:45:00 0:58 0.00024167 MUs 343 ROHITASH NAGAR EAST‐SILAMPUR, KABUL NAGAR‐ROHITASH NAGAR DGN 988 630 KVA UNPLANNED 25‐06‐2018 13:21:48 25‐06‐2018 13:54:10 0:32 0.00022222 MUs 344 ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 1055 990 KVA UNPLANNED 26‐06‐2018 02:19:19 26‐06‐2018 02:45:43 0:26 0.00010833 MUs SUBHASH PARK EXTN.‐GORAKH PARK, BLOCK A‐PRATAP PURA, BLOCK D‐PRATAP PURA, PANCHSHEEL PARK‐NAVIN 345 SHAHDARA DGN 1195 990 KVA UNPLANNED 26‐06‐2018 02:47:29 26‐06‐2018 03:08:27 0:20 0.00008333 MUs 346 BALBIR NAGAR EXTN.‐SILAMPUR, ROHITASH NAGAR EAST‐SILAMPUR, BLOCK 1‐BALBIR NAGAR DGN 2148 630 KVA UNPLANNED 26‐06‐2018 12:42:53 26‐06‐2018 13:35:00 0:52 0.00028889 MUs 347 OLDANPUR‐NAVIN SHAHDARA DGN 11 990 KVA UNPLANNED 27‐06‐2018 11:15:36 27‐06‐2018 11:57:51 0:42 0.00022167 MUs 348 OLDANPUR‐NAVIN SHAHDARA, BLOCK X‐PRATAP PURA, BLOCK Y‐PRATAP PURA DGN 278 990 KVA UNPLANNED 28‐06‐2018 19:58:36 28‐06‐2018 20:25:00 0:26 0.00013 MUs 349 GORAKH PARK WEST‐SILAMPUR, BLOCK B‐GORAKH PARK, BLOCK A‐PRATAP PURA DGN 279 990 KVA UNPLANNED 29‐06‐2018 23:32:00 30‐06‐2018 00:24:00 0:51 0.00026917 MUs 350 DARYA GANJ DRG 263 990 KVA UNPLANNED 02‐06‐2018 09:59:41 02‐06‐2018 10:50:19 0:50 0 MUs 351 DARYA GANJ, HAPPY PUBLIC SCHOOL‐PARDA BAGH DRG 177 630 KVA UNPLANNED 02‐06‐2018 11:43:42 02‐06‐2018 12:29:58 0:46 0 MUs 352 LIG/MIG RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUM DRG 0 400 KVA UNPLANNED 05‐06‐2018 11:54:03 05‐06‐2018 12:25:15 0:31 0 MUs 353 DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR DRG 255 990 KVA UNPLANNED 12‐06‐2018 11:49:53 12‐06‐2018 12:03:22 0:13 0.00002167 MUs 354 DARYA GANJ DRG 362 990 KVA UNPLANNED 12‐06‐2018 11:54:36 12‐06‐2018 12:18:40 0:24 0.00005333 MUs 355 DARYA GANJ DRG 20 990 KVA UNPLANNED 15‐06‐2018 11:19:54 15‐06‐2018 11:30:30 0:10 0.00001667 MUs 356 BALMIKI BASTI‐FEROJ SHAH KOTLA STADIU DRG 110 630 KVA UNPLANNED 15‐06‐2018 13:14:46 15‐06‐2018 13:41:34 0:26 0.00002889 MUs 357 DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR DRG 91 990 KVA UNPLANNED 15‐06‐2018 13:42:19 15‐06‐2018 14:14:42 0:32 0.00003556 MUs DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR, ZAKIR HUSAIN 358 P.G. EVENING COLLAGE‐SKD BASTI DRG 254 990 KVA UNPLANNED 21‐06‐2018 12:06:00 21‐06‐2018 13:20:00 1:13 0.00014194 MUs DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA‐FEROJ SHAH KOTLA STADIUM, 359 LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR DRG 813 990 KVA UNPLANNED 23‐06‐2018 13:55:57 23‐06‐2018 14:16:10 0:20 0.00002222 MUs 360 PATODI HOUSE‐CHANDNI CHOWK, MTNL TELEPHONE EXCHANGE‐PATODI HOUSE, DARYA GANJ DRG 78 990 KVA UNPLANNED 26‐06‐2018 12:25:20 26‐06‐2018 13:24:46 0:59 0.00009833 MUs 361 DARYA GANJ, CHAWRI BAZAR‐CHANDNI CHOWK DRG 18 990 KVA UNPLANNED 26‐06‐2018 14:58:20 26‐06‐2018 15:45:47 0:47 0.00007833 MUs 362 DARYA GANJ DRG 95 990 KVA UNPLANNED 27‐06‐2018 12:04:34 27‐06‐2018 13:01:13 0:56 0.00009333 MUs 363 BALMIKI BASTI‐FEROJ SHAH KOTLA STADIU DRG 32 630 KVA UNPLANNED 27‐06‐2018 12:21:08 27‐06‐2018 13:02:52 0:41 0.00006833 MUs 364 DARYA GANJ DRG 34 990 KVA UNPLANNED 27‐06‐2018 13:24:15 27‐06‐2018 13:49:50 0:25 0.00004167 MUs 365 DARYA GANJ DRG 119 990 KVA UNPLANNED 28‐06‐2018 10:45:27 28‐06‐2018 11:36:51 0:51 0.000085 MUs 366 DARYA GANJ DRG 44 990 KVA UNPLANNED 29‐06‐2018 16:34:49 29‐06‐2018 17:16:48 0:41 0.00006833 MUs KUCHA PATI RAM‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, BRIJ MARKITING PKT LTD‐CHAWRI BAZAR, CHAWRI 367 BAZAR‐CHANDNI CHOWK DRG 1416 990 KVA UNPLANNED 12‐06‐2018 13:08:24 12‐06‐2018 14:03:23 0:54 0.00006 MUs 368 KUCHA PATI RAM‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1223 400 KVA UNPLANNED 14‐06‐2018 11:38:24 14‐06‐2018 12:39:40 1:1 0.00010167 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL 369 COLONY, PKT A‐BLOCK B DRG 1306 990 KVA UNPLANNED 15‐06‐2018 02:00:42 15‐06‐2018 05:56:47 3:56 0.00026222 MUs

COMMUNITY CENTRE‐JAMA MASZID, EVERGREEN PUBLICATION‐KALA MAHAL, GARIG MOSQUE‐JAMA MASZID, MOTHER 370 DAIRY‐NETAJI SUBHASH MARG, CHANDANI MAHAL‐CHANDNI CHOWK, MOTIA MAHAL‐CHANDNI CHOWK DRG 693 990 KVA UNPLANNED 20‐06‐2018 12:30:37 20‐06‐2018 14:20:37 1:50 0.00012222 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV 371 VIHAR, DELHI POLICE BHAVAN‐PAHARI BHOJLA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DRG 2059 990 KVA UNPLANNED 21‐06‐2018 13:08:29 21‐06‐2018 14:00:00 0:51 0.00005667 MUs 372 KUCHA PATI RAM‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1224 400 KVA UNPLANNED 23‐06‐2018 00:40:00 23‐06‐2018 01:08:25 0:28 0.00006222 MUs EVERGREEN PUBLICATION‐KALA MAHAL, MOTHER DAIRY‐NETAJI SUBHASH MARG, CHRISTAN COLONY‐KHABAS PURA, 373 GOVT SENIOR SECONDARY SCHOOL‐KALA MAHAL DRG 122 990 KVA UNPLANNED 23‐06‐2018 11:12:35 23‐06‐2018 11:31:12 0:18 0.00002 MUs KUCHA PATI RAM‐CHANDNI CHOWK, CHANDANI MAHAL‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, HAUZ QAZI‐ 374 CHANDNI CHOWK, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1223 400 KVA UNPLANNED 23‐06‐2018 14:08:42 23‐06‐2018 14:56:11 0:47 0.00005222 MUs KUCHA PATI RAM‐CHANDNI CHOWK, EVERGREEN PUBLICATION‐KALA MAHAL, CHANDANI MAHAL‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, LIG/MIG RES/NON COMM AREA‐VIKRAM NAGAR, HAUZ QAZI‐CHANDNI CHOWK, CHAWRI 375 BAZAR‐CHANDNI CHOWK DRG 1223 400 KVA UNPLANNED 24‐06‐2018 11:59:20 24‐06‐2018 12:54:38 0:55 0.00006111 MUs KUCHA PATI RAM‐CHANDNI CHOWK, EVERGREEN PUBLICATION‐KALA MAHAL, CHANDANI MAHAL‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, DAV PUBLIC SCHOOL‐KALA MASZID, HAUZ QAZI‐CHANDNI CHOWK, CHAWRI BAZAR‐ 376 CHANDNI CHOWK, MOSQUE‐LAL KUAN BAZAR DRG 777 990 KVA UNPLANNED 24‐06‐2018 13:29:20 24‐06‐2018 14:08:00 0:38 0.00004222 MUs KUCHA PATI RAM‐CHANDNI CHOWK, SITARAM BAZAR‐CHANDNI CHOWK, BRIJ MARKITING PKT LTD‐CHAWRI BAZAR, 377 MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1416 990 KVA UNPLANNED 25‐06‐2018 13:31:01 25‐06‐2018 14:14:25 0:43 0.00004778 MUs 378 DARYA GANJ, CHANDANI MAHAL‐CHANDNI CHOWK DRG 14 990 KVA UNPLANNED 25‐06‐2018 15:25:31 25‐06‐2018 16:08:23 0:42 0.00007 MUs KUCHA PATI RAM‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, BINDRABAN UDYOG‐KUCHA PATI RAM, 379 CHAWRI BAZAR‐CHANDNI CHOWK DRG 126 990 KVA UNPLANNED 26‐06‐2018 13:35:24 26‐06‐2018 14:19:07 0:43 0.00004778 MUs KUCHA PATI RAM‐CHANDNI CHOWK, SITARAM BAZAR‐CHANDNI CHOWK, MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐ 380 CHANDNI CHOWK DRG 283 990 KVA UNPLANNED 26‐06‐2018 15:00:46 26‐06‐2018 15:54:36 0:53 0.00005889 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage PATODI HOUSE‐CHANDNI CHOWK, KUCHA PATI RAM‐CHANDNI CHOWK, BRIJ MARKITING PKT LTD‐CHAWRI BAZAR, 381 MOSQUE‐KUCHA PATI RAM, CHAWRI BAZAR‐CHANDNI CHOWK DRG 1416 990 KVA UNPLANNED 26‐06‐2018 16:09:41 26‐06‐2018 17:17:52 1:8 0.00007556 MUs 382 PATODI HOUSE‐CHANDNI CHOWK, CHRISTAN COLONY‐KHABAS PURA DRG 571 990 KVA UNPLANNED 28‐06‐2018 02:27:44 28‐06‐2018 03:06:00 0:38 0 MUs

PATODI HOUSE‐CHANDNI CHOWK, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐ SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, CHANDANI MAHAL‐CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, CHRISTAN 383 COLONY‐KHABAS PURA, PKT A‐BLOCK B DRG 1591 990 KVA UNPLANNED 28‐06‐2018 02:32:32 28‐06‐2018 03:55:00 1:22 0 MUs PATODI HOUSE‐CHANDNI CHOWK, ARYA ANATHALAYA‐KALA MAHAL, COMMUNITY CENTRE‐JAMA MASZID, CHANDANI 384 MAHAL‐CHANDNI CHOWK, DAV PUBLIC SCHOOL‐KALA MASZID, DARYA GANJ DRG 101 990 KVA UNPLANNED 29‐06‐2018 12:42:04 29‐06‐2018 13:46:22 1:4 0.00010667 MUs 385 BIHARI COLONY‐SHAHDARA JLM 20 990 KVA UNPLANNED 15‐06‐2018 13:28:43 15‐06‐2018 14:23:51 0:55 0.00038194 MUs

386 AMBEDKAR NAGAR‐SHAHDARA, JAWALA NAGAR‐SHAHDARA, BLOCK A‐VIVEK VIHAR, NEW VISWAS NAGAR‐SHAHDARA JLM 97 990 KVA UNPLANNED 22‐06‐2018 01:02:39 22‐06‐2018 01:59:00 0:56 0.00077778 MUs BIHARI COLONY‐SHAHDARA, TELIBARA‐SHAHDARA, MAHARAM NAGAR‐SHAHDARA, OLDANPUR‐NAVIN SHAHDARA, 387 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BHOLA NATH NAGAR‐SHAHDARA JLM 691 990 KVA UNPLANNED 23‐06‐2018 01:58:23 23‐06‐2018 02:44:58 0:46 0.00019167 MUs 388 JAWALA NAGAR‐SHAHDARA JLM 1550 990 KVA UNPLANNED 23‐06‐2018 04:45:00 23‐06‐2018 05:33:29 0:48 0.00006667 MUs 389 BHOLA NATH NAGAR‐SHAHDARA, MAHARAM NAGAR‐SHAHDARA JLM 403 990 KVA UNPLANNED 23‐06‐2018 09:37:53 23‐06‐2018 10:28:17 0:50 0.00006944 MUs 390 BHOLA NATH NAGAR‐SHAHDARA, SHALIMAR PARK‐SHAHDARA, SUNDER PARK‐SHAHDARA JLM 118 990 KVA UNPLANNED 24‐06‐2018 13:04:18 24‐06‐2018 18:46:00 5:41 0.00473611 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SUNDER PARK‐SHAHDARA, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, VISHWAS NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, 391 BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B JLM 672 990 KVA UNPLANNED 25‐06‐2018 00:35:13 25‐06‐2018 01:30:49 0:55 0.00007639 MUs 392 BIHARI COLONY‐SHAHDARA JLM 762 630 KVA UNPLANNED 26‐06‐2018 01:45:00 26‐06‐2018 03:35:00 1:50 0.00015278 MUs 393 VISHWAS NAGAR, SUNDER PARK‐SHAHDARA JLM 425 400 KVA UNPLANNED 29‐06‐2018 10:35:00 29‐06‐2018 12:13:00 1:37 0.00026944 MUs BIHARI COLONY‐SHAHDARA, SHALIMAR PARK‐SHAHDARA, BHOLA NATH NAGAR‐SHAHDARA, EAST ROHTASH NAGAR‐ 394 SHAHDARA JLM 1138 990 KVA UNPLANNED 29‐06‐2018 23:50:26 30‐06‐2018 00:13:34 0:23 0.00003194 MUs 395 VISHWAS NAGAR‐SHAHDARA, VISHWAS NAGAR JLM 204 630 KVA UNPLANNED 30‐06‐2018 00:40:15 30‐06‐2018 02:18:51 1:38 0.00157889 MUs 396 PUSHPANJALI‐ANAND VIHAR JLM 10 990 KVA UNPLANNED 15‐06‐2018 03:21:01 15‐06‐2018 04:10:59 0:49 0.00068056 MUs 397 AGCR ENCLAVE‐ANAND VIHAR JLM 60 990 KVA UNPLANNED 20‐06‐2018 04:20:51 20‐06‐2018 05:19:01 0:58 0.00032222 MUs 398 BLOCK D‐ANAND VIHAR, J J COLONY‐ANAND VIHAR JLM 397 990 KVA UNPLANNED 23‐06‐2018 12:49:16 23‐06‐2018 18:05:13 5:15 0.0004375 MUs 399 BLOCK E‐JHILMIL COLONY BLOCK E, ESI HOSPITAL‐JHILMIL COLONY BLOCK C JLM 440 990 KVA UNPLANNED 19‐06‐2018 00:58:57 19‐06‐2018 02:30:00 1:31 0.00012639 MUs 400 ESI HOSPITAL‐JHILMIL COLONY BLOCK C JLM 113 990 KVA UNPLANNED 25‐06‐2018 23:50:00 26‐06‐2018 03:49:00 3:59 0.00033194 MUs 401 BLOCK B‐SURAJMAL VIHAR JLM 8 990 KVA UNPLANNED 28‐06‐2018 06:00:34 28‐06‐2018 06:36:00 0:35 0.00019444 MUs 402 BLOCK B‐SURAJMAL VIHAR JLM 404 990 KVA UNPLANNED 28‐06‐2018 13:00:00 28‐06‐2018 13:55:00 0:54 0.00015 MUs 403 JHEEL‐JHEEL KHURENJA KRN 20 630 KVA UNPLANNED 12‐06‐2018 07:02:26 12‐06‐2018 10:47:00 3:44 0.00018667 MUs 404 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 9‐GANDHI NAGAR KRN 416 990 KVA UNPLANNED 12‐06‐2018 11:22:13 12‐06‐2018 12:14:00 0:51 0.0000425 MUs RANI GARDEN‐GEETA COLONY, BLOCK 12‐GEETA COLONY, BLOCK 18‐GEETA COLONY, BLOCK 15‐GEETA COLONY, BLOCK 405 13‐GEETA COLONY, SAROJINI PARK‐GEETA COLONY KRN 1069 990 KVA UNPLANNED 14‐06‐2018 11:58:35 14‐06‐2018 12:40:00 0:41 0.00028472 MUs 406 BLOCK 9‐GANDHI NAGAR KRN 104 990 KVA UNPLANNED 21‐06‐2018 10:31:00 21‐06‐2018 10:50:03 0:19 0.00001056 MUs 407 BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, KAILASH NAGAR SOUTH KRN 410 990 KVA UNPLANNED 23‐06‐2018 09:30:51 23‐06‐2018 10:27:00 0:56 0.00018667 MUs 408 BLOCK 16‐GEETA COLONY KRN 12 400 KVA UNPLANNED 25‐06‐2018 10:01:04 25‐06‐2018 10:35:00 0:33 0.00004583 MUs

BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, 409 YAMUNA RIVER, BLOCK 9‐GANDHI NAGAR, BLOCK 10‐GANDHI NAGAR, BLOCK 9‐GANDHI NAGAR KRN 2001 990 KVA UNPLANNED 27‐06‐2018 21:05:00 27‐06‐2018 22:01:28 0:56 0.00074667 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 5‐GEETA COLONY, BLOCK 9‐GANDHI NAGAR, KAILASH NAGAR 410 SOUTH KRN 127 990 KVA UNPLANNED 28‐06‐2018 11:49:16 28‐06‐2018 12:20:25 0:31 0.00001722 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 2‐GEETA COLONY, BLOCK 8A‐GEETA COLONY, BLOCK 8‐GEETA 411 COLONY, BLOCK 1A‐GEETA COLONY KRN 462 990 KVA UNPLANNED 29‐06‐2018 11:52:04 29‐06‐2018 12:42:00 0:49 0 MUs 412 BLOCK 2‐GEETA COLONY, BLOCK 8‐GEETA COLONY KRN 554 630 KVA UNPLANNED 30‐06‐2018 11:55:50 30‐06‐2018 12:26:00 0:30 0.00025 MUs 413 BLOCK E‐JAGATPURI, NEW GOVIND PURA‐JAGATPURI, BLOCK D‐JAGATPURI KRN 1067 990 KVA UNPLANNED 12‐06‐2018 12:20:00 12‐06‐2018 14:16:17 1:56 0.00012889 MUs 414 BLOCK B‐JAGATPURI KRN 114 990 KVA UNPLANNED 12‐06‐2018 17:17:00 12‐06‐2018 18:14:00 0:56 0.00004667 MUs 415 BLOCK A‐BALDEV PARK EAST, BLOCK D‐SOUTH ANARKALI COLONY KRN 250 990 KVA UNPLANNED 14‐06‐2018 15:25:02 14‐06‐2018 16:23:00 0:57 0.00003167 MUs BLOCK D‐JAGATPURI, BLOCK B‐JAGATPURI, BLOCK D‐SOUTH ANARKALI COLONY, BLOCK F‐BALDEV PARK EAST, BLOCK A‐ 416 BALDEV PARK EAST KRN 1614 990 KVA UNPLANNED 15‐06‐2018 01:30:03 15‐06‐2018 02:14:30 0:44 0.00012222 MUs BLOCK A‐JAGATPURI EXTN., BLOCK B‐JAGATPURI, RADHE SHYAM PARK‐SWASTHYA VIHAR, BRIJ PURI‐SWASTHYA VIHAR, 417 KHUREJI KHAS‐SWASTHYA VIHAR, OLD BRIJPURI‐SWASTHYA VIHAR KRN 903 990 KVA UNPLANNED 21‐06‐2018 02:12:00 21‐06‐2018 02:54:39 0:42 0.000525 MUs

BLOCK A‐NEW LAYALPUR COLONY, BLOCK E‐CHANDAR NAGAR, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK D‐RAM 418 NAGAR, SHIVPURI‐JAGATPURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, CHANDER NAGAR‐KRISHNA NAGAR KRN 264 990 KVA UNPLANNED 21‐06‐2018 14:58:00 21‐06‐2018 19:44:22 4:46 0.00015889 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐JAGATPURI, RASHID MARKET‐JAGATPURI, BALDEV PARK‐ 419 JAGATPURI, NEW GOVIND PURA‐JAGATPURI, SHIVPURI‐JAGATPURI KRN 1381 990 KVA UNPLANNED 22‐06‐2018 23:17:37 23‐06‐2018 00:45:48 1:28 0.00102667 MUs

BLOCK E‐ANARKALI COLONY NORTH, BLOCK A‐ANARKALI COLONY NORTH, BLOCK D‐AJIT NAGAR, BLOCK D‐SOUTH 420 ANARKALI COLONY, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, BLOCK K‐JAGATPURI KRN 472 990 KVA UNPLANNED 23‐06‐2018 00:50:00 23‐06‐2018 02:49:06 1:59 0.00082639 MUs

BLOCK D‐SOUTH ANARKALI COLONY, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, OLD BRIJPURI‐ SWASTHYA VIHAR, NEW GOVIND PURA‐JAGATPURI, BLOCK B‐SUBHASH MOHALLA, BALDEV PARK‐JAGATPURI, BLOCK D‐ JAGATPURI, BLOCK B‐JAGATPURI, BLOCK F‐BALDEV PARK EAST, BLOCK E‐SUBHASH MOHALLA, RADHE SHYAM PARK EXTN. 421 SWASTHYA VIHAR, BLOCK B5‐YAMUNA PUR (GONDA) BLOCK B, BLOCK E‐SUBHASH MOHALLA KRN 4966 990 KVA UNPLANNED 23‐06‐2018 01:06:12 23‐06‐2018 02:20:34 1:14 0.00049333 MUs BLOCK D‐JAGATPURI, BLOCK B‐JAGATPURI, BLOCK D‐SOUTH ANARKALI COLONY, BLOCK F‐BALDEV PARK EAST, BLOCK A‐ 422 BALDEV PARK EAST KRN 1613 990 KVA UNPLANNED 23‐06‐2018 05:55:06 23‐06‐2018 06:15:33 0:20 0.00013889 MUs BRIJ PURI‐SWASTHYA VIHAR, KHUREJI KHAS‐SWASTHYA VIHAR, BLOCK B‐JAGAT PURI, OLD BRIJPURI‐SWASTHYA VIHAR, 423 BLOCK C‐BRIJ PURI KRN 364 990 KVA UNPLANNED 24‐06‐2018 02:10:42 24‐06‐2018 03:00:59 0:50 0.00006944 MUs 424 KHUREJI KHAS‐SWASTHYA VIHAR, BLOCK A‐JAGATPURI EXTN., RASHID MARKET‐JAGATPURI KRN 125 990 KVA UNPLANNED 25‐06‐2018 02:53:16 25‐06‐2018 03:42:10 0:48 0.00013333 MUs YAMUNA RIVER‐KRISHNA NAGAR YAMUNA FLOOD PLAINS, BLOCK B‐JAGATPURI, BLOCK B‐SOUTH ANARKALI COLONY, BLOCK A‐BALDEV PARK EAST, BLOCK J‐JAGATPURI, KAILASH NAGAR SOUTH, BLOCK H‐JAGATPURI, BLOCK K‐JAGATPURI, 425 BLOCK B‐JAGATPURI KRN 499 990 KVA UNPLANNED 25‐06‐2018 13:06:00 25‐06‐2018 13:31:56 0:25 0.00003472 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

426 GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR, DHARAM PURA‐KAILASH NAGAR KRN 1012 990 KVA UNPLANNED 02‐06‐2018 12:37:00 02‐06‐2018 19:24:00 6:47 0 MUs

427 GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR, DHARAM PURA‐KAILASH NAGAR KRN 0 990 KVA UNPLANNED 11‐06‐2018 10:35:00 11‐06‐2018 12:28:48 1:53 0 MUs 428 YAMUNA RIVER‐KAILASH NAGAR KRN 2 990 KVA UNPLANNED 14‐06‐2018 17:19:00 14‐06‐2018 19:06:00 1:47 0.00005944 MUs

429 GANDHI NAGAR‐KAILASH NAGAR, BLOCK 9‐KAILASH NAGAR, BLOCK 9‐GANDHI NAGAR, DHARAM PURA‐KAILASH NAGAR KRN 0 990 KVA UNPLANNED 18‐06‐2018 12:00:00 18‐06‐2018 17:43:00 5:43 0 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, RAGHUVIR PURA‐SHANKAR NAGAR, RAGHUVIR PURA‐ KANTI NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 5‐TRILOKPURI PHASE I, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OLD SEELAMPUR, BLOCK F‐SHIV VIHAR, 430 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KRN 0 2610 KVA UNPLANNED 20‐06‐2018 11:15:00 20‐06‐2018 14:29:00 3:14 0 MUs 431 OLD SEELAMPUR KRN 950 990 KVA UNPLANNED 28‐06‐2018 05:30:00 28‐06‐2018 06:01:59 0:31 0.000155 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, WEST AZAD NAGAR, SHANKAR NAGAR‐AZAD NAGAR, BLOCK A‐KRISHNA 432 NAGAR, BLOCK X‐RAJGARH COLONY KRN 678 990 KVA UNPLANNED 16‐06‐2018 12:06:19 16‐06‐2018 13:00:00 0:53 0.00014722 MUs 433 BLOCK D‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR, WEST AZAD NAGAR KRN 887 990 KVA UNPLANNED 19‐06‐2018 01:35:00 19‐06‐2018 07:53:00 6:18 0.00315 MUs

BLOCK 2A‐GEETA COLONY, BLOCK 12‐GEETA COLONY, JHEEL‐JHEEL KHURENJA, BLOCK 8‐KAROL BAGH WEST EXTENSION AREA, MAHILA COLONY‐SEELAMPUR, RAMA KRISHNA MISSION FREE T.B. CLINIC‐BLOCK 18, BLOCK X‐RAJGARH COLONY, SANDHA RAMA SCHOOL‐BLOCK 18, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, CHAND MOHALLA‐RAJGARH COLONY, 434 BLOCK C‐RADHEPURI EXTENSION, MCD ADARSH SCHOOL‐BLOCK 18, BLOCK_15‐KAROL BAGH WEST EXTENSION AREA KRN 1325 630 KVA UNPLANNED 19‐06‐2018 14:36:00 19‐06‐2018 16:23:41 1:47 0.00095111 MUs 435 BLOCK C‐KANTI NAGAR NORTH BLOCK C, BLOCK A‐KRISHNA NAGAR KRN 187 630 KVA UNPLANNED 22‐06‐2018 16:45:00 22‐06‐2018 17:42:00 0:56 0.00003111 MUs BLOCK E‐KRISHNA NAGAR, WEST AZAD NAGAR, BLOCK B‐GHONDALI, SHANKAR NAGAR WEST‐AZAD NAGAR, AZAD NAGAR 436 EAST, SHANKAR NAGAR EXTN‐AZAD NAGAR, BLOCK A‐KRISHNA NAGAR KRN 2197 990 KVA UNPLANNED 23‐06‐2018 03:25:00 23‐06‐2018 05:02:54 1:37 0.00134722 MUs OLD SEELAMPUR, AZAD NAGAR EAST, WEST AZAD NAGAR, RAGHUVIR PURA‐SHANKAR NAGAR, SHANKAR NAGAR WEST‐ 437 AZAD NAGAR KRN 101 990 KVA UNPLANNED 23‐06‐2018 11:18:17 23‐06‐2018 13:15:55 1:57 0.000065 MUs SHANKAR NAGAR EXTN‐AZAD NAGAR, WEST AZAD NAGAR, RAGHUVIR PURA‐SHANKAR NAGAR, SHANKAR NAGAR‐AZAD 438 NAGAR KRN 1105 990 KVA UNPLANNED 28‐06‐2018 01:00:00 28‐06‐2018 01:59:00 0:58 0.00038667 MUs 439 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN. KRN 202 990 KVA UNPLANNED 14‐06‐2018 10:31:55 14‐06‐2018 11:10:00 0:38 0.00002111 MUs 440 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN. KRN 158 990 KVA UNPLANNED 14‐06‐2018 13:14:11 14‐06‐2018 14:40:42 1:26 0.00004778 MUs 441 CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN. KRN 158 990 KVA UNPLANNED 14‐06‐2018 18:15:04 14‐06‐2018 19:25:00 1:9 0.00003833 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, CHANDER NAGAR‐KRISHNA NAGAR, CHANDER NAGAR BLOCK D‐KRISHNA 442 NAGAR EXTN., CHANDER NAGAR BLOCK C‐KRISHNA NAGAR EXTN. KRN 886 990 KVA UNPLANNED 15‐06‐2018 13:24:00 15‐06‐2018 13:50:00 0:26 0.00001444 MUs 443 JHEEL‐JHEEL KHURENJA, BLOCK A‐KRISHNA NAGAR, BLOCK X‐RAJGARH COLONY KRN 619 630 KVA UNPLANNED 19‐06‐2018 13:43:00 19‐06‐2018 15:06:00 1:22 0.00047833 MUs BLOCK D‐BALDEV PARK EAST, CHANDER NAGAR BLOCK D‐KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK C‐KRISHNA 444 NAGAR EXTN., BLOCK 13‐GEETA COLONY KRN 202 990 KVA UNPLANNED 23‐06‐2018 11:57:00 23‐06‐2018 12:49:39 0:52 0.00002889 MUs

BLOCK J‐KRISHNA NAGAR EAST, BLOCK A‐KRISHNA NAGAR EAST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK J‐ KRISHNA NAGAR EAST, BLOCK B‐KRISHNA NAGAR EAST, KRISHNA NAGAR EAST BLOCK B‐RADHEPURI, BLOCK F‐KRISHNA 445 NAGAR, KRISHNA NAGAR EAST BLOCK D‐RADHEPURI, JHEEL‐KRISHNA NAGAR BLOCK B KRN 1622 990 KVA UNPLANNED 30‐06‐2018 09:41:01 30‐06‐2018 10:06:00 0:24 0.0001 MUs 446 BLOCK 13‐GEETA COLONY KRN 63 630 KVA UNPLANNED 27‐06‐2018 11:56:24 27‐06‐2018 12:50:00 0:53 0.00002944 MUs BLOCK 2A‐GEETA COLONY, BLOCK C‐GOKUL PURI, JHEEL‐JHEEL KHURENJA, PKT A‐BLOCK C, BLOCK F‐GANGA VIHAR, MAHILA COLONY‐SEELAMPUR, BLOCK B‐GOKUL PURI, BLOCK X‐RAJGARH COLONY, BLOCK E‐GANGA VIHAR, PKT B‐BLOCK C, BLOCK D‐GOKUL PURI, BLOCK A‐GOKUL PURI, PKT G‐BLOCK A, PKT G‐BLOCK C, PKT B‐BLOCK A, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT C‐BLOCK C, BLOCK B‐GANGA VIHAR, PKT A‐BLOCK A, CHAND MOHALLA‐RAJGARH 447 COLONY KWN 7291 3600 KVA UNPLANNED 08‐06‐2018 10:50:00 08‐06‐2018 11:54:00 1:4 0 MUs 448 PKT R‐BLOCK D KWN 508 990 KVA UNPLANNED 12‐06‐2018 14:40:00 12‐06‐2018 15:36:41 0:56 0.00003111 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐ 449 JAGJEET NAGAR, BLOCK F‐BRAHM PURI KWN 1869 630 KVA UNPLANNED 14‐06‐2018 17:05:20 14‐06‐2018 19:17:46 2:12 0.0022 MUs

JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV 450 VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 14‐06‐2018 22:01:08 14‐06‐2018 22:56:46 0:55 0.00154306 MUs

JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV 451 VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 15‐06‐2018 23:41:00 16‐06‐2018 01:00:00 1:19 0.00219444 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐ 452 JAGJEET NAGAR, BLOCK F‐BRAHM PURI KWN 1869 630 KVA UNPLANNED 18‐06‐2018 10:22:57 18‐06‐2018 10:28:29 0:5 0 MUs

453 JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR KWN 1413 0 KVA UNPLANNED 19‐06‐2018 08:58:51 19‐06‐2018 11:25:19 2:26 0.00020278 MUs 454 TUNDA NAGAR‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 184 425 KVA UNPLANNED 19‐06‐2018 13:27:04 19‐06‐2018 14:25:00 0:57 0.000475 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK E‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK F‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐ L BLOCK, BLOCK C‐MAN SINGH NAGAR, BLOCK E‐BRIJ PURI, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK B‐MAN SINGH NAGAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK G‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, BLOCK C‐BRIJ PURI, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI 455 VIHAR KWN 6008 2520 KVA UNPLANNED 19‐06‐2018 19:57:00 19‐06‐2018 20:44:00 0:47 0 MUs PKT G‐BLOCK A, PKT A‐BLOCK C, BLOCK F‐GANGA VIHAR, PKT G‐BLOCK C, PKT C‐BLOCK C, BLOCK B‐GANGA VIHAR, BLOCK 456 E‐GANGA VIHAR KWN 3390 990 KVA UNPLANNED 20‐06‐2018 12:29:39 20‐06‐2018 13:25:00 0:55 0.00015278 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

JOHRI ENCLAVE‐BHAGIRATHI VIHAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK E‐BHAGIRATHI VIHAR, TUNDA 457 NAGAR‐BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, BLOCK C & D‐INDIRA VIHAR, BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 20‐06‐2018 12:31:15 20‐06‐2018 13:26:00 0:54 0.000225 MUs 458 BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK D‐OLD MUSTAFABAD, BLOCK B‐OLD MUSTAFABAD KWN 113 630 KVA UNPLANNED 22‐06‐2018 04:25:18 22‐06‐2018 05:24:00 0:58 0.00032222 MUs BLOCK C‐GOKUL PURI, PKT A‐BLOCK C, BLOCK F‐GANGA VIHAR, BLOCK B‐GOKUL PURI, BLOCK E‐GANGA VIHAR, PKT B‐ BLOCK C, BLOCK D‐GOKUL PURI, BLOCK A‐GOKUL PURI, PKT G‐BLOCK A, PKT G‐BLOCK C, PKT B‐BLOCK A, PKT C‐BLOCK C, 459 PKT A‐BLOCK A, BLOCK B‐GANGA VIHAR KWN 7215 3600 KVA UNPLANNED 22‐06‐2018 14:40:55 22‐06‐2018 15:11:24 0:30 0.00058333 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV 460 VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 1380 1260 KVA UNPLANNED 22‐06‐2018 16:15:56 22‐06‐2018 16:40:00 0:24 0.00053333 MUs BLOCK B‐MUSTAFABAD (DAYALPUR), BLOCK B‐MAN SINGH NAGAR, BLOCK D‐OLD MUSTAFABAD, BLOCK B‐OLD 461 MUSTAFABAD KWN 113 630 KVA UNPLANNED 23‐06‐2018 07:25:18 23‐06‐2018 08:15:00 0:49 0.00027222 MUs

JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, BLOCK F‐BHAGIRATHI VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK B‐MAN SINGH NAGAR, BLOCK B‐OLD MUSTAFABAD, BLOCK G‐BHAGIRATHI 462 VIHAR, BLOCK E‐BHAGIRATHI VIHAR, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, BHAGIRATHI VIHAR KWN 3250 630 KVA UNPLANNED 25‐06‐2018 10:48:43 25‐06‐2018 11:44:00 0:55 0.00030556 MUs 463 JOHRI ENCLAVE‐BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 25‐06‐2018 12:03:09 25‐06‐2018 13:05:20 1:2 0.00051667 MUs 464 BLOCK C‐MAN SINGH NAGAR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR KWN 25 0 KVA UNPLANNED 25‐06‐2018 16:23:10 25‐06‐2018 16:40:00 0:16 0.00008889 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 465 BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 1344 1260 KVA UNPLANNED 26‐06‐2018 13:45:00 26‐06‐2018 14:40:00 0:54 0.0012 MUs

JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK B‐CHAMAN PARK, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV 466 VIHAR, SHIV VIHAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 27‐06‐2018 05:57:08 27‐06‐2018 06:55:00 0:57 0.00079167 MUs

JOHRI ENCLAVE‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐CHAMAN PARK, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, LAXMI GARDEN‐AMBEDKAR NAGAR, BLOCK B‐JOHRI PUR, BHAGIRATHI VIHAR, BLOCK B‐JOHRI PUR, JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK P‐SHIV VIHAR, BLOCK B‐CHAMAN PARK, AMBEDKAR NAGAR INDUSTRIAL AREA‐BHAGIRATHI VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A‐JOHRI PUR, BLOCK F‐INDIRA VIHAR, TUNDA NAGAR‐BHAGIRATHI VIHAR, BLOCK F‐SHIV VIHAR, SHIV VIHAR, BLOCK C‐KARAWAL 467 NAGAR, BHARAT‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 7086 1485 KVA UNPLANNED 27‐06‐2018 07:50:47 27‐06‐2018 09:00:00 1:9 0.00095833 MUs 468 LAXMI GARDEN‐AMBEDKAR NAGAR, BHAGIRATHI VIHAR KWN 486 0 KVA UNPLANNED 27‐06‐2018 09:15:15 27‐06‐2018 10:15:00 0:59 0.00024583 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, JHILMIL INDUSTRIAL 469 AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 1380 1260 KVA UNPLANNED 27‐06‐2018 14:30:00 27‐06‐2018 14:54:00 0:24 0.0006 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, MUSTAFABAD‐MUNGA NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BHAGAT NAGAR‐ DAYALPUR, BLOCK C & D‐INDIRA VIHAR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, LAXMI GARDEN‐ AMBEDKAR NAGAR, BLOCK M‐SHIV VIHAR, BLOCK H‐OLD MUSTAFABAD, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐ SHIV VIHAR, BLOCK C‐BHAGIRATHI VIHAR, BLOCK B‐MAN SINGH NAGAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK B‐INDIRA VIHAR, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐ 470 SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK B‐BHAGIRATHI VIHAR KWN 1380 1260 KVA UNPLANNED 28‐06‐2018 02:04:08 28‐06‐2018 04:02:00 1:57 0.00325 MUs 471 PKT R‐BLOCK D, BLOCK M‐NEHRU VIHAR, PKT M‐BLOCK D KWN 2125 990 KVA UNPLANNED 30‐06‐2018 13:26:41 30‐06‐2018 14:25:48 0:59 0.00032778 MUs BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK M‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK O‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV 472 VIHAR KWN 1882 0 KVA UNPLANNED 12‐06‐2018 09:23:53 12‐06‐2018 10:03:30 0:39 0.0001625 MUs 473 BLOCK CN‐MANGALAM VIHAR KWN 277 0 KVA UNPLANNED 12‐06‐2018 13:35:07 12‐06‐2018 14:04:45 0:29 0.00016111 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NEW CHAUHAN PUR, PKT 1‐BLOCK A, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 3B‐SADAT PUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK B‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK A‐NEHRU VIHAR, BLOCK 1D‐SADAT PUR, BLOCK 2C‐SADAT PUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK A‐MUSTAFABAD (DAYALPUR), PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SADAT PUR, BLOCK 1B‐SADAT PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL 474 AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK 5B‐SADAT PUR KWN 1280 990 KVA UNPLANNED 14‐06‐2018 10:36:37 14‐06‐2018 11:36:51 1:0 0.0005 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, BLOCK E‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK I‐BHAGAT SINGH COLONY, BLOCK C‐SADAT PUR, BLOCK C‐KARAWAL NAGAR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, BLOCK C‐BHAGAT SINGH COLONY, PKT B‐ BLOCK B, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐KHAJURI KHAS, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK D‐WEST KARAWAL NAGAR, BLOCK 475 D‐DLF ANKUR VIHAR, WEST KARAWAL NAGAR KWN 5685 1660 KVA UNPLANNED 20‐06‐2018 23:00:00 20‐06‐2018 23:50:02 0:50 0.000625 MUs BLOCK I‐BHAGAT SINGH COLONY, BLOCK H‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK B‐ 476 BHAGAT SINGH COLONY KWN 467 630 KVA UNPLANNED 22‐06‐2018 14:51:43 22‐06‐2018 15:18:39 0:26 0.00007222 MUs

BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐ 477 PREM VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 1547 990 KVA UNPLANNED 22‐06‐2018 21:51:42 22‐06‐2018 22:39:16 0:47 0.00026111 MUs BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, BLOCK CN‐MANGALAM VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐PATEL VIHAR, BLOCK F‐SHIV VIHAR, SHIV VIHAR, BLOCK 478 CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 852 0 KVA UNPLANNED 23‐06‐2018 10:40:00 23‐06‐2018 11:30:49 0:50 0.00020833 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐HARIJAN BASTI, BLOCK B‐HARIJAN BASTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐RAMA GARDEN, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, BLOCK A‐NEW CHAUHAN PUR, BLOCK E‐PRAKASH VIHAR, BLOCK E‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A‐ PRAKASH VIHAR, BLOCK I‐BHAGAT SINGH COLONY, BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, BLOCK C‐ BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK M‐SHIV VIHAR, BLOCK B‐NEW CHAUHAN PUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, BLOCK C‐DLF ANKUR VIHAR, GEETA COLONY, BLOCK B‐BHAGAT SINGH COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, NANK MILK PLANT‐PRAKASH VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGIRATHI VIHAR, BLOCK B‐PRAKASH VIHAR, BLOCK D‐DLF ANKUR VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR 479 EXTN., BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 9014 5860 KVA UNPLANNED 25‐06‐2018 09:13:00 25‐06‐2018 09:51:18 0:38 0.00105556 MUs

BLOCK C‐GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK D‐WEST KARAWAL NAGAR, GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH 480 COLONY, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR KWN 1499 990 KVA UNPLANNED 25‐06‐2018 11:57:22 25‐06‐2018 12:55:00 0:57 0.000475 MUs

BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐GOVIND VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐PREM VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐ 481 JHILMIL COLONY, PKT A‐BLOCK B KWN 1547 990 KVA UNPLANNED 25‐06‐2018 16:28:52 25‐06‐2018 17:17:32 0:48 0.0004 MUs FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐ BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL 482 NAGAR KWN 861 1620 KVA UNPLANNED 25‐06‐2018 19:27:00 25‐06‐2018 20:02:21 0:35 0.00029167 MUs

483 BHAGIRATHI VIHAR, BHARAT‐AMBEDKAR NAGAR, JAGDAMBA COLONY‐BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 1705 0 KVA UNPLANNED 25‐06‐2018 22:34:58 25‐06‐2018 23:20:27 0:45 0.000375 MUs

BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐ 484 PREM VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 1547 990 KVA UNPLANNED 25‐06‐2018 22:59:32 25‐06‐2018 23:55:00 0:55 0.00030556 MUs

PKT B‐BLOCK B, PKT EA‐BLOCK B, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK B‐NEW CHAUHAN PUR, BLOCK C‐ SHERPUR, PKT A‐BLOCK E, BLOCK 3A‐SADAT PUR, BLOCK D‐WEST KARAWAL NAGAR, PKT D‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT B‐BLOCK A, BLOCK H‐SHIV VIHAR, PKT G‐BLOCK A, 485 BLOCK C‐KARAWAL NAGAR, BLOCK B‐KARAWAL NAGAR (DEHROTI), PKT E‐BLOCK A KWN 937 0 KVA UNPLANNED 26‐06‐2018 06:38:13 26‐06‐2018 07:18:30 0:40 0.00022222 MUs PKT EA‐BLOCK B, ARVIND NAGAR‐GHONDA, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK C‐JAI PRAKASH NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK C‐GHONDA PATTI, BLOCK B‐DAYALPUR, GHONDA PATTI, BLOCK 3A‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 1B‐SADAT PUR, BLOCK H‐GHONDA 486 PATTI, PKT B‐BLOCK A, BLOCK B‐KARAWAL NAGAR (DEHROTI) KWN 1252 630 KVA UNPLANNED 26‐06‐2018 13:48:05 26‐06‐2018 14:45:00 0:56 0.00062222 MUs FACTORY (KHASRA)‐HARIJAN BASTI, BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐ BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL 487 NAGAR KWN 862 1620 KVA UNPLANNED 26‐06‐2018 18:30:00 26‐06‐2018 19:08:48 0:38 0.00095 MUs BLOCK R‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ MANGALAM VIHAR, BLOCK C‐PATEL VIHAR, BLOCK A‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, BLOCK C‐PRAKASH VIHAR, 488 BLOCK B‐PATEL VIHAR, BLOCK B‐BHAGAT SINGH COLONY KWN 1941 2415 KVA UNPLANNED 27‐06‐2018 05:53:07 27‐06‐2018 06:40:00 0:46 0.00127778 MUs BLOCK R‐PATEL VIHAR, BLOCK CN‐MANGALAM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ MANGALAM VIHAR, BLOCK C‐PATEL VIHAR, BLOCK A‐PRAKASH VIHAR, BLOCK C‐PATEL VIHAR, PKT E‐BLOCK A, BLOCK C‐ 489 PRAKASH VIHAR, BLOCK B‐PATEL VIHAR, BLOCK B‐BHAGAT SINGH COLONY KWN 1941 2415 KVA UNPLANNED 27‐06‐2018 07:40:00 27‐06‐2018 08:19:39 0:39 0.00054167 MUs BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK B‐SHIV VIHAR, BLOCK Q‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐PATEL VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, 490 BLOCK L‐SHIV VIHAR KWN 1882 0 KVA UNPLANNED 27‐06‐2018 14:44:52 27‐06‐2018 15:37:56 0:53 0.00022083 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, BLOCK E‐BHAGAT SINGH COLONY, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK A‐PRAKASH VIHAR, BLOCK I‐BHAGAT SINGH COLONY, BLOCK C‐SADAT PUR, BLOCK C‐KARAWAL NAGAR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐ BHAGAT SINGH COLONY, PKT C‐BLOCK E, BLOCK C‐BHAGAT SINGH COLONY, PKT B‐BLOCK B, BHAGAT NAGAR‐DAYALPUR, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐KHAJURI KHAS, BLOCK B‐SADATPUR EXT‐ PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK K‐WEST KARAWAL NAGAR, BLOCK U‐SHIV VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK H‐BHAGAT SINGH COLONY, BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK D‐WEST KARAWAL NAGAR, BLOCK D‐DLF ANKUR VIHAR, WEST KARAWAL NAGAR, BLOCK C‐BHAGAT 491 SINGH COLONY KWN 5690 1660 KVA UNPLANNED 27‐06‐2018 22:06:00 27‐06‐2018 23:03:00 0:56 0.00046667 MUs

PKT R‐BLOCK A, BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK A‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK H‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, SHIV VIHAR, BLOCK T‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐ 492 SONIA VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR KWN 1882 0 KVA UNPLANNED 27‐06‐2018 23:04:59 27‐06‐2018 23:37:01 0:32 0.00044444 MUs

PKT B‐BLOCK B, PKT EA‐BLOCK B, PKT D‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, PKT C‐ 493 BLOCK A, PKT B‐BLOCK A, PKT A‐BLOCK E, PKT G‐BLOCK A, BLOCK 3A‐SADAT PUR, PKT E‐BLOCK A KWN 937 0 KVA UNPLANNED 28‐06‐2018 05:54:09 28‐06‐2018 07:21:41 1:27 0.0003625 MUs

BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C, PKT D‐SHIV VIHAR, BLOCK C‐HARIJAN BASTI, BLOCK A‐SHIV VIHAR, BLOCK Z‐O & 494 P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT Y‐SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 857 0 KVA UNPLANNED 28‐06‐2018 07:37:07 28‐06‐2018 08:30:00 0:52 0.00021667 MUs

PKT R‐BLOCK A, BLOCK M‐SHIV VIHAR, BLOCK C‐HARIJAN BASTI, BLOCK O‐SHIV VIHAR, BLOCK D‐SHIV VIHAR, BLOCK U‐ SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐SHIV VIHAR, BLOCK 495 F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, BLOCK CN‐AMBIKA VIHAR BLOCK ‐ B&C KWN 1882 0 KVA UNPLANNED 28‐06‐2018 09:23:37 28‐06‐2018 09:59:22 0:35 0.00014583 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NEW CHAUHAN PUR, PKT 1‐BLOCK A, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 3B‐SADAT PUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK B‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK A‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK 1D‐SADAT PUR, BLOCK 2C‐SADAT PUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK A‐MUSTAFABAD (DAYALPUR), PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., BLOCK F‐SADAT PUR, BLOCK 1B‐ 496 SADAT PUR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK 5B‐SADAT PUR KWN 1316 990 KVA UNPLANNED 28‐06‐2018 11:43:07 28‐06‐2018 12:37:08 0:54 0.000225 MUs

BLOCK C‐MAHALAXMI ENCLAVE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐PREM VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐PREM VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, BHAGAT NAGAR‐DAYALPUR, BLOCK C‐PREM VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐ 497 PREM VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 1547 990 KVA UNPLANNED 28‐06‐2018 14:07:39 28‐06‐2018 15:00:00 0:52 0.00021667 MUs

BLOCK B‐NEW CHAUHAN PUR, BLOCK B‐SADAT PUR, PKT A3‐BLOCK E, PKT A‐BLOCK E, BLOCK 3A‐SADAT PUR, PKT A4‐ BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK F‐WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK C‐SADAT PUR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐BLOCK E, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, PKT B‐BLOCK B, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), PKT A2‐BLOCK E, BLOCK H‐WEST KARAWAL NAGAR, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐ KHAJURI KHAS, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK K‐WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK D‐MUSTAFABAD (DAYALPUR), BLOCK A‐HARIJAN BASTI, BLOCK D‐ 498 WEST KARAWAL NAGAR, BLOCK F‐SADAT PUR, WEST KARAWAL NAGAR KWN 5690 1660 KVA UNPLANNED 28‐06‐2018 14:57:54 28‐06‐2018 15:50:15 0:52 0.00021667 MUs PKT R‐BLOCK A, BLOCK M‐SHIV VIHAR, BLOCK O‐SHIV VIHAR, BLOCK A‐SHIV VIHAR, BLOCK D‐OLD MUSTAFABAD, BLOCK D SHIV VIHAR, PKT W‐BLOCK A, BLOCK H‐SHIV VIHAR, BLOCK U‐SHIV VIHAR, PKT X‐SHIV VIHAR, BLOCK N‐SHIV VIHAR, BLOCK T‐SHIV VIHAR, BLOCK B‐SHIV VIHAR, BLOCK B‐PREM VIHAR, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK H‐SHIV VIHAR, BLOCK F‐SHIV VIHAR, BLOCK L‐SHIV VIHAR, PKT A‐ 499 BLOCK B, BLOCK S‐SHIV VIHAR KWN 1882 0 KVA UNPLANNED 28‐06‐2018 18:26:17 28‐06‐2018 19:35:00 1:8 0.00028333 MUs PKT C‐BLOCK E, PKT A‐BLOCK E, BLOCK D‐WEST KARAWAL NAGAR, PKT A4‐BLOCK E, BLOCK B‐HARIJAN BASTI, BLOCK K‐ WEST KARAWAL NAGAR, BLOCK A‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR, PKT D‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐SADAT PUR, SHIV VIHAR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, PKT A1‐ 500 BLOCK E KWN 1584 0 KVA UNPLANNED 29‐06‐2018 16:28:34 29‐06‐2018 17:30:00 1:1 0.00025417 MUs 501 BLOCK CN‐MANGALAM VIHAR KWN 277 0 KVA UNPLANNED 29‐06‐2018 18:40:00 29‐06‐2018 19:36:00 0:56 0.00023333 MUs PKT B‐BLOCK B, PKT EA‐BLOCK B, BLOCK E‐SADAT PUR, BLOCK C‐SHERPUR, BLOCK H‐WEST KARAWAL NAGAR, PKT A‐ BLOCK E, BLOCK 3A‐SADAT PUR, BLOCK A‐HARIJAN BASTI, BLOCK D‐WEST KARAWAL NAGAR, PKT D‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, PKT C‐BLOCK A, PKT B‐BLOCK A, WEST KARAWAL NAGAR, PKT G‐ 502 BLOCK A, PKT E‐BLOCK A KWN 937 0 KVA UNPLANNED 30‐06‐2018 16:05:27 30‐06‐2018 16:34:01 0:28 0.00011667 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM 503 AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 1063 630 KVA UNPLANNED 12‐06‐2018 01:08:16 12‐06‐2018 02:05:00 0:56 0.00015556 MUs BLOCK B‐NEHRU VIHAR, BHAGAT NAGAR‐DAYALPUR, BLOCK G‐NEHRU VIHAR, BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK E‐INDIRA VIHAR, BLOCK D‐SHIV VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, BLOCK C‐PREM VIHAR, BLOCK D‐ MUSTAFABAD (DAYALPUR), BLOCK U‐SHIV VIHAR, BLOCK A‐MUSTAFABAD (DAYALPUR), BLOCK F‐NEHRU VIHAR, BLOCK B‐ NEW CHAUHAN PUR, BLOCK A‐KHAJURI KHAS, PKT A‐BLOCK B, BLOCK F‐MUSTAFABAD (DAYALPUR), BLOCK C‐ TUKMIRPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐ SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, BLOCK F‐ SADAT PUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, BLOCK F‐SHIV VIHAR, GEETA COLONY, BLOCK A‐PREM VIHAR, BLOCK C2‐NEW CHAUHAN PUR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK D‐OLD MUSTAFABAD, BLOCK A‐BABU NAGAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK B‐TUKMIRPUR, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐DAYALPUR EXTN., GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK D‐PREM VIHAR, BLOCK D‐TUKMIRPUR, BLOCK E‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NEHRU VIHAR, DEEKSHA MAHILA COLLAGE‐DAYALPUR EXTN., LIG/MIG RES/NON 504 COMM AREA‐NEW CHAUHAN PUR, BHAJANPURA‐DAYALPUR, BLOCK N‐SHIV VIHAR, BLOCK B‐MUSTAFABAD (DAYALPUR), KWN 10576 5530 KVA UNPLANNED 12‐06‐2018 06:27:37 12‐06‐2018 07:40:00 1:12 0.0026 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 505 BLOCK B‐CHANDU NAGAR KWN 433 630 KVA UNPLANNED 12‐06‐2018 12:06:57 12‐06‐2018 12:46:21 0:39 0.00021667 MUs PKT B‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐ TUKMIRPUR, BLOCK D‐TUKMIRPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK V‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, LIG/MIG 506 RES/NON COMM AREA‐SONIA VIHAR KWN 668 0 KVA UNPLANNED 12‐06‐2018 15:11:58 12‐06‐2018 15:35:20 0:23 0.00019167 MUs 507 BLOCK B‐NEHRU VIHAR, BLOCK F‐NEHRU VIHAR, BLOCK Z‐NEHRU VIHAR KWN 896 990 KVA UNPLANNED 12‐06‐2018 16:09:36 12‐06‐2018 16:52:03 0:42 0.00029167 MUs 508 BLOCK C‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY KWN 997 630 KVA UNPLANNED 14‐06‐2018 12:13:45 14‐06‐2018 12:55:56 0:42 0.00035 MUs BLOCK B‐GARI MANDU, MAUJ PUR COMPLEX 1, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK E‐ 509 SUBHASH MOHALLA, BLOCK C‐KABIR NAGAR KWN 1379 400 KVA UNPLANNED 15‐06‐2018 12:25:00 15‐06‐2018 12:54:34 0:29 0.00008056 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐ CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG 510 RES/NON COMM AREA‐SONIA VIHAR KWN 3237 2060 KVA UNPLANNED 15‐06‐2018 21:08:00 15‐06‐2018 21:51:01 0:43 0.00131389 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM 511 AREA‐SONIA VIHAR KWN 412 630 KVA UNPLANNED 16‐06‐2018 17:37:29 16‐06‐2018 18:31:20 0:53 0.00022083 MUs 512 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 173 0 KVA UNPLANNED 17‐06‐2018 20:48:50 17‐06‐2018 21:40:49 0:51 0.0002125 MUs 513 BLOCK B‐CHANDU NAGAR KWN 433 630 KVA UNPLANNED 19‐06‐2018 00:45:51 19‐06‐2018 01:10:30 0:24 0.00013333 MUs

LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, BLOCK A‐ SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, 514 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 3236 2060 KVA UNPLANNED 19‐06‐2018 18:40:00 19‐06‐2018 19:24:49 0:44 0.00097778 MUs

PKT A3‐BLOCK E, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, PKT A‐BLOCK E, PKT A4‐BLOCK E, BLOCK F‐WEST KARAWAL NAGAR, BLOCK E‐BHAGAT SINGH COLONY, BLOCK I‐BHAGAT SINGH COLONY, BLOCK C‐SADAT PUR, BLOCK C‐ KARAWAL NAGAR, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK F‐BHAGAT SINGH COLONY, PKT C‐BLOCK E, BLOCK E‐SONIA VIHAR EXTENSION, BLOCK E‐SADAT PUR, BLOCK A‐BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA‐ SHRI RAM COLONY, BLOCK A‐KARAWAL NAGAR (DEHROTI), BLOCK A‐KHAJURI KHAS, BLOCK F & G‐BHAGAT SINGH COLONY, BLOCK B‐KHAJURI KHAS, BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, BLOCK D‐WEST KARAWAL NAGAR, BLOCK B‐BHAGAT SINGH COLONY, BLOCK K‐WEST KARAWAL NAGAR, BLOCK H‐BHAGAT SINGH COLONY, BLOCK D‐DLF 515 ANKUR VIHAR, BLOCK A‐SHRI RAM COLONY, WEST KARAWAL NAGAR, BLOCK D‐SHRI RAM COLONY KWN 1030 630 KVA UNPLANNED 19‐06‐2018 22:50:00 19‐06‐2018 23:47:00 0:56 0.00186667 MUs

PKT C‐BLOCK E, BLOCK E‐SADAT PUR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, PKT A3‐BLOCK E, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK F & G‐BHAGAT SINGH COLONY, PKT A‐BLOCK E, BLOCK B‐KHAJURI KHAS, BLOCK D‐WEST KARAWAL NAGAR, PKT A4‐BLOCK E, BLOCK H‐BHAGAT SINGH COLONY, BLOCK E‐BHAGAT SINGH COLONY, BLOCK A‐SHRI RAM COLONY, BLOCK I‐BHAGAT SINGH COLONY, WEST KARAWAL NAGAR, BLOCK C‐SADAT PUR, 516 BLOCK C‐KARAWAL NAGAR, BLOCK D‐SHRI RAM COLONY, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK KWN 1030 630 KVA UNPLANNED 19‐06‐2018 23:58:26 20‐06‐2018 00:20:26 0:22 0.00134444 MUs

BLOCK E‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK A‐SONIA VIHAR EXTENSION, PKT Y‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐HARIJAN BASTI, BLOCK B‐SONIA VIHAR 517 EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 1353 0 KVA UNPLANNED 21‐06‐2018 01:10:00 21‐06‐2018 06:55:00 5:45 0.00095833 MUs 518 BLOCK F‐NEHRU VIHAR, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR KWN 62 630 KVA UNPLANNED 21‐06‐2018 12:10:52 21‐06‐2018 13:00:29 0:49 0.00040833 MUs 519 BLOCK F‐NEHRU VIHAR, PKT A‐BLOCK A, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR KWN 62 630 KVA UNPLANNED 22‐06‐2018 11:33:37 22‐06‐2018 13:28:35 1:54 0.00015833 MUs

520 BLOCK A‐KHAJURI KHAS, PKT H‐BLOCK E, BLOCK D‐KHAJURI KHAS, BLOCK I‐KHAJURI KHAS EXTN., BLOCK C‐KHAJURI KHAS KWN 1404 630 KVA UNPLANNED 23‐06‐2018 23:20:58 24‐06‐2018 00:03:51 0:42 0.00023333 MUs 521 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 19 400 KVA UNPLANNED 25‐06‐2018 21:40:05 25‐06‐2018 22:35:00 0:54 0.00045 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐MUSTAFABAD (DAYALPUR), BLOCK D‐MUSTAFABAD 522 (DAYALPUR), BLOCK A‐MUSTAFABAD (DAYALPUR) KWN 730 0 KVA UNPLANNED 26‐06‐2018 00:53:19 26‐06‐2018 01:39:45 0:46 0.00038333 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐ 523 SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 389 400 KVA UNPLANNED 26‐06‐2018 12:40:00 26‐06‐2018 13:30:00 0:49 0.00197361 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SABHEPUR, LIG/MIG RES/NON COMM 524 AREA‐VIJAY VIHAR, CHAUHAN PATTI‐VIJAY VIHAR KWN 222 630 KVA UNPLANNED 26‐06‐2018 18:07:04 26‐06‐2018 18:50:00 0:42 0 MUs PKT C3‐SADATPUR EXT‐PUSTA AREA‐K BLOCK, BLOCK 4A‐SADAT PUR, BLOCK 5C‐SADAT PUR, BLOCK 3A‐SADAT PUR, 525 BLOCK B‐SADATPUR EXT‐PUSTA AREA‐M BLOCK, PKT E‐SADATPUR EXT‐PUSTA AREA‐K BLOCK KWN 1650 990 KVA UNPLANNED 26‐06‐2018 23:40:00 27‐06‐2018 00:29:36 0:49 0.00013611 MUs LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK D‐SHRI 526 RAM COLONY, BLOCK A‐SHRI RAM COLONY KWN 1030 630 KVA UNPLANNED 27‐06‐2018 06:15:00 27‐06‐2018 09:02:03 2:47 0.00231944 MUs LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK B‐ 527 KHAJURI KHAS, BLOCK D‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY KWN 1030 630 KVA UNPLANNED 27‐06‐2018 10:43:00 27‐06‐2018 11:42:00 0:58 0.00128889 MUs 528 BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 521 630 KVA UNPLANNED 27‐06‐2018 14:02:39 27‐06‐2018 15:26:53 1:24 0.00042 MUs JOHRI ENCLAVE‐BHAGIRATHI VIHAR, BLOCK D‐BHAGIRATHI VIHAR, BLOCK A‐MAN SINGH NAGAR, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, BLOCK C‐MAN SINGH NAGAR, BLOCK B‐JOHRI PUR, BLOCK D‐OLD MUSTAFABAD, BLOCK C‐ BHAGIRATHI VIHAR, OLD MUSTAFABAD‐ BLOCK C‐DAYALPUR, BLOCK B‐MAN SINGH NAGAR, BHAGIRATHI VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BLOCK B‐OLD MUSTAFABAD, BLOCK T‐OLD MUSTAFABAD, BLOCK F‐INDIRA VIHAR, BLOCK C‐ 529 KARAWAL NAGAR KWN 355 630 KVA UNPLANNED 28‐06‐2018 00:16:12 28‐06‐2018 02:38:54 2:22 0.00059167 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BLOCK D‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐TUKMIRPUR, BLOCK F‐NEHRU VIHAR, BLOCK C‐TUKMIRPUR, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR, BLOCK B‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐NEHRU VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A1‐MUNGA NAGAR, BLOCK 9‐GANDHI NAGAR, BLOCK B‐CHANDU NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK D‐TUKMIRPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK B‐NEHRU VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐ BHAGIRATHI VIHAR, BLOCK A‐NEHRU VIHAR, BLOCK C‐NEHRU VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, 530 BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B KWN 7550 3870 KVA UNPLANNED 28‐06‐2018 01:32:28 28‐06‐2018 02:20:06 0:47 0.001175 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM 531 AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 19 400 KVA UNPLANNED 28‐06‐2018 12:16:00 28‐06‐2018 14:40:00 2:24 0 MUs 532 BLOCK C‐KHAJURI KHAS, BLOCK A‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 521 630 KVA UNPLANNED 29‐06‐2018 10:56:40 29‐06‐2018 11:40:01 0:43 0.00017917 MUs YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK B‐GARI MANDU, CLOCK C‐ BIHARIPUR, BLOCK A‐SONIA VIHAR EXTENSION, BLOCK D‐TUKMIRPUR, KACHI COLONY‐JAGJEET NAGAR, BLOCK T‐NEHRU VIHAR, CHAUHAN PATTI‐VIJAY VIHAR, JAGJEET NAGAR‐GHONDA, BADARPUR KHADAR, BLOCK B‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, LIG/MIG RES/NON COMM AREA‐SABHEPUR, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK E‐SUBHASH MOHALLA, BLOCK C 533 KABIR NAGAR KWN 3208 2330 KVA UNPLANNED 29‐06‐2018 23:46:00 30‐06‐2018 01:43:46 1:57 0 MUs

LIG/MIG RES/NON COMM AREA‐NEW CHAUHAN PUR, PKT B‐BLOCK B, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PHASE I‐SHIV VIHAR, BLOCK C‐MAN SINGH NAGAR, PKT R‐BLOCK D, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, BLOCK D‐NEW CHAUHAN PUR, BLOCK B‐MAN SINGH NAGAR, BLOCK E‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT D‐BLOCK A, BLOCK A‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐KARAWAL NAGAR, 534 BLOCK D‐PRAKASH VIHAR, BLOCK C‐PRAKASH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR KWN 1717 0 KVA UNPLANNED 30‐06‐2018 11:34:20 30‐06‐2018 12:31:00 0:56 0.00031111 MUs LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK C‐SHRI RAM COLONY, BLOCK A‐SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐ SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐KHAJURI KHAS, BLOCK D‐SHRI RAM COLONY, 535 BLOCK B‐SHRI RAM COLONY KWN 7538 5570 KVA UNPLANNED 30‐06‐2018 19:19:07 30‐06‐2018 19:39:57 0:20 0.00044444 MUs 536 GANESH NAGAR SOUTH‐INDRAPRASTHA EXTENSION LNR 1605 630 KVA UNPLANNED 15‐06‐2018 23:25:14 15‐06‐2018 23:50:29 0:25 0.00006944 MUs 537 BLOCK B‐VINOD NAGAR EAST, BLOCK B‐VINOD NAGAR WEST, BLOCK A‐VINOD NAGAR EAST LNR 1110 990 KVA UNPLANNED 25‐06‐2018 13:15:00 25‐06‐2018 13:55:26 0:40 0.00011111 MUs 538 FAJALPUR‐MANDAWALI, BLOCK H‐MANDAWALI VILLAGE LNR 573 400 KVA UNPLANNED 25‐06‐2018 15:41:27 25‐06‐2018 16:15:55 0:34 0.00009444 MUs 539 FAJALPUR‐MANDAWALI, BLOCK H‐MANDAWALI VILLAGE LNR 574 400 KVA UNPLANNED 26‐06‐2018 13:02:37 26‐06‐2018 14:00:00 0:57 0.00031667 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, FAZALPUR‐MANDAWALI VILLAGE, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐MANDAWALI VILLAGE, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐VINOD 540 NAGAR EAST LNR 2164 990 KVA UNPLANNED 28‐06‐2018 11:42:00 28‐06‐2018 12:25:00 0:42 0.00011667 MUs 541 BLOCK C‐PANDOW NAGAR, BLOCK D‐PANDAV NAGAR LNR 141 990 KVA UNPLANNED 30‐06‐2018 17:45:38 30‐06‐2018 18:20:12 0:34 0.00014167 MUs 542 YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, VISHWAKARMA PARK‐LAKSHMI NAGAR LNR 14 400 KVA UNPLANNED 12‐06‐2018 01:01:32 12‐06‐2018 01:21:13 0:19 0.00002639 MUs

543 BLOCK A‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, GANESH NAGAR‐SHAKARPUR KHAS LNR 1544 990 KVA UNPLANNED 12‐06‐2018 15:30:00 12‐06‐2018 16:00:00 0:29 0.00008056 MUs

BLOCK M‐JAGAT RAM PARK, BLOCK K‐JAGAT RAM PARK, BLOCK J‐LALITA PARK, BLOCK J‐VISHWAKARMA PARK, BLOCK N‐ 544 VISHWAKARMA PARK, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, RAMESH PARK‐LAKSHMI NAGAR LNR 1566 990 KVA UNPLANNED 15‐06‐2018 01:44:45 15‐06‐2018 02:40:05 0:55 0.00022917 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GURU ANGAD NAGAR WEST, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, BLOCK N‐SHIV VIHAR, BLOCK J‐LALITA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK C‐LALITA PARK, GYAN KUNJ‐WEST GURU ANGAD NAGAR, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, MOHAN PARK‐WEST GURU ANGAD NAGAR, PKT R‐BLOCK D, GEETA COLONY, BLOCK F‐GURU ANGAD NAGAR WEST, BLOCK D‐SHIV VIHAR, BLOCK E‐ INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK A‐GURU RAMDAS NAGAR, LAXMI NAGAR COMMERCIAL COPLEX‐SWASTHYA VIHAR, JHILMIL 545 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 1608 990 KVA UNPLANNED 21‐06‐2018 01:50:08 21‐06‐2018 02:23:14 0:33 0.0000275 MUs BLOCK E‐LALITA PARK, BLOCK E‐LAKSHMI NAGAR, BLOCK A‐SWASTHYA VIHAR, BLOCK F‐LALITA PARK, BLOCK B‐ 546 SWASTHYA VIHAR, BLOCK A‐PREET VIHAR, BLOCK C‐LALITA PARK, BLOCK E‐PREET VIHAR LNR 1203 990 KVA UNPLANNED 22‐06‐2018 23:37:03 23‐06‐2018 00:50:00 1:12 0.0002 MUs 547 BLOCK WA&O‐SHAKARPUR KHAS, BLOCK WA‐SHAKARPUR KHAS, GANESH NAGAR‐SHAKARPUR KHAS LNR 1032 630 KVA UNPLANNED 23‐06‐2018 18:14:24 23‐06‐2018 18:30:17 0:15 0.0000625 MUs BLOCK E‐LALITA PARK, BLOCK F‐LALITA PARK, BLOCK E‐LAKSHMI NAGAR, BLOCK B‐LAKSHMI NAGAR, BLOCK C‐LALITA 548 PARK, BANK ENCLAVE‐LAKSHMI NAGAR LNR 1203 990 KVA UNPLANNED 25‐06‐2018 10:00:21 25‐06‐2018 10:42:00 0:41 0.00011389 MUs SHAKARPUR EXTN.‐SHAKARPUR KHAS, BLOCK S1‐SCHOOL BLOCK, GANESH NAGAR‐SHAKARPUR KHAS, DELHI 549 DEVELOPMENT AUTHORITY‐SCHOOL BLOCK LNR 875 990 KVA UNPLANNED 26‐06‐2018 12:33:46 26‐06‐2018 13:32:00 0:58 0.00016111 MUs

BLOCK D‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, GANESH NAGAR‐ SHAKARPUR KHAS, BLOCK J‐VISHWAKARMA PARK, SHAKARPUR EXTN.‐SHAKARPUR KHAS, EAST END ENCLAVE‐LAKSHMI 550 NAGAR, BLOCK R&A‐SHAKARPUR KHAS, BLOCK A‐SHAKARPUR KHAS, BLOCK A‐GANESH NAGAR, BLOCK C‐LALITA PARK LNR 1544 990 KVA UNPLANNED 28‐06‐2018 06:38:36 28‐06‐2018 08:31:00 1:52 0.00031111 MUs GYAN KUNJ‐WEST GURU ANGAD NAGAR, BLOCK A‐SHAKARPUR KHAS, GANESH NAGAR EXTN.‐SHAKARPUR KHAS, GANESH 551 NAGAR‐SHAKARPUR KHAS LNR 1544 990 KVA UNPLANNED 30‐06‐2018 16:08:42 30‐06‐2018 16:54:00 0:45 0.000125 MUs GYAN KUNJ‐WEST GURU ANGAD NAGAR, MOHAN PARK‐WEST GURU ANGAD NAGAR, BLOCK F‐GURU ANGAD NAGAR 552 WEST LNR 853 990 KVA UNPLANNED 30‐06‐2018 17:29:07 30‐06‐2018 17:44:45 0:15 0.0000625 MUs 553 BHARTI COLONY‐NIRMAN VIHAR LNR 110 990 KVA UNPLANNED 15‐06‐2018 10:50:00 15‐06‐2018 11:22:14 0:32 0.00008889 MUs

554 BLOCK B‐SWASTHYA VIHAR, DEFENCE ENCLAVE‐SWASTHYA VIHAR, BLOCK E‐PREET VIHAR, BLOCK A‐SWASTHYA VIHAR LNR 27 630 KVA UNPLANNED 22‐06‐2018 23:38:59 23‐06‐2018 01:00:00 1:21 0.000225 MUs 555 BLOCK F‐PREET VIHAR, BLOCK G‐PREET VIHAR LNR 88 990 KVA UNPLANNED 25‐06‐2018 15:58:09 25‐06‐2018 17:06:00 1:7 0.00018611 MUs

556 PARK END‐GAGAN VIHAR, NEW RAJDHANI ENCLAVE‐GAGAN VIHAR, NEW RAJDHANI ENCLAVE BLOCK C‐GAGAN VIHAR LNR 90 630 KVA UNPLANNED 26‐06‐2018 12:45:00 26‐06‐2018 13:43:00 0:58 0.00016111 MUs 557 BLOCK G‐PREET VIHAR LNR 93 990 KVA UNPLANNED 26‐06‐2018 14:03:49 26‐06‐2018 15:25:00 1:21 0.000225 MUs 558 BLOCK G‐PREET VIHAR LNR 93 990 KVA UNPLANNED 26‐06‐2018 16:19:27 26‐06‐2018 17:15:00 0:55 0.00015278 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 559 BLOCK G‐PREET VIHAR, BLOCK E‐PREET VIHAR LNR 122 630 KVA UNPLANNED 29‐06‐2018 14:46:30 29‐06‐2018 15:43:30 0:56 0.00023333 MUs 560 PARK END‐GAGAN VIHAR LNR 49 630 KVA UNPLANNED 29‐06‐2018 17:19:06 29‐06‐2018 17:46:23 0:27 0.0000225 MUs

561 PARK END‐GAGAN VIHAR, NEW RAJDHANI ENCLAVE‐GAGAN VIHAR, NEW RAJDHANI ENCLAVE BLOCK C‐GAGAN VIHAR LNR 127 630 KVA UNPLANNED 30‐06‐2018 12:52:47 30‐06‐2018 14:46:00 1:53 0.00031389 MUs GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK B‐VIVEK VIHAR, BLOCK B‐MOTHER DAIRY, ISBT‐ISBT ANAND 562 VIHAR, PKT B‐CHITRAKOOT, SHAHDARA JLM LNR 68 1630 KVA UNPLANNED 10‐06‐2018 20:37:00 10‐06‐2018 20:51:00 0:14 0 MUs 563 MANDAWALI FAZALPUR BLOCK B‐JOSHI COLONY, MANDAWALI FAZALPUR BLOCK A‐JOSHI COLONY LNR 252 630 KVA UNPLANNED 15‐06‐2018 22:49:03 15‐06‐2018 23:13:14 0:24 0.00002 MUs 564 INDUSTRIAL AREA‐PATPAR GANJ INDUSTRIAL AREA LNR 47 990 KVA UNPLANNED 26‐06‐2018 15:06:00 26‐06‐2018 15:55:55 0:49 0.00013611 MUs 565 BLOCK B‐NEW ASHOK NAGAR VSE MVR 2 400 KVA UNPLANNED 12‐06‐2018 01:33:50 12‐06‐2018 03:29:12 1:55 0.00031944 MUs 566 PRATAP NAGAR‐PHASE I MVR 1086 630 KVA UNPLANNED 12‐06‐2018 00:39:57 12‐06‐2018 01:23:28 0:43 0.00009556 MUs 567 PKT 1‐ DDA FLATS‐PHASE I MVR 128 630 KVA UNPLANNED 14‐06‐2018 03:17:45 14‐06‐2018 04:09:47 0:52 0.00014444 MUs 568 PANDAV NAGAR MVR‐SHAKARPUR MVR, SAMASPUR‐PANDAV NAGAR, BLOCK F‐PANDAV NAGAR MVR 1073 630 KVA UNPLANNED 15‐06‐2018 11:32:41 15‐06‐2018 12:06:00 0:33 0.00006417 MUs 569 CL‐CHILLA SARDA BANGAR VILLAGE, HIMMAT PURI‐CHILLA VILLAGE MVR 220 990 KVA UNPLANNED 22‐06‐2018 02:35:57 22‐06‐2018 04:20:00 1:44 0.00017333 MUs 570 BLOCK E‐PANDAV NAGAR, PATPAR GANJ‐SHASHI GARDEN, SHASHI GARDEN‐MAYUR VIHAR MVR 197 630 KVA UNPLANNED 23‐06‐2018 11:43:30 23‐06‐2018 15:11:09 3:27 0.00046 MUs SHANGHTA HOUSE STORE‐GAZIPUR DAIRY FARM, BLOCK B‐GAZIPUR DAIRY FARM, BLOCK E‐GAZIPUR DAIRY FARM, 571 KALYAN VAS‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR MVR 352 630 KVA UNPLANNED 12‐06‐2018 08:34:03 12‐06‐2018 12:42:41 4:8 0.00006889 MUs 572 BLOCK G‐VINOD NAGAR EAST, BLOCK F‐VINOD NAGAR EAST, BLOCK E‐VINOD NAGAR EAST MVR 1743 630 KVA UNPLANNED 19‐06‐2018 00:22:27 19‐06‐2018 00:54:45 0:32 0.00007111 MUs BLOCK 20‐KALYAN PURI, BLOCK 17‐KALYAN PURI, BLOCK 14‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR, BLOCK 18‐ KALYAN PURI, BLOCK 21‐KALYAN PURI, BLOCK F‐CHANDAR NAGAR, BLOCK 12‐KALYAN PURI, PATPAR GANJ‐SHASHI 573 GARDEN, BLOCK 16‐KALYAN PURI MVR 298 630 KVA UNPLANNED 21‐06‐2018 01:26:11 21‐06‐2018 02:53:50 1:27 0.00016917 MUs

MAYUR VIHAR EXTN., BLOCK G‐VINOD NAGAR EAST, BLOCK F‐PANDAV NAGAR, BLOCK E‐VINOD NAGAR EAST, BLOCK C‐ VINOD NAGAR EAST, BLOCK B‐VINOD NAGAR EAST, MAYUR VIHAR PHASE II, BLOCK F‐VINOD NAGAR EAST, PHASE I‐ 574 MAYUR VIHAR, BLOCK A‐VINOD NAGAR EAST, KHICHRIPUR RESETTLEMENT COLONY‐KHICHARIPUR MVR 341 630 KVA UNPLANNED 22‐06‐2018 23:08:42 23‐06‐2018 00:16:44 1:8 0 MUs BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, MAYUR VIHAR PHASE II, GEETA COLONY, PKT F‐MAYUR VIHAR PHASE II, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, PKT A‐MAYUR VIHAR PHASE II, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐ BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, 575 PKT A‐BLOCK B MVR 829 630 KVA UNPLANNED 23‐06‐2018 00:31:11 23‐06‐2018 01:26:07 0:54 0.000075 MUs BLOCK 20‐KALYAN PURI, BLOCK 19‐KALYAN PURI, KALYAN PURI‐MAYUR VIHAR, BLOCK 18‐KALYAN PURI, BLOCK 21‐ KALYAN PURI, AMBEDKAR AWAS KALYAN SAMITI‐GHAROLI KONDLI, AMBEDKAR CAMP‐KALYAN PURI, BLOCK 12‐KALYAN 576 PURI, BLOCK 1‐KALYAN PURI, PATPAR GANJ‐SHASHI GARDEN MVR 325 400 KVA UNPLANNED 23‐06‐2018 01:13:59 23‐06‐2018 03:06:44 1:52 0.00015556 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK 10‐KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, KHICHARIPUR‐GAZIPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV 577 VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B MVR 862 400 KVA UNPLANNED 26‐06‐2018 01:25:21 26‐06‐2018 01:45:00 0:19 0.00001056 MUs

BLOCK 20‐KALYAN PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 14‐KALYAN PURI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, KHICHARIPUR‐GAZIPUR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK C‐VINOD NAGAR EAST, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 21‐KALYAN PURI, KALYAN VAS‐KALYAN PURI, BLOCK 18‐KALYAN PURI, BLOCK 16‐KALYAN PURI, BLOCK 17‐KALYAN PURI, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK C‐VINOD NAGAR EAST, AMBEDKAR CAMP‐KALYAN PURI, PKT R‐BLOCK D, GEETA COLONY, BLOCK 12‐KALYAN PURI, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, KALYAN PURI‐ 578 MAYUR VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B MVR 5415 3870 KVA UNPLANNED 27‐06‐2018 13:47:00 27‐06‐2018 14:11:00 0:24 0.00089333 MUs BLOCK 4‐TRILOKPURI PHASE I, BLOCK 5‐TRILOKPURI PHASE I, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 6‐TRILOKPURI 579 PHASE I, BLOCK 3‐TRILOKPURI PHASE I MVR 521 990 KVA UNPLANNED 13‐06‐2018 00:43:05 13‐06‐2018 02:23:33 1:40 0 MUs BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR, BLOCK 22‐HIMMATPURI, BLOCK 21‐ 580 HIMMATPURI MVR 802 990 KVA UNPLANNED 15‐06‐2018 01:50:03 15‐06‐2018 02:45:00 0:54 0.00015 MUs BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, BLOCK 21‐HIMMATPURI, BLOCK 16‐ 581 HIMMATPURI MVR 1294 990 KVA UNPLANNED 15‐06‐2018 18:55:35 15‐06‐2018 22:22:48 3:27 0.000115 MUs BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR, BLOCK 22‐HIMMATPURI, BLOCK 21‐ 582 HIMMATPURI MVR 802 990 KVA UNPLANNED 15‐06‐2018 22:54:46 15‐06‐2018 23:18:21 0:23 0.00006389 MUs BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, BLOCK 21‐HIMMATPURI, BLOCK 16‐ 583 HIMMATPURI MVR 1288 990 KVA UNPLANNED 21‐06‐2018 10:11:04 21‐06‐2018 10:54:24 0:43 0.00005972 MUs BLOCK 14‐TRILOKPURI PHASE II, BLOCK 29‐HIMMATPURI, BLOCK 28‐HIMMATPURI, BLOCK 10‐TRILOKPURI PHASE I, BLOCK 4‐TRILOKPURI PHASE I, BLOCK 20‐HIMMATPURI, HIMMATPURI‐MAYUR VIHAR, BLOCK 12‐TRILOKPURI PHASE I, 584 BLOCK 19‐HIMMATPURI, BLOCK 1‐TRILOKPURI PHASE I MVR 485 990 KVA UNPLANNED 22‐06‐2018 02:00:54 22‐06‐2018 02:17:31 0:16 0 MUs BLOCK 33‐HIMMATPURI, MAYUR VIHAR EXTN., BLOCK 24‐TRILOKPURI PHASE II, BLOCK 36‐HIMMATPURI, BLOCK 10‐ TRILOKPURI PHASE I, MAYUR VIHAR PHASE II, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 29‐HIMMATPURI, BLOCK 25‐ TRILOKPURI PHASE II, BLOCK 28‐HIMMATPURI, BLOCK 23‐TRILOKPURI PHASE II, BLOCK 34‐HIMMATPURI, BLOCK 35‐ 585 HIMMATPURI, BLOCK 27‐HIMMATPURI, BLOCK 21‐HIMMATPURI MVR 371 990 KVA UNPLANNED 22‐06‐2018 22:57:58 23‐06‐2018 00:17:10 1:19 0.00010972 MUs BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 586 18‐HIMMATPURI MVR 1154 990 KVA UNPLANNED 23‐06‐2018 02:15:49 23‐06‐2018 02:35:23 0:19 0.00002639 MUs BLOCK 20‐HIMMATPURI, BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 587 21‐HIMMATPURI, BLOCK 16‐HIMMATPURI MVR 1288 990 KVA UNPLANNED 23‐06‐2018 11:37:16 23‐06‐2018 12:17:55 0:40 0.00008889 MUs 588 HIMMATPURI‐MAYUR VIHAR, BLOCK 20‐HIMMATPURI MVR 420 990 KVA UNPLANNED 26‐06‐2018 23:36:55 26‐06‐2018 23:59:21 0:22 0.00001222 MUs BLOCK 17‐HIMMATPURI, BLOCK 22‐HIMMATPURI, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 16‐HIMMATPURI, BLOCK 589 18‐HIMMATPURI MVR 1158 990 KVA UNPLANNED 27‐06‐2018 11:07:50 27‐06‐2018 11:51:00 0:43 0.00011944 MUs BLOCK 11‐TRILOKPURI PHASE I, BLOCK 8‐TRILOKPURI PHASE I, BLOCK 7‐TRILOKPURI PHASE I, BLOCK 6‐TRILOKPURI PHASE I, BLOCK 10‐TRILOKPURI PHASE I, BLOCK 2‐TRILOKPURI PHASE I, TRILOKPURI PHASE I‐MAYUR VIHAR, BLOCK 13‐ 590 TRILOKPURI PHASE II MVR 169 990 KVA UNPLANNED 28‐06‐2018 00:34:57 28‐06‐2018 03:17:29 2:42 0.000045 MUs 591 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 09‐06‐2018 17:31:09 09‐06‐2018 18:30:00 0:58 0 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐MANDOLI EXTN., BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐MANDOLI EXTN., HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐ 592 SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1493 3010 KVA UNPLANNED 09‐06‐2018 17:45:03 09‐06‐2018 19:39:56 1:54 0 MUs 593 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 09‐06‐2018 22:52:10 09‐06‐2018 23:02:22 0:10 0 MUs

BLOCK B1‐NAND NAGARI, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, GOVT. BOYS 594 SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3, BLOCK A4‐NAND NAGARI, BLOCK A3‐NAND NAGARI NNG 831 990 KVA UNPLANNED 12‐06‐2018 00:39:14 12‐06‐2018 01:31:41 0:52 0.00014444 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐ NARAYAN NAGAR, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK C‐ LALITA PARK, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐ AJMAL KHAN PARK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK F‐SHIV VIHAR, 595 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 9458 2610 KVA UNPLANNED 12‐06‐2018 22:00:00 12‐06‐2018 22:50:00 0:49 0.00204167 MUs 596 DELHI JAL BOARD MIG FLATS‐POCKET A NNG 355 400 KVA UNPLANNED 19‐06‐2018 11:25:37 19‐06‐2018 11:53:34 0:27 0.000075 MUs BLOCK B1‐NAND NAGARI, KACHI MANDIR‐BLOCK E4, BLOCK B3‐NAND NAGARI, BLOCK C1‐NAND NAGARI, BLOCK O‐ SUNDER NAGRI, GOVT. BOYS SCHOOL‐BLOCK A3, MCD PRIMARY SCHOOL‐BLOCK D3, BLOCK A4‐NAND NAGARI, BLOCK A3‐ 597 NAND NAGARI NNG 829 990 KVA UNPLANNED 20‐06‐2018 17:29:18 20‐06‐2018 18:06:00 0:36 0.0001 MUs SABOLI EXTN.‐MANDOLI, MCD SCHOOL‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, 598 SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 21‐06‐2018 07:47:52 21‐06‐2018 08:05:03 0:17 0.0002125 MUs 599 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 22‐06‐2018 15:23:34 22‐06‐2018 15:38:55 0:15 0.000125 MUs 600 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 22‐06‐2018 16:54:05 22‐06‐2018 17:23:20 0:29 0.0003625 MUs

601 SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 23‐06‐2018 09:45:38 23‐06‐2018 10:18:46 0:33 0.00045833 MUs 602 BLOCK A‐MANDOLI VILLAGE NNG 113 990 KVA UNPLANNED 23‐06‐2018 13:50:53 23‐06‐2018 14:45:00 0:54 0.000225 MUs

SABOLI EXTN.‐MANDOLI, MCD SCHOOL‐SABOLI COLONY, BLOCK K‐ANUP VIHAR, SABOLI EXTN.‐MANDOLI, BANK OF 603 BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 24‐06‐2018 13:23:34 24‐06‐2018 14:14:44 0:51 0.00028333 MUs BLOCK A‐SEWA DHAM, BLOCK C‐HARSH VIHAR, BLOCK C‐SEWA DHAM, BLOCK B‐HARSH VIHAR, GOVT.CO. SEC. SCHOOL‐ 604 HARSH VIHAR, SABOLI COLONY‐MANDOLI NNG 1696 0 KVA UNPLANNED 24‐06‐2018 13:52:41 24‐06‐2018 14:38:29 0:45 0.0005625 MUs

605 RAJIV GANDHI SUPER STC HOSPITAL‐GURU TEG BAHADUR ENCLAVE NNG, POCKET B‐GURU TEG BAHADUR ENCLAVE NNG 694 990 KVA UNPLANNED 26‐06‐2018 01:14:54 26‐06‐2018 02:06:00 0:51 0.00014167 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐MANDOLI EXTN., BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D‐MANDOLI EXTN., HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT 606 A‐BLOCK B NNG 1529 3010 KVA UNPLANNED 27‐06‐2018 06:41:36 27‐06‐2018 08:28:33 1:46 0.00294444 MUs 607 BANK OF BARODA‐SABOLI COLONY, SABOLI EXTN.‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 27‐06‐2018 07:10:38 27‐06‐2018 08:08:00 0:57 0.00158333 MUs

BLOCK D‐HARSH VIHAR, SABOLI EXTN.‐MANDOLI, BLOCK A‐BANK COLONY, BLOCK A‐MANDOLI EXTN., BLOCK K‐ANUP VIHAR, BLOCK E‐SEWA DHAM, SABOLI EXTN.‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, 608 SABOLI VILLAGE‐MANDOLI, BLOCK E‐MEET NAGAR, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 27‐06‐2018 09:41:30 27‐06‐2018 10:36:17 0:54 0.0003 MUs

BLOCK D‐HARSH VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐SEWA DHAM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, GTB MIG FLATS‐POCKET F, BHAGAT NAGAR‐DAYALPUR, BLOCK A‐MANDOLI EXTN., BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BHARAT MATA MANDIR JJ COLONY, BLOCK A‐HARSH VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐MANDOLI EXTN., BLOCK C‐HARSH VIHAR, HARSH VIHAR SUB STATION‐POLICE FARM, BLOCK F‐SHIV VIHAR, JHILMIL 609 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1529 3010 KVA UNPLANNED 27‐06‐2018 10:19:15 27‐06‐2018 11:11:11 0:51 0.00028333 MUs BLOCK H‐SEWA DHAM, BLOCK D‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, BLOCK A‐BANK COLONY, BLOCK C‐AMAR COLONY, BLOCK B‐HARSH VIHAR, BLOCK A‐SEWA DHAM, BLOCK E‐RAJIV NAGAR, BLOCK A‐SEWA DHAM, BLOCK C‐HARSH 610 VIHAR, HARSH VIHAR SUB STATION‐POLICE FARM NNG 1266 0 KVA UNPLANNED 27‐06‐2018 10:26:06 27‐06‐2018 11:19:16 0:53 0.00029444 MUs ANUP VIHAR‐MANDOLI, BLOCK B‐ANUP VIHAR, BLOCK A‐ANUP VIHAR, BLOCK C‐ANUP VIHAR, BLOCK K‐ANUP VIHAR, 611 BLOCK D‐ANUP VIHAR, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI NNG 3231 0 KVA UNPLANNED 27‐06‐2018 16:42:13 27‐06‐2018 17:35:27 0:53 0.00029444 MUs

SABOLI EXTN.‐MANDOLI, MCD SCHOOL‐SABOLI COLONY, BLOCK A‐MANDOLI EXTN., SABOLI EXTN.‐MANDOLI, BANK OF 612 BARODA‐SABOLI COLONY, SABOLI COLONY‐MANDOLI, SABOLI VILLAGE‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 28‐06‐2018 01:12:11 28‐06‐2018 01:44:50 0:32 0.0004 MUs SABOLI EXTN.‐MANDOLI, SABOLI EXTN.‐MANDOLI, SEWA DHAM‐MANDOLI, BANK OF BARODA‐SABOLI COLONY, BLOCK A‐ 613 MANDOLI VILLAGE, SABOLI VILLAGE‐MANDOLI, VILLAGE SABOLI‐SABOLI COLONY NNG 89 630 KVA UNPLANNED 28‐06‐2018 09:12:39 28‐06‐2018 09:43:16 0:30 0.00016667 MUs 614 GTB MIG FLATS‐POCKET F NNG 240 630 KVA UNPLANNED 28‐06‐2018 13:06:47 28‐06‐2018 14:00:00 0:53 0.00022083 MUs MCD SCHOOL‐CHITRAKOOT, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, BLOCK B‐MOTHER DAIRY, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK E‐JYOTI NAGAR EAST, SHAHDARA JLM, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, INDIRA GANDHI STADIUM‐AJMERI GATE, PKT A‐CHITRAKOOT, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK B‐VIVEK VIHAR, HARSH VIHAR SUB STATION‐POLICE FARM, ISBT‐ISBT ANAND VIHAR, PKT B‐ 615 CHITRAKOOT NNG 2433 3890 KVA UNPLANNED 08‐06‐2018 11:35:32 08‐06‐2018 12:25:16 0:49 0 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐ 616 UTTARANCHAL COLONY NNG 3958 400 KVA UNPLANNED 09‐06‐2018 17:33:08 09‐06‐2018 18:30:00 0:56 0 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST 617 GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 1571 4540 KVA UNPLANNED 09‐06‐2018 17:35:08 09‐06‐2018 18:35:00 0:59 0 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐ 618 UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3431 2250 KVA UNPLANNED 09‐06‐2018 17:36:03 09‐06‐2018 18:34:00 0:57 0 MUs BLOCK D‐MEET NAGAR, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK A‐AMAR 619 COLONY NNG 1139 630 KVA UNPLANNED 12‐06‐2018 07:51:39 12‐06‐2018 08:48:00 0:56 0.00015556 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST 620 GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 1571 4540 KVA UNPLANNED 12‐06‐2018 12:50:00 12‐06‐2018 14:46:09 1:56 0.00161111 MUs BLOCK D‐MEET NAGAR, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐MEET NAGAR, BLOCK A‐AMAR 621 COLONY NNG 1139 630 KVA UNPLANNED 13‐06‐2018 22:37:53 13‐06‐2018 23:31:01 0:53 0.00014722 MUs 622 BLOCK A‐MEET NAGAR, BLOCK A‐AMAR COLONY NNG 379 630 KVA UNPLANNED 14‐06‐2018 11:08:03 14‐06‐2018 12:06:00 0:57 0.00031667 MUs 623 BLOCK A‐MEET NAGAR, BLOCK A‐AMAR COLONY NNG 379 630 KVA UNPLANNED 14‐06‐2018 13:39:33 14‐06‐2018 14:36:00 0:56 0.00023333 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, BLOCK D‐ASHOK NAGAR, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 624 BLOCK B NNG 3086 990 KVA UNPLANNED 15‐06‐2018 12:23:14 15‐06‐2018 13:05:00 0:41 0.00022778 MUs

BLOCK A‐NATHU PURA, BLOCK B‐HARDEV PURI, BLOCK B‐NATHU PURA, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, 625 BLOCK D‐HARDEV PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK C‐DURGA PURI, BLOCK E‐NATHU PURA NNG 1191 990 KVA UNPLANNED 17‐06‐2018 23:20:40 18‐06‐2018 00:11:23 0:50 0.00013889 MUs

BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK 626 B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3959 400 KVA UNPLANNED 19‐06‐2018 11:55:02 19‐06‐2018 12:50:00 0:54 0.00075 MUs BLOCK D‐MEET NAGAR, BLOCK A‐KABIR NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, 627 BLOCK E‐UTTARANCHAL COLONY, G.B.SSS SCHOOL‐GOKUL PURI NNG 1572 4540 KVA UNPLANNED 19‐06‐2018 13:28:30 19‐06‐2018 14:25:46 0:57 0.00079167 MUs SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL 628 COLONY, BLOCK E‐MEET NAGAR NNG 90 400 KVA UNPLANNED 20‐06‐2018 10:54:41 20‐06‐2018 11:46:00 0:51 0.000425 MUs BLOCK C1‐NEW ASHOK NAGAR, BLOCK A‐NATHU PURA, BLOCK E‐NEW ASHOK NAGAR, BLOCK B‐ASHOK NAGAR, DEV PUBLIC SCHOOL‐CHITRAKOOT, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, BLOCK E‐JYOTI NAGAR EAST, BLOCK E‐ 629 NATHU PURA NNG 360 630 KVA UNPLANNED 21‐06‐2018 00:26:23 21‐06‐2018 01:24:00 0:57 0.00015833 MUs 630 BLOCK A‐EAST GOKUL PURI, BLOCK B‐EAST GOKUL PURI NNG 292 630 KVA UNPLANNED 22‐06‐2018 15:58:54 22‐06‐2018 16:36:26 0:37 0.00020556 MUs 631 BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 729 990 KVA UNPLANNED 22‐06‐2018 16:04:43 22‐06‐2018 16:58:26 0:53 0.00011778 MUs BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BABARPUR EXTN.‐ BABAR PUR, BLOCK B‐UTTARANCHAL COLONY, BLOCK E‐UTTARANCHAL COLONY, BLOCK E1‐NAND NAGARI, BLOCK C‐ MEET NAGAR, BLOCK A‐UTTARANCHAL COLONY, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK A‐AMAR COLONY, BLOCK B‐ 632 EAST GOKUL PURI, BLOCK A‐MEET NAGAR NNG 3430 2250 KVA UNPLANNED 22‐06‐2018 23:23:28 23‐06‐2018 00:20:00 0:56 0.00077778 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, PKT A‐ 633 CHITRAKOOT, BLOCK A‐AMAR COLONY, BLOCK D‐ASHOK NAGAR, BLOCK A‐MEET NAGAR NNG 1140 630 KVA UNPLANNED 23‐06‐2018 01:40:00 23‐06‐2018 02:30:00 0:49 0.00013611 MUs 634 BLOCK A‐EAST GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 92 630 KVA UNPLANNED 23‐06‐2018 10:56:22 23‐06‐2018 11:37:26 0:41 0.00022778 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐GOKUL PURI, BLOCK A‐ AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐ 635 UTTARANCHAL COLONY NNG 776 630 KVA UNPLANNED 23‐06‐2018 23:16:13 23‐06‐2018 23:55:39 0:39 0.00010833 MUs SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL 636 COLONY, BLOCK E‐MEET NAGAR NNG 90 400 KVA UNPLANNED 24‐06‐2018 10:46:02 24‐06‐2018 11:34:40 0:48 0.0004 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST 637 GOKUL PURI NNG 116 990 KVA UNPLANNED 24‐06‐2018 14:23:03 24‐06‐2018 15:06:32 0:43 0.00017917 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST 638 GOKUL PURI NNG 116 990 KVA UNPLANNED 25‐06‐2018 10:05:40 25‐06‐2018 10:20:10 0:14 0.00019444 MUs BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐ ASHOK NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐ SHIV VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐ BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, 639 PKT A‐BLOCK B NNG 1020 630 KVA UNPLANNED 25‐06‐2018 10:26:32 25‐06‐2018 11:20:07 0:53 0.00029444 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐ NARAYAN NAGAR, BLOCK E‐ASHOK NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK B‐HARDEV PURI, BLOCK N‐ SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK D‐ HARDEV PURI, BLOCK C‐LALITA PARK, BLOCK C‐DURGA PURI, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐ SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, BHAJANPURA‐DAYALPUR, DEV PUBLIC SCHOOL‐ CHITRAKOOT, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK F‐SHIV VIHAR, 640 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 9230 4590 KVA UNPLANNED 26‐06‐2018 00:03:19 26‐06‐2018 00:45:30 0:42 0.000525 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, BLOCK B‐ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK A‐NATHU COLONY, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ 641 BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1775 990 KVA UNPLANNED 26‐06‐2018 01:18:39 26‐06‐2018 01:49:19 0:30 0.00016667 MUs BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐ 642 UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3431 2250 KVA UNPLANNED 26‐06‐2018 11:40:00 26‐06‐2018 12:35:00 0:54 0.00075 MUs 643 BLOCK C‐GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 729 990 KVA UNPLANNED 26‐06‐2018 13:20:00 26‐06‐2018 14:17:55 0:57 0.00015833 MUs

BLOCK M‐DURGA PURI, BLOCK A‐KABIR NAGAR, BLOCK F‐DURGA PURI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK M‐ DURGA PURI, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK B‐DURGA PURI, BLOCK B‐DURGA PURI, MANSAROVAR PARK‐ 644 DURGA PURI, BLOCK C‐DURGA PURI, BLOCK E‐JYOTI NAGAR EAST, BLOCK A‐MEET NAGAR NNG 1179 990 KVA UNPLANNED 26‐06‐2018 14:18:19 26‐06‐2018 15:15:00 0:56 0.00015556 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage BLOCK D‐MEET NAGAR, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK F‐DURGA PURI, BLOCK A‐AMAR 645 COLONY, SHIV MANDIR‐JYOTI NAGAR EAST, BLOCK A‐MEET NAGAR NNG 1139 630 KVA UNPLANNED 26‐06‐2018 14:20:03 26‐06‐2018 15:18:00 0:57 0.00015833 MUs BLOCK D‐MEET NAGAR, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, SABOLI EXTN.‐MANDOLI, BLOCK A‐AMAR 646 COLONY, BLOCK D‐ASHOK NAGAR, BLOCK A‐MEET NAGAR NNG 1139 630 KVA UNPLANNED 26‐06‐2018 18:03:53 26‐06‐2018 20:02:00 1:58 0.00032778 MUs BLOCK A‐NATHU COLONY, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK 63‐AJMAL KHAN PARK, BLOCK C‐LALITA 647 PARK, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR NNG 2309 990 KVA UNPLANNED 27‐06‐2018 09:39:03 27‐06‐2018 10:34:12 0:55 0.00022917 MUs BLOCK H‐SEWA DHAM, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, SEWA DHAM‐MANDOLI, SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐ MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY, RAJEEV NAGAR‐SEWA DHAM, G.B.SSS SCHOOL‐ 648 GOKUL PURI NNG 90 400 KVA UNPLANNED 27‐06‐2018 11:20:26 27‐06‐2018 12:06:00 0:45 0.00025 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST 649 GOKUL PURI, G.B.SSS SCHOOL‐GOKUL PURI NNG 1571 4540 KVA UNPLANNED 28‐06‐2018 03:41:54 28‐06‐2018 04:14:21 0:32 0.00026667 MUs BLOCK D‐MEET NAGAR, BLOCK A‐ANUP VIHAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐UTTARANCHAL COLONY, BLOCK A‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK B‐ 650 UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 3431 2250 KVA UNPLANNED 28‐06‐2018 04:20:46 28‐06‐2018 05:16:00 0:55 0.0006875 MUs BLOCK L‐SUNDER NAGRI, BLOCK A‐EAST GOKUL PURI, BLOCK B‐EAST GOKUL PURI, BLOCK B‐UTTARANCHAL COLONY, 651 BLOCK E‐UTTARANCHAL COLONY, G.B.SSS SCHOOL‐GOKUL PURI NNG 49 630 KVA UNPLANNED 28‐06‐2018 13:08:36 28‐06‐2018 14:06:00 0:57 0.0002375 MUs 652 DEV PUBLIC SCHOOL‐CHITRAKOOT, PKT A‐CHITRAKOOT, PKT B‐CHITRAKOOT NNG 192 630 KVA UNPLANNED 28‐06‐2018 14:37:51 28‐06‐2018 15:00:56 0:23 0.00009583 MUs 653 BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐AMAR COLONY, BLOCK B‐EAST GOKUL PURI NNG 292 630 KVA UNPLANNED 28‐06‐2018 15:08:23 28‐06‐2018 16:51:33 1:43 0.00057222 MUs 654 PKT B‐CHITRAKOOT, PKT A‐CHITRAKOOT NNG 246 630 KVA UNPLANNED 28‐06‐2018 22:42:53 29‐06‐2018 00:10:00 1:27 0.00024167 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK A‐AMAR 655 COLONY, BLOCK B‐EAST GOKUL PURI, BLOCK A‐MEET NAGAR NNG 116 990 KVA UNPLANNED 29‐06‐2018 09:52:00 29‐06‐2018 10:16:41 0:24 0.00033333 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK D‐GOKUL PURI, BLOCK B‐EAST GOKUL PURI, POCKET A‐JJ COLONY, SABOLI VILLAGE‐MANDOLI, BLOCK B‐UTTARANCHAL COLONY, 656 BLOCK A‐MEET NAGAR NNG 116 990 KVA UNPLANNED 29‐06‐2018 13:18:55 29‐06‐2018 13:56:54 0:37 0.00020556 MUs 657 PKT B‐CHITRAKOOT NNG 90 630 KVA UNPLANNED 29‐06‐2018 14:00:58 29‐06‐2018 14:46:00 0:45 0.00025 MUs BLOCK D‐MEET NAGAR, BLOCK A‐EAST GOKUL PURI, BLOCK C‐MEET NAGAR, BLOCK C‐AMAR COLONY, BLOCK B‐EAST 658 GOKUL PURI NNG 116 990 KVA UNPLANNED 30‐06‐2018 12:33:28 30‐06‐2018 13:28:42 0:55 0.00030556 MUs

659 BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4716 5260 KVA UNPLANNED 04‐06‐2018 23:48:26 05‐06‐2018 00:41:18 0:52 0 MUs

660 BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4716 5260 KVA UNPLANNED 05‐06‐2018 01:37:56 05‐06‐2018 01:58:56 0:20 0 MUs 661 BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 616 990 KVA UNPLANNED 14‐06‐2018 09:08:43 14‐06‐2018 10:06:00 0:57 0.00015833 MUs BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABA DA DARGA‐KARDAMPURI, 662 BHIM RAO AMBEDKAR COLLAGE‐JYOTI NAGAR, BLOCK C‐KABIR NAGAR, PKT B‐CHITRAKOOT NNG 5349 4060 KVA UNPLANNED 19‐06‐2018 11:30:00 19‐06‐2018 15:45:00 4:15 0 MUs 663 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR NNG 1146 990 KVA UNPLANNED 20‐06‐2018 17:06:28 20‐06‐2018 18:01:21 0:54 0.0003 MUs 664 BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR NNG 788 630 KVA UNPLANNED 21‐06‐2018 01:15:19 21‐06‐2018 01:34:52 0:19 0.00005278 MUs 665 BLOCK B‐DURGA PURI, BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR NNG 830 990 KVA UNPLANNED 21‐06‐2018 15:05:41 21‐06‐2018 16:00:00 0:54 0.00015 MUs OLD SEELAMPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, 666 RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGE NNG 2513 990 KVA UNPLANNED 22‐06‐2018 12:41:08 22‐06‐2018 13:39:35 0:58 0.00016111 MUs

OLD SEELAMPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, 667 BLOCK A‐MEET NAGAR, RAGHUBARPURA NO 2‐SEELAMPUR, BLOCK A‐KONDALI VILLAGE NNG 2513 990 KVA UNPLANNED 22‐06‐2018 17:12:45 22‐06‐2018 18:10:00 0:57 0.00079167 MUs

BHAGAT NAGAR‐DAYALPUR, BLOCK E‐NORTH CHHAJUPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BABARPUR EXTN.‐BABAR PUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐ SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, CHHAJJUPUR‐BABAR PUR, JHILMIL INDUSTRIAL AREA‐JHILMIL 668 COLONY, PKT A‐BLOCK B NNG 1161 630 KVA UNPLANNED 22‐06‐2018 20:10:40 22‐06‐2018 20:51:30 0:40 0.00011111 MUs BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK 1‐BALBIR NAGAR, BABARPUR WEST‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR EXTN.‐BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, CHHAJJUPUR‐BABAR PUR, BLOCK C‐ 669 KABIR NAGAR NNG 984 400 KVA UNPLANNED 22‐06‐2018 23:25:08 23‐06‐2018 00:35:36 1:10 0.00019444 MUs BLOCK H‐JYOTI NAGAR, BLOCK B‐KABIR NAGAR, BLOCK B‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR, BLOCK J‐JYOTI NAGAR, BALBIR NAGAR EXTN.‐SILAMPUR, BABARPUR EXTN.‐BABAR PUR, JYOTI COLONY‐BALBIR NAGAR, CHHAJJUPUR‐ 670 BABAR PUR NNG 352 990 KVA UNPLANNED 23‐06‐2018 01:22:38 23‐06‐2018 02:20:00 0:57 0.00015833 MUs OLD SEELAMPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, RAGHUBARPURA NO 2‐ 671 SEELAMPUR, BLOCK A‐KONDALI VILLAGE NNG 2513 990 KVA UNPLANNED 23‐06‐2018 12:42:57 23‐06‐2018 13:34:56 0:51 0.00014167 MUs BLOCK H‐JYOTI NAGAR, PKT S‐BLOCK C, PKT A‐BLOCK A, BLOCK B‐JYOTI NAGAR, BABARPUR WEST‐BABAR PUR, BLOCK J‐ 672 JYOTI NAGAR, BLOCK D‐JYOTI NAGAR, PKT H‐BLOCK D, PKT C‐BLOCK B NNG 780 990 KVA UNPLANNED 24‐06‐2018 23:01:23 24‐06‐2018 23:55:05 0:53 0.00014722 MUs OLD SEELAMPUR, KONDALI VILLAGE‐GHAROLI KONDLI, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK C‐KONDALI VILLAGE, BABARPUR EXTN.‐BABAR PUR, BLOCK B‐KONDALI VILLAGE, CHHAJJUPUR‐BABAR PUR, RAGHUBARPURA NO 2‐ 673 SEELAMPUR, BLOCK A‐KONDALI VILLAGE NNG 2513 990 KVA UNPLANNED 25‐06‐2018 13:27:44 25‐06‐2018 14:09:16 0:41 0.00022778 MUs 674 BLOCK B‐KABIR NAGAR, BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR NNG 1148 990 KVA UNPLANNED 26‐06‐2018 14:44:07 26‐06‐2018 15:33:09 0:49 0.00013611 MUs

BLOCK A‐KABIR NAGAR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL 675 NAGAR, JYOTI COLONY‐BALBIR NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1188 990 KVA UNPLANNED 27‐06‐2018 15:13:41 27‐06‐2018 16:11:00 0:57 0.0002375 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK B‐DURGA PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, JYOTI COLONY‐BALBIR 676 NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1188 990 KVA UNPLANNED 28‐06‐2018 17:07:03 28‐06‐2018 18:06:00 0:58 0.00024167 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BABARPUR EXTN.‐ BABAR PUR, BALBIR NAGAR EXTN.‐SILAMPUR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, BALBIR NAGAR EXTN.‐SILAMPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, CHHAJJUPUR‐BABAR PUR, JHILMIL 677 INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B NNG 1161 630 KVA UNPLANNED 28‐06‐2018 21:30:00 28‐06‐2018 22:25:00 0:54 0.00015 MUs 678 BLOCK B‐DURGA PURI, BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR NNG 830 990 KVA UNPLANNED 29‐06‐2018 09:54:33 29‐06‐2018 10:32:26 0:37 0.00020556 MUs 679 BLOCK A‐JAGATPURI EXTN., BLOCK D‐JAGAT PURI, BLOCK A‐B&C‐JAGAT PURI NNG 930 630 KVA UNPLANNED 30‐06‐2018 10:36:54 30‐06‐2018 11:26:00 0:49 0.00013611 MUs 680 HATHI KHANA‐NAWAB GANJ, FYAZ GANJ‐NAWAB GANJ PHG 122 990 KVA UNPLANNED 12‐06‐2018 09:16:09 12‐06‐2018 10:08:18 0:52 0.00007222 MUs 681 SADAR BAZAR B G ROAD PHG 117 400 KVA UNPLANNED 15‐06‐2018 10:53:05 15‐06‐2018 11:28:56 0:35 0.00009722 MUs 682 PHARI DHIRAJ‐SADAR BAZAR, SADAR BAZAR B G ROAD PHG 169 990 KVA UNPLANNED 17‐06‐2018 10:38:34 17‐06‐2018 11:11:05 0:32 0.00008889 MUs

SADAR BAZAR B G ROAD, CHOWK NAI BASTI‐SADAR BAZAR, PHARI DHIRAJ‐SADAR BAZAR, FYAZ GANJ‐NAWAB GANJ, DDA 683 POLICE QTRS.‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR, SADAR BAZAR ‐ RAM NAGAR, TELI WARA‐NAWAB GANJ PHG 1120 990 KVA UNPLANNED 21‐06‐2018 13:11:56 21‐06‐2018 13:35:17 0:23 0.00006389 MUs CHOWK NAI BASTI‐SADAR BAZAR, KABRISTAN‐SADAR BAZAR B G ROAD, MODEL BASTI‐SADAR BAZAR B G ROAD, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, BLOCK T‐AHATA KEDARA, FIRE STATION RANI JHANSI ROAD‐SADAR 684 BAZAR B G ROAD, SADAR BAZAR B G ROAD, NAWAB GANJ‐SADAR BAZAR PHG 540 990 KVA UNPLANNED 22‐06‐2018 12:32:02 22‐06‐2018 13:09:59 0:37 0.00005139 MUs 685 NAWAB GANJ‐SADAR BAZAR PHG 288 990 KVA UNPLANNED 22‐06‐2018 12:36:08 22‐06‐2018 12:44:39 0:8 0.00001111 MUs

686 CHOWK NAI BASTI‐SADAR BAZAR, SADAR BAZAR ‐ RAM NAGAR, PHARI DHIRAJ‐SADAR BAZAR, SADAR BAZAR B G ROAD PHG 930 990 KVA UNPLANNED 23‐06‐2018 14:12:26 23‐06‐2018 14:47:51 0:35 0.00009722 MUs CHOWK NAI BASTI‐SADAR BAZAR, KABRISTAN‐SADAR BAZAR B G ROAD, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B G ROAD, MODEL BASTI‐SADAR BAZAR B G ROAD, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS, AMRIT KAUR MARKET‐ 687 PAHAR GANJ PHG 840 990 KVA UNPLANNED 24‐06‐2018 18:06:00 24‐06‐2018 18:56:00 0:49 0.00013611 MUs 688 PHARI DHIRAJ‐SADAR BAZAR, TELI WARA‐NAWAB GANJ PHG 29 400 KVA UNPLANNED 26‐06‐2018 08:43:09 26‐06‐2018 09:31:54 0:48 0.00016 MUs

CHOWK NAI BASTI‐SADAR BAZAR, KABRISTAN‐SADAR BAZAR B G ROAD, FIRE STATION RANI JHANSI ROAD‐SADAR BAZAR B 689 G ROAD, MODEL BASTI‐SADAR BAZAR B G ROAD, SHAHI IDGAH‐SADAR BAZAR ‐ P.P QUARTERS PHG 840 990 KVA UNPLANNED 26‐06‐2018 14:08:16 26‐06‐2018 14:16:36 0:8 0.00001111 MUs 690 SADAR BAZAR B G ROAD PHG 117 400 KVA UNPLANNED 27‐06‐2018 13:45:31 27‐06‐2018 13:54:45 0:9 0.000025 MUs SADAR BAZAR B G ROAD, ARAM NAGAR‐SADAR BAZAR, BLOCK A‐ARAM BAGH, SADAR BAZAR ‐ RAM NAGAR, SADAR 691 BAZAR ‐ RAM NAGAR, NAWAB GANJ‐SADAR BAZAR, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR PHG 77 630 KVA UNPLANNED 29‐06‐2018 02:12:09 29‐06‐2018 02:16:00 0:3 0.00000833 MUs 692 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ PHG 65 990 KVA UNPLANNED 12‐06‐2018 11:09:33 12‐06‐2018 12:46:53 1:37 0.00013472 MUs 693 MULTANI DHANDA‐SADAR BAZAR PHG 89 630 KVA UNPLANNED 12‐06‐2018 16:13:05 12‐06‐2018 17:02:47 0:49 0.00013611 MUs 694 MANTOLA MOHALLA‐PAHAR GANJ, KASERU WALAN‐PAHAR GANJ PHG 68 990 KVA UNPLANNED 12‐06‐2018 19:14:35 12‐06‐2018 20:00:00 0:45 0.000125 MUs 695 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, CHUNA MANDI‐PAHAR GANJ PHG 85 990 KVA UNPLANNED 12‐06‐2018 22:18:52 12‐06‐2018 23:06:00 0:47 0.00013056 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK D‐MOTIA KHAN, BLOCK A‐SADATPUR EXT‐ PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, DDA FLATS‐MOTIA KHAN, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL 696 AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 1337 990 KVA UNPLANNED 14‐06‐2018 01:51:51 14‐06‐2018 02:47:00 0:55 0.00015278 MUs CHUNA MANDI‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, MANTOLA MOHALLA‐ 697 PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 1363 990 KVA UNPLANNED 14‐06‐2018 03:20:00 14‐06‐2018 03:35:41 0:15 0.00004167 MUs 698 MANTOLA MOHALLA‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ PHG 811 990 KVA UNPLANNED 14‐06‐2018 14:22:21 14‐06‐2018 15:06:00 0:43 0.00005972 MUs 699 BLOCK III‐ARAM BAGH, BLOCK II‐ARAM BAGH PHG 146 990 KVA UNPLANNED 15‐06‐2018 01:34:16 15‐06‐2018 01:53:40 0:19 0.00005278 MUs 700 BLOCK L‐RAM NAGAR, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR PHG 168 990 KVA UNPLANNED 15‐06‐2018 23:52:27 16‐06‐2018 01:05:48 1:13 0.00010139 MUs 701 BLOCK L‐RAM NAGAR, S.R.T. NAGAR‐ARYA NAGAR PHG 444 990 KVA UNPLANNED 16‐06‐2018 13:53:05 16‐06‐2018 15:34:00 1:40 0.00027778 MUs SHEELA HOTEL‐ARYA NAGAR, LEGEND HOTEL‐ARYA NAGAR, ST. ANTONYS CHURCH SCHOOL‐ARYA NAGAR, MANTOLA 702 MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 114 990 KVA UNPLANNED 16‐06‐2018 16:02:50 16‐06‐2018 16:27:13 0:24 0.00006667 MUs 703 MULTANI DHANDA‐SADAR BAZAR PHG 129 990 KVA UNPLANNED 20‐06‐2018 00:12:56 20‐06‐2018 00:33:09 0:20 0.00005556 MUs CHUNA MANDI‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR, SHEELA HOTEL‐ARYA NAGAR, TYPE III HOUSE‐CHUNA MANDI, MANTOLA MOHALLA‐ 704 PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 1374 990 KVA UNPLANNED 20‐06‐2018 16:44:28 20‐06‐2018 17:11:46 0:27 0.000075 MUs CHUNA MANDI‐PAHAR GANJ, TYPE III HOUSE‐CHUNA MANDI, MIG FLATS‐CHUNA MANDI, MANTOLA MOHALLA‐PAHAR 705 GANJ PHG 390 990 KVA UNPLANNED 21‐06‐2018 12:53:43 21‐06‐2018 13:30:31 0:36 0.0001 MUs 706 DOCTOR'S APPARTMENT‐VASUNDHARA ENCLAVE VSE, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN PHG 1 400 KVA UNPLANNED 23‐06‐2018 02:17:10 23‐06‐2018 03:15:00 0:57 0.00015833 MUs BLOCK L‐RAM NAGAR, BLOCK A‐AMAR NAGAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE‐CHANDNI 707 CHOWK CCK, BANGALA SAHIB ROAD‐PANCHKUIAN ROAD RAILWAY COLONY PHG 71 990 KVA UNPLANNED 24‐06‐2018 14:45:11 24‐06‐2018 16:00:00 1:14 0.00020556 MUs 708 BLOCK L‐RAM NAGAR, MULTANI DHANDA‐SADAR BAZAR, PAHAR GANJ PHG, S.R.T. NAGAR‐ARYA NAGAR PHG 168 990 KVA UNPLANNED 25‐06‐2018 05:33:25 25‐06‐2018 06:06:22 0:32 0.00008889 MUs CHUNA MANDI‐PAHAR GANJ, BLOCK A‐AMAR NAGAR, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ, BLOCK D‐MOTIA KHAN, MULTANI DHANDA‐SADAR BAZAR, BLOCK K‐ARAM NAGAR, SHEELA HOTEL ARYA NAGAR, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, TYPE III HOUSE‐CHUNA MANDI, MANTOLA 709 MOHALLA‐PAHAR GANJ, S.R.T. NAGAR‐ARYA NAGAR PHG 1363 990 KVA UNPLANNED 25‐06‐2018 11:06:00 25‐06‐2018 11:35:57 0:29 0.00008056 MUs

710 BLOCK L‐RAM NAGAR, MULTANI DHANDA‐SADAR BAZAR, S.R.T. NAGAR‐ARYA NAGAR, ARAM NAGAR‐SADAR BAZAR PHG 168 990 KVA UNPLANNED 25‐06‐2018 15:50:30 25‐06‐2018 16:37:49 0:47 0.00006528 MUs

711 DDA FLATS‐MOTIA KHAN, MULTANI DHANDA‐SADAR BAZAR, BLOCK K‐ARAM NAGAR, BLOCK C‐AMAR NAGAR PHG 89 630 KVA UNPLANNED 25‐06‐2018 19:12:18 25‐06‐2018 19:41:18 0:29 0.00008056 MUs CHUNA MANDI‐PAHAR GANJ, BLOCK B‐ARAM BAGH, TYPE III HOUSE‐CHUNA MANDI, MIG FLATS‐CHUNA MANDI, 712 MANTOLA MOHALLA‐PAHAR GANJ PHG 566 990 KVA UNPLANNED 26‐06‐2018 10:48:42 26‐06‐2018 11:36:00 0:47 0.00006528 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SANT NIRANKARI SCHOOL‐MOTIA KHAN, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, DDA FLATS‐ MOTIAKHAN DUMP SCHEME‐MOTIA KHAN, LIG/MIG RES/NON COMM AREA‐MOTIA KHAN, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐SHIV VIHAR, DDA FLATS‐MOTIA KHAN, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL 713 NAGAR, BLOCK F‐SHIV VIHAR, R.G. COMPLEX‐MOTIA KHAN, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 734 990 KVA UNPLANNED 27‐06‐2018 12:40:31 27‐06‐2018 13:15:00 0:34 0.00009444 MUs

714 KASERU WALAN‐PAHAR GANJ, MANTOLA MOHALLA‐PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ PHG 1141 630 KVA UNPLANNED 27‐06‐2018 15:39:21 27‐06‐2018 16:16:00 0:36 0.0001 MUs 715 SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR PHG 87 400 KVA UNPLANNED 12‐06‐2018 12:49:18 12‐06‐2018 13:20:42 0:31 0.00004306 MUs 716 SADAR BAZAR ‐ RAM NAGAR, BLOCK T‐SADAR BAZAR ‐ RAM NAGAR PHG 218 400 KVA UNPLANNED 12‐06‐2018 15:08:58 12‐06‐2018 15:57:06 0:48 0.00006667 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 717 SADAR BAZAR ‐ RAM NAGAR PHG 447 990 KVA UNPLANNED 22‐06‐2018 12:11:41 22‐06‐2018 12:45:12 0:33 0.00004583 MUs

BHAGAT NAGAR‐DAYALPUR, PHARI DHIRAJ‐SADAR BAZAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK T‐AHATA KEDARA, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SADAR BAZAR ‐ RAM NAGAR, BLOCK Z‐O & P 718 BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B PHG 879 990 KVA UNPLANNED 23‐06‐2018 11:29:44 23‐06‐2018 12:13:56 0:44 0.00012222 MUs 719 BLOCK T‐AHATA KEDARA, SADAR BAZAR ‐ RAM NAGAR PHG 1432 990 KVA UNPLANNED 29‐06‐2018 11:56:49 29‐06‐2018 12:32:45 0:35 0.00009722 MUs 720 BLOCK 30‐WEST PATEL NAGAR, BLOCK T‐BALJIT NAGAR PNR 85 990 KVA UNPLANNED 14‐06‐2018 14:28:58 14‐06‐2018 15:12:46 0:43 0.00023889 MUs 721 BLOCK 35‐RAMJAS SPORTS COMPLEX, CLOSED FACTORY‐FARIDPURI, RAJASTHAN COLONY‐FARIDPURI PNR 853 400 KVA UNPLANNED 16‐06‐2018 16:21:36 16‐06‐2018 17:50:00 1:28 0.00122222 MUs 722 BABA FARID PURI‐PUNJABI BASTI, BLOCK T‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 1789 990 KVA UNPLANNED 20‐06‐2018 11:54:49 20‐06‐2018 12:44:56 0:50 0.00027778 MUs BLOCK E‐WEST PATEL NAGAR, BLOCK B‐WEST PATEL NAGAR, BLOCK Z‐WEST PATEL NAGAR, BLOCK G‐COTTAGE, BLOCK C‐ 723 WEST PATEL NAGAR, BLOCK D‐WEST PATEL NAGAR PNR 656 630 KVA UNPLANNED 21‐06‐2018 11:16:00 21‐06‐2018 12:26:00 1:10 0.00068056 MUs BLOCK A‐COTTAGE, BLOCK P‐WEST PATEL NAGAR, BLOCK U‐WEST PATEL NAGAR, BLOCK T‐WEST PATEL NAGAR, BLOCK F‐ PUNJABI BASTI, PATEL NAGAR POLICE STATION‐WEST PATEL NAGAR, PREM NAGAR‐BALJIT NAGAR, BLOCK T‐BALJIT 724 NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 1327 990 KVA UNPLANNED 22‐06‐2018 10:15:05 22‐06‐2018 10:41:31 0:26 0.00014444 MUs SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK 30‐WEST PATEL NAGAR, BLOCK 29‐WEST PATEL NAGAR, BLOCK 11‐WEST PATEL 725 NAGAR, BLOCK 25‐, PREM NAGAR‐BALJIT NAGAR, BLOCK T‐BALJIT NAGAR PNR 1789 990 KVA UNPLANNED 22‐06‐2018 23:11:07 22‐06‐2018 23:30:59 0:19 0.00006333 MUs BLOCK 38‐WEST PATEL NAGAR, BLOCK 26‐WEST PATEL NAGAR, BLOCK 23‐WEST PATEL NAGAR, BLOCK 35‐WEST PATEL NAGAR, BLOCK 25‐WEST PATEL NAGAR, BLOCK T‐FARIDPURI, BLOCK 37‐WEST PATEL NAGAR, BLOCK 34‐WEST PATEL 726 NAGAR PNR 1014 990 KVA UNPLANNED 23‐06‐2018 06:06:00 23‐06‐2018 06:33:49 0:27 0.00009 MUs BLOCK 38‐WEST PATEL NAGAR, BLOCK 26‐WEST PATEL NAGAR, BLOCK 23‐WEST PATEL NAGAR, BLOCK 35‐WEST PATEL NAGAR, BLOCK 25‐WEST PATEL NAGAR, BLOCK T‐FARIDPURI, BLOCK 37‐WEST PATEL NAGAR, BLOCK 34‐WEST PATEL 727 NAGAR PNR 1014 990 KVA UNPLANNED 23‐06‐2018 06:57:32 23‐06‐2018 12:40:48 5:43 0.00114333 MUs BLOCK J‐WEST PATEL NAGAR, BLOCK E‐WEST PATEL NAGAR, SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK T‐PANJABI BASTI, 728 BLOCK A‐COTTAGE, BLOCK T‐BALJIT NAGAR PNR 971 990 KVA UNPLANNED 25‐06‐2018 11:07:33 25‐06‐2018 12:00:00 0:52 0.00017333 MUs BLOCK F‐PUNJABI BASTI, BLOCK 33‐WEST PATEL NAGAR, BLOCK T‐PANJABI BASTI, BLOCK T‐BALJIT NAGAR, BLOCK 30‐ 729 WEST PATEL NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16 PNR 1622 990 KVA UNPLANNED 25‐06‐2018 14:11:02 25‐06‐2018 15:06:00 0:54 0.00018 MUs SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK 33‐WEST PATEL NAGAR, BLOCK T‐PANJABI BASTI, BLOCK 30‐WEST PATEL NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, CHETAN BASTI‐ BLOCK J‐NEHRU NAGAR, BLOCK F‐PUNJABI BASTI, BLOCK T‐ 730 BALJIT NAGAR PNR 1622 990 KVA UNPLANNED 25‐06‐2018 16:18:35 25‐06‐2018 16:57:56 0:39 0.00010833 MUs

BLOCK A‐COTTAGE, BLOCK P‐WEST PATEL NAGAR, BLOCK U‐WEST PATEL NAGAR, BLOCK T‐WEST PATEL NAGAR, PATEL 731 NAGAR POLICE STATION‐WEST PATEL NAGAR, BLOCK T‐BALJIT NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 1327 990 KVA UNPLANNED 26‐06‐2018 10:47:17 26‐06‐2018 11:26:00 0:38 0.00012667 MUs 732 BLOCK T‐BALJIT NAGAR, KARAMPURA INDUSTRIES‐BALJIT NAGAR, SHADIPUR DEPOT‐BALJIT NAGAR PNR 3073 1390 KVA UNPLANNED 26‐06‐2018 12:45:39 26‐06‐2018 13:22:58 0:37 0 MUs 733 SHADIPUR DEPOT‐BALJIT NAGAR, BLOCK T‐BALJIT NAGAR PNR 971 990 KVA UNPLANNED 28‐06‐2018 13:30:48 28‐06‐2018 14:06:00 0:35 0.00019444 MUs 734 BLOCK 6B‐DEV NAGAR, KHALSA NAGAR‐DEV NAGAR PNR 985 990 KVA UNPLANNED 12‐06‐2018 13:27:01 12‐06‐2018 14:06:44 0:39 0.00015167 MUs BLOCK B‐PUNJABI BASTI, BLOCK 26B‐AJMAL KHAN PARK, BLOCK 24B‐AJMAL KHAN PARK, THAN SINGH NAGAR‐ANAND 735 PARBAT, BLOCK A‐PUNJABI BASTI PNR 1391 630 KVA UNPLANNED 14‐06‐2018 11:50:01 14‐06‐2018 12:29:47 0:39 0.00050917 MUs 736 BLOCK B‐PUNJABI BASTI, BABA FARID PURI‐PUNJABI BASTI, THAKKAR BAPA NAGAR‐BLOCK 16 PNR 1027 990 KVA UNPLANNED 21‐06‐2018 11:07:34 21‐06‐2018 11:55:08 0:47 0.00026111 MUs BLOCK 7B‐DEV NAGAR, BLOCK 12A‐KAROL BAGH, BLOCK_1‐DEV NAGAR, THAKKAR BAPA NAGAR‐BLOCK 16, BLOCK 3‐DEV NAGAR, BLOCK B‐KUNDAN NAGAR, KHALSA NAGAR‐DEV NAGAR, BLOCK 4‐KAROL BAGH, KUNDAN NAGAR‐LAKSHMI 737 NAGAR, BLOCK 6B‐DEV NAGAR PNR 1175 990 KVA UNPLANNED 27‐06‐2018 08:50:00 27‐06‐2018 11:27:18 2:37 0.00087222 MUs BLOCK 7B‐DEV NAGAR, BLOCK_9B‐DEV NAGAR, BLOCK 1B‐DEV NAGAR, BLOCK_5B‐DEV NAGAR, BLOCK B‐KUNDAN NAGAR, KHALSA NAGAR‐DEV NAGAR, BLOCK G‐DEV NAGAR, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK 6B‐DEV NAGAR, 738 BLOCK_10B‐DEV NAGAR PNR 2089 990 KVA UNPLANNED 28‐06‐2018 14:19:09 28‐06‐2018 15:30:00 1:10 0.000875 MUs 739 ANAND PARBAT PNR 230 990 KVA UNPLANNED 21‐06‐2018 08:40:32 21‐06‐2018 09:37:34 0:57 0.00015833 MUs BLOCK A‐NATHU COLONY, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK 63‐AJMAL KHAN PARK, BLOCK C‐LALITA 740 PARK, BLOCK J & K‐NARAYAN NAGAR, RAMESH PARK‐NARAYAN NAGAR SRD 2309 990 KVA UNPLANNED 02‐06‐2018 10:55:52 02‐06‐2018 11:05:34 0:9 0 MUs

BLOCK_1A‐REHAGAR PURA, BLOCK 12A‐KAROL BAGH, BLOCK_21K‐KRISHNA NAGAR, BLOCK_1A‐REHAGAR PURA, BLOCK_6‐KAROL BAGH WEST EXTENSION AREA, BLOCK_20C‐KRISHNA NAGAR, BLOCK_19C‐KRISHNA NAGAR, BLOCK_30B‐ KRISHNA NAGAR, RAMA KRISHNA MISSION FREE T.B. CLINIC‐BLOCK 18, BLOCK_3H‐KRISHNA NAGAR, BLOCK 15A‐KAROL 741 BAGH, BLOCK_17A‐KAROL BAGH WEST EXTENSION AREA, BLOCK 13‐KAROL BAGH SRD 480 400 KVA UNPLANNED 19‐06‐2018 17:30:21 19‐06‐2018 18:12:14 0:41 0 MUs SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA 742 NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR SRD 540 990 KVA UNPLANNED 09‐06‐2018 13:14:00 09‐06‐2018 13:34:00 0:20 0 MUs BLOCK 20‐OLD RAJENDRA NAGAR, BLOCK 18‐OLD RAJENDRA NAGAR, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 19‐OLD 743 RAJENDRA NAGAR, BLOCK 8‐OLD RAJENDRA NAGAR, BLOCK 21‐OLD RAJENDRA NAGAR SRD 440 990 KVA UNPLANNED 20‐06‐2018 14:36:58 20‐06‐2018 15:03:52 0:26 0.00003611 MUs BLOCK 16‐OLD RAJENDRA NAGAR, BLOCK 9‐OLD RAJENDRA NAGAR, BLOCK 8‐OLD RAJENDRA NAGAR, BLOCK 8A‐OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, BLOCK 15‐OLD RAJENDRA NAGAR, 744 BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR SRD 1498 630 KVA UNPLANNED 27‐06‐2018 12:00:48 27‐06‐2018 12:40:29 0:39 0.00027083 MUs

MAYUR VIHAR PHASE III, PKT A 2‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, PKT B7‐MAYUR VIHAR PHASE III, 3RD RD & PKT A 2‐MAYUR VIHAR PHASE III, PKT B8‐MAYUR VIHAR PHASE III, PKT A3‐MAYUR VIHAR PHASE III, 745 MAYUR VIHAR PHASE III, PKT B7 & B6‐MAYUR VIHAR PHASE III, PHASE I‐MAYUR VIHAR VSE 0 3410 KVA UNPLANNED 01‐06‐2018 12:45:00 01‐06‐2018 13:01:00 0:15 0 MUs 746 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 12‐06‐2018 17:47:17 12‐06‐2018 17:54:55 0:7 0.00000972 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐AMAR COLONY, GHAROLI KONDLI, BLOCK A‐MAYUR VIHAR PHASE III, HAUZ QAZI ROAD‐PEEPAL MAHADEV GALI, PKT B1‐MAYUR VIHAR PHASE III, PKT B3‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SHAHDARA JLM, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, PKT B2‐MAYUR VIHAR PHASE III, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, PKT 1‐MAYUR VIHAR PHASE III, BLOCK B‐VIVEK VIHAR, PKT B4‐MAYUR VIHAR PHASE III, PKT B5‐MAYUR VIHAR PHASE III, BLOCK M‐SHIV VIHAR, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, BLOCK B‐MOTHER DAIRY, PKT 6‐ NEW KONDALI, PKT R‐BLOCK D, SEC C‐MAYUR VIHAR PHASE III, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, PKT B8‐MAYUR VIHAR PHASE III, INDIRA GANDHI STADIUM‐AJMERI GATE, BLOCK H‐ BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, ISBT‐ISBT ANAND VIHAR, 747 JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B, PKT B‐CHITRAKOOT VSE 8092 3150 KVA UNPLANNED 12‐06‐2018 18:02:58 12‐06‐2018 18:40:00 0:37 0.00185 MUs 748 BLOCK A‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 15‐06‐2018 08:21:28 15‐06‐2018 10:06:00 1:44 0.00028889 MUs 749 BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR PHASE III VSE 780 0 KVA UNPLANNED 22‐06‐2018 16:29:42 22‐06‐2018 16:55:23 0:25 0.00006944 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

MAYUR VIHAR PHASE III, BLOCK B‐MAYUR VIHAR PHASE III, LAHORE APPARTMENT‐DALLU PURA VSE, BLOCK A‐MAYUR 750 VIHAR PHASE III, BLOCK_G1/A‐KONDALI GHAROLI SECTOR G, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 23‐06‐2018 23:47:04 24‐06‐2018 00:05:36 0:18 0.00015 MUs BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR 751 VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 27‐06‐2018 08:05:55 27‐06‐2018 10:03:55 1:58 0.00098333 MUs MAYUR VIHAR PHASE III, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, SEC C‐MAYUR VIHAR 752 PHASE III, PKT B6‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 1791 0 KVA UNPLANNED 27‐06‐2018 23:26:07 28‐06‐2018 02:20:56 2:54 0.00096667 MUs BLOCK B‐MAYUR VIHAR PHASE III, AMBEDKAR AWAS KALYAN SAMITI‐GHAROLI KONDLI, BLOCK B‐AMBEDKAR AWAS 753 KALYAN SAMITI, SEC D‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III VSE 236 990 KVA UNPLANNED 28‐06‐2018 06:28:15 28‐06‐2018 07:14:09 0:45 0.000025 MUs

754 BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐MAYUR VIHAR PHASE III, GHAROLI KONDLI, BLOCK A‐MAYUR VIHAR PHASE III VSE 2145 0 KVA UNPLANNED 28‐06‐2018 19:56:51 28‐06‐2018 20:58:25 1:1 0.00013556 MUs 755 BLOCK B1‐NEW ASHOK NAGAR VSE 174 400 KVA UNPLANNED 14‐06‐2018 16:16:32 14‐06‐2018 16:41:37 0:25 0.00005556 MUs 756 BLOCK A‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR VSE 762 990 KVA UNPLANNED 25‐06‐2018 23:20:20 25‐06‐2018 23:31:45 0:11 0.00006111 MUs CHILLA‐ TRAFIK BOOTH‐NEW ASHOK NAGAR, BLOCK C1‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, CHILLA‐ NAGARJUNA APPARTMENT‐ BLOCK E‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, BLOCK A‐NEW ASHOK NAGAR, 757 BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK C2‐NEW ASHOK NAGAR VSE 35 990 KVA UNPLANNED 28‐06‐2018 17:09:07 28‐06‐2018 22:17:37 5:8 0.00051333 MUs BLOCK C2‐NEW KONDALI, BLOCK C3‐NEW KONDALI, BLOCK C4‐NEW KONDALI, PARADISE APPARTMENT‐MOTHER DAIRY, 758 BLOCK C‐NEW KONDALI, BLOCK C1‐NEW KONDALI VSE 425 630 KVA UNPLANNED 07‐06‐2018 17:40:56 07‐06‐2018 18:03:45 0:22 0 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐DALLU PURA VSE, DHARMSHILA CANCER HOSPITAL & RESEARCH HOSPITAL‐DALLU PURA VSE, DALLU PURA VSE‐VASUNDHARA ENCLAVE VSE, BLOCK A‐DALLU PURA VSE, BLOCK A‐ 759 KONDALI EXTN. VSE 440 630 KVA UNPLANNED 22‐06‐2018 13:00:24 22‐06‐2018 13:41:25 0:41 0.00022778 MUs

760 PKT 3‐NEW KONDALI, PKT 2‐NEW KONDALI, PKT 4‐NEW KONDALI, PKT 6‐NEW KONDALI, PKT 1‐NEW KONDALI VSE 1003 630 KVA UNPLANNED 26‐06‐2018 22:44:12 26‐06‐2018 23:15:13 0:31 0.00001722 MUs 761 BLOCK V‐GHONDA PATTI CHAUHAN, GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN YVR 1259 990 KVA UNPLANNED 11‐06‐2018 23:58:01 12‐06‐2018 00:47:05 0:49 0.00013611 MUs

BLOCK C‐BHAJANPURA, GHONDA PATTI, BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, 762 BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK H‐GHONDA PATTI, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA YVR 4129 990 KVA UNPLANNED 12‐06‐2018 06:06:00 12‐06‐2018 06:53:00 0:47 0.00013056 MUs 763 BLOCK E‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA YVR 703 990 KVA UNPLANNED 12‐06‐2018 10:42:28 12‐06‐2018 11:07:20 0:24 0.00006667 MUs 764 ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR YVR 477 990 KVA UNPLANNED 12‐06‐2018 21:40:00 13‐06‐2018 01:06:00 3:26 0.00068667 MUs 765 NAYAGAON‐NEW KATWARA, BLOCK L‐BRAHM PURI, BLOCK F‐BRAHM PURI YVR 1832 400 KVA UNPLANNED 14‐06‐2018 01:34:20 14‐06‐2018 02:26:54 0:52 0.00028889 MUs 766 BLOCK P‐BRAHM PURI, NAYAGAON‐NEW KATWARA, BLOCK F‐BRAHM PURI YVR 1462 400 KVA UNPLANNED 14‐06‐2018 09:32:47 14‐06‐2018 10:09:45 0:36 0.0003 MUs 767 BLOCK V‐GHONDA PATTI CHAUHAN, GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN YVR 1259 990 KVA UNPLANNED 15‐06‐2018 12:05:04 15‐06‐2018 12:34:48 0:29 0.00008056 MUs 768 NAYAGAON‐NEW KATWARA, NEW USMANPUR‐NEW KATWARA YVR 456 630 KVA UNPLANNED 15‐06‐2018 13:17:36 15‐06‐2018 14:24:48 1:7 0.00009306 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK C‐JAI PRAKASH 769 NAGAR, ARVIND NAGAR‐GHONDA, GHONDA PATTI YVR 1255 990 KVA UNPLANNED 17‐06‐2018 13:26:40 17‐06‐2018 14:25:00 0:58 0.00016111 MUs GAMRI‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK B2‐YAMUNA VIHAR, BLOCK V‐GHONDA 770 PATTI CHAUHAN, GHONDA PATTI, GAUTAM VIHAR‐GHONDA, BLOCK C‐GHONDA YVR 1259 990 KVA UNPLANNED 19‐06‐2018 23:05:50 19‐06‐2018 23:38:34 0:32 0.00015111 MUs 771 KACHI COLONY‐JAGJEET NAGAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA YVR 1202 990 KVA UNPLANNED 20‐06‐2018 12:32:20 20‐06‐2018 13:27:54 0:55 0.00015278 MUs GAMRI‐GHONDA, BLOCK B2‐YAMUNA VIHAR, BLOCK A‐GHONDA PATTI, BLOCK B‐KARTAR NAGAR, BLOCK C‐JAI PRAKASH 772 NAGAR, BLOCK J‐KARTAR NAGAR, BLOCK D‐BHAJANPURA YVR 1270 990 KVA UNPLANNED 20‐06‐2018 22:37:50 20‐06‐2018 23:26:20 0:48 0.00013333 MUs 773 BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA YVR 445 990 KVA UNPLANNED 21‐06‐2018 11:25:06 21‐06‐2018 12:20:00 0:54 0.00015 MUs

LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐BHAJANPURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK A‐GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐GHONDA PATTI, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐GHONDA PATTI, BLOCK H‐ BHAGIRATHI VIHAR, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK D‐ 774 BHAJANPURA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1576 990 KVA UNPLANNED 21‐06‐2018 12:41:38 21‐06‐2018 13:30:00 0:48 0.00006667 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK L‐BRAHM PURI, BLOCK H‐BRAHM PURI, BLOCK I‐BRAHM PURI, 775 BLOCK F‐BRAHM PURI YVR 1410 990 KVA UNPLANNED 21‐06‐2018 13:15:48 21‐06‐2018 13:46:17 0:30 0.00008333 MUs 776 BLOCK P‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK R‐BRAHM PURI YVR 951 990 KVA UNPLANNED 22‐06‐2018 00:28:49 22‐06‐2018 01:12:11 0:43 0.00011944 MUs

BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, LIG/MIG RES/NON COMM 777 AREA‐SONIA VIHAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA YVR 2795 990 KVA UNPLANNED 22‐06‐2018 01:59:04 22‐06‐2018 02:39:22 0:40 0.00011111 MUs BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, BLOCK B2‐YAMUNA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK 778 BHAJANPURA, BLOCK D‐BHAJANPURA YVR 1849 990 KVA UNPLANNED 22‐06‐2018 03:36:08 22‐06‐2018 05:05:40 1:29 0.00024722 MUs

BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, 779 BLOCK D‐BHAJANPURA, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA YVR 833 990 KVA UNPLANNED 22‐06‐2018 11:41:51 22‐06‐2018 12:06:00 0:24 0.00006667 MUs BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, BLOCK D‐ 780 BHAJANPURA YVR 833 990 KVA UNPLANNED 22‐06‐2018 17:30:28 22‐06‐2018 18:24:29 0:54 0.0003 MUs

BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TANKI ROAD‐C‐ BLOCK BHAJANPURA, BHAGAT NAGAR‐DAYALPUR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, JAFFRABAD‐MAUJ PUR, BLOCK F‐SHIV VIHAR, BLOCK C10 MAHANAGAR STAFF UNION‐COMMUNITY CENTRE YAMUNA VIHAR BLOCK C, BLOCK D‐BHAJANPURA, JHILMIL INDUSTRIAL AREA‐JHILMIL 781 COLONY, PKT A‐BLOCK B YVR 1876 990 KVA UNPLANNED 22‐06‐2018 20:01:46 22‐06‐2018 20:34:55 0:33 0.00018333 MUs

GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM 782 AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI YVR 1160 990 KVA UNPLANNED 22‐06‐2018 23:30:48 22‐06‐2018 23:47:09 0:16 0.00004444 MUs BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐ KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 783 BLOCK B YVR 1876 990 KVA UNPLANNED 23‐06‐2018 01:17:57 23‐06‐2018 02:04:07 0:46 0.00012778 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI, BLOCK B‐BRAHM PURI, 784 BLOCK C1‐YAMUNA VIHAR YVR 1160 990 KVA UNPLANNED 23‐06‐2018 03:11:50 23‐06‐2018 04:04:03 0:52 0.00014444 MUs 785 CHAUHAN BANGAR‐JAFFRABAD YVR 346 630 KVA UNPLANNED 23‐06‐2018 10:41:33 23‐06‐2018 11:40:00 0:58 0.00016111 MUs BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK C‐GHONDA PATTI, GGS INDRAPRASTHA UNIVERSITY‐ KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, BLOCK A‐GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK H‐GHONDA PATTI, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT 786 A‐BLOCK B YVR 747 990 KVA UNPLANNED 23‐06‐2018 12:38:50 23‐06‐2018 13:31:35 0:52 0.00014444 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK V‐GHONDA 787 PATTI CHAUHAN YVR 1208 990 KVA UNPLANNED 23‐06‐2018 13:35:06 23‐06‐2018 14:33:00 0:57 0.00015833 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NORTH GHONDA, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, 788 BLOCK V‐GHONDA PATTI CHAUHAN YVR 1208 990 KVA UNPLANNED 23‐06‐2018 15:31:38 23‐06‐2018 16:25:00 0:53 0.00029444 MUs GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK V‐ 789 GHONDA PATTI CHAUHAN, BLOCK H‐BRAHM PURI YVR 1259 990 KVA UNPLANNED 23‐06‐2018 17:35:53 23‐06‐2018 18:16:21 0:40 0.00023333 MUs

GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM 790 AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI YVR 1160 990 KVA UNPLANNED 24‐06‐2018 00:32:12 24‐06‐2018 00:48:16 0:16 0.00004444 MUs GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG 791 RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 1294 990 KVA UNPLANNED 24‐06‐2018 07:17:21 24‐06‐2018 07:34:31 0:17 0.00004722 MUs

GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, LIG/MIG RES/NON COMM 792 AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM PURI YVR 1160 990 KVA UNPLANNED 24‐06‐2018 07:23:53 24‐06‐2018 08:16:09 0:52 0.00014444 MUs 793 GAMRI‐GHONDA, BLOCK T‐GAUTAM PURI, BLOCK A‐GHONDA PATTI YVR 1270 990 KVA UNPLANNED 25‐06‐2018 11:04:49 25‐06‐2018 18:02:45 6:57 0.00115833 MUs

BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐BHAJANPURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BHAGAT NAGAR‐DAYALPUR, GHONDA PATTI CHAUHAN, BLOCK B3‐YAMUNA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, 794 BLOCK F‐SHIV VIHAR, BLOCK D‐BHAJANPURA, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 1875 990 KVA UNPLANNED 25‐06‐2018 14:32:42 25‐06‐2018 15:20:00 0:47 0.00013056 MUs

795 GAUTAM VIHAR‐GHONDA, GHONDA PATTI CHAUHAN, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK H‐BRAHM PURI YVR 1259 990 KVA UNPLANNED 26‐06‐2018 11:34:47 26‐06‐2018 12:34:00 0:59 0.00031139 MUs BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐ KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 796 BLOCK B YVR 1875 990 KVA UNPLANNED 26‐06‐2018 16:03:30 26‐06‐2018 16:42:33 0:39 0.00010833 MUs BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, SITARAM BAZAR‐CHANDNI CHOWK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, DAV PUBLIC SCHOOL‐ KALA MASZID, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 797 BLOCK B YVR 1875 990 KVA UNPLANNED 27‐06‐2018 12:22:56 27‐06‐2018 13:03:25 0:40 0.00024444 MUs

798 GAMRI‐GHONDA, BLOCK C‐GHONDA PATTI, BLOCK H‐GHONDA PATTI, BLOCK J‐KARTAR NAGAR, BLOCK A‐GHONDA PATTI YVR 1257 990 KVA UNPLANNED 27‐06‐2018 14:07:34 27‐06‐2018 15:06:27 0:58 0.00030611 MUs

BLOCK B‐MANUJPUR, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK B‐GARI MANDU, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL 799 NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 801 990 KVA UNPLANNED 27‐06‐2018 15:38:08 27‐06‐2018 16:25:51 0:47 0.00033944 MUs

BLOCK B‐MANUJPUR, GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST 800 GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 1294 990 KVA UNPLANNED 28‐06‐2018 13:46:13 28‐06‐2018 14:18:47 0:32 0.00017778 MUs GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG 801 RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 1294 990 KVA UNPLANNED 28‐06‐2018 16:46:41 28‐06‐2018 17:16:16 0:29 0.00008056 MUs 802 GAMRI‐GHONDA, BLOCK C‐GHONDA PATTI, BLOCK J‐KARTAR NAGAR, BLOCK A‐GHONDA PATTI YVR 1257 990 KVA UNPLANNED 29‐06‐2018 12:20:30 29‐06‐2018 13:52:02 1:31 0.00025278 MUs GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, WEST GHONDA, LIG/MIG 803 RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 1294 990 KVA UNPLANNED 29‐06‐2018 17:34:04 29‐06‐2018 18:06:55 0:32 0.00020444 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK V‐GHONDA 804 PATTI CHAUHAN YVR 1208 990 KVA UNPLANNED 29‐06‐2018 20:33:29 29‐06‐2018 22:20:00 1:46 0.00061833 MUs 805 JAFFRABAD‐MAUJ PUR YVR 1422 990 KVA UNPLANNED 02‐06‐2018 02:16:00 02‐06‐2018 02:45:00 0:29 0 MUs 806 CHAUHAN BANGAR‐JAFFRABAD YVR 224 990 KVA UNPLANNED 12‐06‐2018 01:42:12 12‐06‐2018 02:40:00 0:57 0.00019 MUs 807 CHAUHAN BANGAR‐JAFFRABAD YVR 224 990 KVA UNPLANNED 12‐06‐2018 11:51:30 12‐06‐2018 12:57:21 1:5 0.00018056 MUs BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK B‐NEW 808 SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 779 990 KVA UNPLANNED 12‐06‐2018 20:25:00 12‐06‐2018 21:03:15 0:38 0.00012667 MUs SUBHASH PARK‐GORAKH PARK, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐ WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE 809 IV YVR 2555 990 KVA UNPLANNED 12‐06‐2018 20:26:00 12‐06‐2018 20:36:00 0:10 0.00056944 MUs BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK B‐NEW 810 SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 779 990 KVA UNPLANNED 14‐06‐2018 00:39:00 14‐06‐2018 09:30:28 8:51 0.001475 MUs SUBHASH PARK‐GORAKH PARK, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐ WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE 811 IV YVR 1371 990 KVA UNPLANNED 14‐06‐2018 12:00:09 14‐06‐2018 12:34:25 0:34 0.00009444 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage SUBHASH PARK‐GORAKH PARK, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐ WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE 812 IV YVR 2555 990 KVA UNPLANNED 14‐06‐2018 13:04:35 14‐06‐2018 13:29:08 0:24 0.00033333 MUs 813 JAFFRABAD‐MAUJ PUR YVR 754 990 KVA UNPLANNED 14‐06‐2018 16:53:47 14‐06‐2018 17:21:57 0:28 0.00007778 MUs 814 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 995 990 KVA UNPLANNED 15‐06‐2018 12:40:02 15‐06‐2018 12:51:52 0:11 0.00003056 MUs 815 JAFFRABAD‐MAUJ PUR YVR 1422 990 KVA UNPLANNED 17‐06‐2018 18:31:26 17‐06‐2018 19:00:20 0:28 0.00007778 MUs 816 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 778 990 KVA UNPLANNED 19‐06‐2018 21:23:27 19‐06‐2018 21:54:11 0:30 0.00008333 MUs SUBHASH PARK‐GORAKH PARK, BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐ WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐NEW SILAMPURI PHASE 817 IV YVR 2554 990 KVA UNPLANNED 20‐06‐2018 13:48:19 20‐06‐2018 15:47:29 1:59 0.00165278 MUs 818 JAFFRABAD‐MAUJ PUR YVR 319 400 KVA UNPLANNED 20‐06‐2018 23:06:48 20‐06‐2018 23:47:35 0:40 0.00011111 MUs 819 JAFFRABAD‐MAUJ PUR, JAFFRABAD‐MAUJ PUR YVR 1348 630 KVA UNPLANNED 21‐06‐2018 13:28:42 21‐06‐2018 14:20:00 0:51 0.00014167 MUs BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW 820 SILAMPURI PHASE IV, DELHI TRANSPORT‐WELCOME COLONY, BLOCK A‐WELCOME COLONY YVR 1276 990 KVA UNPLANNED 22‐06‐2018 12:47:22 22‐06‐2018 13:47:01 0:59 0.00016389 MUs 821 JAFFRABAD‐MAUJ PUR, BLOCK G‐SILAMPUR COLONY, BLOCK E‐NEW SILAMPURI PHASE II YVR 982 990 KVA UNPLANNED 22‐06‐2018 16:00:26 22‐06‐2018 16:19:39 0:19 0.00005278 MUs BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK JB‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW 822 SILAMPURI PHASE IV, DELHI TRANSPORT‐WELCOME COLONY, BLOCK A‐WELCOME COLONY YVR 1276 990 KVA UNPLANNED 22‐06‐2018 23:20:58 22‐06‐2018 23:33:08 0:12 0.00003333 MUs

BLOCK U‐WELCOME COLONY, BLOCK W‐WELCOME COLONY, BLOCK I‐WELCOME COLONY, MAUJ PUR COMPLEX 1, 823 BLOCK X‐WELCOME COLONY, BLOCK Z‐WELCOME COLONY, BLOCK B‐NEW SILAMPURI PHASE IV YVR 1351 990 KVA UNPLANNED 23‐06‐2018 22:45:05 23‐06‐2018 23:35:22 0:50 0.00013889 MUs 824 JAFFRABAD‐MAUJ PUR YVR 785 630 KVA UNPLANNED 25‐06‐2018 11:47:35 25‐06‐2018 12:55:00 1:7 0.00018611 MUs BLOCK C‐NEW SILAMPURI PHASE IV, BLOCK A‐NEW SILAMPURI PHASE IV, BLOCK B‐NEW SILAMPURI PHASE IV, BLOCK D‐ 825 NEW SILAMPURI PHASE IV, SUBHASH PARK‐GORAKH PARK YVR 996 990 KVA UNPLANNED 26‐06‐2018 15:16:39 26‐06‐2018 17:03:01 1:46 0.00029444 MUs 826 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR YVR 381 990 KVA UNPLANNED 26‐06‐2018 16:39:13 26‐06‐2018 17:30:00 0:50 0.00030556 MUs 827 SUBHASH PARK‐GORAKH PARK YVR 164 630 KVA UNPLANNED 27‐06‐2018 12:27:50 27‐06‐2018 13:25:00 0:57 0.00030083 MUs 828 SUBHASH PARK‐GORAKH PARK YVR 98 630 KVA UNPLANNED 27‐06‐2018 15:19:13 27‐06‐2018 16:21:42 1:2 0.00037889 MUs 829 SUBHASH PARK‐GORAKH PARK, BLOCK T‐AHATA KEDARA YVR 93 400 KVA UNPLANNED 28‐06‐2018 20:17:19 28‐06‐2018 21:00:38 0:43 0.00017917 MUs 830 SUBHASH PARK‐GORAKH PARK, BLOCK T‐AHATA KEDARA YVR 93 400 KVA UNPLANNED 28‐06‐2018 22:18:00 28‐06‐2018 23:16:00 0:58 0.00016111 MUs 831 SUBHASH PARK‐GORAKH PARK YVR 192 630 KVA UNPLANNED 29‐06‐2018 15:46:37 29‐06‐2018 16:40:00 0:53 0.00014722 MUs 832 BLOCK E‐NEW SILAMPURI PHASE II, JAFFRABAD‐MAUJ PUR YVR 381 990 KVA UNPLANNED 30‐06‐2018 10:19:36 30‐06‐2018 11:03:45 0:44 0.00012222 MUs 833 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 31 990 KVA UNPLANNED 12‐06‐2018 16:24:49 12‐06‐2018 17:22:00 0:57 0.00015833 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐SILAMPUR COLONY, BLOCK J‐SILAMPUR COLONY, JHUGI‐NEW 834 SILAMPURI PHASE I YVR 994 400 KVA UNPLANNED 14‐06‐2018 01:39:20 14‐06‐2018 01:59:13 0:19 0.00015833 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, BLOCK T‐GAUTAM 835 PURI YVR 580 400 KVA UNPLANNED 14‐06‐2018 05:22:38 14‐06‐2018 05:44:18 0:21 0.00005833 MUs NEW USMANPUR‐NEW KATWARA, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, 836 JAG JEEVAN NAGAR‐NEW KATWARA GHONDA YVR 1177 990 KVA UNPLANNED 14‐06‐2018 13:08:55 14‐06‐2018 14:04:39 0:55 0.00015278 MUs NEW USMANPUR‐NEW KATWARA, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, 837 JAG JEEVAN NAGAR‐NEW KATWARA GHONDA YVR 713 990 KVA UNPLANNED 15‐06‐2018 07:03:17 15‐06‐2018 07:26:01 0:22 0.00006111 MUs 838 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 840 630 KVA UNPLANNED 19‐06‐2018 15:05:24 19‐06‐2018 15:22:52 0:17 0.00004722 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐GARI MANDU, JAFFRABAD‐MAUJ PUR, BLOCK B‐SHASTRI PARK, 839 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 1239 630 KVA UNPLANNED 20‐06‐2018 15:09:00 20‐06‐2018 16:04:51 0:55 0.00045833 MUs 840 MCD COLONY‐NEW KATWARA YVR 136 400 KVA UNPLANNED 20‐06‐2018 16:48:45 20‐06‐2018 17:11:02 0:22 0.00006111 MUs 841 BLOCK A‐SILAMPUR COLONY, BLOCK B‐NEW SILAMPURI PHASE II, BLOCK J‐SILAMPUR COLONY YVR 765 990 KVA UNPLANNED 20‐06‐2018 23:02:45 20‐06‐2018 23:12:49 0:10 0.00002778 MUs BLOCK A‐SILAMPUR COLONY, BLOCK F‐ LIG/MIG RES/NON COMM AREA‐NEW SILAMPURI PHASE II, BLOCK G‐SILAMPUR 842 COLONY YVR 724 630 KVA UNPLANNED 21‐06‐2018 12:37:54 21‐06‐2018 13:29:53 0:51 0.00028333 MUs 843 MCD COLONY‐NEW KATWARA YVR 136 400 KVA UNPLANNED 22‐06‐2018 00:42:34 22‐06‐2018 01:12:41 0:30 0.00008333 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, MCD COLONY‐NEW 844 KATWARA YVR 479 630 KVA UNPLANNED 23‐06‐2018 23:46:32 24‐06‐2018 00:26:53 0:40 0.00011111 MUs 845 LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK R‐BRAHM PURI, BLOCK T‐GAUTAM PURI YVR 1251 990 KVA UNPLANNED 24‐06‐2018 13:19:28 24‐06‐2018 13:46:26 0:26 0.00022389 MUs 846 BLOCK J‐SILAMPUR COLONY YVR 62 400 KVA UNPLANNED 25‐06‐2018 11:17:52 25‐06‐2018 11:59:19 0:41 0.00011389 MUs 847 BLOCK C‐SHASTRI PARK YVR 157 400 KVA UNPLANNED 25‐06‐2018 11:59:43 25‐06‐2018 12:54:27 0:54 0.00015 MUs 848 BLOCK C‐SHASTRI PARK YVR 157 400 KVA UNPLANNED 26‐06‐2018 12:57:50 26‐06‐2018 13:40:33 0:42 0.00022167 MUs 849 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 878 630 KVA UNPLANNED 26‐06‐2018 14:45:19 26‐06‐2018 15:40:00 0:54 0.00015 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SHASTRI PARK, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL 850 NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B YVR 700 990 KVA UNPLANNED 27‐06‐2018 11:47:51 27‐06‐2018 12:32:21 0:44 0.00012222 MUs NEW USMANPUR‐NEW KATWARA, MCD COLONY‐NEW KATWARA, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, 851 JAG JEEVAN NAGAR‐NEW KATWARA GHONDA YVR 713 990 KVA UNPLANNED 27‐06‐2018 18:05:04 27‐06‐2018 19:04:00 0:58 0.00016111 MUs 852 LIG/MIG RES/NON COMM AREA‐SHASTRI PARK YVR 882 630 KVA UNPLANNED 27‐06‐2018 23:11:40 27‐06‐2018 23:38:23 0:26 0.00007222 MUs 853 ZERO PUSTA‐USMAN PUR YVR 161 400 KVA UNPLANNED 30‐06‐2018 11:01:48 30‐06‐2018 12:09:23 1:7 0.00018611 MUs 854 VIJAY PARK‐YAMUNA VIHAR, BLOCK C11‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 1795 990 KVA UNPLANNED 12‐06‐2018 10:42:49 12‐06‐2018 11:11:00 0:28 0.00007778 MUs BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, 855 MAUJ PUR COMPLEX 1, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR YVR 1311 990 KVA UNPLANNED 12‐06‐2018 17:02:02 12‐06‐2018 18:00:53 0:58 0.00048333 MUs 856 MAUJ PUR COMPLEX 1, VIJAY PARK‐YAMUNA VIHAR YVR 1292 990 KVA UNPLANNED 12‐06‐2018 18:21:53 12‐06‐2018 19:11:53 0:49 0.00013611 MUs 857 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 14‐06‐2018 13:14:15 14‐06‐2018 13:50:25 0:36 0.0001 MUs

ADARSH MOHALLA‐MAUJPUR, JAGJEET NAGAR‐GHONDA, BALI MARAN‐BARA DARI, TOWN HILL‐KATRA NEEL, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW KATWARA, KATRA NAWAB‐CHANDNI 858 CHOWK, JAG JEEVAN NAGAR‐NEW KATWARA‐SHASTRI PARK, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 3100 990 KVA UNPLANNED 14‐06‐2018 15:24:29 14‐06‐2018 17:55:00 2:30 0.00041667 MUs 859 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 14‐06‐2018 15:33:59 14‐06‐2018 16:32:00 0:58 0.00016111 MUs 860 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 14‐06‐2018 17:07:00 14‐06‐2018 19:00:00 1:53 0.00037667 MUs

BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐ 861 SONIA VIHAR, BLOCK D‐BHAJANPURA, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK D‐BHAJANPURA YVR 1692 630 KVA UNPLANNED 14‐06‐2018 17:30:00 14‐06‐2018 18:22:35 0:52 0.00021667 MUs 862 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 14‐06‐2018 19:59:27 14‐06‐2018 23:42:36 3:43 0.00061944 MUs TOWN HILL‐KATRA NEEL, MAUJ PUR COMPLEX 1, KATRA NAWAB‐CHANDNI CHOWK, JAG JEEVAN NAGAR‐NEW KATWARA‐ 863 SHASTRI PARK, BALI MARAN‐BARA DARI YVR 94 990 KVA UNPLANNED 14‐06‐2018 21:30:00 14‐06‐2018 23:20:18 1:50 0.00036667 MUs TOWN HILL‐KATRA NEEL, MAUJ PUR COMPLEX 1, KATRA NAWAB‐CHANDNI CHOWK, JAG JEEVAN NAGAR‐NEW KATWARA‐ 864 SHASTRI PARK, BALI MARAN‐BARA DARI YVR 94 990 KVA UNPLANNED 14‐06‐2018 23:59:57 15‐06‐2018 00:19:27 0:19 0.00005278 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 865 KACHI COLONY‐JAGJEET NAGAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA YVR 261 630 KVA UNPLANNED 15‐06‐2018 00:48:35 15‐06‐2018 01:28:02 0:39 0.00010833 MUs

866 BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 569 990 KVA UNPLANNED 15‐06‐2018 01:01:14 15‐06‐2018 02:00:46 0:59 0.00016389 MUs 867 MAUJ PUR COMPLEX 1, VIJAY PARK‐YAMUNA VIHAR YVR 1292 990 KVA UNPLANNED 15‐06‐2018 01:57:40 15‐06‐2018 02:15:21 0:17 0.00004722 MUs

868 BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK C12‐YAMUNA VIHAR YVR 569 990 KVA UNPLANNED 15‐06‐2018 02:52:18 15‐06‐2018 10:15:43 7:23 0.00123056 MUs 869 BLOCK C4‐YAMUNA VIHAR YVR 911 990 KVA UNPLANNED 15‐06‐2018 07:01:07 15‐06‐2018 08:27:55 1:26 0.00023889 MUs MAUJ PUR COMPLEX 1, BLOCK B‐DURGA PURI, JAFFRABAD‐MAUJ PUR, BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI, 870 BLOCK B‐SAKDARPUR YVR 1757 1980 KVA UNPLANNED 15‐06‐2018 09:24:27 15‐06‐2018 10:29:41 1:5 0.00036111 MUs 871 VISHWAS NAGAR EXTN.‐SHAHDARA YVR 47 630 KVA UNPLANNED 15‐06‐2018 10:48:28 15‐06‐2018 11:35:00 0:46 0.00012778 MUs

BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐ 872 SONIA VIHAR, BLOCK D‐BHAJANPURA, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK D‐BHAJANPURA YVR 1692 630 KVA UNPLANNED 15‐06‐2018 16:50:18 15‐06‐2018 17:45:00 0:54 0.00015 MUs 873 BLOCK C4‐YAMUNA VIHAR YVR 911 990 KVA UNPLANNED 15‐06‐2018 18:29:54 15‐06‐2018 19:12:52 0:42 0.00011667 MUs

BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐ 874 SONIA VIHAR, BLOCK D‐BHAJANPURA, BLOCK N‐NEW SILAMPURI PHASE I, BLOCK D‐BHAJANPURA YVR 1692 630 KVA UNPLANNED 16‐06‐2018 15:24:03 16‐06‐2018 16:01:58 0:37 0.00020556 MUs 875 JAFFRABAD‐MAUJ PUR YVR 583 990 KVA UNPLANNED 19‐06‐2018 14:54:30 19‐06‐2018 15:25:26 0:30 0.00008333 MUs 876 MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR YVR 452 990 KVA UNPLANNED 19‐06‐2018 23:55:43 20‐06‐2018 00:29:16 0:33 0.00018333 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAYAGAON‐NEW KATWARA, BLOCK B‐SUBHASH MOHALLA, JAGJEET 877 NAGAR‐GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 1867 990 KVA UNPLANNED 20‐06‐2018 11:11:57 20‐06‐2018 12:24:39 1:12 0.0002 MUs BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C9‐YAMUNA VIHAR, BLOCK B5‐YAMUNA PUR (GONDA) 878 BLOCK B, BLOCK C1‐YAMUNA VIHAR YVR 197 630 KVA UNPLANNED 20‐06‐2018 12:17:10 20‐06‐2018 13:14:00 0:56 0.00015556 MUs 879 JAFFRABAD‐MAUJ PUR YVR 583 990 KVA UNPLANNED 20‐06‐2018 16:23:53 20‐06‐2018 16:41:08 0:17 0.00004722 MUs 880 VIJAY PARK‐YAMUNA VIHAR YVR 649 990 KVA UNPLANNED 20‐06‐2018 16:37:01 20‐06‐2018 17:07:04 0:30 0.00008333 MUs

GHONDA PATTI, BLOCK 36‐HIMMATPURI, NEW JAFFRABAD‐GORAKH PARK, PKT 3‐PHASE I, BLOCK B‐GARI MANDU, BLOCK 881 35‐HIMMATPURI, JAFFRABAD‐MAUJ PUR, BLOCK H‐GHONDA PATTI, BLOCK D‐BHAJANPURA YVR 1144 990 KVA UNPLANNED 20‐06‐2018 17:57:00 20‐06‐2018 18:45:05 0:48 0.00032 MUs

BLOCK C2‐YAMUNA VIHAR, JAGJEET NAGAR‐GHONDA, BLOCK B2‐YAMUNA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐ 882 NEW KATWARA, JAFFRABAD‐MAUJ PUR, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA VIHAR YVR 261 630 KVA UNPLANNED 21‐06‐2018 00:31:59 21‐06‐2018 01:02:09 0:30 0.00008333 MUs BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, NORTH GHONDA, BLOCK B‐SUBHASH MOHALLA, BHAJANPURA‐ DAYALPUR, TANKI ROAD‐C‐BLOCK BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK C‐GHONDA, SUBHASH VIHAR‐ 883 YAMUNA VIHAR YVR 791 400 KVA UNPLANNED 22‐06‐2018 01:43:35 22‐06‐2018 02:25:20 0:41 0.00011389 MUs

884 BLOCK B‐DURGA PURI, JAFFRABAD‐MAUJ PUR, BLOCK A‐CHANDRA LOK, BLOCK M‐DURGA PURI, BLOCK B‐SAKDARPUR YVR 1304 990 KVA UNPLANNED 22‐06‐2018 12:54:39 22‐06‐2018 13:35:40 0:41 0.00034167 MUs

885 BLOCK C8‐YAMUNA VIHAR, BLOCK C10 MAHANAGAR STAFF UNION‐COMMUNITY CENTRE YAMUNA VIHAR BLOCK C YVR 441 990 KVA UNPLANNED 22‐06‐2018 17:04:40 22‐06‐2018 18:04:37 0:59 0.00016389 MUs MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, ADARSH MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, BABARPUR 886 WEST‐BABAR PUR, VIJAY PARK‐YAMUNA VIHAR YVR 1388 990 KVA UNPLANNED 22‐06‐2018 22:49:34 22‐06‐2018 23:40:00 0:50 0.00013889 MUs BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C7‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK 887 C12‐YAMUNA VIHAR YVR 908 990 KVA UNPLANNED 23‐06‐2018 02:52:22 23‐06‐2018 03:14:07 0:21 0.00005833 MUs BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, BLOCK C3‐YAMUNA VIHAR, BLOCK B2‐YAMUNA VIHAR, BLOCK C7‐ 888 YAMUNA VIHAR, BLOCK C9‐YAMUNA VIHAR, BLOCK C1‐YAMUNA VIHAR YVR 1602 630 KVA UNPLANNED 23‐06‐2018 03:28:06 23‐06‐2018 04:08:50 0:40 0.00011111 MUs NORTH GHONDA, BLOCK E‐SUBHASH MOHALLA, WEST GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK 889 B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA YVR 2194 630 KVA UNPLANNED 23‐06‐2018 10:14:46 23‐06‐2018 10:58:10 0:43 0.00023889 MUs 890 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR YVR 1388 990 KVA UNPLANNED 23‐06‐2018 11:01:20 23‐06‐2018 11:34:05 0:32 0.00017778 MUs 891 NORTH GHONDA, BLOCK B‐SUBHASH MOHALLA, BLOCK C‐GHONDA YVR 791 400 KVA UNPLANNED 23‐06‐2018 12:56:53 23‐06‐2018 13:50:00 0:53 0.00014722 MUs MAUJ PUR COMPLEX 1, NORTH GHONDA, JAFFRABAD‐MAUJ PUR, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE 892 YAMUNA VIHAR, BLOCK B‐SUBHASH MOHALLA, VIJAY PARK‐YAMUNA VIHAR YVR 427 990 KVA UNPLANNED 23‐06‐2018 13:45:00 23‐06‐2018 14:13:02 0:28 0.00023333 MUs ADARSH MOHALLA‐MAUJPUR, BALI MARAN‐BARA DARI, TOWN HILL‐KATRA NEEL, MAUJ PUR COMPLEX 1, JAFFRABAD‐ MAUJ PUR, BLOCK Z‐WELCOME COLONY, BLOCK J‐KARTAR NAGAR, KATRA NAWAB‐CHANDNI CHOWK, JAG JEEVAN 893 NAGAR‐NEW KATWARA‐SHASTRI PARK, VIJAY PARK‐YAMUNA VIHAR YVR 1680 1980 KVA UNPLANNED 23‐06‐2018 15:50:40 23‐06‐2018 16:50:00 0:59 0.00032778 MUs NORTH GHONDA, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, MAUJ PUR COMPLEX 1, BLOCK B‐ SUBHASH MOHALLA, BLOCK C9‐YAMUNA VIHAR, VIJAY PARK‐YAMUNA VIHAR, SUBHASH VIHAR‐YAMUNA VIHAR, BLOCK 894 C1‐YAMUNA VIHAR YVR 1535 990 KVA UNPLANNED 23‐06‐2018 21:16:08 23‐06‐2018 21:51:33 0:35 0.00018472 MUs ADARSH MOHALLA‐MAUJPUR, NORTH GHONDA, MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ 895 PUR, BLOCK E‐SUBHASH MOHALLA, VIJAY PARK‐YAMUNA VIHAR YVR 1388 990 KVA UNPLANNED 23‐06‐2018 22:41:45 23‐06‐2018 23:35:00 0:53 0.00014722 MUs MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, ADARSH MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐ 896 YAMUNA VIHAR YVR 1388 990 KVA UNPLANNED 24‐06‐2018 03:02:25 24‐06‐2018 03:59:07 0:56 0.00015556 MUs 897 MAUJ PUR COMPLEX 1, JAFFRABAD‐MAUJ PUR YVR 884 990 KVA UNPLANNED 24‐06‐2018 11:53:48 24‐06‐2018 12:27:16 0:33 0.00017417 MUs 898 BLOCK B4‐YAMUNA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK E‐SUBHASH MOHALLA YVR 1223 990 KVA UNPLANNED 24‐06‐2018 12:05:59 24‐06‐2018 12:41:35 0:35 0.00020417 MUs 899 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 2333 990 KVA UNPLANNED 24‐06‐2018 19:16:45 24‐06‐2018 19:50:16 0:33 0.00017417 MUs BLOCK C2‐YAMUNA VIHAR, BLOCK C‐BHAJANPURA, BLOCK C3‐YAMUNA VIHAR, BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐ 900 YAMUNA VIHAR YVR 24 400 KVA UNPLANNED 25‐06‐2018 00:42:00 25‐06‐2018 01:40:00 0:58 0.00033833 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐ 901 GHONDA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 1867 990 KVA UNPLANNED 25‐06‐2018 02:23:13 25‐06‐2018 03:40:00 1:16 0.00044333 MUs 902 MAUJ PUR COMPLEX 1 YVR 1646 990 KVA UNPLANNED 25‐06‐2018 10:21:42 25‐06‐2018 11:21:37 0:59 0.00016389 MUs 903 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR YVR 1388 990 KVA UNPLANNED 25‐06‐2018 11:03:24 25‐06‐2018 12:02:07 0:58 0.00016111 MUs 904 MAUJ PUR COMPLEX 1, JAFFRABAD‐MAUJ PUR YVR 452 990 KVA UNPLANNED 25‐06‐2018 23:00:28 25‐06‐2018 23:55:00 0:54 0.00015 MUs BLOCK C8‐YAMUNA VIHAR, BLOCK C2‐YAMUNA VIHAR, JAFFRABAD‐MAUJ PUR, BLOCK C9‐YAMUNA VIHAR, BLOCK C1‐ 905 YAMUNA VIHAR YVR 1774 630 KVA UNPLANNED 26‐06‐2018 14:35:37 26‐06‐2018 15:28:20 0:52 0.00014444 MUs 906 MAUJ PUR COMPLEX 1, ARJUN MOHALLA‐MAUJPUR, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA VIHAR YVR 3511 1980 KVA UNPLANNED 26‐06‐2018 15:48:55 26‐06‐2018 16:34:53 0:45 0.000275 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, KACHI COLONY‐ 907 JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 1869 990 KVA UNPLANNED 27‐06‐2018 13:15:51 27‐06‐2018 14:05:35 0:49 0.00031306 MUs BLOCK C3‐YAMUNA VIHAR, BLOCK C5‐YAMUNA VIHAR, BLOCK C6‐YAMUNA VIHAR, BLOCK C4‐YAMUNA VIHAR, BLOCK 908 C12‐YAMUNA VIHAR YVR 756 990 KVA UNPLANNED 28‐06‐2018 07:52:34 28‐06‐2018 08:32:12 0:39 0.00010833 MUs MAUJ PUR COMPLEX 1, ADARSH MOHALLA‐MAUJPUR, NORTH GHONDA, JAFFRABAD‐MAUJ PUR, VIJAY PARK‐YAMUNA 909 VIHAR YVR 452 990 KVA UNPLANNED 28‐06‐2018 18:01:50 28‐06‐2018 18:38:15 0:36 0.0001 MUs

JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW 910 KATWARA, TANKI ROAD‐C‐BLOCK BHAJANPURA, KACHI COLONY‐JAGJEET NAGAR, BLOCK F‐BRAHM PURI YVR 1869 990 KVA UNPLANNED 28‐06‐2018 18:04:51 28‐06‐2018 18:38:29 0:33 0.00009167 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage ADARSH MOHALLA‐MAUJPUR, JAGJEET NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NAYAGAON‐NEW KATWARA, JAFFRABAD‐MAUJ PUR, KACHI COLONY‐JAGJEET NAGAR, VIJAY PARK‐YAMUNA 911 VIHAR, BLOCK F‐BRAHM PURI YVR 1869 990 KVA UNPLANNED 30‐06‐2018 00:30:00 30‐06‐2018 01:05:57 0:35 0.00009722 MUs 912 BLOCK D‐KRISHNA NAGAR, BLOCK A‐KRISHNA NAGAR, WEST AZAD NAGAR KRN 887 990 KVA UNPLANNED 19‐06‐2018 00:10:00 19‐06‐2018 00:12:00 0:2 0 MUs LIG/MIG RES/NON COMM AREA‐RAJIV NAGAR, BLOCK B‐MANUJPUR, BLOCK C‐BHAJANPURA, BSES 66 KV GRID S/STATION‐COMMUNITY CENTRE YAMUNA VIHAR, ARVIND NAGAR‐GHONDA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, SANT NIRANKARI BHAVAN‐GANGA VIHAR KWN, BLOCK B‐GARI MANDU, DDA POLICE QTRS.‐AHATA KEDARA, BLOCK D‐BHAJANPURA, BLOCK B‐SADAR BAZAR ‐ RAM NAGAR, BLOCK N‐ NEW SILAMPURI PHASE I, BLOCK C‐BHAJANPURA, BLOCK A‐GARI MANDU, BLOCK A‐GHONDA PATTI, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, BLOCK H‐GHONDA PATTI, TANKI ROAD‐C‐BLOCK BHAJANPURA, GHONDA PATTI CHAUHAN, JHANDEWALAN FATTED FACTORY COMPLEX, LIG/MIG RES/NON COMM AREA‐SHRI RAM COLONY, BLOCK V‐GHONDA PATTI CHAUHAN, YAMUNA VIHAR YAMUNA FLOOD PLAINS, DR. AMBEDKAR STADIUM‐FEROJ SHAH KOTLA STADIUM, PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA, GAUTAM VIHAR‐GHONDA, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK J‐KARTAR NAGAR, BLOCK C‐GHONDA PATTI, BLOCK A‐JHANDEWALAN, GHONDA PATTI, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, DARYA GANJ, BLOCK E‐SUBHASH MOHALLA, JAFFRABAD‐MAUJ PUR, BLOCK H‐BRAHM PURI, BLOCK D‐BHAJANPURA, 913 BLOCK E‐SUBHASH MOHALLA, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 11652 5460 KVA UNPLANNED 22‐06‐2018 15:10:00 22‐06‐2018 15:15:00 0:5 0 MUs 914 BLOCK CN‐MANGALAM VIHAR KWN 277 0 KVA UNPLANNED 26‐06‐2018 10:06:00 26‐06‐2018 10:17:00 0:11 0 MUs

BLOCK C‐KHAJURI KHAS, BLOCK C‐SHERPUR, CLOCK C‐BIHARIPUR, BLOCK A‐KHAJURI KHAS, PKT A‐BLOCK B, BLOCK B‐ 915 KHAJURI KHAS, BLOCK C‐BRIJ PURI, BLOCK C‐KHAJURI KHAS, LIG/MIG RES/NON COMM AREA‐BLOCK B KWN 1454 2880 KVA UNPLANNED 20‐06‐2018 17:57:00 20‐06‐2018 18:52:00 0:54 0.0006 MUs 916 INDER PRASTHA APARTMENT‐MOTHER DAIRY LNR 67 630 KVA UNPLANNED 24‐06‐2018 14:37:00 24‐06‐2018 14:40:00 0:3 0 MUs 917 BLOCK 26‐HIMMATPURI, BLOCK 36‐HIMMATPURI MVR 109 990 KVA UNPLANNED 26‐06‐2018 09:30:00 26‐06‐2018 09:52:11 0:22 0.00000611 MUs BLOCK H‐SEWA DHAM, BLOCK D‐HARSH VIHAR, BLOCK A‐BANK COLONY, BLOCK B‐SEWA DHAM, BLOCK D‐HARIJAN BASTI EAST EXTN., NEW MANDOLI INDUSTRIAL AREA, BLOCK A‐MANDOLI VILLAGE, BLOCK C‐HARSH VIHAR, HARSH VIHAR SUB 918 STATION‐POLICE FARM NNG 0 400 KVA UNPLANNED 12‐06‐2018 12:20:00 12‐06‐2018 12:49:04 0:29 0.00032222 MUs

MCD SCHOOL‐BLOCK C3, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐NATHU PURA, LAKSHMI NAGAR BLOCK J&K, BLOCK J & K‐NARAYAN NAGAR, BLOCK D‐ASHOK NAGAR, BLOCK E‐ASHOK NAGAR, RAMESH PARK‐NARAYAN NAGAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐NATHU PURA, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK A‐ BHARTIYA BODH SABHA‐HARDEV PURI, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C‐LALITA PARK, BHAGAT NAGAR‐DAYALPUR, BLOCK B‐ ASHOK NAGAR, BLOCK M‐SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK 63‐AJMAL KHAN PARK, PKT R‐BLOCK D, GEETA COLONY, BLOCK E‐NATHU PURA, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK A‐NATHU COLONY, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, OPD. DR. N.C. JOSHI MEMORIAL HOSPITAL‐JOSHI ROAD, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐ 919 BLOCK B NNG 9491 2610 KVA UNPLANNED 25‐06‐2018 05:45:00 25‐06‐2018 06:30:43 0:45 0 MUs BLOCK A‐ANUP VIHAR, BLOCK A‐UTTARANCHAL COLONY, BLOCK B‐UTTARANCHAL COLONY, BLOCK E‐UTTARANCHAL 920 COLONY NNG 1360 0 KVA UNPLANNED 19‐06‐2018 22:30:00 19‐06‐2018 23:06:00 0:36 0.0001 MUs 921 INDUSTRIAL AREA‐ANAND PARBHAT PNR 0 990 KVA UNPLANNED 27‐06‐2018 03:20:00 27‐06‐2018 03:45:20 0:25 0 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐SHIV VIHAR, BLOCK B‐MAYUR VIHAR PHASE III, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, 922 BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B VSE 438 630 KVA UNPLANNED 21‐06‐2018 10:02:11 21‐06‐2018 10:42:37 0:40 0.00001111 MUs 923 PKT A1‐MAYUR VIHAR PHASE III VSE 356 630 KVA UNPLANNED 21‐06‐2018 14:44:52 21‐06‐2018 15:26:59 0:42 0.00001167 MUs 924 BLOCK B‐AMBEDKAR AWAS KALYAN SAMITI, SEC D‐MAYUR VIHAR PHASE III VSE 236 990 KVA UNPLANNED 22‐06‐2018 14:15:00 22‐06‐2018 14:55:01 0:40 0 MUs BLOCK C1‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, BLOCK D‐NEW ASHOK NAGAR, BLOCK A‐NEW ASHOK 925 NAGAR VSE 1157 990 KVA UNPLANNED 29‐06‐2018 10:42:00 29‐06‐2018 11:22:57 0:40 0.00008889 MUs

BLOCK A‐SILAMPUR COLONY, BLOCK J‐SILAMPUR COLONY, JAFFRABAD‐MAUJ PUR, BLOCK C‐SHASTRI PARK, JHUGI‐NEW SILAMPURI PHASE I, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK N‐NEW SILAMPURI PHASE I, MANTOLA 926 MOHALLA‐PAHAR GANJ, ZERO PUSTA‐USMAN PUR, PHASE I‐MAYUR VIHAR, BLOCK C‐NEW SILAMPURI PHASE II YVR 3165 6250 KVA UNPLANNED 29‐06‐2018 09:00:00 29‐06‐2018 09:28:33 0:28 0 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, MAUJ PUR COMPLEX 1, NORTH GHONDA, GHONDA PATTI CHAUHAN, 927 BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 2556 630 KVA UNPLANNED 28‐06‐2018 13:22:43 28‐06‐2018 14:07:11 0:44 0.00036667 MUs 928 GROUP I FLATS‐JANTA FLATS‐PKT A DGN 130 630 KVA PLANNED 15‐06‐2018 09:00:00 15‐06‐2018 15:10:00 6:10 0.00154167 MUs 929 INDIRA GANDHI STADIUM‐AJMERI GATE DRG 0 0 KVA PLANNED 09‐06‐2018 13:25:00 09‐06‐2018 15:18:36 1:53 0.00031389 MUs 930 CHRISTAN COLONY‐KHABAS PURA, CHANDANI MAHAL‐CHANDNI CHOWK DRG 535 990 KVA PLANNED 10‐06‐2018 12:06:00 10‐06‐2018 12:30:44 0:24 0.00006667 MUs

PATODI HOUSE‐CHANDNI CHOWK, BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK M‐ SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, CHANDANI MAHAL‐CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P 931 BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B DRG 2921 990 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 11:56:59 2:50 0 MUs 932 GOVIND BALLABH PANT HASPITAL‐LN JPN COLONY DRG 0 0 KVA PLANNED 02‐06‐2018 12:06:00 02‐06‐2018 13:49:50 1:43 0 MUs 933 BLOCK D‐JHILMIL COLONY BLOCK D, BLOCK E‐JHILMIL COLONY BLOCK E JLM 401 630 KVA PLANNED 04‐06‐2018 10:06:00 04‐06‐2018 11:43:46 1:37 0.00026944 MUs 934 BLOCK 9‐GANDHI NAGAR, SHYAM COLONY‐KAILASH NAGAR SOUTH KRN 173 990 KVA PLANNED 19‐06‐2018 09:00:00 19‐06‐2018 10:45:41 1:45 0.00072917 MUs 935 OLD SEELAMPUR KRN 326 630 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 09:52:03 0:52 0.00011556 MUs BLOCK K‐JAGATPURI, YAMUNA RIVER‐KRISHNA NAGAR YAMUNA FLOOD PLAINS, SHANKAR NAGAR EXTN‐AZAD NAGAR, 936 BLOCK B‐KRISHNA NAGAR BLOCK B KRN 0 630 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 12:55:00 3:55 0.00019583 MUs 937 BLOCK B‐MAHALAXMI ENCLAVE, BLOCK C‐GOVIND VIHAR, BLOCK A‐BABU NAGAR KWN 86 990 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 12:13:00 3:13 0.00117944 MUs 938 BLOCK B‐GANGA VIHAR KWN 259 630 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 11:16:18 2:16 0.00113333 MUs 939 BLOCK D‐OLD MUSTAFABAD, BLOCK H‐OLD MUSTAFABAD KWN 173 630 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 10:46:04 1:46 0.00058889 MUs 940 BLOCK C‐PATEL VIHAR KWN 130 0 KVA PLANNED 18‐06‐2018 09:00:00 18‐06‐2018 11:59:00 2:59 0.00074583 MUs BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK B‐BHAGAT SINGH COLONY, BLOCK B‐HARIJAN BASTI, BLOCK K‐KARAWAL 941 NAGAR (DEHROTI) KWN 492 630 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 11:15:10 2:15 0.001125 MUs 942 BLOCK B‐KARAWAL NAGAR (DEHROTI), BLOCK K‐WEST KARAWAL NAGAR KWN 259 990 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 11:47:42 2:47 0.00139167 MUs 943 MUSTAFABAD‐MUNGA NAGAR KWN 0 0 KVA PLANNED 03‐06‐2018 14:06:00 03‐06‐2018 14:55:46 0:49 0.00027222 MUs YAMUNA FLOOD PLAINS‐CHAUHAN PATTI, LIG/MIG RES/NON COMM AREA‐VIJAY VIHAR, LIG/MIG RES/NON COMM AREA 944 SABHEPUR KWN 86 630 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 12:05:00 3:5 0.00051389 MUs 945 BLOCK D‐NEHRU VIHAR, BLOCK Z‐NEHRU VIHAR, BLOCK M‐NEHRU VIHAR, BLOCK E‐NEHRU VIHAR KWN 173 630 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 10:12:38 1:12 0.0004 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 946 BLOCK E‐GANESH NAGAR, BLOCK B‐GANESH NAGAR LNR 173 990 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 14:25:32 5:25 0.00180556 MUs

PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BANK ENCLAVE‐ LAKSHMI NAGAR, BLOCK J‐VISHWAKARMA PARK, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, KRISHAN KUNJ‐LAKSHMI NAGAR, LIG/MIG RES/NON COMM AREA‐ SONIA VIHAR, GURU RAMDAS NAGAR‐LAKSHMI NAGAR, BLOCK F‐VISHWAKARMA PARK, BLOCK M‐SHIV VIHAR, BLOCK B‐ KUNDAN NAGAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BHAJANPURA‐DAYALPUR, PKT R‐BLOCK D, GEETA COLONY, KUNDAN NAGAR‐LAKSHMI NAGAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK F‐SHIV VIHAR, BLOCK A‐GURU RAMDAS 947 NAGAR, JHILMIL INDUSTRIAL AREA‐JHILMIL COLONY, PKT A‐BLOCK B LNR 7174 2970 KVA PLANNED 08‐06‐2018 10:06:00 08‐06‐2018 16:50:00 6:44 0 MUs YAMUNA FLOOD PLAINS‐LAXMI NAGAR YAMUNA FLOOD PLAINS, BLOCK C‐GURU ANGAD NAGAR WEST, BLOCK K‐JAGAT RAM PARK, BLOCK WA‐SHAKARPUR KHAS, BLOCK B‐GURU ANGAD NAGAR WEST, BLOCK F‐LALITA PARK, BLOCK A‐LALITA PARK, EAST END ENCLAVE‐LAKSHMI NAGAR, BLOCK C‐LALITA PARK, BLOCK J & K‐NARAYAN NAGAR, KUNDAN NAGAR‐ 948 LAKSHMI NAGAR, BLOCK F‐GURU ANGAD NAGAR WEST LNR 173 990 KVA PLANNED 14‐06‐2018 09:06:00 14‐06‐2018 11:57:15 2:51 0.00095 MUs 949 SHANKAR VIHAR‐SWASTHYA VIHAR LNR 86 990 KVA PLANNED 18‐06‐2018 09:35:00 18‐06‐2018 12:24:55 2:49 0.00046944 MUs 950 BLOCK F‐PREET VIHAR, BLOCK G‐PREET VIHAR LNR 86 990 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 12:49:00 3:49 0.00063611 MUs 951 BLOCK C‐PREET VIHAR, BHARTI COLONY‐NIRMAN VIHAR LNR 173 990 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 12:54:51 3:54 0.0013 MUs

952 BLOCK H‐SEWA DHAM, BLOCK D‐HARSH VIHAR, BLOCK A‐HARSH VIHAR, BLOCK C‐HARSH VIHAR, BLOCK B‐HARSH VIHAR NNG 259 0 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 12:30:00 3:30 0.00175 MUs 953 BLOCK C‐SUNDER NAGRI NNG, BLOCK B‐HARSH VIHAR, BLOCK H‐PREM NAGAR NNG NNG 86 990 KVA PLANNED 13‐06‐2018 10:00:00 13‐06‐2018 11:57:00 1:57 0.000325 MUs

BLOCK A‐EAST GOKUL PURI, BLOCK A‐UTTARANCHAL COLONY, SULOCHANA APPARTMENT‐VASUNDHARA ENCLAVE VSE, 954 BLOCK B‐UTTARANCHAL COLONY, BLOCK A‐MEET NAGAR, BLOCK E‐MEET NAGAR, BLOCK E‐UTTARANCHAL COLONY NNG 90 400 KVA PLANNED 01‐06‐2018 09:00:00 01‐06‐2018 12:09:07 3:9 0.00105 MUs

955 BLOCK A‐KABIR NAGAR, BLOCK C‐KABIR NAGAR, BABARPUR WEST‐BABAR PUR NNG, BABARPUR EXTN.‐BABAR PUR NNG 4716 5260 KVA PLANNED 18‐06‐2018 10:30:00 18‐06‐2018 12:12:00 1:42 0 MUs 956 BABA DA DARGA‐KARDAMPURI NNG 86 990 KVA PLANNED 20‐06‐2018 10:30:00 20‐06‐2018 12:00:00 1:30 0.00025 MUs 957 JYOTI COLONY‐BALBIR NAGAR NNG 86 400 KVA PLANNED 20‐06‐2018 10:30:00 20‐06‐2018 11:06:00 0:36 0.0001 MUs 958 BALBIR NAGAR EXTN.‐SILAMPUR, JYOTI COLONY‐BALBIR NAGAR NNG 354 400 KVA PLANNED 14‐06‐2018 11:40:00 14‐06‐2018 12:02:12 0:22 0.00009167 MUs 959 CHOWK NAI BASTI‐SADAR BAZAR, PHARI DHIRAJ‐SADAR BAZAR, SADAR BAZAR B G ROAD PHG 259 990 KVA PLANNED 07‐06‐2018 09:00:00 07‐06‐2018 11:56:00 2:56 0.00097778 MUs 960 SADAR BAZAR B G ROAD PHG 259 990 KVA PLANNED 18‐06‐2018 09:00:00 18‐06‐2018 13:00:00 4:0 0.00133333 MUs 961 FYAZ GANJ‐NAWAB GANJ, PHARI DHIRAJ‐SADAR BAZAR PHG 65 990 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 12:00:00 2:54 0.00024167 MUs 962 NAYA MOHALLA‐KISHAN GANJ RS, SIMLA MANDI GOODTRAN‐RUI MANDI, SADAR BAZAR B G ROAD PHG 15 990 KVA PLANNED 13‐06‐2018 10:06:00 13‐06‐2018 11:47:00 1:41 0.00014028 MUs 963 HATHI KHANA‐NAWAB GANJ, SADAR BAZAR B G ROAD PHG 7 990 KVA PLANNED 15‐06‐2018 10:06:00 15‐06‐2018 11:59:41 1:53 0.00015694 MUs 964 FYAZ GANJ‐NAWAB GANJ, NAWAB GANJ‐SADAR BAZAR, SADAR BAZAR ‐ RAM NAGAR PHG 259 990 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 11:48:27 2:48 0.00093333 MUs 965 NAWAB GANJ‐SADAR BAZAR PHG 259 400 KVA PLANNED 18‐06‐2018 09:00:00 18‐06‐2018 11:55:59 2:55 0.00097222 MUs 966 MANTOLA MOHALLA‐PAHAR GANJ, AMRIT KAUR MARKET‐PAHAR GANJ PHG 259 630 KVA PLANNED 08‐06‐2018 09:00:00 08‐06‐2018 11:15:16 2:15 0.00075 MUs 967 CHUNA MANDI‐PAHAR GANJ, MSC‐ARAM NAGAR, MANTOLA MOHALLA‐PAHAR GANJ PHG 259 990 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 11:44:24 2:44 0.00091111 MUs 968 PANCHKUIAN ROAD RAILWAY COLONY‐PAHAR GANJ PHG 65 990 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 11:44:27 2:38 0.00021944 MUs 969 MANTOLA MOHALLA‐PAHAR GANJ, MULTANI DHANDA‐SADAR BAZAR PHG 259 990 KVA PLANNED 19‐06‐2018 09:00:00 19‐06‐2018 11:02:44 2:2 0.00067778 MUs 970 MANTOLA MOHALLA‐PAHAR GANJ PHG 259 990 KVA PLANNED 19‐06‐2018 09:00:00 19‐06‐2018 12:00:38 3:0 0.001 MUs 971 ARAM NAGAR‐SADAR BAZAR PHG 65 630 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 11:58:36 2:52 0.00023889 MUs 972 BLOCK 24‐WEST PATEL NAGAR, BLOCK 16‐WEST PATEL NAGAR, BLOCK 30‐WEST PATEL NAGAR PNR 517 6570 KVA PLANNED 18‐06‐2018 12:23:00 18‐06‐2018 14:10:00 1:47 0 MUs 973 BLOCK H‐WEST PATEL NAGAR, BLOCK V‐WEST PATEL NAGAR PNR 155 990 KVA PLANNED 13‐06‐2018 09:06:00 13‐06‐2018 10:32:38 1:26 0.00028667 MUs 974 THAKKAR BAPA NAGAR‐BLOCK 16 PNR 259 990 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 10:19:53 1:19 0.00043889 MUs 975 BLOCK_39A‐NAIWALA, BLOCK_49A‐NAIWALA SRD 259 990 KVA PLANNED 09‐06‐2018 09:00:00 09‐06‐2018 10:20:00 1:19 0.00087778 MUs

BLOCK T‐ASHOKA PAHARI, BLOCK 25B‐AJMAL KHAN PARK, BLOCK_48D‐NAIWALA, BLOCK 8‐KAROL BAGH WEST EXTENSION AREA, BLOCK_46‐BEADON PURA, BLOCK_34P‐KRISHNA NAGAR, BLOCK_27F‐NAIWALA, RAMA KRISHNA MISSION FREE T.B. CLINIC‐BLOCK 18, BLOCK_49A‐NAIWALA, BLOCK 51‐AJMAL KHAN PARK PNR, BLOCK_39‐NAIWALA, BLOCK_26I‐BEADON PURA, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK_24N‐BEADON PURA, BLOCK 52‐AJMAL KHAN PARK, LIBERTY CINEMA‐KAROL BAGH PNR, AJMAL KHAN PARK SRD‐KAROL BAGH SRD, BLOCK 29‐NAIWALA, BLOCK_47‐BEADON PURA, BLOCK 57‐AJMAL KHAN PARK, BLOCK 59‐KAROL BAGH PNR, BLOCK_37J‐BEADON PURA, BLOCK 21B‐KAROL BAGH PNR, BLOCK_45‐KRISHNA NAGAR, MOHALLA SUBHASH NAGAR‐NAIWALA, BLOCK 23B‐KAROL BAGH PNR, BLOCK_28C‐NAIWALA, BLOCK 50‐AJMAL KHAN PARK, BLOCK_35M‐BEADON PURA, BLOCK_14A‐KAROL BAGH WEST EXTENSION AREA, BLOCK_39A‐NAIWALA, BLOCK 51‐AJMAL KHAN PARK SRD, BLOCK_15‐KAROL BAGH WEST 976 EXTENSION AREA SRD 6613 8550 KVA PLANNED 04‐06‐2018 09:30:00 04‐06‐2018 10:45:00 1:15 0 MUs 977 KAROL BAGH TERMINAL SLUM‐JHANDEWALAN, BLOCK_35M‐BEADON PURA SRD 259 990 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 11:41:57 2:41 0.00089444 MUs 978 BLOCK_24N‐BEADON PURA SRD 259 990 KVA PLANNED 18‐06‐2018 09:00:00 18‐06‐2018 11:55:54 2:55 0.00097222 MUs 979 BLOCK_2A‐SAT NAGAR, BLOCK_1A‐REHAGAR PURA, BLOCK_5A‐SAT NAGAR SRD 78 990 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 10:47:59 1:41 0.00016833 MUs WEST KAROL BAGH‐CENTRAL RIDGE RESERVED FOREST, BLOCK T‐ASHOKA PAHARI, BLOCK_28C‐NAIWALA, 980 JHANDEWALAN FATTED FACTORY COMPLEX, RAMA KRISHNA MISSION FREE T.B. CLINIC‐BLOCK 18 SRD 521 3960 KVA PLANNED 01‐06‐2018 10:02:00 01‐06‐2018 14:48:00 4:46 0 MUs BLOCK_11A‐BALMIKI COLONY, BLOCK 12A‐KAROL BAGH, BLOCK_13A‐BALMIKI COLONY, BLOCK_10A‐BALMIKI COLONY, 981 BLOCK 38‐OLD RAJENDRA NAGAR, BLOCK 16A‐KAROL BAGH, BLOCK_6A‐SAT NAGAR SRD 388 630 KVA PLANNED 05‐06‐2018 09:00:00 05‐06‐2018 13:04:54 4:4 0.00040667 MUs

982 BLOCK_12D‐KRISHNA NAGAR, BLOCK_19C‐KRISHNA NAGAR, BLOCK_31‐KRISHNA NAGAR, BLOCK 5‐KAROL BAGH SRD 259 990 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 11:40:00 2:40 0.00155556 MUs 983 BLOCK_49A‐NAIWALA SRD 259 630 KVA PLANNED 14‐06‐2018 09:00:00 14‐06‐2018 10:09:56 1:9 0.00067083 MUs 984 BLOCK 28‐OLD RAJENDRA NAGAR SRD 647 990 KVA PLANNED 19‐06‐2018 09:00:00 19‐06‐2018 11:33:51 2:33 0.002125 MUs BLOCK 32‐OLD RAJENDRA NAGAR, BLOCK 38‐OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL‐OLD RAJENDRA NAGAR, BLOCK 30‐OLD RAJENDRA NAGAR, BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 29‐OLD 985 RAJENDRA NAGAR SRD 517 630 KVA PLANNED 16‐06‐2018 09:06:00 16‐06‐2018 11:51:02 2:45 0.00183333 MUs

BLOCK 16‐OLD RAJENDRA NAGAR, BLOCK 9‐OLD RAJENDRA NAGAR, BLOCK 8‐OLD RAJENDRA NAGAR, BLOCK 17‐OLD RAJENDRA NAGAR, BLOCK 8A‐OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL‐CENTRAL RIDGE RESERVED FOREST, 986 BLOCK 15‐OLD RAJENDRA NAGAR, BLOCK 10‐OLD RAJENDRA NAGAR, BLOCK 14‐OLD RAJENDRA NAGAR SRD 1735 630 KVA PLANNED 01‐06‐2018 09:00:00 01‐06‐2018 12:18:28 3:18 0.002475 MUs 987 BLOCK 38‐OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL‐OLD RAJENDRA NAGAR SRD 225 630 KVA PLANNED 04‐06‐2018 09:00:00 04‐06‐2018 12:55:58 3:55 0.00130556 MUs

NORTH EXTENSION AREA‐ BLOCK B‐OLD RAJENDRA NAGAR, JANKI DEVI COLLEGE‐CENTRAL RIDGE RESERVED FOREST, WEST KAROL BAGH‐CENTRAL RIDGE RESERVED FOREST, BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA 988 NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK B3‐OLD RAJENDRA NAGAR SRD 504 630 KVA PLANNED 04‐06‐2018 09:00:00 04‐06‐2018 13:33:39 4:33 0.00379167 MUs BLOCK 19‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK 25‐OLD RAJENDRA NAGAR, BLOCK 24‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD RAJENDRA NAGAR, BLOCK 22‐OLD RAJENDRA NAGAR, BLOCK 60‐OLD RAJENDRA 989 NAGAR, BLOCK A‐OLD RAJENDRA NAGAR SRD 350 990 KVA PLANNED 08‐06‐2018 09:00:00 08‐06‐2018 12:21:04 3:21 0.00111667 MUs Number of Consumers NoCapacity of Distribution Whether Planned or Unplanned Sr. No. Area Affected Division Affected Transformer (in KVA). Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage PART II‐BLOCK E‐BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYA LAYA, PART II‐ DDA COMPLEX‐NEW RAJENDRA NAGAR, N.P.L. STAFF QTRS.‐NEW RAJENDRA NAGAR, PART I‐ BLOCK H‐NEW RAJENDRA NAGAR, N.P.L. STAFF 990 QTRS.‐PART II‐BLOCK G, PART I‐ BLOCK C‐NEW RAJENDRA NAGAR SRD 472 990 KVA PLANNED 11‐06‐2018 09:06:00 11‐06‐2018 11:31:07 2:25 0.00120833 MUs BLOCK B4‐OLD RAJENDRA NAGAR, BLOCK 51‐OLD RAJENDRA NAGAR, BLOCK B‐OLD RAJENDRA NAGAR, BLOCK B6‐OLD 991 RAJENDRA NAGAR, BLOCK A‐OLD RAJENDRA NAGAR, BLOCK B3‐OLD RAJENDRA NAGAR SRD 259 990 KVA PLANNED 15‐06‐2018 09:00:00 15‐06‐2018 11:36:16 2:36 0.00086667 MUs 992 PKT B7 & B6‐MAYUR VIHAR PHASE III VSE 173 400 KVA PLANNED 12‐06‐2018 09:00:00 12‐06‐2018 16:06:23 7:6 0.00236667 MUs 993 BLOCK C‐RAJBIR COLONY, KONDALI VILLAGE‐GHAROLI KONDLI, BLOCK C‐KONDALI VILLAGE VSE 173 990 KVA PLANNED 13‐06‐2018 09:00:00 13‐06‐2018 12:24:44 3:24 0.00113333 MUs

BHAGAT NAGAR‐DAYALPUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, SEC D‐MAYUR VIHAR PHASE III, BLOCK M‐ SHIV VIHAR, BLOCK A‐SADATPUR EXT‐PUSTA AREA‐L BLOCK, BLOCK B‐KONDALI VILLAGE, PKT R‐BLOCK D, GEETA COLONY, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK D‐SHIV VIHAR, BLOCK E‐INDIRA VIHAR, BLOCK U‐SHIV VIHAR, GGS INDRAPRASTHA UNIVERSITY‐KASHMERE GATE, BLOCK N‐SHIV VIHAR, BLOCK H‐BHAGIRATHI VIHAR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK C‐KONDALI VILLAGE, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK Z‐O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK F‐SHIV VIHAR, BLOCK F‐KONDALI VILLAGE, JHILMIL INDUSTRIAL AREA‐ 994 JHILMIL COLONY, PKT A‐BLOCK B, BLOCK A‐KONDALI VILLAGE VSE 797 990 KVA PLANNED 22‐06‐2018 11:30:00 22‐06‐2018 13:29:40 1:59 0.00049583 MUs 995 BLOCK B1‐NEW ASHOK NAGAR VSE 940 400 KVA PLANNED 14‐06‐2018 11:06:00 14‐06‐2018 13:34:49 2:28 0.00032889 MUs BLOCK A & B‐VASUNDHARA ENCLAVE, BLOCK B‐NEW ASHOK NAGAR VSE, BLOCK C1‐NEW ASHOK NAGAR, BLOCK E‐NEW 996 ASHOK NAGAR, BLOCK C2‐NEW ASHOK NAGAR, SUBHASH PARK‐GORAKH PARK VSE 872 990 KVA PLANNED 15‐06‐2018 11:06:00 15‐06‐2018 14:34:56 3:28 0 MUs

MAYUR VIHAR PHASE III, BLOCK C1‐NEW ASHOK NAGAR, BLOCK A‐NEW ASHOK NAGAR, BLOCK B‐NEW ASHOK NAGAR VSE, SARASWATI KUNJ‐ EAST END APPARTMENT‐NEW ASHOK NAGAR, HANUMAN MANDIR‐NEW ASHOK NAGAR, BLOCK 997 B1‐NEW ASHOK NAGAR, NEW ASHOK NAGAR VSE‐VASUNDHARA ENCLAVE VSE VSE 109 1390 KVA PLANNED 25‐06‐2018 09:06:00 25‐06‐2018 12:16:00 3:10 0.00453889 MUs 998 BLOCK B‐GARI MANDU, BLOCK C‐JAI PRAKASH NAGAR, BLOCK J‐KARTAR NAGAR, WEST GHONDA YVR 86 630 KVA PLANNED 18‐06‐2018 09:06:00 18‐06‐2018 14:14:54 5:8 0.00085556 MUs 999 GHONDA PATTI CHAUHAN YVR 86 990 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 14:58:59 5:52 0.00097778 MUs BLOCK B‐GARI MANDU, BLOCK C‐GHONDA PATTI, ARVIND NAGAR‐GHONDA, BLOCK J‐KARTAR NAGAR, KACHI COLONY‐ 1000 JAGJEET NAGAR YVR 86 990 KVA PLANNED 18‐06‐2018 09:06:00 18‐06‐2018 15:32:12 6:26 0.00107222 MUs 1001 WEST GHONDA, BLOCK D‐BHAJANPURA YVR 86 990 KVA PLANNED 20‐06‐2018 09:06:00 20‐06‐2018 14:00:56 4:54 0.00081667 MUs

1002 BLOCK B‐SUBHASH MOHALLA, BLOCK C‐JAI PRAKASH NAGAR, ARVIND NAGAR‐GHONDA, BLOCK D‐BHAJANPURA YVR 86 990 KVA PLANNED 20‐06‐2018 09:06:00 20‐06‐2018 14:01:37 4:55 0.00081944 MUs 1003 BLOCK D‐AJMERI GATE, DELHI GOVT. STAFF FLATS‐PRESS ENCLAVE YVR 837 990 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 13:38:00 4:32 0.00151111 MUs 1004 BLOCK P‐BRAHM PURI, BLOCK Q‐BRAHM PURI, BLOCK N‐BRAHM PURI, BLOCK R‐BRAHM PURI YVR 951 990 KVA PLANNED 20‐06‐2018 11:06:00 20‐06‐2018 16:06:42 5:0 0.00166667 MUs 1005 BLOCK A‐GHONDA PATTI, GAMRI‐GHONDA YVR 130 990 KVA PLANNED 13‐06‐2018 09:06:00 13‐06‐2018 13:32:59 4:26 0.00110833 MUs BLOCK B‐SUBHASH MOHALLA, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, BLOCK D‐BHAJANPURA, 1006 BLOCK E‐SUBHASH MOHALLA, WEST GHONDA YVR 130 990 KVA PLANNED 15‐06‐2018 09:06:00 15‐06‐2018 14:03:47 4:57 0.0012375 MUs 1007 BLOCK P‐BRAHM PURI, NAYAGAON‐NEW KATWARA YVR 130 990 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 15:06:18 6:0 0.0015 MUs GHONDA PATTI CHAUHAN, ARVIND NAGAR‐GHONDA, BLOCK V‐GHONDA PATTI CHAUHAN, JAFFRABAD‐MAUJ PUR, LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, GAUTAM VIHAR‐GHONDA, BLOCK J‐KARTAR NAGAR, BLOCK H‐BRAHM 1008 PURI YVR 2419 990 KVA PLANNED 25‐06‐2018 09:06:00 25‐06‐2018 17:50:01 8:44 0.00145556 MUs 1009 NAYAGAON‐NEW KATWARA, JAGJEET NAGAR‐GHONDA, BLOCK C‐JAI PRAKASH NAGAR YVR 173 630 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 15:04:54 6:4 0.00202222 MUs 1010 NAYAGAON‐NEW KATWARA YVR 173 400 KVA PLANNED 20‐06‐2018 09:00:00 20‐06‐2018 15:05:28 6:5 0.00202778 MUs 1011 JAGJEET NAGAR‐GHONDA, NAYAGAON‐NEW KATWARA YVR 86 400 KVA PLANNED 12‐06‐2018 09:06:00 12‐06‐2018 13:44:32 4:38 0.00077222 MUs 1012 BLOCK V‐GHONDA PATTI CHAUHAN, GHONDA PATTI CHAUHAN, BLOCK C‐GHONDA YVR 86 630 KVA PLANNED 19‐06‐2018 09:06:00 19‐06‐2018 13:51:30 4:45 0.00079167 MUs LIG/MIG RES/NON COMM AREA‐SONIA VIHAR, BLOCK B‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, BLOCK E‐SUBHASH 1013 MOHALLA, BLOCK E‐SUBHASH MOHALLA, WEST GHONDA YVR 2194 630 KVA PLANNED 15‐06‐2018 14:56:00 15‐06‐2018 17:07:40 2:11 0 MUs BLOCK C‐BHAJANPURA, BLOCK C‐BHAJANPURA, BLOCK E‐SUBHASH MOHALLA, BLOCK D‐BHAJANPURA, TANKI ROAD‐C‐ 1014 BLOCK BHAJANPURA, WAZIRABAD ROAD‐C‐BLOCK BHAJANPURA, BLOCK D‐BHAJANPURA YVR 173 990 KVA PLANNED 15‐06‐2018 09:00:00 15‐06‐2018 13:06:00 4:6 0.00136667 MUs