Airport Ltd A Council company

Future LuToN: Making best use of our runway London Limited (LLAL)

Preliminary Environmental Information Report Volume 2: Figures

October 2019

Future LuToN: Making best use of our runway

Preliminary Environmental Information Report Volume 2: Figures

October 2019

LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1

Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures

Contents

PART A - Drawings used to inform the Preliminary Environmental Information Report, provided in this Volume Earthworks LLADCO-3B-ARP-WHS-BEW-DR-GT-0001: Earthworks Stage 2 Design Existing Landform LLADCO-3B-ARP-WHS-BEW-DR-GT-0002: Earthworks Stage 2 Design Proposed Landform LLADCO-3B-ARP-WHS-BEW-DR-GT-0003: Earthworks Stage 2 Design Section A-A LLADCO-3B-ARP-WHS-BEW-DR-GT-0004: Earthworks Stage 2 Design Section B-B LLADCO-3B-ARP-WHS-BEW-DR-GT-0128: Earthworks Landfill Excavation and Deposition LLADCO-3B-ARP-WHS-BEW-DR-GT-0127: Earthworks Level Change for 25mppa LLADCO-3B-ARP-WHS-BEW-DR-GT-0126: Earthworks Level Change for 32mppa

Zone 6 Highway Interventions Z6.1 and Z6.2: SK045 CPAR Alignment – Consented Layout / Proposed Amendments (2024, 2029, 2039) Z6.6: SK020 - Windmill Road / Kimpton Road - 2024 (Do Something) Z6.7: SK021 - A505 Gipsy Ln / Parkway Rd - 2024 (Do Something) Z6.8: SK022 - A505 Kimpton Road / Vauxhall Way – 2029 (Do Something) Z6.9: SK023 - Eaton Green Road / Lalleford Road - 2029 (Do Something) Z6.10: SK024 - Wigmore Lane / Road / Raynham Way - 2029 (Do Something) Z6.10: SK035 - Wigmore Lane / Crawley Green Road / Raynham Way - 2039 (Do Something) Z6.11: SK025 - Wigmore Lane / Eaton Green Road - 2029 (Do Something) Z6.11: SK036 - Wigmore Lane / Eaton Green Road - 2039 (Do Something) Z6.12: SK026 - A1081 / London Rd (North) - 2024 (Do Something) Z6.13: SK027 - Windmill Rd / St. Mary's Rd / Crawley Green Road Gyratory - 2029 (Do Something) Z6.14: SK034 - Crawley Green Road / Lalleford Road - 2039 (Do Something) Z6.15: SK041 - A602 Upper Tilehouse St / Park Way Mitigation - 2039 (Do Something) Z6.16: SK040 - Proposed Pirton Road / Offley Road Mitigation - 2039 (Do Something) Z6.17: SK042 - A602 Park Way / Stevenage Rd Mitigation - 2039 (Do Something) Z6.18: SK031 - A1081 New Airport Way / M1 Junction 10 - 2024 (Do Something)

PART B - Preliminary Environmental Information Report figures provided in this Volume Figure 1-1: Site location plan Figure 2-1: Redline boundary Figure 2-2: Development areas Figure 2-3: Existing Airport Infrastructure Figure 2-4a: Parameter Plan Figure 2-4b: Parameter Plan - Zone 6 Highway Interventions Figure 2-5: Green Infrastructure Plan - 25mppa Figure 2-6: Green Infrastructure Plan - 32mppa

LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 1

Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures

Figure 5-1: Study area and affected road network Figure 5-2: Area of NAEI gridded emissions and location of rural monitoring sites Figure 5-3: Construction dust buffers for the existing area Figure 5-4: Construction dust: buffers for the expansion area Figure 5-5a: Assumed construction traffic route Figure 5-5b: Assumed construction traffic route (focus) Figure A5-2: Modelled LTO sources - brake & tyre wear Figure A5-3: Modelled LTO sources - final approach Figure A5-4: Modelled LTO sources - arrivals 08 Figure A5-5: Modelled LTO sources - arrivals 26 Figure A5-6: Modelled LTO sources – taxi in 08 in baseline, 2024 DM, and 2024 DS scenarios Figure A5-7: Modelled LTO sources – taxi in 26 in baseline, 2024 DM, and 2024 DS scenarios Figure A5-8: Modelled LTO sources – taxi out and hold 08 in baseline, 2024 DM and 2024 DS scenarios Figure A5-9: Modelled LTO sources – taxi out and hold 26 in baseline 2024 DM and 2024 DS scenarios Figure A5-10: Modelled LTO sources - taxi in 08 in 2039 DS scenario Figure A5-11: Modelled LTO sources - taxi in 26 in 2039 DS scenario Figure A5-12: Modelled LTO sources - taxi out and hold 08 in 2039 DS scenario Figure A5-13: Modelled LTO sources - taxi out and hold 26 in 2039 DS scenario Figure A5-14: Modelled LTO sources - departures 08 Figure A5-15: Modelled LTO sources - departures 26 Figure A5-17: Location of modelled auxiliary power units (APUs) in baseline and DM scenarios Figure A5-18: Location of Modelled APUs in 2024 DS Scenario Figure A5-19: Location of modelled APUs in 2039 DS scenario Figure A5-20: Location of modelled aircraft engine testing and fire training ground in 2024 and 2039 DS scenarios Figure A5-22: Location of modelled aircraft engine testing and fire training ground in baseline, 2024 and 2039 DM scenarios Figure A5-25: Location of Modelled Ground Support Equipment (GSE) in baseline and DM Scenarios Figure A5-26: Location of modelled GSE in 2024 DS scenario Figure A5-27: Location of modelled GSE in 2039 DS scenario Figure A5-28: Location of modelled heating and energy plant in baseline, 2024 and 2039 DM scenarios Figure A5-29: Location of modelled heating & energy plant in 2039 DS scenario Figure A5-32: Location of modelled car parks in baseline and future DM scenarios Figure A5-33: Location of modelled car parks in 2024 DS scenario Figure A5-34: Location of modelled car parks in 2039 DS scenario Figure A5-39: Overview: Modelled human receptors Figure A5-40: Modelled ecological receptors Figure 6-1: Local Transport Network Figure 6-2: Strategic Transport Network Figure 6-3: Simulation Network Figure 9-1: Air Surface Noise Study Area Figure 9-2: Ground Construction Noise Study Area Figure 9-3a: Baseline Noise Monitoring Locations Figure 9-3b: Baseline Noise Monitoring Locations Figure 9-4: Extent of 2017 Baseline 16h Noise Contours Figure 9-5: Extent of 2017 Baseline 8h Noise Contours Figure 9-6: Baseline Roadside Traffic LAeq 16h Figure 9-7: Extent of 2029 DN 16h Noise Contours

LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 2

Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures

Figure 9-8: Extent of 2029 DN 8h Noise Contours Figure 9-9: Extent of 2029 DS 16h Noise Contours Figure 9-10: Extent of 2029 DS 8h Noise Contours Figure 9-11: Change of 2029 DS DN 8h Noise Contours Figure 9-12: Change of 2029 DS DN 16h Noise Contours Figure 9-13: Extent of 2039 DN 16h Noise Contours Figure 9-14: Extent of 2039 DN 8h Noise Contours Figure 9-15: Extent of 2039 DS 16h Noise Contours Figure 9-16: Extent of 2039 DS 8h Noise Contours Figure 9-17: Change of 2039 DS DN 16h Noise Contours Figure 9-18: Change of 2039 DS DN 8h Noise Contours Figure 9-19: Change in Roadside Traffic Noise in 2029 LAeq 16h Figure 9-20: Change in Roadside Traffic Noise in 2039 LAeq 16h Figure 10-1: Baseline Conditions - Areas of Proposed Development Figure 10-2: Potential Sources of Contamination Figure 11-1: River and Surface Water Flood Risk Figure 11-2: Groundwater Features Figure 13-1: Airport Employment Area Figure 13-2: Peak-Hour Drivetime From London Luton Airport Figure 13-3: Geographic Coverage of the Study Figure 14-1: Health and Community Study Areas Figure 14-2: Recreational Routes User Count Survey Locations Figure 15-1: Agricultural Land Classification Figure 16-1: Ecological Statutory Designated Sites Figure 16-2: Ecological Non-Statutory Designated Sites Figure 16-3: Ecological Constraints Plan Figure 17-1: The Site and Landscape Study Area Figure 17-2: Zone of Theoretical Visibility Figure 17-3: Local Landscape Character Areas Figure 17-4: Topography Plan Figure 17-5: Aerial Photograph Figure 17-6: Public Rights of Way Figure 17-7: LVIA Constraints Plan Figure 17-8: Assessment Viewpoint Locations Figure 17-9: Landscape Masterplan Embedded Mitigation Figure 17-10: Landscape Masterplan Additional Mitigation Figure 18-1: Cultural heritage constraints Designated assets plan 1 of 2 Figure 18-2: Cultural heritage constraints Designated assets plan 2 of 2 Figure 18-3: Cultural heritage constraints non-designated assets Figure 18-4: Heritage Constraints Plan – Historic Landscape Figure 18-5: Designated Heritage Constraints change of 2029 DS DN 16h Noise Contours Figure 18-6: Designated Heritage Constraints change of 2029 DS DN 8h Noise Contours Figure 18-7: Designated Heritage Constraints change of 2039 DS DN 16h Noise Contours Figure 18-8: Designated Heritage Constraints change of 2039 DS DN 8h Noise Contours Figure 18-9: Layout of (forthcoming) trial trenches on LLAL holdings in Herts Figure 20-1: Other Airports in South East

LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 3

Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures

Figure 20-2: Cumulative Assessment Core Zones of Influence Figure 20-3: Cumulative Effect Assessment (CEA) Wider Zone of Influence Figure 20-4: Cumulative Effect Assessment ‘other development’ search area Figure 20-5: Cumulative Effect Assessment Planning Applications Figure 20-6: Cumulative Effects Assessment Planning Allocations

Figures contained within Volume 1: Main Report of this Preliminary Environmental Information Report

Figure 2-7: Outline Construction Programme Figure 6-4: Passenger throughput at Luton Airport Parkway Station Figure 6-5 Distribution by time of peak hgv construction traffic Figure 7-1: CCR assessment methodology flow diagram Figure 7-2: ICCI assessment methodology flow diagram Figure 8-1: DM Operation GHG emissions (MtCO2e) Figure 8-2: DS DCO-embedded Figure 8-3 Operation emissions: DS DCO-embedded (tCO2e) Figure 8-4: GHG emissions impact DM and DS DCO-embedded Figure 10-3 Proportion of waste type encountered per exploratory hole

Figures contained within Volume 3: Appendices, Appendix 5 Air Quality of this Preliminary Environmental Information Report

Figure A5-1: IAQM dust assessment methodology Figure A5-16: Monthly profile for helicopter use (2017) Figure A5-21: Monthly profile of engine testing (2017) Figure A5-23: Monthly profile for the fire training ground Figure A5-24: Diurnal profile for the fire training ground Figure A5-30: Gas consumption (MWh) for boilers (2017) Figure A5-31: Construction traffic movements Figure A5-35: Luton Airport 2016 wind rose Figure A5-36: Model performance with adjustment – airport Figure A5-37: Model performance with adjustment – roads Figure A5-38: Model performance with adjustment – Hitchin

LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 4

Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures

PART A - Drawings used to inform the Preliminary Environmental Information Report

LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 5

A3 A B C D E F G n g R e S c h r e e l a t e d

6 t r io n 11

22 . 2

4 2 G 1 r

o

u 6 n 1 EA 13 d TO 5 N 1 G 4 F RE il EN li R n O M 9

g A a D 7

s 4 S t t a ( t t

i e 1 10 o 3 23 l BA n e RNS 2 5 c TON CL . OS 9 o E 0 6 18 m

m m

u 2

n 1 ic

22 a 1 t 49

io 2

n 8 K 24 1 ) 18

19 E

l e 42 30 c 8 S

1 D t i r 10 1 s i

t c \ 0 Key: i 1

r t 1 2 N ib y u H t e io a s 3 n lt

5 2 h 7

S 7 C 4 e

26 it 1 n e t

r g T e a 3 9 S n 5 M CCHE 5 k LORTS 3 SEEY 3 4 2

14 n

12 6a 6

17 4

3

1 i

2 7 15 E 42 1 1 l b

T S 4 1

a u 2 6

n b 2 1

k 2

S

t

5

6 a E L 4

1 S w 2

4 2 O I

4 1 8 L N W 1 C ND . 4 A 8 a L H D NAY i m 1 T g OR S m 4 W E o

0 S r a L 5 0 HE Y e 4 C C

1 R P

L r

1 a O 6 O r 4 9 A k 1 3 S D E C

4 e

4 1

1 3 n

32 6

7 7

1 t

1 D 4 Consented CPAR r 3 e 4 3

9 8 _ 4

3 H

4 R 1

a

9 a 2 1 6 1

2 y 4 4 r n 0 10 0

Eaton Green Road 1

t . 4 h 7

a m 9

o m 2

\ E p

a W 3 t W o a E

n L C y D a

a 48 50 T ON

H 1 4 37

16 i 52 o C 2 C 3 b o 51 L s

u 7 7 o e OS 5 u E

s m H r e 0 2

r m 9 o

E u 38 5 u

31 t 56 n 39 33 6 s a it e 3 g t y Alignment

15 5 1

4 57 o 2

3 34 C 6 9 e . 8 5 32 n n m t 1 r 8

e 3 n L L i

B 11 A 4

3 Shelter P 4 Y

3

D

l H P 1

a l

a R

A

m 1 8 .3 c y 52 I M

1 3

V e A r

e w a ARD E 1 1 LEIGH

5 GREE EN ROAD 2 N EATON GRE .3 1 1 m 5 1

5 a 4 1 0 4 . 32 .8 2

m m 27 r

4

2

4 10 2 5

2 12 W

I D 2 G

6 1

8 7 M

E 2 2

l 16 O S R

u 14

8 E b 18 9 2

S .7 B t m L

a A A 3

Y N 0

L E 4 9

K A

E M S

h 0

E e 3 l B t M 5 D e a L r Proposed Amendments -

E r

E l L b o

L r o u g h 10 4

1 1 1

4 1 H

5 \

7 29 o 35

.7 u

m o C s t e

L

0

O 33 5 1 EA 1 OFT

T 2 R

O 6 C a N 4 G S LEY REE 4 BIRT N E ROA

D t

5

3

7

5 4 7 5

4 Frank Lester Way

E t l 2 J 9 a

W o

o S u K o

r b 4 k t 4

C 3 S s t a 6

L 1

D 8 A E 6

o l

2 4

1 t t 4 5 S 4 u .9 b m S t a c

E

l

A 1 S 1 u E

i C e r 3 b A

E p S L M P 4 t j x o a E e r R O C c t M h G y u E I 1 ATON P W t 4 GRE p o 2 EN R g iv . OAD 1 S e m t W P r a ig a m o r r k e 1 1 3 3 H 9 9 o .8 .8 u P m m s e

l

S N h e lt a e r

T a E n n k s r

1 5 D 4

.8 e m 5 t

F n

14

B 0 I a .2 la m

n c in g NUMBER 4 ING STRUCTURE P RETAIN o n HEATON DELL 4 d \

B C

a 0

r E a 1 H t ir o e n

C H 1 e o n u t s r e - e

14

2 3 .4 m

S 9 h e lt e r P 3 R

O 1 F 4 V B 0 AY O W NT 9 S E SID T RE M P a s t W F

R 5 A

A Y

N

K S

o 2 a L k a E 3 Eaton Green R w BE \ S UM a E N y 11 UR T CT TRU E G S ININ R A RET

E 0 l W S 5 u A b

Y S t a 5 0 0

1 E 9 5 l Road Link 7 S . u 5 b m S t a 3 5

1 E l 2

S 8

u \ b 6 B S

u t : i a ld in g E l S 9 u J 4 b

S t a

K 2 e n s a l P H o o s u t s s e

E S 24 S

2 5

Y 0 A 1 W AL IV RC PE P s

D e

123 H a v il

la

9 n

H

d a n

g

a L

H r

1

o 2 T u 9 w s r e Y E A l W S CE u IN b PR S 1 t 6 a 1. 1m C a r

P a sts f Po 1 r Line o 6 1 E k .5 l S m u 15 b E 9 S l .4 t S m a u b

S t L a T w

r

4

0

1

o

t

2

7

1 g

6 n

0 i

d

. l

9 i

m u B

E l S u b

S t a L

T w r

S h e lt e r L C T o w m L r m u T n w it r T y a n Percival Way C e k n t L r e T P w a r v L il io T n w r P la E S y S s A r e a

L

T w r

P

5

3 1 R

E

S

I

D

E L B T r N w i r t a T n n ia

H W o u s e A E

Y a t o n R e G c r y e c e l n in g

L L C ig T h w e t r in n g

C t o r lu m n e

L

T w r

5 12 r ge an

3 H 02 19/09/19 LS JO JO L S ig

h M t in g

C o lu m L n E T l w r S u

S b M

l Title updates o a s

p S t i

n t

g (T

a e

m le

a c

s o

o m n m u r n W

y ic a t i i g o n ) m o r e 01 12/09/19 NS JO JO

V a l L l

T e w r y

P Consented CPAR Layout a r First Issue k L

T w L r T w r E S l u S b h S t e a lt e r Issue Date By Chkd Appd

L

T w

r

M

I

S

T

L

E T

O E

E IV R

D H M HA

I AY L L

L 3 12 13 3 1

5

5 5 1

. 1 4 6 G 1 E m R .9

5 E m A S 4 T H 25 O A M 7 N

C

G L 0 28 R O 1 F E S

E E A N L

S R 14 O U T

12

N O D 8 GREEN

A N B 2 O 1 E

U 3 5 0 T . R 5 e m c S r h e e 0 lt a e 5

6 t r io

n 11

22 2

4 2 G 1 r

o

u 6 1 n EA 13 d TO N 1 N G 4 F RE il EN li R n O M 9

g A a D 7 s S t t a ( t t

i e 1 10 o 3 23 l BA n e RNS 2 5 c TON CL . o OSE 9 6 18 m

m m

u 2 n 1 ic

22 a 1 t 49

io 2

n 8 24 1 ) 18 19 E

l e 42 30 c 8

1 D t r 10 is 1 t ic

i 1 0 r t 1 ib y 2 u t H e io a 3 n lt

5 2 h 7

S 7 C

4 e 26 i 1 n t t e r T e a 3 9 S n 5 M CCHE 5 k LORTS 3 SEEY 3 4 2

14

12 6a 6

17 4

3

1

2 7 15 E 42 1 1 l b

T S 4 1

a u 2 6

n b 2 1

k 2

S

t

5 6 a L 4 1 SE

4 O I 2

4 1 8 L N W 1 C ND . 4 LA 8 D AY m TH N ig OR S m 4 W E o

0 S r L 5 0 HE Y e 4 C C

1 R P L

1 a O 6 O r 4 A k 9 1 3 S D E C

4 e

4 1

1 3 n

32 6

7 7

1 t

1 4 r 3 e 4 3

9

Eaton Green Road 8 4

3 H The Arup Campus, Blythe Gate, Blythe Valley Park

4 R 1

a

9 a 2 1 6 1

2 y 4 4 r n 0 10

1

t . 4 h 7

a m 9

49 o m

47 2 E p

a W 3 t W o a E

n L C y D a

a 48 50 T ON

H 1 4 37

16 i 52 o C o 2 51 C 3 b L u 7 7 o e OS

5 u E Solihull, West Midlands B90 8AE

s m H r e 0 2

r m 9 o

E u

4 5 38 u

31 t 56 n 39 33 6 s a it e 3

t y

15 5 1

4 57 o 2

3 34 C 6 9 e . 8 5 32 n n m t 1 r 8

e 3 L L T +44(0)121 213 3000 F +44(0)121 213 3001

B 11 A 4

3 Shelter P 4 Y

3 D

l P H

a l

a R

A

m 1 8 .3 c y 52 I M

1 3

V e A r e a ARDL E 1 EIGH 5 GREE EEN ROAD 2 N EATON GR .3 www.arup.com 1 15 m

5 1 4 1 0 4 . 32 .8 2

m m 27 4

2

4

10

2 12 W

I 2 G

6 1

8 7 M

E 2 2 l 16 O S R

u 14

8 E b 18 9 2

S .7 B t m L

a A A

Y N 0

L E 4 9

K Client A

E M S h

E e 3 l B t M 5 D e a L r

E r

E l L b o

L r o u g h

1 1 1

4 1 H

5

7 29 o 35

.7 u

m o C s t e

L

0

O 33 5 1 EA 1 OFT

T 2 R

O 6 C N 4 G S LEY Frank Lester Way R 4 IRT EE B N E RO

AD

5

3

7

5 4 7 5

4

E t l 2 J 9

W o

o S u K o

r b 4 k t 4

C 3 S s t a 6

L 1

8 A E 6

o l

2 4

1 t

4 5 S 4 u .9 b m S t a

E l

A 1 S E 1 i u C r 3 b A

E p S L M P 4 t x o a E e r R O C c t M h G y u E I 1 ATON P W t 4 GRE p 2 EN R g iv . OAD 1 S P e m t W a ig a m o r r k e 1 3 13 H 9 9 o .8 .8 u m m s e

S h e lt e r Access to parking area

T a E n k s

1 5 D 4 .8 m 5

F

14 B 0 a .2 la m n c in g

P o n HEATON DELL d

B C a r E a Job Title

H t ir o e n

C H e o n u t s r e e

14 2 .4 m

S h e lt Luton Masterplan e r P

R

O 1 F 4 V B 0 AY O W NT S E SID T RE M P a s t W F

R A

A Y Eaton Green N

K S o a L k a E w S a y T

E

R

E l W S 5 u A b

Y S t a Road Link 5

1 E 5 l 7 S . u 5 b m S t a 3

1 E l

S 8 u b 6 B S u t i a ld i n E 5 g l

S 9 u 4 b

S t a

K e n s a l P H o o s u t s s e

E S 24 S

2 5

Y 0 A 1 W AL IV RC PE P s

D e

123 H a v il

la

9 n

H

d a n

g

a L

H r

1

o 2 T u 9 w s r e Y E A l W S CE u IN b PR S 1 t 6 a 1. 1m C a r

P a sts f Po 1 r Line o 6 CPAR Alignment 1 E k .5 l S m u 15 b E 9 S l .4 t S m a u b

S t L a T w

r

4

0

1

o

t

2

7 - Consented Layout /

1 g

6 n

0 i

d

. l

9 i

m u B

E l S u b

S t a L

T w r

S h Proposed Amendments e lt e r L C Percival Way T o w m L r m u T n w it r y T a C n e k n t L r e 7 T 12 P w a r v L il io T n w r P la (2024, 2029, 2039) E S y S s A r e a

L

T w r

P

5 3 1 Airport TerminalR Access E

S

I

D

E L B T r N w i r t a T n n ia

H W o u s e A E

Y a t o n R e G c r y e Scale at A3 c e l n in g

L L C ig T h w e N.T.S. t r in n g

C t o r lu m n e

Discipline Transport Planning 6

L

T w r

25 1 er ng

Ha Job No Drawing Status L S ig

h M t in g

C o lu m L n 259393-10 Information E T l w r S u b M a s S t t (T a e le c o m m u n W ic © Crown copyright and database rights (2018) a i Drawing No Issue t io g n ) m L ig o h t in r g Proposed Amendments

T o To Long Stay Car Park e w e r Ordnance Survey 0100031673 V a l L l

T e w r SK045 02 y

P a r k

Do not scale © Arup E l

A3 A B S C D E F G ub

S U dgn

t n . N 1 a it

t s 105.5m 41

o 020

K 43 4 S

Key: \ s ng i w a Proposed Works r D

Sports Court 4 5 0_ \ s ng i

1 w a r D Works 03

W - 4

I \ ND a t M a I

LL D

t

R ec OAD j o r P

FB l a n r e t n I

4

W \ 10 ind -

m

63 259393 il \ l R o 259000

a :\ d J 2

71

El Sub Sta

1

Shelter

Road 110.3m 03 07/02/19 NS JO JO Kimpton Minor Amendments

3 02 29/01/19 NS JO JO

KIMPTON ROAD Minor Amendments

106.7m 01 01/10/18 NS JO JO

First Issue

Windmill Issue Date By Chkd Appd (PH) Kerb realignment to increase Minor widening to accommodate entry radius from Kimpton Rd three-arm signalised junction with

two lane entries along Windmill Rd W I ND M I LL Mast (Telecommunication) R The Arup Campus, Blythe Gate, Blythe Valley Park OAD 4 Solihull, West Midlands B90 8AE 95

T +44(0)121 213 3000 F +44(0)121 213 3001 t o www.arup.com Tank 115

Client

r

i e

W

Job Title W FB Luton Masterplan in d m A l ill l o t m R e n t 5 o G a a r d d e n s

111.9m Windmill Road / Kimpton Road

El Sub Sta - 2024 (Do Something)

OSBORNE ROAD

ROUNDABOUT Scale at A3 1:1000

Discipline Transport Planning 6

Job No Drawing Status 259393-10 Information

R Griffin House iv Drawing No Issue e r

L SK020 03 © Crown copyright and database rights (2018) e a

Ordnance Survey 0100031673 o r

Do not scale L © Arup ee A3 A B C D E F G

Luton

Depot

Airport dgn . N Parkway P a v ili 021 o n K S

Key: \ s ng i w a Proposed Works r D 0_ \ s

Bowling Green ng i

Car Park 1 w a

A r D

505 03 El Sub Sta -

4 G \ a i t

p a

s D

y t

L ec j

a o n r P

e l a

G n IP r S

Y e

L t A N

E n I

4

Shelters \

Car Park 10 -

Subway 259393 \ 259000 :\ Kerb realignment to increase length of J 2 two-lane entry along A505 Gipsy Lane

Butt P A R K W A Y R

i R ov OAD Lighting Tower

er

r Play L

L ee ea Area

Tennis Courts Pond

Sports Court

Vauxhall Tennis Courts 04 06/08/19 NS JO JO M

i n

i a

t

u

r

e P

Recreation Club R i f Minor Amendments to Frame MP 29.0

l e

a

R

a

n

g r (Leisure Or Sports Centre) e k 03 17/06/19 NS JO JO

Tank w

a Amendments to A1081 y 3 Minor widening to accommodate R 02 29/01/19 NS JO JO PARKWAY length of two left turn lanes onto A1081 o a Minor Amendments FB d 01 13/06/18 NS JO JO

Cycle Way

First Issue

Issue Date By Chkd Appd

Gantry

AY W T OR GIPSY LANE P IR A W NE

Gantry th Pa The Arup Campus, Blythe Gate, Blythe Valley Park 4 Solihull, West Midlands B90 8AE L OW ER T +44(0)121 213 3000 F +44(0)121 213 3001 HA RP EN DE www.arup.com N RO AD Lo Client we AY W r T OR H P IR A a W NE rp end en R oa FB d

Job Title Luton Masterplan um) h ( Pat

5 Carriageway widened into central reserve k ac r T area to accommodate three lanes in both directions along A1081

A505 Gipsy Ln / Parkway Rd

R

i

v L e ea

r

o

r - 2024 (Do Something)

L

ee Park Street Lodges

Scale at A3 1:1500

Discipline Transport Planning 6

Job No Drawing Status 259393-10 Information

k

ac r T Drawing No Issue SK021 04 © Crown copyright and database rights (2018) Ordnance Survey 0100031673

Do not scale © Arup A3 A B C D E F G

dgn . N 022

y K S

Key: \ a s ng i W

w a ll Proposed Works r D

a

Vauxhall Way to be widened 0_ \ s ng i to dual carriageway to north uxh 1 w a a r D

of junction with Kimpton Road V 03 - 4 \ a t

Works a D

t ec j o r P

l a

SM n r e t n

SM I

Tanks 4 \ Tanks 10 Kerb realignment to provide two - lane exits and increased entry 259393 \ capacity where possible 259000 :\

FB J ay 2 W rt irpo A

117.8m

Segregated left turn lanes provided on all approaches to junction

Roundabout replaced with 03 29/01/19 NS JO JO 8 four arm signalised junction Minor Amendments

3 K 113.8m IMP 02 06/11/18 NS JO JO TON

ROAD AIRPORT WAY Vauxhall Way Dualled Shelter 01 13/06/18 NS JO JO El Sub Sta A505 Kim 109.7m pton Rd First Issue

Issue Date By Chkd Appd 4

k r a P l ia r t s du In

t t a r r a B Vauxhall Business Mall

AY W

T The Arup Campus, Blythe Gate, Blythe Valley Park R O

P A IR Solihull, West Midlands B90 8AE 4 A

W E T +44(0)121 213 3000 F +44(0)121 213 3001 N Two left turn lanes 1 www.arup.com provided Client Garage

D

OA R El Sub Sta

N

E Job Title LL

W A

H

X

A U Luton Masterplan

I

R

VA

P

O

R

T

W

AY 5

P a t h

A505 Kimpton Rd / Vauxhall Way D r

a i n - 2029 (Do Something)

Widening to extend two lane approach

to junction and provide lengthened two lane exit Scale at A3 1:1250

k

ac r Discipline T Transport Planning 6

Job No Drawing Status 259393-10 Information

Drawing No Issue SK022 03 © Crown copyright and database rights (2018) Ordnance Survey 0100031673

Do not scale © Arup A3 A B C D E F G

dgn . N 023 K S

Key: \ s ng 4 i w a Proposed Works r D 0_ \ s ng i

1 w a r D

03 - 4 \ a t a D

t ec j

E o a r P

t l a

5

on n r e t

n 1 I

2 4 \ 10 -

P

l ace 259393 \

1 259000

:\ 7

L J a 2 ll e f o r d

1b W 57

a

y

a d 1 R 56 n ree G ton

Ea

4

3 o 02 29/01/19 NS JO JO

t H

a

1 Minor Amendments r t op 01 01/10/18 NS JO JO

First Issue C

ou Issue Date By Chkd Appd

46 r

t

42

49

50 Mini roundabout to be replaced with The Arup Campus, Blythe Gate, Blythe Valley Park 4 7 Solihull, West Midlands B90 8AE 4 three arm signalised junction T +44(0)121 213 3000 F +44(0)121 213 3001 8 www.arup.com 4 Client

152.3m

52

L

51 Job Title Luton Masterplan r e lt e h K S 5 7 3

8 3 El Sub Sta Eaton Green Road / Lalleford Road OAD R

N EE - 2029 (Do Something) R G

33 ON T A Scale at A3 34 E 1:500

Discipline Transport Planning 632 Job No Drawing Status 259393-10 Information

Drawing No Issue SK023 02 © Crown copyright and database rights (2018) Ordnance Survey 0100031673 154.2m Do not scale © Arup A3 A B C D E F G BU

CKINGHAM DRIVE

dgn . N 024 K S

Key: \

s 4

ng

7 i

24

20

23

96 w 82 a Proposed Works r D 0_ \ s

D ng

A i O R 1 w N E a E r R

G D

1 Y

2 E L W 03 A - R C 4

E \

S

a 13 t

O 1 a

L

C D

t

NG

I ec

d j 1 o

OV R r P

n l a

ee n r r

2 e t

G n CE LA I P EX y

SS 17 4 SU le \ 10

w -

4 ra

C 3

144.3m 259393 Water Wigmore Primary \

School 259000 :\ J 2 Roundabout replaced with signalised 17 El Sub Sta

18

crossroads junction with pedestrian facilities 16

19

2 1

15 8

13 21

4

1 11

2

10 0 9

04 29/01/19 NS JO JO 3 2 2 7 Crawley Green Rd 4 2 28 29

6 Minor Amendments 3 0

CRAWLEY GREEN ROAD 03 22/11/18 NS JO JO

9 1

20 Minor Amendments

144.6m

8 31 1

3 02 06/11/18 NS JO JO 17 5 4

3 New Signalised Junction

12

2 9 6

11 1 01 01/10/18 NS JO JO

First Issue

36 1

16 14

0 F 37 1

EL

T 3 1 ON 39 38 T Issue Date By Chkd Appd

W C

L Y O S F

N E

O E

R E

D R

G D

W

R 13 15 6

I

V ON i 12 T

g E

S

8 I

3 m R

4 F

o 1 re PINFORD DELL L a n e 2 The Arup Campus, Blythe Gate, Blythe Valley Park

4 2 7 Solihull, West Midlands B90 8AE

1 T +44(0)121 213 3000 F +44(0)121 213 3001 1

W I 4 www.arup.com G M TCB 30 20 O 3 R 16 E 18 L Client AN E

1 4 Roundabout replaced with four arm ON T BARFORDWidening RISE to provide two R E D L A 9 C signalised junction with on-demand 1 L O lane approaches to junctions S E 143 pedestrian crossing facilities .4

m

37

35 G

27 11 17 a s

G 2 ov

e r n o r

Job Title 19 6

3 Luton Masterplan 0

1 2

4

9 143.3m

5 25

10

2

7 7 a 6 2

a 3 1 Wigmore Lane / Crawley E S O L 2 C

D R 141.9m Green Road / Raynham Way O 3 3 F 1 L E LB S 10 E O

M L 21 C 9

1 2 4 ING 0 L K 2 C I E

H S 3 O 1 L 11 - 2029 (Do Something)

C Shelter 1 1 AD

11 TE 5 X A

S 5

4 Widening to provide 3 Scale at A3

y 1:1250

12

2 a two lane junction entry 1 W E Discipline V I 9 2 Transport Planning R 5 6 D m M

18 a

Job No Drawing Status 5 AYHA

9 L 7

H 6

I 6 9

GHA ynh 10 259393-10 Information a 29 M 5 D E R R l S Drawing No Issue I 11 3 V ub

E S t a 2

16 SK024 04

9 © Crown copyright and database rights (2018) 11 7 AND Ordnance Survey 0100031673 L NAY 35

8 1 Do not scale © Arup A3 A B C D E F G BU

CKINGHAM DRIVE

dgn . N 035 K S

Key: \

s 4

ng

7 i

24

20

23

96 w 82 a Proposed Works r D 0_ \ s

D ng

A i O R 1 w N E a E r R

G D

1 Y

2 E L W 03 A - R C 4

E \

S

a 13 t

O 1 a

L

C D

t

NG

I ec

d j 1 o

OV R r P

n l a

ee n r r

2 e t

G n CE LA I P EX y

SS 17 4 SU le \ 10

w -

4 ra

C 3

144.3m 259393 Water Wigmore Primary \

School 259000 :\ J 2 Roundabout replaced with signalised 17 El Sub Sta

18

crossroads junction with pedestrian facilities 16

19

2 1

15 8

13 21

4

1 11

2

10 0 9

3 2 2 7 Crawley Green Rd 4 2 28

29 6

3 0

CRAWLEY GREEN ROAD

9 1

20

144.6m 8 31

3 1 02 29/01/19 NS JO JO

17 5 4

3 Minor Amendments

12

2 9 6

11 1 01 03/12/18 NS JO JO

First Issue

36 1

16 14 0 F 37

1 EL

T 3 1 ON 39 38 T Issue Date By Chkd Appd

W C

L Y O S F

N E

O E

R E

D R

G D

W

R 13 15 6

I

V ON i 12 T

g E

S

8 I

3 m R

4 F

o 1 re PINFORD DELL L a n e 2 The Arup Campus, Blythe Gate, Blythe Valley Park

4 2 7 Solihull, West Midlands B90 8AE

1 T +44(0)121 213 3000 F +44(0)121 213 3001 1

W I 4 www.arup.com G M TCB 30 20 O 3 R 16 E 18 L Client AN E

1 4 Roundabout replaced with four arm ON T BARFORDWidening RISE to provide two R E D L A 9 C signalised junction with on-demand 1 L O lane approaches to junctions S E 143 pedestrian crossing facilities .4

m

37

35 G

27 11 17 a s

G 2 ov

e r n o r

Job Title 19 6

3 Luton Masterplan 0

1 2

4

9 143.3m

5 25

10

2

7 7 a 6 2

a 3 1 Wigmore Lane / Crawley E S O L 2 C

D R 141.9m Green Road / Raynham Way O 3 3 F 1 L E LB S 10 E O

M L 21 C 9

1 2 4 ING 0 L K 2 C I E

H S 3 O 1 L 11 - 2039 (Do Something)

C Shelter 1 1 AD

11 TE 5 X A

S 5

4 Widening to provide 3 Scale at A3

y 1:1250

12

2 a two lane junction entry 1 W E Discipline V I 9 2 Transport Planning R 5 6 D m M

18 a

Job No Drawing Status 5 AYHA

9 L 7

H 6

I 6 9

GHA ynh 10 259393-10 Information a 29 M 5 D E R R l S Drawing No Issue I 11 3 V ub

E S t a 2

16 SK035 02

9 © Crown copyright and database rights (2018) 11 7 AND Ordnance Survey 0100031673 L NAY 35

8 1 Do not scale © Arup

A3 A B C D E F G 4

dgn . N 025

K 5 S

Key: \

s 5 ng

Wigmore Park Centre i w a

Proposed Works r 6 D 0_ \ s ng i

1 w

a 7 r D

03 - 4 \

a 8 t a D

Tiber t ec 141.9m House j o r P

l a n

r 9 e t n I

Shelter 4 10 \ 10 - 259393 \ 259000 :\

Marlborough House J 2 25 W ig m Wigmore House or 7 e L 9 140.7m a 2 n 9 e 5

3

11

AND

L 13 16 W Widening to provide IG NAY C M E L O C O RE S L Shelter A

E AN L 18 37 two lane entries E P

E

R

O

M 20 G I

W Roundabout replaced with four arm 1 0 4 signalised junction with on-demand 3 02 29/01/19 NS JO JO 3 9

2 pedestrian crossing facilities

6 Minor Amendments

24 41

6

2 22 01 01/10/18 NS JO JO

First Issue

K EE 16 B Issue Date By Chkd Appd L 43 Widening to provideE two

139.8m L AYHA lane approaches Cto junctions L

O

18 36 D S R M E I V

E

8 3

Ppg 142.4m 140.2m n Rd 11 Sta Gree 9 on Eat

El Sub Sta The Arup Campus, Blythe Gate, Blythe Valley Park

4 4 Solihull, West Midlands B90 8AE T +44(0)121 213 3000 F +44(0)121 213 3001 3 Four arm signalised junction with www.arup.com N EE R G CPAR link road and Keeble Close Client IGH 3 LE D R

A with on-demand pedestrian crossings 1

23 12 5 7

25 1 1

1

0 42

B AY

44 Free-flow segregated left turn lane Job Title L A M 139.8m Luton Masterplan D into CPAR link road ELL

4

2 52

o

t 46 27

5 2

4

2

5

11

28

0

1 D 26 A O Wigmore Lane / Eaton R

N Alignment ties into proposed CPAR EE R G Green Road

N 9 O T

A

o E

t

29 6

142.1m - 2029 (Do Something)

35 33 d R n ree Scale at A3 G 1:1000 on at E Discipline Transport Planning 6

Job No Drawing Status 37

t o 259393-10 Information 43 Balancing Pond

Drawing No Issue SK025 02 © Crown copyright and database rights (2018) Ordnance Survey 0100031673

Do not scale © Arup

A3 A B C D E F G 4

dgn . N 036

K 5 S

Key: \

s 5 ng

Wigmore Park Centre i w a

Proposed Works r 6 D 0_ \ s ng i

1 w

a 7 r D

03 - 4 \

a 8 t a D

Tiber t ec 141.9m House j o r P

l a n

r 9 e t n I

Shelter 4 \ 10 Mini roundabout to be replaced - with three-arm signalised junction 259393 \ 259000 :\

Marlborough House J 2 25 W ig m Wigmore House or 7 e L 9 140.7m a 2 n 9 e 5

3

11

AND

L 13 16 W Widening to provide IG NAY C M E L O C O RE S L Shelter A

E AN L 18 37 two lane entries E P

E

R

O

M 20 G I

W Roundabout replaced with four arm 1 0 4 signalised junction with on-demand 3 02 29/01/19 NS JO JO 3 9

2 pedestrian crossing facilities

6 Minor Amendments

24 41

6

2 22 01 01/10/18 NS JO JO

First Issue

K EE 16 B Issue Date By Chkd Appd L 43 Widening to provideE two

139.8m L AYHA lane approaches Cto junctions L

O

18 36 D S R M E I V

E

8 3 d reen R Ppg 142.4m on G 140.2m Eat 11 Sta 9

El Sub Sta The Arup Campus, Blythe Gate, Blythe Valley Park

4 4 Solihull, West Midlands B90 8AE T +44(0)121 213 3000 F +44(0)121 213 3001 3 Four arm signalised junction with www.arup.com N EE R G CPAR link road and Keeble Close Client IGH 3 LE D R

A with on-demand pedestrian crossings 1

23 12 5 7

25 1 1

1

0 42

B AY

44 Free-flow segregated left turn lane Job Title L A M 139.8m Luton Masterplan D into CPAR link road ELL

4

2 52

o

t 46 27

5 2

4

2

5

11

28

0

1 D 26 A O Wigmore Lane / Eaton R

N Alignment ties into proposed CPAR EE R G Green Road

N 9 O T

A

o E

t

29 6

142.1m - 2039 (Do Something)

35 33 d R n ree Scale at A3 G 1:1000 on at E Discipline Transport Planning 6

Job No Drawing Status 37

t o 259393-10 Information 43 Balancing Pond

Drawing No Issue SK036 02 © Crown copyright and database rights (2018) Ordnance Survey 0100031673

Do not scale © Arup A3 A B C D E F G

dgn . N L 026 K

o S

Key: \ s ndon ng i w a Proposed Works r D

0_

R \ s

o ng i

1 a w a r d D

03 - 4 \ a t a D

t ec j o r P

l a n r e t n I

4 \ 10

Roundabout to be partially signalised -

to accommodate traffic flows GP 259393 Spiral markings to be introduced to \

improve lane discipline in conjunction 259000 :\ J 2 with signage

Proposed Newlands Park access road

NORTH ROUNDABOUT

3 02 29/01/19 NS JO JO

Minor Amendments Widening to roundabout circulatory to 01 01/10/18 NS JO JO

provide free-flow diverge onto A1081 First Issue

Issue Date By Chkd Appd

The Arup Campus, Blythe Gate, Blythe Valley Park 4 Solihull, West Midlands B90 8AE T +44(0)121 213 3000 F +44(0)121 213 3001 www.arup.com

Client

Roundabout to be partially signalised

to accommodate traffic flows

Job Title Luton Masterplan

5

A1081 / London Rd (North)

Gantry - 2024 (Do Something)

y a Scale at A3 W 1:1000 L rt

ondon rpo Discipline i Transport Planning 6 A w e Job No Drawing Status N

R 259393-10 Information

o

D 1081

a A A Drawing No Issue O

d R

N

O SK026 02 © Crown copyright and database rights (2018) D

N

O

Ordnance Survey 0100031673 L

Do not scale © Arup

A3 A B C D E F G

4 dgn . N 027 K S

\ a Key: 4 s ng

i

9 w a a

r 5 Proposed Works D Posts

0_ 9 \ s

S

ng

a M i 5

1 AD w O R a r N D

EE R G

03

Y - 6

LE 4

W \ A a CR t a

D

S 7

a

T t

M ec

A j

R o

Y r 7

' P

S l

ESS Widening to St. Mary's Road to R a R Widening to gyratory to provide

OAD iv n r e e

r t

provide three approach lanes n four circulatory lanes I L d 4

a \ ea o

10

R 2 - o 4 r n

L ree ee

G 259393 y \ le w ra 259000

C :\ J 2 S t.M ary El Sub Sta 's R

oa d 14

UK Centre

for

Carnival Arts 2

Su bway

03 29/01/19 NS JO JO SM Widening to subway portal to Minor Amendments

3 accommodate four lanes across tunnel 02 10/09/18 NS JO JO

1 Subway Widening to subway portal to Hall Minor Amendments accommodate four lanes across tunnel 01 13/06/18 NS JO JO

ST MARY'S First Issue ROUNDABOUT FB R

i 7 E v o Issue Date By Chkd Appd l S e r ub r Widening to Windmill Road to provide L S t ee a L e two entry / two exit lanes from gyratory a 11

Subway 15 14

Dallow Hall

EET The Arup Campus, Blythe Gate, Blythe Valley Park R T 4 S Solihull, West Midlands B90 8AE

E T +44(0)121 213 3000 F +44(0)121 213 3001 AG Fitzroy R www.arup.com A C I Court V Client

Wingate Hall L Twr Widening to subway portal to t Fitzroy Court accommodate four lanes across tunnel ee R Job Title r i v t B O e LT S r Luton Masterplan 1 ON t t e o L r R ee OAD 27 ea r o W t S I ND t m o e Stockwood Hall c r g g M a i du I r a L L i a k ee L V c r W 5 i a

V k P 2 R r OAD a r P a C

2 9

t o

35

Whitehill Spindles Windmill Rd / St. Mary's Rd /

4 1 D OA R Crawley Green Road Gyratory

R NO A M El Sub Sta W Gas Gov - 2029 (Do Something) ind

OAD R m A 4 Shelter LE ill

19 R Scale at A3 o 1:1000

a 2 d Discipline Transport Planning 6

Job No Drawing Status

4 259393-10 Information

Drawing No Issue

SK027 03 © Crown copyright and database rights (2018) 12 L Twr Ordnance Survey 0100031673 Depot

Do not scale © Arup A3 A B C D E F G

dgn . N 034 K S

Key: \ s ng i w a Proposed Works r D 0_ \ s ng i

1 w a r D BU CKI 03 NGHAM - D 4 RIVE \ a t a D

t

33 ec 19 j o r P

l

a 17 n r e t n I

4 \

10 - 9 259393 \ 259000 :\

El Sub Sta J 2

311

27 25

CR AWLE Y GREE N ROAD

3 Crawley 02 29/01/19 NS JO JO Green Rd Minor Amendments

01 06/11/18 NS JO JO

First Issue

Issue Date By Chkd Appd

The Arup Campus, Blythe Gate, Blythe Valley Park

124 Mini roundabout to be replaced with 4 Solihull, West Midlands B90 8AE three arm signalised junction T +44(0)121 213 3000 F +44(0)121 213 3001 www.arup.com

Client

1

127

Job Title Luton Masterplan

5

Crawley Green Road / Lalleford Road

Shelter - 2039 (Do Something)

y

a Scale at A3 W 1:500

d

r Discipline

o Transport Planning 6 f

e

ll Job No Drawing Status

a

L 259393-10 Information

Drawing No Issue

2 117 SK034 02 © Crown copyright and database rights (2018) Ordnance Survey 0100031673

Do not scale © Arup A3 A B C County CourtD E F G

dgn . N 041

Recreation Ground K S \ s ng i

Old Park Road w a r D 0_ \ s ng i

1 w a r D

03 - 4 \ a t a D

t ec j o r P

l

~ a n

Widening to east of Upper Tilehouse St r e t n I

to provide increased length of two lane entry 4 \ 10 - 259393 \ 259000 :\ J 2

A505 Upper Tilehouse St Garage

66 41

REET ST E 3 S 02 23/05/19 NS JO JO HOU ILE Mitigation Proposals Amended T R 01 29/01/19 NS JO JO

E PP m 36 70 U .87 First Issue 74 Issue Date By Chkd Appd BM

T I LE

35 HOU

44 AY

W S E The Arup Campus, Blythe Gate, Blythe Valley Park

Solihull, West Midlands B90 8AE

4 2

K 75 T +44(0)121 213 3000 F +44(0)121 213 3001 3 B S www.arup.com R M T A R Client 73 EET P Widening to east of Park Way to provide 77 increased length of two lane entry .07

m 78 j

Job Title

29 Luton Masterplan Tilehouse Street Baptist Church 5

A602 Park Way A602 Upper Tilehouse St / Park Way Mitigation 3

T 2039 (Do Something)

B il

e a

hou p 2 ti

s

s t e Scale at A3

C

S hu 1:500

t

r

r ee 14 c to Discipline h 17

t The Transport Planning 6

1 Chapmans Job No Drawing Status 259393-10 Information

26 Drawing No Issue

to SK041 02

29 Rob Do not scale ert © Arup Tebbu tt C ourt A3 A B C D E F G

dgn . N 040 K S \ s ng i w a r D B 0_ \

E s a l ng

H i r 1 S w o a G a ub r D

58 i m l

n 03

e - 4 a e S \

nd a t t S u a a D

i lt t B ng ea ec j o

i r r 1 P

l l

c l a

e n h r e

t t n I

w on 4 W \ ood

W 10 - a a v l

e t 259393 \ on L n 5 C 5 yn e

r 259000

y :\

a J t

2 i on g

l R ea EET TR u S ss E S PH e

ll H HOU ' E s

IL P

T 45 ER BM S HITCHINHITCHIN PP li U p 75.60m 2

3 02 02/07/19 NS JO JO

Design Updated 14

01 29/01/19 NS JO JO

SE HOU First Issue LE TI R B655 Pirton Road E Issue Date By Chkd Appd EET UPP R ST

GP Mini roundabout to be realigned to The Arup Campus, Blythe Gate, Blythe Valley Park 4 Solihull, West Midlands B90 8AE provide two-lane entry from Upper T +44(0)121 213 3000 F +44(0)121 213 3001 www.arup.com Tilehouse Street Client 1 to 10

10

o t

1 App W l e s RATTE tree N s e ROAD e r WE t ST e l Job Title

pp A Luton Masterplan

1

1

5 j 29 A505 Offley Road

Proposed Pirton Road /

22 Offley Road Mitigation 4

20

2 2039 (Do Something)

Scale at A3 1:500

Discipline Transport Planning 6

Job No Drawing Status 259393-10 Information

77.4m Drawing No Issue

1 SK040 02

Do not scale © Arup L A T A B C D E F G C A3 S H

t M 40

J 1 O

o R h E n

' C dgn

. H s 4

L I 2 O T P S N C a 3 E H t I h

N 042

H K ILL S \ s ng i w a r

78 D .7

m 0_ \

The s OAD R

Haven ng i

P S '

R w

1 4 I 5 a

O

OHN r R Millford J

D Y

T

S 4 E 7 03 ND

House - 4 \ a Hitchin Hill t a D

8 t ec j o r P

4

l 6

3 a n B r

M e t

85 n I

. 51 4

) m 1 \

m 10

u -

(

h t Lodge

a

P 259393 Widening to Hitchin Hill to provide 19 \

increased length of two lane entry flare 259000 :\ J 2 84.1m

TCB 1 The Three Moorhens

(PH)

Widening to Stevenage Road to provide increased length of two lane entry flare

W e s t C b r ou oo r t k A505 Park Way 85.8m 15

1 7

t o

2 7 2 9

t o

FB 39 3 02 23/05/19 NS JO JO

Mitigation Proposals Amended PARK WAY

87.2m 01 29/01/19 NS JO JO

First Issue

HITCHIN Issue Date By Chkd Appd

HILL

Path (um) Dower Court

Roundwood 2

4 9

o

t a 4

1 A602 Stevenage Road Widening to Park Way to provide increased length of two lane entry flare Rubicon e n a L The Arup Campus, Blythe Gate, Blythe Valley Park 's r e Oakwood h c t Solihull, West Midlands B90 8AE 4 u B T +44(0)121 213 3000 F +44(0)121 213 3001 www.arup.com 8

Client

15

th a P

1 5 l il H

n i h c it

H 4 Job Title

Montserrat Luton Masterplan

5

3 2 4 5

5 4 3

to

1

m .23 87.1m 88

M

B A602 Park Way / 7

LB 9

Priory Park T R Stevenage Rd Mitigation

OU

C 6

2

t

O o M

EL 9

T S

2039 (Do Something)

11

1 a Scale at A3

1:1000 1

5 Discipline P

a 1

7 6 Transport Planning t 6 h

( u m Job No Drawing Status )

259393-10 Information 1 a 8 Drawing No Issue SK042 02 8

E IV R D Do not scale © Arup H C

OA C A3 A B C D E F G

D r a

i n dgn . N 031 K S

Key: \ s

n i a ng r i D w

in a a

r r D Proposed Works D 0_ \ Gantry s

OAD R

H ng i RC U

H w 1 C NE W a LA ND r S R OA D D

Vicarage 03 - 4 N \ a ew t la El Sub Sta a D

nd s t R ec o j a o d r P

y l

Gantry a a Pond n r e W t n

I

t

r 4 \ 10 - D po r a r Length of two lane merge increased by in i A

259393 approx. 150m above existing w \ e N

259000 :\ J 2 Gantry 1081 1 A 08 1 A

P

a

t

h

(

u

m

) Two northbound lanes merge into one

05 08/07/19 NS JO JO

Junction Layout Amended Slip End

Y 04 30/01/19 NS JO JO A W

ain T Dr R O P R Gantry I A Junction Layout and Year Amended

W E N 03 04/12/18 NS JO JO 2 5 Merge Layout Amended

35

3

02 06/11/11 NS JO JO 34

) m S u

U

(

2 MM 4 Junction Layout Amended E R h 4 t S 5 T a R P EET s u Gantry

46 un a 5 F 01 13/06/18 NS JO JO 5 5

6 60 6 3 First Issue

1

2 Issue Date By Chkd Appd

7 72 9 Three lanes merge into two before segregated

72 T Mast

a r

S 74 ac K A

O k 74

E a

7 H left turn lane joins from M1 southbound 6

76 T

a 7

8

8 0

8 7 8

7

8 8

4 13

10 12

9 6 9 Slip End Social Club

k l a W 79 l T o The Arup Campus, Blythe Gate, Blythe Valley Park EE ho R c 11 T S S Solihull, West Midlands B90 8AE 4 d l W O E

91 N T +44(0)121 213 3000 F +44(0)121 213 3001 1 3 5

www.arup.com 14 Allotment Gardens

16 81 A10

Client 58 White lining amendments and widening to provide

95

01 1 1 four circulatory lanes, allowing two northbound

1 lanes onto M1 and three eastbound lanes onto

1 a Gantry

A1081 from M1 D r

a 3 i n

D r

2 7 a

i F n R ON T Round Wood S T R EET Job Title

Luton Masterplan

6 8

Electricity Sub Station 5

168.2m

A1081 New Airport Way / M1

n

i

a

r Junction 10

D Northbound off-slip to be widened to provide - 2024 (Do Something)

three lanes on approach to circulatory

8 12

Scale at A3 um) Path ( N.T.S.

Path Gantry Discipline Transport Planning 6 FB

Job No Drawing Status Pond

Balancing Pond GP 259393-10 Information Little acre Pepperstock Drawing No Issue

Ashridge © Crown copyright and database rights (2018) SK031 05 Half Moon Ordnance Survey 0100031673 (PH)

Do not scale © Arup