London Airport Ltd A Luton Council company
Future LuToN: Making best use of our runway London Luton Airport Limited (LLAL)
Preliminary Environmental Information Report Volume 2: Figures
October 2019
Future LuToN: Making best use of our runway
Preliminary Environmental Information Report Volume 2: Figures
October 2019
LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1
Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures
Contents
PART A - Drawings used to inform the Preliminary Environmental Information Report, provided in this Volume Earthworks LLADCO-3B-ARP-WHS-BEW-DR-GT-0001: Earthworks Stage 2 Design Existing Landform LLADCO-3B-ARP-WHS-BEW-DR-GT-0002: Earthworks Stage 2 Design Proposed Landform LLADCO-3B-ARP-WHS-BEW-DR-GT-0003: Earthworks Stage 2 Design Section A-A LLADCO-3B-ARP-WHS-BEW-DR-GT-0004: Earthworks Stage 2 Design Section B-B LLADCO-3B-ARP-WHS-BEW-DR-GT-0128: Earthworks Landfill Excavation and Deposition LLADCO-3B-ARP-WHS-BEW-DR-GT-0127: Earthworks Level Change for 25mppa LLADCO-3B-ARP-WHS-BEW-DR-GT-0126: Earthworks Level Change for 32mppa
Zone 6 Highway Interventions Z6.1 and Z6.2: SK045 CPAR Alignment – Consented Layout / Proposed Amendments (2024, 2029, 2039) Z6.6: SK020 - Windmill Road / Kimpton Road - 2024 (Do Something) Z6.7: SK021 - A505 Gipsy Ln / Parkway Rd - 2024 (Do Something) Z6.8: SK022 - A505 Kimpton Road / Vauxhall Way – 2029 (Do Something) Z6.9: SK023 - Eaton Green Road / Lalleford Road - 2029 (Do Something) Z6.10: SK024 - Wigmore Lane / Crawley Green Road / Raynham Way - 2029 (Do Something) Z6.10: SK035 - Wigmore Lane / Crawley Green Road / Raynham Way - 2039 (Do Something) Z6.11: SK025 - Wigmore Lane / Eaton Green Road - 2029 (Do Something) Z6.11: SK036 - Wigmore Lane / Eaton Green Road - 2039 (Do Something) Z6.12: SK026 - A1081 / London Rd (North) - 2024 (Do Something) Z6.13: SK027 - Windmill Rd / St. Mary's Rd / Crawley Green Road Gyratory - 2029 (Do Something) Z6.14: SK034 - Crawley Green Road / Lalleford Road - 2039 (Do Something) Z6.15: SK041 - A602 Upper Tilehouse St / Park Way Mitigation - 2039 (Do Something) Z6.16: SK040 - Proposed Pirton Road / Offley Road Mitigation - 2039 (Do Something) Z6.17: SK042 - A602 Park Way / Stevenage Rd Mitigation - 2039 (Do Something) Z6.18: SK031 - A1081 New Airport Way / M1 Junction 10 - 2024 (Do Something)
PART B - Preliminary Environmental Information Report figures provided in this Volume Figure 1-1: Site location plan Figure 2-1: Redline boundary Figure 2-2: Development areas Figure 2-3: Existing Airport Infrastructure Figure 2-4a: Parameter Plan Figure 2-4b: Parameter Plan - Zone 6 Highway Interventions Figure 2-5: Green Infrastructure Plan - 25mppa Figure 2-6: Green Infrastructure Plan - 32mppa
LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 1
Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures
Figure 5-1: Study area and affected road network Figure 5-2: Area of NAEI gridded emissions and location of rural monitoring sites Figure 5-3: Construction dust buffers for the existing area Figure 5-4: Construction dust: buffers for the expansion area Figure 5-5a: Assumed construction traffic route Figure 5-5b: Assumed construction traffic route (focus) Figure A5-2: Modelled LTO sources - brake & tyre wear Figure A5-3: Modelled LTO sources - final approach Figure A5-4: Modelled LTO sources - arrivals 08 Figure A5-5: Modelled LTO sources - arrivals 26 Figure A5-6: Modelled LTO sources – taxi in 08 in baseline, 2024 DM, and 2024 DS scenarios Figure A5-7: Modelled LTO sources – taxi in 26 in baseline, 2024 DM, and 2024 DS scenarios Figure A5-8: Modelled LTO sources – taxi out and hold 08 in baseline, 2024 DM and 2024 DS scenarios Figure A5-9: Modelled LTO sources – taxi out and hold 26 in baseline 2024 DM and 2024 DS scenarios Figure A5-10: Modelled LTO sources - taxi in 08 in 2039 DS scenario Figure A5-11: Modelled LTO sources - taxi in 26 in 2039 DS scenario Figure A5-12: Modelled LTO sources - taxi out and hold 08 in 2039 DS scenario Figure A5-13: Modelled LTO sources - taxi out and hold 26 in 2039 DS scenario Figure A5-14: Modelled LTO sources - departures 08 Figure A5-15: Modelled LTO sources - departures 26 Figure A5-17: Location of modelled auxiliary power units (APUs) in baseline and DM scenarios Figure A5-18: Location of Modelled APUs in 2024 DS Scenario Figure A5-19: Location of modelled APUs in 2039 DS scenario Figure A5-20: Location of modelled aircraft engine testing and fire training ground in 2024 and 2039 DS scenarios Figure A5-22: Location of modelled aircraft engine testing and fire training ground in baseline, 2024 and 2039 DM scenarios Figure A5-25: Location of Modelled Ground Support Equipment (GSE) in baseline and DM Scenarios Figure A5-26: Location of modelled GSE in 2024 DS scenario Figure A5-27: Location of modelled GSE in 2039 DS scenario Figure A5-28: Location of modelled heating and energy plant in baseline, 2024 and 2039 DM scenarios Figure A5-29: Location of modelled heating & energy plant in 2039 DS scenario Figure A5-32: Location of modelled car parks in baseline and future DM scenarios Figure A5-33: Location of modelled car parks in 2024 DS scenario Figure A5-34: Location of modelled car parks in 2039 DS scenario Figure A5-39: Overview: Modelled human receptors Figure A5-40: Modelled ecological receptors Figure 6-1: Local Transport Network Figure 6-2: Strategic Transport Network Figure 6-3: Simulation Network Figure 9-1: Air Surface Noise Study Area Figure 9-2: Ground Construction Noise Study Area Figure 9-3a: Baseline Noise Monitoring Locations Figure 9-3b: Baseline Noise Monitoring Locations Figure 9-4: Extent of 2017 Baseline 16h Noise Contours Figure 9-5: Extent of 2017 Baseline 8h Noise Contours Figure 9-6: Baseline Roadside Traffic LAeq 16h Figure 9-7: Extent of 2029 DN 16h Noise Contours
LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 2
Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures
Figure 9-8: Extent of 2029 DN 8h Noise Contours Figure 9-9: Extent of 2029 DS 16h Noise Contours Figure 9-10: Extent of 2029 DS 8h Noise Contours Figure 9-11: Change of 2029 DS DN 8h Noise Contours Figure 9-12: Change of 2029 DS DN 16h Noise Contours Figure 9-13: Extent of 2039 DN 16h Noise Contours Figure 9-14: Extent of 2039 DN 8h Noise Contours Figure 9-15: Extent of 2039 DS 16h Noise Contours Figure 9-16: Extent of 2039 DS 8h Noise Contours Figure 9-17: Change of 2039 DS DN 16h Noise Contours Figure 9-18: Change of 2039 DS DN 8h Noise Contours Figure 9-19: Change in Roadside Traffic Noise in 2029 LAeq 16h Figure 9-20: Change in Roadside Traffic Noise in 2039 LAeq 16h Figure 10-1: Baseline Conditions - Areas of Proposed Development Figure 10-2: Potential Sources of Contamination Figure 11-1: River and Surface Water Flood Risk Figure 11-2: Groundwater Features Figure 13-1: Airport Employment Area Figure 13-2: Peak-Hour Drivetime From London Luton Airport Figure 13-3: Geographic Coverage of the Study Figure 14-1: Health and Community Study Areas Figure 14-2: Recreational Routes User Count Survey Locations Figure 15-1: Agricultural Land Classification Figure 16-1: Ecological Statutory Designated Sites Figure 16-2: Ecological Non-Statutory Designated Sites Figure 16-3: Ecological Constraints Plan Figure 17-1: The Site and Landscape Study Area Figure 17-2: Zone of Theoretical Visibility Figure 17-3: Local Landscape Character Areas Figure 17-4: Topography Plan Figure 17-5: Aerial Photograph Figure 17-6: Public Rights of Way Figure 17-7: LVIA Constraints Plan Figure 17-8: Assessment Viewpoint Locations Figure 17-9: Landscape Masterplan Embedded Mitigation Figure 17-10: Landscape Masterplan Additional Mitigation Figure 18-1: Cultural heritage constraints Designated assets plan 1 of 2 Figure 18-2: Cultural heritage constraints Designated assets plan 2 of 2 Figure 18-3: Cultural heritage constraints non-designated assets Figure 18-4: Heritage Constraints Plan – Historic Landscape Figure 18-5: Designated Heritage Constraints change of 2029 DS DN 16h Noise Contours Figure 18-6: Designated Heritage Constraints change of 2029 DS DN 8h Noise Contours Figure 18-7: Designated Heritage Constraints change of 2039 DS DN 16h Noise Contours Figure 18-8: Designated Heritage Constraints change of 2039 DS DN 8h Noise Contours Figure 18-9: Layout of (forthcoming) trial trenches on LLAL holdings in Herts Figure 20-1: Other Airports in South East
LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 3
Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures
Figure 20-2: Cumulative Assessment Core Zones of Influence Figure 20-3: Cumulative Effect Assessment (CEA) Wider Zone of Influence Figure 20-4: Cumulative Effect Assessment ‘other development’ search area Figure 20-5: Cumulative Effect Assessment Planning Applications Figure 20-6: Cumulative Effects Assessment Planning Allocations
Figures contained within Volume 1: Main Report of this Preliminary Environmental Information Report
Figure 2-7: Outline Construction Programme Figure 6-4: Passenger throughput at Luton Airport Parkway Station Figure 6-5 Distribution by time of peak hgv construction traffic Figure 7-1: CCR assessment methodology flow diagram Figure 7-2: ICCI assessment methodology flow diagram Figure 8-1: DM Operation GHG emissions (MtCO2e) Figure 8-2: DS DCO-embedded Figure 8-3 Operation emissions: DS DCO-embedded (tCO2e) Figure 8-4: GHG emissions impact DM and DS DCO-embedded Figure 10-3 Proportion of waste type encountered per exploratory hole
Figures contained within Volume 3: Appendices, Appendix 5 Air Quality of this Preliminary Environmental Information Report
Figure A5-1: IAQM dust assessment methodology Figure A5-16: Monthly profile for helicopter use (2017) Figure A5-21: Monthly profile of engine testing (2017) Figure A5-23: Monthly profile for the fire training ground Figure A5-24: Diurnal profile for the fire training ground Figure A5-30: Gas consumption (MWh) for boilers (2017) Figure A5-31: Construction traffic movements Figure A5-35: Luton Airport 2016 wind rose Figure A5-36: Model performance with adjustment – airport Figure A5-37: Model performance with adjustment – roads Figure A5-38: Model performance with adjustment – Hitchin
LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 4
Future LuToN: Making best use of our runway Preliminary Environmental Information Report Volume 2: Figures
PART A - Drawings used to inform the Preliminary Environmental Information Report
LLADCO-3B-ARP-00-00-RP-YE-0006 | Issue 1 | October 2019 Page 5
A3 A B C D E F G n g R e S c h r e e l a t e d
6 t r io n 11
22 . 2
4 2 G 1 r
o
u 6 n 1 EA 13 d TO 5 N 1 G 4 F RE il EN li R n O M 9
g A a D 7
s 4 S t t a ( t t
i e 1 10 o 3 23 l BA n e RNS 2 5 c TON CL . OS 9 o E 0 6 18 m
m m
u 2
n 1 ic
22 a 1 t 49
io 2
n 8 K 24 1 ) 18
19 E
l e 42 30 c 8 S
1 D t i r 10 1 s i
t c \ 0 Key: i 1
r t 1 2 N ib y u H t e io a s 3 n lt
5 2 h 7
S 7 C 4 e
26 it 1 n e t
r g T e a 3 9 S n 5 M CCHE 5 k LORTS 3 SEEY 3 4 2
14 n
12 6a 6
17 4
3
1 i
2 7 15 E 42 1 1 l b
T S 4 1
a u 2 6
n b 2 1
k 2
S
t
5
6 a E L 4
1 S w 2
4 2 O I
4 1 8 L N W 1 C ND . 4 A 8 a L H D NAY i m 1 T g OR S m 4 W E o
0 S r a L 5 0 HE Y e 4 C C
1 R P
L r
1 a O 6 O r 4 9 A k 1 3 S D E C
4 e
4 1
1 3 n
32 6
7 7
1 t
1 D 4 Consented CPAR r 3 e 4 3
9 8 _ 4
3 H
4 R 1
a
9 a 2 1 6 1
2 y 4 4 r n 0 10 0
Eaton Green Road 1
t . 4 h 7
a m 9
o m 2
\ E p
a W 3 t W o a E
n L C y D a
a 48 50 T ON
H 1 4 37
16 i 52 o C 2 C 3 b o 51 L s
u 7 7 o e OS 5 u E
s m H r e 0 2
r m 9 o
E u 38 5 u
31 t 56 n 39 33 6 s a it e 3 g t y Alignment
15 5 1
4 57 o 2
3 34 C 6 9 e . 8 5 32 n n m t 1 r 8
e 3 n L L i
B 11 A 4
3 Shelter P 4 Y
3
D
l H P 1
a l
a R
A
m 1 8 .3 c y 52 I M
1 3
V e A r
e w a ARD E 1 1 LEIGH
5 GREE EN ROAD 2 N EATON GRE .3 1 1 m 5 1
5 a 4 1 0 4 . 32 .8 2
m m 27 r
4
2
4 10 2 5
2 12 W
I D 2 G
6 1
8 7 M
E 2 2
l 16 O S R
u 14
8 E b 18 9 2
S .7 B t m L
a A A 3
Y N 0
L E 4 9
K A
E M S
h 0
E e 3 l B t M 5 D e a L r Proposed Amendments -
E r
E l L b o
L r o u g h 10 4
1 1 1
4 1 H
5 \
7 29 o 35
.7 u
m o C s t e
L
0
O 33 5 1 EA 1 OFT
T 2 R
O 6 C a N 4 G S LEY REE 4 BIRT N E ROA
D t
5
3
7
5 4 7 5
4 Frank Lester Way
E t l 2 J 9 a
W o
o S u K o
r b 4 k t 4
C 3 S s t a 6
L 1
D 8 A E 6
o l
2 4
1 t t 4 5 S 4 u .9 b m S t a c
E
l
A 1 S 1 u E
i C e r 3 b A
E p S L M P 4 t j x o a E e r R O C c t M h G y u E I 1 ATON P W t 4 GRE p o 2 EN R g iv . OAD 1 S e m t W P r a ig a m o r r k e 1 1 3 3 H 9 9 o .8 .8 u P m m s e
l
S N h e lt a e r
T a E n n k s r
1 5 D 4
.8 e m 5 t
F n
14
B 0 I a .2 la m
n c in g NUMBER 4 ING STRUCTURE P RETAIN o n HEATON DELL 4 d \
B C
a 0
r E a 1 H t ir o e n
C H 1 e o n u t s r e - e
14
2 3 .4 m
S 9 h e lt e r P 3 R
O 1 F 4 V B 0 AY O W NT 9 S E SID T RE M P a s t W F
R 5 A
A Y
N
K S
o 2 a L k a E 3 Eaton Green R w BE \ S UM a E N y 11 UR T CT TRU E G S ININ R A RET
E 0 l W S 5 u A b
Y S t a 5 0 0
1 E 9 5 l Road Link 7 S . u 5 b m S t a 3 5
1 E l 2
S 8
u \ b 6 B S
u t : i a ld in g E l S 9 u J 4 b
S t a
K 2 e n s a l P H o o s u t s s e
E S 24 S
2 5
Y 0 A 1 W AL IV RC PE P s
D e
123 H a v il
la
9 n
H
d a n
g
a L
H r
1
o 2 T u 9 w s r e Y E A l W S CE u IN b PR S 1 t 6 a 1. 1m C a r
P a sts f Po 1 r Line o 6 1 E k .5 l S m u 15 b E 9 S l .4 t S m a u b
S t L a T w
r
4
0
1
o
t
2
7
1 g
6 n
0 i
d
. l
9 i
m u B
E l S u b
S t a L
T w r
S h e lt e r L C T o w m L r m u T n w it r T y a n Percival Way C e k n t L r e T P w a r v L il io T n w r P la E S y S s A r e a
L
T w r
P
5
3 1 R
E
S
I
D
E L B T r N w i r t a T n n ia
H W o u s e A E
Y a t o n R e G c r y e c e l n in g
L L C ig T h w e t r in n g
C t o r lu m n e
L
T w r
5 12 r ge an
3 H 02 19/09/19 LS JO JO L S ig
h M t in g
C o lu m L n E T l w r S u
S b M
l Title updates o a s
p S t i
n t
g (T
a e
m le
a c
s o
o m n m u r n W
y ic a t i i g o n ) m o r e 01 12/09/19 NS JO JO
V a l L l
T e w r y
P Consented CPAR Layout a r First Issue k L
T w L r T w r E S l u S b h S t e a lt e r Issue Date By Chkd Appd
L
T w
r
M
I
S
T
L
E T
O E
E IV R
D H M HA
I AY L L
L 3 12 13 3 1
5
5 5 1
. 1 4 6 G 1 E m R .9
5 E m A S 4 T H 25 O A M 7 N
C
G L 0 28 R O 1 F E S
E E A N L
S R 14 O U T
12
N O D 8 GREEN
A N B 2 O 1 E
U 3 5 0 T . R 5 e m c S r h e e 0 lt a e 5
6 t r io
n 11
22 2
4 2 G 1 r
o
u 6 1 n EA 13 d TO N 1 N G 4 F RE il EN li R n O M 9
g A a D 7 s S t t a ( t t
i e 1 10 o 3 23 l BA n e RNS 2 5 c TON CL . o OSE 9 6 18 m
m m
u 2 n 1 ic
22 a 1 t 49
io 2
n 8 24 1 ) 18 19 E
l e 42 30 c 8
1 D t r 10 is 1 t ic
i 1 0 r t 1 ib y 2 u t H e io a 3 n lt
5 2 h 7
S 7 C
4 e 26 i 1 n t t e r T e a 3 9 S n 5 M CCHE 5 k LORTS 3 SEEY 3 4 2
14
12 6a 6
17 4
3
1
2 7 15 E 42 1 1 l b
T S 4 1
a u 2 6
n b 2 1
k 2
S
t
5 6 a L 4 1 SE
4 O I 2
4 1 8 L N W 1 C ND . 4 LA 8 D AY m TH N ig OR S m 4 W E o
0 S r L 5 0 HE Y e 4 C C
1 R P L
1 a O 6 O r 4 A k 9 1 3 S D E C
4 e
4 1
1 3 n
32 6
7 7
1 t
1 4 r 3 e 4 3
9
Eaton Green Road 8 4
3 H The Arup Campus, Blythe Gate, Blythe Valley Park
4 R 1
a
9 a 2 1 6 1
2 y 4 4 r n 0 10
1
t . 4 h 7
a m 9
49 o m
47 2 E p
a W 3 t W o a E
n L C y D a
a 48 50 T ON
H 1 4 37
16 i 52 o C o 2 51 C 3 b L u 7 7 o e OS
5 u E Solihull, West Midlands B90 8AE
s m H r e 0 2
r m 9 o
E u
4 5 38 u
31 t 56 n 39 33 6 s a it e 3
t y
15 5 1
4 57 o 2
3 34 C 6 9 e . 8 5 32 n n m t 1 r 8
e 3 L L T +44(0)121 213 3000 F +44(0)121 213 3001
B 11 A 4
3 Shelter P 4 Y
3 D
l P H
a l
a R
A
m 1 8 .3 c y 52 I M
1 3
V e A r e a ARDL E 1 EIGH 5 GREE EEN ROAD 2 N EATON GR .3 www.arup.com 1 15 m
5 1 4 1 0 4 . 32 .8 2
m m 27 4
2
4
10
2 12 W
I 2 G
6 1
8 7 M
E 2 2 l 16 O S R
u 14
8 E b 18 9 2
S .7 B t m L
a A A
Y N 0
L E 4 9
K Client A
E M S h
E e 3 l B t M 5 D e a L r
E r
E l L b o
L r o u g h
1 1 1
4 1 H
5
7 29 o 35
.7 u
m o C s t e
L
0
O 33 5 1 EA 1 OFT
T 2 R
O 6 C N 4 G S LEY Frank Lester Way R 4 IRT EE B N E RO
AD
5
3
7
5 4 7 5
4
E t l 2 J 9
W o
o S u K o
r b 4 k t 4
C 3 S s t a 6
L 1
8 A E 6
o l
2 4
1 t
4 5 S 4 u .9 b m S t a
E l
A 1 S E 1 i u C r 3 b A
E p S L M P 4 t x o a E e r R O C c t M h G y u E I 1 ATON P W t 4 GRE p 2 EN R g iv . OAD 1 S P e m t W a ig a m o r r k e 1 3 13 H 9 9 o .8 .8 u m m s e
S h e lt e r Access to parking area
T a E n k s
1 5 D 4 .8 m 5
F
14 B 0 a .2 la m n c in g
P o n HEATON DELL d
B C a r E a Job Title
H t ir o e n
C H e o n u t s r e e
14 2 .4 m
S h e lt Luton Masterplan e r P
R
O 1 F 4 V B 0 AY O W NT S E SID T RE M P a s t W F
R A
A Y Eaton Green N
K S o a L k a E w S a y T
E
R
E l W S 5 u A b
Y S t a Road Link 5
1 E 5 l 7 S . u 5 b m S t a 3
1 E l
S 8 u b 6 B S u t i a ld i n E 5 g l
S 9 u 4 b
S t a
K e n s a l P H o o s u t s s e
E S 24 S
2 5
Y 0 A 1 W AL IV RC PE P s
D e
123 H a v il
la
9 n
H
d a n
g
a L
H r
1
o 2 T u 9 w s r e Y E A l W S CE u IN b PR S 1 t 6 a 1. 1m C a r
P a sts f Po 1 r Line o 6 CPAR Alignment 1 E k .5 l S m u 15 b E 9 S l .4 t S m a u b
S t L a T w
r
4
0
1
o
t
2
7 - Consented Layout /
1 g
6 n
0 i
d
. l
9 i
m u B
E l S u b
S t a L
T w r
S h Proposed Amendments e lt e r L C Percival Way T o w m L r m u T n w it r y T a C n e k n t L r e 7 T 12 P w a r v L il io T n w r P la (2024, 2029, 2039) E S y S s A r e a
L
T w r
P
5 3 1 Airport TerminalR Access E
S
I
D
E L B T r N w i r t a T n n ia
H W o u s e A E
Y a t o n R e G c r y e Scale at A3 c e l n in g
L L C ig T h w e N.T.S. t r in n g
C t o r lu m n e
Discipline Transport Planning 6
L
T w r
25 1 er ng
Ha Job No Drawing Status L S ig
h M t in g
C o lu m L n 259393-10 Information E T l w r S u b M a s S t t (T a e le c o m m u n W ic © Crown copyright and database rights (2018) a i Drawing No Issue t io g n ) m L ig o h t in r g Proposed Amendments
T o To Long Stay Car Park e w e r Ordnance Survey 0100031673 V a l L l
T e w r SK045 02 y
P a r k
Do not scale © Arup E l
A3 A B S C D E F G ub
S U dgn
t n . N 1 a it
t s 105.5m 41
o 020
K 43 4 S
Key: \ s ng i w a Proposed Works r D
Sports Court 4 5 0_ \ s ng i
1 w a r D Works 03
W - 4
I \ ND a t M a I
LL D
t
R ec OAD j o r P
FB l a n r e t n I
4
W \ 10 ind -
m
63 259393 il \ l R o 259000
a :\ d J 2
71
El Sub Sta
1
Shelter
Road 110.3m 03 07/02/19 NS JO JO Kimpton Minor Amendments
3 02 29/01/19 NS JO JO
KIMPTON ROAD Minor Amendments
106.7m 01 01/10/18 NS JO JO
First Issue
Windmill Issue Date By Chkd Appd (PH) Kerb realignment to increase Minor widening to accommodate entry radius from Kimpton Rd three-arm signalised junction with
two lane entries along Windmill Rd W I ND M I LL Mast (Telecommunication) R The Arup Campus, Blythe Gate, Blythe Valley Park OAD 4 Solihull, West Midlands B90 8AE 95
T +44(0)121 213 3000 F +44(0)121 213 3001 t o www.arup.com Tank 115
Client
r
i e
W
Job Title W FB Luton Masterplan in d m A l ill l o t m R e n t 5 o G a a r d d e n s
111.9m Windmill Road / Kimpton Road
El Sub Sta - 2024 (Do Something)
OSBORNE ROAD
ROUNDABOUT Scale at A3 1:1000
Discipline Transport Planning 6
Job No Drawing Status 259393-10 Information
R Griffin House iv Drawing No Issue e r
L SK020 03 © Crown copyright and database rights (2018) e a
Ordnance Survey 0100031673 o r
Do not scale L © Arup ee A3 A B C D E F G
Luton
Depot
Airport dgn . N Parkway P a v ili 021 o n K S
Key: \ s ng i w a Proposed Works r D 0_ \ s
Bowling Green ng i
Car Park 1 w a
A r D
505 03 El Sub Sta -
4 G \ a i t
p a
s D
y t
L ec j
a o n r P
e l a
G n IP r S
Y e
L t A N
E n I
4
Shelters \
Car Park 10 -
Subway 259393 \ 259000 :\ Kerb realignment to increase length of J 2 two-lane entry along A505 Gipsy Lane
Butt P A R K W A Y R
i R ov OAD Lighting Tower
er
r Play L
L ee ea Area
Tennis Courts Pond
Sports Court
Vauxhall Tennis Courts 04 06/08/19 NS JO JO M
i n
i a
t
u
r
e P
Recreation Club R i f Minor Amendments to Frame MP 29.0
l e
a
R
a
n
g r (Leisure Or Sports Centre) e k 03 17/06/19 NS JO JO
Tank w
a Amendments to A1081 y 3 Minor widening to accommodate R 02 29/01/19 NS JO JO PARKWAY length of two left turn lanes onto A1081 o a Minor Amendments FB d 01 13/06/18 NS JO JO
Cycle Way
First Issue
Issue Date By Chkd Appd
Gantry
AY W T OR GIPSY LANE P IR A W NE
Gantry th Pa The Arup Campus, Blythe Gate, Blythe Valley Park 4 Solihull, West Midlands B90 8AE L OW ER T +44(0)121 213 3000 F +44(0)121 213 3001 HA RP EN DE www.arup.com N RO AD Lo Client we AY W r T OR H P IR A a W NE rp end en R oa FB d
Job Title Luton Masterplan um) h ( Pat
5 Carriageway widened into central reserve k ac r T area to accommodate three lanes in both directions along A1081
A505 Gipsy Ln / Parkway Rd
R
i
v L e ea
r
o
r - 2024 (Do Something)
L
ee Park Street Lodges
Scale at A3 1:1500
Discipline Transport Planning 6
Job No Drawing Status 259393-10 Information
k
ac r T Drawing No Issue SK021 04 © Crown copyright and database rights (2018) Ordnance Survey 0100031673
Do not scale © Arup A3 A B C D E F G
dgn . N 022
y K S
Key: \ a s ng i W
w a ll Proposed Works r D
a
Vauxhall Way to be widened 0_ \ s ng i to dual carriageway to north uxh 1 w a a r D
of junction with Kimpton Road V 03 - 4 \ a t
Works a D
t ec j o r P
l a
SM n r e t n
SM I
Tanks 4 \ Tanks 10 Kerb realignment to provide two - lane exits and increased entry 259393 \ capacity where possible 259000 :\
FB J ay 2 W rt irpo A
117.8m
Segregated left turn lanes provided on all approaches to junction
Roundabout replaced with 03 29/01/19 NS JO JO 8 four arm signalised junction Minor Amendments
3 K 113.8m IMP 02 06/11/18 NS JO JO TON
ROAD AIRPORT WAY Vauxhall Way Dualled Shelter 01 13/06/18 NS JO JO El Sub Sta A505 Kim 109.7m pton Rd First Issue
Issue Date By Chkd Appd 4
k r a P l ia r t s du In
t t a r r a B Vauxhall Business Mall
AY W
T The Arup Campus, Blythe Gate, Blythe Valley Park R O
P A IR Solihull, West Midlands B90 8AE 4 A
W E T +44(0)121 213 3000 F +44(0)121 213 3001 N Two left turn lanes 1 www.arup.com provided Client Garage
D
OA R El Sub Sta
N
E Job Title LL
W A
H
X
A U Luton Masterplan
I
R
VA
P
O
R
T
W
AY 5
P a t h
A505 Kimpton Rd / Vauxhall Way D r
a i n - 2029 (Do Something)
Widening to extend two lane approach
to junction and provide lengthened two lane exit Scale at A3 1:1250
k
ac r Discipline T Transport Planning 6
Job No Drawing Status 259393-10 Information
Drawing No Issue SK022 03 © Crown copyright and database rights (2018) Ordnance Survey 0100031673
Do not scale © Arup A3 A B C D E F G
dgn . N 023 K S
Key: \ s ng 4 i w a Proposed Works r D 0_ \ s ng i
1 w a r D
03 - 4 \ a t a D
t ec j
E o a r P
t l a
5
on n r e t
n 1 I
2 4 \ 10 -
P
l ace 259393 \
1 259000
:\ 7
L J a 2 ll e f o r d
1b W 57
a
y
a d 1 R 56 n ree G ton
Ea
4
3 o 02 29/01/19 NS JO JO
t H
a
1 Minor Amendments r t op 01 01/10/18 NS JO JO
First Issue C
ou Issue Date By Chkd Appd
46 r
t
42
49
50 Mini roundabout to be replaced with The Arup Campus, Blythe Gate, Blythe Valley Park 4 7 Solihull, West Midlands B90 8AE 4 three arm signalised junction T +44(0)121 213 3000 F +44(0)121 213 3001 8 www.arup.com 4 Client
152.3m
52
L
51 Job Title Luton Masterplan r e lt e h K S 5 7 3
8 3 El Sub Sta Eaton Green Road / Lalleford Road OAD R
N EE - 2029 (Do Something) R G
33 ON T A Scale at A3 34 E 1:500
Discipline Transport Planning 632 Job No Drawing Status 259393-10 Information
Drawing No Issue SK023 02 © Crown copyright and database rights (2018) Ordnance Survey 0100031673 154.2m Do not scale © Arup A3 A B C D E F G BU
CKINGHAM DRIVE
dgn . N 024 K S
Key: \
s 4
ng
7 i
24
20
23
96 w 82 a Proposed Works r D 0_ \ s
D ng
A i O R 1 w N E a E r R
G D
1 Y
2 E L W 03 A - R C 4
E \
S
a 13 t
O 1 a
L
C D
t
NG
I ec
d j 1 o
OV R r P
n l a
ee n r r
2 e t
G n CE LA I P EX y
SS 17 4 SU le \ 10
w -
4 ra
C 3
144.3m 259393 Water Wigmore Primary \
School 259000 :\ J 2 Roundabout replaced with signalised 17 El Sub Sta
18
crossroads junction with pedestrian facilities 16
19
2 1
15 8
13 21
4
1 11
2
10 0 9
04 29/01/19 NS JO JO 3 2 2 7 Crawley Green Rd 4 2 28 29
6 Minor Amendments 3 0
CRAWLEY GREEN ROAD 03 22/11/18 NS JO JO
9 1
20 Minor Amendments
144.6m
8 31 1
3 02 06/11/18 NS JO JO 17 5 4
3 New Signalised Junction
12
2 9 6
11 1 01 01/10/18 NS JO JO
First Issue
36 1
16 14
0 F 37 1
EL
T 3 1 ON 39 38 T Issue Date By Chkd Appd
W C
L Y O S F
N E
O E
R E
D R
G D
W
R 13 15 6
I
V ON i 12 T
g E
S
8 I
3 m R
4 F
o 1 re PINFORD DELL L a n e 2 The Arup Campus, Blythe Gate, Blythe Valley Park
4 2 7 Solihull, West Midlands B90 8AE
1 T +44(0)121 213 3000 F +44(0)121 213 3001 1
W I 4 www.arup.com G M TCB 30 20 O 3 R 16 E 18 L Client AN E
1 4 Roundabout replaced with four arm ON T BARFORDWidening RISE to provide two R E D L A 9 C signalised junction with on-demand 1 L O lane approaches to junctions S E 143 pedestrian crossing facilities .4
m
37
35 G
27 11 17 a s
G 2 ov
e r n o r
Job Title 19 6
3 Luton Masterplan 0
1 2
4
9 143.3m
5 25
10
2
7 7 a 6 2
a 3 1 Wigmore Lane / Crawley E S O L 2 C
D R 141.9m Green Road / Raynham Way O 3 3 F 1 L E LB S 10 E O
M L 21 C 9
1 2 4 ING 0 L K 2 C I E
H S 3 O 1 L 11 - 2029 (Do Something)
C Shelter 1 1 AD
11 TE 5 X A
S 5
4 Widening to provide 3 Scale at A3
y 1:1250
12
2 a two lane junction entry 1 W E Discipline V I 9 2 Transport Planning R 5 6 D m M
18 a
Job No Drawing Status 5 AYHA
9 L 7
H 6
I 6 9
GHA ynh 10 259393-10 Information a 29 M 5 D E R R l S Drawing No Issue I 11 3 V ub
E S t a 2
16 SK024 04
9 © Crown copyright and database rights (2018) 11 7 AND Ordnance Survey 0100031673 L NAY 35
8 1 Do not scale © Arup A3 A B C D E F G BU
CKINGHAM DRIVE
dgn . N 035 K S
Key: \
s 4
ng
7 i
24
20
23
96 w 82 a Proposed Works r D 0_ \ s
D ng
A i O R 1 w N E a E r R
G D
1 Y
2 E L W 03 A - R C 4
E \
S
a 13 t
O 1 a
L
C D
t
NG
I ec
d j 1 o
OV R r P
n l a
ee n r r
2 e t
G n CE LA I P EX y
SS 17 4 SU le \ 10
w -
4 ra
C 3
144.3m 259393 Water Wigmore Primary \
School 259000 :\ J 2 Roundabout replaced with signalised 17 El Sub Sta
18
crossroads junction with pedestrian facilities 16
19
2 1
15 8
13 21
4
1 11
2
10 0 9
3 2 2 7 Crawley Green Rd 4 2 28
29 6
3 0
CRAWLEY GREEN ROAD
9 1
20
144.6m 8 31
3 1 02 29/01/19 NS JO JO
17 5 4
3 Minor Amendments
12
2 9 6
11 1 01 03/12/18 NS JO JO
First Issue
36 1
16 14 0 F 37
1 EL
T 3 1 ON 39 38 T Issue Date By Chkd Appd
W C
L Y O S F
N E
O E
R E
D R
G D
W
R 13 15 6
I
V ON i 12 T
g E
S
8 I
3 m R
4 F
o 1 re PINFORD DELL L a n e 2 The Arup Campus, Blythe Gate, Blythe Valley Park
4 2 7 Solihull, West Midlands B90 8AE
1 T +44(0)121 213 3000 F +44(0)121 213 3001 1
W I 4 www.arup.com G M TCB 30 20 O 3 R 16 E 18 L Client AN E
1 4 Roundabout replaced with four arm ON T BARFORDWidening RISE to provide two R E D L A 9 C signalised junction with on-demand 1 L O lane approaches to junctions S E 143 pedestrian crossing facilities .4
m
37
35 G
27 11 17 a s
G 2 ov
e r n o r
Job Title 19 6
3 Luton Masterplan 0
1 2
4
9 143.3m
5 25
10
2
7 7 a 6 2
a 3 1 Wigmore Lane / Crawley E S O L 2 C
D R 141.9m Green Road / Raynham Way O 3 3 F 1 L E LB S 10 E O
M L 21 C 9
1 2 4 ING 0 L K 2 C I E
H S 3 O 1 L 11 - 2039 (Do Something)
C Shelter 1 1 AD
11 TE 5 X A
S 5
4 Widening to provide 3 Scale at A3
y 1:1250
12
2 a two lane junction entry 1 W E Discipline V I 9 2 Transport Planning R 5 6 D m M
18 a
Job No Drawing Status 5 AYHA
9 L 7
H 6
I 6 9
GHA ynh 10 259393-10 Information a 29 M 5 D E R R l S Drawing No Issue I 11 3 V ub
E S t a 2
16 SK035 02
9 © Crown copyright and database rights (2018) 11 7 AND Ordnance Survey 0100031673 L NAY 35
8 1 Do not scale © Arup
A3 A B C D E F G 4
dgn . N 025
K 5 S
Key: \
s 5 ng
Wigmore Park Centre i w a
Proposed Works r 6 D 0_ \ s ng i
1 w
a 7 r D
03 - 4 \
a 8 t a D
Tiber t ec 141.9m House j o r P
l a n
r 9 e t n I
Shelter 4 10 \ 10 - 259393 \ 259000 :\
Marlborough House J 2 25 W ig m Wigmore House or 7 e L 9 140.7m a 2 n 9 e 5
3
11
AND
L 13 16 W Widening to provide IG NAY C M E L O C O RE S L Shelter A
E AN L 18 37 two lane entries E P
E
R
O
M 20 G I
W Roundabout replaced with four arm 1 0 4 signalised junction with on-demand 3 02 29/01/19 NS JO JO 3 9
2 pedestrian crossing facilities
6 Minor Amendments
24 41
6
2 22 01 01/10/18 NS JO JO
First Issue
K EE 16 B Issue Date By Chkd Appd L 43 Widening to provideE two
139.8m L AYHA lane approaches Cto junctions L
O
18 36 D S R M E I V
E
8 3
Ppg 142.4m 140.2m n Rd 11 Sta Gree 9 on Eat
El Sub Sta The Arup Campus, Blythe Gate, Blythe Valley Park
4 4 Solihull, West Midlands B90 8AE T +44(0)121 213 3000 F +44(0)121 213 3001 3 Four arm signalised junction with www.arup.com N EE R G CPAR link road and Keeble Close Client IGH 3 LE D R
A with on-demand pedestrian crossings 1
23 12 5 7
25 1 1
1
0 42
B AY
44 Free-flow segregated left turn lane Job Title L A M 139.8m Luton Masterplan D into CPAR link road ELL
4
2 52
o
t 46 27
5 2
4
2
5
11
28
0
1 D 26 A O Wigmore Lane / Eaton R
N Alignment ties into proposed CPAR EE R G Green Road
N 9 O T
A
o E
t
29 6
142.1m - 2029 (Do Something)
35 33 d R n ree Scale at A3 G 1:1000 on at E Discipline Transport Planning 6
Job No Drawing Status 37
t o 259393-10 Information 43 Balancing Pond
Drawing No Issue SK025 02 © Crown copyright and database rights (2018) Ordnance Survey 0100031673
Do not scale © Arup
A3 A B C D E F G 4
dgn . N 036
K 5 S
Key: \
s 5 ng
Wigmore Park Centre i w a
Proposed Works r 6 D 0_ \ s ng i
1 w
a 7 r D
03 - 4 \
a 8 t a D
Tiber t ec 141.9m House j o r P
l a n
r 9 e t n I
Shelter 4 \ 10 Mini roundabout to be replaced - with three-arm signalised junction 259393 \ 259000 :\
Marlborough House J 2 25 W ig m Wigmore House or 7 e L 9 140.7m a 2 n 9 e 5
3
11
AND
L 13 16 W Widening to provide IG NAY C M E L O C O RE S L Shelter A
E AN L 18 37 two lane entries E P
E
R
O
M 20 G I
W Roundabout replaced with four arm 1 0 4 signalised junction with on-demand 3 02 29/01/19 NS JO JO 3 9
2 pedestrian crossing facilities
6 Minor Amendments
24 41
6
2 22 01 01/10/18 NS JO JO
First Issue
K EE 16 B Issue Date By Chkd Appd L 43 Widening to provideE two
139.8m L AYHA lane approaches Cto junctions L
O
18 36 D S R M E I V
E
8 3 d reen R Ppg 142.4m on G 140.2m Eat 11 Sta 9
El Sub Sta The Arup Campus, Blythe Gate, Blythe Valley Park
4 4 Solihull, West Midlands B90 8AE T +44(0)121 213 3000 F +44(0)121 213 3001 3 Four arm signalised junction with www.arup.com N EE R G CPAR link road and Keeble Close Client IGH 3 LE D R
A with on-demand pedestrian crossings 1
23 12 5 7
25 1 1
1
0 42
B AY
44 Free-flow segregated left turn lane Job Title L A M 139.8m Luton Masterplan D into CPAR link road ELL
4
2 52
o
t 46 27
5 2
4
2
5
11
28
0
1 D 26 A O Wigmore Lane / Eaton R
N Alignment ties into proposed CPAR EE R G Green Road
N 9 O T
A
o E
t
29 6
142.1m - 2039 (Do Something)
35 33 d R n ree Scale at A3 G 1:1000 on at E Discipline Transport Planning 6
Job No Drawing Status 37
t o 259393-10 Information 43 Balancing Pond
Drawing No Issue SK036 02 © Crown copyright and database rights (2018) Ordnance Survey 0100031673
Do not scale © Arup A3 A B C D E F G
dgn . N L 026 K
o S
Key: \ s ndon ng i w a Proposed Works r D
0_
R \ s
o ng i
1 a w a r d D
03 - 4 \ a t a D
t ec j o r P
l a n r e t n I
4 \ 10
Roundabout to be partially signalised -
to accommodate traffic flows GP 259393 Spiral markings to be introduced to \
improve lane discipline in conjunction 259000 :\ J 2 with signage
Proposed Newlands Park access road
NORTH ROUNDABOUT
3 02 29/01/19 NS JO JO
Minor Amendments Widening to roundabout circulatory to 01 01/10/18 NS JO JO
provide free-flow diverge onto A1081 First Issue
Issue Date By Chkd Appd
The Arup Campus, Blythe Gate, Blythe Valley Park 4 Solihull, West Midlands B90 8AE T +44(0)121 213 3000 F +44(0)121 213 3001 www.arup.com
Client
Roundabout to be partially signalised
to accommodate traffic flows
Job Title Luton Masterplan
5
A1081 / London Rd (North)
Gantry - 2024 (Do Something)
y a Scale at A3 W 1:1000 L rt
ondon rpo Discipline i Transport Planning 6 A w e Job No Drawing Status N
R 259393-10 Information
o
D 1081
a A A Drawing No Issue O
d R
N
O SK026 02 © Crown copyright and database rights (2018) D
N
O
Ordnance Survey 0100031673 L
Do not scale © Arup
A3 A B C D E F G
4 dgn . N 027 K S
\ a Key: 4 s ng
i
9 w a a
r 5 Proposed Works D Posts
0_ 9 \ s
S
ng
a M i 5
1 AD w O R a r N D
EE R G
03
Y - 6
LE 4
W \ A a CR t a
D
S 7
a
T t
M ec
A j
R o
Y r 7
' P
S l
ESS Widening to St. Mary's Road to R a R Widening to gyratory to provide
OAD iv n r e e
r t
provide three approach lanes n four circulatory lanes I L d 4
a \ ea o
10
R 2 - o 4 r n
L ree ee
G 259393 y \ le w ra 259000
C :\ J 2 S t.M ary El Sub Sta 's R
oa d 14
UK Centre
for
Carnival Arts 2
Su bway
03 29/01/19 NS JO JO SM Widening to subway portal to Minor Amendments
3 accommodate four lanes across tunnel 02 10/09/18 NS JO JO
1 Subway Widening to subway portal to Challney Hall Minor Amendments accommodate four lanes across tunnel 01 13/06/18 NS JO JO
ST MARY'S First Issue ROUNDABOUT FB R
i 7 E v o Issue Date By Chkd Appd l S e r ub r Widening to Windmill Road to provide L S t ee a L e two entry / two exit lanes from gyratory a 11
Subway 15 14
Dallow Hall
EET The Arup Campus, Blythe Gate, Blythe Valley Park R T 4 S Solihull, West Midlands B90 8AE
E T +44(0)121 213 3000 F +44(0)121 213 3001 AG Fitzroy R www.arup.com A C I Court V Client
Wingate Hall L Twr Widening to subway portal to t Fitzroy Court accommodate four lanes across tunnel ee R Job Title r i v t B O e LT S r Luton Masterplan 1 ON t t e o L r R ee OAD 27 ea r o W t S I ND t m o e Stockwood Hall c r g g M a i du I r a L L i a k ee L V c r W 5 i a
V k P 2 R r OAD a r P a C
2 9
t o
35
Whitehill Spindles Windmill Rd / St. Mary's Rd /
4 1 D OA R Crawley Green Road Gyratory
R NO A M El Sub Sta W Gas Gov - 2029 (Do Something) ind
OAD R m A 4 Shelter LE ill
19 R Scale at A3 o 1:1000
a 2 d Discipline Transport Planning 6
Job No Drawing Status
4 259393-10 Information
Drawing No Issue
SK027 03 © Crown copyright and database rights (2018) 12 L Twr Ordnance Survey 0100031673 Depot
Do not scale © Arup A3 A B C D E F G
dgn . N 034 K S
Key: \ s ng i w a Proposed Works r D 0_ \ s ng i
1 w a r D BU CKI 03 NGHAM - D 4 RIVE \ a t a D
t
33 ec 19 j o r P
l
a 17 n r e t n I
4 \
10 - 9 259393 \ 259000 :\
El Sub Sta J 2
311
27 25
CR AWLE Y GREE N ROAD
3 Crawley 02 29/01/19 NS JO JO Green Rd Minor Amendments
01 06/11/18 NS JO JO
First Issue
Issue Date By Chkd Appd
The Arup Campus, Blythe Gate, Blythe Valley Park
124 Mini roundabout to be replaced with 4 Solihull, West Midlands B90 8AE three arm signalised junction T +44(0)121 213 3000 F +44(0)121 213 3001 www.arup.com
Client
1
127
Job Title Luton Masterplan
5
Crawley Green Road / Lalleford Road
Shelter - 2039 (Do Something)
y
a Scale at A3 W 1:500
d
r Discipline
o Transport Planning 6 f
e
ll Job No Drawing Status
a
L 259393-10 Information
Drawing No Issue
2 117 SK034 02 © Crown copyright and database rights (2018) Ordnance Survey 0100031673
Do not scale © Arup A3 A B C County CourtD E F G
dgn . N 041
Recreation Ground K S \ s ng i
Old Park Road w a r D 0_ \ s ng i
1 w a r D
03 - 4 \ a t a D
t ec j o r P
l
~ a n
Widening to east of Upper Tilehouse St r e t n I
to provide increased length of two lane entry 4 \ 10 - 259393 \ 259000 :\ J 2
A505 Upper Tilehouse St Garage
66 41
REET ST E 3 S 02 23/05/19 NS JO JO HOU ILE Mitigation Proposals Amended T R 01 29/01/19 NS JO JO
E PP m 36 70 U .87 First Issue 74 Issue Date By Chkd Appd BM
T I LE
35 HOU
44 AY
W S E The Arup Campus, Blythe Gate, Blythe Valley Park
Solihull, West Midlands B90 8AE
4 2
K 75 T +44(0)121 213 3000 F +44(0)121 213 3001 3 B S www.arup.com R M T A R Client 73 EET P Widening to east of Park Way to provide 77 increased length of two lane entry .07
m 78 j
Job Title
29 Luton Masterplan Tilehouse Street Baptist Church 5
A602 Park Way A602 Upper Tilehouse St / Park Way Mitigation 3
T 2039 (Do Something)
B il
e a
hou p 2 ti
s
s t e Scale at A3
C
S hu 1:500
t
r
r ee 14 c to Discipline h 17
t The Transport Planning 6
1 Chapmans Job No Drawing Status 259393-10 Information
26 Drawing No Issue
to SK041 02
29 Rob Do not scale ert © Arup Tebbu tt C ourt A3 A B C D E F G
dgn . N 040 K S \ s ng i w a r D B 0_ \
E s a l ng
H i r 1 S w o a G a ub r D
58 i m l
n 03
e - 4 a e S \
nd a t t S u a a D
i lt t B ng ea ec j o
i r r 1 P
l l
c l a
e n h r e
t t n I
w on 4 W \ ood
W 10 - a a v l
e t 259393 \ on L n 5 C 5 yn e
r 259000
y :\
a J t
2 i on g
l R ea EET TR u S ss E S PH e
ll H HOU ' E s
IL P
T 45 ER BM S HITCHINHITCHIN PP li U p 75.60m 2
3 02 02/07/19 NS JO JO
Design Updated 14
01 29/01/19 NS JO JO
SE HOU First Issue LE TI R B655 Pirton Road E Issue Date By Chkd Appd EET UPP R ST
GP Mini roundabout to be realigned to The Arup Campus, Blythe Gate, Blythe Valley Park 4 Solihull, West Midlands B90 8AE provide two-lane entry from Upper T +44(0)121 213 3000 F +44(0)121 213 3001 www.arup.com Tilehouse Street Client 1 to 10
10
o t
1 App W l e s RATTE tree N s e ROAD e r WE t ST e l Job Title
pp A Luton Masterplan
1
1
5 j 29 A505 Offley Road
Proposed Pirton Road /
22 Offley Road Mitigation 4
20
2 2039 (Do Something)
Scale at A3 1:500
Discipline Transport Planning 6
Job No Drawing Status 259393-10 Information
77.4m Drawing No Issue
1 SK040 02
Do not scale © Arup L A T A B C D E F G C A3 S H
t M 40
J 1 O
o R h E n
' C dgn
. H s 4
L I 2 O T P S N C a 3 E H t I h
N 042
H K ILL S \ s ng i w a r
78 D .7
m 0_ \
The s OAD R
Haven ng i
P S '
R w
1 4 I 5 a
O
OHN r R Millford J
D Y
T
S 4 E 7 03 ND
House - 4 \ a Hitchin Hill t a D
8 t ec j o r P
4
l 6
3 a n B r
M e t
85 n I
. 51 4
) m 1 \
m 10
u -
(
h t Lodge
a
P 259393 Widening to Hitchin Hill to provide 19 \
increased length of two lane entry flare 259000 :\ J 2 84.1m
TCB 1 The Three Moorhens
(PH)
Widening to Stevenage Road to provide increased length of two lane entry flare
W e s t C b r ou oo r t k A505 Park Way 85.8m 15
1 7
t o
2 7 2 9
t o
FB 39 3 02 23/05/19 NS JO JO
Mitigation Proposals Amended PARK WAY
87.2m 01 29/01/19 NS JO JO
First Issue
HITCHIN Issue Date By Chkd Appd
HILL
Path (um) Dower Court
Roundwood 2
4 9
o
t a 4
1 A602 Stevenage Road Widening to Park Way to provide increased length of two lane entry flare Rubicon e n a L The Arup Campus, Blythe Gate, Blythe Valley Park 's r e Oakwood h c t Solihull, West Midlands B90 8AE 4 u B T +44(0)121 213 3000 F +44(0)121 213 3001 www.arup.com 8
Client
15
th a P
1 5 l il H
n i h c it
H 4 Job Title
Montserrat Luton Masterplan
5
3 2 4 5
5 4 3
to
1
m .23 87.1m 88
M
B A602 Park Way / 7
LB 9
Priory Park T R Stevenage Rd Mitigation
OU
C 6
2
t
O o M
EL 9
T S
2039 (Do Something)
11
1 a Scale at A3
1:1000 1
5 Discipline P
a 1
7 6 Transport Planning t 6 h
( u m Job No Drawing Status )
259393-10 Information 1 a 8 Drawing No Issue SK042 02 8
E IV R D Do not scale © Arup H C
OA C A3 A B C D E F G
D r a
i n dgn . N 031 K S
Key: \ s
n i a ng r i D w
in a a
r r D Proposed Works D 0_ \ Gantry s
OAD R
H ng i RC U
H w 1 C NE W a LA ND r S R OA D D
Vicarage 03 - 4 N \ a ew t la El Sub Sta a D
nd s t R ec o j a o d r P
y l
Gantry a a Pond n r e W t n
I
t
r 4 \ 10 - D po r a r Length of two lane merge increased by in i A
259393 approx. 150m above existing w \ e N
259000 :\ J 2 Gantry 1081 1 A 08 1 A
P
a
t
h
(
u
m
) Two northbound lanes merge into one
05 08/07/19 NS JO JO
Junction Layout Amended Slip End
Y 04 30/01/19 NS JO JO A W
ain T Dr R O P R Gantry I A Junction Layout and Year Amended
W E N 03 04/12/18 NS JO JO 2 5 Merge Layout Amended
35
3
02 06/11/11 NS JO JO 34
) m S u
U
(
2 MM 4 Junction Layout Amended E R h 4 t S 5 T a R P EET s u Gantry
46 un a 5 F 01 13/06/18 NS JO JO 5 5
6 60 6 3 First Issue
1
2 Issue Date By Chkd Appd
7 72 9 Three lanes merge into two before segregated
72 T Mast
a r
S 74 ac K A
O k 74
E a
7 H left turn lane joins from M1 southbound 6
76 T
a 7
8
8 0
8 7 8
7
8 8
4 13
10 12
9 6 9 Slip End Social Club
k l a W 79 l T o The Arup Campus, Blythe Gate, Blythe Valley Park EE ho R c 11 T S S Solihull, West Midlands B90 8AE 4 d l W O E
91 N T +44(0)121 213 3000 F +44(0)121 213 3001 1 3 5
www.arup.com 14 Allotment Gardens
16 81 A10
Client 58 White lining amendments and widening to provide
95
01 1 1 four circulatory lanes, allowing two northbound
1 lanes onto M1 and three eastbound lanes onto
1 a Gantry
A1081 from M1 D r
a 3 i n
D r
2 7 a
i F n R ON T Round Wood S T R EET Job Title
Luton Masterplan
6 8
Electricity Sub Station 5
168.2m
A1081 New Airport Way / M1
n
i
a
r Junction 10
D Northbound off-slip to be widened to provide - 2024 (Do Something)
three lanes on approach to circulatory
8 12
Scale at A3 um) Path ( N.T.S.
Path Gantry Discipline Transport Planning 6 FB
Job No Drawing Status Pond
Balancing Pond GP 259393-10 Information Little acre Pepperstock Drawing No Issue
Ashridge © Crown copyright and database rights (2018) SK031 05 Half Moon Ordnance Survey 0100031673 (PH)
Do not scale © Arup