Environmental Statement Volume 6 – Onshore

9 Effects on Landscape Resources During the Construction Phase PINS Document Reference: 7.6.5.9 APFP Regulation 5(2)(a)

January 2015 sdf

Copyright © 2015

SMart Wind Limited All pre-existing rights reserved.

Hornsea Offshore Wind Farm Project Two – Environmental Statement Liability Volume 6 – Onshore Annex 6.5.9 - Effects on Landscape Resources During the Construction Phase This report has been prepared by RPS, with all reasonable skill, care and diligence within the terms of their contracts with SMart Wind Ltd or their subcontractor to RPS placed under RPS’ contract with SMart Wind Ltd as the case may be.

Document release and authorisation record PINS document reference 7.6.5.9 Report Number UK06-050700-REP-0041 Date January 2015 Client Name SMart Wind Limited

SMart Wind Limited 11th Floor 140 London Wall London EC2Y 5DN

Tel 0207 7765500 Email [email protected]

i sdf

Table of Contents

1 Effects on landscape resources during the construction phase ...... 1

Table of Tables

Table 1.1 Effect on landscape resources during the construction phase of the landfall and cable route ...... 1

Table 1.2 Effect on landscape resources during the construction phase of the onshore

HVDC converter/HVAC substation ...... 11

ii sdf

Lindsey’s Areas of Great Landscape Value (AGLV) as the closest designated landscapes.

1.1.1 Only those landscape resources within the study area have been considered below, with the exception of the Wolds Area of Outstanding Natural Beauty (AONB), Brocklesby Estate Registered Park and Garden (RPaG) and East and West

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects Designated landscapes National High Outside study area: Negligible Temporary Minor Details of lighting AONB No direct effect. during the Installation construction works is machinery including to be specified by movement of HGVs the contractor and may be seen as a agreed with the distant element from relevant statutory the closest parts of consultees. the Wolds. Brocklesby Estate National High Outside study area: Negligible Temporary Minor Details of lighting RPaG No direct effect. during the Installation construction works is machinery including to be specified by movement of HGVs the contractor and may be seen as a agreed with the distant element from relevant statutory the closest parts of consultees. the Estate. East Lindsey AGLV Local Medium Outside study area: Negligible Temporary Negligible Details of lighting No direct effect. during the Installation construction works is machinery may be to be specified by seen as a distant the contractor and element from the agreed with the closest parts of the relevant statutory AGLV. consultees.

1 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects West Lindsey AGLV Local Medium Outside study area: Negligible Temporary Negligible Details of lighting No direct effect. during the Installation construction works is machinery may be to be specified by seen as a distant the contractor and element from the agreed with the closest parts of the relevant statutory AGLV. consultees. National Seascape Character Areas NSCA 6 ‘ National Low Within study area: Low Temporary Negligible Details of lighting Waters’ No direct effect. during the Installation construction works is machinery including to be specified by HGVs on the the contractor and landward side of the agreed with the wall will be seen relevant statutory as a new element consultees. from the closest parts of the Seascape. NSCA 7 ‘ National Low Within study area: Medium Temporary Minor Details of lighting Coastal Waters’ Direct effect. during the Installation construction works is machinery will be to be specified by seen as an element the contractor and within this seascape agreed with the character area. relevant statutory consultees. National Landscape Character Areas 41 Humber Local Low The introduction of No Change to Temporary None to Minor Details of lighting machinery installing Negligible during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area and will not alter the character of the landscape area.

2 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects 42 Lincolnshire Local Low The introduction of No Change to Temporary None to Minor Details of lighting and machinery installing Negligible during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area and will not alter the character of the landscape area. Regional Landscape Character Areas/Types East Midlands 1A Coastal Saltmarshes Local Medium The introduction of Medium to High Temporary Moderate to Major Details of lighting and Mudflats machinery installing during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the alter the character of relevant statutory the landscape area consultees. temporarily by introducing a new element in an open naturalistic area. 2A Settled Fens and Local Low The introduction of No Change to Temporary None to Minor Details of lighting Marshes machinery installing Negligible during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area and will not alter the character of the landscape area.

3 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects 2C Fen and Local Low The introduction of No Change to Temporary None to Minor Details of lighting Margin Farmlands machinery installing Negligible during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not alter the relevant statutory character of the consultees. landscape area.

Regional Landscape Character Areas North East Lincolnshire A Humber Estuary Local Low The introduction of No Change to Temporary None to Minor Details of lighting machinery installing Negligible during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area and will not

alter the character of the landscape area.

B Wooded Open Local Low The introduction of No Change to Temporary None to Minor Details of lighting Farmland machinery installing Negligible during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area and will not alter the character of

the landscape area.

4 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects Broad Landscape Character Areas West Lindsey D The Wolds Local Low The introduction of No Change to Temporary None to Minor Details of lighting machinery installing Negligible during the the cable within the construction works is character area will to be specified by not be visible in the contractor and many parts of the agreed with the area and will not relevant statutory alter the character of consultees. the landscape area.

Regional Landscape Character Areas/Types North Lincolnshire Lincolnshire Drift Local Low The introduction of No Change to Temporary None to Minor Details of lighting machinery installing Negligible during the the cable within the construction works is character area will to be specified by not be visible in the contractor and many parts of the agreed with the area and will not relevant statutory alter the character of consultees. the landscape area.

Humber Estuary Local Low The introduction of No Change to Temporary None to Minor Details of lighting machinery installing Negligible during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area and will not

alter the character of the landscape area.

Local Landscape Character Areas East Lindsey

5 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects I1 Holton le Clay to Local Low The introduction of No Change to Temporary None to Minor Details of lighting Great Steeping Middle machinery installing Negligible during the Marsh the cable and construction works is potentially to be specified by undertaking HDD the contractor and works within the agreed with the character area will relevant statutory not be visible in consultees. many parts of the area, and will not alter the character of

the landscape area.

J1 Tetney Lock to Local Low The introduction of No Change to Temporary None to Minor Details of lighting Coastal machinery installing Negligible during the Outmarsh the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area, and will not alter the character of the landscape area.

K1 to Local Medium The introduction of Medium to High Temporary Moderate to Major Details of lighting machinery installing during the Naturalistic Coast the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the alter the character of relevant statutory the landscape area consultees. temporarily by introducing a new element in an open

naturalistic area.

Local Landscape Character Areas North East Lincolnshire

6 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects Ai Humber Estuary: Local Low The introduction of No Change to Temporary Negligible Details of lighting Industrial Landscape machinery installing Negligible during the the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area, and will not alter the character of the landscape area. Bi Lincolnshire Coast & Local Low The introduction of No Change to Temporary Negligible Details of lighting Marshes: Open machinery installing Negligible during the Farmland the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area will not alter the character of the landscape area. Bii Lincolnshire Coast & Local Low The introduction of No Change to Temporary Negligible Details of lighting Marshes: Flat Open machinery installing Negligible during the Farmland the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area, and will not alter the character of the landscape area.

7 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects Bii Lincolnshire Coast Local Medium The introduction of Medium to High Temporary Minor Details of lighting and Marshes: Wooded machinery installing during the Open Farmland the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area, and will not alter the character of the landscape area.

Biii Lincolnshire Coast Local Low The introduction of Negligible Temporary Negligible Details of lighting and Marshes, Flat Open machinery installing during the Farmland the cable and construction works is undertaking HDD to be specified by works within the the contractor and character area will agreed with the not be visible in relevant statutory many parts of the consultees. area, and will not alter the character of the landscape area.

Local Landscape Character Areas West Lindsey 14 Wolds Estates Local Low The introduction of Negligible Temporary Negligible Details of lighting machinery installing during the the cable within the construction works is character area will to be specified by not be visible in the contractor and many parts of the agreed with the area, and will not relevant statutory alter the character of consultees. the landscape area.

Local Landscape Character Areas North Lincolnshire

8 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects Lincolnshire Drift: Open Local Low The introduction of Negligible Temporary Negligible Details of lighting Undulating Farmland – machinery installing during the , the cable within the construction works is Goxhill, Thornton character area will to be specified by Curtis, Ulceby, Wootton not be visible in the contractor and many parts of the agreed with the area, and will not relevant statutory alter the character of consultees. the landscape area. Lincolnshire Drift: Local Low The introduction of Negligible Temporary Negligible Details of lighting Wooded Farmland – machinery installing during the East Halton, the cable within the construction works is Kirmington, Thornton character area will to be specified by Abbey, Ulceby Junction not be visible in the contractor and many parts of the agreed with the area, and will not relevant statutory alter the character of consultees. the landscape area. Humber Estuary: Local Low The introduction of Negligible Temporary Negligible Details of lighting Industrial Landscape – machinery installing during the South Humber Bank the cable within the construction works is character area will to be specified by not be visible in the contractor and many parts of the agreed with the area, and will not relevant statutory alter the character of consultees. the landscape area. Humber Estuary: Open Local Low The introduction of Medium to High Temporary Minor to Moderate Details of lighting Undulating Farmland – machinery installing during the South Killingholme the cable within the construction works is character area will to be specified by alter the character of the contractor and the landscape area agreed with the temporarily by relevant statutory introducing a new consultees. element.

9 sdf

Landscape resource Landscape effects during construction Significance of effects Landscape Description of Value Sensitivity Magnitude Duration Daytime Night time type/character area landscape effects Humber Estuary: Local Medium The introduction of Medium to High Temporary Moderate to Major Details of lighting Wooded Farmland – machinery installing during the East Halton, North the cable and construction works is Killingholme undertaking HDD to be specified by works within the the contractor and character area will agreed with the alter the character of relevant statutory the landscape area consultees. temporarily by introducing a new element in a small scale wooded landscape.

10 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects

Designated Landscapes

Lincolnshire Wolds National High On the extreme edge of No Change to Temporary None to Minor Details of lighting during the AONB the study area, no direct negligible construction works is to be effect. The construction specified by the contractor works may be seen as a and agreed with the relevant distant element from the statutory consultees. closest parts of the Wolds.

Brocklesby Park National High No direct effect. The No Change to Temporary None to Minor Details of lighting during the Registered Park and construction works may be negligible construction works is to be Garden seen as a distant element specified by the contractor from the closest parts of and agreed with the relevant the Estate. statutory consultees.

East Park Registered National High The construction works will No Change Temporary None Details of lighting during the Park and Garden, not be visible from this construction works is to be Kingston upon Hull landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

Pearson Park National High The construction works will No Change Temporary None Details of lighting during the Registered Park and not be visible from this construction works is to be Garden, landscape receptor. specified by the contractor Kingston upon Hull and agreed with the relevant statutory consultees.

West Lindsey AGLV Local Medium The construction works will No Change to Temporary None to Negligible Details of lighting during the not be visible in many Negligible construction works is to be parts of the area and will specified by the contractor not alter the character of and agreed with the relevant the landscape area. statutory consultees.

Seascape National Character Areas NSCA 6 ‘Humber National Low The construction works Negligible Temporary Negligible Details of lighting during Waters’ will not be visible in many the construction works is to parts of the area and will be specified by the not alter the character of contractor and agreed with the landscape area. the relevant statutory consultees.

11 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects NSCA 7 ‘East National Low The construction works No Change Temporary None Details of lighting during Midlands Coastal will not be visible from the construction works is to Waters’ (not seen from this landscape receptor. be specified by the this NSCA). contractor and agreed with the relevant statutory consultees. National Landscape Character Areas

27 Wolds Local Low The construction works will No Change Temporary None Details of lighting during the not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

40 Holderness Local Low The construction works will No Change Temporary None Details of lighting during the not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

41 Humber Estuary Local Low The construction works No Change to Temporary None to Minor Details of lighting during the within the character area Negligible construction works is to be will not be visible in many specified by the contractor parts of the area and will and agreed with the relevant not alter the character of statutory consultees. the landscape area.

42 Lincolnshire Coast Local Low The construction works will No Change to Temporary None to Minor Details of lighting during the and Marshes not be visible in many Negligible construction works is to be parts of the area and will specified by the contractor not alter the character of and agreed with the relevant the landscape area. statutory consultees.

43 Lincolnshire Wolds Local Low The construction works No Change to Temporary None to Minor Details of lighting during the may be discernible from Negligible construction works is to be this landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

44 Central Lincolnshire Local Low The construction works will No Change Temporary None Details of lighting during the Vale not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

12 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects

Regional Landscape Character Areas North East Lincolnshire

A Humber Estuary Local Low The construction works No Change to High Temporary None to Moderate Details of lighting during the may be discernible from construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance it is unlikely. statutory consultees.

B Wooded Open Local Low The construction works Negligible Temporary Negligible to Details of lighting during the Farmland may be discernible from Minor construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance it is unlikely. statutory consultees.

Broad Landscape Character Areas West Lindsey

The Wolds Local Low The construction works Negligible Temporary Negligible to Details of lighting during the may be discernible from Minor construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance it is unlikely. statutory consultees.

Regional Landscape Character Areas/Types North Lincolnshire

Vale of Ancholme Local Low The construction works will No Change Temporary None Details of lighting during the not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

Lincolnshire Wolds Local Low The construction works Negligible Temporary Negligible to Details of lighting during the may be discernible from Minor construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

Lincolnshire Drift Local Low The construction works Negligible Temporary Negligible to Details of lighting during the may be discernible from Minor construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor,

13 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects this is considered unlikely.

Humber Estuary Local Low The onshore HVDC No change to High Temporary None to Moderate Details of lighting during the converter /HVAC construction works is to be substation lies within this specified by the contractor character area. The and agreed with the relevant construction works will be statutory consultees. visible from the parts of character area immediately surrounding the site.

Regional Landscape Character Areas/Types East Riding of Yorkshire

11 Jurassic Hills Local Low The construction works will No Change Temporary None Details of lighting during the Farmland not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

17 Farmed Urban Local Low The construction works will No Change Temporary None Details of lighting during the Fringe not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

19 Open Farmland Local Low The construction works Negligible Temporary Negligible Details of lighting during the may be discernible from construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

21 Low Lying Drained Local Low The construction works will No Change to Temporary None to Negligible Details of lighting during the Farmland be visible from parts of this Negligible construction works is to be landscape receptor. specified by the contractor However, due to distance and agreed with the relevant the construction activities statutory consultees. will be barely discernible.

22 Farmed Urban Local Low The construction works will No Change Temporary None Details of lighting during the Fringe not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

14 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects

Local Landscape Character Areas North East Lincolnshire

Ai Humber Estuary: Local Low The construction works Negligible Temporary Negligible to Details of lighting during the Industrial Landscape may be discernible from Minor construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance it is unlikely. statutory consultees.

Bi Lincolnshire Coast & Local Low The construction works Negligible Temporary Negligible to Details of lighting during the Marshes: Open may be discernible from Minor construction works is to be Farmland this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

Bii Lincolnshire Coast & Local Low The construction works Negligible Temporary Negligible to Details of lighting during the Marshes: Flat Open may be discernible from Minor construction works is to be Farmland this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

Biv Lincolnshire Coast Local Low The construction works Negligible Temporary Negligible to Details of lighting during the & Marshes: Sloping may be discernible from Minor construction works is to be Farmland this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

Local Landscape Character Areas West Lindsey

12 North-West Wolds Local Low The construction works Negligible Temporary Negligible to Details of lighting during the Escarpment may be discernible from Minor construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

14 Wolds Estates Local Low The construction works Negligible Temporary Negligible to Details of lighting during the may be discernible from Minor construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant

15 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects distance between the statutory consultees. works and the receptor, this is considered unlikely.

Local Landscape Character Areas North Lincolnshire

Vale of Ancholme: Flat Local Low The construction works will No Change Temporary None Details of lighting during the Valley Bottom Farmland not be visible from this construction works is to be – Roxby, Bonby, landscape receptor. specified by the contractor Appleby, Worlaby and agreed with the relevant Carrs, Cadney, statutory consultees. Froghall, North Kelsey Carrs

Vale of Ancholme: Local Low The construction works will No Change Temporary None Details of lighting during the Heathy Woodland – not be visible from this construction works is to be Elsham Country Park landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

Vale of Ancholme: Local Low The construction works will No Change Temporary None Details of lighting during the Open Undulating not be visible from this construction works is to be Farmland – Brigg, landscape receptor. specified by the contractor Wrawby and Barnetby and agreed with the relevant statutory consultees.

Lincolnshire Wolds: Local Low The construction works will No Change Temporary None Details of lighting during the Open Farmed Scarp not be visible from this construction works is to be Slope – Barnetby le landscape receptor. specified by the contractor Wold and agreed with the relevant statutory consultees.

Lincolnshire Wolds: Local Low The construction works Negligible Temporary Negligible to Details of lighting during the Open Rolling High may be discernible from Minor construction works is to be Farmland – Lincolnshire this landscape character specified by the contractor Wolds Escarpment Top area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

Lincolnshire Wolds: Local Low The construction works will No Change Temporary None Details of lighting during the Wooded Farmed Scarp not be visible from this construction works is to be Slope – Between landscape receptor. specified by the contractor Barton upon Humber and agreed with the relevant and Elsham statutory consultees.

16 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects

Lincolnshire Drift: Open Local Low The construction works Negligible Temporary Negligible to Details of lighting during the Undulating Farmland – may be discernible from Minor construction works is to be Barrow upon Humber, this landscape character specified by the contractor Goxhill, Thornton area. However, due to the and agreed with the relevant Curtis, Ulceby, Wootton distance between the statutory consultees. works and the receptor, this is considered unlikely.

Lincolnshire Drift: Local Low The construction works will No Change to Temporary None Minor Details of lighting during the Wooded Farmland – not be visible in many Negligible construction works is to be East Halton, parts of the area and will specified by the contractor Kirmington, Thornton not alter the character of and agreed with the relevant Abbey, Ulceby Junction the landscape area. statutory consultees.

Humber Estuary: Flat Local Low The construction works will No Change to Temporary None to Minor Details of lighting during the Open Farmland – not be visible in many Negligible construction works is to be Barrow Haven, New parts of the area and will specified by the contractor Holland, Goxhill Haven not alter the character of and agreed with the relevant the landscape area. statutory consultees.

Humber Estuary: Local Low The construction work No Change to Temporary None to Minor Details of lighting during the Industrial Landscape – abuts this landscape Negligible construction works is to be South Humber Bank character area. However, specified by the contractor the works will not be and agreed with the relevant visible in many parts of the statutory consultees. area and will not alter the character of the landscape area.

Humber Estuary: Open Local Medium The onshore HVDC Medium to High Temporary Moderate to Major Details of lighting during the Undulating Farmland – converter /HVAC construction works is to be South Killingholme substation lies within this specified by the contractor character area. The and agreed with the relevant construction works will be statutory consultees. visible from the majority of the northern section of this character area (the works will not be visible from the southern section).

Humber Estuary: Local Low The construction works Negligible Temporary Negligible to Details of lighting during the Water-filled Clay Pits – may be discernible from Minor construction works is to be Barton and Barrow Clay this landscape character specified by the contractor Pits area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor,

17 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects this is considered unlikely.

Humber Estuary: Local Medium This landscape character Medium Temporary Moderate Details of lighting during the Wooded Farmland – area lies adjacent to the construction works is to be East Halton, North one in which the onshore specified by the contractor Killingholme HVDC converter/HVAC and agreed with the relevant substation is located. The statutory consultees. works will not be visible from much of the area. However, it will be seen from it and will have some impact upon it.

Local Landscape Character Areas East Riding of Yorkshire

11C Elloughton cum Local Low The construction works will No Change Temporary None Details of lighting during the Brough to Hessle Urban not be visible from this construction works is to be Edge Farmland landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

17A Hedon, Preston Local Low The construction works will No Change Temporary None Details of lighting during the and Bilton Farmland not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

17D North Hessle Local Low The construction works will No Change Temporary None Details of lighting during the Farmland not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

19D Central Holderness Local Low The construction works will No Change Temporary None Details of lighting during the Open Farmland not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

19E Burstwick to Local Low The construction works will No Change to Temporary None to Negligible Details of lighting during the Withernsea Farmland not be discernible from this Negligible construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

21B Sunk Island Local Low The construction works Negligible Temporary Negligible Details of lighting during the

18 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects may be discernible from construction works is to be the majority of this specified by the contractor landscape character area. and agreed with the relevant statutory consultees.

21C South Patrington, Local Low The construction works will No Change to Temporary None to Negligible Details of lighting during the Ottringham and not be discernible from the Negligible construction works is to be Keyningham Farmland majority of this landscape specified by the contractor character area. and agreed with the relevant statutory consultees.

21D Paull Farmland Local Low The construction works Negligible Temporary Negligible Details of lighting during the may be discernible from construction works is to be this landscape character specified by the contractor area. and agreed with the relevant statutory consultees.

22A North Ferriby Local Low The construction works will No Change Temporary None Details of lighting during the Farmland not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

Local Landscape Character Areas Kingston upon Hull

1 Medieval Core Local Low The construction works Negligible Temporary Negligible Details of lighting during the may be discernible from construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

2 18th Century Local Low The construction works Negligible Temporary Negligible Details of lighting during the Expansion may be discernible from construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

3 19th/20th/21st Century Local Low The construction works Negligible Temporary Negligible Details of lighting during the city Centre may be discernible from construction works is to be development this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees.

19 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects works and the receptor, this is considered unlikely.

4 Historic Village Core Local Low The construction works will No Change Temporary None Details of lighting during the not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

5 Pre-World War One Local Low The construction works will No Change Temporary None Details of lighting during the Terraces (1800 – 1919) not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

6 Pre-World War One Local Low The construction works will No Change Temporary None Details of lighting during the Suburbs (1800 – 1919) not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

7 Interwar Council Local Low The construction works will No Change Temporary None Details of lighting during the Estates (1919 – 1945) not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

8 Interwar Private Local Low The construction works will No Change Temporary None Details of lighting during the Suburbs (1919 – 1945) not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

9 Post World War Two Local Low The construction works will No Change Temporary None Details of lighting during the Council Estates (1945 – not be visible from this construction works is to be 1960) landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

10 Post World War Two Local Low The construction works will No Change Temporary None Details of lighting during the Council Estates (1960 – not be visible from this construction works is to be 1980) landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

11 Interwar/Post World Local Low The construction works will No Change Temporary None Details of lighting during the

20 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects War Two Council Inner not be visible from this construction works is to be City Redevelopment landscape receptor. specified by the contractor (1930 – 39 and 1960 – and agreed with the relevant 1980) statutory consultees.

12 Post World War Two Local Low The construction works will No Change Temporary None Details of lighting during the Private Suburbs (1945 not be visible from this construction works is to be – 1980) landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

13 Post 1980 Private Local Low The construction works Negligible Temporary Negligible Details of lighting during the Estates may be discernible from construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

14 Pre-World War One Local Low The construction works will No Change Temporary None Details of lighting during the Industrial (1800 – 1919) not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

15 Interwar Industrial Local Low The construction works will No Change Temporary None Details of lighting during the (1919 – 1945) not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

16 Post-World War Two Local Low The construction works Negligible Temporary Negligible Details of lighting during the Industrial may be discernible from construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

17 Docks Local Low The construction works Negligible Temporary Negligible Details of lighting during the may be discernible from construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

21 sdf

Landscape Resource Landscape effects during construction Significance of effects

Landscape/townscape Description of landscape Value Sensitivity Magnitude Duration Daytime Night time type/character area effects

18 Post-1980 Business Local Low The construction works Negligible Temporary Negligible Details of lighting during the and Retail Parks may be discernible from construction works is to be this landscape character specified by the contractor area. However, due to the and agreed with the relevant distance between the statutory consultees. works and the receptor, this is considered unlikely.

19 Agricultural Land Local Low The construction works will No Change Temporary None Details of lighting during the not be visible from this construction works is to be landscape receptor. specified by the contractor and agreed with the relevant statutory consultees.

22