Development of 8 lane (Greenfield Highway) from Etawa (Ch. 284.000 Km) to after River near Durjanpura village at (Ch. 349.000 Km) Section of NH-148 N (Total length 65.0 Km), Under BHARATMALA PRIYOJANA Lot-4/Pkg-4 in the state of Salient Features

 The proposed project is a development of 8/6 lane access control Green field Economic Corridors to improve the efficiency of freight movement under Bharatmala Pariyojana Lot4/Pkg4.  Total Length of the proposed project is about 65.000 km. The proposed alignment starts from Ch. 284.000 km (26°01'57.36"N, 76°15'42.35"E) near Etawa village in district and ends after near Durjanpura village at Ch. 349.000 Km (25°28'20.34"N,76°12'41.81"E) in Sawai Madhopur, and of Rajasthan State.  The proposed project will cover Sawai Madhopur, Tonk, Bundi and Kota districts in Rajasthan State.  The land use pattern on 10 km either side of the project road is predominantly agriculture followed by barren, forest area and habitation area.  Tentative length of affected forest area along the proposed alignment is about 1.38 km with about 13.8 ha of affected forest area considering the RoW of 100 m.  The proposed alignment passes through the buffer area of Ranthambore Reserve and National Chambal Sanctuary, whereas, Ranthambore National Park and Sawai Madhopur Wildlife Sanctuary are located at an approximate distance of about 12.9 km and 10.5 km respectively.  Best effort has made to keep the proposed alignment outside from the buffer Area of the Ranthambore Tiger Reserve. Affected buffer area of Ranthambore Tiger Reserve will be estimated after joint inspection with forest department. Project alignment is also passing through the Papdi protected Forest Block in Bindi division.  Total land acquisition for the proposed alignment is about 650 ha considering 100 m RoW.  3 Major Bridges, 1 ROB, 20 Minor Bridges, 2 Flyovers, 2 Interchanges, 17 LVUP, 21 SVUP, 2 Minor Bridge cum LVUP and 3 VUP are proposed along the project stretch for free passage to villagers & animals and to avoid any impact on local hydrology.  Safety measures will be provided as per NHAI Safety Manual and IRC: SP 88 and Expressway Manual IRC: SP 99. Safety Measures, as provided in NHAI Safety Manual i.e.

Page 1 of 2 Development of 8 lane (Greenfield Highway) from Etawa (Ch. 284.000 Km) to after Chambal River near Durjanpura village at (Ch. 349.000 Km) Section of NH-148 N (Total length 65.0 Km), Under BHARATMALA PRIYOJANA Lot-4/Pkg-4 in the state of Rajasthan Salient Features

Unit-3 (pertaining to Traffic Safety, such as traffic control zone, advance warning zones, traffic control devices, regulatory & warning signs cylindrical cones, drums, flagman, Barricades, Pedestrian Safety, Speed control, etc.) and other safety guidelines and measures suggested in Unit-4 (Construction Zone Safety), Unit-5 (Temporary Structures Safety), Unit-6 (Workers & Work Zone Safety), Unit-7 (Electrical & Mechanical Safety) will be strictly implemented. All required illustrative plans for safety at construction sites keeping in view all situations highlighted IRC: SP 55 and in NHAI Safety Manual will be prepared and strictly implemented.  Efforts will be made to minimize the trees loss by restricting tree cutting with formation width. Avenue plantation shall be carried out as per IRC SP21:2009 on available RoW apart from statutory requirements of Compensatory Afforestation. The tree enumeration for affected trees shall undertake during detailed EIA Study. The inventory will include tree species, girth and height.  Construction Materials requirement are about Aggregates - 454017 Cum, Sand - 71045 Cum, Cement - 64615 MT, Bitumen - 39158 MT, Steel - 15899 MT and Earth Work- 11235891 Cum.  Total requirement of water for construction is estimated to ~3,395 ML.  The estimated civil cost of the project is ~ 3500 Cr.

Page 2 of 2