ACTIVITY REPORT 2017

Louvre Abu Dhabi Museum (United Arab Emirates) Headquarters of Norvento, Lugo (Spain)

Flyover at junction EA15, Kappara (Malta) Mamsha Al Saadiyat Residential Complex, Abu Dhabi (United Arab Emirates)

www.gruposanjose.biz

2 ACTIVITY REPORT 2017 CONTENTS 3

Contents

1 Grupo SANJOSE 5 GSJ Solutions 112 Corporate Strategy Civil Engineering / and Culture 4 Infrastructure

Identity Sign 4 Architecture

GSJ Worldwide 5 Real Estate Management

Technology / R&D&i / Industrial

Sustainable Development 2 SANJOSE Constructora Building 12 Civil Works 46 6 Investees Engineering and Industrial Distrito Castellana Norte 126 Construction 62 Carlos Casado 132 Subsidiaries 72 Comercial Udra 140

3 SANJOSE Energía y Medio Ambiente 7 Corporate Social Responsibility 144 Energy Efficiency 80

Renewable Energy 84

8 Business Directory 158

4 SANJOSE Concesiones y Servicios Hospitals 88

Buildings, Power Plants and Facilities 94

Conservation of Parks and Gardens 98

Transport Infrastructure 104

Refurbishment of the 5* Sofia Hotel, (Spain) 4 ACTIVITY REPORT 2017 CONTENTS 5

Corporate Strategy and Culture GSJ Worldwide EUROPE Germany Spain It develops infrastructure that boosts produc- Individual responsibility and demandingness France tivity, promotes growth, encourages progress of the Group and all its professionals are also Malta and contributes to the development of society part of this core. Therefore, we always try to Portugal in a more responsible and sustainable manner. accompany each action with complementary Romania innovations capable of increasing the efficien- The Grupo upholds a stable growth trajec- cy and productivity ratios, optimising resources tory in all the markets where it operates. Dri- and minimising the environmental impact. ven mainly by quality, experience, innovation, technical capabilities, operational efficiency, Further, belonging to a global and diversified responsibility and a full commitment to its cus- group helps to share this knowledge and de- tomers and society. This corporate culture, to- velop many of its innovations simultaneously in gether with the unique projects it has carried different markets, both from a geographic and out worldwide, have consolidated an efficient business point of view. business model and a global benchmark in all Faced with the profound changes that society its business lines: Construction, Energy and is experiencing, SANJOSE ensures customers Environment, Concessions and Services and anticipation and capacity to adapt to their real Consulting Services and GSJ Solutions (Pro- needs, providing, at all times, competitive ad- ject Management). vantages and measurable results in different AMERICA Sustainability is part of the core of GSJ’s stra- markets and cultural environments. tegy. Its main objective is to create a positive Argentina Chile impact on society and facilitate the day to day Colombia of people with each project developed. United States Mexico SEE VIDEO Panama AFRICA ASIA Paraguay Cape Verde United Arab Emirates Peru India Uruguay East Timor Identity Sign

A dynamic and diversified company Quality High Technical Capacity (R&D&I) Commitment to Customers Business lines Construction, Energy and Envi- GSJ is committed to excellence in all business Execution of high-technology complex projects Relationships based on trust, transparency, ronment, Concessions and Services and GSJ activities; the history of the Group and the por- and commitment to constant innovation. professionalism and a strict compliance with Solutions (Consulting Services and Project Ma- tfolio of projects developed endorse this diffe- contract terms. Corporate Social Responsibility nagement). . rentiating factor. Commitment to the Environment and Sustai- Global company and long-standing presence Efficiency nability, exhaustive care on Occupation Risk To grow, to create value, to innovate and to The optimisation of costs and resources is es- Prevention of all professionals integrating the produce wealth at each country where it ope- sential for ensuring the competitiveness of the organisation, as well as on their training and rates is the commitment of the Group since company and constitutes a key factor for the career promotion opportunities. the beginning of its expansion overseas in the development and execution of works. 90s. 6 ACTIVITY REPORT 2017 CONTENTS LIST OF MAIN PROJECTS 7

List of Main Projects

> Louvre Abu Dhabi Judicial Centre of La Museum (United Arab > Serena (Chile) - pag 39 Emirates) - pag 14

5* White Sands Hotel & < Al Ain Hospital, Abu Dhabi < Spa, Boavista Island (Cape (United Arab Emirates) - Verde) - pag 40 pag 19

> Enlargement of the 5* > Hospital of Ovalle (Chile) - Castillo Hotel Son Vida pag 22 Luxury Collection, Palma de Mallorca - pag 41 Carlos Cisternas Hospital < of Calama (Chile) - pag 25 Stretch Miamán - Ponte < Ambía (Orense). AVE Madrid - Galicia - pag 48

General Hospital Zone > Tunneles of Pajares. AVE # 3 of Aguascalientes > - Asturias - pag 53 (Mexico) - pag 26

Stretch Highway Regue- < Mamsha Al Saadiyat Resi- < rón Ring Road MU-30 of dential Complex, Abu Dhabi Murcia - pag 54 (United Arab Emirates) - pag 29

> Plaza Río 2 Shopping Cen- > Stretch Vilaboa - A Ermi- tre, Madrid - pag 32 da of the future Highway A-57, Pontevedra - pag 57 Alisios Shopping Cen- < tre, Tamaraceite in Las Road from Dili - Tibar < Palmas de Gran Canaria - Liquica (East Timor) - - pag 35 pag 58

Ciudad de la Tele and new > Design and refurbishment Headquarters of Grupo > of the stretch Raebarely - Secuoya in Tres Cantos, National Highway NH-232 Madrid - pag 36 (India) - pag 59

Headquarters of the Cen- < Headquarters of Norvento, < tral Bank of Cape Verde Lugo - pag 64 - pag 38 8 ACTIVITY REPORT 2017 CONTENTS LIST OF MAIN PROJECTS 9

List of Main Projects

Conservation of green spa- Factory Nueva Bureba > > ces located within the south of Campofrío in Burgos - and east areas of Valladolid pag 66 and San Sebastián de los Reyes- pag 102 y 103 Txomin Enea District < Winter Maintenance and Heating Power Plant, San < daily conservation, Ponte- Sebastián - pag 69 vedra - pag 105

> District Heating and Cooling Poligeneration Power Plant > State Roads Sector CC-3, ST-4 in Cerdanyola del Cáceres Extremadura - Vallés, Barcelona - pag 82 pag 106

PV Solar Farm in < State Roads Sector Lorca < Alcaudete, Jaén - pag 84 and Murcia - pag 108 y 109

> Flyover at junction at > Wind Farms in Uruguay - EA15, Kappara (Malta) - pag 85 pag 114

El Carmen Dr.Luis Valen- < Enlargement of the tín Ferrada Hospital of < drinkable water plant of Maipú, Santiago de Chile Belgrano, Buenos Aires - pag 91 (Argentina) - pag 116

> Dra. Eloísa Díaz Insunza > Condominium Nuevavista Metropolitan Hospital of at the district of Bellavista, La Florida, Santiago de Lima (Perú) - pag 119 Chile - pag 92 Condominium Parques de < Property Real Madrid, < la Huaca, Lima (Perú) - Madrid - pag 96 pag 120

> Parque Lagos La Matanza Urban Transformation, > Central Services Building of Buenos Aires (Argentina) the Ministry of the Interior - pag 123 of Spain, Madrid - pag 97 R&D&I project for detection < Gardens of National < and dissipation system for Heritage - pag 100 fog precipitación, Lugo - pag 124 CONTENTS

SANJOSE Constructora is a reference in the sector for its experience in the execu- tion of singular projects. More than 40 years of experience throughout the world have allowed the creation of own management models that generate operational efficien- cies capable of improving each project in terms of quality, innovation, sustainability, profitability and safety. Key factors for the growth, competitiveness and reputation of BUILDING the company. The company relies on technically and geographically specialised teams of profes- CIVIL WORKS sionals, technological capacity and a cross-sectoral organisation structure capable of bringing together all its knowledge to provide customers with high added value. ENGINEERING AND INDUSTRIAL SANJOSE has been successfully exporting its business model and know-how since the CONSTRUCTION 1990s to different geographical environments. Currently the company occupies posi- tion 155th within the “ENR Top 250 International Contractors”, world ranking of the most SUBSIDIARIES international engineering and construction companies issued annually by the presti- gious North American magazine ENR (Engineering News-Record).

Plaza Río 2 Shopping Centre, Madrid (Spain)

Stretch Miamán - Ponte Ambía (Orense). AVE Madrid - Galicia (Spain) Louvre Abu Dhabi Museum (United Arab Emirates) 12 ACTIVITY REPORT 2017 CONTENTS BUILDING 13

Building Projects

Louvre Abu Dhabi Museum (United Arab Emirates) Louvre Abu Dhabi Museum (UAE). Headquarters of the Central Bank of Cape Verde. Al Ain Hospital, Abu Dhabi (UAE). Headquarters of Porsche Iberica in Madrid. Hospital of Ovalle (Chile). Enlargement Marqués de Murrieta Winery in Logroño. Carlos Cisternas Hospital of Calama (Chile). Enlargement Bankinter Headquarters in Alcoben- das, Madrid. General Hospital Zone # 3 of Aguascalientes (Mexico). Service Building of the new Headquarters of Banco Hospital of Caceres (Stage I). Popular in Madrid. General Hospital Zone # 5 in Zapatec, State of Mo- Headquarters Celta F.C. of . relos (Mexico). Ciudad de la Tele and new headquarters of Grupo Refurbishment of the General Hospital Zone # 5 in Secuoya in Tres Cantos, Madrid. Atlixco - Metpec, State of Puebla (Mexico). Courts of Guadalajara. Interior refurbishment of the children’s emergency area of the University Hospital of La Paz in Madrid. Headquarters of the Maritime Authority and Coor- dination Centre of Harbouring Services in the Port Refurbishment of the Emergency Area of S. Teotó- of Las Palmas de Gran Canaria. nio de Viseu Hospital (Portugal). Enlargement of the Instituto Ferial de Vigo (IFEVI). Plaza Río 2 Shopping Centre, Madrid. Mamsha Al Saadiyat Residential Complex, Abu Dha- Alisios Shopping Centre in Tamaraceite in Las Pal- bi (UAE). mas de Gran Canaria. Hacienda Rosario Residential Complex in Seville, “Mar Shopping Algarve” of IKEA in Loule, Faro Stages I & II. (Portugal). Habitat Bulevar Residential Complex in Mairena del 5* Great Luxury Six Sense Hotel Ibiza. Aljarafe, Seville, Stages I & II. 5* New Horizons Ponta Sino, Salt Island (Cape Verde). Villas La Finca 3 El Pinar, Marbella. 5* White Sands Hotel & Spa, Boavista Island (Cape Single-family units in La Morelia of Marbella. Verde). Semi-detached houses at La Cala de Mijas, Malaga. 5* Eurostars Museum Hotel, Lisbon (Portugal). Los Altos Residential Complex of Estepona, Malaga. 5* Great Luxury H10 The One Hotel, Barcelona. Lamarca Residential Building, Madrid. Refurbishment of the 5* Sofia Hotel, Barcelona. Residencial Grande Hotel Monte Estoril (Portugal). Enlargement of the 5* Castillo Hotel Son Vida Luxury Collection, Palma de Mallorca. Santos Design Residential Building. Lisbon (Portugal). Enlagrment 5* Son Brull Hotel & Spa 5 in Pollença, Refurbishment and remodelling for its use as resi- Mallorca. dential building of the Santa Helena Palace of Lis- bon (Portugal). Refurbishment 4* NH Malaga Hotel. Mar de Plata Sports Centre, Seville. Refurbishment and remodelling for use as a 4* hotel of the “Casa de La Carnicería” at Plaza Mayor of Mergelina headquarters of the School of Industrial Madrid. Engineers of the University of Valladolid. 5* The Lumiares Hotel & Spa 5, Lisbon (Portugal). CEU San Pablo School of Seville in Bormujos. RAW Culture Bairro Alto de Lisbon Aparthotel Infant School of the Lycée Français of Madrid. (Portugal). “Jardín Valenciano” Secondary School in Melilla. Judicial Centre of La Serena (Chile). School of the Rota Naval Base, Cadiz. Mamsha Al Saadiyat Residential Complex, Carlos Cisternas Hospital, Calama (Chile) Ciudad de la Tele and new headquarters of Grupo Abu Dhabi (United Arab Emitates) Secuoya in Tres Cantos, Madrid (Spain) 14 ACTIVITY REPORT 2017 CONTENTS BUILDING 15

LOUVRE ABU DHABI MUSEUM

Location. Abu Dhabi (United Arab Louvre Abu Dhabi, designed by geometric lace that resembles a Emirates. the Pritzker Prize Jean Nouvel, network or fabric, through which combines modern architecture sunlight enters, generating an Built Surface. 64,000 m². with the tradition of the region. effect similar to the rays that Buildings. 55. The 64,000 m² complex is made are filtered by the leaves of palm Art Galleries. 9,200 m². up of 55 buildings, pavilions, squa- trees. To achieve this spectacular res, corridors and canals that effect that floods the whole site Architect. Jean Nouvel. evoke a floating city on the sea so-called by Jean Nouvel as “rain inspired by traditional Arabic ar- of light”, over 8,000 pieces known chitecture and exceptionally fulfils as stars have been used. the desire to create a universal Under the dome, the exterior vo- museum where all cultures have a lumes of the museum, with their meeting place and where to show simple geometric shapes, low pieces of art from prehistoric ori- height, diversity of facades and gin to contemporary works. without apparent rational order, The first branch of the Louvre transport visitors to an ancient outside France is located at the Arab city. Inside the buildings, the- Cultural Island of Saadiyat, be- re are 9,200 m² of galleries that tween the sand and the sea. It offer visitors occasional windows is covered in its two thirds by a to the sea, the sky and outdoor dome of 180 meters in diameter, courtyards. 36 meters high at its highest point In addition to the 23 art galleries, and approximately 7,500 tons of the museum has spaces devo- steel (practically the same as the ted to temporary exhibitions, an Eiffel Tower), which are supported interactive museum for children, by only four points of support that a 200-seat auditorium, a restau- have been carefully hidden inside rant, a cafeteria and a commer- the museum buildings, creating cial space. the illusion that the entire dome is suspended in the air.

This unique structure is compo- SEE VIDEO sed of 8 overlapping layers of

“Harper’s Bazaar Interiors - Best Building Design 2017” for the best design.

“Project of the Future 2015“Award granted at the first edition of the “Identity Design Award “recognising on- going projects that place the UAE as a worldwide archi- tectural centre.

“Green Building Award” to the environmental excellence at the “Green Middle East Awards 2013”. 16 ACTIVITY REPORT 2017 CONTENTS BUILDING 17 18 ACTIVITY REPORT 2017 CONTENTS BUILDING 19

AL AIN HOSPITAL

Location. Abu Dhabi (United Arab Health complex that will replace Further, the new building will inclu- Emirates) the current one in the area of Al de 104 outpatient consultations, Ain (at approximately 160 kilome- 17 radiology rooms, 22 rooms for Built Surface. 315,000 m². tres from Abu Dhabi), highlighting endoscopy and diagnostic proce- Beds. 719 (26 for VIP patients for its unique design, which has dures, traumatology, specialised and royal suites). managed to combine the latest orthopaedics, sports medicine Intensive Care Units. . 67. medical technologies with an ar- units, a Regional Centre of Exce- chitecture style that provides the llence in Rehabilitation Medicine Car Park Spaces. 1,500. building with the feeling of a heal- or the first specialised stroke unit Architects. Icme, Faust Consult th Oasis / Town so as to improve from all United Arab Emirates, and Obermeyer. the stay and well-being of pa- among other services. tients during healing and recovery. The project also includes other The new hospital, with a built sur- types of non-sanitary facilities or face amounting to 315,000 m², services, standing out a logistics will have a total of 719 beds, of service centre, a 60 MW power which 484 will be devoted to ge- plant, a mosque, a central morgue neral medicine, surgery, children and an underground parking with and maternity, 67 to ICUs, 142 to 1,500 spaces. medical rehabilitation and 26 to SEE VIDEO VIP patients and royal suites. 20 ACTIVITY REPORT 2017 CONTENTS BUILDING 21 22 ACTIVITY REPORT 2017 CONTENTS BUILDING 23

OVALLE HOSPITAL

Location. Ovalle (Chile) This new hospital will be the largest energy savings. It also has a solar in the region, providing services to heating system, modern air con- Built Surface. 40,887m². the entire province of Limarí, invol- ditioning systems and the most Beds. 340. ving more than 215,000 people in modern facilities and equipment Intensive Care Units. 2. its more than 40,000 m², with 340 on the market. beds, 8 surgery rooms, 96 boxes, Intensive Treatment Units. 15. 2 ICUs, 15 UTIs, 419 parking spaces Car Park Spaces. 419. at ground level and a heliport.

Helipad. Avant-garde technologies have been key in its design, especially Architects. Heriberto F. Hidel- in terms of energy efficiency. The brant Klapp - Hidelbrant Plan- new construction has a concrete consult. envelope in its entirety and is co- vered with EIFS so as to promote 24 ACTIVITY REPORT 2017 CONTENTS BUILDING 25

CARLOS CISTERNAS HOSPITAL

Location. Calama (Chile) The health complex comprises including all clinical services with four main buildings: greater complexity: Emergency Built Surface. 34,462 m². Room, ITU - ICU for adults and Hospital stay building, a four-sto- Beds. 206. children, Delivery rooms, neona- rey building housing some general tology, surgery pavilion and steri- Intensive Care Units. 6. services on the ground floor, a lization plant. Intensive Treatment Units. 10. first floor devoted to offices and hospital stay areas on the upper Central Services Building. Sin- Car Park Spaces. 253. floors. gle-storey building housing changing rooms, laundry, clini- Helipad. Outpatient Consultation building, cal gas, workshops, solid waste Architect. Hernán Pinchera a four-storey building housing plant, mailroom. Squella. consultation rooms and procedu- re rooms of for different medicine Further, the new hospital has specialities and therapeutic diag- other buildings, highlighting, nostic services. among other, the nursery school and the electric substation and Critical Patient Unit. Two-storey generator providing service to the building next to the previous one, entire complex. 26 ACTIVITY REPORT 2017 CONTENTS BUILDING 27

GENERAL HOSPITAL ZONE # 3 JESUS MARIA AGUASCALIENTES

Location. Aguascalientes New health complex of the IMSS In its more than 26,000 m² of (Mexico) (Mexican Institute of Social Se- built surface, it houses more than curity) that serves more than 144 beds, 36 specialties, 8 ICUs Built Surface. 26,353 m². 400,000 citizens of the States of for adults, 4 neonatal ICUs and Beds. 144. Aguascalientes, Jalisco and Za- state-of-the-art equipment to Intensive Care Units. 12. catecas. The Hospital is arranged offer the best service to patients. by a main building that combines Further, the hospital has an audi- Car Park Spaces. 526. the geometry of several bodies torium with 150 seats and 526 car Architects. Quirón Promotora linked together from the main hall. parking spaces. Inmobiliaria. It consists of a ground floor and three levels in height where me- dical, administrative and support services are located. SEE VIDEO 28 ACTIVITY REPORT 2017 CONTENTS BUILDING 29

MAMSHA AL SAADIYAT RESIDENTIAL COMPLEX SEE VIDEO

Location. Abu Dhabi (United Arab One of the first residential pro- will soon house, in addition to the Emirates) jects in the cultural district of Louvre Abu Dhabi Museum, the Saadiyat Island. It stands out for National Zayed Museum and the Built Surface. 240,000 m². a clean architecture to comple- Guggenheim Abu Dhabi Museum. Public leisure and entertainment ment the beauty of the surroun- In terms of figures, its 240,000 m² area. 34,200 m². ding coastal location. The use of of total built surface are arranged glass in façades from floor to cei- Number of housing units. 461. into 9 buildings that will house 461 ling results in a striking design that housing units, plus 34,000 m² of Buildings. 9. makes it possible to take advan- public recreation area and 1,929 tage of life in front of the beach Car Park Spaces. 1.929. parking spaces. but also an urban and contempo- Architect. Dewan Architects + rary design that does not break Engineers. the aesthetics of the island, which

Award for the Best Mixed Use Architectural Design 2016 in Africa and Arabia at the International Property Awards. 30 ACTIVITY REPORT 2017 CONTENTS BUILDING 31 32 ACTIVITY REPORT 2017 CONTENTS BUILDING 33

PLAZA RÍO 2 SHOPPING CENTRE

Locationn. Madrid (Spain). Three-storey building that stands tions, in addition to the quality of out for its wide and long facade the variety of services provided Built Surface. 124,000 m². combining stone with other cons- in its 124,000 m² of built surface Commercial Premises. 180. tructive elements of great quality and 180 commercial premises, is Car Park Spaces. 1,500. providing the building with great to have the largest food court in elegance. The interior space of Madrid with about 3,000 m²: El Architect: Chapman Taylor. the centre is connected by a dou- Mirador de Plaza Río 2. ble mall covered with a skylight The building is provided with the that enhances natural lighting. most advanced technology in Its location, overlooking the Man- terms of energy efficiency and zanares River by one of its two sustainability. main facades, allows you to enjoy one of the most pleasant areas of the city. One of its great attrac- 34 ACTIVITY REPORT 2017 CONTENTS BUILDING 35

ALISIOS SHOPPING CENTRE

Location. Tamaraceite, Las To the north of the island, near It is a shopping centre open to Palmas de Gran Canaria (Spain). the capital city of Las Palmas, the sky composed of an under- and with the advantage of its ground parking with capacity for Built Surface. 165,000 m². warm climate all year long, a new 2,500 vehicles; a ground floor Commercial Premises. 120. shopping centre, arranged into housing the shopping centre with Car Park Spaces. 2.500. several volumes around open three accesses from the street, streets, squares with terraces all the commercial premises and Architect. Mikel Arriola Azaldegui and a leisure space, is located. a square for events; a first floor (Chapman Taylor). where the food court and a play- Alisios highlights, in addition to its ground are located and a second figures: 165,000 m² of built sur- floor devoted it its entirety to a face and 120 commercial premi- cinema. ses, for its sustainability since it incorporates PV renewable ener- SEE VIDEO gy and a responsible water use system. 36 ACTIVITY REPORT 2017 CONTENTS BUILDING 37

CIUDAD DE LA TELE AND NEW HEADQUARTERS OF GRUPO SECUOYA

Location. Tres Cantos, Madrid The Ciudad de la Tele is born with The new Corporate Headquar- (Spain) the vocation of becoming a ben- ters of the Secuoya Group is a chmark for the audio-visual indus- modern four-level building of 900 Built Surface. 9,445 m². try. On its almost 22,000 m², a m² of built surface that is located Architects. Pelayo García Cos- project of 9,445 m² of built sur- to the south of the plot, facing all tales and Santiago Cifuentes face is arranged into, mainly, two its working spaces. Barrio. buildings: A large parking zone, a loading A building of great volume that dock, several warehouses, premi- houses three recording sets of ses for the repair and manufac- approximately 1,200 m² each one. ture of sets and a large esplana- All of them incorporate their own de to record outdoors complete area of production and an addi- the facilities. tional post-production work area, of 450 m² each, as well as sets, dressing rooms, changing rooms, offices and a warehouse so as to work autonomously. 38 ACTIVITY REPORT 2017 CONTENTS BUILDING 39

NEW HEADQUARTERS OF THE CENTRAL BANK OF CAPE VERDE JUDICIAL CENTRE OF LA SERENA

Location. Praia, Santiago Island Complex of three buildings lo- vide optimal working conditions, Location. La Serena (Chile) The project includes practically and a two-storey building in the (Cape Verde) cated in the neighbourhood of it was essential to use mecha- 12,000 m² of built surface and access by the Colon street. Built Surface. 11,730 m². Achada de Santo Antonio, the nical air conditioning systems to 2,000 m² of urbanised surface, Built Surface. 15,678 m². The project has been designed ta- most popular district of the city of reduce the temperature and, in Urbanised Surface. 1,908 m². where the Justice Centre of the king into consideration demogra- Buildings. 3. Praia. The main building will house particular, reduce humidity. Solu- city will be built, a complex hou- Architect. Fermín Bustamante phic and climatic characteristics of a basement, a parking area and tions found were summarised as sing, among other facilities, the Architect. Álvaro Siza Vieira Villarroel. the city. It will be granted the LEED 6 floors for cabinets. The two re- mechanical ventilation for tempe- Family, Labour and three civil certificate of sustainable buildings maining buildings, of a single floor, rature and humidity control, the courts. (Leadership in Energy & Environ- are devoted to social areas: au- central atrium as an extraction Works consist mainly of the refur- mental Design) and will promote ditorium, museum, library, dining plenum, fans that promote the bishment, conservation and re- energy efficiency, the use of re- room, etc. In a first approach, a agitation of air and static equip- modelling for its new use of two newable energies, interior environ- study of the building’s energy-en- ment (radiant surfaces that fa- existing buildings after the appro- mental quality and innovation of vironmental performance was vour natural convection). val of National Monuments; and spaces in terms of design, lumino- carried out, given that the existing the construction of two new buil- sity and accessibility. climate in Cape Verde is charac- dings, a six-storey building (four terised by high temperatures and floors in height and another two humidity levels. In order to pro- underground floors for parking) 40 ACTIVITY REPORT 2017 CONTENTS BUILDING 41

5 * WHITE SANDS HOTEL & SPA ENLARGEMENT OF THE 5* CASTILLO HOTEL SON VIDA LUXURY COLLECTION Location. Boavista Island (Cape 5* White Sands Hotel & Spa is a 14 swimming pools, 5 restaurants, Verde) luxury complex carefully divided 6 bars, playground, tennis courts, into two sections: one for adults gym, theatre with capacity for Location. Palma de Mallorca Majestic castle built in the 13th The project, in addition to expan- Built Surface. 70,606 m². only and another for families in 250 people, 741 m² spa and 76 (Spain). century located on the top of ding its capacity with the new re- Palma de Mallorca, overlooking sidential units, triples the surface Urbanised Surface. 23,4901 m². order to guarantee a high-quality parking spaces. Built Surface. 14,800 m². service adapted to the individual the bay and surrounded by green of Spa, improves the accessibility Hotel. 188 rooms. Rooms. 164. needs of its guests. areas. It currently has 164 rooms of the site and changes the lo- Villas. 15. Villas. 16. and upon completion of the ex- cation of the parking area while It consists of 835 luxury pro- pansion works, it will have 16 new increasing its capacity. Housing Units. 632. perties that include duplex and Architects. Paula Olabarría Va- independent luxury villas proper- Architect. Alfonso Ramos apartment-style hotel suites, as quero and José Francisco Reynés. ty of the complex. well as a range of incredible priva- Martínez. Engineers. Cabot Proyectos. te villas provided with all services: 42 ACTIVITY REPORT 2017 CONTENTS BUILDING 43

“Mar Shopping Algarve” of IKEA in Loule, Faro (Portugal) CEU San Pablo School of Seville in Bormujos (Spain)

5* Great Luxury Six Sense Hotel Ibiza (Spain) Residencial Grande Hotel Monte Estoril (Portugal) 44 ACTIVITY REPORT 2017 CONTENTS BUILDING 45

Enlargement Bankinter Headquarters in Alcobendas, Madrid (Spain) 5* New Horizons Ponta Sino, Salt Island (Cape Verde)

5* The Lumiares Hotel & Spa 5, Lisbon (Portugal) “Casa de La Carnicería” at Plaza Mayor de Madrid (Spain) 46 ACTIVITY REPORT 2017 CONTENTS CIVIL WORKS 47

Civil Works Projects

Stretch Miaman - Ponte Ambia (Orense). Spanish High-Speed Railway Line AVE Madrid - Galicia (Spain) Stretch Miaman - Ponte Ambia (Orense). Spanish Remodelling of the shopping area and departure High-Speed Railway Line AVE Madrid - Galicia. lounge of the Gran Canaria Airport in Las Palmas. Tunnels of Pajares (complementary civil works South New terminal building of DHL at the air cargo centre Batch) Spanish High-Speed Railway Line AVE Madrid of the Adolfo Suárez International Airport Madrid - - Asturias. Barajas. Coating of the gallery of Folledo Stretch La Roba - Design and construction of flyover at link EA15, Ka- Pola de Lena (Variant of Pajares) of the AVE Madrid ppara (Malta). - Asturias. Four railway tunnels for Indian Railways (India). Stretch Highway Reguerón Ring Road MU-30 of Amendment link highways A-30 and A-7 and exten- Murcia. sion of the additional lane for slow-moving vehicles Strech Vilaboa - A Ermida of the future Highway at A-30, Murcia. A-57, Pontevedra. Railway Terminal South Quay Huelva Port. Refurbishment and maintenance of a 28.7 km long Stage VI of the Fast-Public Transport Systems of road from Dili - Tibar - Liquica (East Timor). Las Palmas de Gran Canaria. Design and refurbishment of the stretch Raebarely Service road A-1 access to Iberdrola Campus at - National Highway NH-232, State of Uttar Pradesh San Agustin de Guadalix, Madrid. (India). Improvement works of accesses and car parks of Access to the area of logistics and industrial ac- Ikea store in Jerez de la Frontera. tivities of Asturias (Zalia) from the high capacity network. Reinforcement and replacement of road surface at SA-801 from Peñaranda de Bracamonte to CL- Expansion of the General Belgrano Water Treat- 605, Salamanca. ment Plant, Buenos Aires (Argentina). Development of the execution projects and condi- Drinkable water supply network and tank of Cortes, tioning and development of the western front side Burgos. of the sport Centre of Real Madrid in Valdebebas, Stage IV earthworks and soil stabilisation New Air- Madrid. port Navi Mumbai. Deep foundations and rafts of contaminated mate- Preventive maintenance and repair of parallel rial for the refinery of Talara - Piura (Peru). runways, taxiways and shoulders (130,000 m²) from Earthworks and consolidation of the new 5-star Ra- the US Naval Base Airport in Rota, Cadiz. disson Blu Hotel, Salt Island (Cape Verde).

Stretch Highway Reguerón Ring Road MU-30 Stretch Raebarely - National Highway NH-232, Strech Vilaboa - A Ermida of the future Highway Tunnels of Pajares (complementary civil works South Batch) Spanish High-Speed Railway Line AVE Madrid - Asturias (Spain) of Murcia (Spain) State of Uttar Pradesh (India) A-57, Pontevedra (Spain) 48 ACTIVITY REPORT 2017 CONTENTS CIVIL WORKS 49

STRETCH MIAMAN - PONTE AMBIA

Location. Orense. AVE Madrid - 6.7 km. in length that run entirely stage due to its technical com- Galicia (Spain). through the municipality of Baños plexity, executed through the de- de Molgas in Orense. It includes molition of 70.8 m long two se- Length. 6.7 Km. the execution of the 852 me- mi-arches, built almost vertically, Viaductos. 3 tre-long bouzas tunnel and three which share a foundation with the Tunnels. 1. viaducts (Miaman 177 m, Bouzas adjacent piles. 216 m and Arnoia 1,014 m). So as to folding the semi-arches, The Viaduct of Arnoia, the most the descent rods balance the unique structure of the section, weight of each half-arch, which has 55 m spans. and a central reaches 1,350 tons and the retai- 110 m-span executed by fol- ning straps counteract the hori- ding the half-arches, one of the zontal force transmitted by the most advanced techniques as descent straps to the top of piers far as construction process is 8 and 9. Each folding process has concerned for using a system of been executed separately, with a abatement of arches that seeks duration of 5 hours. Total folding maximum respect for the envi- angle from start position until fi- ronment in especially sensitive nal position is 41.4 degree, with environments. folding cycles of 4.4 degrees. The overall process involves 12 work The process of abatement of the stages. pointed arch is the most striking 50 ACTIVITY REPORT 2017 CONTENTS CIVIL WORKS 51 52 ACTIVITY REPORT 2017 CONTENTS CIVIL WORKS 53

TUNNELS OF PAJARES

Location. AVE Madrid - Asturias Waterproofing work by means of nical rooms and cable crossings (Spain). injections and other treatments under track. and construction of a separative Length of the two pipes. 9.79 km. The tunnels, the second longest drainage system for infiltration in Spain and the seventh in the Inside diameter. 8.50 m. waters and discharges from the world with a length of almost 25 South Lot of the Pajares Tunnels. km., allow passage through the A concrete slab, sidewalks and Cantabrian Mountains and redu- ducts have also been executed, ce the current route from 83 km. as well as the construction of a to 50 km. false floor in galleries and tech- 54 ACTIVITY REPORT 2017 CONTENTS CIVIL WORKS 55

STRETCH HIGHWAY REGUERON RING ROAD MU-30

Location. Murcia (Spain). Important infrastructure for Mur- To the section of 16.3 kilometres

0+000 OD-ALEV-860 cia, where works are concentra- in length (with two roads and 3.00X3.00 0+050 Length. 16.3 km. 0+000

ted, involving the extension of the three lanes each one of them), it 0+000 0+000 0+050 0+000 0+000 0+000 1+100 0+000 Viaducts. 2. MU-30 ring road and an improve- is necessary to add the 2.7 kilo- 1+000 1+200 0+900 1+300 0+000 1+400 1+500 1+600 Flyovers. 3. ment in access to all the towns lo- metres of the Avenue of Levante 0+000 AVENIDA DE LEVANTE 0+000 0+000 cated in the so-called Costera Sur and the 1.6 kilometres of roads of 0+100 0+050 0+100 0+000 Underpasses. 15, including two through the appropriate junctions provisional connections with the 0+000 0+000

GLORIETA 1 pergola type. with the regional road network. highway in construction Zeneta - 0+000

0+000 San Javier.

Término Municipal de Murcia

SECRETARÍA DE ESTADO DE EMPRESA CONSTRUCTORA: ESCALAS TITULO: Nº PLANO DESIGNACIÓN DEL PLANO FECHA INFRAESTRUCTURAS SUBDIRECCIÓN GENERAL DE PROYECTOS PROYECTO MODIFICADO Nº1 0 20 40 60 m SECRETARÍA GENERAL DE PLANTAS INFRAESTRUCTURAS 1 : 2.000 "CIRCUNVALACIÓN DE MURCIA MU-30 FEBRERO.2018 DIRECCIÓN GENERAL DE DEMARCACIÓN DE CARRETERAS DEL ESTADO EN MURCIA HOJA DE GENERALES

CARRETERAS ORIGINAL DIN A-1 TRAMO: AUTOVÍA DEL REGUERÓN" 3 17 Término Municipal de Murcia de Municipal Término 56 ACTIVITY REPORT 2017 CONTENTS CIVIL WORKS 57

STRECH VILABOA - A ERMIDA OF THE FUTURE HIGHWAY A-57

Location. Pontevedra (Spain). Section of 6.48 kilometres in len- exterior and 0.60 meters for the gth that will be the first of the fu- interior. Length. 6.48 km. ture A-57 motorway, infrastruc- For the connection of this new Viaducts. 4. ture that will be the alternative infrastructure with the current of high capacity to the N-550 Flyovers. 5. N-550 a bidirectional link of 1.74 highway in Pontevedra. Underpasses. 2. kilometres will be executed, star- The new highway will consist of ting at the junctions with Vilaboa, Junctions. 3. two roads (one for each direc- and after crossing the railway line tion), separated by a 3-meter Pontevedra-Redondela and the wide median. Both roads will be AVE “Atlantic Axis” axis, will con- formed by two 3.5-meter-wide nect with the N-550, remodelling lanes, a 1.50-meter inner shoul- the existing junction in said area der, a 2.5-meter outer shoulder with the AP-9. and berms of 1.10 meters for the 58 ACTIVITY REPORT 2017 CONTENTS CIVIL WORKS 59

STRETCH RAEBARELY - HIGHWAY NH-232

Location. Uttar Pradresh (India). After its completion, the road will over 200 million inhabitants. It con- have two lanes and shoulders pa- nects Uttar Pradesh and Madhya Length. 133 kilometres. ved along its entire length. With Pradesh, situated in the Centre of Bridges. 14. the execution of this project, being the country, and intersects with Toll Stations. 2 one of the most prestigious and National Highway NH-24B which important projects for the National connects Lucknow and Allahabad, Highways Authority of India (NHAI), the two most important cities of a safer and faster traffic flow is the State. guaranteed, while at the same It is important to highlight the great time the general economic deve- number of structures within the lopment of the state is enhanced. project. Of the 14 existing bridges, The development of this infras- stand out those that save the two tructure is essential for the region most important rivers in the coun- and has a strategic importance. It try, Ganga and Yamuna, and the is located in the southern part of two that allow the passage over Uttar Pradesh, the most populous two existing railway lines in the ring state in India with a population of roads of Lalganj and Fatehpur.

REMODELLING AND MAINTENANCE OF THE ROAD DILI-TIBAR-LIQUICA Location. Dili-Tibar-Liquica (East Works shall start at kilometre ters arranged into two lanes (one Timor). point 6.8 of the existing road (at in each direction) plus two shoul- the outskirts of the capital city ders of 1 meter each. Length. 28.7 km. Dili), which has one of the highest The concerning road is a coastal traffic flows of non-urban roads route between the sea and rock within the country and constitutes formations with steep gradients. one of the most important com- The existing road has slope sta- munication routes linking East Ti- bility problems in several locations mor and Indonesia. which require different and various The existing road has a width of actions throughout its entire path. 4 meters and the new route will ensure a minimum width of 6 me- 60 ACTIVITY REPORT 2017 CONTENTS CIVIL WORKS 61

Reinforcement and replacement of road surface at SA-801 from Peñaranda de Bracamonte to CL-605, Salamanca (Spain) Service road A-1 access to Iberdrola Campus at San Agustin de Guadalix, Madrid (Spain)

Access to the area of logistics and industrial activities of Asturias (Zalia) from the high capacity network (Spain) Stage VI of the Fast-Public Transport Systems of Las Palmas de Gran Canaria (Spain) 62 ACTIVITY REPORT 2017 CONTENTS ENGINEERING AND INDUSTRIAL CONSTRUCTION 63

Engineering and Industrial Construction Projects

Factory of Campofrío, Burgos (Spain) New Headquarters of Norvento in Lugo. Refurbishment Conditioning System of 9 Correos premises in Catalonia. Design and construction of the Txomin Enea District Heating Power Plant. Conditioning system factory of PICDA, Valencia. Electrical and fluid mechanical works of the new Adaptation of Central Cold / Heat plant in the buil- production factory of Campofrío, Burgos. ding Corporación de Radio Television Española in Prado del Rey, Madrid. Central Thermal Refurbishment of the Padre Soler Auditorium Building of the Carlos III University in the Remodelling of the facilities of Volkwagen in Pam- Campus of Leganes, Madrid. plona, Navarra. Substation and High Voltage Line 20 / 66KV Con- Facilities and refurbishment at the factory of SEAT sorcio de Agua Callejones de Lanzarote. in Martorell, Barcelona. Enlargement and remodelling of the Estrella Galicia Control building and Electrical substations. Refinery factory in A Coruña. Talara - Piura (Peru). Refurbishment of installations of the Penitentiary Assessment of risks and fire protection of the Naval Centre Salto del Negro, Las Palmas de Gran Canaria. Base of Rota, Cadiz. Refurbishment of the urban branch #3 of Correos, Refurbishment of the building 55 FLC of the Naval of the special services unit (USE) and of the distri- Base of Rota, Cadiz. bution units ·#2 and #3 of Sabadell. Enlargement and refurbishment of the warehouse Replacement Urban Lighting at Catalonia Roads for of Lonza Biologics in Porriño, Vigo. SEITT. Refurbishment Conditioning System CPD of General Directorate of the Police in El Escorial.

Headquarters of Norvento in Lugo (Spain) Factory of Campofrío, Burgos (Spain) 64 ACTIVITY REPORT 2017 CONTENTS ENGINEERING AND INDUSTRIAL CONSTRUCTION 65

HEADQUARTERS OF NORVENTO

Location. Lugo (Spain). The new headquarters of the re- and its formal beauty, where newable energy company, loca- geometric lines highlight, mainly in Built Surface. 4,644 m². ted between an industrial estate meeting spaces. Car Park Spaces. 54. it seems to turn its back on and The building is energetically au- an adjacent forest it seems to Architect. Francisco Mangado tonomous and is not connected embrace, achieves an easily re- Beloqui. to the network. It has energy sa- cognisable image completely far ving measures, such as insulation ZERO ENERGY building. It covers from the usual concept. all energy needs with renewable of 10 centimetres, light roofs with energy resources. The headquarters of Norvento is photovoltaic panels in the parking composed of two buildings, gar- area, rainwater collection, cross den and green areas and an out- ventilation and a solar collector door parking. The main building system on the roof (covered with consists of a main warehouse of zinc-TECU- covering a copper 190 meters in length from which tube circuit through which a con- five modules emerge in the rear ductive fluid circulates). facade in the form of a fan to the The headquarters of Norvento green space created on the plot are one of the most sustainable of land and which seem to join buildings in Europe. The building’s the aforementioned forest. This electricity sources will be mainly arrangement into bodies that are three: photovoltaic panels (60%), prolonged and integrated into the a state-of-the-art wind turbine environment allows structuring (35%) and a biomass boiler (5%). each department in an autono- Further, it relies on an electric mous way, yet keeping in touch storage system based on 1,000 with the other departments, while kWh lithium batteries. The heating ensuring that each one may be will be supported by a geothermal easily expanded in the future. heat pump system fed exclusively The interior architecture stands on renewable energies. out for its simplicity, the predomi- nance of light (several skylights)

American Architecture Prize 2017 for Architecture & Desing / Other Architectures.

Barcelona Building Construmat Award. Finalist and honourable mention of the jury within the architecture in completed works award 2017.

Silver Medal in the XII Edition International Prize of Sustainable Architecture FASSA BARTOLO 2017 by the Faculty of Architecture, Università degli Studi di Ferrara. 66 ACTIVITY REPORT 2017 CONTENTS ENGINEERING AND INDUSTRIAL CONSTRUCTION 67

FACTORY NUEVA BUREBA OF CAMPOFRÍO

Location. Burgos (Spain). The new factory will have approxi- Electrical works mately a surface of 97,000 sqm Plant and machinery. - High-voltage (45 kV), Me- and represents a European ben- dium-voltage (20kV) and low chmark for industrial production voltage power lines. Total power: within its sector. With a production 9,218 kw.. capacity of more than 100,000 tons a year it will operate as a - 2 AT-transformers of 10MVA sustainable industrial complex at each, working in parallel. all levels, optimising the consump- - Transformer Substation 45/20 tion of water, energy and .CO . 2 Kv with 2 power transformers of emissions. 10 MVA each, 4 new cells of 52 Technical Facilities Kv and 5 new cells of 24 Kv.

- It includes steam, fluid and com - 7 dry type transformers of pressed air facilities. 2,000 KVA and 2 dry 3,150 KVA transformers. - 9 storage stainless steel tanks of 160 m³ and a network of dis- - Ring of 20 kV for the intercon- tribution of 25,000 ml. of stain- nection of all the transformation less steel pipes. centres. - 3 low voltage panels and over 60 secondary panels. 68 ACTIVITY REPORT 2017 CONTENTS ENGINEERING AND INDUSTRIAL CONSTRUCTION 69

TXOMIN ENEA DISTRICT HEATING POWER PLANT

Location. San Sebastián (Spain). Future neighbours of the new nei- pumps for distribution to the dis- ghbourhood under construction trict network. Design, execution and mainte- “Txomin Enea” of San Sebastian nance for a period of 15 years. The infrastructure that integrates will have a sustainable power the entire District Heating sys- It will provide service to 1,458 plant and a heating network that tem includes, in addition to this housing units and more than will supply their hot water and building, the distribution network 104,246 m². heating demands through a ‘Dis- and all its accessories (from the trict Heating’ system. A building Within the frameworks of the thermal installation to each subs- capable of producing sustaina- ‘Replicate’ project of the Euro- tation of the residential buildings ble energy for its inhabitants at a pean Union. and premises), elements belon- lower cost and, equally, capable ging to customers and end users, of reducing 80% of CO emissions. 2 such as the substations themsel- The project includes the design ves with all their components, the and construction of the thermal distribution and pumping system power plant for energy produc- of the interior of each building of tion, a building that houses bio- houses and premises, including mass boilers, natural gas, silos the interior pipes (from the subs- and pumping systems: tation to each user module), the user modules themselves and -2 biomass boilers of 1,400 kW the system of regulation, control of thermal power for a maximum and monitoring of consumption moisture content of 55%. Boilers of the entire district heating sys- allows three high-performance tem, including heat energy me- passages of gas, up to 92%. ters (from the user module to the -2 natural gas boilers of 2,300 kW thermal installations - including each, with smoke-water exchan- wiring, electrical installations and ger made of Stainless Steel to the electronic elements of these achieve high performance of the systems) ) and the energy mana- set and external heat recovery. gement computer platform con- Low temperature boilers with low nected to the user modules and emission of NOx in combustion the thermal power plant itself. products.

-The installation, which will be va- riable flow, is composed of two groups of pumping; one in each primary circuit of the boiler and a pumping group consisting of five 70 ACTIVITY REPORT 2017 CONTENTS ENGINEERING AND INDUSTRIAL CONSTRUCTION 71

Enlargement and remodelling of the Estrella Galicia factory in A Coruña (Spain) Substation and High Voltage Line 20 / 66KV Consorcio de Agua Callejones de Lanzarote (Spain)

Control building and Electrical substations. Refinery Talara - Piura (Peru) Adaptation of Central Cold / Heat plant in the building Corporación de Radio Television Española in Prado del Rey, Madrid (Spain) 72 ACTIVITY REPORT 2017 CONTENTS SUBSIDIARIES 73

Subsidiaries

Within its policy of integration and growth, Grupo SANJOSE develops part of its activity in the Cartuja is an Andalusian company with branches in Seville and Malaga and with more than 30 construction sector through subsidiary companies able to increase the competitiveness of the years of experience in both public and private projects throughout the eight provinces of Anda- company and adapt perfectly to certain geographical areas. lusia. During the last years, it is important to highlight its geographic expansion executing projects in Madrid, Barcelona, Murcia and Las Palmas de Gran Canaria. In 2017, the three subsidiaries of the Group (Cartuja I., EBA and Construtora Udra) have increa- sed their turnover and the business areas of action. Cartuja is specialised in the construction and restoration of buildings: administrative buildings, hotels, shopping centres, hospitals and health care centres, housing units, educational centres Go-Fit Sports Centre in Peñagrande, Madrid (Spain) and sport facilities, etc. Relationships with customers are based on the knowledge of the local markets, the mutual trust and its experience in technical advice and execution of projects.

Projects

New Headquarters of the special office of the Tax Sundry works at the theme park Isla Magica, Seville. State Agency in Murcia. Remodelling and expansion of the Monaita and Mul- Go-Fit Sports Centre in Peñagrande, Madrid. hacen Schools of Granada. Refurbishment of facades of the laboratory building Housing units in Sector 1 of Can Batlló, Barcelona. of the Hospital of La Paz, Madrid. Housing units, premises and car park spaces in Dos Enlargement works of the 4* Zenit Hotel Seville. Hermanas, Seville. Enlargement and refurbishment works of the 3* Vi- New kennels in the Municipal Zoosanitary of Seville. llasol Hotel in Benalmadena, Malaga Karcher Building in Tormares, Seville. Office building of the General Treasury of the Social Housing units at Castilla St. of Seville. Security of Lepe, Huelva. Housing units at Marques de Nervion St. of Seville. Remodelling of the sports centre Go-Fit Santa Justa of Seville. completion of housing units in Palomares del Rio, Seville.

Office building of the General Treasury of the Social Security of Lepe, Huelva (Spain) New Headquarters of the special office of the Tax State Agency in Murcia (Spain) 74 ACTIVITY REPORT 2017 CONTENTS SUBSIDIARIES 75

4* One Shot Tabakalera House Hotel in San Sebastian (Spain)

Basque company with registered office in Vitoria highly appreciated by public and private custo- mers of the Basque Country, Navarra, La Rioja, Asturias, Cantabria and Castilla Leon. Experience, professionalism and a relationship of trust with clients and suppliers has enabled the company to successfully face any type of construction challenges of any type of projects, such as hotels, administrative buildings, schools, housing units, hospitals, health care centres, cultural works, sports centres, emblematic refurbishments, etc.

Projects

4* One Shot Tabakalera House Hotel in San Sebastian. Refurbishment of the Employment Office in Sestao, Vizcaya. Expansion of the car park at Silo de Arana, Vitoria. Refurbishment of the Basque Police Academy in Ar- Remodelling of the Archives and Customer Service kaute, Alava. in Renteria, Gipuzcua. Enlargement of the premises of Gamesa in Lerma, Empowerment of the Onco-Hematology and Day Burgos. Care Hospital of Txagorritxu at the University Hospi- tal of Alava in Vitoria. Development and execution of a building at the Te- chnology Park of San Sebastian. New education centre with 9 primary school classes at CEP Aiete LHI in San Sebastian, Guipuzcoa. Firemen Station in Iruña de Oca, Vitoria. Refurbishment of the City Hall of Zuia in Murguia, Refurbishment and covering of the fronton of Plaza Alava. Azoka of Bilbao. Remodelling Casa Kapitain as Museo del Traje in Tracks CEP Luis Briñas of Bilbao. Errentería, Guipuzcoa. New nursery building at CEIP Bizkotxalde Hlhi in Ba- Covering of the remains of the Plaza Corazón de sauri, Vizcaya. María of Bilbao. Refurbishment facade sundry faculties of the çu- Refurbishment of the Secondary Insitute of Zumaia niversity of the Basque Country in San Sebastian. BHI, Guipuzcoa. Health Care Centre in Amurrio, Alava. Arqueología Mikaela Portilla Labs for the University Enlargement of the swimming pool at the Sports of the Basque Country in Vitoria. Centre of Hernani, Guipuzcoa.

Refurbishment and covering of the fronton of Plaza Azoka of Bilbao (Spain) Faculty of Philosophy and Education Sciences, University of the Basque Country in San Sebastián (Spain) 76 ACTIVITY REPORT 2017 CONTENTS SUBSIDIARIES 77

Refurbishment of the 4* Aparthotel at Prata St., Lisbon (Portugal)

Portuguese Company with offices in Lisbon and Cape Verde. It is devoted to the construction, restoration, extension and remodelling of all types of buildings (residential and non-residential) of both, unique and high technical complexity projects and rapid intervention projects. Its specialisation, flexibility and adaptation to customers’ needs have helped to overcome the complex economic situation of Portugal and keep turnover, procurement and execution figures.

Projects

Housing units and car park spaces and green areas Refurbishment of the 5* H10 Palacio da Anunciada at Rua Nova de S. Mamede St. in Lisbon. Hotel, Lisbon. Housing units and car park spaces at Rua Alfredo Refurbishment of the 4* O Artista Hotel, Lisbon. da Silva in Lisbon. REfurbishment of the 4* Aparthotel at Prata St., Lis- Refurbishment of housing units and commercial bon. premises at Ferragial 29, Lisbon. 4* Browns Avenida Hotel, Lisbon. Refurbishment housing units at Calçada do Deste- Expansion Outlet Shopping, Odivelas. rro, Lisbon. Expansion of the Restaurant Solar dos Presuntos, Refurbishment housing units at Vitor Cordón 47, Lisbon. Lisbon. Enlargement and new underground car park spaces Refurbishment housing units at Ivens 30-34, Lisbon. at Gimnasio Clube Português of Lisbon. Refurbishment housing units at Boavista 43, Lisbon. Housing units at Patrocínio 50-58, Lisbon. Refurbishment housing units at Arrabida 32-38, Refurbishment housing units at Aurea 72, Lisbon. Lisbon. Refurbishment housing units at Restauradores 53- 57, Lisbon.

Refurbishment housing units at Calçada do Desterro, Lisbon (Portugal) Enlargement and new underground car park spaces at Gimnasio Clube Português of Lisbon. (Portugal) CONTENTS

The development of clean energies, the respect for the environment and the imple- mentation of sustainable development policies and energy efficiency are the pillars of business activity of SANJOSE Energía y Medio Ambiente. Aware of the importance of climate change, the Group boost renewable energies and the research and development of sustainable energy solutions capable of reducing the consumption of energy and optimising the use of clean energies by the application ENERGY EFFICIENCY of avant garde technologies. Joining the efforts made by major companies that, in coalition with Governments around the world, are committed to curb the global war- ming of the planet and achieve emission reduction targets agreed upon at the COP21 RENEWABLE ENERGY Conference in 2015 in Paris. In parallel, these measures are also important to alleviate the strong dependence on foreign energy of Europe (and particularly, of Spain). The involvement of the company in energy efficiency and energy savings are a priority, in compliance with several EU Directives on the issue. SANJOSE, as an Energy Services Company (ESE or ESCO), brings to this sector a high added value for its experience as promoter and constructor of this type of projects, professional teams of great experience, continuous innovation, and services and spe- cialised solutions offered to each customer in all stages of this type of initiatives: Engi- neering (design and analysis), Operation and Maintenance and Energy Management.

Science and Technology Park Parc de L’Alba of Cerdanyola del Vallés, Barcelona (Spain)

PV solar farm in Alcaudete, Jaen / 5,4 MW (Spain) Wind Farms in Urugyuay 80 ACTIVITY REPORT 2017 CONTENTS ENERGY EFFICIENCY 81

Energy efficiency and Renewable Energy Projects

Operation and sale of energy of the Txomin Enea Improvement of the energy efficiency system of the District Heating Power Plant. buildings property of the Governement of Canarias. Sale of electrical and thermal energy. Science and Technology Park of Cerdanyola del Valles, Barcelona. Sale of electrical and thermal Wind Farm Carape I, District of Maldonado (Uru- energy. guay) / 50 MW. Puerto Real Hospital, Cadiz. Sale of thermal energy Wind Farm Carape II, District of Maldonado (Uru- guay) / 40 MW. Hospital of Torrecardenas, Almeria. Sale of thermal energy. PV solar farm in Alcaudete, Jaen / 5,4 MW. Primary Health Care Centres of Catalonia (CAPS) of Just Oliveres, Anoia, Parragones and Villanova del Camí. Sale of thermal energy.

Hospital of Torrecardenas, Almeria (Spain) Puerto Real Hospital, Cadiz (Spain) 82 ACTIVITY REPORT 2017 CONTENTS ENERGY EFFICIENCY 83

DISTRICT HEATING AND COOLING POLYGENERATION POWER PLANT ST-4 OF THE SCIENCE AND TECHNOLOGY PARK PARC DE L’ALBA

Location. Cendanyola del Vallés, This polygeneration plant will allow Refrigerating towers. Barcelona (Spain). energy savings of 109,000 MW/ Gas Natural boiler. hour each year and will reduce Engineering and design. GSJ CO emissions by 7,500 tons per The ST-4 has pioneering facilities Solutions. 2 year, what represent, compared at European level that have been Construction. SANJOSE to traditional energy systems, sa- subsidized by the European Union Constructora. vings up to nearly 35% by using through the project Polycity, such residual energy (heat generated as: a refrigeration machine by by electrical motors) for the pro- double-effect absorption only in duction of cold and hot water. Ba- Europe, which uses the heat ge- sed on a design which increases nerated by electric motors to cool energy efficiency and energy sa- water from the district cooling ne- vings, it incorporates many tech- twork; a thermal storage tank of nology items: large capacity, which allows the plant to operate at a steady pace Cogeneration engines. 3 of 3.35 for 24 hours a day; or an advan- MW each. ced energy management system Absorption machines. 2 of 50 MW that optimizes plant efficiency. each. The system will also incorporate Chiller. 2 of 5 MW each. two renewable energy facilities on a trial basis at European level: a Storage tanks. 2 of 5,000 m³. biomass gasification plant and a Boilers. 2 of 4 MW each solar cooling plant.

Power supplier of the first particle accelerator synchrotron in Spain and south western Europe: Alba Synchrotron. 84 ACTIVITY REPORT 2017 CONTENTS RENEWABLE ENERGY 85

PV SOLAR FARM IN ALCAUDETE

Locationn. Jaen (Spain). Renewable energy project located on an area of 14 hectares, con- 5.4 MW trading power. sisting of 486 double-axis solar Engineering and design. GSJ trackers and designed to provide Solutions. enough electricity to meet the de- Construction. SANJOSE mand of 1,500 conventional homes Constructora. for a period of 20/25 years.

WIND FARMS IN URUGYUAY

Location. Maldonado district CARAPE I WIND FARM. CARAPE II WIND FARM. (Uruguay). 50 MW trading power. 40 MW trading power. Engineering and design. GSJ Aero generators. 17. Aero generators. 14. Solutions.

Construction. SANJOSE Constructora. CONTENTS

SANJOSE Concessiones y Servicios boosts its diversification strategy and interna- tional expansion by developing business models which provide access to long-term contracts capable of providing recurrent income and promoting the sustainable deve- lopment of the company. The company, in its eagerness to promote sustainable growth and improve the life of HOSPITALS people, actively collaborates in the development of new and innovative infrastructu- re through public/private concessionary regimes and in the provision of maintenance BUILDINGS, ENERGY POWER PLANTS services capable of promoting efficiency, energy savings and citizens welfare. AND FACILITIES Due to its experience in various areas, SANJOSE Concesiones y Servicios has multidis- ciplinary teams capable of optimising resources, maximising profitability, encouraging CONSERVATION OF PARKS AND GARDENS the use of new technologies and providing effective and tailored solutions to the con- cession or services required by its customers; among which are public administrations TRANSPORT INFRASTRUCTURE and private companies of the first level such as: the Ministry of Public Works of Spain, the Ministry of Public Works of Chile, National Heritage of Spain, the Xunta de Galicia, Madrid City Council, Telefónica, Aena, Real Madrid, various national and international hospitals, etc. The strategic policy of the company and its wide expertise in all its area of activity have enabled the establishment of a sound, innovative and competitive business area with great global growth potential.

Winter maintenance and daily conservation Pontevedra Sur (Spain)

Santiago Bernabeu Stadium Maintenance of the Property of Real Madrid (Spain) El Carmen Dr. Luis Valentin Ferrada Hospital of Maipu, Santiago de Chile 88 ACTIVITY REPORT 2017 CONTENTS HOSPITALS 89

Hospitals Projects

El Carmen Dr. Luis Valentin Ferrada Hospital of Veterinary Defense and the Transfusion Center of Maipu, Santiago de Chile Concession. the FAS, and the General Hospital of the Defense of Zaragoza). Electromedice services. Dr. Eloísa Díaz Insunza Metropolitan Hospital of La FLorida, Santiago de Chile. Concession. Sant Joan de Deu Hospital, Barcelona. Electrome- dice services. Gregorio Marañon University Hospital, Madrid. Main- tenance services. Quiron Hospital of Tenerife. Electromedice services. La Mancha - Centro Hospital Complex, Alcazar de San Juan de Dios Hospital Order of the province of San Juan. Maintenance services. Baetica (15 centres). Electromedice services. Nuestra Señora del Prado Hospital, Talavera de la Infanta Luisa Hospital, Seville Electromedice services. Reina, Toledo. Maintenance services. Institut d´Oncología (VHIO) of the Vall d´Hebron Hos- Sant Pau Hospital, Barcelona. Maintenance services. pital, Barcelona. Electromedice services. Puerto Real University Hospital, Cadiz. Maintenance Hospital of Badalona, Barcelona. Electromedice services. services. Hospital of Torrecardenas, Almeria. Maintenance Consorci Sanitari del Garraf (2 hospitals and a re- services. habilitation centre). Electromedice services. Logistic healthcare platform of the Province of Jaen Hospital of El Bierzo, Leon. Radiology. (5 hospitals and 174 health care centres). Mainte- Electrocardiographs prisons dependent on the Mi- nance services. nistry of the Interior (70 centres). Electromedice Health Centers of the Parc de Salut Sea Consortium services. of Barcelona (Hospital del Mar, Hospital de l’Espe- Santa Catalina Hospital, Las Palmas de Gran Cana- rrança, Center Fòrum de l’Hopsital del Mar, Center ria. Electromedice services. Emili Mira i Edifici França). Maintenance services. Santa Cruz Hospital, Tenerife. Electromedice services. San Vicente del Raspeig Hospital. Electromedice services. Clínica de Onyar, Girona. Electromedice services. Transfuccion Centre of Alicante. Electromedice Cínica de Ponent, Lleida. Electromedice services. services. Terres de l’Ebre, Tarragona. Electromedice services. Sant Joan d’Alacant University Hospital, Alicante. Hosp. of Pallars, Lleida. Electromedice services. Electromedice services. Clínica la Arruzafa, Cordoba. Electromedice services. Hospitals of the Ministry of Defense (In Madrid: The Central Hospital of Defense Gómez Ulla, the Institu- Public Company of Health Emergencies (EPES) of te of Toxicology of Defense, the Military Center for Andalusia (41 centres). Electromedice services.

El Carmen Dr. Luis Valentin Ferrada Hospital of Maipu, Santiago de Chile Dr. Eloísa Díaz Insunza Metropolitan Hospital of La FLorida, Santiago de Chile 90 ACTIVITY REPORT 2017 CONTENTS HOSPITALS 91

EL CARMEN DR. LUIS VALENTIN FERRADA HOSPITAL

Location. Maipú, Santiago de Chile. Infrastructure services. Water, Non-health care services Green energy, lighting, conditioning, pa spaces and landscape, cleaning, BOT (Built, Operate & Transfer). system, medicine gas network, waste treatment, uniforms, ca- Design, construction and mana- vertical transport, industrial equi- feteria, security control, nursery, gement for a period of 15 years pment, non-medical furniture. etc. (with the exception of health care services). SEE VIDEO Built Surface. 70,646 m².

Beds. 375.

Architects. BBATS Consulting & Projects, SLP / MURTINHO+RABY Architects.

Engineering and design. GSJ Solutions.

Construction. SANJOSE Constructora.

First hospital under concession regime of the country together with the Dr. Eloísa Díaz Insunza in Santiago de Chile.

Vulcan Award 2016. Architecture contest “Vulcan, 100 years building a better Chile”.

First Award to Architectural Quality in newly Health- care buildings overs 5,000 m² (Best Hospital), granted by at the XXIII the International Federation of Hospital Engineering 2014 held in Buenos Aires.

Project awarded by Constest AADAIH – Domus 2009 for its contribution to environmental, social and economic sustainability within the health care sector.

“Latin America Social Infrastructure Deal of the Year 2015” granted in New York by the prestigious Ame- rican magazine “IJGlobal” (Euromoney) to Grupo SANJOSE for the issuance of bonds in Chile to finance both hospitals. 92 ACTIVITY REPORT 2017 CONTENTS HOSPITALS 93

DR. ELOÍSA DÍAZ INSUNZA METROPOLITAN HOSPITAL OF LA FLORIDA

Locationn. Santiago de Chile Infrastructure services. Water, Non-health care services Green energy, lighting, conditioning, pa spaces and landscape, cleaning, BOT (Built, Operate & Transfer). system, medicine gas network, waste treatment, uniforms, ca- Design, construction and mana- vertical transport, industrial equi- feteria, security control, nursery, gement for a period of 15 years pment, non-medical furniture. etc. (with the exception of health care services). SEE VIDEO Built Surface. 71,987 m².

Beds. 391. First hospital under concession regime in the country together the Carmen Dr. Luis Valentín Ferrada Hospital Architects. BBATS Consulting & of Maipu, Santiago de Chile. Projects, SLP / MURTINHO+RABY Architects. “Latin America Social Infrastructure Deal of the Year Engineering and design. 2015” granted in New York by the prestigious American GSJ Solutions. magazine “IJGlobal” (Euromoney) to Grupo SANJO- SE for the issuance of bonds in Chile to finance both Construction. SANJOSE hospitals. Constructora. 94 ACTIVITY REPORT 2017 CONTENTS BUILDINGS, ENERGY POWER PLANTS AND FACILITIES 95

Maintenance of Buildings, Power Plants and Facilities Projects

Property Real Madrid. Terminal Building of the Airport of Vigo. Central services building of the Ministry of the Inte- Premises of the headquarters of Michelin, Madrid. rior of Spain, Madrid. Headquarters of DHL, Madrid. Headquarters of the Official Credit Institute, Madrid. Theatre - Auditorium of Revellin, Ceuta Five real estate properties of Inmobiliaria Colonial, National Police Facilities of Ceuta and Melilla. Madrid. Puerta de Europa shopping centre, Algeciras. National Police Academy in Avila. Buildings of the University of Granada. Firemen buildings and facilities of the City Council of Madrid. Buildings of the City Hall of Cordoba. Heat and Cool Polygeneration ST-4 Power Plant in Headquarters of the Ministry of work and social ma- Cerdanyola del Vallés, Barcelona tters of the Generalitat, Barcelona. 5.4 MW PV solar plant in Alcaudete, Jaen. Technical assistance services for Telefonica. Production plant of Bimbo in Azuqueca de Henares. Network and Customer Maintenance services for R - Euskaltel. Maintenance of office and premises of Telepizza. Airport of Las Palmas.

Santiago Bernabeu Stadium Maintenance of the Property of Real Madrid (Spain) Real Madrid Sports City in Valdebebas, Madrid (Spain) 96 ACTIVITY REPORT 2017 CONTENTS BUILDINGS, ENERGY POWER PLANTS AND FACILITIES 97

PROPERTY REAL MADRID

Santiago Bernabéu Stadium Preventive, corrective and tech- - Other. Plumbing, anti-intrusion, no-legal maintenance services of fire protection (including detec- Capacity. 81,044 seats. facilities: tion and suppression), hydro- VIP Grades. 245. therapy areas, industrial water - Low and medium voltage elec- treatment, control system of fa- “Bernabéu Tour” Museum. More trical works. Including transfor- cilities, lifting devices, etc. than 850,000 visitors in 2012 from mers, switchboards of low vol- more than 100 different countries. tage, distribution panels and Adjoint Building. 7,000 m² lighting, power lines, exterior and devoted to administrative and interior lighting, emergency ligh- commercial purposes. ting, generators, UPS, etc.

“Elite” stadium, according to - Air conditioning and hot water. UEFA. Production plants including air conditioning and hot water, hot Sport City of Valdebebas water accumulation, conditioning Surface plot of land. 1,200,000 m². terminal equipment, circulation pumps, hydraulic substations, Developed Surface. 360,000 m². distribution lines fluids, etc. Built Surface. 21,578 m².

Football pitches. 10.

Alfredo Di Stefano Stadium. 6,000 localidades.

CENTRAL SERVICES BUILDING OF THE MINISTRY OF THE INTERIOR OF SPAIN

Location. Madrid (Spain) Preventive, corrective and tech- water accumulation, conditioning no-legal maintenance services of terminal equipment, circulation Buildings. 13. facilities: pumps, hydraulic substations, dis- Surface. 58,378 m² of buildings tribution lines fluids, etc. - Low and medium voltage elec- and 11,505 m² of development. trical works. Including transfor- - Other. Plumbing, fire protection mers, switchboards of low volta- (including detection and suppres- ge, distribution panels and lighting, sion), control system of facilities, power lines, exterior and interior lifting devices, gardening services, lighting, emergency lighting, gene- etc. rators, UPS, etc.

- Conditioning and sanitary hot water: production plants including air conditioning and hot water, hot 98 ACTIVITY REPORT 2017 CONTENTS CONSERVATION OF PARKS AND GARDENS 99

Conservation of Parks and Gardens Projects

Conservation and maintenance of green areas of Conservation of the gardens of National Heritage. “Fuentelucha” urbanization and landscaped areas, Conservation and improvement works of Municipal urban trees in public schools and municipal nursery green spaces, line up trees and urban furniture of schools in Alcobendas (Madrid). San Sebastián de los Reyes (Madrid). Conservation and improvement works of the green Maintenance and conservation of the green spaces spaces of the Canal de Isabel II in zone D (Madrid) of Ferrol (A Coruña). Maintenance and cleaning of parks, green areas and Maintenance service and conservation of parks and related furniture at Paracuellos de Jarama. gardens located within the south and east areas of Enlargement works of Parque Lineal del Manzanares the City Council of Valladolid. between Mezquita St. and Caja Magica for the City Hall Plan silvo - Bosque de Riofrío at La Granja. National of Madrid. Heritage. Refurbishment and conservation works of the green Maintenance Service, conservation, cleaning and areas of the neighbourhoods of Valladolid - Batch 2: improvement of parks, gardens, street trees and left bench of the Pisuerga River. planters of Renedo de Esgueva.

Royal Palace of La Granja de San Ildefonso, Segovia (Spain) Royal Palace of El Escorial, Madrid (Spain) 100 ACTIVITY REPORT 2017 CONTENTS CONSERVATION OF PARKS AND GARDENS 101

GARDENS OF NATIONAL HERITAGE Palacio de El Pardo, Madrid (Spain)

Location. Spain. The contract of conservation and The project demands the utmost maintenance of Historical Gar- care, dedication and professio- Total Surface. 600 hectares. dens of National Heritage is the nalism, both for the maintenan- Surface of gardens subject to most singular of Spain. SANJO- ce, adaptation and conservation conservation. 73 hectáreas. SE Concesiones y Servicios is ho- of the palatial gardens with diffe- Meadow Surface. 11 hectáaes. noured with the responsibility of rent styles commented, as well maintaining and preserving jewels as for the forest and mountain Shrub Surface. 9 hectares. of Spanish culture, such as the areas that require a meticulous Arboreal Surface. 92 hectares. gardens of La Granja de San Ilde- work of repopulation, mainly of fonso (50 hectares), Aranjuez (43 holm oaks, oak groves and espe- Trees. 6,345. hectares), El Pardo (40 hectares) cially pine, as a means of defen- and El Escorial (25 hectares), as ce against erosion. well as the Campo del Moro in Madrid (20 hectares).

Royal Palace of Aranjuez, Madrid (Spain) 102 ACTIVITY REPORT 2017 CONTENTS CONSERVATION OF PARKS AND GARDENS 103

MUNICIPAL GREEN SPACES, LINE UP TREES AND URBAN FURNITURE CONSERVATION AND IMPROVEMENT WORKS OF PARKS, TREES OF SAN SEBASTIÁN DE LOS REYES AND GARDENS LOCATED WITHIN THE SOUTH AND EAST AREAS OF THE CITY COUNCIL OF VALLADOLID Location. San Sebastián de los The main conservation works in- Reyes, Madrid (Spain). clude: vegetation, terraces, play- Location. Valladolid (Spain). The main conservation works in- grounds, leisure areas, street fur- Total Surface. 473 hectares. clude: vegetation, terraces, se- niture, separate areas for dogs, Total Surface. 182 hectares. parate areas for dogs, drainage Surface of gardens subject to drainage networks and sewage. Surface of gardens subject to networks and sewage. conservation. conservation. 259 hectares. 127 hectares. Meadow Surface. Meadow Surface. 190 hectares. 42 hectares. Shrub Surface. 24 hectares. Shrub Surface. 13 hectares. Trees. 23,860. Trees. 16,650. 104 ACTIVITY REPORT 2017 CONTENTS MAINTENANCE OF TRANSPORT INFRASTRUCTURE 105

Maintenance of Transport Infrastructure Projects

State roads sector CC-3 Caceres, Extremadura. State roads sector Murcia. State roads sector Lorca. Winter maintenance and daily conservation Ponte- vedra Sur.

WINTER MAINTENANCE AND DAILY CONSERVATION PONTEVEDRA SUR

Location. Pontevedra (Spain). Conservation and winter main- so as to guarantee the normal tenance of 522 Km. of regional conditions of the road in terms of Length. 522 km. roads during 4 years in the south traffic flow and safety. Average Traffic Flow. 9,000 of Pontevedra. It includes syste- vehicles rough. matic or sporadic surveillance ac- tions, assistance to accidents and all those operations deemed ne- cessary to deal with emergencies 106 ACTIVITY REPORT 2017 CONTENTS MAINTENANCE OF TRANSPORT INFRASTRUCTURE 107

STATE ROADS SECTOR CC-3, CACERES

Location. Caceres, Extremadura Conservation and maintenan- elements, slopes, berms and of all (Spain). ce during 4 years of 254 Km. of the singular structures within the roads plus service roads. Highlight sector, among which highlight the Length. 254 km. mainly: A-66 Highway “Ruta Vía viaducts over the rivers Almonte Average Traffic Flow. 10,400 de la Plata” from k.p. 507+600 and Tajo with central spans of 184 vehicles. (Cañaveral North) and 598+300 meter and 220 meters, respecti- (province border with Badajoz) vely and heights over 42 meters. and National Road N-630 from The contract also includes sys- k.p. 515+000 and 598+145, run- tematic or sporadic surveillance, ning parallel to the above-men- accident care and all operations tioned A-66 stretch. deemed necessary to deal with The contract includes the main- emergencies so as to guarantee tenance of pavement, horizontal normal road conditions, flow and and vertical signalling, containment safety. systems, beaconing items, land- marks, conservation of drainage 108 ACTIVITY REPORT 2017 CONTENTS MAINTENANCE OF TRANSPORT INFRASTRUCTURE 109

STATE ROADS, SECTOR MURCIA

Location. Murcia (Spain). Conservation and maintenance of day, 365 days a year, automated state roads during 4 years of 203.5 fault detection system and main- Length. 203.5 km. Km. of roads plus service roads. tenance of related facilities, ventila- Average Traffic Flow. 130,000 tion, lighting, fire suppression, traffic Direct and telematic management vehicles rough. lights, control of access, signalling, of the tunnel of Alcantarilla, with etc. a total length of 2,300 meters. Screen centre running 24 hours a

STATE ROADS, SECTOR LORCA

Location. Lorca, Murcia (Spain). Conservation and maintenance of 350 meters of communication and state roads during 4 years of 181 evacuation galleries. Screen centre Length. 181 km. Km. of roads plus service roads. It running 24 hours a day, 365 days Average Traffic Flow. 25,000 includes winter road maintenance a year, automated fault detection vehicles rough. services and auxiliary installations. system and maintenance of re- lated facilities, ventilation, lighting, Direct and telematic manage- fire suppression, traffic lights, con- ment of the tunnel of Lorca, with trol of access, signalling, etc. a total length of 1500 meters and CONTENTS

GSJ Solutions is an engineering company whose mission is to promote responsible developments by providing integral solutions adapted to customers’ needs, both re- garding the design of a project and its global management. GSJ Solutions is a global provider of consultancy and project management services for any its lines of specialisation. It relies on the experience and expertise necessary CIVIL ENGINEERING / INFRASTRUCTURE for promoting the optimisation of resources and, therefore, improving competitiveness and profitability of projects at any stage: planning, execution and operation. ARCHITECTURE The company’s culture is based on the search for innovative solutions that add value to any activity and project with the main objective of guaranteeing its economic viability, REAL ESTATE MANAGEMENT efficiency, sustainability and completion in the agreed time and budget. TECHNOLOGY / R&D&i / INDUSTRIAL The company believes in the talent and responsibility of its human team as an engine capable of transforming society, which is why it provides its public and private cus- SUSTAINABLE DEVELOPMENT tomers with multidisciplinary teams made up of consultants, economists, engineers, architects, etc. Professionals who study the project from different perspectives to de- velop a strategy and performance capable of meeting the objectives defined by cus- tomers and the return of their investment in all project stages.

Flyover at junction EA15, Kappara (Malta)

Condominium Parques de la Huaca - 3,072 housing units -, Lima (Peru) 112 ACTIVITY REPORT 2017 CONTENTS GSJ SOLUTIONS 113

GSJ Solutions Project Stages

CONCEPTUALISATION

Lines of Specialisation Technical feasibility Design including social, economic and environmental requirements Civil Engineering / Infrastructure Technology / R&D&I / Industrial Legal and regulatory framework The design and development of infrastructu- Innovation and the use of avant-garde tech- Optimisation of resources

re capable of improving the quality of life and nology is a key differentiating element for any CONCEPTUALISATION economic growth of counties, affecting as little industrial, energy or environmental project to as possible the natural environment where lo- be carried out by GSJ Solutions. EXECUTION cated, is the main goal of GSJ Solutions. This vocation represents an added value that Financial structure Thus, it relies on skilled engineers specialised in positively impacts the optimisation and reco- Technical monitoring EXECUTION a wide range of areas in order to provide the very of investment, in altering as little as pos- Management of problems best solution possible and the most efficient sible the natural environment, in the promotion Cost controlling response so as to optimise investment, deve- of sustainability and in the boost of socio-eco- Completion within execution term and lop and manage financial systems (public, pri- nomic development of counties where it ope- budget vate or both) which certify financial feasibility rates and the improvement of the quality of OPERATION of projects, ensure the best criteria possible on life of citizens. safety issues and strongly commit to sustaina- Sustainable Development bility and respect for the environment. GSJ Solutions conducts preliminary studies in Architecture order to assess all land factors so as to deve- OPERATION One of the main values of architecture is to lop the most appropriate operation strategy meet the needs of people in terms of functio- according to land features. Profitability and return of nality, aesthetic value, social sensitivity, sustai- the investment The development of each property shall ensu- nability, energy efficiency, innovation, invest- Sustainability re the profitability of investment. It shall provi- ment criteria, respect for the environment, etc. Commitment de a revalued and sustainable heritage by im- Any building has numerous possibilities and proving infrastructure and productive capacity variants. They shall all be assessed in order to of the same yet altering as little as possible materialise social equipment in line with cus- the natural environment and not committing Projects tomers’ needs and final users of the hospital, resources and opportunities of future genera- educational centre, sports complex, theatre, tions. museum, office, etc. Flyover at junction EA15, Kappara (Malta). General Hospital Zone # 5 in Zapatec, State of Mo- Expansion of the General Belgrano Water Treat- relos (Mexico). Real Estate Management ment Plant, Buenos Aires (Argentina). Refurbishment of the General Hospital Zone # 5 in Specialised in urban, regulatory, market, eco- Condominium at the district of Bellavista in Callao - Atlixco - Metpec, State of Puebla (Mexico). nomic-financial, technical analysis of real esta- 1,104 housing units - Lima (Peru). Offshore Oil Master Plan of the State of Veracruz te projects and the subsequent promotion or Parque Lagos. Urban transformation of La Matan- (Mexico). management of assets of any kind. za-Buenos Aires (Argentina). Carape I 50 MW Wind Farm, District of Maldonado It provides advice or support to clients at any Condominium Parques de la Huaca - 3,072 housing (Uruguay). stage of the project in order to maximise pro- units -, Lima (Peru). Carape II 40 MW Wind Farm, District of Maldonado fits and reduced risks at any stage of real es- El Carmen Dr. Luis Valentin Ferrada Hospital of Mai- (Uruguay). tate transactions. pu, Santiago de Chile. R&D&i project for an automated and fixed detection Dr. Eloísa Díaz Insunza Metropolitan Hospital of La and dissipation system for fog precipitation on hy- Florida, Santiago de Chile. drometric data. 114 ACTIVITY REPORT 2017 CONTENTS GSJ SOLUTIONS 115

FLYOVER AT JUNCTION AT EA15, KAPPARA

Location. Kappara (Malta). The project, which has been fun- of reinforced concrete to avoid ded by the European Union, has as much as possible the effects Length. 1 km. improved a road traffic problem on existing traffic. Flyover. 193 meters. between Mikel Anton Vasalli and Among its singularities, highlight Tas Silema of Kappara. SANJOSE Width. 18 meters. the deck, for which it was deci- has designed and developed the ded to manufacture the metallic Lanes. 2 on each direction. construction project in a perfor- beams in a workshop in Galicia mance of more than one kilo- Engineering and design. GSJ (Spain) and ship them to the metre in length where stands Solutions. port of Marsa so that, once the out a bridge that saves the Construction. SANJOSE abutments and piles were built, roundabout of distribution of Constructora. they were lifted and placed in secondary traffic. This bridge only 8 nights. The bridge was has a total length of 193 metres divided into 16 pieces between and two lanes on each direction. 23 and 27 meters long each The width is 9.95 metres (inclu- and 6 meters wide. All the me- ding two useful lanes of 3.50) tallic beams weighed a total of and the solution adopted was 520 tons and it took two weeks to separate decks in each di- to ship them from the port of A rection and prefabricate it with Coruña. SEE VIDEO metallic beams and pre-slabs

It is the first bridge that is made in Malta with this typology of steel and concrete.

The Prime Minister of Malta, Mr. Joseph Muscat, starred in the inauguration, where he praised all those involved in the development of the Kappara crossing for its “high level” He also highlighted the great effort made so that traffic was not affected by the works. 116 ACTIVITY REPORT 2017 CONTENTS GSJ SOLUTIONS 117

ENLARGEMENT OF THE DRINKABLE WATER PLANT OF BELGRANO

Location. Belgrano, Province of It is an important engineering work, The objective is to cover an ad- The plant will increase its production by 50% from an Buenos Aires (Argentina). with a built surface amounting to ditional daily flow of treated wa- additional volume of one million cubic meters 40,000 m², which will make it pos- ter of 1,000,000 m3 / day, raising Built Surface. 40,000 m². per day. sible to bring drinking water to the the water production of the plant Engineering and design. population of the metropolitan from the current maximum of The project is one of the largest undertakings in the GSJ Solutions. area of Buenos Aires. 1,950,000 m³ / day to a maximum field of water developed in the district and will provide of 2,950,000 m³ / day. Construction. SANJOSE The project consists of the de- service to more than 12 million people. Constructora / Técnicas de Des- sign and construction of the ex- The project, which will provide alinización de Aguas. pansion works for the General service to more than 12 million Belgrano Water Treatment Plant, inhabitants, is one of the largest which will be carried out on the undertakings in the field of water land adjacent to the current plant. developed in the district. 118 ACTIVITY REPORT 2017 CONTENTS GSJ SOLUTIONS 119

CONDOMINIUM NUEVAVISTA

Location. District of Bellavista Residential complex promoted and three different models so as to in the province of Callao, Lima designed by Grupo SANJOSE in a adapt to needs of final clients: (Peru). privileged location in the district of 2 bedrooms, 3 bedrooms and 3 Bellavista in Lima and very close to bedrooms plus garden. Surface plot of land. 18,450 m² education centres, hospitals, sho- Built Surface. 94,434 m² pping centres, green areas, etc.

Buildings. 10 The project contemplates a clo- Housing units. 1,104. sed, quiet condominium with a high percentage of public recrea- Free surface. 69%. tion spaces and green areas that Developer. San José Inmobiliaria favour the quality of life of all its Perú SAC. inhabitants.

Architect. Joan Ipince. With a built surface of 94,434 m² arranged into 10 buildings Engineering and design. that will house 1,104 homes of SEE VIDEO GSJ Solutions. 120 ACTIVITY REPORT 2017 CONTENTS GSJ SOLUTIONS 121

CONDOMINIUM PARQUES DE LA HUACA

Location. Lima (Peru). Residential complex promoted, in the enhancement of the Hua- designed and built by Grupo ca (archaeological remains) of Surface plot of land. 101,190 m². SANJOSE in Lima with a built 3,651 m² that was on the plot. The Built surface. 250,000 m². surface amounting to 250,000 name Huaca is an indigenous voi- Number of housing units. 3,072. m² where in three independent ce, present in both Quechua and condominiums, 64 12-storey buil- Aymara, whose original meaning Buildings. 64 (12 floors). dings housing a total of 3,072 ho- can be translated as sacred. Car Park Spaces. 1,148. mes are arranged.

Free surface. 49,974 m² A balanced and human urban (67,06%). development, which favours the quality of life of the inhabitants Developer. San José Inmobiliaria of the condominium. Where, from Perú SAC. the phase of study and design, Architect. SANJOSE Perú. great importance has been pla- ced on mobility, public recreation Engineering and design. areas, green areas, etc. GSJ Solutions. SEE VIDEO In carrying out the project and Construction. SANJOSE its execution, it was necessary to Constructora. take special care and attention 122 ACTIVITY REPORT 2017 CONTENTS GSJ SOLUTIONS 123

PARQUE LAGOS LA MATANZA URBAN TRANSFORMASTION New concept of urban planning that perfectly integrates buildings with lakes and green spaces Location. Buenos Aires (Argentina). It is the largest urban develop- The project, which conserves the ment carried out in the capital city environment and causes minimal Surface plot of land. 1,222,665 m². of Argentina in the last fifty years. impact, integrates, in a responsi- Parque Lagos surface. 745,355 m². This project aims to be key for the ble manner, the lakes and natural Built surface. 1,857,721 m². future of the city of Buenos Aires, spaces with its 20,562 homes, given its strategic location in La 28 towers, the urbanisation of 35 Number of housing units. 20,562. Matanza. blocks, new commercial spaces, Number of car spaces. 20,575. common spaces, recreation areas, etc. Towers. 28.

Blocks. 35.

Architects. Guillermo Reynés and Rodrigo Cruz.

Engineering and design. GSJ Solutions.

Project Management. Grupo SANJOSE. 124 ACTIVITY REPORT 2017 CONTENTS GSJ SOLUTIONS 125

R&D&i PROJECT FOR AN AUTOMATED AND FIXED DETECTION The system has been patented for use on motorways AND DISSIPATION SYSTEM FOR FOG PRECIPITATION ON and railways, as well as airport infrastructure HYDROMETIC DATA

Location. Lugo (Spain) The A-8 Highway of the Can- 2014 and cut off repeatedly by tabrico running through Alto do fog, at the forefront as from 2020. Length. 4 kilometres Fiouco, in the province of Lugo, The method designed and crea- Average traffic flow Approxima- is frequently affected by dense ted by GSJ Solutions and propo- tely 4,500 vehicles and an annual and persistent fog with very spe- sed by SANJOSE Constructora intensity of more than 1,600,000 cific characteristics that seriously consists of the dissipation of fog vehicles. affect visibility. The affected sec- by means of an automatic diffu- tion is located between the kilo- sion system by sprinklers / diffu- metre points 545 + 680 and 549 sers of a hygroscopic material, + 680, what involves a total length which agglutinates water droplets of 4,000 meters. in the air, giving rise to others of The Ministry of Public Works pre- greater size and that by this grea- pared in 2016 the first consulta- ter size precipitate in the form of tion on innovative ideas to solve rain or snow, all lodged in a fixed out this issue; 28 solutions were structure along the roadways. proposed and the contract for The construction of a support “research and development ser- structure as a lightweight pergola vices for precommercial public has been thought for the arran- purchase of design, construction gement of sprinklers since it only and experimentation with an- has to support its own weight ti-fog prototypes” in one of the and that of the diffusers network foggiest enclaves of the Spanish and have sufficient gauge for the road network will be appointed in passage of vehicles, equivalent to 2018. Upon validations of the tes- that of a road tunnel. The insta- ted technology, a contract will be llation of the hygroscopic material appointed for the construction of contribution will be fully automatic. the selected anti-fog systems. All these stages would place the new solution for this stretch of A-8 hi- ghway, inaugurated in February CONTENTS

Madrid is involved in a new stage providing a unique opportunity to draw the future of the city required by all its neighbours and that will be the picture of the city to the world. It is a sustainable, avant-garde and top-level project, a 21st century project that will become a benchmark at international level. An action that emerges from consensus, thought by all and for all, with a strategic vision that consists of improving the quality of life through the generation of economic activity, in a space full of life. A new centre for Madrid, alive 24 hours a day and everything you need at your finger- tips, with the Chamartín Station as the heart of the project, surrounded by a compe- titive and innovative Business District and La Castellana as green axis. And, above all, with the people in the centre of the design. INVESTEE

SOCIAL COMMITMENT BUSINESS CENTRE SUSTAINABLE CHAMARTIN STATION SUSTAINABLE MOBILITY VIBRANT SPACE

A project thought by all and for all Strategic vision: to improve the A sustainable action at a social, It is the heart of the project; it will More and better public transport, Unique strategic location in a pla- where all citizens take part in the quality of life by generating eco- economic and environmental level, promote accessibility and reduce bicycles and pedestrians become ce where you find everything you definition of their city. nomic activity and employment, which substantially improves the mobility needs. the main players of the plan, redu- need: housing, employment, leisure, by providing Madrid with a large quality of life of people. cing dependence on cars and po- green areas, shops... business centre. llution. 128 ACTIVITY REPORT 2017 CONTENTS DISTRITO CASTELLANA NORTE 129

Distrito Castellana Norte

The action plan is arranged into five balanced and independent areas under a global design Distrito Castellana Norte (DCN), investee of Grupo State-of-the-art urbanism SANJOSE and BBVA, promoter that drives Madrid Madrid Nuevo Norte is a project guided by the most Nuevo Norte, the largest urban regeneration project 01 02 03 04 05 advanced practices of sustainable urbanism, which in Europe, which will be carried out on an area of 2.3 CHAMARTIN BUSINESS FUENCARRAL FUENCARRAL FUENCARRAL places citizens within the design and intends to im- STATION DISTRICT MALMEA TRES OLIVOS LAS TABLAS million square metres in the North of Madrid. prove their quality of life. DCN is a company committed to neighbours and citi- The urban design focuses on a compact and zens, which implements a new concept of urban plan- mixed-use city model and is based on the creation ning, inclusive and participatory to develop Madrid 04 of an extensive hyperconnected public transport Nuevo Norte, the most important urban regeneration 01 03 network, which will involve a significant change in 02 project in the country and one of the most important Madrid’s mobility model towards a more sustaina- at international level. A strategic, avant-garde and ble model, reducing congestion and pollution. sustainable action for Madrid, that places the quality 05 of life of people at the centre of design and will gene- The project closes a historic gap in the north of Ma- rate wealth and create employment. drid, completing the city, connecting isolated neigh- Development potential of each area is adapted to the surrounding neighbourhoods and priority use bourhoods and recovering degraded and disused Madrid Nuevo Norte brings a new approach, it is a spaces. response thought by all and for all - neighbours of South Calle 30: the area, citizens of Madrid and national and inter- The project includes the construction of a modern national markets -. international business centre and 10,500 housing Tertiary use mainly: consolidation of the units of the highest quality and energy efficiency. Business District that Madrid needs and Sustainability leads all stage of the project, based 20% of them will have some degree of public pro- the Chamartin Station as central axis on three main pillars: tection, twice the amount established by law. of the project. - Social. Mixed, compact and connected city model, Further, Madrid Nuevo Norte will provide the area which favours the creation of a cohesive community. with public facilities and large green spaces. Among - Environmental. It minimises environmental impact the latter, highlight the large central park that will be and reduces the consumption of natural resources. located on the Chamartin tracks and the extensive network of parks that will form a green axis connec- North Calle 30 - Economic. All the design and planning has as main ting the city with El Monte de El Pardo. Residential use mainly. purpose the execution of a feasible project from an economic point of view.

SEE VIDEO

11,000 housing units, 20% of them will be social housing units, the double as established by law. 130 ACTIVITY REPORT 2017 CONTENTS DISTRITO CASTELLANA NORTE 131

Strategic project for the city, that will provide the same will all necessary infrastructure

01 02 03 04 05 Extension of La Castellana Chamartin Station, Innovative Business District More accessible, Sustainable mobility: as green axis connecting heart of the project. Big with a unique and compact so as to reduce mobility amenities for pedestrians the city with the Monte de transport hub. design that will generate needs. and bicycles, commitment El Pardo. employment and wealth. to public transport to the detriment of the car.

Accessibility and connections and Eastern-Western Bus Rapid Transit System connecting the area with the surrounding neighbourhoods

Powerful infrastructure network: Cercanías, metro, Northern-Southern Cycle paths and pedestrian ways CONTENTS

Carlos Casado is one of the top agriculture and cattle companies of LATAM. It is an Argentine company, listed on the Buenos Aires Exchange Market (1958) and New York Exchange Market (2009) with more than 200,000 hectares of land in the Paraguayan Chaco, Mercosur country with a stable social and institutional framework. Founded by Mr. Carlos Casado del Alisal in 1883 it has always been characterised for being a pioneering and innovative company in all its activities. It operates under sus- tainable production models, succeeding in the assessment of lands and developing important progress and improvements in its agricultural and stock breeding develop- ments, becoming an important global food supplier. Carlos Casado always works for sustainability by pursuing the preservation of all-na- INVESTEE tural resources involved in the production process. Its business model takes care of land and future, it is based on previous assessments of environmental impact, respec- ting legal requirements and local regulations in order to avoid damaging the different ecosystems, respecting and conserving the environment and the natural resources. One of its key principles is innovation and continuous improvement of working practices for the development of its activities and generation of wealth in the most efficient and environmentally-friendly-way. 134 ACTIVITY REPORT 2017 CONTENTS CARLOS CASADO 135

Business Strategy

The socioeconomic development of a property or - Consolidating a sustainable agricultural model that large estate should be respectful with the existing lasts over time. environment and shouldn’t commit the resources - Ensuring the profitability of the investment and an and opportunities of future generations. optimal final product. Carlos Casado’s developments devote each land to Carlos Casado’s Business Plan focuses mainly on its most appropriate use, always attending to crite- the following: ria of sustainability, profitability and respect for the natural and social environment. - Geographical Expansion.

Based on its experience and detailed studies, the - Adding value to and exploiting assets. company transforms land into rational develop- - Consolidation of a sustainable and innovative agri- ments capable of: cultural system based on the formation of human - Re-assessing the heritage, both for the infrastruc- teams and own resources. ture and improvements made and for the future - Important investment at all business lines. productivity capabilities of the same.

- Adding value from the use of innovative metho- dologies and the application of cutting-edge tech- nologies to improve the performance of the land. SEE VIDEO

200,000 Hectares within the Paraguayan Chaco 136 ACTIVITY REPORT 2017 CONTENTS CARLOS CASADO 137

Business Lines

LAND TRANSFORMATION

The main objective of Carlos Casado’s business strategy is the valuation of assets, transforming the unproductive land to livestock, from livestock to agricultural activity, or applying cutting-edge technology to improve agricultural yields, thus ge- nerating greater appreciation of the land.

In recent years the prices of fields in the southern hemisphere (mainly Mercosur) used in agricultural production have increased, yet they still remain re- latively low compared to those in the northern he- misphere (United States and Europe).

The consideration of different factors is essential for a correct transformation.

In addition to the location of land, it is necessary to carry out an analysis of soil and water, including the quality of the soil and its adaptation for the intended use (whether for agricultural or livestock production), a classification of the various sectors of the plot of land , previous uses of the same, any improvements made, easements, rights of way or other applicable domain variants, satellite photographs of the land (which are useful for relieving soil drainage charac- teristics during different cycles of rainfall).

At 31 December 2017, Carlos Casado owns land re- serves, 200,794 hectares arranged into 21 plots of land in the Paraguayan Chaco, in the Department of Boquerón,

132,281 hectares do already have Environmental li- cense and 68,513 hectares remain as reserves for future developments. 138 ACTIVITY REPORT 2017 CONTENTS CARLOS CASADO 139

AGRICULTURE Sowing machinery used is all direct sowing; It is com- STOCK BREEDING In this sense, in addition to continuing the traditional pleted with ground sprayer, an aero applicator pla- monitoring of veterinary health by meeting all inter- All Carlos Casado’s agricultural activity is carried out This region is characterised by its high fertility soils ne and harvesters. national standards regarding the prevention of di- on its own land in the Central Chaco with the pre- that allow fodder production with high productivity, seases through clinical analysis and vaccination, the sence of fertile soils. Agricultural activities are fo- The 16/17 harvest has been marked by an increa- quality and low cost. company is implementing an animal control and tra- cused on dry production of soybean and corn in a se in production and yield in general terms with the Direct grazing thus achieves high yields with a high ceability system to obtain the Certification of Sale balanced rotation to conserve the potential of soils. same area planted, 4,140 hectares of soybeans and productive animal efficiency. Margins achieved en- of meat for the markets of the United States and 2,227 hectares of corn. It is carried out according to a sustainable model, hance and value the lands. This region has livestock the European Union. highly efficient in spending, under the modality of infrastructure and tradition. Pasture area is expected to be increased during direct sowing with the use of cover crops during Carlos Casado’s activities are carried out on pre- year 2018, providing 3,300 hectares for the comple- the winter. Innovative practices, incorporating the viously developed land with first-level livestock in- te cycle of the Hacienda Mbigua, 1,100 hectares for highest technology of processes and inputs, are frastructure. Production options are as follows: wintering in the Hacienda Jerovia and 1,300 hecta- implemented. All this allows high efficiency in spen- res for breeding in the Hacienda Fondo de la Legua. ding, what is reflected in good results that value our - Breeding. Rodeo of cows bred in a grazing open-air lands. system, sale of males and the surplus of females. The wintering capacity of steers under the intensi- ve feedlot system of the Hacienda Jerovia will be The conservation of soil fertility and the care of the - Complete cycle. Breeding and fattening of male maintained at 1,800 heads per year, although the environment is an important part of the whole pro- and female calves until their sale. Strategic Plan intends to increase said capacity in cess. Therefore, soil is maintained to conserve and - Over- wintering. Animals, males or females, are order to respond to business opportunities due to improve its physical properties, avoiding erosion fattened to pasture until sale. an increase in external demand. processes. Crop rotation and the use of cover crops are current practices. Carlos Casado’s population is made up of 4,293 heads of Brahma and Brangus breeds, and through The company uses outsourced machinery services the study of the land where they graze in and their with a large operating capacity and also with the adaptation to the environment and climate, bree- highest available technology to reach the highest ding optimisation is achieved, as an essential basis operating efficiency. A policy of loyalty and support for providing animals with the best conditions for is followed to achieve continuous improvement. their sale. CONTENTS

Comercial Udra, head of the commercial division of Grupo SANJOSE, has develo- ped its business activity for over twenty years through its Sport and Fashion Divi- sions, through its subsidiaries: Arserex, Outdoor King, Athletic King and Trendy king. Comercial Udra has become a reference distributor due to the quality of the brands it works with and the highly specialised teams it relies on in each area.

INVESTEE 142 ACTIVITY REPORT 2017 CONTENTS COMERCIAL UDRA 143

Sports Fashion

ARSEREX - ARENA its presence and become a common option in the OUTDOOR KING - HUNTER TRENDY KING - FRED PERRY best specialised shops in Outdoor, sports stores, Innovation, authenticity and passion are the main In 2017 Outdoor King, official distributor of the Hun- Since 2007 Trendy King is the distributor in Spain of fashion stores and shoe stores. pillars of Arena’s DNA. Since its creation in 1973, ter brand in Spain and Andorra, has included Portu- the footwear of the legendary British casual brand Arena is the leading brand in water sports for pro- RUNNING KING S.A.U. gal to its territory of action, as well as renewed its Fred Perry, with more than 60 years of history. fessionals and amateurs looking for innovative and distribution contract. Hoka One is a brand specialised in sports footwear Founded by the charismatic tennis player, the Fred quality products. founded in 2009 by Nicolas Mermoud and Jean-Luc With more than 150 years of history, the Welling- Perry brand made the jump from the tennis courts Arserex celebrated its 25th anniversary as official distri- Diard. Since then, thanks to its innovative technology, ton Classic (1856) has become a global fashion icon. to the street becoming a basic item of clothing. Co- butor of the Arena brand in 2017. Arserex is one of the it is the brand that has grown fastest in the running Boots are hand-made, using the finest natural ru- llaborations with important designers, such as Raf most important distributors in Europe for commercial industry. At the moment it belongs to the Ameri- bber and 28 different pieces of rubber in order to Simmons, musicians, such as Miles Kane or Amy Wi- and sporting successes achieved in the Iberian market can group Deckers Outdoor Corporation, possessor ensure maximum comfort. nehouse, through the foundation of the same name, through different sponsorships and events. In its com- among other brands of Ugg Australia and Teva. serve as proof of the mix between modernity and Hunter continues to provide its classic style designs mitment to high competition, Arserex has supported authenticity that characterizes the brand. Fred Pe- Athletic King has become in 2017 the official distri- and news designed adapted to new fashion trends. the sponsorship of the Portuguese Swimming Fede- rry’s relationship with music and fashion has marked butor of the brand Hoka One in Spain, Portugal and Boot collections, traditionally associated with rain, ration and as for the Spanish market it has joined the communication actions carried out by Trendy King in Andorra. The commitment to the specialist running hunting and the countryside, made the leap to the Olympic swimmer Jessica Vall, gold medal and national 2017, collaborating with bands, such as Sidonie and channel and the sponsorship of athletes and spor- world of fashion a few years ago, with collections record in 200 meters breaststroke at the European independent, such as like Costello. ting events have been key to achieve very positive that keep the brand’s DNA alive. 2017 saw the con- Championships of Copenhagen. results in the first year. solidation of new product lines, including textiles and In the commercial sphere, Fred Perry’s footwear is The commitment to diversification has led Arena to accessories, becoming a “Total Look” brand. still present in the main market operators as a safe Hoka One is an excellent business opportunity for enter into an international sponsorship agreement value to reach a wide range of consumers due to the following years. Technological innovations are Outdoor King has personalised spaces in selected with the prestigious IRONMAN Triathlon competition, the versatility of its lines. a success as shown by the results achieved in the centres of El Corte Inglés and is present in the best and Arserex has been present at the four competi- IronMan World Championship in Hawaii and the Ultra boutiques and shoe stores in the territory. Further, tions held in Spain. Trail of Mont Blanc (UTMB). the firsts Hunter’s “Pop Up store” model was tes- Arena is present as a leading brand in water sports ted in Spain in 2017, including all Hunter universe in ATHLETIC KING - DIADORA in the main operators of the sports market, such as a single space. El Corte Inglés, Sport Zone, Forum Sport, Décimas, Since 2014 Athletic King is the commercial part- TRENDY KING - DR. MARTENS Intersport or Base Detall and in countless speciali- ner for Spain, Portugal and Andorra of the legen- sed stores. dary brand Diadora, born in 1948, present in more Since 2008, Trendy King is the official distributor in than 68 countries and currently owned by the Geox Spain and Portugal of Dr. Martens. Symbol of indi- OUTDOOR KING - TEVA group. viduality and self-expression since the first Dr. Mar- Outdoor King is, since 2003, the only distributor in tens left the factory in 1960 after the union of the Diadora has always been united to the best athletes, Spain, Portugal and Andorra of Teva, the American German Doctor Klaus Martens and the English fami- from world champions of tennis, athletics and soccer, brand of casual and high-tech outdoor footwear. ly of footwear entrepreneurs Grigss. to pilots of formula 1 and motorcycling. This heritage Teva was born thirty years ago at the Grand Can- has helped Diadora to go beyond sport and occu- The brand has reached record of international and yon (the United States). Since then, it has been the py the shop windows of shoe stores and boutiques national sales in 2017. Media and relevant people market leader in the category of technical sandals thanks to its Sportwear and Heritage collections that from the world of fashion have echoed this phe- and the perfect footwear for water and mountain unite sporting tradition with fashion trends. nomenon, providing an extraordinary exhibition. related activities. During 2017 Outdoor King has in- Further, the association with the music industry During 2017 Athletic King has combined a distribu- creased the presence of the brand in the specialist has been another trigger to reach the younger au- tion and agency model, providing a service tailored sector driven by the sales of mythical models such dience. to market needs. In order to promote the expan- as “Hurricane XLT or Terra FI”. sion of Diadora, a single distribution contract inclu- Dr. Martens is present in the main market operators: The innovation in its lines and the adaptation to the ding all its lines has been renewed. El Corte Inglés, Ulanka, Calzados Casas, Krack shoe new consumption habits have allowed it to expand stores and a great number of specialised premises. CONTENTS

CORPORATE SOCIAL RESPONSIBILITY For SANJOSE, it is just as important to execute a project perfectly as to transmit its values and business ethics, based mainly on protecting the rights of its stakeholders, shareholders, workers, suppliers, customers, third parties and the society. PRINCIPLES AND COMMITMENTS The main objective is to think and act responsibly when carrying out sustainable and quality projects. To achieve this, GSJ finds it essential to maintain a long-term vision HUMAN CAPITAL / TEAM SANJOSE and establish a sustainable circular economy capable of making sense. Sustainability, understood broadly under social, environmental and Good Governance criteria, is a key RISK AND INSURANCE MANAGEMENT strategic factor for the growth and reputation of SANJOSE. It is a priority objective, in which we work continuously to boost the business and con- QUALITY tinue to count on the trust of “stakeholders”, markets and society as a whole as an integral, committed, transparent, innovative and able to generate value model in all the ENVIRONMENTAL MANAGEMENT sectors where it operates. Sustainability is part of the core of GSJ’s strategy. The company promotes new mo- ENERGY EFFICIENCY dels and tools to promote social responsibility and involves all areas of the company and all its professionals, from Senior Management to the last employee of the Group. R&D&i For ensuring an efficient and transparent and honest dialogue with interest groups, SANJOSE relies upon an internal system created for this purpose and consisting of a MAIN INITIATIVES Supplier and Customer Protection Plan, an Investor Relations Department, Sharehol- der Service and Mass media Department. AWARDS AND RECOGNITIONS

“Mar Shopping Algarve” of IKEA in Loule, Faro (Portugal) 146 ACTIVITY REPORT 2017 CONTENTS CORPORATE SOCIAL RESPONSIBILITY 147

Social Commitment & Principles

The objective of the company is to contribute a Grupo SANJOSE understands the Corporate So- SANJOSE is a listed company, transparent and or entities who it collaborates with achieving thus responsible development to the environment. Pro- cial Responsibility as its commitment to society committed to social responsibility and the mainte- a much more responsible environment. Therefore, jects are transient but it is essential to have solid, and people. It is a key element of business strategy nance and adaptation of its Corporate Governan- the third parties with who Grupo SANJOSE inte- transparent ethical principles and apply them in and a differentiating item which has been in conti- ce to the best national and international practices racts in the development of its activity must know each action and market. nuous development since its foundation. Acting in in this area. It has demonstrated in its career the its values and comply with its normative codes, a responsible, transparent and sustainable way in pillars which it is based on, its high level of com- accepting their application in all relationships. Ethical, social and environmental sensitivity and its order to promote wealth and welfare and boost mitment to the values of safety, sustainability, res- principles of responsible government are priority Therefore, the company has an Internal Surveillan- its principles and commitments to each professio- pect, integrity, honesty, equality, solidarity, innova- over other dehumanizing criteria. ce Authority (who maintains a fluid and constant nal integrating the Group and all its “stakeholders” tion and continuous improvement. communication relationship with the Board of Di- Grupo SANJOSE assumes as own the 10 principles involved: SANJOSE’s Code of Conduct and Anticorruption rectors) to oversee the proper operation and com- of the United Nations Global Compact, based in • Maximum attention to people, to the quality of Policy include the basic principles that should guide pliance with the principles defined by the Group, turn on the Universal Declaration of Human Rights, their working conditions, equality and training. the activity of the Group and each of its companies the Declaration on principles and Rights at work, Both the Code of Conduct and the Anticorruption and professionals, regardless of the activity they International Labour Organisation, the Declaration • Work Risk Prevention as company culture, espe- Policy of Grupo SANJOSE are published in full on its carry out, the country where the registered office of Rio on Environment and Development and the cially preventive at all hierarchical levels of the website - www.gruposanjose.biz - for the knowled- is and where they develop their activity. United Nations Convention against Corruption: Group. ge of its professionals, stakeholders and all third The Group understands that the development of parties whom it interacts with. To support and respect the protection of interna- • Respect for diversity and creation of a policy of these policies and regulations provides all its pro- tionally proclaimed human rights in the internatio- equal opportunities and personal and professional fessionals with this business culture, and due to the nal arena. development. transparency of the same, an expansive effect has • Make sure they are not complicit in human rights • Commitment to sustainable development and been achieved in all its “stakeholders” and people abuses. greater respect for the environment, avoiding any possible pollution and minimizing waste genera- • Respect freedom of association and the effective tion. recognition of the right to collective bargaining. • Public Vocation and wealth. Understanding of • Eliminate all forms of forced or compulsory labour. R&D&I and the quality of products and services • Effectively abolish child labour. as the GSJ contribution to improve the social, • Eliminate discrimination in respect of employment economic and environmental development of and occupation. the regions or countries where it operates.

• Support a precautionary approach to environ- • Implementation of formal procedures and open mental challenges. dialogue with all stakeholders.

• Undertake initiatives to promote greater environ- • Transparency policy. mental responsibility. In order to establish professional, ethical and res- • Encourage the development and diffusion of en- ponsible behaviour guidelines and to establish a vironmentally harmless. system for monitoring their implementation and the identification of possible irregularities, Grupo • Work against corruption in all its forms, including SANJOSE has a “Code of Conduct” and “Anti-Co- extortion and bribery. rruption Policy” of mandatory compliance for all Di- rectors, officers and employees.

Team SANJOSE Portugal in 5* Eurostars Museum Hotel, Lisbon (Portugal) 148 ACTIVITY REPORT 2017 CONTENTS CORPORATE SOCIAL RESPONSIBILITY 149

Human Capital / Team SANJOSE Risk and Insurance Management Prevention of Occupational Hazards

SANJOSE believes in the talent and responsibility Recruitment takes place in collaboration with Grupo SANJOSE boosts preventive training of all of its entire human team as a driving force for the first-rate Universities and Training Centres and Group SANJOSE is committed to the comprehen- its employees and compliance with any applica- transformation of society. trough the incorporation of reputable professio- sive management of risks that may affect its acti- ble regulations on the prevention of risks that may nals who provide the Group with their experience vity in order to achieve the best possible protection Self-responsibility and self-demand are part of the affect the health and safety of workers. and know-how. against them thus increasing the confidence of cus- Group’s business culture. With the aim of learning, tomers and shareholders. The Occupational Management System implemen- improving and innovating in all areas, SANJOSE in- Annual Training Plans anticipate the needs of ted for many years in the company is revised an- tegrates ethics, social responsibility and sustainabi- SANJOSE in order to adapt high technology to The area of Risk Management and Insurance has nually and certified under OHSAS 18001 and reflects lity throughout its formation. executed activities, develop personal and profes- a corporate nature and participates in transversal the reality of the prevention policy throughout the sional capabilities, boost the learning and impro- processes of identification and evaluation of the va- SANJOSE’s team is the most important capital of corporate structure. vement of languages for a global market, boost rious types of risks, actively contributing along with Group. Thus, its recruitment, training and manage- the other business areas to set appropriate reten- new technologies and safety, quality, R&D&I and Prevention is an essential tool to protect against ment are a priority for the Group. The experien- tion thresholds. environmental issues. risks that may affect the health or safety of people ce, knowledge and flexibility of professionals are and SANJOSE invests in it, in their professionalism essential for increasing the company’s competiti- The Human Resources Management is based on SANJOSE has a global insurance policy, adapted to and adequate training, aware of the fact that em- veness and for meeting the company’s goals and ethical codes of equal opportunity, cultural diver- its own risk map, and continuously works to improve ployees are their most valuable asset and that their objectives. sity, internal promotion and sound values, such its insurance contracts, understanding them as effi- protection is a priority objective. as involvement, responsibility, perseverance and cient tools for protection and transfer of risks. Investing in talent provides a top added value and commitment. innovative solutions on a par with customers’ re- The overall scenario where it develops its activi- quirements. GSJ believes that investing in human ty has made a priority the fulfilment of regulation resources is investing in leadership, growth, R&D&I “compliance” on insurance matters to suit the pe- in the future. culiarities of each country without losing the benefit from the comprehensive treatment of risk manage- ment and international insurance programmes.

The integrated risk management adds value and generates a more secure and efficient company.

Internal and External Risks

Political Macro Operational Organization Economic and Physical

Natural Legal Environmental Personal Estrategy

Al Ain Hospital, Abu Dhabi (United Arab Emirates) 150 ACTIVITY REPORT 2017 CONTENTS CORPORATE SOCIAL RESPONSIBILITY 151

Quality Environmental Management

Grupo SANJOSE stays still to its commitment to It is important to highlight that during 2017, the sys- The preservation of the environment is a stra- The environmental management system is based quality in the development of activities. The con- tem has been adapted to the new standard ISO tegic objective of the Group, establishing as a on common principles that are specific to each tinuous improvement of services and the adapta- 9001: 2015, as well as the certification pursuant to priority the implementation of its environmental activity, location and customer, thus tailored to tion to needs and expectations of customers, with new requirements. management model where its operates, in order the diversification and internationalisation of the the sole aim of achieving full satisfaction, are set as to integrate business development, the genera- business and establishing voluntary environmen- Involvement, motivation and commitment of the identifying signs of the company. tion of social value and environmental protection. tal performance requirements on regulatory and entire Group with the overall quality is total. And contractual requirements. The result of this strategy is a quality, flexible and this has been recognised through ISO 9001 certifi- Since 1999 Grupo SANJOSE has maintained a effective system appropriate to the business sec- cation awarded to the following Group companies: firm commitment to the environment, having an tors of the Group, which provides the framework environmental management system in conti- for setting and achieving improvement targets that nuous review and adaptation to needs and ex- result in the optimisation of services and adapta- pectations of the society and its customers. tion to growing demands of customers.

Company Type of Certificate Company Type of Certificate CONSTRUCTORA SAN JOSÉ, S.A. ER-0510/1997 CONSTRUCTORA SAN JOSÉ, S.A. GA-2003/0398 CARTUJA I., S.A.U. ER-1363/1999 CARTUJA I., S.A.U. GA-2006/0028 EBA, S.L. ER-1170/2004 EBA, S.L. GA-2007/0371 TECNOCONTROL SERVICIOS, S.A. ER-1202/1998 TECNOCONTROL SERVICIOS, S.A. GA-2007/0395 SANJOSE ENERGÍA Y MEDIO AMBIENTE, S.A. ER-1202/1998-002/00 SANJOSE ENERGÍA Y MEDIO AMBIENTE, S.A. GA-2007/0395-002/00 CONSTRUCTORA SAN JOSÉ PORTUGAL, S.A. ER-0011/2002 CONSTRUCTORA SAN JOSÉ PORTUGAL, S.A. GA-2009/0351 CONSTRUTORA UDRA, LDA. ER-0102/2011 CONSTRUTORA UDRA, LDA. GA-2011/0013 SOCIEDAD CONCESIONARIA SAN JOSE SOCIEDAD CONCESIONARIA SAN JOSE BVCSG5570 BVCSG5571 TECNOCONTROL, S.A. TECNOCONTROL, S.A. SANJOSE CONTRACTING L.L.C. GR17300266 SANJOSE CONTRACTING L.L.C GR17300267

Audits per Area

Monitoring and control activity has been maintained Concessions and Services 3,00% with respect to previous years in the range of 100 annual audits, distributed as indicated in the graphs.

Maintenance services 7,00%

Energy and Environment 3,00%

Construction - Industrial Engineering 87,00% % 0 20 40 60 80 100 Mamsha Al Saadiyat Residential Complex, Abu Dhabi (United Arab Emirates) 152 ACTIVITY REPORT 2017 CONTENTS CORPORATE SOCIAL RESPONSIBILITY 153

AUDIT & ENVIRONMENTAL CERTIFICATION ENVIRONMENTAL PERFORMANCE Non-halogenated solvents 0.33% SANJOSE has obtained recognition of its commit- SANJOSE ensures the continuous monitoring and Aerosols 17.17% ment to the environment through the certification environmental measurement of its activities thanks of its management system in accordance with the to a system of indicators that allow to obtain the Contaminated plastic requirements of ISO 14001, by accredited entities of measurement of environmental parameters in or- containers recognised international prestige, such as AENOR der to evaluate the environmental performance 32.88% International, Bureau Veritas or Gabriel Registrar. and the effectiveness of the Environmental Mana- Used oil 6.10% gement System of the organisation. SANJOSE’s management system certificates are Absorbing materials and rags 1.34% internationally accepted through the multilateral The Group’s environmental management esta- recognition agreements (MLA) signed between the blishes the necessary resources and controls for Types off accreditation entities. the control of environmental risks, compliance with Fluorescent tubes and other Hazardous applicable regulations and the improvement of en- mercury-containing wastes 0.71% It is important to highlight that during 2017, the sys- vironmental performance. waste tem has been adapted to new ISO 14001: 2015, as Polluted lands 5.98% well as the certification pursuant to new require- Each work or service performs an analysis and clas- ments. sification of environmental aspects and impacts Laboratory waste 3.97% produced during the execution of the works, which It is important to highlight the continuous review and are the basis of operational control and the establi- Contaminated metal expansion of the scope of environmental certifica- Hazardous chemicals 1.85% shment of improvement objectives. containers tions, and the interest in continuing to strengthen in 29.67% the international market with a vocation for stability. As significant environmental impacts of the com- pany we can highlight the generation of waste, air SUSTAINABILITY pollution (dust, noise, vibration, etc.) and the de- SANJOSE’s environmental management model focu- crease of natural resources (associated with water We can establish the following ratios of hazardous SUPPLY CHAIN ses on its commitment to sustainable development consumption, electricity, fuel, raw materials, etc.). waste production based on data on works monito- and respondis to increasingly demanding and sensiti- With regards to the supply chain, suppliers who Through the planning of activities, the adoption of red during the last period. ve social and environmental needs. good environmental practices, the application of SANJOSE works with are subjected to a process of The responsible, efficient and rational consumption selection and continuous evaluation based, among Activities developed under the environmental ma- protection and minimisation measures, and the of natural resources are guidelines established by others, on sustainability criteria. nagement model of the organisation have allowed establishment of operational controls, it is possible SANJOSE in the development of its activities. the development of important activities framed wi- to improve the environmental performance of the The Group strengthens, as far as possible, en- thin the scope of sustainability, innovation and ener- company and the impact on the environment. Measures on energy efficiency, reduction of water vironmental criteria such as the use of materials gy efficiency. In this sense, one of the strategic objectives of the consumption, and reuse and recycling of construc- manufactured with recycled raw materials as well Company is the reduction of waste generation, fa- tion materials are implemented. as recyclable products, the contracting of services The Group has sound experience in the execution with recognition of environmental management, or vouring reuse, recycling and recovery of waste. Alig- All employees are responsible for environmental of works under sustainable construction principles: manufacturing processes that respect the envi- ned with this objective, SANJOSE has developed performance within their professional performance LEED, BREEAM, HQE, PASSIVHAUS. ronment. R&D&I projects focused on the use of recycled ma- and rely on two key tools, training and a specialised Aware of the important environmental benefits of a terials, which are detailed in the innovation section. human support team. sustainable construction, it also participates in the design of buildings that incorporate these so-called To optimise the aforementioned operations, SAN- Training and awareness in environmental matters green or sustainable practices, seeking to design JOSE promotes procedures and processes aimed are a constant bet, that is why new needs related buildings that are more respectful with the environ- at the prevention of waste generation, as well as the to, among others, sustainable construction models ment and more efficient in the use of resources. correct segregation and treatment of waste. SAN- are being incorporated into the continuous training JOSE has centralized agreements for the manage- programme. ment of waste, which allow achieving this objective, One of the strategic objectives of SANJOSE is to facilitating the reuse and recovery of the waste ge- promote the ecological awareness of workers by in- nerated. volving them in the Group’s environmental strategy. 154 ACTIVITY REPORT 2017 CONTENTS CORPORATE SOCIAL RESPONSIBILITY 155

Energy Efficiency R&D&i

Grupo SANJOSE, aware of the importance of pre- Numbers: 2016-01152-E, 2016-01153-E and 2016- The planet has limits, but the Group’s ability to in- ned by GSJ Solutions and proposed by SANJOSE serving natural resources, is committed to the effi- 01154-E. novate and its social conscience must always be Constructora to the Ministry of Public Works for sol- cient use of energy for the development of its activi- present to try to improve the way things are done, ving out the issue on the A-8 Highway of the Can- - Energy Services Provider according to standard ties by boosting the necessary mechanisms so as to overcome the challenges that arise, provide value tabrico running through Alto do Fiouco, in the pro- EA 0055:2016. constantly improve energy performance. and try to return to the planet everything it gives to vince of Lugo, is frequently affected by dense and - Energy management systems according to stan- the company and society. persistent fog with very specific characteristics that The Group researches and develops sustainable dard UNE-EN ISO 50001. seriously affect visibility during a 4-km-long stretch. energy solutions capable of reducing energy con- Grupo SANJOSE is fully committed to technological Said highway has an annual intensity of more than sumption, optimising its use and promoting the use - Certified professionals in measurement and verifi- development and innovation. Key elements for the 1,600,000 vehicles. of renewable energies, both for its activity and that cation of savings (CMVP). competitiveness of the company, driving progress of its customers. - Installation and maintenance technician licence. and being able to offer more effective solutions The system has been patented for use on mo- adapted to real needs of its customers and society. torways and railways, as well as airport infras- GSJ designs and executes integral solutions adap- Grupo SANJOSE is a member of the board of di- tructure. This method consists in the dissipation ted to customers’ needs in order to guarantee the Research and innovation are priorities in all the bu- rectors of prestigious associations in the field of of fog by means of an automatic diffusion system maximum energy efficiency of facilities, ensure the siness areas of GSJ. Aware of the importance of energy efficiency and renewable energy, such as by sprinklers / diffusers of a hygroscopic material, production and distribution of energy, reduce the R&D&I on the competitiveness and success of the AMI or ADHAC, and collaborates with public and pri- which agglutinates water droplets in the air, giving environmental impact and optimise costs. Group, top management members have acquired vate entities in the dissemination and development rise to others of greater size and that by this grea- a commitment to enhance brainstorming and inno- As a result of this business commitment, SANJOSE of the same. ter size precipitate in the form of rain or snow, all vative practices. Encouraging this culture to all its has developed its own know-how in the field of ener- lodged in a fixed structure along the roadways. For With regards to renewable energy, aware of the employees, recognising creative contributions and gy efficiency that has been successfully implemented the arrangement of diffusers, a lightweight pergola importanceof climate change, SANJOSE carries laying the foundations for competitive improvement in the numerous projects executed. This methodolo- (it only has to support its own weight and that of out researches on and develops sustainable ener- and technological surveillance. gy is complemented by the numerous accreditations, gy solutions capable of reducing the consumption the diffusers) with sufficient clearance for the pas- & & homologations and certifications obtained by com- of energy and optimising the use of clean energies R D I policy focuses on enhancing the generation of sage of vehicles, with a section equivalent to that panies of the Group as well as its professionals, that by the application of avant garde technologies. The new technology to construction activities, highligh- of a road tunnel, is executed. The installation of the allow to guarantee the fulfilment of objectives with result of its work as promoter is the net contribution ting technology applicable to building and civil works, hygroscopic material contribution will be fully auto- the highest quality, in strict compliance with current of green energy of the Group in its activity, gene- optimisation of resources and seeking continuous matic. regulations. Among others: improvement and efficiency. Among the strategic rating more energy from renewable sources than it SANJOSE aims to provide value in each project and technological areas and initiatives for the develop- - Energy Services Provider according to Royal De- consumes in all its facilities in the world. positively impact society in terms of quality, sustai- ment of R&D&I, highlights mainly the following areas: cree 56/2016 as of 12 February and registered in nability, efficiency ... For this, it promotes the sustai- technologies applicable to the execution of the work, the List of Energy Services of IDAE, Registration nable origin of raw materials, optimises resources, durability and safety in construction, new materials boosts the respect for the natural environment, and construction processes, renewable energy and Company Type of Certificate reuse, recycling, and projects capable of reducing energy efficiency, industrial automation and specia- CONSTRUCTORA SAN JOSÉ, S.A. GE-2013/0010-002/1 consumption, innovating in areas such as energy lized maintenance facilities, preservation of the en- TECNOCONTROL SERVICIOS, S.A. GE-2013/0010-001/1 efficiency, the rational use of water, new construc- vironment and natural environment, etc. tion systems, management models, materials, va- Among the initiatives developed by the Group, hi- luation, etc. ghlights the R&D&I project for an automated and The R&D&I system implemented has obtained re- fixed detection and dissipation system for fog pre- cognition trough the certification of UNE 166002 cipitation on hydrometric data. The method desig- standard.

Company Type of Certificate CONSTRUCTORA SAN JOSÉ, S.A. IDI-0056/2010 SANJOSE ENERGÍA Y MEDIO AMBIENTE, S.A. IDI-0055/2010 R&D&i project for an automated and fixed detection and dissipation system for fog precipitation on hydrometric data in Lugo (Spain) 156 ACTIVITY REPORT 2017 CONTENTS CORPORATE SOCIAL RESPONSIBILITY 157

Main Initiatives

SANJOSE intends to create a positive impact on • Implementation of important sustainable measu- of granite and fifth in the world). The gas expands Louvre Abu Dhabi Museum (UAE) society and facilitate the day to day of people with res on civil works in India, in order to ensure the and can be found in areas of mountain water that - “Harper’s Bazaar Interiors - Best Building Design each project developed. Boost growth, provide ad- preservation of local fauna and flora minimising are not treated and in rocky soils. his causes the 2017” for the best design. ded value in a responsible and sustainable manner the impact on the environment. radon gas to be found in rural Galicia. and help day-to-day activities of people and society. - Granted the “Project of the Future 2015“Award at • Collaboration with Fundación Manantial, a non-pro- SANJOSE is working with various research and te- the first edition of the “Identity Design Award “ce- • Promotion, design and execution of more than fit organisation founded in 1995 that serves more chnology organisations to create an association that lebrated in Dubai and arranged by Identity, leading 5,500 social housing units in Peru. Grupo SANJO- than 2,000 people a year, which aims to provide will be launched in 2018 to carefully study and find magazine in the design, architecture and contem- SE is executing top quality affordable important comprehensive care to people with severe mental innovative solutions to this issue. The main objecti- porary real estate of the region. It is granted to social housing developments under the framework disorders and specially to give an effective res- ve of the project is to reduce levels of radon con- projects in execution which set the UAE as archi- of the My Home Programme which provides home ponse to issues related to their social and labour centration and make them within the appropriate tectural hub. purchase assistance to thousands of families situation. Among the actions undertaken highlights thresholds so that it is not harmful to health and in LATAM. The company has promoted and built the “VI Solidarity Race for Mental Health” organi- remains below those allowed by state, local and EU - “Green Building Award” to the environmental ex- important urban developments in Lima, including sed in the Parque del Oeste in Madrid on 5 March legislation and regulations. cellence at the “Green Middle East Awards 2013”. the new Nuevavista Condominium, of 1,104 homes, 2017 to, through a space of inclusive participation For this reason, a computer application will be de- Residencial Grande Hotel Monte Estoril (Portugal) which is currently being designed in the Bellavista and leisure, raise awareness and give visibility to veloped to predict the level of radon concentration district; the 1.392 housing units of the Condominio health mental and support inclusion, breaking ta- - National Real Estate Prize 2017 of Portugal for the in indoor air (PROGNOSIS) both in existing buildings del Aire (already sold in its entirety); and the 3,072 boos, preconceived ideas and negative attitudes. Best Development in the Housing Category. and in future constructions. The scope of this pro- housing units of the Condomio Parques de la Hua- Profit obtained after a participation close to 2,000 ject aims to protocolise and implement the syste- ca (already sold in its entirety), where it has also runners was allocated to the “Project of Early At- matic measurement of radon concentration in the sponsored the restoration and enhancement of a tention to Youth with Psychosis” that Fundación subsoil to act in a preventive manner and study in Huaca (archaeological site) of 3,651 sqm in close Manantial has launched in collaboration with the parallel, through various experiments, how to imple- collaboration with the National Institute of Culture . Madrid Health Service. ment different constructive solutions, some of them • Training programme on Quality and Risk Preven- • The European Union has ruled that the continuous innovative. tion plans in several countries of Asia, Africa and exposure to radon poses a serious risk to health, LATAM. in fact exposure to this gas is the second cause Awards and Recognitions of lung cancer after smoking. Radon is present in • In Nepal and East-Timor training programmes on granite areas around the world, which are very safety, environmental, risk prevention issues, etc. Headquarters of Norvento in Lugo. “Zero Energy” buil- abundant in Galicia (second European producer are being developed in order to improve sociocul- ding covering all energy needs with renewable ener- tural conditions of local workers, such as on sexua- gy resources. lly transmitted diseases or risks on heavy alcohol - BREEAM Exceptional rating, there is only another intake. building in Spain with this distinction.

• Environmental and revaluation studies carried out - American Architecture Prize 2017 for Architecture on sustainable cattle and farm developments in & Design / Other Architectures. Paraguay. - Barcelona Building Construmat Award. Finalist and • Full commitment to energy efficiency and the use honourable mention of the jury within the architec- of renewable energies, as well as collaboration with ture in completed works award 2017. public and private entities for the dissemination and development of them. The result of its work is - Silver Medal in the XII Edition International Prize of the net contribution of green energy in its activity, Sustainable Architecture FASSA BARTOLO 2017. generating more energy from renewable sources Promoted by the Facoltà di Architettura, Universi- than it consumes in all its facilities in the world. tà degli Studi di Ferrara.

Headquarters of Norvento, Lugo (Spain) Residencial Grande Hotel Monte Estoril (Portugal) 158 ACTIVITY REPORT 2017 CONTENTS DIRECTORY 159

Regional Delegations Spain REGISTERED OFFICE HEADQUARTERS C/ Rosalía de Castro, 44 C/ Ronda de Poniente, 11 Construction 36001 Pontevedra 28760 Tres Cantos, Madrid Tel. +34 986 86 64 64 Tel. +34 91 806 54 00 ANDALUSIA CATALONIA BALEARIC ISLANDS [email protected] [email protected] Cádiz Barcelona Palma de Mallorca C/ Pintores, nº 24, Polígono C/ Aragó, 383. 1er C/ Joan Miró, 3 Entresuelo B Industrial 08013 Barcelona 07014 Palma de Mallorca 11520 Rota, Cádiz Tel. + 34 93 207 70 15 Tel. + 34 971 73 51 02 Tel. + 34 956 54 09 04 COMUNIDAD VALENCIANA CANARY ISLANDS Head Offices Granada Alicante Las Palmas de Gran Canaria Carretera Huetor-Vega, 26 C/Severo Ochoa, 20 C/ Triana, 75 1º 18008 Granada Edificio 1 1º B-C 35002 Las Palmas de Gran Canaria SANJOSE CONSTRUCTORA BUILDING GSJ SOLUTIONS Tel. + 34 958 12 17 22 Elche Parque Empresarial Tel. + 34 928 36 87 72 C/ Ronda de Poniente, 11 C/ Ronda de Poniente, 11 03203 Elche, Alicante Málaga Santa Cruz de Tenerife 28760 Tres Cantos, Madrid 28760 Tres Cantos, Madrid Tel. + 34 96 568 18 66 C/ Marie Curie, 9-11 C/ Puerto Escondido, 5 1º B Tel. +34 91 806 54 00 Tel. +34 91 806 54 00 Parque Tecnológico de Andalucía Valencia 38002 Santa Cruz de Tenerife [email protected] [email protected] 29590 Campanillas, Málaga Avda. Blasco Ibañez, 20 2º Tel. + 34 922 24 38 88 Tel. + 34 952 02 80 77 46010 Valencia Tel. + 34 963 62 15 12 MADRID SANJOSE CONSTRUCTORA CIVIL WORKS CARTUJA I. Sevilla Ronda de Poniente, 11 C/ Ronda de Poniente, 11 Avda. de la Buhaira. 27 1º A C/ Luis Montoto, 112 GALICIA 28760 Tres Cantos, Madrid 28760 Tres Cantos, Madrid 41018 Sevilla 41018 Sevilla Santiago de Compostela Tel. + 34 91 807 63 00 Tel. +34 91 806 54 30 Tel. +34 954 98 93 10 Tel. + 34 954 57 45 00 C/ Rua de Amio, 122 [email protected] [email protected] Polígono Costavella ASTURIAS 15707 Santiago de Compostela SANJOSE ENGINEERING AND INDUSTRIAL Oviedo Tel. + 34 981 55 57 30 CONSTRUCTION EBA Avda. Galicia, nº 40 - 4º C 33005 Oviedo Vigo C/ Ronda de Poniente, 11 Avda. Océano Pacífico nº 21-23 Tel. +34 620 852 936 C/ Emilia Pardo Bazán, 144. 28760 Tres Cantos, Madrid 01010 Vitoria-Gasteiz (Álava) Tel. +34 945 15 17 05 Nave 3 Tel. +34 91 807 63 00 CASTILLA Y LEÓN [email protected] 36214 Vigo, Pontevedra [email protected] Valladolid Tel. +34 986 49 30 40 C/ Juan Martínez Villergas, 8 Entreplanta COMERCIAL UDRA SANJOSE ENERGÍA Y MEDIO AMBIENTE 47014 Valladolid Calle Zurbano nº 76, piso 4º C/ Ronda de Poniente, 11 Tel. +34 983 34 49 08 28760 Tres Cantos, Madrid 28010 Madrid Tel. +34 91 807 63 15 Tel. +34 91 762 82 00 Concessions and Services [email protected] [email protected] ANDALUSIA CATALONIA GALICIA Málaga Barcelona Vigo SANJOSE CONCESIONES Y SERVICIOS C/ Marie Curie, 9-11 Avda. de les Garrigues 38-44 C/ Emilia Pardo Bazán, 144. Nave 3 C/ Ronda de Poniente, 11 Parque Tecnológico de Andalucía 08820 El Prat de Llobregat, 36214 Vigo, Pontevedra 28760 Tres Cantos, Madrid 29590 Campanillas, Málaga Barcelona Tel. +34 986 49 30 40 Tel. +34 91 806 54 00 Tel. + 34 952 02 83 67 Tel. + 34 93 280 00 00 [email protected] MADRID Ronda de Poniente, 11 28760 Tres Cantos, Madrid Tel. + 34 91 807 63 00 160 ACTIVITY REPORT 2017 CONTENTS DIRECTORY 161

SANJOSE Worldwide

SANJOSE FRANCE SANJOSE MEXICO / UDRA MEXICO SANJOSE EAST TIMOR 253 Boulevard de Leeds - Euralille Calle Francisco Petrarca Nº 223. Unit 324-325 Timor Plaza, 59777 Lille - France Oficina 505 Colonia Polanco. Rua Presidente Nicolau Lobato, Tel. +33 328 53 57 06 Delegación Miguel Hidalgo Comoro - Dili. Timor Leste [email protected] 11570 - Ciudad de México Tel. +670 78136134 Tel. +52 (55) 5203 0242 [email protected] SANJOSE PORTUGAL [email protected] Oporto SANJOSE CAPE VERDE Rua Orfeão do Porto, 360 Sala 4 SANJOSE PANAMA Santa María, Apartado 231 4150-798 Oporto Edificio Capital Plaza, Piso 7. Ilha do Sal (Cabo Verde) Tel. +351 226 151 870 Avda. Costa del Este y Ave, Tel. +238 242 2600/01 [email protected] Roberto Motta [email protected] Costa del Este, Panama Lisboa República de Panamá. CONSTRUTORA UDRA (PORTUGAL) Av. D. João II, nº 30, 7º Piso Tel. +507 264 2338 Avda. D.João II, n. 30 - 7º Piso Edifício Meridiano - Parque das [email protected] Edifício Meridiano - Parque das Nações, 1998-017 Nações 1998-017 Lisboa Tel. +351 218 933 120 SANJOSE PERU Tel. + 351 213 506 430 [email protected] Av. La Paz 1049, Piso 3 [email protected] Miraflores - Lima SANJOSE MALTA Tel. +51 1 215 08 00 CARLOS CASADO ARGENTINA 49 Triq Antonio Schembri [email protected] Edificio Torre Alem Plaza San Gwan, Malta Avda. Leandro N Alem 855 piso 15 Tel. +356 27400679 SANJOSE CONSTRUCTION (USA) 1001 Buenos Aires - CF [email protected] 5335 Wisconsin Avenue, Tel. +5411 4311 0170 / 0865 N.W. Suite 440 administracion@carloscasadosa. SANJOSE ARGENTINA Washington, D.C. 20015 com.ar Edificio Torre Alem Plaza Tel. +1 202 885 5540 Avda. Leandro N Alem 855 piso 15 [email protected] CARLOS CASADO PARAGUAY 1001 Buenos Aires - CF C/ Gómez Ríos 1244 Tel. +5411 4315 7878 SANJOSE ABU DHABI Asunción - Paraguay [email protected] Al Bustan Complex - Office 402 Tel. +595 21 213 896/7/8 Airport Road PO Box 113781 administracion@carloscasadosa. SANJOSE CHILE Abu Dhabi - United Arab Emirates com.py Alcántara 44, piso 5º Tel. +971 264 227 28 Las Condes, Santiago de Chile [email protected] SANJOSE CONTRACTING Tel. +56 22 5941800 (UNITED ARAB EMIRATES) [email protected] SANJOSE INDIA Al Bustan Complex - Office 402 Unit 602 Global Foyer Building Golf Airport Road PO Box 113781 SANJOSE COLOMBIA Course Road, Sector 43, Gurgaon. Abu Dhabi - United Arab Emirates Carrera 14 nº 93b - 29, CP: 122002 Estado Haryana Tel. +971 264 227 28 oficina 208 Tel. +91 1 244 970 270 commercial@sanjosecontractingllc. Bogotá, Colombia [email protected] com Tel. +57 1 622 58 42 [email protected]