Race Guide

Kerry Group Rás Mumhan 2011

Page 1 of 21

Contents

Race Schedule

General Organisation

Route Maps and brief course guide

Route in detail

Contact Telephone Numbers

Tadhg Moriarty 087 2443360 Mícheal Concannon 087 6444292 Mary Concannon 087 2802071 Dan Aherne 086 1565228

Page 2 of 21

Kerry Group Rás Mumhan

2011

Schedule

Friday 22nd April. Registration and Sign-On in Sports & Leisure Centre from 2:00p.m. to 3:30 p.m. Stage 1 will depart the Killorglin Sports and Leisure Centre at 3:55p.m. and proceed to Killorglin Town Centre. The Race will depart the start/finish area at 4:00p.m. The Chief Commissaire and the race officials will meet team managers in the Killorglin Sports and Leisure centre at 3:00 p.m.

Saturday 23rd April. Sign-On in Pobail Scoil Chorca Dhuibne from 10:30a.m. to 11:30a.m. The race will depart the school at 11:50a.m for a ceremonial start in front of the Centra Homevalue shop on Main Street. There is a one mile controlled roll out to the start of this stage through town. The race cavalcade should form up on Goat Street. Despite the length of the controlled rollout there will not be a halt at the end of the control section and before racing gets underway

Sunday 24th April. Sign-On in the Bay View Hotel, Waterville from 10:30a.m. to 11:30a.m. The race will depart from the Bay View Hotel at 12:00 noon.

Monday 25th April. Sign-On in Killorglin Sports & Leisure Centre from 8:30 a.m. to 9:30a.m. Riders will depart the Killorglin Sports and Leisure Centre at 9:50a.m. and proceed to Killorglin Town Centre. The Race will depart the start finish area at 10:00a.m. All riders will finish on the same lap as the stage winner. Lapped riders will have the appropriate time penalty added to their times.

Refreshments etc will be provided at St Michaels Church of Parish Centre, Iveragh Road, Killorglin from 1:00p.m. Race Radios, race numbers and timing transponders are to be returned at St. Michaels Church of Ireland Parish Centre.

Page 3 of 21

Map of Killorglin Town

A Sign-on Killorglin Sports and Leisure Centre B Prize presentation, St Michaels Parish Centre C Start/Finish area, Killorglin

Map of Dingle/ An Daingean Town and Controlled Section

A Sign-on, Pobalscoil Chorca Dhuibhne B Centra Homevalue, Formal race start C Goat Street, Formation area for team cars D Race start, TOP Filling Station

Page 4 of 21

Map of Waterville Village and Final 500m

A Sign-on, Bayview Hotel, Waterville B Start/Finish area

Page 5 of 21

General Organisation

The Kerry Group Rás Mumhan is a massed start cycle race on the road for riders who hold a competition licence from Cycling Ireland or from a member federation of Union Cycliste International. All riders are required to sign the disclaimer when they sign on each day. All riders in the race are covered for third party liability under the insurance for the event that is provided by Cycling Ireland.

The race is on open roads and while the race organisers will attempt to maintain a traffic free envelope the riders are responsible for their own safety in the manner in which they ride their machines. Riders are subject to the rules of the road and are obliged to obey the instructions of Gardai and race officials.

The race is run under its own specific race regulations and by the technical and general regulations of Cycling Ireland.

The race is promoted by Killorglin Cycling Club as part of the calendar of events that Cycling Ireland approves. The list of race officials is specified in the table below with an individual tasks and responsibilities identified for each one of them.

Liaison with the public authorities is by way of this document and the associated meetings. The public authorities to be dealt with are and An Garda Siochana. Kerry General Hospital will be notified the event is taking place.

Page 6 of 21

Kerry Group Rás Mumhan, 22nd to 25th April 2011.

Stage maps

and

Brief route guides

Page 7 of 21

Kerry Group Rás Mumhan, Stage 1, Friday 22nd April 2011.

The Slide through Sliebh Luchra

Route in brief: Start in the Square Killorglin at 4:00pm. Turn right over the bridge on N72 direction . At Ballydowney roundabout, take 1st exit. At Cleeney roundabout, take 1st exit on N22 direction . At the top of the Madam’s Height, turn right across the N22 direction Kilcummin. Continue on this road direction Gneevguilla. At the end of the village, turn left direction . After 1 mile turn left and continue to a T-junction with the R577. Turn left direction Scartaglen. Pass through Scartaglen and continue direction . At the Supervalu, turn left direction Tralee/Killarney. At the T-junction, turn left direction Killarney. At the roundabout, take the first exit on N23 direction Killarney. At Lisheenabaun X, turn right across the N23 direction . Pass through the village and cross the N22 using the flyover. Continue on this road to Ballyfinnane X. Turn left direction . At the T-junction, turn right on to the R561 direction Castlemaine/Killorglin. At Castlemaine, the road becomes the N70 and continue to Killorglin.

Page 8 of 21

Kerry Group Rás Mumhan, Stage 2, Saturday 23rd April 2011.

The Dance around Dingle (Damhsa an Daingean)

Route in brief: Start from Fitzgerald’s Centra/Homevalue in Main St at 12:00 noon. The race will be neutralised for a procession through Dingle. The race start is at the TOP filling station on R559 at 1.5 miles from the formal start. There is no stop. It is a rolling start. Continue on R559 via , Slea Head, and . At Ceathru an Caislean X turn right off the R559 on to Mám na Gaoithe direction Ventry. At the T-junction, turn left on to R559 direction Dingle. At Milltown X, turn left on R559 direction Murreigh. At the T-junction, turn right on R549 direction Feothanach. At Feothanach, continue on R549 direction Dingle. At Milltown roundabout, take the 2nd exit direction Dingle. Near the harbour the road forks to the right. Riders may use both sides of the traffic island to get to The Tracks. At the roundabout at the end of The Tracks take the 3rd exit on N86 direction Tralee. After 200m there is a roundabout take 2nd exit on N86 direction Tralee. Continue on N86 via , and Camp village. At the T-junction Camp X turn left on R560. Continue on R560 via Stradbally to the finish at Conor Pass.

Page 9 of 21

Kerry Group Rás Mumhan, Stage 3, Sunday 24th April 2011.

The Waltz about Waterville

Route in brief: Race starts on N70, direction , from the Bayview Hotel Waterville at 12:00 noon. At Pauline Sugrue Auctioneers, Kineigh X turn left on R567. At T-junction Emlaghmore Bridge, turn left on R566 direction . At Ballinskelligs, turn right direction . At the T-junction, The Glen X turn right direction Cahersiveen. At the T-junction Anagar Bridge, turn right on R565 direction Cahersiveen. At the T-junction Creamery X, turn left on N70 direction Cahersiveen. Continue on N70 via Cahersiveen to Barry’s X (Baghaghs X). Turn right at Barry’s X (Bahaghs X) and continue to Raheens X. At Raheens X turn right direction Killeenleigh. At Killeenleigh X turn right direction Waterville. At New Chapel X turn right on N70 direction Cahersiveen. At Creamery X turn left on R565 direction Valentia. At Portmagee cross the bridge on to . At junction, turn right direction Chapeltown/Knightstown. At Chapeltown, turn left before the church. At T-junction turn, left and return to the bridge. Turn right to cross the bridge and continue to Anagar Bridge via Portmagee. At Anagar Bridge, turn right direction St Finan’s Bay. At The Glen X turn left direction Ballinskelligs. At Ballinskelligs, turn left on R566 direction Cahersiveen. Continue to N70 via Aghatubrid. At T-junction, turn right on N70 direction Waterville. Continue on N70 to Waterville.

Page 10 of 21

Kerry Group Rás Mumhan, Stage 4, Monday 25th April 2011.

The Puck Fair Polka

Route in brief: Start in the Square Killorglin at 10:00am. Turn right over the bridge on N72 direction Killarney. At the Golden Nugget Bar, turn left on R563 direction Milltown. At Milltown, turn left on N70 direction Killorglin. At roundabout, take 2nd exit on N72 direction and repeat the first lap of the course. At roundabout on the 2nd lap take 3rd exit over the bridge and continue up the hill. Keep left and turn left on Langford Street at the Square. At Ardmoniel X continue straight ahead on the minor road. Continue to Gormon’s X. At t-junction, turn left. Continue to T-junction with Beaufort road. Turn left direction Killorglin. At the Bianconi Inn, turn left and continue up the hill to the square. Repeat nine more times.

Page 11 of 21

Route in detail

Stage 1: Killorglin, Sliebh Luachra, Killorglin. Start Killorglin at 4:00pm, 22nd April 2011 Estimated arrival time at: 32.5KPH 39kph 45KPH 20 MPH 24MPH 28MPH Km Location Instruction 16:00 16:00 16:00 0.0 0.0 The Square Killorglin Start Line 16:00 16:00 16:00 0.3 0.2 Roundabout 3rd Exit dir. Killarney N72 16:00 16:00 16:00 0.8 0.5 60km sign End of control race start 16:01 16:01 16:01 5.2 3.2 Coolbane X Straight ahead 16:09 16:08 16:06 12.2 7.5 Beaufort Bridge Straight ahead 16:22 16:18 16:16 12.4 7.6 Lahard X Straight ahead 16:22 16:19 16:16 12.7 7.8 Pallas X Straight ahead 16:23 16:19 16:16 16.4 10.1 The Golden Nugget Straight ahead 16:30 16:25 16:21 17.9 Killarney Golf Club/ Liebherr/Esso 11.0 filling station Straight ahead 16:33 16:27 16:23 20.0 1st exit dir. N22 12.3 Ballydowney R'about Cork/Tralee 16:36 16:30 16:26 20.5 12.6 Lidl R'about 1st exit dir. N22 Tralee 16:37 16:31 16:27 20.5 12.6 Pedestrian operated traffic Lights Caution 16:37 16:31 16:27 21.9 13.5 Caution! TurnRight Traffic ghost island Kilcummin Turn off road centre 16:40 16:33 16:28 22.1 13.6 Caution Narrow bridge Narrow Bridge 16:40 16:34 16:29 22.4 13.8 4 way junction. Straight ahead 16:41 16:34 16:29 22.9 14.1 Dooneen X Keep left 16:42 16:35 16:30 24.4 15.0 Inchicullane X Keep left 16:45 16:37 16:32 24.9 15.3 Junction Keep right 16:45 16:38 16:32 25.5 15.7 50km sign Kilcummin Straight ahead 16:47 16:39 16:33 26.2 16.1 Kilcummin PO Straight ahead 16:48 16:40 16:34 26.7 16.4 KoH Start Cat 3 16:49 16:41 16:35 27.8 17.1 KoH prime line 16:51 16:42 16:36 28.4 17.5 Knockataggle X Turn Right Stop sign Yield Caution Right of Way Turn Right 16:52 16:43 16:37 29.4 18.1 Narrow Humpbacked Bridge Straight ahead 16:54 16:45 16:38 33.5 20.6 Anablaha NS Straight ahead 17:01 16:51 16:44 33.6 20.7 Road Narrows Caution 17:02 16:51 16:44 34.9 21.5 Caution Narrow Humpbacked Bridge Narrow Bridge 17:04 16:53 16:46 36.7 22.6 Junction LHS Straight ahead 17:07 16:56 16:48 Page 12 of 21

38.2 23.5 Caution Narrow Humpbacked Bridge Narrow Bridge 17:10 16:58 16:50 38.8 23.9 Junction LHS Straight ahead 16:00 16:00 16:00 39.8 24.5 Caution Narrow Bridge Narrow Bridge 17:13 17:01 16:52 40.1 24.7 Quarry X Straight ahead 17:14 17:01 16:52 41.4 25.5 50 km sign Straight ahead 17:16 17:03 16:54 41.9 25.8 Gneeveguilla Turn Left 17:17 17:04 16:55 44.4 27.3 S Bends on a steep narrow descent Caution 17:21 17:08 16:58 44.9 27.6 Bawnard X Turn Left 17:22 17:09 16:59 0.0 KoH Start Cat 2 16:00 16:00 16:00 52.2 32.1 KoH prime line 17:36 17:20 17:08 52.5 32.3

Knocknaboul X Turn Left on to R577 dir. Stop sign Yield right of way Castleisland 17:36 17:20 17:09 61.9 38.1 50km Sign Scartaglin 17:54 17:35 17:21 68.6 42.2 50km Sign Castleisland 18:06 17:45 17:30 69.2 42.6 Junction RHS Straight ahead 18:07 17:46 17:31 69.6 42.8 Garveys Super-Valu Turn Left dir N23 18:08 17:47 17:31 70.2 43.2 Stop Sign Turn Left dir N23 18:09 17:48 17:32 70.4 43.3 Roundabout 1st exit dir. N23 Killarney 18:09 17:48 17:32 74.9 46.1 Turn Right Caution Junction on sweeping bend Turn Right 18:18 17:55 17:38 77.8 47.9 Sharp right turn after the Train Bridge bridge. 18:23 17:59 17:42 78.3 48.2 Sharp left hand turn 18:24 18:00 17:43 79.5 48.9 4 way junction Yield Right of Way Straight ahead 18:26 18:02 17:44 80.0 49.2 Junction on bend Keep Left 18:27 18:03 17:45 83.5 51.4 50km Sign Ballyfinnane 18:34 18:08 17:50 83.9 51.6 Ballyfinnane X Turn Left 18:34 18:09 17:50 97.3 59.9 T Junction Stop Sign Turn Caution Right Turn Right 18:59 18:29 18:08 94.9 58.4 Brackhill X Straight ahead on N70 Straight ahead 18:55 18:26 18:05 97.3 59.9 Left turn followed by a Milltown Village centre right turn 18:59 18:29 18:08 97.5 60.0 KoH Start Cat 4 19:00 18:30 18:08 98.0 60.3 KoH prime line 19:00 18:30 18:09 101.4 62.4 Kennedys X Straight ahead 19:07 18:36 18:13 103.2 63.5 60km sign 19:10 18:38 18:16 104.3 64.2 Roundabout 3rd exit dir. Killorglin N72 19:12 18:40 18:17 104.5 64.3 Bianconi corner Straight ahead 104.7 64.4 The Square Killorglin Finish line 19:13 18:41 18:18

Page 13 of 21

Stage 2: Dingle to the Conor Pass. Start Dingle at noon, 23rd April 2011 Estimated arrival time at:

32.5KPH 39kph 45KPH 20 MPH 24MPH 28MPH Km Miles Location Instruction 12:00 12:00 12:00

0.0 0.0 Pobail Scoil Chorca Dhubhaine Assembly point 12:00 12:00 12:00

0.1 An Driochead Beag Turn right 0.2 P+T Fitzgerald Centra Homevalue Ceremonial start line

1st exit on R559 dir. 1.6 1.0 Roundabout Ventry 2.1 1.3 TOP Fuel Station End of control race start 12:10 12:10 12:10 End of control 0.0 0.0 TOP Fuel Station Race start 12:10 12:10 12:10 5.4 3.3 50km sign Ceann Tra Straight ahead 12:19 12:18 12:17

5.7 3.5 Ventry Village Junction RHS Straight ahead 12:20 12:18 12:17 4 way junction at Caravan Park 6.0 3.7 Ventry Straight ahead 6.2 3.8 Baile an Treasna X Keep Left 12:21 12:19 12:18

7.6 4.7 4 way junctionj Paidi O Shea's Straight ahead

8.5 5.2 Junction LHS Right hand bend 12:25 12:23 12:21

8.8 5.4 Junction LHS Keep Left 12:26 12:23 12:21 Caution River crossing 13.3 8.2 Ford water + cobbles 12:34 12:30 12:27 15.0 9.2 Lay-by 12:37 12:33 12:29 16.1 9.9 Lay-by at Grotto 12:39 12:34 12:31 15.8 9.7 12:39 12:34 12:30

17.1 10.5 Access road to Coumeemoole Strand 12:41 12:36 12:32 Caution 18.7 11.5 Road Narrows Road Narrows 12:44 12:38 12:34

18.7 11.5 Junction LHS from Dun Choain Pier Straight ahead 19.0 11.7 Pottery Shop Straight ahead Junction RHS Mám 19.8 12.2 an Caslach Keep Left 12:46 12:40 12:36 20.3 12.5 Junction LHS Kruger's Pub Straight ahead 23.7 14.6 Louis Mulcahy Pottery Straight ahead 24.1 14.8 Sharp right hand bend 12:54 12:47 12:41 27.1 16.7 Baile an Feartearig Straight ahead 13:00 12:51 12:45 Caution Turn Right 29.3 18.0 Ceathru an Caislean X Yield Right of Way 13:04 12:55 12:48 Page 14 of 21

34.1 21.0 Baile an Treasna X Keep Left 13:13 13:02 12:55

34.6 21.3 Ventry Village Junction LHS Keep Left 13:13 13:03 12:55 40.3 24.8 50km Sign 13:24 13:12 13:03

40.5 24.9 Junction after Top Fuel Station Turn Left 13:24 13:12 13:03 43.6 26.8 KoH Start Cat 3 12:10 12:10 12:10 45.3 27.9 KoH prime line Cat 3 13:33 13:19 13:09 Caution 45.5 28.0 Road Narrows Road Narrows 13:34 13:20 13:10 47.5 29.2 Kilmaceader Church

49.1 30.2 Murreigh NS Straight ahead 13:40 13:25 13:14 Caution T Junction Turn Right 49.4 30.4 Murreigh village Yield Right of Way 13:41 13:26 13:15

50.9 31.3 Holding place RHS Dingle RFC 13:43 13:28 13:17

51.2 31.5 Holding place Post Office 13:44 13:28 13:17

52.2 32.1 Holding place Gormons B+B 13:46 13:30 13:18 Caution Sharp Left then 100m 53.3 32.8 S Bends sharp right 13:48 13:32 13:20

53.8 33.1 Holding Place at pub An Cuainne Straight ahead 13:49 13:32 13:20 57.1 35.1 Junction LHS Straight ahead 13:55 13:37 13:25

64.8 39.9 Roundabout 2nd exit to R599 Dingle 14:09 13:49 13:35 Industrial and commercial premises on the Wood Straight ahead

65.5 40.3 Pedestrian operated traffic lights 14:10 13:50 13:36 Entrances to marina and pier car 65.7 40.4 parks Straight ahead 14:11 13:51 13:36 Caution 65.8 40.5 Traffic calming ramp Ramp across the road 14:11 13:51 13:36 Caution Traffic island 66.0 40.6 Traffic Island Turn Right 14:11 13:51 13:37

66.1 40.7 Roundabout 3rd exit dir. Tralee N86 14:12 13:51 13:37

66.5 40.9 Roundabout 2nd exit dir N86 Tralee 14:12 13:52 13:37 KoH Start 74.4 45.8 Lispole bridge 14:27 14:04 13:48 Kates Shop 76.9 47.3 KoH Prime line Cat 4 14:31 14:08 13:51 Caution 77.5 47.7 Hairpin Bend Descent to Hairpin 14:33 14:09 13:52 Caution 80.0 49.2 Hairpin Bend Descent to Hairpin 14:37 14:13 13:55 Caution 80.9 49.8 Hairpin Bend Descent to Hairpin 14:39 14:14 13:56

Page 15 of 21

83.5 51.4 50km sign Annascaul Straight ahead 14:44 14:18 14:00 Caution Descent to Hairpin on 91.8 56.5 Hairpin Bend bridge 14:59 14:31 14:11 93.0 57.2 KoH Start Cat 3 15:01 14:33 14:12 Top of Gleann na nGealt KoH 94.7 58.3 Prime line Cat3 15:04 14:35 14:14 Caution freestanding Chevrons 97.0 59.7 Sweeping right hand bend on LHS 15:09 14:39 14:17

99.3 61.1 Camp Village X 4 way Junction 15:13 14:42 14:20 Caution 99.8 61.4 Camp Bridge Descent to Hairpin 15:14 14:43 14:21 Caution Turn left to R560 dir 100.6 61.9 Camp Cross Yield Right of Way 15:15 14:44 14:22 106.0 65.2 50km sign Aughcashla Straight ahead 15:25 14:53 14:29 108.9 67.0 Grotto RHS Straight ahead 15:31 14:57 14:33 112.3 69.1 50km sign Stradbally Straight ahead 15:37 15:02 14:38 115.9 71.3 Conor Pass junction Keep Left 15:43 15:08 14:42

Cloghane X 120.9 74.4 KoH Start Cat 1 15:53 15:16 14:49

124.6 76.7 Pedalers Lake carpark Straight ahead 16:00 15:21 14:54

Conor Pass carpark/viewing area Finish Line 126.3 77.7 KoH Prime Line Cat 1 16:03 15:24 14:56

Page 16 of 21

Stage3: Waterville and Valentia. Start Waterville at noon, 24th April 2011

Estimated arrival time at:

32.5kph 39kph 45kph

Km Miles Location Instruction 20mph 24mph 28mph 0.0 0.0 Start Line 12:00 12:00 12:00 0.5 0.3 100km speed sign 12:00 12:00 12:00

2.1 1.3 Sweeping right hand bend 12:03 12:03 12:02 2.9 1.8 New Chapel X Keep left 12:05 12:04 12:03 3.8 2.4 Inny Bridge Straight ahead 12:07 12:06 12:05

4.6 2.9 Pauline Sugrue Auctioneer Turn Left dir Baile an Sceilig 12:08 12:07 12:06 10.6 6.6 T junction Emlaghmore Turn Left 12:19 12:16 12:14 14.1 8.8 Junction Turn Right dir. Portmagee 12:26 12:22 12:18 14.6 9.1 Junction Turn Left 12:27 12:22 12:19 14.7 9.2 Caution sharp bend Caution 12:27 12:23 12:19

17.8 11.1 Caution fast narrow winding decsent Caution 12:28 12:24 12:20 Caution 21.0 13.1 Narrow bridge Straight ahead 12:30 12:25 12:22

21.1 13.2 Car parking LHS Keep right 12:31 12:26 12:22

21.3 13.3 The Glen T Junction Start of KOH Turn Right 12:39 12:33 12:28 23.5 14.7 KOH Cat 2 Prime line Kilurley 12:44 12:36 12:31 27.8 17.4 Junction Straight ahead 12:52 12:43 12:37 Anagar Br. T Junction Yield 31.0 19.4 Right of Way Turn Right on R565 12:58 12:48 12:41 Creamery X Yield 33.0 20.6 right of Way Turn Left on to N70 13:01 12:51 12:44 35.7 22.3 60 km Speed limit Cahersiveen 13:06 12:55 12:47 35.7 22.3 Renard X Striaght ahead 37.0 23.1 Pedestrian Traffic lights 13:09 12:57 12:49 37.9 23.7 The Square Cahersiveen 4 way junction Straight ahead 13:11 12:59 12:50 39.4 24.6 100 km speed limit 13:13 13:01 12:52 Turn Right dir Glencar Road 39.8 24.9 Barry's X Narrows 13:14 13:02 12:53 Sweeping right hand bend 43.0 26.9 Start of KoH Start of KoH 13:20 13:07 12:57 44.6 27.9 Mick Murphy's House Prime 13:23 13:09 12:59 Position at roadway on left for 45.9 28.7 Cat 3 KoH Prime line Coars NS 13:26 13:11 13:01 Turn Right dir. The Inny 48.0 30.0 Raheens X Tavern road narrows 13:30 13:15 13:04 51.7 32.3 Y junction Keep left 13:36 13:20 13:09 53.0 33.1 Caution narrow bridge Caution 13:39 13:22 13:10 53.3 33.3 4 way junction Killenleigh Turn Right dirn Waterville 13:39 13:23 13:11

Page 17 of 21

Turn Right on N70 dir. 63.0 39.4 New Chapel X Cahersiveen 13:58 13:38 13:24

64.2 40.1 Inny Bridge Start of KoH 14:00 13:40 13:25

65.3 40.8 Prime Pauline Sugrue Auctioneer Prime 14:01 13:41 13:26 65.3 40.8 Cat 4 KoH Keinneagh Heights 14:02 13:42 13:27 Turn left on R565 dir 72.3 45.2 Creamery X Knightstown 14:15 13:52 13:36 73.9 46.2 Caution Anagar Bridge Straight ahead 14:18 13:55 13:39 81.6 51.0 Caution 90° Right 14:33 14:07 13:49 82.1 51.3 Caution 90° Left 14:33 14:08 13:49 82.9 51.8 Y junction Keep right 14:35 14:09 13:50 82.9 51.8 Valentia Bridge 14:35 14:09 13:51 83.4 52.1 80Km sign Prime 14:36 14:10 13:51 83.7 52.3 T junction Turn Right 14:36 14:10 13:52 86.2 53.9 50km Sign Chapeltown 14:41 14:14 13:55

86.6 54.1 Junction Road narrows Turn Left Start of KoH 14:42 14:15 13:55 88.0 55.0 Cat 2 KoH Prime line 14:44 14:17 13:57 88.2 55.1 Caution severe bends 14:45 14:17 13:58 88.3 55.2 T junction Turn left 14:45 14:18 13:58 91.0 56.9 4 way junction Straight ahead 14:50 14:22 14:01

93.1 58.2 Severe bends on the descent for 1km 14:54 14:25 14:04 Turn Right on R565 dir 95.4 59.6 Junction Cahersiveen 14:58 14:29 14:07 96.2 60.1 end of Valentia Br Keep Left 15:00 14:30 14:09 96.3 60.2 Caution Narrow bridge 15:00 14:30 14:09 97.3 60.8 Caution 90° Right 15:01 14:31 14:09 97.8 61.1 Caution 90° Left 15:02 14:32 14:10

110.2 68.9 Anagar Br. Caution very severe turn Turn Right Caution 15:16 14:44 14:20 106.1 66.3 Sign "An " Start of KoH 15:20 14:46 14:22 108.3 67.7 4 way junction Straight ahead 15:22 14:49 14:24 108.5 67.8 Cat 3 KoH Prime line 15:23 14:49 14:25 111.4 69.6 Road from Left 15:27 14:52 14:28 114.4 71.5 50km sign The Glen 15:34 14:59 14:33 114.7 71.7 Junction The Glen Turn Left dir Cahersiveen 15:35 14:59 14:33 115.4 72.1 80 km sign St. Finians Bay Start of KoH 15:36 15:00 14:34 117.0 73.1 Y junction Keep left 15:39 15:02 14:36 118.6 74.1 Cat 2 KoH Prime line + Prime Prime 15:42 15:05 14:38 121.3 75.8 Caution 90° Left 15:47 15:09 14:42 121.6 76.0 Caution 90° Right 15:47 15:09 14:42 122.1 76.3 Caution 90° Left @ bottom of hill Turn left on to R566 15:48 15:10 14:43 Straight ahead dir 125.6 78.5 Emlaghmore junction (bridge) Cahersiveen 15:55 15:16 14:48

Page 18 of 21

130.4 81.5 Narrow bridge 16:04 15:23 14:54 131.4 82.1 Aghatubrid X Straight ahead 16:06 15:25 14:55 132.0 82.5 T junction Turn Right dir Waterville 16:07 15:26 14:56 132.3 82.7 4 way junction 10 km to go 16:07 15:26 14:56 139.0 86.9 New Chapel X Keep right 16:20 15:37 15:06 139.8 87.4 Sweeping left hand bend 16:22 15:38 15:07 141.6 88.5 50km signs Waterville 16:25 15:41 15:09 142.1 88.8 Finish 16:26 15:41 15:10

Stage 4: Killorglin and Milltown. Start Killorglin at 10:00am, 25th April 2011 Estimated arrival time at: 32.5KPH 39KPH 45KPH

Km Miles Location Instruction 20MPH 24MPH 28MPH 0.0 0.0 Start 10:00 10:00 10:00 0.2 0.1 Roundabout 3rd exit dir. Killarney 10:00 10:00 10:00 0.8 0.5 60km sign End of control race start 10:02 10:01 10:01

5.0 3.1 Coolbane X Straight ahead 10:09 10:08 10:07 11.7 7.3 Beaufort Bridge Straight ahead 10:22 10:18 10:16 11.8 7.4 Lahard X Straight ahead 10:22 10:19 10:16

12.3 7.7 Pallas X Straight ahead 10:23 10:19 10:17 14.6 9.1 60km sign Fossa 10:27 10:23 10:20

16.0 10.0 The Golden Nugget -Turn left Start of KOH 10:30 10:25 10:21 16.5 10.3 Cat 4 KOH Prime At 80km sign 10:31 10:26 10:22

20.2 12.6 Caution bends 10:38 10:32 10:27 21.8 13.6 4 way junction Faha X 10:41 10:34 10:29

Staggered junction and very narrow 24.2 15.1 bridge Caution 10:45 10:38 10:32

Turn left caution traffic island 29.1 18.2 Centre of Milltown centre of street 10:55 10:46 10:39

29.4 18.4 Bridge Start of KOH 10:55 10:46 10:39 29.8 18.6 Cat 4 KOH Prime At 100km sign 10:56 10:47 10:40 34.9 21.8 60km sign Killorglin 11:05 10:55 10:47 35.8 22.4 Chub's Corner Sharp left 11:07 10:56 10:48 36.0 22.5 Roundabout 2nd exit dir. Killarney 11:08 10:56 10:48 36.8 23.0 60km sign 11:09 10:58 10:49 41.0 25.6 Coolbane X Straight ahead 11:17 11:04 10:55 47.7 29.8 Beaufort Bridge Straight ahead 11:29 11:15 11:04 47.8 29.9 Lahard X Straight ahead 11:30 11:15 11:04 48.3 30.2 Pallas X Straight ahead 11:31 11:16 11:05 50.6 31.6 60km sign Fossa 11:35 11:19 11:08

Page 19 of 21

52.0 32.5 The Golden Nugget -Turn left Start of KOH 11:38 11:21 11:10 52.5 32.8 Cat 4 KOH Prime At 80km sign 11:38 11:22 11:10 56.2 35.1 Caution bends 11:45 11:28 11:15 57.8 36.1 4 way junction Faha X 11:48 11:30 11:17 Staggered junction and very narrow 60.2 37.6 bridge Caution 11:53 11:34 11:21 Turn left caution traffic island 65.1 40.7 Centre of Milltown centre of street 12:02 11:42 11:27 65.4 40.9 Bridge Start of KOH 12:03 11:42 11:28 65.8 41.1 Cat 4 KOH Prime At 100km sign 12:03 11:43 11:28 70.9 44.3 60km sign Killorglin 12:13 11:51 11:35 71.8 44.9 Chub's Corner Sharp left 12:15 11:52 11:36 72.0 45.0 Roundabout 3rd exit over bridge 12:15 11:53 11:36

72.2 45.1 Bianconi Inn Corner Continue up the hill 72.3 45.2 Top of the Square Turn Left Fexco Headquarters Straight ahead Ardmoniel X Road narrows at Aquadesigns 73.0 45.6 Ltd Straight ahead Gormons X Caution Yield 74.1 46.3 right of way Turn left Junction Yield Right of 75.0 46.9 Way Turn Left Bianconi Inn Corner 76.3 47.7 Caution Yield Right of Way Turn Left KOH Prime on each crossing of 76.5 47.8 Finish area the finish line Cat 4 KOH Prime each lap Each Lap will take approx 7 minutes 113.8 71.1 Finish 13:25 12:03 12:46

Page 20 of 21

Page 21 of 21