Project No/Name: OR BPRD T 372(1)/ Bend Haul Trail Improvements

This work consists of: Clearing, grubbing, grading, milling, crushed aggregate, hot asphalt pavement, permeable pavement, signing, striping, concrete accessible ramps.

Project length: 3.1 Miles.

Tentative Fixed Completion Date: October, 2021

(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: Bend, OR

DESCRIPTION OF WORK in US CUSTOMARY UNITS FP-14

One Schedule One Schedule Sch Name ______DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) - Silt Fence 1,150 LNFT

DIVISION 200 – Earthwork 201 Clearing and Grubbing 1 ACRE 201 Removal, Individual Tree 35 EACH 203 Removal of Pavement, Asphalt 1,750 SQYD 203 Removal of Pavement, Concrete 70 SQYD 203 Removal of Pavement Markings 20 SQYD

One Schedule One Schedule Sch Name ______204 Roadway Excavation 1,250 CUYD 204 Unclassified Borrow 1,480 CUYD 207 Separation-Stabilization Geotextile 7,930 SQYD 211 Roadway Obliteration 990 SQYD DIVISION 300 – Aggregate and Base Courses 302 Roadway Aggregate 750 Tons 302 Permeable Ballast 2,450 Tons DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 1,730 Tons 403 Open Graded Asphalt (permeable asphalt) 1,160 Tons 413 Asphalt Pavement Milling 8,150 SQYD DIVISION 600 – Incidental Construction 615 Accessibility Ramp, Concrete 7 EACH 619 Fence, Split Rail, 2 Rail 840 LF 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 623 General Labor (Arborist) 60 Hours 625 Turf Establishment 1.0 Acre 633 Permanent Control (sign system) 295 SQFT 634 Permanent Pavement Markings (traffic pavement symbols) 1,200 SQFT 634 Permanent Traffic Control (Striping) 1,800 LNFT 635 Temporary Traffic Control (Barricade) 20 EACH 635 Temporary Traffic Control (Sign) 40 SQFT 635 Temporary Traffic Control (Flagger) 40 HRS 635 Temporary Traffic Control Supervisor 50 DAYS