SNELLING MIDWAY REDEVELOPMENT SITE DRAFT CONCEPT PLANS (FOR DISCUSSION ONLY) ST. PAUL, MN JANUARY 7, 2016 RK MIDWAY SNELLING-MIDWAY SITE

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY REGIONAL CONTEXT JANUARY 7, 2016 2 SNELLING-MIDWAY SITE

LRT GREEN LINE BRT A LINE

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY TRANSPORTATION CORRIDORS JANUARY 7, 2016 3 ST. ANTHONY PARK HAMLINE-MIDWAY THOMAS DALE / FROGTOWN NEIGHBORHOOD NEIGHBORHOOD NEIGHBORHOOD

SNELLING-MIDWAY SITE UNIVERSITY AVE

INTERSTATE 94

UNION PARK SUMMIT-UNIVERSITY NEIGHBORHOOD NEIGHBORHOOD SNELLING AVE LEXINGTON PKWY LEXINGTON

LRT GREEN LINE BRT A LINE

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY NEIGHBORHOOD CONTEXT JANUARY 7, 2016 4 1230’ UNIVERSITY AVE

SPRUCE TREE AVE RK MIDWAY (24.6 AC)

SHIELDS AVE 1220’ SITE AREA 1190’ 34.4 AC

MET COUNCIL (9.8 AC) PASCAL ST N PASCAL SNELLING AVE

ST. ANTHONY AVE 1240’ I-94

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY SITE AREA AND DIMENSIONS JANUARY 7, 2016 5 2 1 UNIVERSITY AVE

1 2 SNELLING AVE ST N PASCAL

3 4

ST. ANTHONY AVE 4 3 I-95

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY SITE VISIBILITY JANUARY 7, 2016 6 1 UNIVERSITY AVE

1 2 2 SNELLING AVE 3 3 4 PASCAL ST N PASCAL

ST. ANTHONY AVE 4 I-95

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY EXISTING SITE CONDITIONS JANUARY 7, 2016 7 1230’ UNIVERSITY AVE

SPRUCE TREE AVE RK MIDWAY (24.6 AC)

SHIELDS AVE 1220’ SITE AREA 1190’ 34.4 AC

MET COUNCIL (9.8 AC) PASCAL ST N PASCAL SNELLING AVE

ST. ANTHONY AVE 1240’ I-94

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY SITE AREA AND DIMENSIONS JANUARY 7, 2016 8 1230’ UNIVERSITY AVE

SPRUCE TREE AVE EXISTING MIDWAY SHOPPING CENTER

SHIELDS AVE 1220’ 1190’

APPROXIMATE LOCATION OF PROPOSED

SOCCER FIELD ST N PASCAL SNELLING AVE

ST. ANTHONY AVE 1240’ I-94

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY PROPOSED JANUARY 7, 2016 9 Soccer Construction • Supporter groups • RK Midway and S9 Architects • Amateur community and recreational clubs • Mortenson Construction • MYSA and youth clubs • United Properties and other developers • Universities and colleges • Solar energy companies • Major League Soccer and select league teams • NSC (National Sports Center, Blaine) Future Users and Occupants • Residential developers Architecture • Restaurants, food and beverage establishments • Stadium architects ( and others) • Grocery and food purveyors • International soccer participants • Health and wellness facilities • Community planners and developers • Medical care service providers • Corporate offices Community • Hotel and related hospitality companies • The CAC, neighborhood associations, local • Entertainment venues residents • Multiple local, metro and regional community groups • City and County leadership, public officials and planning staff • State government and legislative officials • Local and regional businesses • Out-state business and community leaders

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY INPUT SOURCES REGARDING THE STADIUM, JANUARY 7, 2016 SITE AND NEIGHBORHOOD 10 Game Days

• Traffic flow and parking

• Pedestrian, bicylce, bus and light rail transportation use

• Pre- and post-game activities

• External light and noise (stadium related) abatement

• Activation of local and in-stadium amenities The Superblock

• Retail enhancements

• Hospitality opportunities - food and beverage, hotel, meeting spaces

• Additional businesses and corporate offices

• Community uses - green spaces, meeting places, entertainment

• Enhanced, year-round activities

• Traffic flow and parking

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY MAJOR COMMUNITY-RELATED CONSIDERATIONS JANUARY 7, 2016 11 • MLS (Domestic) and International

• “Urban Villages” and multi-faceted “24/7“ communities

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY INSPIRATIONS FOR THE STADIUM JANUARY 7, 2016 12 STADIA COMPARISON MLS STADIA

AVAYA STADIUM | SAN JOSE EARTHQUAKES DICK’S SPORTING GOODS PARK | COLORADO RAPIDS SPORTING PARK | SPORTING KANSAS CITY 18,000 CAPACITY 18,086 CAPACITY 18,467 CAPACITY

PPL PARK | PHILADELPHIA UNION TOYOTA PARK | CHICAGO FIRE MAPFRE STADIUM | COLUMBUS CREW SC 18,500 CAPACITY 20,000 CAPACITY 20,145 CAPACITY

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015RK MIDWAY STADIA COMPARISON: MLS STADIA JANUARY 7, 2016 13 STADIA COMPARISON MLS STADIA

RIO TINTO STADIUM | REAL SALT LAKE TOYOTA STADIUM | FC DALLAS SAPUTO STADIUM | MONTREAL IMPACT 20,213 CAPACITY `20,500 CAPACITY 20,801 CAPACITY

PROVIDENCE PARK | PORTLAND TIMBERS BBVA COMPASS STADIUM | HOUSTON DYNAMO RED BULL ARENA | NEW YORK RED BULLS 21,144 CAPACITY 22,038 CAPACITY 25,000 CAPACITY

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015 RK MIDWAY STADIA COMPARISON: MLS STADIA JANUARY 7, 2016 14 STADIA COMPARISON MLS STADIA

ORLANDO CITY STADIUM | ORLANDO CITY SOCCER STUBHUB CENTER | LA GALAXY BMO FIELD | TORONTO FC 25,000 CAPACITY 27,000 CAPACITY 30,991 CAPACITY

SACRAMENTO | SACRAMENTO REPUBLIC FC SOUTH LOS ANGELES | LA FC 22,000 [PROPOSED] CAPACITY 22,000 [PROPOSED] CAPACITY

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015RK MIDWAY STADIA COMPARISON: MLS STADIA JANUARY 7, 2016 15 STADIA COMPARISON INTERNATIONAL STADIA

FNB STADIUM | , MARACANA STADIUM | , BRAZIL | , GERMANY 94,736 CAPACITY 78,838 CAPACITY 75,024 CAPACITY

CAPE TOWN STADIUM | CAPTE TOWN, SOUTH AFRICA AVIVA STADIUM | DUBLIN, IRELAND HBZ STADIUM | AL AIN, UAE 55,000 CAPACITY 50,000 CAPACITY 25,000 CAPACITY

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015 RK MIDWAY STADIA COMPARISON: INTERNATIONAL STADIA JANUARY 7, 2016 16 STADIA COMPARISON NEW INTERNATIONAL STADIA

CHELSEA STADIUM | LONDON, ENGLAND TOTTENHAM STADIUM | LONDON, ENGLAND STADE DES LUMIERES | LYON, FRANCE 60,000+ CAPACITY 61,000 CAPACITY 58,927 CAPACITY

CRAIOVA STADIUM | CRAIOVA, ROMANIA LEVBERDON ARENA | ROSTOV-ON-DON, RUSSIA 40,000 CAPACITY 43,702 CAPACITY

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015 RK MIDWAY STADIA COMPARISON: NEW INTERNATIONAL STADIA JANUARY 7, 2016 17 • 20,000 guests

• 25-35 soccer events yearly (March to early December)

• Partial roof covering for weather protection and light and noise abatement

• Year-round and daily use elements

• Adjacent green spaces

• Beautiful and inspiring

• Complements and elevates the neighborhood

• Approachable and accessible - physically and economically

• Recognizable and appreciated

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY KEY STADIUM ELEMENTS AND FEATURES JANUARY 7, 2016 18 SECTION OVERLAY - BOWL EAST SECTION - TARGET FIELD

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015 SECTION OVERLAY - BOWL: RK MIDWAY JANUARY 7, 2016 EAST SECTION - TARGET FIELD 20 SECTION OVERLAY - BOWL EAST SECTION - TCF BANK STADIUM

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015 SECTION OVERLAY - BOWL: RK MIDWAY JANUARY 7, 2016 EAST SECTION - TCF BANK STADIUM 21 SECTION OVERLAY - BOWL EAST SECTION - US BANK STADIUM

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015 SECTION OVERLAY - BOWL: RK MIDWAY JANUARY 7, 2016 EAST SECTION - US BANK STADIUM 22 SECTION OVERLAY - BOWL EAST SECTION - TARGET CENTER

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015 SECTION OVERLAY - BOWL: RK MIDWAY JANUARY 7, 2016 EAST SECTION - TARGET CENTER 23 SECTION OVERLAY - BOWL EAST SECTION - EXCEL ENERGY CENTER

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY MINNESOTASITE SPECIFIC INFORMATION SOCCER SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN 12|09|2015 SECTION OVERLAY - BOWL: RK MIDWAY JANUARY 7, 2016 EAST SECTION - EXCEL ENERGY CENTER 24 MINNESOTA SOCCER 12|09|2015

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY JANUARY 7, 2016 25 • A great stadium for the sport - both players and fans • An exciting area to live, work, visit, shop and enjoy • An enhanced, dynamic and progressive community • A catalyst for continued improvement in our lives • A cornerstone for the future of the World’s sport in Minnesota

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY THE IDEAL END RESULT JANUARY 7, 2016 26 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY JANUARY 7, 2016 27 SNELLING MIDWAY MASTER PLAN

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY JANUARY 7, 2016 28 SNELLING-MIDWAY REDEVELOPMENT DESIGN PRINCIPLES

1. TOD - Pedestrian first (walkable neighborhood) 4. Mixed-use

• Direct link to Green Line train stations and BRT • Mix of 24/7 uses including stadium, office, stops retail, residential, entertainment, hotel,

• Public open spaces for citizens of the Twin Cities and open space

• Creation of new mixed use neighborhood • Active retail street fronts on principal streets

2. Amending the street grid and urban fabric • Day and night uses

• Creation of a new neighborhood district respective • Mix of international, regional, and local to surrounding existing neighborhoods programs

• Walkable block dimensions 5. Sustainable stormwater management

3. Emphasizing public open spaces • Green infrastucture such as tree trenches,

• Creation of open space network rain gardens, boulevard swales, and green

• Connecting parks and bike paths roofs

• Creation of new public open spaces for four • Sustainable landscape

season use • Permeable paving surface

• Irrigation cistern

• Grey water recycling station

• Water feature incorporating stormwater management system.

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY DESIGN PRINCIPLES JANUARY 7, 2016 29 1230’ UNIVERSITY AVE

SPRUCE TREE AVE RK MIDWAY (24.6 AC)

SHIELDS AVE 1220’ SITE AREA 1190’ 34.4 AC

MET COUNCIL (9.8 AC) PASCAL ST N PASCAL SNELLING AVE

ST. ANTHONY AVE 1240’ I-94

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY SITE AREA AND DIMENSIONS JANUARY 7, 2016 30 7TH ST W

FORT RD MINNESOTTA CHILDREN’S MUSEUM MINNESOTTA STATE COLLEGES & UNIVERSITIES

7TH PL W 7TH PL E

NEARLY 12 BLOCKS OF ST. PAUL DOWNTOWN BLOCK 6TH ST E

LANDMARK MEARS PARK PLAZA

5TH ST E

CENTRAL STATION 4TH ST E UNION DEPOT STATION ST PETER N SIBLEY ST CEDAR ST CEDAR JACKSON ST JACKSON ROBERT ST N MINNESOTA ST MINNESOTA WABASHA ST N WABASHA THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY ST. PAUL DOWNTOWN BLOCKS OVERLAY JANUARY 7, 2016 31 SNELLING–MIDWAY SMARTSITE

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY “SNELLING-MIDWAY SMARTSITE” JANUARY 7, 2016 32 TOD REDEVELOPMENT STRATEGY REPORT OF FINDINGS AND RECOMMENDATIONS

JUNE 17, 2014 IMPSON ST N ASBURY ST N ASBURY S UNIVERSITY AVE

SPRUCE TREE AVE

SHIELDS AVE

LRT GREEN LINE

LRT PLATFORM APPROXIMATE BRT A LINE

PASCAL ST N PASCAL SNELLING AVE LOCATION OF BRT STOP

PROPOSED PEDESTRIAN CIRCULATION

SOCCER FIELD EXISTING TRAFFICE SIGNAL

ST. ANTHONY AVE

I-94 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY PUBLIC TRANSIT & PEDESTRIAN ENTRIES JANUARY 7, 2016 33 IMPSON ST N ASBURY ST N ASBURY S UNIVERSITY AVE

SPRUCE TREE AVE

SHIELDS AVE

LRT GREEN LINE BRT A LINE

PASCAL ST N PASCAL SNELLING AVE VEHICULAR CIRCULATION

EXISTING TRAFFICE SIGNAL

ST. ANTHONY AVE

I-94 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY PRIMARY VEHICLE ACCESS ROUTES JANUARY 7, 2016 34 CONNECTION TO CHARLES AVE BIKE ROUTE IMPSON ST N ASBURY ST N ASBURY S

UNIVERSITY AVE

SPRUCE TREE AVE

SHIELDS AVE CONNECTION TO CONNECTION TO ALDINE ST BIKE ROUTE LEXINGTON PARKWAY

LRT GREEN LINE

LRT PLATFORM BRT A LINE

PASCAL ST N PASCAL SNELLING AVE BRT STOP

BICYCLE CIRCULATION

EXISTING TRAFFICE SIGNAL

ST. ANTHONY AVE CONNECTION TO SNELBY DEVELOPMENT I-94 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY BIKE ROUTES JANUARY 7, 2016 35 IMPSON ST N ASBURY ST N ASBURY S

UNIVERSITY AVE

SPRUCE TREE AVE

SHIELDS AVE PASCAL ST N PASCAL SNELLING AVE

ST. ANTHONY AVE

I-94 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MENDING THE STREET GRID MIDWAY, ST. PAUL, MN RK MIDWAY JANUARY 7, 2016 (CONNECTING THE NEIGHBORHOODS) 36 OFFICE OPEN SPACE RETAIL

RESIDENTIAL ENTERTAINMENT HOTEL

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY EXAMPLES OF MIXED-USE JANUARY 7, 2016 37 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY FOUR SEASON FESTIVALS JANUARY 7, 2016 38 405’ 400’

BUILDING OUTLINE

OPEN SPACE

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY OPEN SPACE OVERLAY - MEARS PARK, ST. PAUL JANUARY 7, 2016 39 475’

250’

BUILDING OUTLINE

OPEN SPACE

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY OPEN SPACE OVERLAY - PEAVEY PLAZA, MINNEAPOLIS JANUARY 7, 2016 40 450’

355’

BUILDING OUTLINE

OPEN SPACE

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY OPEN SPACE OVERLAY - RICE PARK ST. PAUL JANUARY 7, 2016 41 180’ 460’ 180’ 155’

105’ 515’

BUILDING OUTLINE

OPEN SPACE

THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY OPEN SPACE OVERLAY - LANSDOWNE, OTTAWA JANUARY 7, 2016 42 LA LIVE, LOS ANGELES, CA STE. CATHERINE STREET, MONTRÉAL, CANADA

PORTLAND STADIUM, PORTLAND, OR THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY EXAMPLES OF PLACES DURING EVENT JANUARY 7, 2016 43 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY EXAMPLES OF OPEN SPACE: JANUARY 7, 2016 FORMAL PLAZA 44 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY EXAMPLES OF OPEN SPACE: JANUARY 7, 2016 MORE SOFTSCAPE 45 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY EXAMPLES OF OPEN SPACE: JANUARY 7, 2016 MORE HARDSCAPE (ACTIVE USE W/ SEASONAL EVENTS) 46 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY EXAMPLES OF URBAN SPACES JANUARY 7, 2016 WITH FOOD AND OTHER PROGRAMS 47 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY JANUARY 7, 2016 EXAMPLES OF BOULEVARD STREETSCAPE 48 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY JANUARY 7, 2016 EXAMPLES OF PEDESTRIAN 1ST STREETSCAPE 49 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY EXAMPLES OF CURBLESS STREETSCAPE: JANUARY 7, 2016 LANSDOWNE PARK, OTTAWA, CANADA 50 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY SUSTAINABLE LANDSCAPE JANUARY 7, 2016 51 THIS CONCEPTUAL STUDY IS FOR PLANNING PURPOSE ONLY. DRAFT CONCEPT PLANS FOR DISCUSSION ONLY SITE SPECIFIC INFORMATION SUCH AS SURVEY, EXISTING CONDITIONS, ZONING REQUIREMENTS MUST BE VERIFIED. MIDWAY, ST. PAUL, MN RK MIDWAY JANUARY 7, 2016 52