Waste Management

REGIONS OF Regional Waste Management CLIMATE ACTION System in

Expected project CAPEX : 42’000’000 € Mandating Authority : City of Kragujevac

Summary The project purpose is to develop, finance and implement the RWMS through Service, Works and Supply contracts so that the region meets National Waste Management Strat- egy Phase 1 objectives for the Landfill and Waste Framework Directive, and contributes towards the Packaging Directive.

Location and population Kragujevac, Arandjelovac, , Knic, , 300’000 inh.

Social and environmental impact Establisment of new jobs and development of new companies; improved public health of the citizens; improved air and water quality and reduction of GHGs; increased aware- ness about the benefits of recycling.

Main stakeholders Ministry of and Environmental Protection, Department for Waste Man- agement; Ministry of Construction, Transport and Infrastructure; Ministry of Economy; Ministry of Finance; Ministry of Mining and Energy; Ministry of Public Administration and Local Self-Government; Local governments; Public utilities; Private operators of special types of waste; Householdes and Citizens

100 Climate Solutions Project Campaign ~ 2016 100 Climate Solutions Project Campaign ~ 2016 Amount of waste generated Current recycling rate 97000 tons/year Low level

Amount of waste currently collected Existing waste management plan 81771 tons No Waste type Final disposal today Organic 51,8% Plastic 12,9% Paper 11,7% Dumpsite

Metal 1% Glass 3,9% Comments A consortium of municipalities has not issued a final decision on Project maturity ( IFC / Bank Categories ) the adoption of one of the proposed options. STAGE 1 : Concept Development, Site identification STAGE 2 : Pre-Feasibility Studies STAGE 3 : Feasibility Studies STAGE 4 : Permitting / Financing / Contracts STAGE 5 : Engineering/Construction/Commercial Operation

Infrastructure Stage Short description Expected Capex Expected Capacity Containers: 2735 – metal 1.1 m3 1. Containers for the implementation of 2735 – HDPE 1.1 m3 a collection system with two flows. 1- 4.5 mil EUR Improving 40079 – HDPE 0.12 m3 No 2. Collection vehicles for a system with 2- 5.5 mil EUR collection 40079 – HDPE 0.24 m3 two flows. 3- 1.21 mil EUR 11 – 12 m3 3. Collection Centres. 35 – 16 m3 7 Transfer Two transfer stations, one in Kragujevac No 2.3 mil EUR 68000 t/year stations and one in Topola. Two sorting centres, one in Kragujevac Sorting Centre No 4.5 mil EUR 97000 t/year and one in Topola Composting No. One MBT facility; bio-drying facility No 12 mil EUR 60000 t/year facilities in Kragujevac Recyclables No.Recyclable waste will be sold to processing No No No private operators. facilities Waste to Energy Landfill Gas Recovery – bioreactor No 7.9 mil EUR No facilities (electrical and heat energy) No. Disposal of waste at an existing Sanitary landfill No No No commercial landfill.

100 Climate Solutions Project Campaign ~ 2016 100 Climate Solutions Project Campaign ~ 2016