Cycling Network Plan York District

Cycle 's Etobicoke Advocacy Summit, January 30th 2018 [Heading] [Subheading] Example from CNP: Ward 3 [Heading] Proposed Cycling Routes 13 – Burnhamthorpe Rd (Martin Text Text Grove to Dundas)

• Text • Text 52 – Martin Grove Rd (Rathburn to south of Burnhamthorpe)

67 – Princess Margaret Neighbourhood Connections

69 – Rathburn Rd (Mill to the East Mall)

70 – Renforth Dr (Rathburn to Eglinton) 2 Please note: Proposed projects are subject to design feasibility, public consultation, and approvals.

3 2018 Proposed Cycling Facilities

• Completion of Lake Shore Cycle Track • Completion of Etobicoke Creek Trail at Eglinton • PFR starting work on Etobicoke Creek Trail at Sherway 2018 • Eglinton West Trail (Spectrum/Rakely to Etobicoke Creek) • Martin Grove Rd line marking and signage improvements (Eglinton to Rathburn) + bike signal at Martin Grove and Eglinton • Humber Trail connection at Emery Creek to Weston Rd • Feasibility Study of Mid Humber Gap Phase 2 (Mallaby Park to Fairglen/Cardell) – planned to start 2018

4 2018 Proposed Cycling Facilities

• Annette St and Jane St intersection – line marking improvements (green thermoplastic) • Runnymede Rd line marking improvements (St. Clair and Bloor intersections – continue work started in 2017) • Six Points (Kipling / Dundas / Bloor intersection) cycle track (2018 – 2020) • Humber Bay Shores Trail Improvements • Phase 1 - Complete 2018; Phase 2 work planned for 2018/2019

5 2018 York University Connections

Near Etobicoke (heard there was interest in this project).

Purpose: to connect to the campus, to transit and to trails. It is funded 50% through the federal Public Transit Infrastructure Fund.

6 2018 York University Connections

Three public consultations coming up: • Tuesday, February 27, 2018, 10 a.m. to 2 p.m., York University, Keele Campus, Vari Hall Rotunda • Thursday, March 1, 2018, 12 p.m. to 2 p.m., Grandravine Community Centre, 23 Grandravine Drive • Thursday, March 1, 2018, 6 p.m. to 8 p.m., St. Jerome Catholic School, 111 Sharpecroft Blvd

Visit toronto.ca/yorkudownsview

7 2019 Proposed Cycling Facilities

• Looking at options for St. Clair Ave W (Runnymede to Scarlett), Scarlett Rd (Dundas to Eglinton), and Neighbourhood Connections (connections between Dundas St, Annette St, and the Humber River) • Kipling Heights Neighbourhood and Weston Neighbourhood Connections wayfinding sharrows on quiet streets • Oakwood Village Neighbourhood Connections wayfinding sharrows and contra-flow bike lanes on quiet streets • Vaughan Rd bike lane (Oakwood to Eglinton)

8 2019 Proposed Cycling Facilities

• Eglinton West Trail (Jane to Weston) (2018 – 2019) • Stakeholder consultation spring/summer 2018, construction likely 2019 • Eglinton Ave W bike signals at Lloyd Manor, Royal York, Scarlett • Looking at potential for Silverthorn Ave contra-flow bike lane and sharrows (Davenport to Eglinton)

9 2020 Proposed Cycling Facilities

Note: Bikeway type (e.g. bike lane vs cycle track) will be confirmed through feasibility analysis and public consultation. • Martin Grove Rd (Swan to Rathburn) • Looking at options to connect Martin Grove Rd to Kipling Station • Norseman St (Royal York to Kipling) • Judson St (Royal York to Horner) • Rathburn Rd (Elmcrest to just east of Centennial Park Rd) • Coordinate with 427 bridge rehabilitation and look at improving existing section from The East Mall to Martin Grove • Trethewey Dr (Eglinton to Jane)

10 2020 Proposed Cycling Facilities

• Upgrading Kipling Ave boulevard multi-use trail (Steeles to Mount Olive Dr) + bike signals at Mt. Olive, Rowntree, Kidron Valley • Eglinton Ave W bike signals at Eden Valley, Islington, Wincott, Kipling (bundled with other work) • Oakdale Rd (Sheppard to Finch) • The Kingsway (Dundas to Anglesey) • Looking at options for North Queen St and connecting it to Royal York and the waterfront through neighbourhood • Finch cycle tracks to be built as part of LRT work; construction likely to start in 2019 but will not be complete until beyond 2020

11 Eglinton Crosstown

• Eglinton Crosstown Cycle Tracks / Streetscaping Design Study includes Ward 12 and 17 in Etobicoke • Preliminary design has started and the City will consult stakeholders this spring/summer (2018) • Detailed design is planned to be complete by mid-2019 • Timing and funding for construction has not yet been determined, but the City will work with Metrolinx to coordinate this

12 toronto.ca/cyclingnetwork