District Council Discussion Paper No. EFA 6/2020 For Environmental Protection, Fisheries, Agriculture, Industries, Commerce, Food and Health Committee Meeting on 22 January 2020

Food and Environmental Hygiene Department First Phase of Anti-rodent Campaign 2020 in

Purpose

To brief Members on the arrangements and details of the First Phase of Anti-rodent Campaign 2020 to be launched by the Food and Environmental Hygiene Department (FEHD) in Tai Po District.

Background

2. The Second Phase of Anti-rodent Campaign 2019 organized by FEHD was launched from 8.7.2019 to 13.9.2019. Actions taken in the district and the results of the Campaign are detailed at Annex I.

3. With a view to sustaining anti-rodent measures, FEHD is going to launch the Anti-rodent Campaign 2020, under the slogan “Prevent Disease Eliminate Rodent Nuisance”, in two phases as follows -

(a) First Phase : 6.1.2020 to 13.3.2020

(b) Second Phase : 6.7.2020 to 11.9.2020

First Phase of Anti-rodent Campaign

4. The First Phase of Anti-rodent Campaign is to be launched from 6.1.2020 to 13.3.2020 targeting at markets/ municipal services buildings, typhoon shelters, lanes adjacent to food premises and other problematic spots as well as their surroundings. The objectives of this phase are –

(a) To arouse public awareness on the significance of rodent prevention and control in the community;

- 1 - (b) To promote participation of the public in rodent prevention and control work in their premises; and

(c) To reduce the rodent population in the territory, particularly in the target areas and their peripheries.

5. Poor environmental hygiene, improper handling and disposal of refuse, structural defects and inadequate rodent proofing are the major causes of rodent infestation in markets/ municipal services buildings, typhoon shelters, lanes adjacent to food premises and other rodent problematic spots. To prevent rodent infestation effectively, it is important to tackle the problem at root by eliminating the three survival conditions of rodents, namely food, harbourage and passages, meaning the elimination of food sources and hiding places of rodents, as well as blockage of their passages. These problems will be addressed during the First Phase of Anti-rodent Campaign 2020 with a view to raising awareness of the people living or working in those problematic areas on the importance of proper rodent prevention and control. Besides, rodent prevention and control work will be strengthened in areas with Rodent Infestation Rate (RIR) of 10 percent or higher obtained in the second half of 2019. To sustain the results of rodent prevention and control work, publicity education will be strengthened in areas with RIR below 10 percent obtained in the second half of 2019.

Action Plan

6. During the Campaign period, our in-house and pest control contractors’ staff will, in accordance with the action plan at Annex II, carry out systematic rodent surveys and disinfestation work in the target areas, and public places in their vicinity, such as vacant lands, sewers, flower beds, refuse collection points, etc, as well as other rodent problematic spots. Poisonous baits or rodent traps will be set whenever signs of rodent infestation are detected. At the same time, staff of our Hawkers, Markets and Cleansing Sections will step up inspections of markets/ municipal services buildings, typhoon shelters, lanes adjacent to food premises and other problematic spots in the target areas, and to augment rodent prevention and control work in those areas.

7. To intensify rodent prevention and control work in the district, we have taken into account factors including RIR, the number of rodent complaints received, views of the local community and the number of food premises and “three-nil” buildings in identifying suitable locations in each district to carry out targeted rear lane anti-rodent operations (Please refer to Annex III). Adopting multi-pronged strategies and the concept of rodent disinfestation in designated target areas, we carry out targeted rodent prevention and control

- 2 - work through elimination of the three basic survival conditions of rodents, namely food, harbourage and passages, including improving environmental hygiene, stepping up rodent disinfestation and enforcement actions. Pest Control, Cleansing, Environmental Hygiene, Markets and Hawkers Sections of FEHD will carry out strategic anti-rodent operations on various fronts with a view to eliminating the food sources and hiding places of rodents, as well as blocking their passages. Apart from stepping up anti-rodent work, we will enhance street cleansing services in target rear lanes, including sweeping and washing streets and rear lanes, removing refuse and waste, emptying and washing litter containers as well as clearing miscellaneous articles and refuse from markets in the target rear lanes and their vicinity, so as to keep the environment clean.

8. In addition, to enhance the effectiveness of anti-rodent work in target rear lanes, we will step up inspections of food premises and enforcement actions against food premises causing poor environmental hygiene conditions, food preparation and scullery in rear lanes and improper handling and disposal of rubbish, etc. We will adopt a zero-tolerance approach against common public cleanliness offences and take stringent enforcement actions against illegal disposal of refuse and waste.

9. To increase public knowledge about rodent control and elimination in rear lanes, we will also step up public education and publicity. We will collaborate with the District Councils and District Offices of the Home Affairs Department to organise anti-rodent promotional activities and arrange health talks for building management offices of private buildings, persons-in-charge of food premises, and market and hawker stall operators to provide information and technical advice on rodent prevention and control.

10. Once the anti-rodent work in target rear lanes achieves positive results, we will extend the scope of such work to cover more places. The multi-pronged strategies and the concept of rodent disinfestation in designated target areas will continue to be adopted to eliminate the three basic survival conditions of rodents, namely food, harbourage and passages so as to enhance the effectiveness of the Anti-rodent Campaign.

- 3 - 11. Relevant government departments including the Housing Department, the Leisure and Cultural Services Department, the Home Affairs Department, the Highways Department, the Agriculture, Fisheries and Conservation Department, the Drainage Services Department, the Lands Department and the Marine Department, etc. have been notified of the First Phase of Anti-rodent Campaign 2020 and invited to take appropriate actions in rodent prevention and control in areas under their respective ambit.

Publicity and Education

12. Effective rodent prevention and control hinges on the active participation and support of the community in anti-rodent work, especially in maintaining environmental hygiene, proper handling and disposal of rubbish, repairing damaged building fittings and taking rodent-proofing measures, etc. Hence, on publicity and education fronts, the department will adopt the following measures in addition to arranging television and radio announcements in public interests -

(a) To produce publicity posters, pamphlets, banners and educational materials on rodent prevention and control for public circulation;

(b) To enhance and maintain close liaison with the relevant government departments and local organisations;

(c) To disseminate messages on rodent prevention and control by broadcasting van and distribute publicity materials to the public;

(d) To organise thematic talks on rodent prevention and control and ectoparasites of rodent for stall tenants and the management of the public markets;

(e) To organise roving exhibitions at major shopping malls of housing estates and outreaching health talks for students and management of housing estates;

(f) To disseminate messages on rodent prevention and control to various stakeholders of the target rear lanes and organise health talks to provide them with information and technical advice on rodent prevention and control;

(g) To hold thematic exhibitions at the FEHD Health Education Exhibition and Resource Centre, and include information of the Campaign in the FEHD

- 4 - homepage; and

(h) To disseminate messages on rodent prevention and control through the Facebook and the Instagram of Keep Clean Ambassador 「Ah Tak」.

13. To ensure smooth implementation of the Campaign, the Pest Control Advisory Section of the department would provide technical assistance in the rodent prevention and control operations and the related publicity and education activities.

Local Participation

14. To enlist support and active participation of the District Council in the Campaign, Council Members and Committee Members will be invited to participate in related events, organise publicity activities and offer views on the rodent prevention and control work.

Tai Po District Environmental Hygiene Office Food and Environmental Hygiene Department 27 December 2019

- 5 -

Annex I

Food and Environmental Hygiene Department Second Phase of Anti-rodent Campaign 2019 in Tai Po District

The Second Phase of the Anti-rodent Campaign 2019 was launched between 8.7.2019 and 13.9.2019. During the period, related rodent prevention and control measures were implemented smoothly. The actions and results of the Second Phase of Anti-rodent Campaign 2019 in the district were as follows:

1. Number of patrols conducted at target areas : 817

2. Number of rat cages and traps placed : 4875

3. Number of rodent poison treatment operations : 542 conducted

4. Number of live rodents trapped : 144

5. Number of dead rodents collected : 189

6. Number of rat holes filled : 81

7. Number of advice on rodent prevention given : 236 to members of the public

8. Number of leaflets/posters distributed : 4105

9. Number of publicity/promotion activities : 16 conducted

- 6 - Annex II

First Phase of Anti-Rodent Campaign 2020 Action Plan in Tai Po District

Action Locations Date Team(s) AM PM

Nai Chung, Pier Departmental Hoi Ha, Pak Sha O, Nam and Barbecue area, Tung 6.1.2020 Staff and Wah Po, Ha Hang Tsuen, Leung Road, Ting Tai Road, (Monday) Contractor Cycling track from Fo Chun Road, Island House Staff Road to Island House Lane, Yuen Shin Road, Kwong Chun Street

Plover Cove Road, Road Market, Po Wu Lai Pek Shan Tsuen, Lin Au Departmental Lane, Po Heung Street, Kam Tsuen, Pun Chun Yuen, Tai 7.1.2020 Staff and Shan Tsuen, Shek Kwu Lung Po Road, Lo Wai, Contractor Tsuen, Treasure Garden, (Tuesday) Tai Po Kau San Wai, Hung Staff Jade Plaza, Fortune Plaza, Lam Drive Yau King Lane, Lookout link & RCP

Nga Yiu Tau, Shuen Wan Chan Uk Village, Shuen Wong Yue Tan, Ha Tei Ha, Wan Chim Uk Village, Departmental Tsz Tong Tsuen, Tai Mei Tuk 8.1.2020 Shuen Wan Lei Uk Village, Staff and Tsuen, Chai Kek Village, Tit Ping Long Tsuen, Shan Liu Contractor Mei Tsai, Nam Wan Road, Road, Shan Nam Road, Tai (Wednesday) Staff Hiu Wan Road, Fung Wan Tung, Tseng Tau, Wan Tau Road Bus Terminus Tong Estate, Yat Nga Court, Yat Nga Lane

Tong Hang Tung Chuen, San Departmental Ng Uk Tsuen, Ma Kwu Lam, Wai Tsai, Lo Tsz Tin Tsuen, 9.1.2020 Staff and Tin Liu, Kwun Hang, Kau Yuen Shin Road, Wang Fuk Contractor Liu Ha Tsuen, Chong San (Thursday) Court, Kwong Fuk Road, Staff Road Plover Cove Road

- 7 - Action Locations Date Team(s) AM PM

Ying Pun Ha Tsuen, Chuk Wai Tau Tsuen, Lo Fai Road, Departmental Hang Tsuen, Tsuen, Lo Ping Road, Tai Po Tau 10.1.2020 Staff and Tai Po Plaza, Tai Po Tsuen, San Wa On Lane, Tai (Friday) Contractor Hospital, Alice Ho Miu Po Centre, Chek Keng, Tung Staff Ling Nethersole Hospital, Ping Chau

Tai Tan, Tai Wo Estate, Yue Po Nga Court, Fung Wong Kok Tsuen, Tai Po Nga Court, Tai Po Industrial Industrial Estate (Dai Fat 11.1.2020 Contractor Estate (Dai King Street, Dai Street, Dai Wa Street, Dai Staff Hei Street, Dai Fu Street, Dai (Saturday) Fuk Street), Parc Kwai Street, Dai Cheong Versailles, Tai Po Garden, Street, Dai Wang Street) Shui Wai

Pak Sha O, Pak Sha O Ha Yeung, Chung Nga Court, Departmental Ko Tong, Ko Tong Ha Nai Chung, A Shan, Tseng 13.1.2020 Staff and Yeung, Tai Po Centre, Fong Tau Tsuen, Ting Tai Road, (Monday) Contractor Ma Po, Sheung Wun Yiu, Ha Ting Kok Road, Footpath Staff Wun Yiu, Cycling track along Tai Po riverside from Tat Wan Road to Wun Yiu Road

Po Yick Street, Po Yick Lane, Tung Mau Square, Tung Sau Square, Tung Fat Square, Tung Cheong Departmental Fung Yuen Tsuen, Mont Street, Luk Heung Lane, 14.1.2020 Staff and Vert, Tai Om Village, Chung Plover Cove Road, Plover Contractor Uk Tsuen, Tai Po Road, (Tuesday) Cove Road Market, Po Wu Staff Tsung Tsai Yuen Lane, Sheung Ha Pak Ngau Shek, Tai Po Mei, Cheung Shue Tan, Wong Nai Fai, Po Min

Departmental 15.1.2020 Nga Yiu Tau, Wo Tong Pui, Staff and Wong Yue Tan, Ha Tei Ha, Che Tei Tsuen, Serenity Contractor Tit Mei Tsai, T ap Mun Park, (Wednesday) Staff

- 8 - Action Locations Date Team(s) AM PM

San Tong Tsuen, Greenery Hang Ha Po, Tai Po Jockey Plaza, Chui Lok Street, Club General Out-patient Departmental Chui Yi Street, Beautiful Clinic, Kau Hui Chik Street, 16.1.2020 Staff and Garden, Tin Liu, Kwun Chui Wo Lane, Wai Tau Contractor Hang, Wong Siu Ching (Thursday) Tsuen, Nam Wan Road, Hiu Staff Clinic, Wan Tau Tong Wan Road, Fung Wan Road Estate, Yat Nga Court, Yat Bus Terminus Nga Lane

Pan Chung San Tsuen, Pan Chung Tsuen, Tycoon Uptown Plaza, Elegance Place, The Education Departmental Garden, University of , 17.1.2020 Staff and Station, Chek Keng, Yuen Shui Wo, Tai Yeung Che, Contractor Shin Road, Wang Fuk Court, (Friday) Ma Po Mei, Tai Po Hospital, Staff Kwong Fuk Road, Plover Alice Ho Miu Ling Cove Road Nethersole Hospital, Chong San Road

Kei Ling Ha San Wai, Kei 18.1.2020 Contractor Tai Yuen Estate, Ting Nga Ling Ha Lo Wai, San Tau Staff Court, Mui Shue Hang (Saturday) Kok Tsuen

Heung Sze Wui Street, Heung Sze Wui Square, Po Heung Lane, Po Heung Square, Po Heung Street, Departmental Hoi Ha, Nam Wah Po, Ha Kwong Fuk Lane, Kwong Fuk 20.1.2020 Staff and Hang Tsuen, Tung Ping Square, Tai Ming Lane, Wan Contractor (Monday) Chau Tau Street, Wan Tau Square, Staff Tai Kwong Lane, Tai Wing Lane, Tai Mei Tuk Pier and Barbecue area, Tung Ping Chau

Lai Pek Shan Tsuen, Lin Au Plover Cove Road Market, Tsuen, Pun Chun Yuen, Sam Departmental Po Wu Lane, Kam Shan Mun Tsai Road and Typhoon 21.1.2020 Staff and Tsuen, Shek Kwu Lung Shelter, Tak Nga Court, King Contractor Tsuen, Treasure Garden, (Tuesday) Nga Court, cycling track Staff Jade Plaza, Fortune Plaza, from Nam Wan Road to Tat Lai Chi Shan & RCP Wan Road

- 9 - Action Locations Date Team(s) AM PM

Shuen Wan Chan Uk Tai Po Sports Ground, Yee Village, Shuen Wan Chim Nga Court, Treasure Spot 22.1.2020 Departmental Uk Village, Shuen Wan Lei Garden, Ma Wo, Sai O, Staff and Uk Village, Sai Keng, Island House Lane, Cycling Contractor Cycling track from Fo Chun track outside Kwong Fuk (Wednesday) Staff Road to Island House, Estate, Footpath along Lam Cycling track from Science Tsuen River, Kwong Fuk Park to Fo Chun Road Estate

Ng Uk Tsuen, Ma Kwu Lam, Fu Shin Estate, Lo Tsz Tin Departmental Kau Liu Ha Tsuen, Pak Tin Tsuen, Che Ha, Tai Po Road, 23.1.2020 Staff and Kong Tsuen, Hong Lok Tai Po Kau Lo Wai, Tai Po Contractor (Thursday) Yuen Road, Yau King Lane, Kau San Wai, Hung Lam Staff Lookout link & RCP Drive

Ying Pun Ha Tsuen, Chuk Hang Tsuen, Sham Chung, Departmental Tai Wo Tsuen, Tai Po Lo Fai Road, Lo Ping Road, 24.1.2020 Staff and Hospital, Alice Ho Miu Tai Po Tau, San Wa On Lane, Contractor (Friday) Ling Nethersole Hospital, Tai Po Centre, Ko Lau Wan Staff Tai Po Plaza, Shui Wo, Ko Lau Wan

Tai Yuen Estate, Ting Nga Tai Tan, Railway Museum, 25.1.2020 Contractor Court, Tung Tsz Tsuen, Tai Shui Wai, Tai Po Garden, Staff Po Industrial Estate (Dai (Saturday) Parc Versailles Kwai Street, Dai Hei Street)

A Shan Tsuen, Tseng Tau Tsuen, Tai Ming Lane, Chuen On Road, Alice Ho Kwong Fuk Lane, Tai 27.1.2020 Contractor Miu Ling Nethersole Kwong Lane, Tai Wing (Monday) Staff Hospital, Tai Po Centre, Tai Lane, Kwong Fuk Square, Po Plaza, Fong Ma Po, Po Heung Square, Heung Sze Wui Square, Wan Tau Square,

- 10 - Action Locations Date Team(s) AM PM

Sha Lan, Nam Hang, Tai Hang Chung Sum Wai, Tai 28.1.2020 Contractor Chung Uk Tsuen, Lin Au Hang Garden, Prince Staff Tsuen, Pun Chun Yuen (Tuesday) Garden, Shek Kwu Lung Tsuen, Kam Shan Tsuen,

Kau Lung Hang Lo Wai, Departmental Wong Yue Tan, Ha Tei Ha, 29.1.2020 Ping Long Tsuen, Classical Staff and Treasure Spot Garden, Tit Gardens, Wo Tong Pui, Nga Contractor Mei Tsai, Tsz Tong Tsuen, Yiu Tau, Tai Tung, Tseng (Wednesday) Staff Tap Mun Tau, Tap Mun

Lo Tsz Tin Tsuen, Jockey Wong Siu Ching Clinic, Pak Club General Out-patient Departmental Shing Street, Ma Kwu Lam, Clinic, Kau Hui Chik 30.1.2020 Staff and Tai Ping Industrial Centre, Street, Mei Sun Lane, Chui Contractor (Thursday) Ng Uk Tsuen, Cheung Shue Wo Lane, Wai Tau Tsuen, Staff Tan & RCP Tai Po Road, Tai Po Kau San Wai

Lo Fai Road, Lo Ping Road, Departmental Ting Kok Village, Ying Pun San Uk Tsai, Tai Po 31.1.2020 Staff and Ha Tsuen, Chuk Hang Centre, Tak Nga Court, (Friday) Contractor Tsuen, Yung Shue O, Lai King Nga Court, cycling Staff Chi Shan & RCP track from Nam Wan Road to Tat Wan Road

Eightland Gardens, Tai Wo 1.2.2020 Contractor Road, Wong Chuk Tsuen, Tung Tsz Tsuen, Mui Shue (Saturday) Staff Tai Mei Tuk Tsuen, San Tau Hang, Sha Pa Kok Tsuen, Yue Kok Tsuen

- 11 - Action Locations Date Team(s) AM PM

Heung Sze Wui Street, Heung Sze Wui Square, Tai Po Hui Market, Po Heung Lane, Po Heung Square, Po Po Sam Pai Tsuen, Long Ha, Heung Street, Kwong Fuk Departmental Tai Po Centre, Po Heung Lane, Kwong Fuk Square, 3.2.2020 Staff and Estate, Chung Nga Road, Tai Ming Lane, Wan Tau Contractor Yuen Leng Village, Cycling (Monday) Street, Wan Tau Square, Tai Staff track from Science Park to Kwong Lane, Tai Wing Lane, Fo Chun Road Cycling track outside Kwong Fuk Estate, Footpath along River, Kwong Fuk Estate

Che Ha, Nam Hang, Tai Wo Departmental Tung Tsz Tsuen, Tung Tsz Tsuen, Tai Po Sports 4.2.2020 Staff and Shan Road, Sha Lan, She Ground, Tai Hang Fui Sha Contractor Shan Tsuen, Care Village, (Tuesday) Wai, Lai Chi Hang, Tai Po Staff Yin Tse Lane Road, Tsung Tsai Yuen

Tai Tung, Tseng Tau, Kau Lung Hang Lo Wai, Treasure Spot Garden, Ma Departmental Classical Gardens, Shan Wo, Kau Lung Hang San 5.2.2020 Staff and Nam Road, Wai Ha, Sun Lai Wai, Yee Nga Court, Sha Po Contractor (Wednesday) Garden, Hong Shing Tsai, Cheung Uk Tei, Tiffany Staff Garden, San Villa de Oka, Court San Uk Ka & RCP

Sai Keng, Green Cove, Tai Departmental Ping Industrial Centre, Sai O, Fu Shin Estate, Sun 6.2.2020 Staff and Road, Kam Hing Garden, Shan Tong Contractor (Thursday) Shek New Village, Fo Yin Road, Shan Yin Road Staff Road,

- 12 - Action Locations Date Team(s) AM PM

Ting Kok Village, Tycoon Tai Po Tau Tsuen, Yuen Departmental Place, The Education Leng Village, Wai Tau 7.2.2020 Staff and University of Hong Kong, Tsuen, San Uk Tsai, Ping Contractor (Friday) Sam Mun Tsai New Village, Long Tsuen, Tai Po Market Staff Fung Mei Wai, Ko Lau Wan Station, Ko Lau Wan

Wong Chuk Tsuen, Tai Mei Tung Tsz Tsuen, Lung Mei 8.2.2020 Contractor Tuk Tsuen, Tai Wo Estate, Tsuen, Hong Lok Villa, Sha Staff Eightland Gardens, Yue (Saturday) Pa, San Tong Tsuen Kok Tsuen

Nai Chung, San Uk Pai Tsuen, Sheung Ha Tin Liu Departmental Tsuen, Lung A Pai, Tai Po Lam Tsuen Sa n Tsuen, Yuen 10.2.2020 Staff and Hui Market, Tung Leung Leng Village, Long Ha, Lai Contractor Road, Tak Nga Court, King (Monday) Chi Shan & RCP Staff Nga Court, cycling track from Nam Wan Road to Tat Wan Road

Fung Yuen Tsuen, Lai Pek She Shan Tsuen, Sheung Ha Shan Tsuen, Tai Om Pak Ngau Shek, Po Yick Departmental Village, Sam Mun Tsai Street, Po Yick Lane, Tung 11.2.2020 Staff and Road and Typhoon Shelter, Cheong Street, Luk Heung Contractor Cycling track outside (Tuesday) Lane, Tung Tsz Shan Road, Staff Kwong Fuk Estate, Cycling track from Science Footpath along Lam Tsuen Park to Fo Chun Road River, Kwong Fuk Estate

12.2.2020 Departmental Shan Liu Road, Shan Nam Tai Mei Tuk Tsuen, Chai Staff and Road, Wai Ha, Cho Ma Wu, Kek Tsuen, Lai Chi Hang, Contractor Che Tei Tsuen, Care Tai Po Road, Tsung Tsai (Wednesday) Staff Village, Yin Tse Lane Yuen

- 13 - Action Locations Date Team(s) AM PM

Kam Shek New Village, Tin Sai O, Sun Hing Garden, Liu, Kwun Hang, Fung Yuen Departmental Chung Shun Lane, Hang Ha Tsuen, Hong Lok Yuen 13.2.2020 Staff and Po, San Wai Tsai, Ng Tung Road, Sun Lai Garden, Contractor Chai Tsuen, Sha Po Tsai, (Thursday) Hong Shing Garden, San Staff Cheung Uk Tei, Tiffany Villa de Oka, San Uk Ka & Court RCP

Fung Mei Wai, Tai Po Hospital, Alice Ho Miu Ling Nethersole Hospital, On Fu Road, Shung Tak Street, Wai Yi Street, Wai Departmental Luen Yik Sun Tsuen, Yuen Sin Street, Nam Shing 14.2.2020 Staff and Leng Village, Chek Keng, Street, Wai Yan Street, Pak Contractor Shan Tong Road, Shan Yin (Friday) Shing Street, Sui On Street, Staff Road Yan Wo Lane, Hei Yuen Street, Yan Hing Street, Fu Shin Street, Tsing Yuen Street, Sham Chung, Fo Yin Road, Pak Shek Kok

Tong Sheung Tsuen, Tai Po Chung Uk Tsuen, (Dai Fat 15.2.2020 Contractor Industrial Estate (Dai Shing Street, Dai Wah Street, Dai Staff Street, Dai Fu Street), Lung (Saturday) Fuk Street), Kei Ling Ha Lo Mei Tsuen, Hong Lok Villa Wai, Kei Ling Ha Sun Wai

San Uk Pai Tsuen, Sheung Departmental Hoi Ha, Pak Sha O, Yuen Ha Tin Liu Tsuen, Lung A 17.2.2020 Staff and Leng Village, Nam Wah Po, Pai, Fu Heng Estate, Wan Contractor Lam Tsuen Riverside, Ha (Monday) Tau Street, Kwong Fuk Staff Hang Tsuen, Ko Lau Wan Square, Ko Lau Wan

- 14 - Action Locations Date Team(s) AM PM

Plover Cove Road Market, Tai Hang Fui Sha Wai, Sam Departmental Plover Cove Road, Po Wu Mun Tsai Road and 18.2.2020 Staff and Lane, Tai Wo, Treasure Typhoon Shelter, Yuen Tun Contractor Garden, Jade Plaza, Fortune (Tuesday) Ha, Pun Shan Chau, Hilltop Staff Plaza, Ta Tit Yan, Wun Yiu Garden Road, Lo Lau Uk

Tai Po Sports Ground, Yee Departmental Serenity Park, Cho Ma Wu, 19.2.2020 Nga Court, Tai Mei Tuk Staff and Che Tei Tsuen, Sai Keng, Tsuen, Kau Lung Hang San Contractor Fo Yin Road, Fo Shing Wai, Shan Tong San Tsuen (Wednesday) Staff Road, Chong San Road & RCP

Greenery Plaza, Chui Lok Departmental Street, Chui Yi Street, Kau Fu Shin Estate, Lai Chi 20.2.2020 Staff and Liu Ha Tsuen, Pak Tin Kong Hang, Tai Po Road, Tsung Contractor (Thursday) Tsuen, Care Village, Yin Tsai Yuen Staff Tse Lane

Sham Chung, , Pan Chung San Tsuen, Pan Chung Tsuen, Departmental Tycoon Place, The Uptown Plaza, Elegance 21.2.2020 Staff and Education University of Garden, Tai Po Market (Friday) Contractor Hong Kong, Shui Wo, Tai Station, Tai Po Tau Tsuen, Staff Yeung Che, Ma Po Mei, Sun Tung Ping Chau Lai Garden, Hong Shing Garden, San Villa de Oka, Tung Ping Chau

Ko Tong Ha Yeung, Eightland Gardens, Tai Wo 22.2.2020 Contractor Road, Shui Wai Tsuen, Parc Tai Yuen Estate, Ting Nga (Saturday) Staff Versailles, Tai Po Garden, Court, Po Nga Court Wan Tau Street, Tai Wo Estate

- 15 - Action Locations Date Team(s) AM PM

Heung Sze Wui Street, Heung Sze Wui Square, Tai Po Hui Market, Po Heung Pak Sha O, Pak Sha O Ha Lane, Po Heung Square, Departmental Yeung, Hoi Ha, Long Ha, Po Kwong Fuk Lane, Kwong Fuk 24.2.2020 Staff and Sam Pai Tsuen, Chung Nga Square, Tai Ming Lane, Wan Contractor (Monday) Court, Tai Po Centre, Fong Tau Street, Wan Tau Square, Staff Ma Po, Tap Mun Tai Kwong Lane, Tai Wing Lane, A Shan, Tseng Tau Tsuen, Fu Heng Estate, Tap Mun

Po Yick Street, Po Yick Lane, Tung Mau Square, Tung Sau Square, Tung Fat Departmental Square, Tung Cheong Che Ha, Fung Yuen Tsuen, 25.2.2020 Staff and Street, Luk Heung Lane, Mont Vert, Yu On Street, Tai Contractor Plover Cove Road, Plover (Tuesday) Po Road, Tsung Tsai Yuen Staff Cove Road Market, Po Wu Lane, Tung Tsz Shan Road, Tai Po Mei, Cheung Shue Tan, Wong Nai Fai, Po Min

Classical Gardens, Nga Yiu Tau, Serenity Park, Shan Kau Lung Hang San Wai, Departmental 26.2.2020 Liu Road, Shan Nam Road, Cycling track outside Kwong Staff and Wai Ha, Tai Tung, Tseng Fuk Estate, Footpath along Contractor Tau, Cycling track from Lam Tsuen River, Kwong (Wednesday) Staff Science Park to Fo Chun Fuk Estate Road

Sai O, San Wai Tsai Tsuen, Sai Keng, San Tong Tsuen, Fu Shin Estate, Sun Hing Departmental Greenery Plaza, Chui Lok Garden, Tai Po Jockey Club 27.2.2020 Staff and Street, Chui Yi Street, General Out-patient Clinic, (Thursday) Contractor Beautiful Garden, Wong Siu Kau Hui Chik Street, Chui Staff Ching Clinic, Care Village, Wo Lane, Lai Chi Hang, Tai Yin Tse Lane Po Road, Tsung Tsai Yuen

- 16 - Action Locations Date Team(s) AM PM

Sham Chung, Lai Chi Chong, Pan Chung San Tsuen, Pan Chung Tsuen, Uptown Plaza, Elegance Tycoon Place, The Departmental Garden, Tai Po Market Education University of 28.2.2020 Staff and Station, Ting Kok Village, Hong Kong, Shui Wo, Tai Contractor Chung Nga Road, Sha Po (Friday) Yeung Che, Ma Po Mei, Staff Tsai, Cheung Uk Tei, Tiffany Yung Shue O, Sun Lai Court Garden, Hong Shing Garden, San Villa de Oka, San Uk Ka & RCP

Ko Tong Ha Yeung, Wong Chuk Tsuen, Tai Mei Tuk Tai Yuen Estate, Ting Nga 29.2.2020 Contractor Tsuen, Tai Wo Estate, San Court, Sha Pa, Chung Uk (Saturday) Staff Tau Kok Tsuen, Kei Ling Tsuen, Mui Shue Hang, Lung Ha San Wai, Kei Ling Ha Lo Mei Tsuen Wai,

Departmental Lam Tsuen Sa n Tsuen, Nai Chung, Tai Po Hui 2.3.2020 Staff and Chung Nga Road, Tai Po Market, A Shan Tsuen, (Monday) Contractor Plaza, Tai Po Centre, Fo Tseng Tau Tsuen, Shan Staff Yin Road, Pak Shek Kok Tong Road, Shan Yin Road

Sha Lan, Tai Hang Chung Sum Wai, Tai Hang Garden, Kwong Fuk Road, Tai Om Departmental Prince Garden, Nam Hang, Village, Yu On Street and 3.3.2020 Staff and She Shan Tsuen, Beverly Wholesale Fish Market, (Tuesday) Contractor Hills, Tai Po Mei, Cheung Kwong Fuk Road, Nam Hang, Staff Shue Tan, Wong Nai Fai, Po Tai Po Road, Tsung Tsai Min Yuen

- 17 - Action Locations Date Team(s) AM PM

Shan Nam Road, Shan Liu Treasure Spot Garden, Chai Departmental Road, Wai Ha, Ping Long 4.3.2020 Kek Tsuen, Wo Liu, Tit Mei Staff and Tsuen, Wo Tong Pui, Tsai, Tsz Tong Tsuen, Ma Wo Contractor Classical Gardens, Ta Tit Village, Yuen Tun Ha, Pun (Wednesday) Staff Yan, Wun Yiu Road, Lo Lau Shan Chau, Hilltop Garden Uk

Pak Tin Kong Tsuen, Kau Tong Hang Tung Chuen, Departmental Liu Ha Tsuen, Tai Ping Hang Ha Po Tsuen, Ng Tung 5.3.2020 Staff and Industrial Centre, Kam Shek Chai Tsuen, Kau Hui Chik (Thursday) Contractor New Village, Fo Chun Road Street, Mei Sun Lane, Chui Staff Construction Site, Fo Shing Wo Lane, Shan Tong New Road, Chong San Road Village & RCP

On Fu Road, Shung Tak Street, Wai Yi Street, Wai Sin Street, Nam Shing Departmental Street, Wai Yan Street, Pak Wai Tau Tsuen, Lo Fai Road, 6.3.2020 Staff and Shing Street, Sui On Street, Ting Kok Village, Wan Tau Contractor Yan Wo Lane, Hei Yuen (Friday) Street, Tung Ping Chau Staff Street, Yan Hing Street, Fu Shin Street, Tsing Yuen Street, Sam Mun Tsai New Village, Tung Ping Chau

Fung Wong Nga Court, Tai Yue Kok Tsuen, Tai Po Po Industrial Estate (Dai Industrial Estate (Dai Fat King Street, Dai Hei Street, 7.3.2020 Contractor Street, Dai Wa Street, Dai Dai Fu Street, Dai Kwai Staff (Saturday) Fuk Street), Kau Lung Hang Street, Dai Cheong Street, Lo Wai, Railway Museum Dai Wang Street), Sha Pa, San Tong Tsuen

- 18 - Action Locations Date Team(s) AM PM

Kwong Fuk Road, Plover Ha Hang Tsuen, Lam Tsuen Departmental Cove Road, Tai Po Hui San Tsuen, Chung Nga 9.3.2020 Staff and Market, Tai Mei Tuk Pier Road, Chung Nga Court, Po Contractor and Barbecue area, A Shan, (Monday) Sam Pai Tsuen, Cheung Staff Tseng Tau Tsuen, Tai Po Shue Tan & RCP Road, Tai Po Kau San Wai

Sha Lan, Tai Hang Chung Sum Wai, Yu On Street and Fung Yuen Tsuen, Mont Departmental Wholesale Fish Market, Vert, Tai Om Village, 10.3.2020 Staff and Nam Hang, Tung Tsz Tsuen, Chung Uk Tsuen, Island Contractor (Tuesday) Tung Tsz Shan Road, House Lane, Yuen Shin Staff Cycling track from Fo Chun Road, Kwong Chun Street Road to Island House

Shuen Wan Chan Uk Treasure Spot Garden, Chai 11.3.2020 Departmental Village, Shuen Wan Chim Kek Tsuen, Wo Liu, Tit Staff and Uk Village, Shuen Wan Lei Mei Tsai, Tsz Tong Tsuen, Contractor Uk Village, Ping Long Tai Po Road, Tai Po Kau (Wednesday) Staff Tsuen, Yau King Lane, Lo Wai, Tai Po Kau San Lookout link & RCP Wai, Hung Lam Drive

Sai O, Tong Hang Tung Chuen, Hang Ha Po Tsuen, Pak Tin Kong Tsuen, Kau Departmental Ng Tung Chai Tsuen, Kau Liu Ha Tsuen, Tai Ping 12.3.2020 Staff and Hui Chik Street, Mei Sun Industrial Centre, San Tong Contractor Lane, Chui Wo Lane, (Thursday) Tsuen, Wong Siu Ching Staff Jockey Club General Clinic, Ko Lau Wan Out-patient Clinic, Ko Lau Wan

- 19 - Action Locations Date Team(s) AM PM

On Fu Road, Shung Tak Street, Wai Yi Street, Wai Sin Street, Nam Shing Street, Wai Yan Street, Pak Shing Street, Sui On Street, Departmental Yan Wo Lane, Hei Yuen 13.3.2020 Staff and Street, Yan Hing Street, Fu Wai Tau Tsuen, Tap Mun Contractor (Friday) Shin Street, Tsing Yuen Staff Street, Sam Mun Tsai New Village, Tai Po Hospital, Alice Ho Miu Ling Nethersole Hospital, Tap Mun

- 20 - Annex III

Food and Environmental Hygiene Department First Phase of Anti-rodent Campaign 2020 Target Rear Lanes in Tai Po District

Date Target Rear Lanes

6.1.2020 Wai Yi Street, Nam Shing Street, Wai Yan Street (Monday)

8.1.2020 Tsing Yuen Street, Kwong Fuk Street

(Wednesday) (from On Fu Road to Po Heung Street)

Po Heung Square, Heung Sze Wui Square, 10.1.2020 (Friday) Kwong Fuk Lane, Tai Wing Lane

13.1.2020 Wai Yi Street, Nam Shing Street, Wai Yan Street (Monday) Tsing Yuen Street, Kwong Fuk Street 15.1.2020 (Wednesday) (from On Fu Road to Po Heung Street)

Po Heung Square, Heung Sze Wui Square, 17.1.2020 (Friday) Kwong Fuk Lane, Tai Wing Lane

20.1.2020 Wai Yi Street, Nam Shing Street, Wai Yan Street (Monday) Tsing Yuen Street, Kwong Fuk Street 22.1.2020 (Wednesday) (from On Fu Road to Po Heung Street)

Po Heung Square, Heung Sze Wui Square, 24.1.2020 (Friday) Kwong Fuk Lane, Tai Wing Lane

27.1.2020 Wai Yi Street, Nam Shing Street, Wai Yan Street (Monday) Tsing Yuen Street, Kwong Fuk Street 29.1.2020 (Wednesday) (from On Fu Road to Po Heung Street)

- 21 - Po Heung Square, Heung Sze Wui Square, 31.1.2020 (Friday) Kwong Fuk Lane, Tai Wing Lane

3.2.2020 Wai Yi Street, Nam Shing Street, Wai Yan Street (Monday) Tsing Yuen Street, Kwong Fuk Street 5.2.2020 (Wednesday) (from On Fu Road to Po Heung Street)

Po Heung Square, Heung Sze Wui Square, 7.2.2020 (Friday) Kwong Fuk Lane, Tai Wing Lane

On Fu Road, Shung Tak Street, Sui On Street, Hei Yuen Street, 10.2.2020 (Monday) Yan Wo Lane, Yan Hing Street, Fu Shin Street, Pak Shing Street

Po Yick Lane, Po Yick Street, Luk Heung Lane, 12.2.2020 (Wednesday) Tung Mau Square, Tung Sau Square

Tung Fat Square, Tung Cheong Street, 14.2.2020 (Friday) Wan Tau Street, Wan Tau Kok Lane

Wan Tau Square, Kwong Fuk Square, 17.2.2020 (Monday) Tai Ming Lane, Tai Kwong Lane

19.2.2020 Wai Yi Street, Nam Shing Street, Wai Yan Street (Wednesday) Tsing Yuen Street, Kwong Fuk Street 21.2.2020 (Friday) (from On Fu Road to Po Heung Street)

Po Heung Square, Heung Sze Wui Square, 24.2.2020 (Monday) Kwong Fuk Lane, Tai Wing Lane

On Fu Road, Shung Tak Street, Sui On Street, Hei Yuen Street, 26.2.2020 (Wednesday) Yan Wo Lane, Yan Hing Street, Fu Shin Street, Pak Shing Street

Po Yick Lane, Po Yick Street, Luk Heung Lane, 28.2.2020 (Friday) Tung Mau Square, Tung Sau Square

- 22 - Tung Fat Square, Tung Cheong Street, 2.3.2020 (Monday) Wan Tau Street, Wan Tau Kok Lane

Wan Tau Square, Kwong Fuk Square, 4.3.2020 (Wednesday) Tai Ming Lane, Tai Kwong Lane

6.3.2020 Wai Yi Street, Nam Shing Street, Wai Yan Street (Friday) Tsing Yuen Street, Kwong Fuk Street 9.3.2020 (Monday) (from On Fu Road to Po Heung Street)

Po Heung Square, Heung Sze Wui Square, 11.3.2020 (Wednesday) Kwong Fuk Lane, Tai Wing Lane

- 23 -