· Digital Museum has been provided at station. · Modern Pay and Use toilets in circulating area at Indore, Laxmi Bai Nagar, Rajendra Nagar, , Barnagar, Gautampura Road stations have been commissioned. · Development of Green patch and Beautification between Platform no 1,2 and 3,4 with INDIAN RAILWAYS Paintings, Fountain and Artifacts at Indore Station.

C. WORKS IN PROGRESS · Doubling of Indore – Dewas – Section. · New line between Indore – – Dahod Section. · Electrification work of Rau to Tihi Stations. · Doubling of Dr. Ambedkar Nagar to Rau Stations. · Development of Indore Station to be done by IRSDC.

Developmental Works - Some Glimpses

Laying foundation stone of doubling of Indore-Dewas Inauguration of Indore-Puri Hamsafar Express -Ujjain section

NEW RAILWAYS

Developed sit out area near platform no. 5 at Indore station Pedestrian Plaza in front of Indore station A progressive journey since 2014 INPUTS BY RAILWAY IN INDORE PARLIAMENTARY CONSTITUENCY ON FAST TRACK DEVELOPMENT : 2014-PRESENT INDORE PARLIAMENTARY CONSTITUENCY INFRASTRUCTURE ENHANCEMENT: A. ASSEMBLY SEGMENTS v New Line Projects Rau, , Indore – 1, Indore – 2, Indore -3, Indore -4, Indore-5, Depalpur o New Line Projects of 521 Kms for ₹ 8646 Crore sanctioned since 2014. o New Line increased from 4 Km/Year in 2009-14 to 25 Km/Year in 2014- B. WORKS COMPLETED IN LAST SEVEN YEARS 2021 i. e. +525% B1. Infrastructure Enhancement · Opening of newly converted Fathehabad – Indore BG section for Passenger Traffic. v Doubling/Tripling/4th Line Projects o CRS sanction for Fatehabad to Laxmibainagar (35.83 Km) in Oct'2014 th o CRS sanction for the Laxmibai Nagar Station in Jun'2016. o Doubling/Tripling/4 Line Projects of 1754 Kms for ₹ 19257 Crore o CRS sanction for Laxmibai Nagar to Indore in Aug'2016 sanctioned since 2014. · New line Indore to Rau and Rau to Tihi commissioned. th o Doubling/Tripling/4 Line increased from 7 Km/Year in 2009-14 to 60 · Elimination of LC No. 250 at Indore by Road Over Bridge. Km/Year in 2014-2021 i. e. +757% · Electrification of Indore – Dr. Ambedkar Nagar Section. · Opening of newly converted Indore – BG Section for Passenger Traffic. v Electrification Projects · Opening of Heritage section i.e Patalpani Kalakund Heritage Railway from Dec'2018. o Electrification Projects of 2539 Kms for ₹ 2222 Crore sanctioned since · LHS at LC No. 221 and 224 between – Fatehabad – Indore Section commissioned. 2014. · Two Pit lines (No. 5 & 6) commissioned at Indore Yard. o Electrification increased from 64 Km/Year in 2009-14 to 201 Km/Year in · 18 LC Closed by construction of 07 Nos. Road Over Bridges and 11 Nos. Road Under 2014-2021 i. e. +214% Bridges/ Limited Height Subway. o 96.62 % - 4203 Route Kms in Madhya Pradesh has been Electrified. · Roof Top Solar Plant of 309.44 KW installed at 06 Locations/Stations.

v Rail Fly Over Projects B2. Improvement in Passenger Amenities o Rail Fly Over Projects of 74 Kms for ₹ 2174 Crore sanctioned since 2014. · Provision of New Passenger Platform No. 05 and 06 at Indore station · New Platforms with various Passenger Amenities like Booking Office, Covering Shed, Drinking Water, FOB, Toilets, Circulating Area etc. has been provided at Laxmibai Nagar, PASSENGER AMENITIES: Dr. Ambedkar Nagar (Mhow), Rajendra Nagar, Rau, Harnayakhedi Stations. v Cover Over Platforms · Extension of Platform at Fatehabad and Chandrawati Ganj Stations. v Foot Over Bridges · Provision of 06 Escalators at Indore Station. v Washable Aprons · Provision of 05 Lifts at Indore Station. v Lifts & Escalators · New Foot Over Bridges at Rau and Rajendra Nagar Stations and Extension of FOB at v Extension and Raising of Platforms Indore Station. v Wi-Fi Facility · 100ft Monumental Flag at Indore Station. · Commissioning of Water Recycling Plant of 105 kL Capacity Per day at Coaching Depot v Automatic Ticket Vending Machines Indore v Coach Guidance Systems · Wi-Fi System has been started at Indore, Mangaligaon, Barlai, Gautampura, Ajnod, v Water Vending Machines Palia, Laxmibai Nagar, Rau stations. v LED Lights at Stations · Sanitary Pad Vending Machine and Incinerator installed at Indore Station. · Computerised Online Booking of Retiring rooms and Dormitories facility started at Indore SAFETY – OUR PRIME CONCERN: station. v Use of Drone by WCR in Madhya Pradesh for the 1st time in for Disaster · 04 Automatic Ticket Vending Machines (ATVM) have been commissioned at Indore station. Management, Crowd Management and Project Monitoring etc; · Operation of Battery Operated Car at Indore station. v Use of GPS Trackers for Patrolling and Monitoring by WCR in Madhya Pradesh · PRS cum UTS has been commissioned at Fatehabad station. st for the 1 time in India. · 5-Line Train Display Board has been installed at Indore Station · On-Line Train Reservation Charting Station provided at Indore Station PF 1 · Indore GPO PRS has been commissioned. · Coach Guidance System has been provided at Indore station PF No. 5 and 6.