DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CE/C/I-JP

Dy. CE/C/GC-JP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 DY.CE /C/ Construction of Open 16.12.11 Single 25.01.12 06 - - Yes 11/NWR/Dy. M/s Surabhi 276.47 15.08.12 30.3.2012. 31.01.14. Final bill under GC/ New Major Bridge tender Packet CE/C-GC/JP Maheshwar rao, Ext. process. NWR/ of span 12 X 6.10 system /2012- C-58, Road No. 1, 31.01.14 2011/T- m (Km. 319/6-7) 13/JP-SIKR- Film Nagar, Jublee and strengthening 14 CUR & Hills, of Bridge no. 165 (3x6.10 M at Km. SIKR-LHU Hyderabad 268/5-6) and PSC dt. 04.07.12 Slabs as super- structure including earth work in approaches and other ancillary works in Sikar- Loharu section in connection with Jaipur-Sikar- Loharu & Sikar- Churu Gauge conversion Project. 2 DY.CE /C/ Dismantling of Open 16.12.11 Single 20.01.12 02 - - YES 16/NWR/Dy. M/s Bharwal Lal 511.17 06.03.13 20.7.2012 GC/ existing MG track, tender Packet CE/C-GC/JP Bijarnia, Ext. NWR/ Laying and linking system /2012-13/JP- Villgae- Raipur, Post- 31.12.14 2011/T- of Broad gauge SIKR-CUR & Prewari, Distt. Nagour. main line, loop 18 SIKR-LHU dt. lines including points and 27.09.12 crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar - Loharu section Zone-II (Km. 267.50 to Km. 314.00) including , Nua & yards in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project 3 DY.CE /C/ Dismantling of Open 16.12.11 Single 18.01.12 05 - - YES 13/NWR/Dy. M/s Laxyo Energy Pvt. 473.94 06.03.13 20.7.2012 GC/ existing MG track, tender Packet CE/C-GC/JP Ltd., Ext NWR/ Laying and linking system /2012- 113, Bakhatgarh 31.12.14 2011/T- of Broad gauge 13/JP-SIKR- Tower, 10/A, New main line, loop 19 CUR & Plasia, Indore (MP) lines including 1 SIKR-LHU points and DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

crossings in yards, dt. spreading of 03.08.12. ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar - Loharu section Zone-III (Km. 314.00 to Km. 360.70) including Ratan Shahar, , & Loharu yards in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project. 4 DY.CE /C/ Dismantling of Open 16.12.11 Single 23.01.12 04 03 1. M/s Bhika L-4 12/NWR/Dy. M/s Shupal Kumawat, 330.97 04.04.13 06.9.2012 GC/ existing MG track, tender Packet ram Dev CE/ C- Rly. Contractor, Village 31.12.2014 NWR/ Laying and linking system rath, VPO- GC/JP & Post.- Badhal, Dhiarla, 2011/T- of Broad gauge /2012- Distt.- Jaipur. main line, loop Distt. 17 13/JP-SIKR- lines including Churu. points and 2. M/s Goel CUR & crossings in yards, Brothers SIKR-LHU spreading of Rail Infra dt. 03.08.12 ballast, tamping of PVT. Ltd., track, Bareilly. transportation of P. 3. Shri Nahar Way materials and Const. Co., other ancillary Jodhpur. works in Sikar - Loharu section Zone-I (Km. 237.50 to Km. 267.50) including Sikar & Nawalgarh yards in connection with Jaipur-Sikar- Loharu & Sikar - Churu Gauge conversion project. 5 Dy.CE/C/ Residual work of Open 12.6.12 Single 16.7.12 02 - - yes 18/NWR/Dy. M/s RSB Project 783.97 10.3.13 18.09.12 construction GC/2012/ tender Packet CE/C-GC/JP Limited, RSB Plaza, Ext. including addition system /2012-13/JP- SCO,30,31, Sector -16 30.04.15. T-26 and alteration of SIKR-CUR & Faridabad (Haryana) station buildings, Staff quarters, SIKR-LHU dt. passenger 22.11.12 platforms, platform surfacing, and all other ancillary works between Jhunjhunu (excl.)- Loharu (incl.)

2

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

stations of Sikar- Loharu section in connection with Jaipur-Sikar- Loharu & Sikar- Churu GC project

6 Dy.CE/C/ Residual work of Open 14.6.12 Single 17.7.12 01 - yes NWR M/s RSB Project 1213.13 20.3.13 25.09.12 construction GC/2012/ tender Packet /S&C/CA/11 Limited, RSB Plaza, Ext. including addition system 9 SCO,,30.31, Sector - 30.04.15 T-9 and alteration of dtd.20.11.1 16 Faridabad station buildings, Staff quarters, 2 (Haryana) passenger platforms, platform surfacing, and all other ancillary works between Sikar(Incl.)- Jhunjhunu (incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar- Loharu & Sikar- Churu GC project 7 Dy.CE/C/ Residual earth work Open 11.7.12 Single 14.08.12 02 - - yes 19/NWR/Dy. M/s Bharwal Lal 119.22 03.01.13 21.09.2012 GC/2012/ in bank, Cutting and tender Packet CE/C-GC/JP Bijarnia, Ext. lead bank utilising system /2012-13/JP- Jaulsa Kua Road, Near 30.11.14. T-28 cut spoils for SIKR-CUR & Tagore B. Ed. College, widening/constructio SIKR-LHU dt. Tegore Nagar, n of BG formation 21.12.12 Kuchaman City, Distt. including side Nagour. drains, trolley refuses, cess wall etc. and other ancillary works between Sikar(Incl.)-Loharu (Incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project. 8 Dy.CE/C/ Residual work for Open 11.7.12 Single 14.8.12 01 - - yes 21/NWR/Dy. M/s Surabhi 301.79 26.02.13 03.10.12 construction of GC/2012/ tender Packet CE/C-GC/JP Maheshwar rao, Ext. minor bridges system /2012-13/JP- C-58, Road No. 1, 31.12.2014 T-29 including SIKR-CUR & Film Nagar, Jublee . dismantling of existing bridges, SIKR-LHU dt. Hills, construction of 19.01.13 Hyderabad return/wing walls, launching of already casted &

3

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

transported RCC box and other ancillary works between Sikar(Incl.)- Loharu (Incl.) and Sikar(Incl.)-Churu (Incl.) stations of Sikar- Loharu & Sikar – Churu section in connection with Jaipur-Sikar- Loharu & Sikar- Churu GC project. 9 Dy.CE/C/ Providing in situ Open 06.07.12 Single 07.08.12 03 - - yes 22/NWR/Dy. M/s Creative 141.22 19.02.15 20.12.12 Glued joints of G- GC/2012/ tender Packet CE/C-GC/JP Engineers, 3 ( L) type as per system /2012-13/JP- F-189, Road NO. 5, I. T-27 RDSO drawings SIKR-CUR & P. Industrial Area, for 60 kg & 52 kg rails with all SIKR-LHU dt. Kota. fittings etc. 22.02.13 complete in Jaipur - Sikar -Loharu & Sikar - Churu section in connection with Jaipur - Sikar - Loharu & Sikar - Churu 10 Dy. CE Construction Open 10.12.12 Single 11.01.13 06 - - Yes 28/ NWR/Dy. M/s Rishab 695.22 07.10.13 05.04.13 including /C/ tender Packet CE/C-GC/JP Construction (Pvt.) Ext.31.12.1 Fabrication of system /2012-13/JP- Ltd. 4. GC/NWR/ FOBs and SIKR-CUR & 53-54, Shopping platform shelters 2012/T- in SIKAR-LOHARU SIKR-LHU dt. Centre, 24R-1 section in 27.07.13 Janata Colony, connection with Jaipur JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project. 11 Dy. CE Supplying and Open 01.08.13 Single 05.09.13 02 - - Yes 30/ NWR/Dy. Rajesh Kumar Gupta, 353.05 20.05.2014 27.11.2013 stacking 65mm /C/ tender Packet CE/C-GC/JP Railway Contractor, Ext.30.09.1 gauge stone system /2013-14/JP- 54, Nehru Nagar, Kush 4. GC/NWR/ ballast machine SIKR-CUR & Marg, crushed (hard 2013/T- stone) conforming SIKR-LHU dt. P. O. - Alwar (Raj.) 37 to RDSO 20.12.13 301001 specifications at Nawalgarh, Jerthi Dadhiya station on Sikar - Loharu section in connection with Jaipur-Sikar- Loharu and Sikar- Churu Gauge Conversion project.

4

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12 NWR/S&C Construction of Open 02.09.13 Two Packet 14.10.13 01 - - Yes NWR/S&C/CA M/s Park 4316.25 11.12.2015 27.01.2014 Road Under /LHS/ tender system /131, dt. Infrastructure Limited, Bridge/Limited 05.03.2014 101-B, Pocket –A, SIKR-LHU Height Sub-way in Ashok Vihar, Phase-II, lieu of level /T/4 crossing (36 no) Delhi – 110052 between Km. 274 to 311 in Sikar – Loharu section. 13 NWR/S&C Construction of Open 02.09.13 Two Packet 09.10.13 01 - - Yes NWR/S&C/CA M/s Park 3309.22 11.12.2015 20.12.2013 Road Under /LHS/ tender system /132, dt. Infrastructure Limited, Bridge/Limited 05.03.2014 101-B, Pocket –A, SIKR-LHU Height Sub-way in Ashok Vihar, Phase-II, lieu of level /T/5 crossing (27 no) Delhi – 110052 between Km. 311 to 360 in Sikar – Loharu section. 14 Dy. CE Construction of Open 09.10.14 Single 12.11.14 08 - - Yes P. G. Not yet M/s Ramswaroop Jat, 411.13 17.06.2015 11.01.2015 /C/ GC/ toe wall, Pitching tender Packet submitted. 295-B, Taru Chhaya NWR/ on high bank, system Nagar, 2014/T- Road works at Tonk Road, 47 Level Crossings and other misc. Jaipur works required between Sikar (including) to Jhunjhunu (excluding) stations for successful commissioning of the Sikar-Loharu section in connection with Jaipur-Sikar- Loharu and Sikar- Churu Gauge Conversion Project. 15 Dy. CE Construction of Open 17.01.15 Single 17.02.15 05 - - Yes P. G. Not yet M/s Jai Mata Di Energy 323.78 10.09.15 /C/ GC/ toe wall, Pitching tender Packet submitted. Systams, NWR/ on high bank, system V. P. O. - Narodara, 2014/T- Road works, Teh. - Laxmangarh, 48R construction of Over Head water Distt.- Sikar (Raj) Tank at Jhunjhunu & Chirawa and other misc. works from Jhunjhunu (incl.) to Loharu (incl.) required for successful commissioning of the Jhunjhunu- Loharu section in connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion 5

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Project.

DY. CE/C/III-JP

1 Construction Open Two bid 15 07 08 Yes CPM/JP/KTT/ M/s Jugendra Singh 2.98 crore 04.01.2000 01.06.01 31/3/04 Final bill passed strengthening and tender system CA/16 dated & Co., Etah. in June-2015. rebuilding minor 15.02.2000

bridges between . Nadbai- Bharatpur

AF/BKI/GC/JP/4R

29.04.99

2 Laying and linking Open One bid 5 1 4 Yes NWR/S&C/CA M/s RSV Construction 1.83 crore 01.03.05 5.11.04 31.5.05 Reply of BG track between tender system /51 dated Hyderabad technically check

BTE- AH section 04.01.05 received on 24.7.15 from Sh. J.K. Jain. Final bill/ Final variation is

under technically

check. AF/BKI/GC/ JP/68 AF/BKI/GC/

24..04.04 27.09.04 3 Laying and linking Open One bid 5 1 4 Yes NWR/S&C/CA M/s Engipress Rail 1.58 crore 25.02.05 28.10.04 30.11.05 Final bill awaited BG track between tender system /49 Link, Gwalior from AEN/C/AWR

BTE-AH section dated24.12.0 & (Sh. S.K.

9 4 Mittal ) .

AF/BKI/GC/JP/6

24.04.04 27.9.2004

4 Welding of rail Open One packet 3 1 2 Yes, Dy. M/s Thermit 1.02 08/3/04 12/10/03 30/06/04 Final variation

joints bet. BKI- KL tender system CE(C)JP/CA/7 Corp Ltd., Kanpur under finance

section 7 dated Crore vetting. /36

07.10.03

AF/BKI/GC

- 09.06.03

5 Const/ Extension Open One packet 03 - 01 Yes Dy CE/C- M/S Sanjeev Brothers, 4.16 22/4/09 22/02/09 31/12/11 Work Stopped by

of FOB&PF shelter tender system JP/CA/224 dt. Jaipur. contractor, Case

- shed bet. RE-HIS. 19.03.09 Lakhs is under Arbitration.

HIS

RE/Doubling/2

24.07.2008 25.08.2008

6

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

6 Construction of Open One packet 05 - 01 Yes NWR/S&C/CA M/s ARSS- Triveni(JV) 50.81 24/2/10 03/11/08 31/10/12 Work completed. Major Bridge minor tender system /101 dated Bhubaneshwar Final bill/Final bridge R/wall earth 23.10.08- Crore variation under work station technical check

building ballast since 24.8.2014

supply , track

linking etc.

21 21 &

RE/Doubling/1

22.07.2008

-

HSI

23.04.2008

7 Construction Open One packet 06 - 01 Yes NWR/S&C/CA M/s ARSS Infra 21.24 02/07/09 27/10/08 31/05/12 Work completed station building tender system /102 dated structure project Ltd. Final bill under

Misc. structure 23.10.08 Bhubaneshwar Crore process. Material

ballast supply track (Orissa) statement under

linking etc. cheking.

HSI/Doubling/6 -

21.02.2008 23.04.2008 AWR

8 Construction of Open One packet - Yes Dy 4.75 28.02.2015 28.5.13 28.2.15 Work physical 53 - ROB- 53-B on tender system CE/C/IIII/JP Crore completed. Biwani- Rohtak /CA/242 dt. line. 11.9.2013

M/s Shree Goutam

Construction Co. Ltd.

NWR/S&C/T/1/ROB 9 Construction of One packet Dy M/s Shree Shayam 1.93 31.3.20154 1.6.13 Work physical RRI building at system CE/C/IIII/JP Engg. Crore completed

satroad & Bhiwani Yes /CA/241 dt. sattion yard. 13.8.2013

Building. Open -

tender

NWR/S&C/T/1/RRI NWR/S&C/T/1/RRI

10 Construction 118 Open Two packet - Yes NWR/S&C/C M/s V.K. Sood 19.27 Crore 3.2.15 1.1.14 - Work terminated Qtrs DFCCIL tender system A/127 dated Engineers & on 07.8.2015 25.6.13 contractors

NWR/S&C/T/1/RR

7

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

11 Construction of Open Two packet - Yes NWR/S&C/C 34.28 crore 26.4.16 27.10.14 - Work in officers Qtrs at tender system A/140 dated progress. jagatpura 28.12.14 M/s Harinarayan Khandelwal

NWR/S&C/T/39

12 - Construction of Open Two packet - Yes Work in FL

- road under tender system progress. bridges / limited height subways (35 Nos) in

Rewari–Phulera( Madar/T/1

RPC) section

NWR/S&C/LHS/RE

13 - Construction of Open Two packet - Yes Work in FL

- road under tender system progress. bridges / limited height subways (32 Nos) in Rewari

– Phulera( RPC) Madar/T/2

section

NWR/S&C/LHS/RE

8

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Dy. CE/C/II-JP

Dausa-Jaipur Doubling Project. 1 JP-DO/ Construction of Open - Single 29.11.06 2 M/s. 1 YES Dy.CE(C)- M/s. Sanjeev 130.02 15.4.08 14.2.07 15/04/08 Under Doublin FOB bet. DO-JP tender Packet Sanjeev II/JP/CA /4 Brothers Jaipur Extended preparation. g/8 section System Brothers dt.18/4/07 upto Jaipur 15/10/2010

2 DO-JP- Welding of 52Kg. Open - Single 31/07/07 1 M/s. ITC, 0 YES Dy.CE(C)- M/s. ITC, Kanpur. 341.22 18/02/09 20/06/09 18/02/09 Physically FL/ /60Kg. Rails tender Packet Kanpur. II/JP/CA /4 Extended completed. Doublin System dt.18/4/07 upto g/16 30/04/2011

3 NWR/S Construction of Open _ Single 16/09/201 Modi YES NWR/S&C/ Modi 1724 26/04/201 02.01.2012 Extended Final bill under &C/JP- Minor Bridges , tender Packet 1 Construction CA/116 Construction(JV) 3 upto process with SIKR - Wing /Return System (JV) Jaipur Dated Jaipur 31/10/13 SE/C/W/JP LHU walls.E/work in 27/03/201 &SIKR- formation 2 CUR/GC construction /T/5 RR including addition altretation of stn. Bldg. Passanger platforms etc.Bet RGS -SIKAR

4 NWR/S Staking out Open _ Single 20.12.201 M/S Surbhi YES NWR/S&C/ M/S Surbhi 946 Lakhs 01.09.2012 08-01-2012 Extended work in progress &C/JP- alignment , tender Packet 1 Enterprises CA/118 Enterprises upto SIKR - conducting System Jagatpura Dated Jagatpura Jaipur. 31/12/13 LHU geotechnical Jaipur. 25/07/12 &SIKR- investigation CUR/GC design of the /T/ sun/super 01(geot structure of minor ech) & major bridges , prepration of GAD got minor &Major bridges etc

9

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

5 NWR/S Carrying out Open Single 17.02.12 6 C.S.Engineer no NWR/S&C/ 19.30 lacs 25/09/12 Extended Final bill under &C/ROB Geotechnical tender Packet s & CA/127 extended up upto process with /Design investigation and System consulants Dated to 30/03/14 31/08/14 SE/C/W/JP - consultancy work Delhi 12 25/06/201 Drg/T/1 for Road 3 Over/Under Bridge (ROB/RUB) for Railway span including detail design (foundation, sub structure and super structure), preparation of GAD and working drawing as desired in scope of work of 3 ROBs on LC No.C-149 (at Phulera in Ringus – Phulera section), LC No.323/A (Jodhpur- Samdari- Barmer section), LC No.61-A (at Rewari in Rewari – Alwar section) and 2 RUBs on LC No.232 & 234 (in Jaipur – Phulera section). 6 NWR/S Construction of Open double 20/12/201 V.K.Sood YES NWR/S&C/ V.K.Sood Engineers& 15.36 04-10-2014 22/04/2013 Extended Work in progress &C/JP/R Road Under Bridge tender Packet 2 Engineers& CA/127 Contractor Panchkula Crores upto UB- including providing System Contractor Dated 31/12/2015 82&83/ road approaches, Panchkula 25/06/13 T-1]: covering shed, retaing wall, pedestrian path way, height gauge, drainage arrangement, sump etc complete in lieu of level crossing No.- 82 & 83 in Jaipur - Sawai Madhopur Railway section.

10

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

7 Tender Construction of 2 Open Single 27/02/13 M/s Biharilal YES M/s Biharilal Meghani 6.50 crores 29/04/2014 16/05/2013 Extended Final bill under No. lane Road over tender Packet Meghani New Delhi upto process with NWR/S bridge (3span) System New Delhi 30/05/2015 SE/C/W/JP &C/RPC with RCC deck slab /ROB- on composite &PSC 149 girder super C/T-01 structure including pile foundation & RCC sub structure & related allied works, in lieu of Level crossing No.C-149 at Km 212/0 - 1 near Phulera in Rewari - Ringus - Phulera (RPC) section.

8 Tender “Fabrication & Open Single 10.10.201 2 M/s. M.H. YES M/s. M.H. Khanusiya, 7.17 cores 16.09.2015 Work in progress No. erection of tender Packet 4 Khanusiya, Himmatnagar- NWR/S structural steel System Himmatnaga 383001, Dist. S.K. &C/FL covering shed r-383001, (Gujrat) Shed/T/ including gantry for Dist. S.K. 1 EOT cranes (Gujrat) alongwith Pway track for freight examination & stabling line with and without inspection pit and construction of misc. offices, minor bridge and other ancillary structures etc complete in connection with re orgnisation of freight train examination facility at Phulera

11

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CE/C/II-JP

Dy. CE/C/UDZ

1 T.NO. Construction of Open 19.11.10 Single 21.12.10 2 Yes NWR/S&C/ M/S Om Prakash 1568 29.11.12 10.08.11 Work in UDZ- Major bridges from CA/111 Goyal & Co., 31.12.14 Progress HMT/ DNRP-HMT in dtd. 9.9.11 Neemach 30.06.15 MB/T/1 connection with 31.12.15 UDZ-HMT section GC Project .

2 T.NO. Const., minor Open 19.11.10 Single 21.12.10 3 Yes NWR/S&C/ M/s Braham Prakash 1212.6 21.09.12 30.04.11 Work in UDZ- bridges & earthwork CA/109 ModiRavi Constn.Co. 804.33 27.6.13 Progress HMT/GC from Km. 160/0 to dtd. (JV) , Jaipur 31.03.14 /MB/T-2 187/0 in 16.8.11 30.09.14 connection with 31.03.15 UDZ-HMT Section 31.08.15 GC Project 31.12.15

3 T.NO. Construction of Open 02.01.11 Single 04.02.11 7 Yes NWR/S&C/ M/s Rahee-Triveni 3045.2 07.02.13 23.08.11 Work in UDZ- Minor bridges & CA/113 (J/V), Kolkatta 2343.48 30.11.13 Progress HMT/GC earthwork form dtd. 31.07.14 /EW/T/4 Km. 207/0 to 250/0 21.10.11 31.03.15 in connection with 31.12.15 UDZ-HMT section GC Project .

4 T.NO. Construction of Open 17.07.12 Single 23.8.12 03 - - Yes NWR/S&C/ M/S M.G. 1919.40 6.02.14 27.11.12 Work in UDZ- Minor bridges & CA/1223 Contractors, Pvt., 2120.31 31.12.14 Progress HMT/GC/ earthwork from dtd. Ltd., Panchkula 30.06.15 EW/T/11 Km.187/0 to 207 in 23.01.2013 31.12.15 connection with UDZ-HMT section GC Project 5 T.NO. Construction of Open 17.07.12 Single 23.8.12 03 - - Yes NWR/S&C/ M/S Ravi Infrabuild 3517.86 30.11.14 03.11.12 Work in UDZ- Minor bridges & CA/ 123 Projects Pvt, Ltd., 4383.64 31.03.15 Progress HMT/GC/ earthwork from dtd. sector-11, Udaipur 31.08.15 EW/T/12 Km. 250/0 to 270/0 13.02.1013 30.09.15 in connection with 30.11.15 UDZ-HMT section GC Project 6 Tender Construction of Open 27.10.12 Two bid 5.12.12 05 04 01 Yes NWR/S&C/ M/S M.G. 5652.54 30.04.15 21.05.13 In progress No. UDZ- Limited Height Sub- system CA/ 126 Contractors, Pvt., 6242.99 31.01.16 HMT/LHS way in lieu of Level dtd. Ltd., Panchkula /T-14 crossings (63Nos) in 19.06.2013 Udaipur- Himmatnagar section

12

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

7 UDZ- Provision of Open 14.08.14 Single 17.09.14 05 NA NA Yes Dy.CE/CUD M/S Ravi Infrabuild 499.75 13.06.15 10.11.14 Work HMT/GC/ additional pit line at Z/CA/23 Projects Pvt, Ltd., 13.08.15 Completed PIT- Udaipur s dt. sector-11, Udaipur 13.08.15 LINE/T- 06.01.15 13.10.15 16 8 UDZ- Construction of Open 14.8.14 Single 17.09.14 05 NA NA Yes Dy.CE/CUD M/S A.R. 108.26 16.06.15 20.10.14 Work in HMT/GC/ officer Rest house Z/CA/22 Construction 16.08.15 Progress ORH/T- in ORH campus at dt. New Delhi- 15.10.15 17-R Udaipur 09.12.14 31.10.15

9 UDZ- Substructures of Open 13.11.14 Two bid 17.12.14 05 02 Yes NWR/S&C/ M/s Murali Krishna 4930.68 23.04.17 09.05.15 Work in HMT/GC/ major bridges from system CA/ 142 Const. Co, progress MB/T-13- Udaipur to dtd. Hyderabad R-1 Dungarpur. 30.06.15

10 T. No. Construction of Open 08.05.15 Two bid 12.06.15 03 02 01 Yes - M/S M.G. 6502.92 13.03.17 - Work in UDZ- Minor bridges & system Contractors, Pvt., Progress HMT/GC earthwork from Ltd., Panchkula /EW/T- Km. 121/0 to160/0 20 in connection with UDZ-HMT section GC Project 11 T. No. - Construction of Open 08.05.15 Two bid 12.06.15 06 01 05 Yes - M/s Royal Infra 2706.07 19.04.17 - Work in UDZ- Minor bridges & system Engineering Pvt. Ltd., Progress HMT/GC earthwork from Surat /EW/T- Km. 270/0 to 3-R 320/0 in connection with UDZ-HMT section GC Project

13

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Dy. CE/C/Dungarpur

1. Dy.CE/C Carrying out final Open 1/6/11 & Single 15-07- 10 NA NA Yes NWR/S&C/ M/s S.M.Consultants, 4.99 Cr 13/11/12 14/11/2011 - Work in progress /UDZ/D location of survey & 30/6/11 2011 CA/114 Dt. Bhubneswar Extended NRP- ….other preliminary (NIT & First 27-02-12 up to RTM/FL activities in corrigendum 31.12.2015. S/2011/ connection with ) T/1 new BG line between DNRP- RTM via Banswara

2. Dy. E/W in cutting and Open 23-01-2013 Two 06-03- 15 5 10 Yes NWR/S&C/ M/s Nayak 56.74 Cr. 09-07-15. 06-11-2013 - Work in CE/C/D filling for formation Packet 2013 CA/129 Infrastructure Pvt. Further progress. NRP/ & all other ancillary Dt. 31-10- Ltd., Guwahati extended RTM- works etc. from 13 upto DNRP/E Km. 0.00 to Km. 09.07.2016 W/ 17.00 between NL/T-8 Dungarpur-Nawa Gaon station in c/with DNRP-RTM New BG Rail Line Project.

3. T. No. – Const. of minor Open 10-09-2013 Two 23-10- 8 6 2 Yes NWR/S&C/ M/s Gannon 38.06 Crore 03-04-2016 14.11.2014 - Work in Dy. bridges, RUB & Packet 2013 CA/137 Dt. Dunkerley & Co. Ltd., progress. CE/C/ other ancillary 30-06- Ahmedabad (24 months) DNRP/ works etc. from 2014 RTM- Km. 0.00 to 17.00 accepted DNRP/M bet. Dungarpur to on B/NL/T/ Nawa Gaon 04.04.2014 10 stations in c/with DNRP-RTM New BG Rail Line Project.

Dy. CE/C/RTM

1. Construction of Open 23.10.13 Single 12.12.13 3 Nos. - - Yes Dy.CE/C/ M/S Kirti Rs. 124.14 09.09.14 11.03.14 Work is in - Office RTM/CA/ Contractors & Lacs Extension progress.

Accommodation 02 Engineers, 168, given up

9

- for Dy.CE/C/RTM dt.21.04.14 Samta Parisar, 31.10.15 & Officers Rest Ratlam (MP) House at Ratlam in c/w Construction of

RTM/NL/T New BG Line between DNRP-

RTM via Dy.CE/C/BNSW/DNRP Banswara.

14

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

2. Construction of

2 2 minor

- 380006

bridges,Road -

303,Prema 303,Prema -

under bridges

(RUB) & other

ess.

RTM/NL/T ancillary works

-

from 142.85 to

-

163.00 km 6.2014

Yes

01No

Open 5 Nos. 5

between Chotti Twobid

23.07.14

16.0 17.12.2016 10.08.2015 Sarvan -Shivgarh Rs.42.89Cr

stations in c/w Workin is progr Construction of

DNRP-RTM via NWR/S&C/CA/141 16.03.2015 dated Dy.CE/C/RTM/DNRP

Banswara.New BG Near House, Doctor Opp Acrcade,3rd Floor, Parimal Crossing,C.G.Road,Ahemdabad Parimal

Rail line project M/S301 DunkerleyCo.Ltd. & Gannon

3. Earth work in 3 - cutting and filling for formation as per BG standard

profile,

RTM/NL/T

-

3 Construction of

- RCC box type

bridges and all 370110(Gujarat) -

other ancillary

RTM/NL/T

works i.e. retaining

-

wall, drain, toe

wall, stone

Yes Open

pitching etc from 06(six)

02(two)

04(four)

Two bid Two

26.03.15 06.09.2017 Km.142.85 to 05.05.2015

163.00 km 07.09.2015 dated between Chotti Rs.53,66,81,489.48 Sarwan &

Dy.CE/C/RTM/DNRP Shivgarh stations in connection with Ratlam - Dungarpur via

Banswara New BG Pvt.Ltd.,New Anjar MMSInfratech

line project. letter Dy. no. Ce/C/RTM/DNRP Acceptance

Dy. CE/C/BNSW

- NIL -

15

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CE/C/III-JP

DY. CE/C/I-Aii

Const. & fabrication of various sheds with or No, without tracks for EOT Tender 22/04/2012, cranes of different awarded 06/11/2012, capacity and to 2nd NWR/S&C/ 30/06/2013, construction of offices, M/s Era M/s Bharat Span- GPT lowest CA/31 3829.48 31/12/2013, 1 Toilets including laying Open 25.08.09 Single 28-10-09 08 Nos. Infra Engg. - (JV) 43 Industrial 27/03/2010 - Work completed. tenderer, Dt. Lakhs 31/12/2014, of BG tracks and Ltd. Noida. Area, Jhotwara, Jaipur after 17-06-10 31/03/2015 dismantling of existing Tech. & structures/sheds, evaluation 30/06/2015 BG/MG tracks in c/with of L-1. AII/Const/ Loco/Mod/T/1 AII/Const/ Modernisation of Loco Workshop at Ajmer.

Const. & fabrication of various sheds with or without tracks for EOT cranes of different M/s Prem Fabricators 05/12/2012, capacity and NWR/S&C/ 301 Meera Manon 31/12/2013, construction of offices, CA/34 Arcude, Near Krupa 1524.97 30/07/2014, 2 Toilets including laying Open 14.06.10 Single 07-07-2010 - - - Yes dated 05/09/2011 - Work Completed. Petrol Pump, Parimal Lakhs 31/10/2014 of BG tracks and 07/09/201 Garden, Ellis Bridge, & dismantling of existing 1 Ahmedabad. 31/12/2014 structures/sheds, BG/MG tracks in c/with Modernisation of C&W

AII/Const/ C&W/Mod. /T/3/R1 C&W/Mod. AII/Const/ Workshop at Ajmer.

Construction of major 18/07/2012, bridge including earth NWR/S&C/ 31/12/2012, work on the CA/38 M/s SB-SHC-MCDPL Rs. 31/08/2013, approaches between Work Completed,

3 NL/T/2 RAS/ Open 03.11.10 Single 10.12.10 07 Nos. - - Yes dated (JV) C-10, Vaishali 1592.08 31/01/2014, 23/07/2011 - - BNGM (Excl.)-RAS final bill passed. 09/12/201 Nagar, Jaipur. Lakhs 31/03/2014 (incl.) section in c/with 1 & BNGM-RAS New B.G. 31/05/2014

Rail Line Project. AII/BNGM

16

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

30/10/2012, 31/03/2013, Earthwork in NWR/S&C/ M/s Jandu 31/07/2013, bank/cutting and CA/39 Rs. Work Completed, Construction Co. 305, 31/10/2013, 4 construction of minor Open 12.07.11 Single 03.08.11 07 Nos. - - Yes dated 1060.43 1011/2011 - final bill under

Model Town Mandi, 31/01/2014, RAS/ NL/T/3(R) RAS/

- bridges between Km. 16/01/201 Lakhs preparation. Adampur Hisar 30/04/2014 0.00 to 10.50 2 &

31/10/2014

AII/BNGM

Earthwork in bank/cutting and 16/06/2012, construction of minor 31/12/2012, 15/05/2014 bridges including NWR/S&C/ M/s Jai Mata Di Energy 31/05/2013, ancillary works CA/37 System (JV) VPO- Rs. 30/09/2013, Work Completed.

5 NL/T/4 RAS/ beween Bangurgram- Open 16.12.10 Single 24.01.11 10 Nos. - - Yes dated Narodara, Tehsil - 1103.49 31/12/2013, 29/06/2011 - Final bill passed. RAS 08/12/201 Laxmangarh Sikar Lakhs 28/02/2014, (Km. 10.50 to 20.50) 1 (Raj.) 30/04/2014 section in c/with & Bangurgram-RAS new 15/05/2014 AII/BNGM BG Rail Link Project.

Earthwork in 19/06/2012, bank/cutting and 31/12/2012, construction of minor 30/06/2013, bridges including NWR/S&C/ M/s Jandu 31/10/2013, ancillary works CA/36 Work Completed, Construction Co. 305, Rs. 825.62 28/02/2014,

6 NL/T/5 RAS/ beween Bangurgram- Open 16.12.10 Single 24.01.11 08 Nos. - - Yes dated 04/07/2011 - final bill under - Model Town Mandi, Lacs 30/06/2014, RAS (Km. 20.50 to 08/12/201 preparation. Adampur Hisar 30/09/2014, 28.50) section in 1 31/12/2014 c/with Bangurgram- & RAS new BG Rail Link

AII/BNGM 31/03/2015 Project.

17

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Supplying and Stacking machine Dy. crushed stone track CE/C/AII/B 25/12/2012, Ballast in stacks as per M/s Rajesh Kumar NGM- 31/03/2013, Railways’ specifications Gupta, 54, Nehru Rs. 406.50

7 NL/T/8 RAS/ Open 19.08.11 Single 27.09.11 4 Nos. - - Yes RAS/NL/CA 30/06/2013 08/02/2012 - Final bill passed. - between Km. 0.00 to Nagar, Kush Marg, Lacs /73 dated & 28.50 [Bangurgram to Alwar(Raj.) 12/03/201 30/09/2013 Ras] in connection 2 with Bangurgram - Ras

AII/BNGM new rail line project.

Construction of Road

under Bridges & Road 335944842.45 Over Bridges including 21/10/2013, NWR/S&C/ M/s. Varaha Infra Ltd., earth work & Road 28/02/2014, CA/46 Umesh Smriti, 6- work on the 30/06/2014,

8 RAS/NL/T/12 Open 13.08.12 Single 21.09.12 6 Nos. - - Yes dated Jalam Vilas Sceheme, 23/11/2012 - Work completed.

- approaches & 30/11/2014 24/12/201 Paota, B-Road, miscellaneous works in & 2 Jodhpur (Raj.) connection with 31/05/2015 Bangurgram-Ras New

AII/BNGM BG line project

Laying and linking of

Broad gauge main line, 66749882.09 loop lines including points and crossings in yards, spreading of ballast, tamping of Dy. 17/09/2013, track, transportation of CE(C)/AII/ 28/02/2014, M/s. Bhanwar Lal P-way materials, BNGM- 31/05/2014, Bijarnia, Village- Work in 9 construction of station Open 05.10.12 Single 09.11.12 1 Nos. - - Yes RAS/CA/85 30/09/2014, 02/09/13 - Rajpura, Tehsil-Nawa, progress. RAS/NL/T/11 R2 RAS/NL/T/11 building & platform dated 31/01/2015 - District-Nagaur (Raj.) and other ancillary 20/11/201 & works between 3 31/05/2015 Bangurgram and Ras

stations in connection AII/BNGM with Bangurgram-Ras New Broad Gauge Line Project.

18

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

R

- Construction of staff Quarters including electric work, Under NWR/S&C/

Ground Water Tank, M/s. RSB project 248670141.36 17/08/2014, CA/53 Road work, Boundary Limited, RSB Plaza, 31/05/2015 Work under 10 Open 11.10.12 Two Bid 19.11.12 2 Nos. - - Yes dated 13/03/13 - Wall etc. between SCO 30-31, sector-16, & progress. 05/07/201 Madar-Guriya Section Faridabad-121002 30/11/2015 3 in connection with shifting of utilities for

DFCCIL.

AII/Const./DFCCIL/T/1

R2 -

Shifting of track NWR/S&C/

M/s. Ravi Infra build 321699681.79 between Madar & CA/60 04/02/2015 Pvt. Ltd., 95, Hiran Work under 11 Durai stations & Open 17.04.13 Two Bid 02.04.13 4 Nos. 1 No. 1 No. Yes dated & 14/12/13 - Magri, Sector-11, progress. shifting MG yard at 26/12/201 30/04/2016 Udaipur

Marwar Jn. i.c.w. DFC. 3

AII/Const./DFCCIL/T/3

NWR/S&C/ M/s. Rama Construction of station CA/61 Construction 05/03/2015 building & staff 411703686.34 Work under 12 Open 10.01.13 Two Bid 15.02.13 9 Nos. 5 Nos. 5 Nos. Yes dated company, H-240, & 15/09/13 - quarters in c/w shifting progress. 27/12/201 Ashok Vihar Phase-I 31/12/2015 of utilities for DFCCIL.

3 New Delhi

AII/Const./DFCCIL/T/6

Providing Limited Height Subways in lieu of existing Level NWR/S&C/ Crossings between CA/64 M/s. Lall Construction Madar & Haripur 457717339.35 Work under 13 Open 10.06.13 Two Bid 17.07.13 01 Nos. - - Yes dated Co. AA-105, Shalimar 15/12/2015 18/02/14 - stations of Madar - progress. 20/02/201 Bagh, Delhi-110088 Marwar Section in 4 connection with

elimination of existing AII/Const./LHS/T/3 level crossing gates.

19

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1.0 JCC Infra Projects Pvt. Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.)2.0 Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur- 3020123.0 M/s. B. L. Infra Projects Pvt. Ltd., B-8/6, Improvement to Sector-3, drainage system in Rohini, New Loco Workshop by the Delhi - construction of drain 110085. using mostly pre-cast M/s. Satish NWR/S&C/ Prem Fabricator's, RCC units including & Amit Infra CA/70 426, Near Jyoti Power, 07 03 1326.88 Work in 14 launching. Work also Open 21/10/14 Two Bid 26/11/14 Structure Yes dated Behind Steel Town, 04/02/2016 17/02/2015 - (Seven) (Three) Lakhs progress. includes construction 2/108, Royal 29/07/201 Moriya, Chandgodar, of traverser path and Green, Near 5 Ahmedabad-382110 other ancillary works Sirsi Mod, in connection with Post office

AII/Const./Loco/Mod/T/7 Modernisation of Loco Sirsi, Workshop, Ajmer Jaipur.JCC Infra Projects Pvt. Ltd., 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) Bharat Spun Pipe & Construction Company, 43, Industrial Area, Jhotwara, Jaipur- 302012. M/s. B. L. Infra Projects Pvt. Ltd., B-8/6, Sector-3, Rohini, New 20

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1Delhi - 110085. M/s. Satish & Amit Infra Structure 2/108, Royal Green, Near Sirsi Mod, Post office Sirsi, Jaipur.

1.0 Varaha Infra Limited, Umesh Smriti-6, Jalam Vilas Scheme, Poata B. Road, Jodhpur (Raj.)- 342006. 2.0 Bharat Spun

Improvement to Pipe &

drainage system in Construction C&W Workshop by the Company, construction of drain 43, Dy. using mostly pre-cast Industrial Prem Fabricator's, CE(C)/AII/ RCC units including Area, 426, Near Jyoti Power, CA/91 948.74 Work in 15 launching. Work also Open 23/10/14 Two Bid 26/11/14 06 (Six) 04 (Four) Jhotwara, Yes Behind Steel Town, 21/01/2016 - - dated Lakhs progress. includes construction Jaipur- Moriya, Chandgodar, 30/07/201 of traverser path and 302012. 3.0 Ahmedabad-382110 5 other ancillary works JCC Infra in connection with Projects Pvt.

AII/Const./C&W/Mod./T/6 Modernisation of C&W Ltd., Workshop, Ajmer 761/30, Aklank House, Tikam Ganj, Ajmer (Raj.) 4.0 M/s. Raj Kumar Gupta Contractors, III-J/59, Nehru Nagar, Ghaziabad- 201001.

21

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Dy. CE/C/II-Ajmer

Ist Lowest

Earthwork in M/S Varaha 17/11/2011,

bank/cutting for

Infra Ltd., 31/03/2012,

formation between Umesh M/S Varaha Infra Ltd., 30/06/2012, Keshavganj (incl.) – Work Completed, Smriti-6 Umesh Smriti-6 Jalam 30/11/2012,

1 Swarupganj (Excl.) Open Single NIL Yes - final bill under KRJD/I/BG KRJD/I/BG

- Jalam Vilas

section in connection Vilas Scheme, Poata 31/12/2012, preparation.

14Nos.

24.09.10 Scheme, B. Road, Jodhpur 31/03/2013

with Keshavganj– 01/02/2011

896.90 Lacs. Doubling/T/3 Swarupganj Patch Poata B. ` &

AII/KVJ Doubling Project. Road, 30/05/2013

Jodhpur

01.11.10 NWR/S&C/CA/32 NWR/S&C/CA/32 21.07.11 Dt.

Dismantling of existing R

- BG track, laying and linking of Broad gauge main line, loop lines including points and 14/04/2012,

crossings at various st 30/09/2012,

I Lowest M/s yards, spreading of 30/04/2013, Laxyo Energy ballast, tamping of Ist Lowest M/s Laxyo 31/10/2013, Pvt. Ltd., 2 track, transportation of Open Single NIL Yes Energy Pvt. Ltd., 46/1, 30/05/2014, - Work under progress

46/1, TIT Dtd. SRPJ/BGD/CA/71 - P.Way materials and 6Nos. TIT Road, Ratlam (M.P.) 31/01/2015,

27.07.11 Road, Ratlam 05.12.2011

other ancillary works 22/10/2011 371.12 Lacs. 30/05/2015 (M.P.) `

between Keshavganj – & KRJD/I/BG Doubling/T/8 KRJD/I/BG

- Swarupganj (both incl.) section in connection 20/06/2015 with Keshavganj–

Swarupganj BG Patch AII/KVJ

Doubling Project. Dy.CE(C)AII/KVJ 02.09.11 Addition, alteration and

construction of S&T

R structures, Pass. - Platform, Platform

Shelters, station st Building, staff Quarters, I Lowest

water Huts, toilets, M/S Varaha 14/06/2013,

Hand Pumps, FOBs, Infra Ltd., 30/09/2013,

Level Crossing works, Umesh M/S Varaha Infra Ltd., 31/12/2013, Km Post, Gradient Smriti-6 Umesh Smriti-6 Jalam 30/04/2014, 3 Open Single NIL Yes - Work under progress

Posts & Hectometer Jalam Vilas Vilas Scheme, Poata 30/09/2014, 02Nos.

Posts etc. between 30.07.12 Scheme, B. Road, Jodhpur 31/01/2015,

23.10.2012 898.86 Lacs. Keshavganj – Poata B. ` 30/04/2015& Swarupganj (both incl.) KRJD/I/BG Doubling/T/14 KRJD/I/BG Road, 31/07/2015 - section and Officer Jodhpur Rest House at Aburoad

Station in connection NWR/S&C/CA/47 dated 24/12/2012 dated NWR/S&C/CA/47

AII/KVJ with Keshavganj– Swarupganj BG Patch

Doubling Project. 03.09.12

22

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Construction of Limited Height Subway in lieu of existing LC No. 101

(Km 548/5-6), LC No. 2nd Lowest

102 (Km 550/7-8), LC M/s. Ravi

No. 107 (Km 562/6-7), Infrabuild M/s. Ravi Infrabuild 11/05/2013, LC No. 109 (Km 568/9- Projects Pvt. Projects Pvt. Ltd. 10/12/2013, 10), LC No. 110 (Km Ltd. Office 4 Open Single NIL Yes Office 95, Hiran Magri 31/05/2014 - Work completed. 571/2-3) & LC No. 111 95, Hiran

2Nos. Sector-11, Udaipur- &

(Km 572/5-6) between 08.08.12 Magri Sector- 313002 (Raj.). 31/07/2014 19.12.2012

stations Keshavganj- 11, Udaipur- 1122.63 Lacs. `

AII/Const/LHS/T/1 Swarupganj of Marwar-

313002 PalanPur Section in (Raj.). connection with elimination of level

crossing gates.

19.09.12 NWR/S&C/CA/50 dated 21.02.2013 dated NWR/S&C/CA/50 Construction of Limited

Height Subway in lieu 1st Lowest

of existing LC No. 58, M/s. Ravi

60, 61, 62, 64, 65, 66, Infrabuild M/s. Ravi Infrabuild Projects Pvt. 67, 68, 69, 71, 72 & Projects Pvt. Ltd. 31/12/2014 73(13 Nos) between Ltd. Office 5 Open Single NIL Yes Office 95, Hiran Magri & - Work under progress

stations Marwar to 95, Hiran

Sector-11, Udaipur- 30/09/2015

Rani of Marwar- 01Nos. Magri Sector- 14/09/2013 21.02.2013 313002 (Raj.). Palanpur Section in 11, Udaipur- 179049792.55 connection with ` AII/Const./LHS/T/2 313002 elimination of level (Raj.).

crossing gates.

28.03.2013 NWR/S&C/CA/58 NWR/S&C/CA/58 18/11/2013 dated Earthwork in embankment for cutting & filling, Blanketing for bank, Addition, alteration and

construction of S&T

structures, Pass. 1st Lowest

Platform, Platform M/s. Braham

M/s. Braham Prakash 30/09/2014, Shelters, station Prakash Building, staff Quarters, Modi, 74 Modi, 74 30/04/2015,

6 water Huts, toilets, Open Single Sudarshanpu NIL Yes Sudarshanpura, 31/07/2015 - Work under progress MJ/BGD/T/1

- Hand Pumps, FOBs, ra, Industrial Industrial Area, &

07Nos. 30.08.12

TMC Rest house etc. Area, Baisgodam, Jaipur-06 30/10/2015 31/12/2012 3541.71 Lacs. between Guriya– Baisgodam, `

AII/GRI Marwar Jn. stations Jaipur-06 (both excl.) and Officer Rest House at Mawar Jn. Station in connection with Guriya- Marwar Jn. BG Patch

Doubling Project.

16.10.12 NWR/S&C/CA/51 dated 14/03/2013 dated NWR/S&C/CA/51

Construction of 1st Lowest Important/Major

M/s.PNC Bridges including

Infratech

earthwork, blanketing

Ltd.-Jain M/s. PNC Infratech on the approaches Construction Ltd.-Jain Construction between stations 28/01/2015 Company Company (JV) 761/30, Work under 7 Guriya to Marwar Open Single NIL Yes & -

MJ/BGD/T/2 (JV) 761/30, Aklank House, Near progress. - Junction with 31/12/2015

06Nos. Aklank Mal Godown, Tikam

06/12/2013 Railway’s/Contractor’s 21.01.2013

House, Near 324043284.89 design & drawing in Ganj, Ajmer ` Mal Godown, AII/GRI connection with Guriya- Marwar Junction BG Tikam Ganj,

Patch Doubling Project. Ajmer

26.02.2013 NWR/S&C/CA/62 dated 06/01/2014 dated NWR/S&C/CA/62 23

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Marking out of center line, taking levels including all details, Carrying out Geotech investigation, designing of foundation and sub – structures / super 2nd Lowest M/s. BPC structure of Minor / M/s. S. M. India,

Major bridges/LHS, Consultants, Nataraj 06/07/2013,

M/s. S. M. preparation of land 30/11/2013, Plot No.-130, Bhawan, Consultants, Plot No.- plans & proposal, S.M. Tower, P.O.Khamar 31/03/2014, Preparation of L- 130, S.M. Tower, 8 Open Single Mancheswar chandi, P.S. Yes 31/10/2014, - Work under progress section & yard plans Mancheswar Industrial Industrial Haripal, 30/04/2015

etc. & submitting 03Nos. Estate, Rasulgarh, 02/02/2013 17.09.2012 Estate, Dist.- detailed working 18338293.97 & Bhubneshwar (Odisha) ` Rasulgarh, Hooghly, 31/08/2015 AII/Const./FLS/T/1 drawings in connection with Bangurgram to Bhubneshwar West Guriya & Marwar to (Odisha) Bengal Rani Doubling projects and Various shifting of utility works of DFCCIL & LHS works between Kishangarh & Palanpur

stations.

09.11.2012 NWR/S&C/CA/57 dated 07/11/2013 dated NWR/S&C/CA/57 Flash butt Welding of 60/52 Kg. 1st Lowest

New/SH,(72/90 UTS )

M/s. The

Rail joints by using India Thermit M/s. The India Thermit mobile flash butt 18/03/2015 Corpn. Ltd., Corpn. Ltd., 84/22, 9 welding plant in Open Single NIL Yes & - Work under progress 84/22, Fazal Fazal Ganj, Kanpur-

connection with various 01No. 18/03/2016

Ganj, 208012 13/11/2013

sanctioned works of 11.10.2012 69904800.00 Ajmer unit of Kanpur- `

AII/Const/FBW/T/1 construction 208012.

organization.

19.11.2012 Dy. CE(C)/AII/FBW/CA/85 21/10/2013 dated Shifting of different utilities in connection with infringements in

DFCCIL alignment by

dismantling of service building, over head / 1st Lowest

underground water M/s. RSB

tank, diesel shed, cycle project

M/s. RSB project Limited, RSB 28/11/2014 stand etc. and Limited, RSB Plaza, 10 reconstruction of the Open Single Plaza, SCO NIL Yes & - - Work under progress SCO 30-31, sector-16, same utilities, 1No. 30-31, 30/09/2015 Faridabad-121001

construction of Road, 11.01.2013 sector-16, 307708356.73 boundary wall, drains, Faridabad- ` septic tanks, pathways 121002 AII/Const./DFCCIL/T/7 & extension of FOB's etc. as per requirement of shifted locations between Madar-

Palanpur section.

19.02.2013&22/04/2012 NWR/S&C/CA/54 dated 20/09/2012 dated NWR/S&C/CA/54

24

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Construction of staff 1st Lowest Quarters including M/s. RSB electric work, Under project M/s. RSB project 19/11/2014, Ground Water Tank, Limited, RSB Road work, Boundary Limited, RSB Plaza, 31/05/2015 11 Open Single Plaza, SCO NIL Yes - - Work under progress

Wall etc. between SCO 30-31, sector-16, &

01No. 30-31, Chandawal (incl.) – Faridabad-121002 31/10/2015

11.01.2013 sector-16,

Nana (incl.) Section in 294735233.22 connection with shifting Faridabad- ` 121002

AII/Const./DFCCIL/T/8 of utilities for DFCCIL.

19.02.2013&22/04/2013 NWR/S&C/CA/55 NWR/S&C/CA/55 20/09/2013 dated

Construction of staff Quarters including 1st Lowest

electric work, Under M/s. RSB

Ground Water Tank, project M/s. RSB project 19/08/2014, Limited, RSB Road work, Boundary Limited, RSB Plaza, 30/04/2015 12 Wall etc. between Open Single Plaza, SCO NIL Yes - Work under progress

SCO 30-31, sector-16, &

Nana (excl.) – 01No.

st./DFCCIL/T/9 30-31,

Faridabad-121002 30/11/2015 22/07/2013

Palanpur (excl.) 11.01.2013 sector-16, 187112204.24 Section in connection Faridabad- ` with shifting of utilities 121002

AII/Con for DFCCIL.

19.02.2013&22/04/2013 NWR/S&C/CA/56 NWR/S&C/CA/56 20/09/2013 dated -

Providing Limited 1st Lowest

Height Subways (19 M/s. Ravi

Nos.) in lieu of existing

Infrabuild M/s. Ravi Infrabuild level crossings Projects Pvt. between Rani & Two Projects Pvt. Ltd. Office Ltd. Office 13 Keshavganj stations of Open packet 03 (Three) Yes 95, Hiran Magri Sector- 18/05/2016 - Work under progress Marwar Jn. – Palanpur 95, Hiran

04Nos. 11, Udaipur-313002

system Magri Sector-

03/12/2014 section in connection 21.02.2013 (Raj.).

with elimination of 11, Udaipur-

Rs.3908.17Lacs AII/Const./LHS/T/5

313002 2015

existing level crossing -

gates. (Raj.).

13.08.2014 NWR/S&C/CA/66 NWR/S&C/CA/66 Dt. 27 02

Providing Limited 1st Lowest

Height Subways in lieu M/s. Ravi

of existing level

Infrabuild

M/s. Ravi Infrabuild crossings between Projects Pvt. Swaroopganj & Two Projects Pvt. Ltd. Office Ltd. Office

14 Palanpur stations of Open packet 03 (Three) Yes 95, Hiran Magri Sector- 18/05/2016 - Work under progress

95, Hiran Marwar Jn. - Palanpur system 11, Udaipur-313002

04Nos. Magri Sector- 18/12/2014 section in connection 21.02.2013 (Raj.).

with elimination of 11, Udaipur- Rs.3873.36Lacs. AII/Const./LHS/T/6 existing level crossing 313002

gates. (Raj.).

13.08.2014 NWR/S&C/CA/67 NWR/S&C/CA/67 dated 27/02/2015

1.0 M/s. Ashish Constructio Construction of Minor n Co.- SP

Bridges including other Infracon

ancillary work between (JV) 211, M/s. JCC InfraProjects station Guriya Two Shivam Pvt. Ltd., 761/30, Work under 15 (excluding) - Marwar Open packet 1.0 (One) Complex, Yes 29/02/2016 -

MJ/BGD/T/6 "Aklank House", Tikam progress. - Jn. (excluding) in system Opp.

04Nos. Ganj, Ajmer (Raj.). 01/03/2015

connection with Guriya 07/07/2014 Hetarth

216963087.73

- Marwar Junction BG Party Plot, `

AII/GRI patch doubling project. Science City Road, Sola, Ahmedabad

- 380061.

13/08/2014 NWR/S&C/CA/69 dated 09/03/2015. dated NWR/S&C/CA/69

25

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Dy. CE/C/Jodhpur

1. 1 JUConst MKN-BIDD E/Work Open 21.02.11 Single 07.06.11 01 M/s - L-1 Dy.CE/C/ M/s Bhanwar Lal 335.54 29.09.12 10.10.11 Work - -/ in cutting & filling temder Bhanwar Lal JU/37/ Bijarnia 31.01.13 Physically 09.R/20 Const.of ROB Bijarnia Vill. 2011-12 30.04.13 completed 10-11 instead of LC etc. Rajpura dtd. 31.07.13 Distt. NGO 23.01.12 31.12.13 31.03.14 2. 2 T.No. Work of remodeling Open 25.03.12 Single 26.04.12 04 Sh.Girdhari M/s P.C. L-1 Dy.CE/C/ Sh.Girdhari Ram S/o 132.02 16.06.13 11.11.12 Work in Work delayed due JU/ of JU yard including Ram S/o Sh. Sharma, JU/03/201 Sh. Sajjan Ram, 31.10.13 progress, to non availability CONST/ all work related to Sajjan Ram, Noida 2-13, dtd. JODHPUR 30.04.14 of DISCOM land. 15/2011 P. way, AT JODHPUR (U.P.) 13.12.12 31.12.14 -12 welding 28.02.15 Accepte 20.03.15 d on– 31.12.15 17.09.1 2 3. 3 T.No. Work of remodeling Open 19.07.12 Single 22.08.12 03 M/s Kalu M/s L-1 Dy.CE/C/ M/s Kalu Ram 414.97 15.08.13 07.12.12 Work in -do- JU/ of JU yard incl all Ram Prathem JU/05/201 Contractor, E- 15.12.13 progress, Const/T work related to Civil Contractor, Builders, 2-13, dtd. 15,Shastri Nagar, JU. 31.03.14 -02/ works Jodhpur. Jodhpur 08.01.13 31.08.14 2012-13 Kera Ram 31.01.15 (JU S/o Pusha 30.12.15 Yard) Ram, Accepte Jodhpur. d on– 16.10.1 2 4. 4 T.No.JU Carrying out Open 10.10.12 Single 08.11.12 04 M/s C.S. 1M/s L-2 Dy.CE/C/ M/s C.S. Engineers & 18.87 28.04.13 07.02.13 Work in Work delayed due / Geotechnical tender Engineers & Strength JU/.63./20 Consultants, 30.11.13 progress. to not matter not Const./ investigation for Consultants, Engineering 13-14, dtd. Shakarpur, DELHI – 31.03.14 finalization of ROB T- ROB on LC No.21 & Shakarpur, Services 29.014.20 110 092 30.06.14 61 04/2012 LC No.61 DELHI – 110 Pvt. Ltd., 14 31.12.14 - 092 Jaipur 30.06.15 13/GAD 2. M/s 31.12.15 ARKITECHN O Consultants (India) , Bhubanesw ar 5. 5 T.No.JU Preparation of GAD Open 07.12.12 Single 10.01.13 03 M/s Theme 1. M/s M.K. L-1 Dy.CE/C/ M/s Theme 20.19 06.07.13 15.04.13 Work in Work delayed due /CONST and Soil Testing for tender Engineering Soil Testing JU/10/201 Engineering Services 30.11.13 progress to NOC of various ./T-08 RUBs in various Services Pvt. Laboratory, 3-14/GAD, Pvt. Ltd., Jaipur 31.03.14 LCs were not /2012- sections of JU Ltd., B-24, Ahmedabad dtd. 30.04.14 received from 13/GAD division Jaipur 2. M/s 19.10.13. 31.08.14 Divn. - Engineer's 30.10.14 Associates, 31.12.14 Ratanada, 28.02.15 ,JU 30.06.15 31.10.15

6. 6 JU/Cons Staking out Open 19.04.13 Single 23.05.13 03 Nos. M/s Spage 1. M/s L-3 NWR/S&C/ M/s Spage 90.68 05.03.14 10.09.13 Work in Work delayed due t./ T- alignment, detail tender Tender Consultancy, Metro CA/59, Consultancy, 31.12.14 progress to land acquisition 15/2013 Engg. Construction Jodhpur. Survey dated Jodhpur. 30.06.15 process from -14/ survey in c/w new Services & 18.11.201 31.10.15 various GAD line between Thaiyat Constructio 3 department. Hamira - Sanu n, Jodhpur (58.50 Kms.) 2. M/s Theme 26

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Engineering Services Pvt. Ltd., B-24, Gokul Vatika, Jawahar Circle, Jaipur 7. 7 JU/Cons Construction of Open 08.11.13 Two 13.12.13 09 Nos. 06 Nos. 03 Nos. L-1 M/s Vishnu Prakash R 18.88 Cr. 03.07.16 08.07.14 Work in t./ T- complete ROB (2 tender packet 1. Vishnu 1. Shree NWR/S&C/ Punglia Limited, H-1 progress 18/13- lane) system Prakash R Gautam CA-65, First Floor Shivalik 14/ incl.approaches in Pungalia Constructio dtd. Complex, Near Gol ROB/C- lieu of existing LC 2. Rachana n Co. Ltd., 20.10.201 Building, Sardarpura, 21/NAC No.C-21 on MTD-FL Const. Co. 2. M/s Maan 4 Jodhpur sec at NAC station 3. Praveen Rana (JV), Gulati Infra- structures 3. M/s Pvt. Ltd. DRA-BSP 4. Sona Constructio Builders, n (JV), 5. Rakesh Const. Co. 6. M/s Jain Const. Co. 8. 8 T.No. RUBs in lieu of LCs, Open 05.11.14 Single 09.12.14 04 Nos. M/s Shree - L-1 Dy.CE/C/ M/s Shree Karni 624.15 lacs. 27.04.16 17.04.15 Work in - JU/ in section of MTD- Tender Tender Karni JU/13/201 Traders, progress Const./ BKN (04 Nos.), MTD Traders, 4-15/LHS, C-171 Kanta Khaturia T-06R/ Bye Pass (01 No.) & C-171 Kanta dtd. Colony, 2014- MTD-FL (01 No.) on Khaturia 18.04.201 Bikaner 15/LHS JU division Colony, 5. Bikaner

9. 9 JU/Cons All Civil & P.Way Open 21.11.14 Single 23.12.14 02 Nos. M/s M/s Jai L-1 Dy.CE/C/ M/s Bhanwar Lal 715.80 lacs. 03.10.16 10.04.15 Work in - t./T- work c/with Std-II Tender Tender Bhanwar Lal Mata De JU/14/201 Bijarnia, progress 22/14- work in MTD-BKN & Bijarnia, Energy 5-16/Std- Village-Rajpura, Post- 15/Std.I RKB-PLC sec Village- System, IIR, dtd. Prewari, IR/MTD- Rajpura, Laxmangar 11.06.15. Tehsil- Nawa, Distt. BKN Post- h sikar Nagour Prewari, () Tehsil- Nawa, Distt. Nagour (Rajasthan)

10. 10 JU/Cons Supplying and Open 03.02.15 Single 05.03.15 05 Nos. M/s Jai M/s Shree L-2 Dy.CE/C/ M/s Jai Balaji 194.77 lacs. 22.01.16 01.06.15 Work in - t./T- stacking 28400 cum Tender Tender Balaji Shyam JU/15/201 Construction Co., progress 23R/20 65mm gauge hard Construction Engineering 5-16/Std- Shanti Marble, 14- stone ballast Co., Shanti Co., 29, IIR, dtd. Station Road, 15/Std.I (Machine crushed) Marble, Poonia 04.08.15. Chirawa, Distt. IR/MTD- in c/ with RKB-PLC Station Colony, Jhunjhunu BKN Std-IIR work Road, Churu Chirawa, (Rajasthan) Distt. Jhunjhunu 11. 11 JU/Cons Residual work of Open 13.02.15 Single 18.03.15 05 Nos. M/s Shree  M/s Shri L-1 Dy.CE/C/ M/s Shree Shyam 42.82 lacs. 28.08.15 05.06.15 Work in Work is delay due t./74- Through rail renewal Tender Tender Shyam Balaji & Co. JU/16/201 Engineering Co. , 15.10.15 progress to heavy rain in W- of 90R S/H Rails by Engineering Jodhpur. 5-16/MKN- Poonia Colony, Churu Aligarh & Makrana 24/2014 60Kg./52Kg. S/H Co. , Poonia  M/s BIDD, dtd. (Raj.) - rails converting into Colony, Narendra 19.08.15 15/MKN LWR in MKN-BIDD Kumar, 27

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

-BIDD Churu (Raj.) Railway Contractor  Shri Girdhari Ram Jodhpur  M/s Bhanwar Lal Bijarnia, Jodhpur 12. 12 JU/Cons Supplying and Open 05.06.15 Single 10.07.15 04 Nos. M/s J.K.  A.K. Gupta L-1 Dy.CE/C/ M/s J.K. Construction 142.84 lacs. 10.05.16 ...... Work yet to- - t./74- stacking of 20800 Tender Tender Const.Co. & Co., , JU/___/ Co., be started. W- cum Stone ballast Nokha, DELHI 2015- New Market, Nokha, 26/2015 for Std.IIR work in  M/s 16/Std.IIR - RKB-PLC section Hanuman / RKB-PLC, District – Bikaner 16/Std.I Constructio dtd. 334803 IR/ n Co., ...... 15 (Rajasthan) RKB- Nokha PLC  M/s Shree Shyam Engineering Co, Churu 13. 13 JU/Cons All Civil & P.Way Open 11.06.15 Single 15.07.15 01 No. M/s - L-1 Dy.CE/C/ M/s Bhanwar Lal 679.84 lacs. 15.03.17 t./ T- work c/with Std-II Tender Bhanwar Lal JU/___/ Bijarnia, 27/2015 work in RKB-PLC sec Bijarnia, 2015- Village-Rajpura, Post- - Village- 16/Std.IIR Prewari, 16/Std.I Rajpura, / RKB-PLC, Tehsil- Nawa, Distt. IR/ Post- dtd. Nagour RKB- Prewari, ...... 15 (Rajasthan) PLC Tehsil- Nawa, Distt. Nagour (Rajasthan) 14. 14 JU/Cons Providing “IN SITU” Open Single 10.07.15 M/s Tirupati  Dynamic L-1 Dy.CE/C/ M/s Tirupati Metal 320.01 lacs. 31.03.18 - - - t./T- Glued Insulated Tender Metal EngineersK JU/___/ Fabricators, 25/2015 Joints of G-3 (L) Fabricators, ota. 2015- 1433 Sector 16, -16/Std type for 52 kg/60 kg 1433 Sector  Creative 16/Std.IIR Faridabad-121002 IIR rails in c/w StdIIR 16, Engineers / RKB-PLC, (Haryana) work in MTD-BKN & Faridabad- Kota - dtd. RKB-PLC section. 121002 ...... 15 (Haryana)

CE/C/IV-JP

Dy. CE/C/BKN

28

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 Const/B Supplying and Open 14.09.11 single 14.10.11 08 nos Tender Yes, tender Yes 172- M/S Jai Mata Rs 305.25 25.05.12 10.01.12 30.06.15 Final bill is under KN/04/2 stacking 55000 cum tender awarded to awarded to NWR/Dy Const.Co. lakhs preparation. 011- 65mm gauge stone evaluated L- lowest valid CE/C-I/BKN H.No.14169 Street 12/BKN ballast machine 1 . and eligible Dt no.8A Ganesh Nagar -SDLP- crushed (hard tenderer 09.03.2012 Bhatinda( Pb) RTGH- stone) confirming to SRDR RDSO specifications between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh- Sardarshahar section in connection with Bikaner-Sadulpur- Ratangarh- Sardarshahar gauge conversion project 2 Const/B Earthwork in banks Open 17.09.311 single 17.10.11 2 nos Tender Yes, tender Yes 173- M/S LVJ Projects Rs 534.82 01.06.12 05.01.12 31.12.15 Work is in KN/08/2 and cutting for tender awarded to awarded to NWR/Dy Private Limited, 1 & lakhs progress 011- formation including evaluated L- lowest valid CE/C-I/BKN 2, 1st Floor, Shri 12/BKN side drains , trolley 1 . and eligible Dt Krishna Centre , -SDLP- refuges, toe walls/ tenderer 09.03.2012 Near Mithakhari Six RTGH- retaining wall , Roads , SRDR stone pitching etc. Navrangpura, in Ratangarh ( Ahemadabad- including) to 380009 , Gujrat Sardarshahar (including) section in connection with Bikaner-Sadulpur- Ratangarh- Sardarshahar gauge conversion project.

29

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

3 Const/B Dismantling of Open 20.01.12 single 22.02.12 2 nos Tender Yes, tender Yes 178- M/S Shree Nahar Rs 531.61 25.12.12 24.05.12 31.03.16 Work is in KN/06 existing MG track, tender awarded to awarded to NWR/Dy Construction Co., A- lakhs progress. (R)/201 Laying and linking of evaluated L- lowest valid CE/C-I/BKN 328, Shastri Nagar , 1- Broad gauge main 1 . and eligible Dt Jodhpur -342003 12/BKN line, loop lines tenderer 18.08.2012 -SDLP- including points and RTGH- crossings in yards, SRDR spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh - Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project 4 Const/B Construction and Open 20.01.12 single 28.03.12 04 nos Tender Tender Yes 177- M/S Maheshwari Rs 647.31 03.03.13 06.07.12 31.10.15 Work is in KN/09( modification of tender awarded to awarded to NWR/Dy Construction Co lakhs progress R)/2011 station buildings, evaluated L- evaluated CE/C-II/BKN Bikaner Road, - platform, platform 1 . L-1. Dt 07.08.12. Nokha(Bikaner) 12/BKN shelter level -SDLP- crossings and RTGH- earthwork in filling SRDR for platforms Dt between Ratangarh 13.01.2 ( including ) to 012. Sardarshahar (including) in Ratangarh- Sardarshahar section in connection with Bikaner-Sadulpur- Ratangarh- Sardarshahar 30

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

gauge conversion project

5 Const/B Supplying and Open 26.05.12 single 27.06.12 05 nos Tender Tender Yes 20/NWR/Dy M/S Rs137.94 28.12.12 07.09.12 31.03.14 Contract KN/01/2 stacking 14000 cum tender awarded to awarded to CE/C/BKN/2 R.K.Infrastructure, lakhs terminated. Final 012- 65mm gauge stone evaluated L- evaluated 012- 407, Pink Tower, variation in 13/SRP ballast machine 1 . L-1. 13/SRPR- Tonk Road, Jaipur process. R-SGNR crushed (hard SGNR Dated Dated stone) conforming 19.10.2012 29.08.2 to RDSO 012 specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project 6 Const/B Dismantling & Open 08.08.12 single 08.08.12 02 nos Tender Tender Yes 21-NWR/Dy M/S V.K.Const Co, Rs131.75 06.05.13 26.10.12 10.02.15 Final variation KN/05/2 reconstruction of tender awarded to awarded to CE/C/BKN/S 2-D- lakhs under finance 012- parcel office, evaluated L- evaluated RPR-SGNR 37,Jawaharnagar vetting. 13/SRP extension of waiting 1 . L-1. Dt 06.12.12 Sri Ganganagar R-SGNR hall, construction of platform shelters, improvement of platform surfacing of Island platform and other ancillary works at Sri Gangsanagar in connection with Sarupsar - Sriganganagar Gauge Conversion Project. 7 Const/H Construction/modific Open 16.07.12 single 22.08.12 05 nos Tender Tender Yes NWR/S&C/C M/S Ramesh Kumar Rs 1051.42 03.08.13 27.10.12 30.09.15 Final bill under MH/09/ ation of station tender awarded to awarded to A/48 dated Bansal, 182, Vinoba lakhs preparation 2012- buildings & evaluated L- evaluated 22.01.2013 Basti, Near Dhan 13/SUR structures i.e. S&T 1 . L-1. Mandi Gate, Sri P-HMH- buildings, Platforms, Ganganagar SGNR duty bunk and other ( Raj) Dated ancillary works 16.07.1 between Diplana 2 (excluding) to Tehsil Bhadra (including) section in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project

31

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

8 Const/B Dismantling & Open 27.06.12 single 06.08.12 02 nos Tender Tender Yes NWR/S&C/C M/S Pragati Rs 1009.05 02.07.13 26.10.12 31.10.14 Final variation KN/03/2 Construction of BG tender awarded to awarded to A/45 dated Construction lakhs duly vetted by 012- Washing line coach evaluated L- evaluated 07.12.12. Consultants, 28/12, associate finance 13/SRP care complex,BG 1 . L-1. East Punjabi Bagh, submitted to HQ R-SGNR goods platform with Main Ring Road, office for sanction approach road, New Delhi -110026. of competent electrical sub- authority. station building,building extension of high level passenger platform, water hydrants on washable apron,drainage pipe line and other ancillary works at Sri Gangsanagar station yard in connection with Sarupsar - Sriganganagar Gauge Conversion Project. 9 Const/B Construction of BG Open 27.06.12 single 06.08.12 01 nos Tender Tender Yes NWR/S&C/C M/S Pragati Rs 1266.63 02.07.13 26.10.12 31.01.15 Final variation KN/04/2 Sick line shed , tender awarded to awarded to A/44 dated Construction lakhs duly vetted by 012- Dismantling of MG evaluated L- evaluated 07.12.12. Consultants, 28/12, associate finance 13/SRP sheds & MG goods 1 . L-1. East Punjabi Bagh, submitted to HQ R-SGNR PF at Sri Main Ring Road, office for sanction Ganganagar, Foot New Delhi -110026. of competent Over bridge at Sri authority. Ganganagar & Suratgarh station, and other ancillary works at Sriganganagr station yard in connection with Sarupsar- Sriganganagar Gauge Conversion Project

32

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

10 Const/B Dismantling of Open 11.08.12 single 14.09.12 2 nos Tender Tender Yes 06/NWR/Dy M/S Laxyo Energy 553.10 lakhs 08.11.13 15.12.12 31.03.16 Work is in KN/01/2 existing MG track, tender awarded to awarded to CE/C/BKN/2 Pvt. Ltd 46/1 TIT progress 012- laying and linking of evaluated L- evaluated 012- Road Ratlam (MP) 13/SUR broad gauge main 1 . L-1. 13/SURP- P-DPLN- line, loop lines, DPLN dated HMH- including points and 20.02.2013 SGNR crossings in yards, dated spreading of ballast 08.08.1 tamping of track, 2 transportation of P.Way materials and other ancillary works in Zone-3 (Ch.88000 to 132000 including Gogameri, Tehsil Bhadra & Anupsahar station yard) on Hanumangarh- Suratpura section in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project 11 Const/B Dismantling of Open 11.08.12 single 14.09.12 2 nos Tender Tender Yes 05/NWR/Dy M/S Bhairav Rs 521.79 08.11.13 17.11.12 31.03.16 Work is in KN/02/2 existing MG track, tender awarded to awarded to CE/C/BKN/2 Construction Co, lakhs progress. 012- laying and linking of evaluated L- evaluated 012- Sukh sagar , Arya 13/SUR broad gauge main 1 . L-1. 13/SURP- Samaj Road, Gulab P-DPLN- line, loop lines, DPLN dated Bari < Kota ( Raj) HMH- including points and 08.02.2013 SGNR crossings in yards, dated spreading of ballast 08.08.1 tamping of track, 2 transportation of P.Way materials and other ancillary works in Zone-4 (Ch.132000 to 175000 including Sidhmukh, Narwasi, Suratpura & Sadulpur By-pass station yard) on Hanumangarh- Suratpura section in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project

33

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

12 Const/B Dismantling of Open 10.12.12 single 11.01.13 2 nos Tender Tender Yes 22-NWR/Dy M/S P.C. Sharma, Rs 294.64 25.11.13 07.04.13 31.12.14 Final variation KN/04( existing MG track, tender awarded to awarded to CE/C/BKN/S A-87, Sector-49, under preparation. R)/2012 Laying and linking of evaluated L- evaluated RPR-SGNR Noida, Gautam - Broad gauge main 1 . L-1. Dt15.05.13 Budh Nagar,UP 13/SRP line, loop lines R-SGNR including points and dt. crossings in yards, 07.12.2 spreading of ballast, 012 tamping of track, Addition and alteration to station yards, insertion of fan shaped turnouts, shifting of existing turnouts, leading of P.way material and other miscellaneous works in Suratgarh Yard on Suratgarh - Sriganganagar section in connection with Sarupsar - Sriganganagar Gauge conversion project 13 Const/B Balance work of Open 14.11.13 single 17.12.13 4 nos Tender Tender Yes 11-NWR/Dy M/S V.K. Rs 272.70 12.07.14 05.02.14 31.03.16 Work is in KN/03/2 earthwork in banks tender awarded to awarded to CE/C/BKN/2 Construction Co. 2- lakhs progress 013- and cutting for evaluated L- evaluated 013- D-37 A, Jawahar 14/SUR formation including 1 . L-1. 14/SURP- Nagar, Sri P-HMH- side drains, trolley HMH-SGNR Ganganagar-335001 SGNR refuges, toe walls/ Dt ( Raj) dated retaining wall etc. 15.03.2014 12.11.2 between Diplana 013. (excluding) to Suratpura ( including) section i.e. from km 88.00 to km 175.00 in connection with Suratpura- Hanumangarh-Sri Ganganagar gauge conversion project 14 Tender Construction / Open 23.02.14 single 26.03.14 04 nos Tender Tender Yes 14-NWR/Dy M/S Navdeep Rs 149.14 16.02.15 20.06.14 30.10.15 Work is in No. modification of tender awarded to awarded to CE/C/BKN/2 Constructions, VPO- lakhs progress Const/B station buildings & evaluated L- evaluated 014-15 Badhawar Distt KN/05/2 structures i.e. S&T 1 . L-1. dated Hisar. 013- buildings and other 29.10.2014 14/ROK ancillary works -BNW between Rohtak ( STD IIR excluding) to 20.02.2 Bhiwani ( excluding) 014 section in connection with Rohtak- Bhiwani standard II-R works

34

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

15 Tender Addition and Open 23.02.14 single 26.03.14 03 nos Tender Tender Yes 15/NWR/Dy. M/S Bhikha Ram Rs 101.62 12.03.15 01.09.14 31.12.15 Work is in No. Alteration to station tender awarded to awarded to CE/C/BKN/2 DevrathVillage- lakhs progress Const/B yards, insertion of evaluated L- evaluated 014-15 Digarla, Tehsil- KN/07/2 fan shaped 1 . L-1. dated Rajgarh,District – 013- turnouts, linking of 07.11.2014 Churu ( Rajasthan 14/ROK track, sand humps -BNW and over runs, STD IIR shifting of existing 20.02.2 turnouts, leading of 014 p.way material and other miscellaneous works at all station in connection with Standard –IIR and Signalling work at Lahil, Kalanaur Kalan & Bamla stations on Rohtak – Bhiwani section..)

DY. CE/C/HMH

1 Const/ Rebuilding, Open 09.10.10 One 10.11.10 4 1 3 Yes, Const/ M/s Poonia Const 425.56 04.02.12 24.11.11 04.02.12 Work is in BKN/ Construction, Tender packet L-1 BKN/ Co. 30, Sector-13, 31.03.15 progress. SURP- Strengthening/ system SURP-HMH- Part-II, Hisar HMH- extension of SGNR/ SGNR/ existing Minor 13/ 13/ bridges and upto 2010-11 Dt: 2010-11 6.10m including - 05.02.11 Dt. earthwork in in 04.10.10 Hanumangarh (excluding) to Diplana (including) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP- HMH-SGNR GC project. 2 Const/ Construction of Open 28.08.11 One 28.09..11 2 1 1 Yes, Const/BKN/1 M/s Sajneev 302.87 Lakh 15.12.12 20.03.12 15.12.12 work is in BKN/ Foot Over Bridge Tender packet L-1 6/2011- Brothers, 15.11.14 progress 16/2011- and Platform system 12/SURP- C-10, Vaishali 12/ Shelter at HMH-SGNR Nagar, SURP- Hanumangarh Dated: - Jaipur HMH- Junction, 16.12.2011 SGNR Hanumangarh Dated– Town, Ellenabad 16.08.20 and Nohar station 11 in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project.””

35

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

3 Const/HM Transportation, Open 13.01.12 One 30.7.12 4 1 3 Yes, Const/HMH/ M/S Kiran Infra 495.56 16.9.13 01.10.12 16.9.13 work is in H/1/ 12- Assembling, Tender packet L-1 1/ 12- engg.Lted B-141 31.05.15 progress 13/SURP- Erection, system 13/SURP- Road no 9D VKI HMH- Cambering, HMH-SGNR area JP SGNR Riveting (with Dated Dated contractor’s rivets) 23.6.2012, 23.6.201 painting and 2, launching (as per contractor’s approved scheme) of open web through steel girders on Bridge No. 2-A (2 x 61.00m) at km. 2.347 on Ghaggar River, Bridge No. 14-B (2 x61.00m) at km. 18.345 on Ghaggar River and Bridge No. 21-A (1x 76.20m) at Km. 28.638 on Indira Gandhi Main Canal (Girder components will be supplied by Railway) with supplying & fixing of bearings and supplying, fabricating & fixing of galvanized steel channel sleepers along with matching fittings at site, on newly constructed top of pier/abutment to perfect level & alignment and other ancillary works in c/with SURP-HMH-SGNR GC project. (M/s Kiran Infra Engineers Ltd, Jaipur.

36

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

4 Const/HM Construction / Open 11.07.12 One 13.08.12 2 1 1 Yes, Const/HMH/ M/S. V.K. 828.64 03.8.13 20.10.12 03.8.13 work is in H/05/SU modification of Tender packet L-1 05/SURP- Construction Co, 2- 30.09.15 progress RP-HMH- station buildings & system HMH- D-37, Jawahar SGNR/20 structures i.e. RRI SGNR/2012- Nagar, Sri 12-13 Building, officers / 13 Dated – Ganganagar Dated – sub ordinate rest 09.07.2012 09.07.20 house, S&T 12 buildings, Platforms, duty bunk and other ancillary works between Hanumangarh Jn (including) to Hanumangarh Town (including) section 5 Const/HM Construction / Open 11.07.12 One 13.08.12 4 1 3 Yes, Const/HMH/ M/S. V.K. 691.32 23.07.13 20.11.12 23.07.1330. work is in H/06/SU modification of Tender packet L-1 06/SURP- Construction Co, 2- 06.15 progress RP-HMH- station buildings & system HMH- D-37, Jawahar SGNR/20 structures i.e. S&T SGNR/2012- Nagar, Sri 12-13 buildings, 13 Dated – Ganganagar Dated – Platforms, duty 09.07.2012 09.07.20 bunk and other 12 ancillary works between Hanumangarh Town (excluding) to Talwara Jhil (including) section in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project. 6 Const/HM Construction / Open 11.7.12 One 13.8.12 4 1 3 Yes, Const/HMH/ M/S P.S.Infra Build 779.3 12.7.13 4.11.12 12.7.13 work is in H/7/ 12- modification of Tender packet L-1 25/SURP- Pvt.Lited 15 jaat 31.07.15 progress 13/SURP- station buildings & system HMH- Dharmshala HMH- structures i.e. S&T SGNR/2011- G.T.Road Fatehabad SGNR buildings, 12Dated– Dated Platforms, duty 07.01.12 09.7.201 bunk and other 2, ancillary works between Talwara Jhil (excluding) to Khinaniyan (including) section in connection

37

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

7 Const/HM Construction / Open 11.7.12 One 13.8.12 4 1 3 Yes, Tender No. M/S Shree Shyam 779.3 12.7.13 29.10.12 12.7.13 work is in H8/ 12- modification of Tender packet L-1 Const/HMH/ Engineering Co.29 31.07.15 progress 13/SURP- station buildings & system 08/SURP- Poonia Colony HMH- structures i.e. S&T HMH- Churu(Raj) SGNR buildings, SGNR/2012- Dated Platforms, duty 13 Dated – 09.7.201 bunk and other 09.07.2012 2, ancillary works between Khinaniyan (excluding) to Diplana (including) section in connection

8 Const/HM Dismantling of Open 10.8.12 One 14.9.12 2 1 1 Yes, M/S Bhanwar Lal 709.89 30.10.13 22.11.12 30.10.1328. work is in H9/ 12- existing MG track, Tender packet L-1 Const/HMH/ Bijarnia, village- 02.16 progress 13/SURP- Laying and linking system 09/SURP- Rajpura, Tehsil HMH- of Broad gauge HMH- nawa. Distt.Nagaur SGNR main line, loop SGNR/2012- (Raj) Dated lines including 13 Dated – 05.8.201 points and 05.08.2012 2, crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-1 (Ch. 0.000 to 44.000 including Hanumangarh, Hanumangarh town, Sherekan, Talwara Jhil & Ellenabad station yard) 9 Const/HM Dismantling of Open 10.8.12 One 14.9.12 2 1 1 Yes, Const/HMH1 M/S. P.C.Sharma A- 444.35 21.10.13 23.10.12 21.10.13 work is in H10/ 12- existing MG track, Tender packet L-1 0/ 12- 87-sector 49 NOIDA 30.09.15 progress 13/SURP- Laying and linking system 13/SURP- Distt. Gautum Budh HMH- of Broad gauge HMH-SGNR Nagar SGNR main line, loop Dated Dated lines including 05.8.2012, 05.8.201 points and 2, crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-2 (Ch. 44.000 to 88.000 including Khinaniyan, Nohar & Diplana station yard)

38

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

10 Const/HM Construction of Open 25.10.12 One 27.11.12 1 1 1 Yes, Const/HMH1 M/S Hari Singh & 852.45 10.11.13 27.01.13 10.11.13 work has been H13/ 12- Road under Bridges Tender packet L-1 3/ 12- Co.,H.No.101, Model 31.03.16 complited & final 13/SURP- in lieu of existing system 13/SURP- Town, Narwana, bill under process HMH- Level crossing HMH-SGNR Distt- Jind SGNR No.33 at km. Dated 09416464971. Dated 47.420, 38 at km. 22.10.2012, 22.10.20 55.032, 40 at km. 12, 67.620, 48 at km. 75.564, 53-1 at km.93.197, 56 at km. 99.028, 74 at km. 132.745 & 81 at km. 143. 380 on Hanumangarh- Sadulpur section in connection with elimination of level crossing gates. 11 Const/HM Flash Butt Welding Open 23.11.12 One 26.12.12 2 1 1 Yes, Const/HMH/ M/s Speed Crafts 577.81 01.10.14 2.4.13 30.11.14 Work is in H/02 (R) of 52 Kg / 60 Kg Tender packet L-1 02 (R) Limited, Layak 31.08.15 Progress SURP- rails at site / depot system SURP-HMH- Bhawan Boring HMH- using Mobile Flash SGNR/2012- Canal Road Patna- SGNR/20 Butt Welding Plant 13 dated – 800001 12-13 between Sri 19.11.2012 dated – Ganganagar station 19.11.20 (including)- 12 Hanumangarh Junction-Suratpura station (including) in connection Suratpura - Hanumangarh- Sri Ganganagar gauge conversion project 12 Const / Supplying and Open 09.07.13 One 12.08.13 3 1 2 Yes, Const / HMH M/s Sura Const. 342.94 26.03.14 10.10.13 26.3.14 Work is in HMH / 04 stacking 33000 Tender packet L-1 / 04 / Co., Sector No. 13 30.09.15 Progress / SURP- cum 65mm gauge system SURP-HMH- H.No.1133/1323, HMH- stone ballast SGNR/2013- Hissar SGNR/20 machine crushed 14 dt. 13-14 dt. (hard stone) 04.07.2013 04.07.20 conforming to 13 RDSO specifications in the section of Hanumangarh- Diplana in connection with Suratpura- Hanumangarh- SriGanganagar Gauge Conversion Project.

39

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

13 Const/HM Construction of Open 09.07.13 One 12.08.13 2 1 1 Yes, Const/HMH/ M/s Mohla Const. 730.558 25.09.14 1.0314 31.3.15 Work is in H/02/SU Road under Bridges Tender packet L-1 02/SURP- Co., 476,Sector 15- 30.08.15 Progress RP-HMH- in lieu of 07 Nos. of system HMH- A Hisar SGNR/20 Level Crossing SGNR/2013- 13-14 Gates on 14 dated dated Hanumangarh - 04.07.2013 04.07.20 Suratpura section 13 in connection with elimination of level crossing gates 14 Const/ Miscellaneous Open 09.01.14 One 12.02.14 4 1 3 Yes, Const/ HMH M/s J.B. 248.58 11.11.14 26.04.14 20.4.15 Work is in HMH balance work of Tender packet L-1 /07/SURP- Construction, V.P.O. 05.10.15 Progress /07/SURP earthwork in banks system HMH- DaharDistt- Panipat- -HMH- and cutting, side SGNR/2013- 132103, SGNR/20 drains, trolley 14 dated 13-14 refuges, toe walls 06.01.2014 dated /retaining wall, etc. 06.01.20 including supply of 14 cement between Km. 0.00 to Km 88.00 in connection with Suratpura – Hanumangarh- Sriganganagar gauge conversion project. 15 Const/HM Construction of 04 Open 22.12.14 One 23.01.15 11 1 10 Yes, Const/HMH/ M/s Punia Const 912.48 17.12.15 17.12.15 H/02/RO lane Road Over Tender packet L-1 02/ROB/MBY Co., B/MBY/2 Bridge (single span system /2014-15 30, Sector No.13, 014-15 over Railway dated18.04. Part-II, Hisar dated tracks) with RCC 15 (Haryana) 125005. 17.12.20 deck slab, 14 composite girder super structure, with RCC substructure & pile foundation and construction of Limited Height Subway in lieu of level crossing No. 32-B at km. 35/2-3 on Bathinda - Suratgarh section at Mandi Dabwali on Delhi - Hisar - Fazilka (NH-10) at RD 315.280 in Sirsa District

40

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

CE/C/ HQ-JP

Dy. CE/C/DO

1 Construction of BG Single Yes NWR/S&C/C M/s Kewai 6.45 crore 26/09/07 12/07/06 - Final bill has been formation from Packet A/81dated Construction (JV) Further technically

Chainage 1150 to system 06.09..06 Jodhpur extension checked and 15000 between granted up under process. Dausa Kala- 04/01/2006 to DO/GGC/NL/9 Shekhpura in 30/11/2011

connection with DO- Opentender GGC new BG line project.

2 Construction of BG Single Yes NWR/S&C/C M/s Parma Ram 6.39 crore 17/07/07 11/05/06 - Final bill has been formation from Packet A/79 dated Bhakar Jodhpur. extended technically Chainage 15000 to system 30.06.06 upto checked and 28000 between 30/11/2011 under process. Dausa and Lalsot in 16/01/2006

DO/GGC/NL/10 connection with DO-

GGC new BG line Opentender project.

3 Construction of Single Yes NWR/S&C/C M/s Atlanta-ARSS 17.95 Crore 30/07/09 14/03/08 - Work short closed Broad Gauge packet A/97 dated (JV) Bhubneshwar extended vide HQ’s letter Formation & Minor system 03/03/2008 (Orissa) upto dated

Bridges from 30/06/2014 18/06/2014. Final Chainage 41000.00 14/11/2007 measurements

DO/GGC/NL/18 to 45000.00 between under process Dausa and Lalsot in

connection with Opentender Dausa- Gangapur City New Broad Gauge line project.

4 Construction of BG Single 3 Yes NWR/S&C/C M/s. ARSS 8.41 20/03/09 15/03/08 - Work in progress.

formation and Minor Packet A/95 dated Infrastructure Crores Extended Bridge from chanaige system 18/02/2008 Projects Limited, upto 45000 to 60000 bet. Bhubaneshwar 30/06/15

Lalsot and Gangapur 02/11/2007 24/09/2007

DO/GGC/NL/21 City in connection Opentender with DO-GGC New B

G line Project

41

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

5 Construction of BG Single 3 Yes Dy. M/s. ARSS 6.71 Crores 10/03/09 10/03/08 - Work short closed

formation and Minor Packet CE/C/I/JP/C Infrastructure Extended vide HQ’s letter

Bridge from chanaige system A/17 dated Projects Limited, upto dated 60000to 75000 bet. 29/02/2008 Bhubaneshwar 30/06/2014 18/06/2014. Final Lalsot and Gangapur 02/11/2007 measurements

DO/GGC/NL/22 City in connection under process. Opentender with DO-GGC New B 24/09/2007 G line Project

6 Construction of BG Single 3 Yes NWR/S&C/C M/s. ARSS 8.56 20/03/09 15/03/08 - Work short closed

formation and Minor Packet A/96 dated Infrastructure Crores Extended vide HQ’s letter

Bridge from chanaige system 18/02/2008 Projects Limited, upto dated 75000 to 90000 bet. Bhubaneshwar 31/03/2014. 18/06/2014. Final Lalsot and Gangapur 02/11/2007 Further measurements

DO/GGC/NL/23 City in connection extension under process. 24/09/2007 with DO-GGC New B Opentender under G line Project process

7 Construction of Single 1 Yes Dy. M/s Kewai 5.98 Crore 01/01/09 28/08/08 - Final variation has Minor Bridges from packet CE/C//DO/C Construction Co. Extended been vetted by

Chainage 00.00 to system A/20 (J/V), Jodhpur upto finance and under 30000.00 between Dated23/06 31/08/2012 sanction with HQ. Dausa and Lalsot in 20/02/2008 /2008

connection with

Dausa Gangapur city

Opentender DO/GGC/NL/8(R&C) new Broad gauge line project.

17/01/2008

8 Construction of Single 9 - - Yes Dy.CE/C/DO M/s Bharat- Kamal 5.47 crore 04/08/10 07/08/2009 - Final variation has platforms, earthwork packet /CA/ 35 (J/V), Jaipur Extended been sent to HQ

in platform in system dated: 15 upto for approval on 9 connection with /10/2009 31/07/2014 06/02/2015 and

Dausa- Gangapurcity 02/03/2009 under Opentender DO/GGC/NL/29 new BG line project. correspondence

27/01/200 with HQ

9 Construction of ROBs Single 11 - - Yes NWR/S&C/C M/s Shree Ram 13.44 Crore 29/02/2012. - - Work in progress.. across Railway track packet A/105 dated Kripa Construction Extended up at chainage system 22/11/2010 Jaipur to

37034,83925 & 31/12/2015

37925 and drainage DO/GGC/NL/31 over pass at chainage 36960 &

37520 between 16/02/2010 salempura to Opentender Udaikalan station inconnection with Dausa- Gangapurcity

new BG line project

42

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

10 Construction of Single 02 - - Yes NWR/S&C/C M/s L.N. Agrawal- 15.65 Crore 31/03/2012. - - Final variation has 150unit type II, 7 packet A/107 dated MCD Pvt. Ltd., (J/V) Extended been vetted by units type-III staff system 28/03/2011 Jaipur upto finance and under quarters & IOW 31/05/2014. sanction with HQ. office and other ancillary works the

water supply,

sewerage, drinakge, roads, parking, sanitary and provision of

electrical// 05/07/201 Opentender DO/GGC/NL/32 communication conduits & metal boxes for NWR residential colony at various stations between Dausa- Gangapurcity new

BG line project.

11 Construction of Single 12 - - Yes NWR/S&C/C M/s Valecha- 53.02 Crore 27/09/2012. - - Work terminated single line 13 packet A/106 dated Transtonelstroey Extended on 07/07/2015. standard straight system 29/12/10 (J/V) Mumbai upto Final bill is under alignment tunnel in 31/12/2015 process.

soil and rock DO/GGC/NL/30 including cut and

cover portion

between chainage 38/720 to 40/840 including side drain

and other 27/07/2009 Opentender approaches of tunnel between Didwana- Lalsot Railway station in connection with Dausa- Gangapurcity new

BG line project. 12 Laying and linking of Single 6 - - Yes M/s Goel Brothers 5.66 Crore 01/08/2012. 13/09/11 Work in progress BG track and packet Dy.CE/C/DO Rail Infra Pvt. Ltd., Extended

transportation of system /CA/56 Bareilly. upto

P.Way material, PSC dated 31/10/2014

sleepers etc between 18/10/11 DO/GGC/NL/40

Dausa- Deedwana

section in connection

18/05/2011 Opentender with Dausa- Gangapurcity new

BG line project. 28/03/2011

43

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

13 Construction of Single 7 - - Yes Dy.CE/C/DO M/s Jai Salasar 4.60 04/05/12 21/01/12 - Final bill has been Broad Gauge packet /CA/58 Balaji Construction Extended cleared during Formation from system dated Co. (J/V) Jaipur upto this month. chainage 1150.00 to 21/02/2011 04/09/2012

15000.00 between 2

Dausa Kala and

DO/GGC/NL/9 (R&C) DO/GGC/NL/9 Shekhpura Villages in connection with

Dausa-Gangapur

25/11/2011 28/12/2011 City New Broad Opentender Gauge line Project(Risk & Cost tender).

14 Construction of Single 7 - - Yes Dy.CE/C/DO M/s Jai Salasar 2.95 04/05/12 21/01/12 - Final bill has been Broad Gauge packet /CA/59 Balaji Construction Extended cleared during Formation from system dated Co. (J/V) Jaipur upto this month.

chainage 15000.00 21/02/2011 04/09/2012

to 28000.00 2 between Dausa and

Lalsot in connection DO/GGC/NL/10 (R&C) DO/GGC/NL/10

with Dausa-

25/11/2011 28/12/2011 Gangapur City New Opentender Broad Gauge line Project(Risk & Cost tender).

15 Construction of Single - - Yes Dy.CE/C/DO M/s Meenesh 5.47 Crore 05/07/2013. 08/04/2013 - Work completed.

broad gauge packet /CA/67 Contractor & Extended Final

formation from system 2 dated Developers Pvt. upto measurements chainage 1150 to 16/04/13 Ltd., Jaipur 15/10/2014 under process

15000 in connection

with Dausa 11/01/2013

Gangapurcity new Opentender DO/GGC/NL/9 (R&C)R DO/GGC/NL/9 line project (Risk & Cost tender).

16 Construction of Single - - Yes Dy.CE/C/DO M/s MCD Pvt. Ltd., 3.30 Crore 05/07/13 08/04/2013 - Completed. Final

broad gauge packet /CA/68 & Aastha Extended measurements

formation from system 2 dated Construction upto under process. chainage 15000 to 16/04/13 Co.(JV), Jaipur 15/10/2014

28000 in connection

with Dausa 11/01/2013 Gangapurcity new Opentender DO/GGC/NL/10(R&C)R line project(Risk & cost tender).

44

DETAILS OF CONTRACT CONCLUDED DURING THE MONTH OF NOVEMBER, 2015 Sr. Tender Item /nature of Mode of Dt. of Types of Last date Nos. of Nos. and Nos. & Whether Contract Name of contractor. Value of Scheduled Actual date Actual date Remarks/ No No. work tender publication bidding of receipt tenders name of names of contract No. & date. contract date of of start of of Reason for delay of NIT ( single of tender received parties parties not awarded completion work completion if any, /two bid qualified qualified to lowest of supplies. system ) after after tenderer technical technical evaluated evaluation evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

17 Construction of Single 3 - - yes Dy. M/s Shree Ram Rs.4.74 10/06/2014 26/12/2014 Safety works in

minor bridges from packet CE/C/DO/CA Kripa Constructions, Crore Extended progress.

chainage 00 to system /74 dated Jaipur upto

30000 between 14/03/2014 30/09/2015

Dausa- Lalsot in DO/GGC/NL/60R

connection with 20/11/2013 opentender Dausa- Gangapurcity new BG line project

18 Construction of 12 Two 2 - - Yes Dy.CE/C/DO M/s HGIEPL- Rs.10.72 29/03/2015 - - Work in progress.

nos LHS between packet /CA/75 COLOSSAL (JV), Crore extended Dausa- Deedwana system dated Jaipur upto

section in 16/04/2014- 28/02/2016

connection with

06/09/13 DO/GGC/NL/48R Dausa- Gagnapurcity Opentender new BG line project.

19 Construction of 3 nos Two 4 - - Yes NWR/S&C/C M/s Bharat Spun Rs.10.44 08/04/15 - - Agreement Low Over Pass at LC packet A/136 dated Pipe & Construction Crore further executed. Work

No. 4, 26 & 27 on system 03/06/2014 Co., Jaipur extension held up for want

Dausa- Gangapurcity under of funds.

secton 06/09/13 process.

DO/GGC/NL/53 Opentender

20 Construction of Road Two 6 - - Yes NWR/S&C/C M/s Bharat Spun Rs.13.43 12/07/15 - - Work in progress. Over Bridge at LC packet A/134 dated Pipe & Construction Crore extended

No. 5B on Dausa- system 16/05/2014 Co., Jaipur upto

Gangapurcity 31/07/2016

section 06/09/13

DO/GGC/NL/56 Opentender

21 Construction of Road Two 4 - - Yes NWR/S&C/C M/s Bharat Spun Rs.13.75 09/07/15 - - Agreement Over Bridge at LC packet A/135 dated Pipe & Construction Crore further executed. Work

No. 24B on Dausa- system 19/05/2014 Co., Jaipur extension held up for want

Gangapurcity under of funds.

section 06/09/13 process

DO/GGC/NL/57 Opentender

For CAO/C/JP

45