Dhulikhel-Namobudha-Balthali Trek - 3 Days
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
3702-NEP: Disaster Resilience of Schools Project and Title: DRSP/CLPIU/076/77-Kavre-02 Contract No
Invitation for Bids Date: 24 September 2019 Loan No. 3702-NEP: Disaster Resilience of Schools Project and Title: DRSP/CLPIU/076/77-Kavre-02 Contract No. Construction of School Buildings, Toilet and Water Supply Facilities and Title: including Site Development Works in Nine (9) Schools of Kavrepalanchok District Deadline for Submission of 8 November 2019, 12:00 hours Nepal Standard Time (NST) Bids: 1. The Government of Nepal has received a financing from the Asian Development Bank (ADB) toward the cost of Disaster Resilience of Schools Project (DRSP). Part of this financing will be used for payments under the contract named above. Bidding is open to bidders from eligible source countries of ADB. 2. The Central Level Project Implementation Unit (Education), National Reconstruction Authority (NRA) (the “Employer”) invites sealed bids from eligible bidders or joint ventures for the Construction of School Buildings, Toilet and Water Supply Facilities including Site Development Works in Nine (9) Schools of Kavrepalanchok District. Construction period is 18 months after contract signing date. 3. Only eligible bidders with the following key qualifications should participate in the bidding: Key Qualification Minimum Description of works Minimum Lot work to be bid as SINGLE PACKAGE Average Annual S.N. Identification experience, (Construction of following school building Turnover (Last (ID) No. size and complex) three (3) years). nature. • Bhaleswor Mavi, Malpi, Panauti Municipality-8 • Dedithumka Mavi, Mandan Deupur Municipality-9 • Gyaneswori Mavi, Padalichaur, Anaikot-1 • Himalaya Mavi, Pipalbot, Rosh RM-6 At least one (1) • Laxmi Narayan Mavi, Narayantar, Roshi RM-2 DRSP/CLPIU/0 USD 7.00 Million project of Saraswati Mavi, Bhugdeu, Bethanchok RM-6 1 76/77-Kavre -02 • worth USD • Sarbamangala Mavi, Aglekot, Panchkhal Municipality-3 2.52 Million. -
Quaternary Stratigraphy of Panchkhal Valley, Central Nepal
Bulletin of the Department of Geology C Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 10, 2007, pp. 1–8 e y n g t o ra l l eo De G partment of Kirtipur Quaternary stratigraphy of Panchkhal valley, Central Nepal *Yadu Nath Timsina and Prakash Chandra Adhikary Central Department of Geology, Tribhuvan University, Kathmandu, Nepal ABSTRACT The Panchkhal Valley is one of intermontane basins in the Central Nepal east of Kathmandu with two sets of neo-tectonic lineaments sited from satellite imagery and aerial photographs. One extending NNW–SSE east of the valley results the old Panchkhal Valley uplifting along south during Plio-Pleistocene age and second one NE–SW has ultimately uplifted the old valley. The Panchkhal Clay, Ratopairo Formation, Rampur Formation and Tamaghat Formation are four depositional lithostratigraphical units. Similarly, Tamaghat, Rampur, Thumka, and Chisapani surfaces are depositional and Basukidada, Sano-Tinghare, Sumara-Thulo Tinghare, Dhulikhel, Koiralathumka and Bhamarkot surfaces are erosional morphostratigraphic geomorphic surfaces. Geomorphic terrace cutting level is around 1400–1440 m and all surfaces and deposits above and below are relatively young. INTRODUCTION Thrust (MT). Abrupt change in terrace elevation The Panchkhal Valley, intermontane basin associated with observed lineaments at Khok Village developed in the southeast of the Kathmandu Valley and at Okhare Village signifies that they are is located within the eastern flank of a synclinorium neotectonic in origin. in Kavre District (Stocklin 1980). The Jhiku Khola, Two type of lineaments were recognised, of which a tributary of the Sun Koshi River is characterised the first extends along NNW-SSE passing from the by development of geomorphic surfaces at different east of the Panchkhal Valley along the Cha Khola elevations formed after the last glacial retreat in the and eastern ridge. -
Food Insecurity and Undernutrition in Nepal
SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014. -
Map of Dolakha District Show Ing Proposed Vdcs for Survey
Annex 3.6 Annex 3.6 Map of Dolakha district showing proposed VDCs for survey Source: NARMA Inception Report A - 53 Annex 3.7 Annex 3.7 Summary of Periodic District Development Plans Outlay Districts Period Vision Objectives Priorities (Rs in 'ooo) Kavrepalanchok 2000/01- Protection of natural Qualitative change in social condition (i) Development of physical 7,021,441 2006/07 resources, health, of people in general and backward class infrastructure; education; (ii) Children education, agriculture (children, women, Dalit, neglected and and women; (iii) Agriculture; (iv) and tourism down trodden) and remote area people Natural heritage; (v) Health services; development in particular; Increase in agricultural (vi) Institutional development and and industrial production; Tourism and development management; (vii) infrastructure development; Proper Tourism; (viii) Industrial management and utilization of natural development; (ix) Development of resources. backward class and region; (x) Sports and culture Sindhuli Mahottari Ramechhap 2000/01 – Sustainable social, Integrated development in (i) Physical infrastructure (road, 2,131,888 2006/07 economic and socio-economic aspects; Overall electricity, communication), sustainable development of district by mobilizing alternative energy, residence and town development (Able, local resources; Development of human development, industry, mining and Prosperous and resources and information system; tourism; (ii) Education, culture and Civilized Capacity enhancement of local bodies sports; (III) Drinking -
49215-001: Earthquake Emergency Assistance Project
Environmental Assessment Document Initial Environmental Examination Loan: 3260 July 2017 Earthquake Emergency Assistance Project: Panchkhal-Melamchi Road Project Main report-I Prepared by the Government of Nepal The Environmental Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Government of Nepal Ministry of Physical Infrastructure and Transport Department of Roads Project Directorate (ADB) Earthquake Emergency Assistance Project (EEAP) (ADB LOAN No. 3260-NEP) INITIAL ENVIRONMENTAL EXAMINATION OF PANCHKHAL - MELAMCHI ROAD JUNE 2017 Prepared by MMM Group Limited Canada in association with ITECO Nepal (P) Ltd, Total Management Services Nepal and Material Test Pvt Ltd. for Department of Roads, Ministry of Physical Infrastructure and Transport for the Asian Development Bank. Earthquake Emergency Assistance Project (EEAP) ABBREVIATIONS AADT Average Annual Daily Traffic AC Asphalt Concrete ADB Asian Development Bank ADT Average Daily Traffic AP Affected People BOD Biological Oxygen Demand CBOs Community Based Organization CBS Central Bureau of Statistics CFUG Community Forest User Group CITIES Convention on International Trade in Endangered Species CO Carbon Monoxide COI Corridor of Impact DBST Double Bituminous Surface Treatment DDC District Development Committee DFID Department for International Development, UK DG Diesel Generating DHM Department of Hydrology and Metrology DNPWC Department of National -
Nepal Tour (Dhulikhel/Namo Buddha/Balthali) – 03 Days
NEPAL TOUR (DHULIKHEL/NAMO BUDDHA/BALTHALI) – 03 DAYS Dhulikhel is situated only 30 Km East of Kathmandu, the capital of Nepal on the Araniko Highway in the lap of Greenwood and at an elevation of 1,550 meter above the mean sea level and along the ridge that separates the valley of Banepa and Panchkhal. It looks as if Dhulikhel is busy in conversation with the Himalayan range on the north with a beautiful smile. This might be the reason why many people call this place as the 'Queen of the Hills', and say that this place shares many features with Darjeeling a tourist city in India. From Dhulikhel one can get a panoramic view of the Himalayas from east to west. Your day at Dhulikhel may begin through witnessing the spectacular sunrise over the some of the greatest peaks of the world, including Gauri Shanker, Langtang, and Ganesh Himal. Namo Buddha is situated at the elevation of 1750m above sea level and located 40 kilometers southeast of Kathmandu (approx 1 hr 30 minutes drive from Kathmandu by private vehicle). Namo Buddha is one of the most important Buddhist pilgrimage sites south of the Himalayas, as well as being one of the holiest Buddhist sites in the world. Known by Tibetans as Takmo Lu Jin, meaning “Tigress Body Generosity”, the Namo Buddha stupa marks the site where a young prince (in some versions, the Buddha himself) encountered a tigress close to starvation and unable to feed her own cubs. Overcome with compassion, the prince allowed the tigress to consume him and thereby feed her cubs. -
Provincial Summary Report Province 3 GOVERNMENT of NEPAL
National Economic Census 2018 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 Provincial Summary Report Provincial National Planning Commission Province 3 Province Central Bureau of Statistics Kathmandu, Nepal August 2019 GOVERNMENT OF NEPAL National Economic Census 2018 Provincial Summary Report Province 3 National Planning Commission Central Bureau of Statistics Kathmandu, Nepal August 2019 Published by: Central Bureau of Statistics Address: Ramshahpath, Thapathali, Kathmandu, Nepal. Phone: +977-1-4100524, 4245947 Fax: +977-1-4227720 P.O. Box No: 11031 E-mail: [email protected] ISBN: 978-9937-0-6360-9 Contents Page Map of Administrative Area in Nepal by Province and District……………….………1 Figures at a Glance......…………………………………….............................................3 Number of Establishments and Persons Engaged by Province and District....................5 Brief Outline of National Economic Census 2018 (NEC2018) of Nepal........................7 Concepts and Definitions of NEC2018...........................................................................11 Map of Administrative Area in Province 3 by District and Municipality…...................17 Table 1. Number of Establishments and Persons Engaged by Sex and Local Unit……19 Table 2. Number of Establishments by Size of Persons Engaged and Local Unit….….27 Table 3. Number of Establishments by Section of Industrial Classification and Local Unit………………………………………………………………...34 Table 4. Number of Person Engaged by Section of Industrial Classification and Local Unit………………………………………………………………...48 Table 5. Number of Establishments and Person Engaged by Whether Registered or not at any Ministries or Agencies and Local Unit……………..………..…62 Table 6. Number of establishments by Working Hours per Day and Local Unit……...69 Table 7. Number of Establishments by Year of Starting the Business and Local Unit………………………………………………………………...77 Table 8. -
Balthali Village Via Dhulikhel Namobuddha Hiking
Xtreme Climbers Treks And Expedition Pvt Ltd Website:https://xtremeclibers.com Email:[email protected] Phone No:977 - 9801027078,977 - 9851027078 P.O.Box:9080, Kathmandu, Nepal Address: Bansbari, Kathmandu, Nepal Balthali Village via Dhulikhel Namobuddha Hiking Introduction Balathali is a village development committee in Kavrepalanchok District in the Bagmati Zone of central Nepal. At the time of the 1991 Nepal census it had a population of 2687 and had 526 houses in it. Houses are built of pagoda style with different colors. The traditional settlement of the Balthali Day Hike via NamoBuddha is really attractive. The surrounding location is full of green terraced farmlands and forest. Balthali Day Hike via NamoBuddha village hiking leads through the beautiful tourist destination Dhulikhel, historical Namobuddha monastery and several ascending and descending on the foothills. Namobuddha bears an interesting history of princes a sacrifice to fulfill the hunger of a tigress and her cubs. Starting Balthali Namobuddha Scenic Hike from the eastern rim of Kathmandu valley at Changunarayan. We reach Nagarkot for superb sunset view by the evening and exquisite sunrise in the morning. After breakfast we make a wonderful hike to Dhulikhel, a beautiful town to the east of Kathmandu. From Dhulikhel. Facts Duration: 5 days Grade: Easy Group: 2 - 15 Country: Nepal Best Season: March-May and Sept-Nov Start/Ends: Kathmandu (Capital of Nepal) Accomodation: Hotel/Lodge Transportation: Private Vehicle Highlights Balthali Day Hike Beautiful tourist destination & Pilgrimage place NamoBuddha Thrangu Tashi Yangtse -a Karma Kagyu tradition Tibetan Buddhist monastery Sunrise and sunset views including views of spectacular green hill’s. -
A Final Report On
Jalsrot Vikas Sanstha A FinalKathmandu Report on ROSHI KHOLA IN RELATION TO ITS MULTIPLE USES AND MANAGEMENT AT THE COMMUNITY LEVEL December 2016 Jalsrot Vikas Sanstha (JVS)/GWP Nepal i Disclaimer The findings, interpretations and conclusions expressed herein are those of the author(s) and do not necessarily reflect the views of the institution. ii Foreword This research was part of WACREP activity of Jalsrot Vikas Sanstha (JVS)/GWP Nepal. JVS/GWP Nepal highly appreciates the contribution of Mr. Prakash Gaudel for conducting the research. Our sincere gratitude also goes to Mr. Batu K. Uprety and Dr. Vijaya Shrestha for reviewing the draft by providing valuable suggestions. JVS/GWP Nepal also acknowledges the contribution from Mr.Tejendra GC and Ms. Anju Air during the preparation of this publication. Jalsrot Vikas Sanstha (JVS)/GWP Nepal iii Acronyms DDC : District Development Committee DHM : Department of Hydrology and Meteorology DoED : Department of Electricity Development GoN : Government of Nepal GWP : Global Water Partnership HEP : Hydroelectric Project JVS : Jalsrot Vikas Sanstha KVIWSP : Kavre Valley Integrated Water Supply Project MoEn : Ministry of Energy MoI : Ministry of Irrigation MoUD : Ministry of Urban Development MW : Megawatt NEA : Nepal Electricity Authority NGO : Non-governmental Organization NPC : National Planning Commission NWSC : Nepal Water Supply Corporation VDC : Village Development Committee WUA : Water Users Association iv Contents Introduction ............................................................................................................... -
UPPSATSER Kulturgeografiska Institutionen
UPPSATSER Kulturgeografiska institutionen Policy, agency and scale in local adaptation to socio-environmental change in the Panchkhal Valley, Nepal Jakob Grandin Course: 2KU046: Master’s Thesis in Geography 30hp Semester: Autumn semester 2015 ABSTRACT Grandin, J. 2016. Policy, agency and scale in local adaptation to socio-environmental change in the Panchkhal Valley, Nepal. Uppsatser Kulturgeografiska institutionen, Uppsala Univer- sity. Masters Thesis in Geography, 30hp, Fall Semester 2015. This case study explores climate change coping and adaptation strategies in an agriculture- dependent community in the Panchkhal Valley in Nepal that suffered from five years of drought between 2004 and 2009. Based on fieldwork and interviews in Panchkhal 2011–2012, it explores how drought, combined with an ongoing process of agricultural commercialization and intensification, lead to a situation of ‘double exposure’ for Panchkhal farmers. As a con- sequence, current development policies based on the intensification and commercialization of agriculture may both support and undermine climate change adaptation in important ways. For instance, access to markets and a monetary income facilitated coping and adaptation, while dependence on agrochemicals led to increased vulnerability and environmental deterio- ration at the local level. Furthermore, none of the reported coping and adaptation strategies were able to provide the agricultural system in Panchkhal with sufficient amounts of water during the drought. While community organizations and NGOs were reported to play im- portant roles in facilitating adaptation and mediating support at the time of the drought, gov- ernment support was regarded to be insufficient. Coping and adaptation projects were often launched by local level actors, but these projects were dependent on resources from other ad- ministrative scales for their realization. -
A6-4-11 Test Pit Log of Grid Sampling at Location TP-6
Test Pit Log of Grid Sampling at Location TP-6 A6-4-11 River bed condition and mean particle size at Location TP-6 A6-4-12 2) River Cross Section Topo Survey Results Survey locations, direction and sections are shown from page A6-4-13 to A6-4-17. Cross section survey location at Sunkoshi River Cross section survey location at Rosi River A6-4-13 River bed cross section(1/4) A6-4-14 River bed cross section(2/4) A6-4-15 River bed cross section(3/4) A6-4-16 River bed cross section(4/4) A6-4-17 6-5 Traffic Survey 6-5 TRAFFIC SURVEY Traffic survey was conducted at 6 different intersection locations. All turning movement counts on each leg of the intersection were recorded. Locations and durations of survey are as shown below and in Figure 1; (1) Dhalkebar 24 hours/1 day (6am-6am) (2) Bardibas 16 hours/2 days (4am- 8pm) (3) Pathlaiya 24 hours/1 day (6am-6am) (4) Narayanghat 24 hours/1 day (6am-6am) (5) Naubise 24 hours/1 day (6am-6am) (6) Dhulikhel 16 hours/2 days (4am-8pm) (6) (5) (4) (2) (3) (1) Figure 1 Traffic Count Stations RESULTS The results of the survey are shown in Table 1 and Figure 2. The results for Bardibas and Dhulikhel were converted to 24hours volume by applying factors calculated from Dhalkebar and Naubise respectively. A6-5-1 Table 1 Results of Traffic Volume Counts Direction Bus Truck Survey Car Motor Others Location Date Van Medium/Tractor Tempo Total From To Mini Bus Bus Light Cycle and Time Jeep Heavy etc From Kathmandu Mugling 666 140 384 80 1037 3 362 2 2674 March 19,'08 Mugling Kathmandu 671 158 344 57 1131 1 298 2 -
ROLE of REMITTANCE in LIVELIHOOD: a Case Study of Gokule VDC, Kavre District, Nepal
ROLE OF REMITTANCE IN LIVELIHOOD: A Case Study of Gokule VDC, Kavre District, Nepal A Thesis Submitted to Central Department of Rural Development Tribhuvan University, In Partial Fulfillment of the Requirements for the Degree of the Master of Arts (M.A.) in Rural Development By SITA LAMA Central Department of Rural Development Tribhuvan University, Kathmandu TU. Regd No: 6-2-715-28-2008 Exam Roll No: 172 August , 2016 DECLARATION I hereby declare that the thesis entitled Role of Remittance in Livelihood : A Case Study of Gokule VDC, Kavre District, Nepal submitted to the Central Department of Rural Development, Tribhuvan University, is entirely my original work prepared under the guidance and supervision of my supervisor Bishnu Bahadur Khatri.. I have made due acknowledgements to all ideas and information borrowed from different sources in the course of preparing this thesis. The results of this thesis have not been presented or submitted anywhere else for the award of any degree or for any other purposes. I assure that no part of the content of this thesis has been published in any form before. ............... Sita Lama Central Department of Rural Development Tribhuvan University, Kathmandu TU. Regd No: 6-2-715-28-2008 Exam Roll No: 172 Date: 11st August, 2016 2073/04/29 2 RECOMMENDATION LETTER The thesis entitled Role of Remittance in Livelihood : A Case Study of Gokule VDC, Kavre District, Nepal has been prepared by Sita Lama under my guidance and supervision. I hereby forward this thesis to the evaluation committee for final evaluation and approval. ............................... Bishnu Bahadur Khatri Thesis Supervisor Date: 21st August, 2016 2073/05/05 3 APPROVAL LETTER The thesis entitled Role of Remittance in Livelihood : A Case Study of Gokule VDC, Kavre District, Nepal submitted by Sita Lama in partial fulfilment of the requirements for the Master Degree (M.A.) in Rural Development has been approved by the evaluation committee.