March 2, 2015

CERTIFICATE 25270

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 345 Park Avenue South, southeast corner of Park Avenue South and East 26th Street, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7156-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015.

Faith Rose Executive Director CITY NEW YORK

March 2, 2015

CERTIFICATE 25271

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 363 West 23'd Street, northeast corner of West 23'd Street and Ninth Avenue, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7157 -A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on Mar:ch 2, 2015.

Faith Rose Ex¢cutive Director N¥CDESIGN OF THE OF NEW YORK

March 2, 2015

CERTIFICATE 25272

RESOLVED That the Design Commission, having considered designs for the installation of photovoltaic panels, Port Richmond High School, 85 St. Joseph's Avenue, Staten Island, submitted by the Department of Citywide Administrative Services, represented by exhibits 7158-A & 8 of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on ~rch 2, 2015. l "'" N¥CDESIGN THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25273

RESOLVED That the Design Commission, having considered designs for the installation of photovoltaic panels, Evander Childs High School, 800 East Gun Hill Road, Bronx, submitted by the Department of Citywide Administrative Services, represented by exhibits 1543-AO & AP of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015.

0 30% N¥1:0 IGN NEW YORK

March 2, 2015

CERTIFICATE 25274

RESOLVED That the Design Commission, having considered designs for the installation of photovoltaic panels, Hillcrest High School and P.S. 86, 160-05 Highland Avenue and 87-01 Parsons Boulevard, Queens, submitted by the Department of Citywide Administrative Services, represented by exhibits 3725-Y & Z of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting 2015.

0 30% N¥COESIGN OF THE CITY NEW YORK

March 2, 2015

CERTIFICATE 25275

RESOLVED That the Design Commission, having considered designs for the installation of photovoltaic panels, Hale A. Woodruff School, 755 Wortman Avenue, , submitted by the Department of Citywide Administrative Services, represented by exhibits 7159-A & B of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting 2, 2015.

Faith Rose E;lecutive Director "~/ 11¥1:0 IGN OF THE CiTY OF NEW YORK

March 2, 2015

CERTIFICATE 25276

RESOLVED That the Design Commission, having considered designs for the installation of photovoltaic panels, Rafael Cordero Middle School, 350 Linwood Street, Brooklyn, submitted by the Department of Citywide Administrative Services, represented by exhibits 7160-A & B of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting 2, 2015. II¥COESIGN OF THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25277

RESOLVED That the Design Commission, having considered designs for the installation of photovoltaic panels, Sarah Garnett Junior High School, 800 Gates Avenue, Brooklyn, submitted by the Department of Citywide Administrative Services, represented by exhibits 7161-A & B of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project COnsisting Of 8" X 10" archival-quality COlOr photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. ,/ 'S ,/ ) ,// ~ _,,-~~-=--:""t' t/ Fatth Rose Eiecutive Director N¥CDESIGN OF NEW YORK

March 2, 2015

CERTIFICATE 25250

RESOLVED That the Design Commission, having considered a proposal for the installation of Waterfront Nature Walk by George Trakas, Phase II & Ill, Newtown Creek Water Pollution Control Plant, 329 Greenpoint Avenue, Brooklyn, submitted by the Department of Cultural Affairs' Percent for Art Program, the Department of Design and Construction and the Department of Environmental Protection, represented by exhibits 2421-DX, DY, DZ, EA, EC, ED & EM of record in this matter, hereby gives to the same unanimous preliminary approval. Commissioner Polshek recused himself.

The Commission thanks the Department of Environmental Protection for establishing a landscape maintenance division to ensure that Waterfront Nature Walk and other planted spaces on the agency's property are well maintained.

Preliminary approval is conditioned upon commencement of work before March 2, 2017 and submission of this project for final review and approval.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. /;?''"\ THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25278

RESOLVED That the Design Commission, having considered designs for the installation of signage, Staten Island Museum, Building A, Snug Harbor Cultural Center, 1000 Richmond Terrace, Staten Island, submitted by the Department of Cultural Affairs, represented by exhibits 41 91-HO, HP & HQ of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting 2, 2015. CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25279

RESOLVED That the Design Commission, having considered designs for the installation of doors, a canopy with signage and rooftop mechanical equipment, Staten Island Family Justice Center, 126 Stuyvesant Place, Staten Island, submitted by the Department of Design and Construction, represented by exhibits 5877 -D, E, F & G of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 2, 2017.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. NW:DESIGN OF THE CITY NEW YORK

March 2, 2015

CERTIFICATE 25280

RESOLVED That the Design Commission, having considered designs for the reconstruction of the marquee, St. George Theatre, 35 Hyatt Street, Staten Island, submitted by the Department of Design and Construction, represented by exhibits 7098-A, B, K & L of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that, per standard procedure, the construction drawings submitted for final review will include details of (1) the reveal between the lay light marquee ceiling and the LED screens and {2) the reveal where the LED screens meet the existing building fa<;ade.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 2, 2017.

A true copy of resolution adopted by the Design Commission at its meeting 2, 2015. NVCDESIGN THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25281

RESOLVED That the Design Commission, having considered designs for the construction of an NYPD bomb squad training facility, 100A Rodman Neck Path, Pelham Bay Park, Bronx, submitted by the Department of Design and Construction, represented by exhibits 1842-GV, GW, GX, GY & GZ of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the Police Department will (1) confirm whether the existing bomb squad facility will be demolished, (2) confirm whether that site can be restored to a natural and more resilient condition, and (3) although beyond the scope of this project, update the Commission on any future plans to relocate the K9 kennel which is currently in the floodplain prior to submission for final approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 2, 2017.

A true copy of resolution adopted by the Design Commission at its meeting on March.2, 2015. /"

Faith/Rose Exeeutive Director / N¥CDESIGN OF THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25282

RESOLVED That the Design Commission, having considered designs for the reconstruction of 1 1 Montefiore Square, Hamilton Place, West 136 h Street, Broadway and West 138 h Street, Manhattan, submitted by the Department of Design and Construction, the Department of Parks & Recreation and the Department of Transportation, represented by exhibits 5411-L, M, N & 0 of record in this matter, hereby gives to the same unanimous final approval subject to the submission of designs for a skate deterrent at the seat wall.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on 2015. IIVCOESIGN THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25283

RESOLVED That the Design Commission, having considered designs for the reconstruction of 1 Corona Plaza, south side of Roosevelt Avenue between National Street and 1 04 h Street, Queens, submitted by the Department of Design and Construction, the Department of Parks & Recreation and the Department of Transportation, represented by exhibits 6896-1, J, K & L of record in this matter, hereby gives to the same unanimous final approval with the understanding that (1) the agencies will specify a placeholder for the lighting (Flushing Meadows pole with LED Cobra luminaire) that can be swapped out without incurring change orders and (2) the Department of Transportation will update the Commission on its evaluations of appropriately-scaled directional LED luminaire and attachment options for use on the pedestrian-scale Flushing Meadows light pole in the next month.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. N¥CDESIGN THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25284

RESOLVED That the Design Commission, having considered designs for the installation of 1 lighting, Rocket Park miniature golf course, New York Hall of Science, 47-01 111 h Street, Queens, submitted by the Department of Design and Construction, the Department of Parks & Recreation and the Department of Cultural Affairs, represented by exhibits 21 03-AAC & AAD of record in this matter, hereby gives to the same unanimous final approval with the understanding that the Parks Department's Forestry, Horticulture & Natural Resources Group will be consulted to ensure that trenching for the conduit installation will avoid the critical root zones of the existing mature trees.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting 2015. March 2, 2015

CERTIFICATE 25285

RESOLVED That the Design Commission, having considered designs for prototypical public communications structures (LinkNYC) for installation citywide, submitted by the Department of Information Technology and Telecommunications, represented by exhibits 6816-EI, EJ & EK of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the team will work with the committee on siting guidelines to establish a plan for installation that will be included in the project rules. The Commission commends the design. Commissioner Nielsen recused herself.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 2, 2017.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. N¥CDESIGN OF THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25286

RESOLVED That the Design Commission, having considered designs for the installation of streetscape improvements as Phase I of the streetscape master plan, New York Presbyterian Hospital and Columbia University Medical Center, West 168th Street between Fort Washington Avenue and Broadway, Manhattan, submitted by the Department of Transportation, represented by exhibits 1093-AS, AT, AW, AX & AY of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March ;n2015. I I / I Faid1 Rpse

E~eckffive.1 Director

0 30% II¥COESIGN OF THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25287

RESOLVED That the Design Commission, having considered designs for the installation of streetscape improvements as Phase II of the streetscape master plan, New York Presbyterian Hospital and Columbia University Medical Center, Fort Washington Avenue between West 1 165 h Street and West 168th Street, Manhattan, submitted by the Department of Transportation, represented by exhibits 1 093-AZ & BA of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 2, 2017.

A true copy of resolution adopted by the Design Commission at its meeting on 2015. N¥CD IGN OF THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25288

RESOLVED That the Design Commission, having considered designs for the construction of a pavilion and adjacent site work, Conference House Park, Hylan Boulevard at the Arthur Kill, Staten Island, submitted by the Department of Parks & Recreation, represented by exhibits 1959-X, Y, Z, AA & AB of record in this matter, hereby gives to the same unanimous final approval. The Commission commends the design.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015.

0 30% NW:DESIGN OF CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25289

RESOLVED That the Design Commission, having considered designs for the reconstruction of the shoreline south of the Robert F. Kennedy Bridge (formerly the Triborough Bridge), Randall's Island Park, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 5914-DG & DH of record in this matter, hereby gives to the same unanimous final approval. The Commission commends the project.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. J-, /I <-' j ;fait~ Rose {=ytcutive Director lftiCDESIGN OF THE CITY NEW YORK

March 2, 2015

CERTIFICATE 25290

RESOLVED That the Design Commission, having considered designs for the restoration of the landscape, Shore Belt Parkway between Bergen Avenue and Pennsylvania Avenue, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 6433-DO, DP & DQ of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. IWCDESIGN OF THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25291

RESOLVED That the Design Commission, having considered designs for the construction of adult and youth fitness areas and adjacent site work, Aileen B. Ryan Recreational Complex, Bruckner Expressway, Suhre Avenue, Middletown Road and Stadium Avenue, Pelham Bay Park, Bronx, submitted by the Department of Parks & Recreation, represented by exhibits 1842-HA & HB of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. lfiiCDESIGN OF THE CITY NEW YORK

March 2, 2015

CERTIFICATE 25292

RESOLVED That the Design Commission, having considered designs for the construction of a restaurant and adjacent site work, 831 Arthur Kill Road, LaTourette Park, Staten Island, submitted by the Department of Parks & Recreation, represented by exhibits 5195-G & H of record in this matter, hereby gives to the same unanimous final approval with the understanding that a signage proposal consistent with the details in the construction drawings will be submitted for committee review once a tenant is selected.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on Marc~,2, 2015.

0 30% IIIICDESIGN OF THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25293

RESOLVED That the Design Commission, having considered designs for the reconstruction of Veterans Grove Triangle, 43rd Avenue, Judge Street and Whitney Avenue, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 7118-G & H of record in this matter, hereby gives to the same unanimous final approval. This approval does not include the memorial plaque, which was not submitted to or approved by the Design Commission.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. II¥CDESIGN OF THE CITY NEW YORK

March 2, 2015

CERTIFICATE 25294

RESOLVED That the Design Commission, having considered designs for the reconstruction of 1 1 the boardwalk, Phase Ill, Rockaway Beach between Beach 108 h Street and Beach 126 h Street, Queens, submitted by the Department of Parks & Recreation and the Economic Development Corporation, represented by exhibits 2530-EW, EX & EY of record in this matter, hereby gives to the same unanimous final approval. Commissioner Scher recused herself.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. IIVCDESIGN

March 2, 2015

CERTIFICATE 25295

RESOLVED That the Design Commission, having considered a final report for the repair of the Raoul Wallenberg Monument (1998) by Gustav Kraitz, Raoul Wallenberg Place, First Avenue and East 47th Street, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 5888-K, L & M of record in this matter, hereby gives to the same unanimous final approval.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. IWCDESIGN THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25296

RESOLVED That the Design Commission, having considered a final report for the restoration and alteration of the John F. Kennedy Monument(1966) by Neil Estern, , , Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 1611-AO, AP & AQ of record in this matter, hereby gives to the same unanimous final approval.

A true copy of resolution adopted by the Design Commission at its meeting on March 2015.

G 30% NVCOESIGN OF THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25297

RESOLVED That the Design Commission, having considered a final report for the conservation of Columnade (1973) by Eduardo Ramirez Villamizar, east of the Cloisters and Margaret Corbin Drive, and south of Sir William's Dog Run, Fort Tryon Park, Manhattan, submitted by the Department of Parks & Recreation, represented by exhibits 2026-BV, BW & BX of record in this matter, hereby gives to the same unanimous final approval.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015. NIICDESIGN OF THE CITY NEW YORK

March 2, 2015

CERTIFICATE 25298

RESOLVED That the Design Commission, having considered designs for the installation of signage, Industry Kitchen, Pavilion A, East River Waterfront south of Maiden Lane under the FOR Drive, Manhattan, submitted by the Economic Development Corporation, represented by exhibits 5467-FY, FZ, GA, GB, GC & GO of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the illuminated graphics will be carefully aligned with the glass fiber reinforced concrete coursing of the fa9ades.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 2, 2017.

A true copy of resolution adopted by the Design Commission at its meeting """'rrn 2, 2015.

0 30% N¥CDESIGN THE OF NEW YORK

March 2, 2015

CERTIFICATE 25268

RESOLVED That the Design Commission, having considered designs for the conversion of 370 Jay Street {formerly the Board of Transportation Central Office Building) for use as New York University's Center for Urban Science and Progress, Brooklyn, submitted by the Economic Development Corporation, represented by exhibits 2342-W, X, Y, Z & M of record in this matter, hereby gives to the same unanimous final approval. Commissioner Scher recused herself.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 10" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on 2015. IIIICDESIGN THE CITY OF NEW YORK

March 2, 2015

CERTIFICATE 25299

RESOLVED That the Design Commission, having considered designs for the installation of a signage system, East River Waterfront Esplanade, between Whitehall Street and Pier 35 at Jefferson Street, Manhattan, submitted by the Economic Development Corporation and the Department of Parks & Recreation, represented by exhibits 5467-GE, GF, GG & GH of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before March 2, 2017 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 2, 2015.