FORM-1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY ‘B2’ FOR LESS THAN AND EQUAL TO FIVE HECTARE

(I) BASIC INFORMATION S.No ITEM DETAILS (i) Name of the Mining Lease site M/s. SRI NELURI MADHU BABU (ii) Location/site (GPS Co-ordinates) Sy.No.384/2Villages:kubudapuram, Mandal: Rajupalem, District: , State:

1.16°28'16.17"N -79°55'53.48"E 2.16°28'10.46"N -79°55'50.10"E 3.16°28'10.72"N -79°55'49.50"E 4.16°28'16.23"N - 79°55'53.34"E

(iii) Size of the Mining Lease (Hectare) 0.235 Ha (iv) Capacity of Mining Lease(TPA) 17,328 TPA (v) Period of Mining Lease 2 Years (vi) Expected cost of the project Rs. 10.00 lakhs (vii) Contact Information Sri Neluri Madhu Babu, S/o. Peda Ramawiah, H.NO:3-4, Near Boddurai Center, Janapadu Village, Piduguralla Mandal, , Andhra Pradesh.

(II) ENVIRONMENTAL SENSITIVITY

Distance in kilometer / S. No. Areas Details 1. Distance of project site from Piduguralla RS at 5.5 km in W nearest rail or road bridge over the concerned River, Rivulet, Nallah is at distance of etc. 1.8 km SSW Erra Vagu – 2.9 km - W Distance from infrastructural facilities 2. Railway line Nalgonda - Guntur of South Central Railway line, is 0.2 km to North National Highway (NH-9) connecting – Vijayawada at a distance of about 49.0 km in NE direction State Highway Highway (SH-45) connecting from Piduguralla – Narasaraopet is at distance of 1.8 km in SSW.

(SH-45) connecting from Piduguralla – Narasaraopet is at distance of 1.8 km in SSW Major District Road Pidugurall – Guntur is at distance of 2 km in S direction. Any Other Road Piduguralla – Narasaraopet is at distance of 1.8 km in SSW. Electric transmission line pole or No Electric transmission line tower pole or tower is present in the Lease Area Canal or check dam or reservoirs Erra Vagu – 2.9 km - W or lake or ponds In-take for drinking water pump Not Applicable house Intake for Irrigation canal pumps Not Applicable 3. Areas protected under None international conventions, national or local legislation for their ecological, landscape, cultural or other related value 4. Areas which are important or sensitive for ecological reasons - Konanki RF – 1.6 km – E Wetlands, watercourses or other Janapadu RF – 1.7 km – SSW water bodies, coastal zone, biospheres, mountains, forests. 5. Areas used by protected, important or sensitive species of Konanki RF – 1.6 km – E flora or fauna for breeding, Janapadu RF – 1.7 km – SSW nesting, foraging, resting, over wintering, migration 6. Inland, coastal, marine or None underground waters 7. State, National Boundaries Andhra Pradesh – Telangana – 17.6 km - N 8. Routes or facilities used by the - public for access to recreation or other tourist, pilgrim areas 9. Defence installations None Densely populated or built-up Sitaramapuram Colony – 0.7 10. area, distance from nearest human km - WNW habitation Areas occupied by sensitive man- None within 10 km radius made land uses (hospitals, 11. schools, places of worship, community facilities) Areas containing important, high None 12. quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to None pollution or environmental 13. damage. (those where existing legal environmental standards are exceeded) Areas susceptible to natural None hazard which could cause the project to present environmental problems 14. (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Is proposed mining site located No 15. over or near fissure/fracture for ground water recharge Whether the proposal involves Not Applicable approval or clearance under the following regulations or acts, namely:- (a) The Forest (Conservation) Act, 1980; 16. (b) The Wildlife (protection) Act,1972 (c) The Coastal Regulation Zone Notification, 2011. If yes, details of the same and their status to be given 17. Forest land involved (Hectares) Forest land is not involved Whether there is any litigation No litigation is pending against pending against the project and / the project. or land in which the project is propose to be set up? (a) Name of the Court 18. (b) Case No. (c) Orders or directions of the court, if any, and its relevance with the proposed project.