RANGE OF SERVICES

We offer services in Engineering, Designing, Fabrication, Erection, Testing, Commissioning, Operation & Maintenance of

Refineries Petrochemicals Fertilizers Thermal Power Plants up to 800 MW

Fabrication Shops (Pressure Parts, Structures)

Note:

We work under the inspection of Boiler Inspectors / Lloyds / EIL / TPI thereby strictly following quality norms of IBR regulations,EIL, TPI & Lloyds Quality Policy.

1 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Operation & Maintenance, Mechanical, Electrical and C & I, Field operations of Power Plants Consisting of Switchyards, Switchgears, Boilers, Turbines, BOP, AHP, CHP, Water Management System of Thermal Power plants.

Sr. Description of Works Plant / Client Duration Status No Name Mechanical Maintenance of rotary parts on round the clock basis for PNC at IOCL (Refineries 1. IOCL 24 Months Continue… Division) Panipat Naphtha Cracker, Panipat, Haryana. AMC for Rotary Equipment maintenance & ISRL 36+24 Continue... 2. Workshop Mechanical Maintenance at ISRL Months petrochemical Complex, Panipat, Haryana Operation and maintenance of Boiler, Turbine STEAG/HMEL 24 months Completed 3. generator including BOP of 165 MW combined cycle based power plant at HMEL, Bathinda Refinery (Punjab). 4. Operation & Maintenance and Electrical and C&I Hindustan Zinc 36 Months Continue… of Ore Beneficiation Plant of Zinc of 4.7 million Limited MT of Hindustan Zinc limited, Zawar Mines, Udaipur Rajasthan. Operation & Maintenance services of 1X108 MW TATA-TPDDDL 24 Months Continue... 5. Gas based Power Plant at -Rithala Plant, Delhi Composite Electrical works in upcoming Oil Refinery including Erection, Testing & 6. commissioning of Transformers, LT/ HT Bus bars, Dangote Refinery 18 Months Continue… HT/LT Motors, Laying HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria. Mechanical Field Works at IIR Butyl Rubber Plant- Reliance Sibur Structural Steel Fabrication & Erection, 7. Elastomers 12 Months Continue… Equipment Erection (Static & Rotary), ABG Piping, Private Limited Bolt Torqueing etc… Reliance Sibur 8. Under Ground Piping Works Elastomers 8 Months Continue… Private Limited Structural, Piping and Equipment(Static & Rotary) Reliance/ Linde Installation Works 5000 MT at Reliance 9. Engineering 09 Months Completed Industries, Jamnagar, SEZ 1 and SEZ 2 Steam Ltd Supper Heater Project 2 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Piping & Structural Steel works of Mechanical Reliance Contract for Additive Dosing tank In DTA Jamnagar 10. 06 Months Completed RTF.(30000 IND) Refinery

Stack Height Increase, CFN Piping and Flue Gas Reliance 11. Duct jobs at SEZ-FCCU Reliance Industries Limited Jamnagar 2.5 Month Completed Jamnagar Gujarat. Refinery IBR Related Piping Modification/ Inspection Jobs Reliance at SEZ-FCCU Area Reliance Industries Limited Jamnagar 12 1.5 Month Completed Jamnagar Gujarat. Refinery

Service contract for ‘Rotary & Static Equipment ISRL 11. Maintenance’ at ISRL petrochemical Complex, 36 Months Continue... Panipat Rubber plant, Panipat, Haryana. Fabrication, Erection, Testing and Commissioning of Piping along with Rotating Equipment’s includes CS,AS,SS,P91, 904L, LTCS, Rubber Line, 12. Jacketed piping, Cast Iron (5,10,000 Inch Meter) OCFL 24 Months Completed of 2 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL Paradeep Orissa Fabrication, Erection, Testing and commission of piping (Executed Qty: - 74000 INM which includes P-91, P-11, 22, SS- 304L, 316L, 310 L,CS) OMPL/TOYO/ 13. of combined cycle of 72 MW including 12 Months Completed THERMAX commissioning of HRSG, GTG and STG at OMPL (Petrochemical Complex) at Mangalore, Karnataka. Erection, testing & commissioning of complete sulphur furnace package with burners, Boiler 06 14. drum, furnaces, IBR & NIBR piping at IOCL, IOCL/ISGEC Completed Months Panipat Refinery.

Structural Steel Fabrication/ Mechanical and Reliance other related Works at SFS- SEZ, RIL- Jamnagar J3 15. Jamnagar 30 Months Completed Project Refinery

Reliance Structural Erection works-MEG area 16. 08 Months Completed Jamnagar Reliance 16. Mechanical structural erection at SEZ PCG area Jamnagar 01 Year Completed

3 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Reliance 17. Circular Platform Erection works SEZ-MEG area Jamnagar 02 Months Completed

Turn around Maintenance of SAP & PAP at 01 MT 18. capacity at ICS-Senegal (International). Includes ICS Senegal 06 Months Completed Piping, Equipment’s(rotary +Static) Assembly and Erection of steel stack along with OMPL/TOYO/ 19. Platforms of 74 Mtrs height of 72MW at OMPL, 03 Months Completed THERMAX Mangalore, Karnataka (QTY -02 No. stacks). Assembly, Erection, Testing and Commissioning of Static and Rotating Equipments(Total Weight 20. 19000 MT) of 02 Million Tonne Capacity Di OCFL 22 Months Completed Ammonia Phosphate Fertilizer Plant at OCFL, Paradeep, Orissa Fabrication of Pressure Vessels and Evaporators. 21. Y’NAGAR/ ISGEC 1.5 Years Completed Fabrication, Assembly, Welding, Pre/Post Weld 22. Treatment and Hydro Testing of Headers. Y’NAGAR/ ISGEC 36 Months Completed

23. Inspection and correction of turbine bearing no. 01 to MCCPL, CG 01 Months Completed 09, alignment of MOP & Bearing gear at 1x 300 MW MCCPL, Bandhakhar, Chhattisgarh. Annual Overhauling of Turbine & Auxiliaries of Unit 1 ACBIL 01 Month Completed 24. & 2 at 2x135 MW, ACBIL, Kasaipali, Chhattisgarh 25. Services for erection & commissioning of the KFCL, Kanpur 2 Month Completed Drum Belt at KFCL, JAIPRAKASH ASSOCIATES LIMITED. 26. Triennial Maintenance (Running Maintenance, NTPC Limited, 36 Month Continue… Breakdown Works) Contract of Boiler, Turbine, Kudgi Air Compressors and AC of Stage-I (3 X 800 MW) Units at NTPC Kudgi, Karnataka

Triennial Maintenance (Running Maintenance, Continue… 27. Breakdown Works) Contract of Balance of Plant NTPC Limited 36 Month (BOP) of Stage-I (2 X 800 MW) Units at NTPC Gadarwara Gadarwara

28. Providing Complete mechanical maintenance Service including preventive maintenance, regular Continue… maintenance & break down maintenance of Boiler & its Auxiliaries (including ESP), Turbine & Rajasthan Ltd. 24 Month its Auxiliaries and BOP and Boiler tubes weld joints repair for Unit-I & II, Kawai Thermal Power Plant, Rajasthan

4 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Operation & Maintenance of Ore Beneficiation Hindustan Zinc 36 Months Continue… 29. Plant of Zinc of 2.7 mm MT of Hindustan Zinc Limited limited, Zawar Mines, Udaipur Rajasthan. Operations Support Services in Ash Handling CGPL Gujarat 24 Continue… 30. Plant (AHP) of 5X800 MW Costal Gujarat Power Months Limited (CGPL), Mundra Gujarat. Operation & Maintenance Services of Ash Handling L&T Nabha 12 + 24 Continue… 31. Plant (AHP), Mill Reject System (MRS) and Recovery Power Months system WRS at 2X700 MW Nabha Power Limited. Annual Mechanical Maintenance Contract for Boiler & Continue… 32. its Auxiliaries, TG & its Auxiliaries, Balance of Plant, STEAG/TSPL 60 Operation Assistance in Water Treatment Plant Months including material handling and Housekeeping of 3x660MW Super Critical Power Plant of M/S Talwandi Sabo Power Limited,Vill. Banwala, Dist. Mansa, Punjab for Five Years. Operation and maintenance of Boiler, Ash TSPL/Vedanta 36 Months Completed Handling & its Auxiliaries of 3x660 MW Super Group 33. Critical Thermal Power Plant at Talwandi Sabo, Mansa Punjab. Routine, Preventive, Predictive Maintenance of LANCO 36 + 36 Continue… 34. Boiler, Turbine and Auxiliaries, All Pumps, DM Months water plant, Fans of Cooling Towers, Fans, Compressors, HFO system, Ash Handling & BOP etc. of 2x600 MW at LANCO Anpara Power Corporation Ltd, Uttar Pradesh. Commissioning Support for Complete Power DB POWER 24 Months 35. Plant for Mechanical, Electrical and C&I for BTG, Completed BOP Equipment, Associated Piping, CHP & AHP of 2x600 MW DBPL BADAHARA, Chhattisgarh Complete Maintenance (Routine, Breakdown, SEL IPP/ EESI 52 Months Completed 36. Preventive) of Boilers along with its auxiliaries of 4 x 600MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda Maintenance for the housekeeping and material SEL IPP/ EESI 36 Months Completed 37. management of 4 x 600 MW boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda Field Operations of BOP of 4 x 600 MW Boilers at SEL IPP/ EESI 42 Months Completed 38. Evonik Energy Service(India) Pvt. Limited Jharsuguda Annual Maintenance Contract of Boiler, Mill & its Reliance Rosa 36 Months Continue… 39. Auxiliaries of 4x300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh. AMC for Preventive, Running, Predictive and LANCO- 36 Months Continue... 40. Breakdown Maintenance of Boiler, Turbine Amarkantak

5 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd. AMC for Preventive, Running, Predictive and UPCL 24 Months Completed 41. Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd. Operation & Maintenance of Ash Handling Plant 42. CPP Unit 3 & 4 (4X300 MW) at JSW Energy JSW 36 Month Continue... Limited, Bellary, Karnataka.

Annual Maintenance, Preventive Maintenance & 43. Breakdown Maintenance of Boiler, Turbine and JSW 36 Month Continue... its Auxiliaries CPP- I,II,III,IV & SBU- I,II at 1690 MW JSW Energy Limited, Bellary Karnataka. AMC for Mechanical Preventive Maintenance & JSW 24 + 12 Completed 44. Misc. Services of Boiler and Auxiliaries of SBU 2 Months and CPP3&4 units Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. AMC for Mechanical Breakdown Maintenance & JSW 24 + 12 Completed 45. Misc. Services of Boiler, CHP and Auxiliaries of Months SUB2 and CPP3&4 Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka. Maintenance Contract of BTG & Mill Reject TRN Energy 36 Months Continue… 46. System at 2X300 MW TRN Energy Private Limited Limited,Vill-Bhengari, Po- Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

Maintenance Work For Electrical and C & I at TRN Energy 36 Months Continue… 47. 2X300 MW TRN Energy Private Limited, Vill- Limited Bhengari, Po-Nawarpara(Tenda), Tehsil- Gharghoda, Raigarh (C.G.)

Annual Service Contract for Maintenance of Main TRN Energy 12 Months Completed 48. Plant and Plant Water System at 2X300 MW TRN Limited Energy Private Limited, Vill-Bhengari, Po- Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)

6 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Operation & Maintenance of Ash Handling Plant TRN Energy 12 Months Completed 49. at 2 X 300 MW TRN Energy Pvt.Ltd, Vill-Bhengari, Limited Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.) Maintenance work for Electrical and Control & Maruthi Clean & 12 Months Completed 50. Instrumentation of 1x300 MW Thermal Power Coal power Ltd Plant. Complete Operation & Maintenance Services for GVK 36 Months Continue... 51. BTG, BOP, Switch Yard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at Goindwal Sahib, Punjab.

Field operations of Boiler, Coal Mills, Fans, DM GVK 36 Months Completed 52. Plant, FOPH, CW/ RW / FF / SW / PW/ ETP/ STP, Turbine & its Auxiliaries, ESP, Ash Handling Plant, Switch Yard, Switch Gears including HT / LT System etc. of 2 x 270 MW Power Plant at Goindwal Sahib, Punjab. Annual Mechanical Maintenance & Operations of JSPL 12 Months Continue... 53. Boiler Turbine Generator & BOP of 4x135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh.

Annual Contract for Operation & Maintenance of ACB-Spectrum 12 + 12 Completed 54. Boiler & its auxiliaries, Turbine auxiliaries, CHP, Coal & Power Months AHP, WTP and BOP at 2x50MW Spectrum Coal & power limited, Chhattisgarh.

Operation & Maintenance of 1 X 18 MW solar KEC International 36 Months Completed 55. Power Plant of KEC International at Jalaun, Uttar Pradesh.

Operation & Maintenance of 5 MW solar IOCL 36 Months Continue... 56. Photovoltaic Power Plant at IOCL, Rawra Rajasthan

7 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Operation and Maintenance of complete Coal PTPS / TECPRO 07 Months Completed 57. Handling Plant – II of 2x210 MW, PTPS-HPGCL, Panipat Haryana

Operation & Maintenance of PTPS / TECPRO 07 Months Completed 58. Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal handling Plant – III of 2x250 MW, PTPS-HPGCL, Panipat Haryana Maintenance of all Equipment’s of Conveyor PTPS / HPGCL 07 Months Completed 59. System (Routine & Breakdown) & Heavy Equipment’s of Coal Handling Plant – II of 2 x 210 MW PTPS-HPGCL, Panipat Haryana Complete Mechanical Maintenance of PTPS/ HPGCL 24 Months Completed Equipment’s of Conveyor System of Coal Handling 60. Plant-I of 4 x 110 MW Boilers.

Complete Mechanical Maintenance of Crusher, PTPS/ HPGCL 15 Months Completed 61. RDM, Wagon Tippler, Motors, and other Allied Equipment’s installed at CHP-II of 2 x210 MW PTPS-HPGCL, Panipat Haryana.

Renovation & Modernization of Conveyor Belts PTPS/ RMEC 06 Months Completed 62. by replacing existing Toughing Idlers frame with Rollers, Flat Return Idlers, Toughing Training Idlers, Return Training Idlers & Impact Idlers of 20 Toughing Angle with 35 Toughing Angle Idlers & replacement of Vibrating Feeders, Flap Gates, Transfer Chutes of Coal Handling Plant – I of 4 x 110 MW, PTPS-HPGCL, Panipat Haryana. 63. Complete Maintenance of Tube Coal Mills, RC PTPS/ HPGCL 15 Months Completed Feeders & Vibrators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 6 Complete Maintenance of Coal Mills, RC Feeders, PTPS / HPGCL 15 Months Completed 64. PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit – 1 & 2.

Complete Maintenance of Coal Mills, RC Feeders RGTPP/ 15 Months Completed 65. of 2 x 600 MW Boiler at Unit–1&2

8 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Complete Maintenance of Coal Mills, RC Feeders PTPS 15 Months Completed 66. & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 Complete Maintenance of Coal Mills, RC Feeders PTPS/ HPGCL 15 Months Completed 67. & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5 Complete Maintenance of Coal Mills, RC Feeders DCRTPP/ HPGCL 15 Months Completed 68. and PF Piping of 2x300 MW at Unit – 1&2.

Complete Maintenance of Coal Mills, RC Feeders, PTPS/ HPGCL 15 Months Completed 69. PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit 1 & 2. Complete Maintenance of Coal Mills, RC Feeders DCRTPP/ HPGCL 15 Months Completed 70. and PF Piping of 2x300 MW at Unit – 1&2.

Routine/Breakdown/Capital Maintenance of all PTPS/ HPGCL 15 Months Completed 71. Electrical & Electronics (C&I) Equipment’s of Unit – 7&8

Routine, Breakdown & Capital Maintenance of all PTPS/ RMEC 15 Months Completed 72. Electrical & Electronics (C&I) Equipment’s in CHP- II of 2 x 210 MW Boilers. Routine/Breakdown/ Capital Maintenance of all PTPS/ HPGCL 15 Months Completed 73. Electrical & Electronics (C&I) Equipment of Unit 2x250 MW – 7&8

Routine/Breakdown/ Capital Maintenance of all PTPS/ RMEC 15 Months Completed 74. Electrical & Electronics (C&I) Equipment of Coal Handling Plant – III of 2x250 MW

75. Routine/Breakdown/ Capital Maintenance of all PTPS/ HPGCL 07 Months Completed Electrical & Electronics (C&I) Equipment of CHP-II of 2x210 MW Boilers 76. Maintenance / Replacement of Fabric / Conveyor PTPS / HPGCL 04 Months Completed Belt Compensators over existing Metallic Expansion Joints of Boiler of 110 MW at Unit -2

9 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Annual Overhauling Works

S. No. Description of Works Plant / Client Duration Status Name 1. Annual overhauling of Boiler Pressure Part, APH, FAN, Coal Essar Power 01 Month Continue… Burner, Safety valves 2X600 MW Essar Power M.P Limited , M.P Limited Bandhora, Waidhan , M.P 2. Annual Overhauling of Boiler Pressure Part, APH, Fans, ESP & Reliance Rosa 01 Month Continue… Coal burner of Unit 1 & 3 of 4x300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh. 3. Annual Overhauling of Boiler Pressure Part, Esp Duct & TSPL, Punjab 01 Month Continue… Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. 4. Annual Overhauling of Boiler Pressure Part, Esp Duct & TSPL, Punjab 01 Month Completed Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. 5. Annual Overhauling of Boiler Pressure Part, Esp Duct & TSPL, Punjab 01 Month Completed Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab. 9. Annual Overhauling of Boiler & its auxiliaries of U #50 at Costal TATA POWER - 02 Months Completed Gujarat Power Limited (TATA POWER-5X800 MW), Mundra. CGPL 10. Annual Overhauling of Boiler & its auxiliaries of Unit #40 at TATA POWER - 02 Months Completed Costal Gujarat Power Limited (TATA POWER-5X800 MW), CGPL Mundra 11. Annual Overhauling of Pressure Parts of Boiler unit #1 and CLP 2 Months Completed Unit #2 at 2x600 MW CLP Jhajjar- Haryana 12. Annual Overhauling of APH & Fans of unit #1 at 2x600 MW CLP 01 Month Completed CLP Jhajjar- Haryana 13. Misc. work During Overhauling including Vortex Plate & APH JSPL 01 Month Completed tube replacement in 4 x135 MW JSPL, Korba, CG 14. Annual Overhauling of ESP, APH of SBU #2, CPP3 at 4X300 MW JSW 02 Month Completed JSW Energy, Bellary 15. Annual Overhauling of Boiler and Turbine with auxiliaries at JSW 02 Months Completed 4X300 MW JSW Energy, Bellary

16. Annual Overhauling of LT Motors at 4X300 MW JSW Energy, JSW 02 Months Completed Bellary 17. Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL 02 Months Completed JSPL, Raighar. 18. Annual Overhaul activities of Boiler, Burner, Valve, Pressure JSW/Bellary 09 Days Completed Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2x300 MW 19. Annual Overhaul activities of Boiler, Burner, Valve, Pressure JSW/Bellary 45 days Completed Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2x300 MW 20. Capital Overhauling of Pressure Parts, Burners, Pent & Dog SEL IPP/ EESI 01 Completed

10 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

House, Fans – (ID/FD/PA/SA), Valves, Ducting, Pumps, Month Compressors, Gates and Dampers etc. of 2 x 600 MW Power Plants at Jharsuguda. 21. Annual Overhauling of Turbine, Boiler and its Auxiliaries, APH & JSW Energy 01 Months Completed Fans with auxiliaries at CPP 2 at JSW Energy, Bellary Limited

22. Annual turbine, Generator overhauling of Unit -II & IV at Guru GGSSTTP 01 Months Completed Gobind Sinagh Thermal Power Station , Rupnagar, Punjab.

23. Capital Overhauling of ESP & Bag Filters of 2 x 600 MW Power SEL IPP/ EESI 01 Month Completed Plants at Jharsuguda. 24. Capital Overhauling of Coal Mills, Gates & Dampers of 2 x 600 SEL IPP/ EESI 01 Month Completed MW Power Plants at Jharsuguda. 25. Capital Overhauling of Air Pre Heaters of 2 x 600 MW Power SEL IPP/ EESI 01 Month Completed Plants at Jharsuguda. 26. Replacement of Support/Guide Bearing of APH of 2 x 600 MW HPGCL/REL 01 Month Completed at Hisar. 27. Capital overhauling of unit-3 of 110Mw at PTPS Panipat PTPS 1.5 Months Completed complete pressure parts. 28. Commissioning Support for Mechanical Maintenance Work of NPL 06 Months Power Plant Equipment’s, Piping, Valves etc. at 2x700 MW NPL Completed Rajpura, Punjab 29. Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP JSPL 1.5 Months Valve, BED Nozzles etc. For 135 MW Power Plant at Angul, Completed Orissa. 30. Annual Overhauling of Boiler Pressure Parts, IBR HP Valve, JSPL 01 Month BED Nozzles etc. For4x 135 MW Captive Power Plant at Completed Dongamahua, Tamnar, Raigadh. 30. Annual Overhauling and Annual Maintenance of Boiler, Boiler JSPL 01 Month Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Completed Captive Power Plant at Dongamahua, Tamnar, Raigadh. 31. Capital Overhauling of Pressure Parts (First pass & Second Pass PTPS /HPGCL 01 Month Completed ) of Unit # 5 of 210 MW capacity at PTPS, Panipat 32. Capital Overhauling of Pressure Parts (First pass & Second Pass PTPS / HPGCL 01 Month Completed ) of Unit # 4 of 110 MW capacity at PTPS, Panipat 33. Capital Overhauling of Pressure Parts, Burner, RAH, Pent PSEB/ ALSTOM 01 Month House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler Completed at Unit – 2 34. Capital Overhauling of Pressure Parts, Burner, RAH, Pent PSEB/ ALSTOM 01 Month House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler Completed at Unit – 2 35. Capital Overhauling of Pressure Parts, Burner, RAH, Pent PSEB/ ALSTOM 01 Month House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler Completed at Unit – 3 36. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent PSEB/ PCP 01 Month Completed House, Ducting, Erection of the Sky Climber, ESP at Unit -4 37. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent PSEB/ PCP 01 Month Completed House, Ducting, Erection of the Sky Climber, ESP at Unit 5

11 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

38. Capital Overhauling of RAH, ESP, Dampers & Gates & Ducting PTPS / HPGCL 01 Month Completed of 210 MW Boiler at Unit-6 39. Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 PTPS/ RMEC 01 Month Completed MW Boiler at Unit-6 40. Overhauling of complete Pressure Parts, Pent House, APH of PTPS/ HPGCL 01 Month Completed 110 MW Boiler at Unit-2 41. Overhauling of Pressure Parts, Cleaning, Washing & Repairing PTPS/ HPGCL 01 Month Completed of the Pent House of 110 MW Boiler at Unit – 3 42. Overhauling of RAH, ESP, Gates & Dampers, various Ducts of PTPS/ HPGCL 01 Month Completed 210 MW Boiler at Unit-5 43. Repair/Rectification of 6 Nos. Damaged ESP Fields / ESP PTPS/ HPGCL 01 Month Completed Structure along with Replacement of the Slide Bearing of 210 MW Boiler at Unit-6 44. Overhauling of Instrument Air Compressor of 110 MW Boiler at PTPS/ HPGCL 01 Month Completed Unit-2 45. Overhauling Work of Repairing of Pent House, Boiler Drum PTPS / HPGCL 01 Month Completed. Internals, Inspection and Repairing of Hangers of 110 MW of Doing from Unit -3. last 7 years

12 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

Major Experience of Electrical and C & I jobs in Power Plant, Refinery or Petro Chemicals

Sr. Description of Works Plant / Client Duration Status No Name 1. Composite Electrical works in upcoming Oil Refinery including Erection, Testing & commissioning of Dangote 18 Transformers, LT/ HT Bus bars, HT/LT Motors, Laying Continue… Refinery Months HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria. 2. Assembly Erection, Testing & Commissioning of Skipper Nigeria H&M Equipment’s for Kano Hydro Electric Project for 8 Months Continue… Limited Skipper Nigeria Limited, at Tiga Site, Nigeria 3. Complete Operation & Maintenance Services for BTG, GVK 36 Continue... BOP, Switch Yard, Electrical and C&I and Auxiliaries Months including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at GOINDWAL Sahib, Punjab.

4. Maintenance Work For Electrical and C & I at 2X300 TRN Energy 36 Continue… MW TRN Energy Private Limited, Vill-Bhengari, Po- Limited Months Nawarpara (Tenda), Tehsil-Gharghoda, Raigarh (C.G.) 6. Commissioning Support for Complete Power Plant DB POWER 24 for Mechanical, Electrical and C&I for BTG, BOP Months Completed Equipment, Associated Piping, CHP & AHP of 2x600 MW DBPL BADAHARA, Chhattisgarh 7. Operation & Maintenance of 5 MW solar IOCL 36 Continue... Photovoltaic Power Plant at IOCL, Rawra Rajasthan Months 8. Maintenance Work for Electrical and Control & Maruti Clean & 12 Completed Instrumentation of 1x300 MW Thermal Power Plant. Coal power Ltd Months 9. Operation and maintenance of Boiler, Turbine STEAG/HMEL 24 generator including BOP & Electrical and C&I of 165 months Completed MW combined cycle based power plant at HMEL, Bathinda (Punjab). 10. Operation & Maintenance of 1 X 18 MW solar Power KEC 36 Completed Plant of KEC International at Jalaun, Uttar Pradesh. International Months 11. Annual Maintenance Contract for Electrical and C&I Hindustan 36 Completed System and Technical Support Services including Power Months Module Cleaning of 3X25 MW Solar Power Plant of

13 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in

CONTACT DETAILS

Registered Office: Registered Office: Suite 106, National Engineering Centre 208, Virat Nagar Panipat, Haryana CBD, Abuja, FCT Corporate Office: Corporate Office: 218, Virat Nagar Panipat, Haryana 4, Amore Street off Toyin Street, Ikeja, Lagos State Contact Person: 1. Harsimran Singh Contact Person: Mob:+91-9355650017 1. Mr. Amandeep Singh Email: [email protected] Mob: +234 8180 382 394 2. Amar Kumar Singh- DGM Contracts Email: [email protected] Mob:+91-8684000421 2. Mr. PN Gopa Kumar Email: [email protected] Mob: +234 7084 905 677 Email:[email protected]

14 SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599

[email protected] –www.simar.co.in